Loading...
HomeMy WebLinkAboutSW8960326_CURRENT PERMIT_20220314STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0I�L o3210 DOC TYPE © CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2oZ2 o3�y YYYYMMDD t ROY COOPER Governor EU7ABETH S. BISER Secretary BRIAN WRENN Director March 14, 2022 DWNR LLC Attn: Charles Donald Williamson, Manager 310 Western Blvd Jacksonville, NC 28546 NORTH CAROLINA EnHronrnental Quality Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 960326 Don Williamson Nissan Onslow County Dear Mr. Williamson: Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR"). All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on March 9, 2022. The Division is hereby notifying you that permit SW8960326 has been renewed, updated, and re -issued on March 14, 2022, as attached. Please be aware that the renewal and re -issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until June 20, 2028 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919431-3000, or visit their website at www.NCOAB.com. Unless such demands are made this permit shall be final and binding. If yyou have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Oftce, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, Q ,9;; Brian Wrenn, Director Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardirul Drive Extension I Wilmington. North Carolina 28405 �� 910.796.7215 State Stormwater Permit No. SW8 960326 Page 2 of 2 Enclosures: Attachment C — Permitting History Renewal Application Documents DES/ams: %Stormwater\Permits & Projects\ 1 996\960326 HD\2022 03 permit 960326 cc: Betty Bullock; John L. Pierce & Associates, PA; P.O. Box 1682; Jacksonville, NC 28541 Don Williamson; DWNR LLC; 2445 N. Marine Blvd; Jacksonville, NC 28546 Wilmington Regional Office Stotmwater File D Q�,.� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North. Carolina 28405 910,796.7215 Post -Construction Stormwater Management Permit No. SW8 960326 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY ALTERNATIVE DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO DWNR LLC Donald Williamson Nissan 310 Western Boulevard, Jacksonville, Onslow County FOR THE construction, operation and maintenance of an alternative design stormwater control system, in compliance with the alternative design criteria provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications') as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until June 20, 2028 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 of this permit. The Stormceptor® STC 1800 has been designed to handle the runoff from 46,072 ft2, and the sediment pits have been designed to handle the runoff from 31,000 ft2 of impervious area. 3. The tract and each drainage area will be limited to the amount of built -upon area indicated in Section 1.2 of this permit, and as indicated on the approved plans. 4. The plans previously approved on April 4, 1997 remain in full force and effect for this transfer to DWNR, LLC. Page 1 of 5 Post -Construction Stormwater Management Permit No. SW8 960326 5. The following design criteria have been approved for the alternative BMP's, and must be maintained at design condition: Stormwater BMP: Stormceptor® STC 1800 a. Design Depth: N/A b. Permanent Pool Elevation: N/A c. Proposed BUA: 46,072 ft2 d. Required 1" Storage Volume: 3,650 ft- e. Provided Storage Volume: OO 3,833 ft- f. Temporary Storage Elevation: g. Controlling Orifice: In. TSS Removal: i. Time to drawdown: j. Receiving Stream: k. Stream Index Number: I. Stream Classification: n/a .02 cfs pump discharge 85% 53 hours Scales Creek WOK02 19-16-4 "SC HQW NSW' Sediment Pits 2.5' feet 44 MSL 31,000 ft2 1,314 ft3 cubic feet 2,255 ft3 46.5 MSL 24" perforated riser pipe 85% N/A OO Available in 273 If 48" pipe, 75 If 18" pipe, and 244 cf within STC 1800 unit itself. II. SCHEDULE OF COMPLIANCE 1. The permittee is responsible for verifying that the built -upon area within each drainage area does not exceed the maximum allowed under this permit. 2. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 3. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface except roads. 4. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. Page 2 of 5 Post -Construction Stormwater Management Permit No. SW8 960326 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan for each BMP must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the pump and outlet structure must be available at all times. The pump shall be inspected every 6 months, cycled, and routine maintenance peformed. The pump shall be maintained in good eperating condition. If the pump fails, immediate repair/replacement to original design specifications is required. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. The required Designer's Certification for the permitted project was submitted on May 15, 2012. A modification may be required for those deviations. 9. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. Page 3 of 5 Post -Construction Stormwater Management Permit No. SW8 960326 TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased, ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur. b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Page 4 of 5 Post -Construction Stormwater Management Permit No. SW8 960326 Permit renewed, updated and reissued this the 14th day of March 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Brian Wrenn, Director-N Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 960326 Page 5 of 5 Attachment C - Permitting History Don Williamson Nissan Permit No. 5 W 8 960326 Approval Permit BUMS Description of the Changes Date Action Version 5/29/1996 Original 10 Approval Previously permitted for 4/4/1997 Modification 1.1 grass swales and dry detention. Proposal to utilize a Stormceptor 6/20/2012 Renewal 2.0 from Cardinal Motors to DWNR LLC and name 8/8/2012 Transfer 2.1 change to Don Williamson Nissan 3/14/2022 Renewal 3.0 lExpires June 20, 2028 OPERATION AND MAINTENANCE PLAN FOR DRY BASINS CARDINAL MOTORS EXPANSION, ONSLOW COUNTY All grassed areas of an extended dry detention basin should be mowed at least twice annually. Extended dry detention basins will tend to collect debris, and .it should be removed whenever it accumulates, or at least twice annually. Pond should be inspected annually after a rain event to ensure that the basin is operating as designed. At a minimum, items that should be included in the inspection are: 1. clogging of the outlet or too rapid a release 2. erosion on the banks 3. erosion at the inlet and outlet 4. sediment accumulation and the need for removal 5. condition of the emergency spillway, and 6, woody vegetation in the embankment "ATU00=WINtR/CLIFTON JACOBS OWNER'S ADDRESS: C/0 cardinal Motors, J_.0 Western Blvd_ Jd-Qk zonvi 1 1 e NC 28�4Q SUBSC�BED AND SWORN BEFORE ME THIS .DAY OF/(✓��a 1996. NOTARY PUBLIC MY COMM;$8 C�9UI,�xPIRES 'NOTAO VBLIC 000Nr;.. Date Received Fee Paid I Permit Number # 03 -I�f SV \DCJtfhu NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 960326 2. Project name: Don Williamson Nissan 3. Project street address: 310 Western Blvd City: , 28546 County: ZIP 4. What, if any, changes have been made to the project as permitted? None, except a Site Plan Modification occurred in 2011 which resulted in LESS QUA than what previously existed, in order to meet City of Jacksonville landscaping ordinance requirements. If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deg,nc.gov/about/divisions/energy- mi nera I -Ian d-resources/energv-mi nera I -la nd-rules/stormwater-pros ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energv-mineral-land- resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: DWNR. LLC 2. Signing Official's Name: Charles Donald Williamson 3. Signing Official's Title: Manager 4. Mailing Address: 310 Western Blvd. City: Jacksonville State: NC ZIP 28546 5. Street Address: 310 Western Blvd City: Jacksonville 28546 6: Phone: (9910)) 353-7700 Email: Stormwater Permit Renewal Form Page 1 of 3^ — May 11, 2018 4f C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: DKN 1. A permit application processing fee of $505.00 payable to NCDEQ. DKN 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. DKN 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. DKN 4, O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. DKN 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. n/a 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. DKN 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the INC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration PARR 0 9 2022 Stormwater Permit Renewal Application Form Page 2 of 3 BY'�- May 11, 2018 D. PERMITTEE'S CERTIFICATION I, Ch e3 DoNAti Q 1 I t iRrrx;o 0 , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the 0&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All Information r9viQed on this permit renewal application is, to the best of my knowledge, go r)ect and Pomp te. / A I M L,/D—ate: 3 1J3la'a N T RI IS-e\��C ^ I, M �,r/h/h� �J�/ 1 , a Notary Public for the State of l_ a +I t v\ County of do hereby certify that S I k� 10 MIZWY)personally appeared before me this the 9 f L-Aday of W Q yr n 20� and acknowledge the due B"cution. of ther of n tr men .Witness my hand and official seal, KELSEY BENSON Notary Public, North Carolina (Notaq Segl slow County y o mission Expires February 28. 2023 Notary Signature: ^«/W _r vv My commission expires C&— o c p'ao a—. —.. t=O.oI=6 V L_ MAR 0 9 2022 8Y: Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 03/07/2012 13:47 FAX 910 455 3817 Cindy Sha mun r10004/0012 Ms. Jacobs and Mr. Williamson March 2, 2012 SWB 960326 Cardinal Motors Page 1 of 2 Onslow County Stormwater Proiect No. SWS 960326 Designer's Certification as a duly registered/ ly ull(., the State of North Carolina, having been authorized to observe (periodically week time) the construction of the project, for rt/ wlU_//9>'/%�cJ 1/ (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and Intent of the approved plans and specifications. Required Items to be checked for this certification to be considered complete are on page 2 of this form. Noted deviations from approved plans and specifications: Signature - late ±�%�► CA gel SEAL 1 Pjaw i ��p1`,� ,N �P : •r c ECEIVE MAY 15 2012 .,a. ��n.• �iy. •',c�fl�.a r.r•%,. �,�?�pizz?r rya, vg,. y z _ ;: )A]?, Spt&I �'e'y''�-334St'�:3� Y�' ,, _�.���i�i`� ,: :\', .. � `\ . \ .,� __- 03/07/2012 13:47 FAX 010 456 3617 Cindy Shannon/10005/0012 Ms. Jacobs and Mr. Williamson March 2, 2012 SW8 960326 Certificafion Requirements: Page 2 of 2 j�dl The.dralnage area to the system contains approximately, the permuted acreage. .. The drainage area to the system contains no more then the permitted amount of'built-uponarea.. . All the built -upon area associated with the project is graded such tiist the t ! /n runoff drains to the system. /!, / 6. The ou0et/bypass structure elevations are per the approved plan. ��' The outlet.struclure is located per the approved plans. .Trash rack istprovided on the outlet/bypass structure, 77 Vj All slopes are grassed with permanent vegetation. ifegetatect'slopes-are no steeperthan / a /9. The inlets are located per the approved, plans, and do not cause short- circuiting of the system. 0. The permitted amounts of surface area and/or volume have been,provided. 7�L4411. Required drawdown devices are correctly sized per the approved plans.. &='2. All required design depths are provided. Alz� . All required parts of the system are provided, such as a vegetated shelf, and, �r7 a forebay. Q/LU4. The dimensions of the system, as shown on the a ' y pproved plans, are ' provided. cc: NCDENR-DWQ Onslow, County Building Inspections