Loading...
HomeMy WebLinkAboutSW8130501_HISTORICAL FILE_20130530STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 13 0 5 01 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS NHISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2013 05 30 YYYYMMDD r� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. John E. Skvarla, III Governor Director Secretary May 30, 2013 Mr. Henry D. Butts., Jr., Vice President S.T. Wooten Corporation PO Box 2408 Wilson, NC 27893 Subject: State Stormwater Management Permit No. SW8130501 Burton Industrial Park — Concrete Plant for S.T. Wooten Corporation High Density Commercial Wet Detention Pond Project Onslow County Dear Mr. Butts: The Wilmington Regional Office received a complete Stormwater Management Permit Application for the Burton Industrial Park — Concrete Plant for S.T. Wooten Corporation on May 29, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 130501 dated May 30, 2013, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until May 30, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson, at (910) 796-7215. Sincerely, (� Charles akild, P.E., Director Division of Water Quality GDS/ can: S:\WQS\Stormwater\Permits & Projects\130501\130501 HD\2013 05 permit 130201 cc: Ryan Fisher, Withers & Ravenel Onslow County Building Inspections Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910350-20041 DENR Assistance: 1-877.6238148 NorthCarolina Internet www.ncwaterquality.org Naturally An Equal Opportunity l Alarmative Acton Employer (/y ` llsLs State Stormwater Management Systems Permit No. SW8 130501 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO S.T. Wooten Corporation Burton Industrial Park — Concrete Plant for S.T. Wooten Corporation Burton Park Boulevard, Jacksonville, Onslow County FOR THE construction, operation and maintenance of two (2) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until May 30, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.9 of this permit. The stormwater controls labeled BMP 1 and BMP 2 have been designed to handle the runoff from 197,065 and 65,340 square feet of built -upon area, respectively. 3. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 4. A vegetated filter strip is not required for this pond as it has been designed for a 90% total suspended solids removal efficiency. 5. The level spreaders shown on the plans are not required for 90% ponds by the stormwater rules and have not been demonstrated to meet the State Stormwater BMP design requirements and therefore are not considered a part of the approved state stormwater treatment system. These additional measures are incorporated only by reference and are not enforceable parts of the permit. 6. The tract will be limited to the amount of built -upon area indicated in this permit, and per approved plans. The built -upon area for the future development within the drainage areas of BMP 1 and 2 is limited to 7,877 and 3,414 square feet, respectively. Paqe 2 of 7 State Stormwater Management Systems Permit No. SW8 130501 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 8. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. 9. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: Design Criteria BMP 1 BMP 2 a. Drainage Area, acres: Onsite, ft2: Offsite, ft2: 5.06 220,414 0 1.7 74,052 0 b.Total Impervious Surfaces, ft : Onsite, ft2: Offsite ft2: 197,065 197,065 0 65,340 65,340 0 d. Design Storm, in: 1.5 1.5 e. Average Design Depth, ft: 5.0 3.0 f. TSS removal efficiency: 90% 90% g. Permanent Pool Elev., FMSL: 36.5 40.0 h. Perm. Pool Surface Area, : 14,224 8,696 i. Permitted Storage Volume, ft: 57 9,583 . Temporary Storage Elev., FMSL: 41.0 k. Pre-dev.1- r, 24-hr dischar a rate, cfs:4 0.45 I. Controllin Orifice, (P Inches: j38.0 1.5 m. Orifice flow rate cfs: 1 0.03 n. Permitted Foreba Volume, ft: 75 4,394 o. Max. Fountain HP: n/a p. Receiving Stream/River Basin New River / White Oak q. Stream Index Number 19- 1 r. Classification of Water Body C NSW II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Paqe 3 of 7 State Stormwater Management Systems Permit No. SW8 130501 5. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in BMP 1 is 1/6 horsepower. A fountain is not permitted in BMP 2 as the permanent pool volume is less than 30,000 ft3. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Pape 4 of 7 State Stormwater Management Systems Permit No. SW8 130501 13. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Any individual or entity found to be in noncompliance with the provisions of this storrmwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in G.S. 143 Article 21. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 30th day of May, 2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quali{yr V� v By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 130501 Burton Industrial Park — Concrete Plant for S.T. Wooten Corporation Stormwater Permit No. SW8 130501 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Pape 6 of 7 State Stormwater Management Systems Permit No. SW8 130501 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Paqe 7 of 7 Nelson, Christine From: Fisher, Ryan [rfisher@withersravenel.com] Sent: Tuesday, May 28, 2013 1:17 PM To: Nelson, Christine Cc: Butch Lawter; Werenko, Dale; Diaz, Jennifer Subject: ST Wooten - Burton Park Recorded Deed Attachments: DB3992PG971—Recorded Deed.pdf Christine — Attached is the recorded deed of the Burton Park property that S.T. Wooten acquired on 5/23/2013. This should be the last document needed for the issuance of the final stormwater permit to S.T. Wooten. If you have any questions, let me know. Thank you, Ryan Fisher, PE WITHERS L'KRAVENEL 115 MacKenan Drive I Cary, NC 27511 Phone: 919.469.3340 1 Fax: 919.467.6008 Direct: 919,535.5175 rtsherno withersravenel.com www.withersravenel.com NOTICE OF CONFIDENTIALITY AND NONDISCLOSURE: This electronic message, which includes any attachments and other documents referred to herein, contains information from Withers & Ravenel, Inc. that may be proprietary or confidential. The Information is intended for the use of the addressees) only. If you are not the addressee, note that any disclosure, copying, printing, distribution, or use of the contents of this message is prohibited. If you received this message in error, please advise the sender by reply and delete this electronic message and any attachments. COPYRIGHT NOTICE: Copyright 2012 Withers & Ravenel, Inc. All Rights Reserved by Withers & Ravenel, Inc. This electronic message, any attachments thereto and all documents referred to therein are provided for the recipient's information only, and no rights are licensed, transferred or otherwise granted by the transmission of this electronic message by Withers & Ravenel, Inc. or receipt of this message by the recipient or any other parry. - uEAS CwsuxO n cmmwrt cvGuutP4 CpNE isBE w[ i.9E Ym �S -.L 'Mi!KES 9q'.x A4E MLM6nMK Wf4 MIFD nMEAeCi. 11Ir.L tFw4m 2. 0 T. 4v.£MI cW WC ;WNa t1xE r/EtE - 41 b.7RS-C]-wc. "VE %1BlK Ux1F55 x p.pwSE. - en eEnum wvE eE�: oair/aEn ow ]x5 pgavERM1 • um - rXa �M1 a Wi IPG.� w . ill%O .WYD YE - W 0.'0l Wxnw[7115 Nfwr SrOJ' �.�r���� - Ms waccrc a aucr ro .0 Ew¢vwis..cnmm�rs..wn I B:raasbE-wv � cEmao wan ro 1ME wre a• rxa w/.r. 'vueY¢__T�� - :nvxs uE ro a s[r "r .0 caBaEnss :_e.`i.'i`t'-� nv ¢uc]Eias ma .mom ow rBmoev - :�Eva:cEs- pm evo. ixs PacE sv YV BT.M U GI.GE ]6 w aoox s v]rE so - Burton Past : an aPpwnd Pbn•r0 Om.bp•ent ilr W Z.im rtLacY rwluvaxv�l, m nwtraa a U,e reapectivMvfv of Zenixp p.n+al Iwa Be.n nmvM arauM p. prIq PmY. �Q /MORE mv� .v'. env voa ZO 2 b rocs / rwcxs Px M. ♦-wRlax OI .1]M]M).1] wpmry .vows Dean vuw ew. ovip ars�ur wumm o v.aur wv meat. E•M LLa1p YR. ]¢•M LI pIgM y w.r .yr WtiM .min.' • Y yStmL. ydnn rv.* e..'.w.pew.e. �'•'."°. mar %��� wp 1�1�1Y��f01� W lciA/./d%l� • GRAPHIC SCALE • ta1'fi �:� • � p Ri ) mw' man. nrt .a+exv:•:n BARTLETT _- ENGMEERiNG @ SURJET.NG. PC xortr: u (xaa s. ..:mcR csx]aa txs) v xDd110N WP b LlE im li®mu®mmllmmoaa ar — -66 -138 day m � . cm&oQ" 0 a a of $T. {4U7MUCC-i]RATUN FINAL PLAT BURTOjV GVDUSTFML LOT4 Nelson, Christine From: Butch Lawter [Butch@stwcorp.com] Sent: Tuesday, May 21, 2013 7:57 AM To: Dale Werenko; Ryan Fisher; Jeff Radack; Nelson, Christine Subject: Fwd: Burton Ind. recorded plat Attachments: Burton Recorded Plat.PDF; ATT00001.htm Sent from my iPhone Begin forwarded message: From: "Chad Pomeroy" <chad a,Bartlettena.com> To: "Butch Lawter" <Butch ,stwcorp.com> Cc: "Tony Bartlett" <tonyb2Bartlelteny.com> Subject: Burton Ind. recorded plat Butch, I've attached a pdf of the recorded plat for Burton Industrial Park. Thanks, Chad E. Pomeroy, PLS, CFS Survey Manager Bartlett Engineering & Surveying, PC 1906 Nash Street North Wilson, North Carolina 27893-1726 Office 252 • 399 •0704 Nextel 150*26* 10933 www.bartlett.us.com Fax 252 • 399. 0804 Cell 252 •205 • 1172 maiIto:chadna bartletteng.com<blocked::blocked:: maiIto:chad(a�,bartletteng.com> MEMORY TRANSMISSION REPORT i FILE NO. 013 DATE 05.20 15:40 TO :n 919194676008 DOCUMENT PAGES 2 START TIME 05.20 15:40 END TIME 05.20 15:41 PAGES SENT 2 STATUS OK TIME :05-20-2013 15:41 FAX NO.1 NAME 'SUCCESSFUL TX NOTICE' 3ufn of Norab CArollna oepartmonr of Hnvfronment and NMu al Nmourem Wilm{nQton BaQbne� OMee Pnr Mn4u y. Governor FAX C VM SHHHT JOAn 8-Shvo.Ia //!. Seorwary No. Pagw (excl. cwcr): J Caa Prom: Phono: fal 017a6- 01— Pax: _.-sd� a 2'1 Cvdlnra Otive Hawn�on. Wnmin6ann. NC 28705 0 (9a O) 796-'1315 e M Hgml rJppnnunlry nfrlrmeuve Acnnn IImplgea State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office PaiMcCrory, Governor FAX COVER SHIFT John ESkvarJaIII, Secretary Date:� - TO ��� No. Pages (excl. cover): / To: _xQ/4,T) ' s From: Jo Casmer Co: / 7�E� 5 `��//E ✓E� Phone: (910) 796-7336 Fax: ��� _ % — � Fax: (910) 350-2004 Re: �/�� �O %�-2cYu.5 14-161G 127 Cardinal Drive Extension, Wilmington, NC 28405 e (910) 796-7215 o An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :05-20-2013 15:40 FAX NO.1 NAME FILE NO. 012 DATE 05.20 15:39 TO :n 912522430901 DOCUMENT PAGES 2 START TIME 05.20 15:39 END TIME 05.20 15:40 PAGES SENT 2 STATUS OK 'SUCCESSFUL TX NOTICE"' Sr. r. orlVurth C.rolin. nnP..rm.na or e...rro.menr .nn rv.rnr.l ae..n.m. wummeron aneln.a ome. par MpCro y. rnvwrnur PAX COVEH 6HE61' Jnnn RSR.wr/n Ol. Sacr'.bry n...: W.- P.,.. (...1. Coo a,,'� `<�po so .✓ ��� /�' Phnn.: [9rM O96-y336 P.x: 2✓6Z — Z %3 -" 090 / Pea: C9101 3502ooa .11— ...... NC 18105 - (9.0)'196-7113. M d9u.1 6PPoaNni[y A(tlrmntivn 11.. M 01 PalAIcCrory, Governor Date: To: Co: Fax: Re: State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office FAX COVET: SHEET John EShvarlaIII, Secretary 5- ZD -zD/-5 ��� �o ✓ Tn��s/iAG No. Pages (excl. cover): / Front: Jo Casmer Phone: (910) 796-7336 Fax: (910)350-2004 f5EE — /,-,' 61 i /7 /nn � G- 127 Cardinal Drive Extension, Wilmington, NC 28405 o (910) 796-7215 o An Equal Opportunity Affirmative Action Employer 4 NCDENR North Carolina Department of Environment and Division of Water Quality Pat McCrory Charles Wakild, P. E. Governor Director May 16, 2013 Mr. Henry D. Butts., Jr., Vice President S.T. Wooten Corporation PO Box 2408 Wilson, NC 27893 Natural Resources John E. Skvarla, III Secretary Subject: DRAFT State Stormwater Management Permit No. SW8130501 Burton Industrial Park — Concrete Plant for S.T. Wooten Corporation Onslow County Dear Mr. Butts: On May 16, 2013, The Division of Water Quality (DWQ), Wilmington Regional Office (WIRO), received your permit application package. DWQ (WIRO) has determined that the proposed stormwater system for the Burton Industrial Park — Concrete Plant for S.T. Wooten Corporation will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 and Session Law 2008-211. A draft permit has been prepared based on this review. However, as stated in the April 29, 2013 and May 14, 2013 email correspondence, the final permit can only be issued when the recorded deeds has been submitted to WIRO documenting that S.T. Wooten Corporation is now the owner of the property. Once the recorded deed has been submitted, the permit will be finalized and issued to your company, S.T. Wooten Corporation. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson, at (910) 796-7215. Sin erely, 9" Charles Wakild, P.E., Director Division of Water Quality GDSI can: S:\WQS\Stormwater\Permits & Projects\130501\130501 HD\2013 05 permit letter 130201 cc: Ryan Fisher, Withers & Ravenel Jeff Hudson, County Manager, Onslow County Onslow County Building Inspections Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX: 910,350-20041 DENR Assistance: 1-877-623-6748 Internet: w .ncvvalerquality.org An Equal Opportunity 1 Affirmative Action Employer None Carolina Naturally r WITHERS r- RAVENEL ENGINEERS I PLANNERS I SURVEYORS 115 MacKenan Drive CARY, NORTH CAROLINA, 27511 (919) 469-3340 FAX (919) 467-6008 TO: NCDENR 127 Cardinal Dr. Extension Wilmington, NC 28405 DATE 5/15/2013 1 JOB NO. 2120335.10 ATTENTION Christine Nelson PHONE # (910) 796-7323 RE: S.T. Wooten Corporation Burton Park Concrete Plant WE ARE SENDING YOU ® Attached via the following items: ❑ Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change order ❑ Diskette ❑ COPIES DATE NO. DESCRIPTION 1 5/15/13 2 Construction Drawings with Revised Sheet 8 R-if3 THESE ARE TRANSMITTED as checked below: ® For approval ❑ Approved as submitted ❑ For your use ❑ Approved as noted ❑ As requested ❑ Returned for corrections ❑ For review and comment ❑ ❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: Christine, The Dlans have been revised Der vour comment to add the trashrack to the outlet structure. Please let us know if you have any questions. Thank vou. ❑ Resubmit ❑ Submit ❑ Return COPY TO: Butch Lawter, PE; W&R File SIGNED: PE copies for approval copies for distribution corrected prints lfenclosures are not as noted, kindly notify as at once. Nelson, Christine From: Nelson, Christine Sent: Wednesday, May 15, 2013 11:51 AM To: 'Butch Lawter' Subject: RE: ST Wooten - request for info Butch, I would ask this question to your consultants. I'm not aware of an outlet like the proposed structure this in this region. The difference may be that they are attempting to provide the emergency overflow at this same device instead of at a separate spot along the berm wall. I have reviewed plans for other outlets designs that also use a weir instead of the traditional outlet device. I know a few of these were proposed at Camp Lejeune but I don't recall which projects those were. If I come up with an example, I will let you know. In the meantime, here is one example that I could find online that is pretty close to those designs (the second photo on the link): http://www.udfcd.org/downloads/pdf/fhn/fhn2002/­mainteligO2.htm Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Butch Lawter [mailto:Butch@stwcorp.com] Sent: Wednesday, May 15, 2013 11:17 AM To: Nelson, Christine Subject: RE: ST Wooten - request for info Having not seen a trash rack used in this application, can you tell me where some are so that I can go take a look at them? R. S. (Butch) Lawter, Jr. Senior Engineer S.T. Wooten Corporation 919-218-2834 (m) 252-291-5165 (o) 252-243-0901 (fax) Mailing Address Street Address P.O. Box 2408 3801 Black Creek Road Wilson, NC 27894-2408 Wilson, NC 27893 The information In this email and in any attachments is confidential and maybe privileged. If you are not the intended recipient, please destroy this message, delete any copies on your systems and notify the sender immediately. you should not retain, copy or use this email for any purpose, nor disclose all or any part of its content to any other person. From: Nelson, Christine[mailto:christine.nelsonCalncdenr.ciovl Sent: Wednesday, May 15, 2013 11:01 AM To: Fisher, Ryan Nelson, Christine From: Nelson, Christine Sent: Wednesday, May 15, 2013 11:01 AM To: 'Fisher, Ryan' Cc: Diaz, Jennifer; Werenko, Dale; Butch@stwcorp.com; Russell, Janet Subject: RE: ST Wooten - request for info Ryan, My comment was to provide a trash rack over the entire outlet structure. Is there a reason you are not providing a trash rack for the entire height of the weir? Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Fisher, Ryan fmailto:rfisherCalwithersravenel.com] Sent: Wednesday, May 15, 2013 8:17 AM To: Nelson, Christine Cc: Diaz, Jennifer; Werenko, Dale; ButchCalstwcorp.com; Russell, Janet Subject: RE: Sf Wooten - request for info Christine — Prior to making these changes and resubmitting, can you take a look at the attached sketches for each outlet device? I've extended the trash rack 1' above the weir elevation and extended it to cover the entire length of the weir. Please confirm that this is what you are looking for. Thank you, Ryan Fisher, PE Withers & Ravenel 115 MacKenan Drive I Cary, NC 27511 Phone: 919.469.3340 1 Fax: 919.467.6008 Direct: 919.535.5175 rfisher cDwithersravenel.com From: Nelson, Christine rmailto:christine.nelson(a)ncdenr.cI Sent: Tuesday, May 14, 2013 4:38 PM To: Fisher, Ryan Cc: Diaz, Jennifer; Werenko, Dale; ButchCulstwcorp.com; Russell, Janet Subject: RE: Sf Wooton - request for info Ryan, There are just two comments on the documents provided on May 9th: - The trash rack must be provided for the entire outlet device, not just the weir at the temporary pool. One purpose of the trash rack is to prevent trash from littering downstream conveyances. - Also, two sets of the revised plans need to be submitted. The package only contained one set. Please try to provide the updated plan sheets by Friday. Thanks, Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law Nelson, Christine From: Nelson, Christine Sent: Tuesday, May 14, 2013 4:38 PM To: 'Fisher, Ryan' Cc: Diaz, Jennifer; Werenko, Dale; Butch@stwcorp.com; Russell, Janet Subject: RE: ST Wooton - request for info Ryan, There are just two comments on the documents provided on May 9th: - The trash rack must be provided for the entire outlet device, not just the weir at the temporary pool. One purpose of the trash rack is to prevent trash from littering downstream conveyances. - Also, two sets of the revised plans need to be submitted. The package only contained one set. Please try to provide the updated plan sheets by Friday. Thanks, Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Fisher, Ryanfmailto:rrisher0withersravenel.com] Sent: Tuesday, May 07, 2013 3:09 PM To: Nelson, Christine Cc: Diaz, Jennifer; Werenko, Dale; ButchOstwcoro.com; Russell, Janet Subject: RE: ST Wooton - request for info Christine — We have made the revisions requested in your May 6, 2013 additional information request for the S.T. Wooten Concrete Plant in Burton Industrial Park. I have attached our response letter, revised plans, revised application, and revised calculations for your review. Hard copies will follow by FeclEx and should arrive tomorrow. Let us know if you have any questions or need any additional information. Thank you, Ryan Fisher, PE Withers & Ravenel 115 MacKenan Drive I Cary, NC 27511 Phone: 919.469.3340 1 Fax: 919.467.6008 Direct: 919.535.5175 rfisherawithersravenel. com From: Nelson, Christine fmailto:christine.nelson(o)ncdenr.gov] Sent: Monday, May 06, 2013 4:33 PM To: Diaz, Jennifer; Fisher, Ryan; Werenko, Dale; Butch(o)stwcoro.com Cc: Russell, Janet Subject: ST Wooton - request for info All, I have attached a pdf of the request for additional information for the ST Wooten project in the Burton Industrial Park (SW8 130501). Please let me know if you have any questions. Christine Nelson, Christine From: Nelson, Christine Sent: Tuesday, May 14, 2013 3:15 PM To: 'Fisher, Ryan' Cc: Werenko, Dale; Diaz, Jennifer; Butch Lawler; Scott, Georgette Subject: RE: S.T. Wooten Purchase Agreement/Resolution - Burton Park Ryan, After speaking to Georgette about this resolution, it was determined that the permit may only be issued to the ST Wooten Corporation once the deed has been transferred. I have just started going through the information provided on May 9th. If everything looks good, a letter will be issued acknowledging a complete project but will require the final deed to be submitted in order to issue the permit. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Fisher, Ryan[mailto:rfisher0withersravenel.com] Sent: Wednesday, May 08, 2013 3:35 PM To: Nelson, Christine Cc: Werenko, Dale; Diaz, Jennifer; Butch Lawter Subject: S.T. Wooten Purchase Agreement/Resolution - Christine — Burton Park I have attached the executed resolution for S.T. Wooten to purchase the concrete plant property in Burton Industrial Park from Onslow County. Please confirm that this document meets the requirements to issue the stormwater permit to S.T. Wooten, once approved. Thank you, Ryan Fisher, PE WITHERS SrRAVENEL 115 MacKenan Drive I Cary, NC 27511 Phone: 919.469.3340 1 Fax: 919.467.6008 Direct: 919.535.5176 rfisher(d)withersravenel.com www.withersravenel.com NOTICE OF CONFIDENTIALITY AND NONDISCLOSURE: This electronic message, which includes any attachments and other documents referred to herein, contains information from Withers 8 Ravenel, Inc. that may be proprietary or confidential. The information is Intended for the use of the addressee(s) only. If you are not the addressee, note that any disclosure, copying, printing, distribution, or use of the contents of this message is prohibited. If you received this message in error, please advise the sender by reply and delete this electronic message and any attachments. COPYRIGHT NOTICE: Copyright 2012 Withers 8 Ravenel, Inc. All Rights Reserved by Withers 6 Ravenel, Inc. This electronic message, any attachments thereto and all documents referred to therein are provided for the recipient's information only, and no rights are licensed, transferred or otherwise granted by the transmission of this electronic message by Withers 8 Ravenel, Inc. or receipt of this message by the recipient or any other party. Nelson, Christine From: Fisher, Ryan [rfisher@withersravenel.com] Sent: Wednesday, May 08, 2013 3:35 PM To: Nelson, Christine Cc: Werenko, Dale; Diaz, Jennifer; Butch Lawler Subject: S.T. Wooten Purchase Agreement/Resolution - Burton Park Attachments: Purchase Resolution.pdf Christine — I have attached the executed resolution for S.T. Wooten to purchase the concrete plant property in Burton Industrial Park from Onslow County. Please confirm that this document meets the requirements to issue the stormwater permit to S.T. Wooten, once approved. Thank you, Ryan Fisher, PE WITHER® (k71RAVENEL 115 MacKenan Drive I Cary, NC 27511 Phone: 919.469.3340 1 Fax: 919.467.6008 Direct: 919.535.5175 rfisherC7a withersravenel.com www.withersravenel.com NOTICE OF CONFIDENTIALITY AND NONDISCLOSURE: This electronic message, which includes any attachments and other documents referred to herein, contains information from Withers & Ravenel, Inc. that may be proprietary or confidential. The information is intended for the use of the addressee(s) only. If you are not the addressee, note that any disclosure, copying, printing, distribution, or use of the contents of this message is prohibited. If you received this message in error, please advise the sender by reply and delete this electronic message and any attachments. COPYRIGHT NOTICE: Copyright 2012 Withers & Ravenel, Inc. All Rights Reserved by Withers & Ravenel, Inc. This electronic message, any attachments thereto and all documents referred to therein are provided for the recipient's information only, and no rights are licensed, transferred or otherwise granted by the transmission of (his electronic message by Withers & Ravenel, Inc. or receipt of this message by the recipient or any other parry. WITHERS &— RAVENEL ENGINEERS IPLANNERS ISURVEYORS 115 MacKenan Drive CARY, NORTH CAROLINA, 27511 (919) 469-3340 FAX (919) 467-6008 TO: NCDENR 127 Cardinal Dr. Extension Wilmington, NC 28405 IFTITEQ OCR UR ° NMUUAL DATE 5/7/2013 1 JOB NO. 2120335.10 ATTENTION. Christine Nelson PHONE# (910) 796-7323 RE: S.T. Wooten Corporation Burton Park Concrete Plant WE ARE SENDING YOU ® Attached via the following items: ❑ Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change order ❑ Diskette ❑ COPIES DATE NO. DESCRIPTION 1 5/7/13 Response Letter 1 5/7/13 Revised Page 3 of the Stormwater Application 1 5/7/13 Revised Sheets 7 & 8 of the Plans 1 5/7/13 Revised BMP #1 Design Summary 1 5/7/13 Revised Page 3 of BMP #1 O&M Agreement 1 5/7/13 Revised BMP #2 Design Summary 1 5/7/13 Revised Page 3 of BMP #2 O&M Agreement THESE ARE TRANSMITTED as checked below: ® For approval ❑ Approved as submitted ® For your use ❑ Approved as noted ❑ As requested ❑ Returned for corrections ❑ For review and comment ❑ ❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: Christine, ❑ Resubmit ❑ Submit ❑ Return copies for approval copies for distribution corrected prints Attached is the supporting documentation in response to your comments on May 6, 2013 for the S.T. Wooten Concrete Plant in Burton Industrial Park. Let us know if you have any questions. Thank You. COPY TO: I I SIGNED:- If enclosures are not as noted, kindtynotify us at once. WITHERS & RAVEN EL ENGINEERS I PLANNERS I SURVEYORS May 7, 2013 Ms. Christine Nelson NC Department of Environment & Natural Resources Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Express Review Burton Industrial Park Concrete Plant for S.T. Wooten Corporation Stormwater Project No. SW8 130501 W&R No. 2120335.10 Dear Christine, Attached please find one (1) set of revised plans that address your comments received on May 6, 2013 for the above referenced project. Your comments are repeated below and followed by our responses in red: 1. Please correct the river basin listed in Section IV.3 of the application. The New River basin is located in the western part of North Carolina. The river basin has been updated as the White Oak River Basin. The revised page 3 of the application is attached. 2. Please double check the calculations used to determine the average depth of the ponds. It appears that the depth used in the average depth calculation option 2 is the entire depth of the pond, not the distance between the bottom of the shelf and the bottom of the pond as defined in Figure 10-2b of the BMP manual. The average depth calculations for each pond have been revised per the BMP Manual. To achieve adequate depth, each pond bottom has been lowered by 6-inches. Sheet 7 and the attached calculations have been updated to reflect this change. 3. The orifice diameter for BMP 2 is presented in the weir schedule on plan sheet 8 as 1 inch while the supplements and calculations indicate it will be 1.5 inches. Please ensure the information is presented consistently and accurately. The correct orifice diameter for BMP 2 is 1.5-inches. Sheet 8 has been revised to indicate the correct size. 4. Please provide a trash rack on the pond outlet structures. To prevent clogging of the notched weir, a rebar trash rack has been specified on Sheet 8 for each outlet structure. 5. Due to the minor nature of these comments, the express additional information fee has been waived. ECEIVE Comment noted.i i MAY 0 9 2013 11 115 MacKenan Drive I Cary, NC 275111 tel.: 919.469.33401 fax: 919.467-6008 1 www.withersraven Rom i License No. C-083 1410 Commonwealth Drive i Suite 1011 Wilmington, NC 284031 tel: 910.256.92771 fax ' 0.256.2584 _ 7011 Albert Pick Road i Suite G i Greensboro, NC 27409 1 tel: 336.605.3009 1 fax: 919.467.6008 6. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Comment noted. Please let us know if you have any questions regarding our responses to your review comments. Sincerely, WITHERS &-RAVENEL, INC. Ryan Fisher, P. . WITHERB & RAVENEL Page 2 of 2 Nelson, Christine From: Nelson, Christine Sent: Monday, May 06, 2013 4:34 PM To: 'Diaz, Jennifer; Fisher, Ryan; Werenko, Dale; Butch@stwcorp.com Cc: Russell, Janet Subject: ST Wooton - request for info Attachments: 2013 05 addinfo 130501.pdf All, I have attached a pdf of the request for additional information for the ST Wooten project in the Burton Industrial Park (SW8 130501). Please let me know if you have any questions. Christine Christine Nelson Environmental Engineer State Stormwater Program NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Phone:910-796-7323 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. Governor Director May 6, 2013 Mr. Henry D. Butts Jr., Vice President S.T. Wooten COrporation PO Box 2408 Wilson, NC 27894-2408 John E. Skvarla, III Secretary Subject: Request for Additional Information Stormwater Project No. SW8 130501 Burton Industrial Park Concrete Plant for S.T. Wooten Corporation Onslow, County Dear Mr. Butts: The Wilmington Regional Office received an (a modified) Express Stormwater Management Permit Application for the Burton Industrial Park Concrete Plant for S.T. Wooten Corporation on May 1, 2013. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please correct the river basin listed in Section IV.3 of the application. The New River basin is located in the western part of North Carolina. 2. Please double check the calculations used to determine the average depth of the ponds. It appears that the depth used in the average depth calculation option 2 is the entire depth of the pond, not the distance between the bottom of the shelf and the bottom of the pond as defined in Figure 10-2b of the BMP manual. The orifice diameter for BMP 2 is presented in the weir schedule on plan sheet 8 as 1 inch while the supplements and calculations indicate it will be 1.5 inches. Please ensure the information is presented consistently and accurately. 4. Please provide a trash rack on the pond outlet structures. Due to the minor nature of these comments, the express additional information fee has been waived. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to May 13, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Wilmington Regional Offoe 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151FAX: 910-350-20041DENRAssistance: 1-877-623-6748 NO Carolina Internet: www.ncwaterquallty.org K {ra tetlff An Equal Oppotunily l Affirmative Action Employer LL" Henry D. Butts, Jr. May 6, 2013 Stormwater Application No. SW8 130501 If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7323 or email me at christine.nelson@ncdenr.gov. Sincerely, CL,0-� Christine Nelson Environmental Engineer GDSlcan: S:\WQS\StormWater\Permits & Projects\2013\130501 HD\2013 05 addinfo 130501 cc: Ryan Fisher, Withers & Ravenel Wilmington Regional Office Page 2 of 2 WITHERS t- RAVENEL ENGINEERS IPLANNERS ISURVEYORS 111 MacKenan Drive CARY, NORTH CAROLINA, 27511 (919) 469-3340 FAX (919) 467-6008 TO: NCDENR 127 Cardinal Dr. Extension Wilmington, NC 28405 WE ARE SENDING YOU ® Attached via ❑ Shop Drawings ❑ Prints ❑ Copy of Letter ❑ Change order P"R tl LSW OF ll PANOfIVl1MAL DATE 4/30/13 1 JOB NO. 2120335.10 ATTENTION Janet Russell PHONE# RE: S.T. Wooten Corporation Burton Park Concrete Plant the following items: ® Plans ❑ Samples ❑ Specifications ❑ Diskette ❑ COPIES DATE NO. DESCRIPTION 1 4/26/13 458161 Express Review Fee ($4,000.00) THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ® For your use ❑ Approved as noted ® As requested ❑ Returned for corrections ❑ For review and comment ❑ ❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: Janet, Attached is the express review fee for both the stormwater review and sedimentation and erosion control review. Thanks. COPY TO: SIGNED: an F r, PE +. p tfenctosures are not as noted, kindly notify us at once. t MAY 0 1 2013 BY:__ ❑ Resubmit ❑ Submit ❑ Return copies for approval copies for distribution corrected prints T' \ aoeten W,21mq, NC l 17894-1408 orporatJon 251-19/-5/65 FAX151-143-0900 JOB/SUB JOB NO. I CO. I DIV. I VENDOR REFERENCE CHECK NO. 10 1000 1 33140 1 458161 INVOICE NUMBER INVOICE DATE DESCRIPTION GROSS AMOUNT DISCOUNT NET AMOUNT PERMIT 04/26/13 EXPRESS REV. STORMWA 4.000.00 4.000.00 EBVE r AY 01 2013 By: - DETACH AND RETAIN THIS STATEMENT TOTALS 4,000.00 4,000.00 THE ATTACHED CHECK IB IN PAYMENT OF ITEMS DESCRIBED ABOVE FORM NO STWC - IGA WITHERS I- RAVENEL ENGINEERS I PLANNERS I SURVEYORS 111 MacKenan Drive CARY, NORTH CAROLINA, 27511 (919) 469-3340 FAX (919) 467-6008 TO: NCDENR 127 Cardinal Dr. Extension Wilmington, NC 28405 DATE 4/30/13 JOB NO. 2120335.10 ATTENTION Christine Nelson PHONE# RE: S.T. Wooten Corporation Burton Park Concrete Plant WE ARE SENDING YOU ® Attached via the following items: ❑ Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change order ❑ Diskette ❑ COPIES DATE NO. DESCRIPTION 1 4/30/13 Permit Application with Supporting Documents and Calculations 1 4/30/13 Original Permit Application 2 4/30/13 Plans THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ For your use ❑ Approved as noted ® As requested ❑ Returned for corrections ❑ For review and comment ❑ ❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: Christi ❑ Resubmit ❑ Submit ❑ Return copies for approval copies for distribution corrected prints Attached is the application for the ST Wooten Concrete Plant in Burton Industrial Park. The Express Review fee is being sent to Janet Russell's attention. Thanks. COPYTO: a^^ r_., SIGNED: MAY 0 1 2013 PE lfenclosums are not as noted, kindly notify us at once. DWQ USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1 95 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- FIQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Burton Industrial Park Concrete Plant for S.T. Wooten Corporation 2. Location of Project (street address): City: Jacksonville County:Onslow Zip:28540 3. Directions to project (from nearest major intersection): From the intersection of HWY 53 and HWY 24, head NW on HWY 24 for approximately 3 miles to the intersection of Hines Farm RD. Head E onto Hines Farm RD for approximately 1/2 miles to Burton Park BLVD. Head S onto Burton Park BLVD for approximatly 1000 feet to the project site entrance on the E side of 4. Latitude:34° 47' 21" N Longitude:77° 29' 16" W of the main entrance to the project. Il. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New []Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, N/A and the previous name of the project, if different than currently proposed, N/A 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: 8.50 ac of Disturbed Area NNPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts N/A b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:N/A 5. is the project located within 5 miles of a public airport? NNo ❑Yes _ pp�( If yes, see S.L. 2012-200, Part VI: httl2://12ortal.ncdenr.org/web/wq/ws/sUsTat'eswn""aAs'04 E 4Jj MAY 01 2013 Form SWU-101 Version 06Aug2012 Page I of il i EY: III: CONTACT INFORMATION I. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the proiect): Applicant/Organization:S.T. Wooten Corporation Signing Official & Title:Flenry D. Butts, Jr., Vice President b.Contact information for person listed in item I above: Street Address:3801 Black Creek Road City:Wilson State:NC Zip:27893 Mailing Address (if applicable):PO Box 2408 City:Wilson State:NC Zip:27894-2408 Phone: (252 ) 291-5165 Fax: (252 ) 243-0901 Email: Hank®stwcorp.com c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ® Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:Onslow County Signing Official & Title:Ieff Hudson, County Manager b.Contact information for person listed in item 2a above Street Address:4024 Richlands Hiehwav City: Jacksonville State:NC Zip:28540 Mailing Address (if applicable):N/A City: State: Zip: Phone: (910 ) 347-4717 Fax: (N/A ) 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Butch Lawter, PE Signing Official & Title:Senior Engineer b.Contact information for person listed in item 3a above: Mailing Address:3801 Black Creek Road City:Wilson State:NC Zip:27893 Phone: (252 ) 291-5165 Fax: (252 ) 243-0901 Email:13utch@stwcorp.com 4. Local jurisdiction for building permits: Onslow County Point of Contact:George Lacey Phone H: (910 ) 989-3072 EGERVE- MAY 0 1 2013 €€ Form SWU-101 Version 06Aug2012 Page 2 of B1 4. Local jurisdiction for building permits: OnSlpw County Point of Contact:Ceor>ef Lacey IV. PROJECT INFORMATION Phone #: (910 1 989-3072 I. In the space provided below, briefly summarize how the stormwater runoff will be treated. The stormwater will be treated with 2-90 % stormwater wet ponds. 13MP I will be located in the eastern Property corner and 13MP 2 will be located in the northwest property corner. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development flan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulotion(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwaler runoff from this project drains to the White Oak River basin. 4. Total Property Area: 10.01 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':10.01 acres Total project area shall be calculated to exclude the followin the normal pool of impounded structures, the area behueen the bunks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MFIW) line, and coastal wetlands landward from the NFIW (or MHKq line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal tetlands lwidward of the NHW (or MHIM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 60 9. Flow many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stonmwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Perm SWIJ-101 Version 06Aug2012 Page 3 of 7 ECEIVE MAY 0 9 2013 RY: _. Basin Information Drainage Area To BMP #1 Bypass BMP #1 to South To BMP #2 Bypass BMP #2 to North Reciving Stream Name New River New River New River New River Stream Class C; NSW C; NSW C; NSW C; NSW Stream Index Number 19-(1) 19-(1) 19-(1) 19-(1) Total Drainage Area (sf) 220414 101059 74052 40511 On -site Drainage Area (sf) 220414 101059 1 74052 40511 Off -site Drainage Area (sf) 0 0 0 0 Proposed Impervious Area (sf) 197065 0 65340 0 % Impervious Area (total) 89% 0% 88% 0% Impervious Surface Area Drainage Area To BMP #1 Bypass BMP #1 to South To BMP #2 Bypass BMP #2 to North On -site Buildings / Lots (sf) 784 0 0 0 Material Storage Yard (sf) 95521 0 53230 0 Gravel / Concrete Plant Area (sf) 78659 0 0 0 BMP Water Surface Area (sf) 14224 0 8696 0 Future (sf) 7877 1 0 1 3414 1 0 Off -Site (sf) 0 1 0 0 0 Existing BUA (sf) 0 1 0 0 0 Total (sf): 197065 1 0 65340 0 MAY 0 1 2013 BY: 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://12ortal.ncdenr.org/web/wq/ws/su/bmp-manual. V1. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portaI.ncdenr.org/web/wq/­ws/su/mal2s.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. JGD 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants N I E4 Form. (if required as per Part Vll below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M S C n agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCOENR. (For an Express review, refer to J C http://www.envhelp.org/pages/onestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor AGE the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the J C receiving stream drains to class SA waters within'/z mile of the site boundary, include the 1h mile radius on the map. 7. Sealed, signed and dated calculations (one copy). J G ll 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. t l n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. � G E t'' V CE o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). MAY 01 2013 FormSWU-101 Version06Aug2012 Page 4of6 BY: 9. ' Copy of any applicable soils report with the associated SHWT elevations (Please identify J GIB elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWTprior to submittal, (910) 796-7378.) ,GD .1 GD A copy of the most current property deed. Deed book: 1365 Page No: 322 For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from ham://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. Vlll. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer.Ryan Fisher, PE Consulting Firm: Mailing Address:115 MacKenan Dr. City:Cary State:NC Zip:27511 Phone: (919 ) 469-3340 Email:rfisher@withersravenel.com Fax: (919 ) 467-6008 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, itern 2a) Jeff Hudson, Counht Manager certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 7a) Hennt D. Butts, Jr. with (print or hype nanne of organization listed in Contact Information, item la) S.T. Wooten Corporation to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 06Aug2012 Page 5 or MAY 0 1 2013 hY: VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Rvan Fisher, PG Consulting Firm: Withers & Ravenel Mailing Address:115 MacKenan Dr. City:Cary Phone: (919 ) 469-3340 Email: rfisherOwilhersravenel.com State:NC Zip:27511 Fax: (919 ) 467-6008 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete th section) I, (print or type name of person listed in Contact Information, item 2a) Jeftlt4tdsm,, CC tit Manager �, certify own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) Hennt D. Butts, Jr. with (print or type name of organization listed in 7V Contact Information, item la) S.T. Wooten Corporation to develop the project as currently proposed. A copy of has been provided with the submittal, which indicates the AWparty responsible for the operation and maintenance of the stormwater system. As the legal properly owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil pep'''yyyle/e/e/���itie f up tc , 5,0 ) per day, pursuant to NCGS 143-215.6. GG / q\ Sienalure: h Date: r�,J / J V '1tt /� dO- a Notary P/uuy� is for th'IefISlate of -Nan- rt e4rn 1i n0-, County of do hereby certify that J1471-P-V H(Ad 66fl personally appeared before me thisklTday of �T� � �and ac n wledge the do ex cution of the application for a stormwater permit, Witness my hand and official seal, al,(,�. Ul IAOTARy MyCOMM, Exp. 12-26-2017 PUBLIC SEAL My commission expires I) Fornn SWU-101 Version 06Aug2012 Page 6 of 7 i g MAY 0 1 2013 BY: X. APPLICANT'S CERTIFICATION I, (print or type name ofperson listed in Contact Information, item Ia) Henry D. Butts, fr., Vice President certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable storm !t Uyles-under 15A NCAC 21-1.1000 and any other applicable state stormwater requirements. Date: 4'29- 13 1, J P nni e F. 7J o I 1 Cwni e a Notary Public/N for the State of OVA Lpli-hQ, County of Wi I5Ori , do hereby certify that Nli 6112J l J • Bics- S Jr. personally appeared before me this 2"t day of A$26 I ,'qOI 3 • and acknowledge the due execution Qf the application for a stormwater permit. Witness my hand and official seal, iv .: Tt 0" �'t,a(�L) _ 'C S form SWU-101 Version 06Aug2012 SEAL My commission expires I P 61 Lu ' oo(8 jar --'CEI 6E''. Page 7 of 7 V) MAy 0 1 202 lI WITHERS RAVENEL STORMWATER MANAGEMENT PLAN For NCDWQ Coastal Stormwater Permitting Burton Industrial Park Concrete Plant for ST Wooten Corporation Jacksonville, Onslow County, North Carolina Prepared For: S.T. Wooten Corporation 3801 Black Creek Road Wilson, NC 27894 Attn: Butch Lawter Prepared By: WITHERS & RAVENEL, INC ui MacKenan Drive Cary, North Carolina 27511 .oCAR•, Revised April 2013 •`•p oFEss}o�?'/ % W&R Project No. 02120335•10 l JenniferC. Diaz, PE 11 MAY 0 1 2013 BY: S.T. WOOTEN CONCRETE PLANT — BURTON INDUSTRIAL PARK (ONSLOW COUNTY) STORMWATER NARRATIVE April 30, 2013 The ST Wooten Concrete Plant is a proposed 10.01-acre industrial development located on Burton Park Boulevard, approximately 1/10 mile southeast of the intersection of Burton Park Boulevard and Hines Farm Road, and approx. % mile east of the intersection of Richlands Highway (NC-24) and Hines Farm Road, in Onslow County, North Carolina. The site is currently undeveloped but is part of the previously approved Burton Industrial Park. There is no existing impervious area on site. The main entrance to the site will be located on Burton Park Boulevard; there is no proposed secondary entrance. The site will use existing public utilities for water and sewer service. The project includes development entirely on 1 parcel which will be established as a subdivision of a larger existing parcel. The parent parcel is identified on Onslow County GIS Mapping. The Parcel Identification Numbers and acreage based on GIS property lines for the parcel are as follows. 4357.02.69.7417 (543.61 ac) Total GIS Area = 543.61 acres The site is divided into two drainage basins by an existing ridge in the pre -developed condition. The project's proposed grading plan will maintain natural runoff patterns to the maximum extent practicable. The entire site ultimately drains to lowlands and wetlands tributary to the New River, which is classified as C, NSW at the confluence point. The site is located approximately 13.50 miles northwest of the point where the New River is classified as SA, HQW. The site is located approximately 4.0 miles northwest of the Upper New River Primary Nursery Area (0.103 13 c xv). Site vicinity maps showing primary nursery areas and stream classifications are attached. Based on site investigations by Hal Owen (licensed soil scientist) and previous USACoE Jurisdictional Maps, the proposed site contains no natural wetlands. There are wetlands present on the parent tract, but no additional impacts will occur during construction of this development beyond what was previously permitted for construction of the roadways. Stormwater permitting for the site will be conducted in accordance the current coastal stormwater regulations. Based on the site plan, the proposed site contains a development built upon area density of approximately 52% (60% for possible future impervious area). The BUA limit for low density projects that are not within one-half mile and draining to class SA waters is 24%. Therefore the project as a whole will be permitted as a high density project. Per the EGERVE'; MAY 0 1 2013 g� BY: €� Coastal Stormwater Regulations, the site will require structural Best Management Practices (BMPs) to control and treat the runoff generated by 1.5 inches of rainfall. Two stormwater wet ponds are proposed for the site, and both will be designed to remove 90% of Total Suspended Solids in the runoff. Although level spreaders are not required, they are proposed as part of the BMPs at the request of the client. Although no future impervious area is planned, the BMPs have been sized to handle possible future impervious area. This would allow the owner to convert open space to impervious without having to seek a modification to the stormwater permit. There are no stream buffers, jurisdictional surface waters or wetlands on site. The site is not subject to CAMA restrictions. The soil tests have been completed by Hal Owen and indicate primarily well drained sandy loam soils. The seasonal high water table is within 26" of the surface in the area of proposed BMP 1 and within 14" of the surface in the area of proposed BMP 2; the proposed normal pool elevation has been set at the approximate Seasonal High Water Table elevation. A site visit has been completed with Vincent Lewis and the SHWTs for each BMP have been verified. The site is also subject to NPDES Industrial Wastewater discharge regulations. A monitoring plan will be developed in accordance with NCG-14 for ready mix concrete plants. EGF-I @9 E MAY 01 2013 Project Name: ST Wooten - Burton Park Lot 4 BMP #1 City/State: Onslow County Project #: 2120335.1 Date: 30-Apr-13 Table 10.4 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 90% Pollutant Removal Efficiency in Coastal Regions Impervious Permanent Pool Depth (feet) 3.0 3.5 4.0 4.5 5.0 5.5 6.0 30 3.5 3.0 2.7 2.5 2.2 1.9 1.6 40 4.5 4.0 3.5 3.1 2.8 2.5 2.1 50 5.6 S.0 4.3 3.9 3.5 3.1 2.7 60 7.0 6.0 5.3 4.8 4.3 3.9 3.4 70 8.1 7.0 6.0 5.5 5.0 4.5 3.9 80 9.4 8.0 7.0 6.4 5.7 5.2 4.6 90 10.7 9.0 7.9 7.2 6.5 5.9 5.2 100 12.0 10.0 8.8 1 8.1 7.3 6.6 5.8 Source: NCDENR/DWQ Stomovater Best Management Practices, pg. 10-14, July 2007 rev. 6/16/09 STORMWATER BMP - STORMWATER WET POND (25% TN Removal) Land Use Area (ac) % IA Imp. Area (ac) Impervious 4.02 100 4.02 BMP 0.64 51 0.33 Open Space 0.22 0 0.00 Future Impervious Area 0.18 100 0.18 Totals 5.06 4.52 I otal % Impervious Surface Area = 09.4 %n Surface Area of Permanent Pool: Average depth - 5.00 ft SA/DA ratio - 6.45 From Table 10.4 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.327 acres 14224 sq. ft. Normal pool elevation - 36.5 feet Surface area provided - 0.327 acres 14224 sq. ft. 1.5-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(l) where, Rv - Runoff coefficient, in./in. I - Percent impervious Rv - 0.85 in./in. Total runoff volume from 1.5-inch precipitation: Runoff volume, S - (Design rainfall) (Rv) (Drainage Area) S = 0.541 acre-ft 23550 cu. ft. Water quality pool elevation- 37.89 feet Overflow elevation- 38.00 feet Storage volume provided - 0.589 acre-ft B� . 25657 cu. ft. MAY 0 1 2013 K:\I2%12.0330\120335.10-S1' Wwten Lot 4 Burton Park\11-11\13MP 41 BY: Project Name: ST Wooten - Burton Park Lot 4 BMP #1 City/State: Onslow County Project #: 2120335.1 Date: 7-May-13 AVERAGE DEPTH Per NCDENR "Stormwater Best Management Practices ", the average depth of a wet pond is to be calculated by one of these two options: Average Incremental Accumulated Below Normal Contour Contour Contour Contour Pool Contours Area Area Volume Volume Aix),, pond 27.50 1347 674 674 674 29.00 2132 1740 2609 3283 30.00 2771 2452 2452 5734 31.00 3808 3290 3290 9024 32.00 4970 4389 4389 13413 33.00 6359 5665 5665 19077 34.00 7953 7156 7156 26233 35.00 9735 8844 8844 35077 Adn shelf 36.00 11756 10746 10746 45823 Ape rn qvd " _ 36.50_ _ 14224 12990 6495 52318 -Total Volume PP, = Total Volume - Sediment Storage Volume = 51,644 cf OPTION 1: Average Depth — Permanent Pool Volume/ Surface Area PP, — 51,644 cf SA — 14,224 sf da, = 3.63 it OPTION 2: Use the following equation: da, — 0.25 % 1 + Abet helf + Abot shelf + Abet pond X Depth Aperm pool 2 Abot shelf da, = 5.10 ft Use Average Depth = 5.0 ft OPTION 2 FOREBAY DESIGN Per NCDENR "Stormwater Best Management Practices ", the forebay volume should equal about 20 % of the total basin volume. Average Incremental Accumulated Forebay Contour Contour Contour Contour Contours Area Area Volume Volume (feet) (SF) (SF) (CF) (CF) 30.00 0 31.00 320 160 160 160 36.00 3014 2673 2673 9740 36.50 3367 3191 1595 11335 Forebay Volume = Total Forebay Volume - Sediment Storage Volume — 11,175 cf % Forebay = 21.6% Total Forebay Volume ECEI V E MAY 0 9 7013 K 1I N 2.03301120335.1 o-s r Wooten Lot 4 Burton Pnrk\H-Hq IMP 0 1 Project Name: ST Wooten - Burton Park Lot 4 BMP #1 Project #: 2120335.1 Cit St t : Onslow County QdteL 30-Apr-13 STORMWATER BMP - WET POND (25% TN Removal) Orifice Calculator Q=Cd*A*(2gh)"(1/2) Variables Constants WQ Volume: 0.541 Acre-ft 23550 cf g — 32.2 ft/s2 Head / Driving Head: 1.39 ft 0.4633333 ft Cd— 0.6 Draw down time: 58 hrs 208800 s Orifice Area = 0.034 sq. ft 4.955 sq. in Orifice Diameter = 2.512 in USE 2.5 INCH DIAMETER ORIFICE �EIVE1 01 2013 K:\12\12-0330\120335.10-Sr Wooten Lot 4 Burton Park\1i-11\nMP #I rAY BY: Project Name: ST Wooten - Burton Park Lot 4 BMP #2 City/State: Onslow County Project #: 2120335.1 Date: 30-Apr-13 Table 10.4 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 90% Pollutant Removal Efficiency in Coastal Reeions % Impervious Permanent Pool Depth (feet) 3.0 3.5 4.0 4.5 5.0 1 5.5 6.0 30 3.5 3.0 2.7 2.5 2.2 1.9 1.6 40 4.5 4.0 3.5 3.1 2.8 2.5 2.1 50 5.6 5.0 4.3 3.9 3.5 3.1 2.7 60 7.0 6.0 5.3 4.8 4.3 3.9 3.4 70 8.1 7.0 6.0 5.5 5.0 4.5 3.9 80 9.4 8.0 7.0 6.4 5.7 5.2 4.6 90 10.7 9.0 7.9 7.2 6.5 5.9 5.2 100 12.0 10.0 8.8 1 8.1 7.3 6.6 5.8 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-14, July 2007 rev. 6116109 STORMWATER BMP - STORMWATER WET POND (25% TN Removal) Land Use Area (ac) % IA Imp. Area (ac) Im ervious 1.22 100 1.22 BMP 0.40 50 0.20 Future Impervious Area 0.08 100 0.08 Totals 1.70 1.50 I otal % Impervious Surface Area = B8.2 '70 Surface Area of Permanent Pool: Average depth - 3.00 ft SA/DA ratio - 10.47 From Table 10.4 Minimum pond surface area (SA) - (DA * SA/DA ratio)/100 SA = 0.178 acres 7752 sq. ft. Normal pool elevation - 40.0 feet Surface area provided - 0.200 acres 8696 sq. ft. 1.5-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv - 0.05 + 0.009(I) where, Rv - Runoff coefficient, in./in. I - Percent impervious Rv - 0.84 in./in. Total runoff volume from 1.5-inch precipitation: Runoff volume, S - (Design rainfall) (Rv) (Drainage Area) S = 0.179 acre-ft 7812 cu. ft. Water quality pool elevation- 40.85 feet Overflow elevation- 41.00 feet Storage volume provided - 0.220 acre-ft 9583 cu.ft. ' MAY 0 1 2013 K:\I2\I2-0330\120335.10-S't Wooten Lot 4 Burton Park\11-11\13MP #2 Project Name: ST Wooten - Burton Park Lot 4 BMP #2 City/State: Onslow County Proiect #: 2120335.1 Date: 7-May-13 AVERAGE DEPTH Per NCDENR "Stormwater Best Management Practices ", the average depth of a wet pond is to be calculated by one of these two options: Average Incremental Accumulated Below Normal Contour Contour Contour Contour Pool Contours Area Area Volume Volume Abot_pmd 35.50 2182 1091 1091 1091 37.00 3570 2876 4314 5405 38.00 5000 4285 4285 9690 39.00 6565 5783 5783 15473 Abot s,,e0 � 39.50 7593 7079 3540 19012 Apenn pool � 40.00 8696 8145 4072 23084 —Total Volume PP,, = Total Volume - Sediment Storage Volume = 21,993 cf OPTION 1: Average Depth — Permanent Pool Volume / Surface Area PP — 21,993 cf SA — 8,696 sf dae = 2.53 ft OPTION 2: Use the following equation: day = 0.25 x 1 + Abot shelf + Ats shelf + Abut oond x Depth Aperm_pool 2 Abot_shelf day _ Use Average Depth = 3.04 ft 3.00 ft OPTION 2 FOREBAY DESIGN Per NCDENR "Stormwater Best Management Practices ", the forebay volume should equal about 20% of the total basin volume. Average Incremental Accumulated Forebay Contour Contour Contour Contour Contours Area Area Volume Volume (feet) (SF) (SF) (CF) (CF) 36.00 0 37.00 398 199 199 199 38.00 1073 736 736 935 39.00 1813 1443 1443 2378 -Total Forebay 40.00 2617 2215 2215 4593 Volume Forebay Volume = Total Forebay Volume - Sediment Storage Volume — 4,394 cf Forebay = 20.0% E4ff3E1Vt-- MAY 0 9 20S K:\I2\12-0330\120335.10-S'I' Woolcn Lot 4 13urton Park\11+1\BMP 92 Project Name: ST Wooten - Burton Park Lot 4 BMP #2 Project #: 2120335.1 i /State: Onslow County Date: 30-Apr-13 STORMWATER BMP- WET POND (25% TN Removal) Orifice Calculator Q=Cd*A'(2gh)"(1/2) Variables Constants WQ Volume: 0.179 Acre-ft 7812 cf g — 32.2 ft/s2 Head / Driving Head: 0.85 ft 0.2833333 ft Cd— 0.6 Draw down time: 69 hrs 248400 s Orifice Area = 0.012 sq. R 1.767 sq. in Orifice Diameter = 1.500 in USE 1.5 INCH DIAMETER ORIFICE EGEIVE 1 MAY 0 1 2013 U12\I2-0330\120335.10-SP Woolen Lot4Ilunon Park\11-11\13MP #2 T HAL OWEN & ASSOCIATES, INC. SOIL & ENVIRONMENTAL SCIEN'ris,rS P.O. Box 400, Lillington NC 27546-0400 Phone (910) 893-8743 / Fax (910) 893-3594 www.lialowensoi 1. coni 28 March 2013 Mr. Butch Lawter ST Wooten Corporation 3801 Black Creek Road SE Wilson, NC 27983 Reference: Wetland Consultation — Lot 4 Burton Industrial Park Dear Mr. Lawter, A site investigation has been conducted for the above referenced property, located on the northern side of Burton Park Blvd, Onslow County, North Carolina. 'rhe purpose of this investigation was to determine the existence and extent of jurisdictional wetland areas located on the property. All wetland determinations were made in accordance with the appropriate Regional Supplement to the Corps of Engineers Wetland Delineation Manual. Stream determinations were made in accordance with the NC Division of Water Quality Methodology for ldenlificalion qi hhter•millent and Perennial Streams and their Origins, Version 4.11. This report represents my professional opinion as a Licensed Soil Scientist but does not guarantee or represent concurrence from the Corps of Engineers. Areas that meet the criteria for jurisdictional wetlands or streams were not observed on this property. In concurrence with the previously approved and recorded wetland delineation map (2008) fm• the entire industrial park, Lot 4 does not appear to contain any areas that would be consideredjurisdictional wetlands or streams. I appreciate the opportunity to provide this service. Feel free to contact me should you have any questions or need additional information. Sincerely, Hal Owen Licensed Soil Scientist rMV IF�1' I F AY 0 1 202 BY: Soil Science Investigations • Wetland Delineations, permitting, and Consulting HAL OWEN & ASSOCIATES, INC. SOIL & ENVIRONMENTAL SCIENTISTS P.O. Box 400, 266 Old Coats Road Lillington, NC 27546-0400 Phone (910) 893-8743 / Fax (910) 893-3594 www.halowensoil.com 25April 2013 Mr. Butch Lawler S.T.Wooten Corporation 110 Box 2408 Wilson, NC 27894-2408 Reference: Soil Scientist Investigation for Stormwater Burton Industrial Park Plant Site, Lot 4 Dear Mr. Lawler, A site investigation has been conducted for the above referenced project, located on Burton Park Boulevard, Onslow County, North Carolina. The purpose of this investigation was to determine the depth to evidence of a seasonal high water table in the area proposed for a stormwater basin. All soil characteristics were described in accordance with the USDA Field Book for Describing and Sampling Soils. This report represents my professional opinion as a Licensed Soil Scientist. Auger borings were advanced at two locations at the site (Figure 1). Soil morphological characteristics indicating a seasonal high water table (SHWT) were observed at 26 inches at location #1 and at 14 inches at location #2. Soil profile descriptions were collected at each location and are attached to this report. I appreciate the opportunity to provide this service and trust that you will feel free to call on me again in the future. If you have any questions or need additional information, please contact me at your convenience. Sincerely Hal Owen Licensed Soil Scientist ECEI BD' E MAY 0 1 2013 6 f: Soil Science Investigations • Wetland Delineations, Permitting, and Consulting HAL OWEN & ASSOCIATES, INC. Soil Scientist Investigation for Stormwater Burton Industrial Park Plant Site Lot 4 8 April 2013 Figure I L9PT.•artCE••••"••_ w•w •+Mn "e i ea3i�n'_� u E G E N VH E e MAY 01 2013 Soil Science Investigations • Wetland Delineations, Permitting, and Consulting I4AL OWEN & ASSOCIATES, INC. SOIL PROFILE DESCRIPTIONS FOR STORMWATER MANAGEMENT DEVICES PROJECT NAME: S.T. Wooten - Burton Site Lot 4 PROPOSED FACILITY: Wet Pond LOCATION OF SITE: Burton Park Boulevard COUNTY: Onslow EVALUATED BY: Hal Owen, NC Licensed Soil Scientist DATE EVALUATED: 17 April 2013 EVALUATION METHOD: Auger Boring ®, Pit ❑ PROFILE: 1 HORIZON DEPTH IN MATRIX MOTTLES TEXTURE SIRUCIURE TEN E TENCE PERMEABII. ITY IN/IIR NOTES A 0-5 IOYR 4/1 salt & pepper 50/50 fist. 2MGR VFR Bwl 5-22 IOYR 6/6 sl. 2 M SBK FR Bw2 22-26 10YR 8/6 SI, I M SBK FR C 26-36 10YR 8/2 LS AWF 23 inches SIIWT 26 inches SLWT SLOPIi 2 % DRAINAGE SOIL SERIES VEGETATION COMMENTS: normal conditions, heavy rain six days ago, PROFILE: 2 HORIZON DF.P'1'H IN MATRIX MOTTLES TEXTURE S'FRUC'IURI3 CONSIS- TENCE PERMBABII. ITY IN/FIR NOTES Al 0-10 IOYR 2/2 fist, 2MGR FR A2 10-14 10YR 32 IOYR 4/2 IS 2 M Gil FR Ilw1 14-20 10YR 513 IOYR 4/2 LS 2 M Gil FR 13w2 20-24 IOYR 6/3 10YR 52 LS 2 M Gil FR Bw3 24-30 IOYR 6/3 IOYR 62 LS 2MGR FR C 30-42 IOYR 62 IOYR 42 LS SG FR AWr 18 inches SHWI' 14 inches SLWT SLOPE DRAINAGE SOIL SERIliS VEGETATION COMMENTS: Site appears to he in normal/typical hydrology state GENE MAY 0 1 2013 av; Soil Science Investigations • Wetland Delineations, Permitting and Consulting FIAL OWEN & ASSOCIATES, INC. LLUEND UN ABBKL V IA I IUNN TEXTURE. S - Sand LS - Loamy Sand SL - Sandy Loam L - Loam SCL - Sandy Clay Loam CL -Clay Loam Sit, - Silt Loam Si - Silt SiCL- Silt Clay Loam SC - Sandy Clay C - Clay SiC - Silty Clay O - Organic MOTTLES f — few c —common m — many STRUCTURE 0 - structureless I - weak 2 - moderate 3 - strong MOIST CONSISTENCE L - Loose VFR - Very Friable FR - Friable FI - Firm VFI - Very Firm EFI - Extremely Firm AWT—Apparent Water Table SHWT— Seasonal High Water Table SLWT— Seasonal Low Water Table 1 - fine F - Faint 2 - medium D - Distinct 3 - coarse P - Prominent VF -very fine G - Single Grain F - fine M - Massive M - medium CR - Crumb C - coarse GR - Granular VC - very coarse SBK - Subangular Blocky ABK - Angular Blocky PI, - Platy PR - Prismatic MAY 0 1 2013 Soil Science Investigations • Wetland Delineations, Permitting, and Consulting White Oak River Basin Name Index Number Classification Description i NEW RIVER 19-(27) SA;HQW (,From a line extending across New River from Grey Point to a point of land approximately 2200 yards downstream from mouth of Duck Creek to Atlantic Ocean; including all unnamed bays, creeks, and other !waters except restricted areas 111 and # 2 described be NEW RIVER 19-(7) SB;NSW !From Blue Creek to U. S. Hwy. 17 bridge Class Date :Special Designation 06/01/60 08/01/91 NEW RIVER 19-(11) SC;HQW,NSW From Atlantic Coast Line Railroad Trestle to Mumford Point NEW RIVER 19-(15.5) SC;NSW From Mumford Point to a line extending across the river from Grey Point to point of land approximately 12200 yards downstream from mouth of Duck Creek NEW RIVER 19-(1)�� !From source to Blue Creek NEW RIVER 19-(30.5) SB;HQW,NSW (From U. S.Hwy. 17 bridge to Atlantic Coast Line Railroad Trestle _ _I New River Restricted Area # 1 19-31 SC jAII waters within 1,000 yards of earthen dock at the United States Marine Corps Rifle Range New River Restricted Area # 2 19-37 SC !All waters within a line beginning at the Government Dock in front of U.S. Coast Guard Detachment (Barracks at Marines and running a southwest course 1,000 yards to Channel Marker #13, thence a Lsoutheasteriy course 1,000 yards to Flash Beacon # 11, thence _ Newby Creek 21-35-1-8 SA;HQW From source to North River 08/01/91 08/01/91 08/01/91 08/01/91 06/01/56 06/01/56 06/01/56 NEWPORT RIVER 21-(17) SA;HQW 06/01/56 !From Little Creek Swamp to Atlantic Ocean with exception of Morehead City Harbor restricted area I I NEWPORT RIVER 21-(1) C 06/01/56 From source to Little Creek Swamp Newport River Restricted Area (Morehead City Harbor) 21-31 SC 06/01/56 !{All waters within a line beginning at a point of land near the south end of 11th street in Morehead City at { ILat. 34 43' 08, Long. 76 43' 04; thence in straight line to the western end of Sugarloaf Island; thence along the north shore of the Island to the North Fork White Oak River 20-2 C 06/01/56 jFrom source to White Oak River North Leopard Creek 21-35-1-7-2 SA;HQW 06/01/56 From source to Ward CreekC J _- Ip_� � MAY 01 2013 Thursday, February 00, 2012 Based on Classifications as of 20120208 1 Page 16 of 24 BY: Precipitation Frequency Data Server Page 1 of 3 POINT PRECIPITATION jI}1�► (b FREQUENCY ESTIMATES ♦ FROM NOAA ATLAS 14 ( �, , SNEADS FERRY, NORTH CAROLINA (31-8037) 34.55 N 77.4 W 49 feet from 'Precipiuton-Frequency Adu of Ne United Sutee" NO" Ads. 14. Vdume 2, Version 3 G M. B®nin, D, Martin, B. ua T. Pazybok, M.Yekta end D. Rilry NOAA, National Weather Service, Silver Spdn& Muylad, 2004 Fauacld: Wad Nor, 112009 confidence L Imils (' SeaSr' onal' 1 y , ` y Locati� on p '. Othr' er Info. GIS data Maps Doo& R Precipitation Frequency Estimates (inches) (A an 19i11 �nla min min m n10 ]min 3 hr 6 hr 12 hr 24 hrhr 4 hr 4 deer 7 day � d 0.49 0.79 0.99 1.35 1.69 2.06 2.23 2.72 3.21 3.68 4.28 4.75 5.48 6.06 7.98 9.79 12.33 14.975 0.59 0.94 1.16 1.63 2.04 2.52 2.72 3.31 3.91 4.48 5.17 5.75 6.60 227 9.49 11.64 14.60 17.63 0.69 1.10 1.39 1.97 2.53 3.20 3.47 4.25 5.04 5.79 6.65 7.31 6.30 9,01 1 L55 I4.00 IZ43 20.80 10 0.77 i.22 I,55 2.24 2.92 3.77 4.12 5.04 6.01 6.91 7.91 8.60 9.70 10.44 13.23 I5.88 19.75 23.34 25 0.87 1.38 1.75 2.59 3.45 4.57 5.05 6.20 7.44 8.56 9.62 10.49 11.72 12.50 15.62 18.48 23.01 26.80 50 0.94 1.50 L90 2.86 3.87 5.22 5.85 Z19 8.69 9.98 11.49 12.09 13.41 14.21 17.58 20.57 25.66 29.52 100 1.02 1.62 2.04 3.13 4.31 5.93 6.71 8.29 10.07 11.56 13.34 13.83 15.22 16.04 19.64 22.69 28.40 32.28 200 1.09 1.73 2.19 3.41 4.78 6.69 7.66 9.49 11.61 13.32 15.41 15.72 17.17 I8.00 21.82 24.88 31.26 35.07 500 1.19 1.89 2.37 3.78 5.42 7.77 9.05 11.28 13.91 15.94 18.55 18.80 19.99 20.80 24.88 27.86 35.22 38.84 ]000 1.27 2.00 2.52 4.07 5.95 8.66 10.23 12.79 15.91 18.19 21.26 21.44 22.32 23.11 27.34 30.22 38.38 41.74 ' These precipitation frequency es6mama are based on a P&IIdl juraW 5ak8 Aid is the Average Resonance Interval. Plena MarioNOAA Atlas 14 Dreurem her maa hEwmatlon. NOTE: Fomating bone esEmates rear tap te eppew a tap. * Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) (yRlro m n m n mm onto min in ITIThr hr ha de de day 11 day 11 day 11 day 11 site �1 0.5J 0.65 1.07 1.46 1.82 2.21 2.39 2.94 3.52 4.05 4.75 5.27 6.03 6.67 8.67 10.56 13.45 16.09 �2 0.63 I.01 1.27 1.75 2.20 2.70 2.92 3.59 4.28 4.93 5.76 6.38 7.25 8.01 10.32 12.54 15.91 19.01 F3 0.74 1.18 1.49 2.12 2.72 3.43 3.72 4.59 5.49 6.35 7.38 8.10 9.11 9.90 12.54 15.06 19.02 22.41 10 0.82 1.32 1.67 2.41 3.14 4.04 4.41 5.45 6.56 7.55 8.78 9.52 10.63 11.46 14.34 17. 99 21.56 25.11 25 0.93 1.48 L88 2.78 3.70 4.88 5.39 6.68 8.09 9.35 10.88 11.57 12.78 13.68 16.89 19.88 25.15 28.62 50 L01 1.61 2.04 3.07 4.16 5.59 6.24 7.75 9.43 10.89 12.74 13.31 14.64 15.56 19.00 22. I6 28.04 31.76 100 1.09 1.74 2.20 3.37 4.64 6.35 7.16 8.91 10.91 12.59 14.79 15.24 16.63 17.56 21.26 24.47 EJfl 34.72 200 LIB 1.87 2.36 3.67 S.IS Z 16 8.18 10.22 12.57 14.51 17. 14 17.36 i 8.78 19.75 23.66 26.89 E1fl 37.84 500 1.29 2.04 2.57 4.09 5.86 8.34 9.69 12.15 15.09 17.41 20.69 20.87 22.04 22.99 27.19 30.30 F38--6-71 42.14 1000 1.38 2.17 2.73 4.42 6.45 9.33 10.99 13.81 17.29 19.98 23.83 23.99 24.78 25.66 30.00 32.99 42.34 45.53 The upper bound of the confidence, Interval a 90% confidence evel is the value which 5%of the simulated quaNle values for a given frequency se greater than. -These precipitation bequency ntlmalm we oared on a portal duration sales. ARI is the Average Recurrence Interval, please risen to NOAA Ate 14 Occurrent be more WonreEon. NOTE FomWtltp previous aNmates new zap b appear in rate * Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) FAR hr hr hr h8 de day (y alra) mio mio m o m n m o ig Itte day ley day day day =1 0.46 0.74 0.92 1.26 1.57 1.93 2.09 2.53 2.95 3.36 3.88 4.30 5.00 5.55 7.37 9.13 11.41 13.98 = OSS 0.87 L10 1.52 1.90 2.35 2.55 3.07 3.58 4.11 4.69 5.21 6.03 6.65 8.77 10.8-6 13.49 16.49 0 0.64 1.02 1.29 1.83 2.35 2.98 3.24 3.92 4.60 5.31 6.00 6.60 7.57 8.22 10.62 13.03 16. 88 19.41 10 0.71 1.14 1.44 2.08 2.71 3.49 3.82 4.65 5.47 6.30 7.11 7.74 8.81 9.48 12.15 14.75 18.19 21.74 25 0.80 L27 1.61 2.38 3.I8 4.21 4.66 5.67 6.72 7.74 8.76 9.39 10.60 11.30 14.25 17.12 21.08 24.84 SO 0.86 1.38 1.74 2.62 3.56 4.79 5.34 6.53 7.80 8.95 10.16 10.76 12.04 12,78 15.96 18.93 23.41 27.29 100 0.93 EE 1.67 2.86 3.94 5.40 6. 99 E45j 8.97 10.28 EE 12.20 13.56 14,34 17.73 20.80 25.75 29.68 200 I 0.99 L58 L99 3.10 4.34 6.04 6.89 8.45 10.22 11.70 13.33 13.73 I5.15 15.90 19.51 22.63 E1fl 32.07 500 1.07 1.70 2.13 EE 4.88 6.95 8.04 9.89 12.08 13.75 H7fl 16. 17 17.40 18.16 21.90 25.11 31.26 35.18 1000 1.13 1.79 2.24 3.63 5.30 7.69 8.99 11.10 13.62 15.46 17.72 18.20 19.19 19.92 23.84 27.00 33.71 37.54 -The low bound of as contldence interval a 90% confidence level rumble value., for a given frequency are Ina than ryFry 1 MAY 0 1 2013 F� GY: http://tidsc.nws.noaa. gov/cgi-binihdsclbuildout.perl?type=pf&units=us&series=pd&state... 11/11/2009 Precipitation Frequency Data Server Page 2 of 3 Tbew prKotOon eagnrcytsbTAw are beset an a parbaI9sason manna series ARI b INe Awrape Recwreoce Isswl. Pbaw refer b NOAA Atlas 14 Document N mac Isalmason. NOTE: Fomal6ng pm m m estunars near owe to Apes as mm. { Text 4ersion of tabl;T 7,1 Partial duration based Point Precipitation Frequency Estimates - Version: 3 34.55 N 77.4 W 49 ft 42 40 30 36 34 32 30 _ - 28 — 0 26 0 2/ - c 22 _..._..__...___..-__.-......__ ...__........__........_., _.._. �_...____ _.._.._. _.-..._-_ ...-.___ -_ _. 20 � IB - �. 16 m 14 - i 12 ' L 10 4 2 - - - B l 2 9 10 23 50 10B 200 SBB 1000 Average Recurrence Interval (years) Wed Nov 11 09823111 2009 ura on -m n _ 48-hr - -tlay to -.I 4-day m 13-min ehr 7-day I 68-day -+_ - 30-in 10-day , 60-min -«- 24-hr -m- 20-day -� 42 ♦0 30 36 34 32 30 r 20 p 26 oe 24 c 22 20 10 6 n 14 u IZ 10 8 6 4 2 0 Partial duration based Point Precipitation Frequency Estimates - Version: 3 34.55 N 77.4 W 49 ft �6�_..�-iir..eri■.ii.�i...NiN.),� i�CCC�:'.�C�C�'.CC�'■9B::C �eEMOM M 0 mill Omar mwm Wed Nov 11 99-25-11 2009 Average Recurrence Interval (users) 1 2 100- 5 -1- 10 300 25 1000 -aN Maps - µY� http://hdsc.nws.noaa.gov/cgi-binlhdsclbuildout.perl?type=pf&units=us&series=pd&state... 11 /11/2009 Precipitation Frequency Data Server Page 3 of 3 These maps were pruduced mina a direst map request horn the U S. Census Bureau Mapping and Cartatrathb Resources Tlailha19CV9f. Please reed jn more iafivmaaun LEGEND — State — Connector — County W Stream p Indian Resv © Military Area ® Lake/Pond/Ocean p Hat tonal Park — Street = Other Park Expressway F-7 City — Highway U T--- County,, B mi Scale 1:220503G p eu *average —true scale d9tienas on plotter resoltlol Other Maps/Photographs - View tJ.�Oyd gilei_urlhophoto quad Mngie_LDOQ) covering this location from'rerraServer; USCS Aerial Photograph may also be available front this site. A DOQ is a computer -generated image of an aerial photograph in which image displacement caused by terrain relief and cement tilts has been removed. It combines the image characteristics of a photograph with the geometric qualities of a map. Visit the USGS for more information. Watershed/Stream Flow Information - Eiad_the_WateSshed for this location using the U.S. Environmental Protection Agency's site. Climate Data Sources - Precipitation frequency results are bared on data from a variety ofsources, but largely NCDC. The following links provide general information about observing sites in the area, regardless of if their data was used in this study. For detailed information about the stations used in this study, please refer to NOW Atlas 14 Document. Using the National Climatic Data Center's (NCDCI station search engine, locate other climate stations within: +/-30+1-30 minutes ,,,OR,,, }. Fl degrtse __ i of this location (34.55/-77.4). Digital ASCII data can be obtained directly from !L_ft)C Hydrometeorel.giul Design studies Center DOCNOA .ti.n.1 weemer Stevie¢ USS tut -West Higher, Silver Spring, Me 20910 (301) 7 13-1669 Quesdaa7: HDSC.Duesdunl2roe..go, Diu1jimsc MAY O i 20n http://hdsc.nws. noaa. gov/cgi-bin/hdsc/buildout.perl?type=pf&units=us&series=pd&state... 11 / 11 /2009 Hydrologic Soil Group-0nslow County, North Carolina Hydrologic Soil Group ST Wooten - Burton Park Lot 4 Hydrologic Soil Group —Summary by Map Unit—Onslow County, North Carolina (NC133) Map unll symbol Map unit name I Rating Acres in AOI Percent of AOI BeB Ln Baymeade fine sand, 0 to 6 percent slopes Leon fine sand LA _ 6.0 59.5% 4.1 40.5% Totals for Area of Interest 10.0 100.0% Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff None Specified Tie -break Rule: Higher Natural Resources Conservation Service COMPOSITE SCS CN WOODED = 30x59.5% + 77x40.5% = 49 OPEN SPACE = 39x59.5% + 80x40.5% = 56 Web Soil Survey National Cooperative Soil Survey �a ��q� 4/25/2013 `L.v Q Od' CL3 of 3 MAY 0 1 2013 BY: Job File: K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW BURTON PARK LOT 4.PP Rain Dir: K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\ -------------------------- -------------------------- JOB TITLE Project Date: 4/14/2013 Project Engineer: WR Project Title: ST Wooten Burton Park Project Comments: MAY 0 1 2013 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Table of Contents i Table of Contents +++++++++++*+*++++++++ MASTER SUMMARY ****+*****++++++++++++ Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Onslow Type III Design Storms ...................... 2.01 ++++++++++++*++**+++++ TC CALCULATIONS ********************* NORTH PRE....... TC Calcs ........................... 3.01 NORTH UT POST... Tc Calcs ........................... 3.03 SOUTH PRE....... Tc Calcs ........................... 3.05 SOUTH UT POST... Tc Calcs ........................... 3.07 TO BMP 1........ Tc Calcs ........................... 3.09 TO BMP 2........ Tc Calcs ........................... 3.11 +++++++++**++**+++++++ CN CALCULATIONS +****+*++++++++++++++ NORTH PRE....... Runoff CN-Area ..................... 4.01 NORTH UT POST... Runoff CN-Area ..................... 4.02 SOUTH PRE....... Runoff CN-Area ..................... 4.03 SOUTH UT POST... Runoff CN-Area ..................... 4.04 SIN: Bentley PondPack (10.00.027.00) 8:22 AM Bentley Systems, Inc. 4/26/2013 Table of Contents ii Table of Contents (continued) TO BMP I........ Runoff CN-Area ..................... 4.05 TO BMP 2........ Runoff CN-Area ..................... 4.06 a aaa+a+«aaaaaa«aaaaaaa« POND VOLUMES **+a«wwwawawaaaa«www+aw WET POND 1...... Vol: Elev-Area ..................... 5.01 WET POND 2...... Vol: Elev-Area ..................... 5.02 ««««««««««aaaa++aaa+ OUTLET STRUCTURES ***«+««««w««+++a«a««« Outlet 1........ Outlet Input Data .................. 6.01 Composite Rating Curve ............. 6.04 Outlet 2........ Outlet Input Data .................. 6.06 Composite Rating Curve ............. 6.09 S/N: Bentley PondPack (10.00.027.00) 8:22 AM ECEI E MAY 0 1 2013 BY: Bentley Systems, Inc. 4/26/2013 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw fuL•I7l 01=big"EelN&8*i]:TZ 1 &uYif9uuy"-.0 Network Storm Collection: Onslow Type III Total Depth Rainfall Return Event in Type RNF ID 1 3.6800 Synthetic Curve TypeIII 24hr 10 6.9100 Synthetic Curve TypeIII 24hr 25 8.5600 Synthetic Curve TypeIII 24hr 50 9.9800 Synthetic Curve TypeIII 24hr 100 11.5600 Synthetic Curve TypeIII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Qpeak Qpeak Node ID Type Event ac-ft Trun hrs CIS NORTH POST JCT 1 - .429 -- ---- 13.6000 --- -------- .35 NORTH POST JCT 10 .997 12.1500 3.22 NORTH POST JCT 25 1.310 12.3000 5.48 NORTH POST JCT 50 1.587 12.2000 8.63 NORTH POST JCT 100 1.902 12.1500 12.33 NORTH PRE AREA 1 .076 12.2000 .45 NORTH PRE AREA 10 .402 12.1500 4.47 NORTH PRE AREA 25 .622 12.1000 7.16 NORTH PRE AREA 50 .829 12.1000 9.73 NORTH PRE AREA 100 1.075 12.1000 12.73 NORTH UT POST AREA 1 .026 12.2000 .14 NORTH UT POST AREA 10 .146 12.1500 1.61 NORTH UT POST AREA 25 .228 12.1000 2.61 NORTH UT POST AREA 50 .306 12.1000 3.57 NORTH UT POST AREA 100 .398 12.1000 4.70 S/N: Bentley PondPack (10.00.027.00) 8:22 AM Max Max WSEL Pond Storage ft ac-ft -------------------- Bentley Systems, Inc. 4/26/2013 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left6Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs cfs ft ac-ft ----------------- *OUT POST ---- JCT ------ 1 ---------- 1.713 -- --------- 13.5500 -------- 1.51 -------- ------------ *OUT POST JCT 10 3.937 12.2000 24.53 *OUT POST JCT 25 5.153 R 12.1500 38.80 *OUT POST JCT 50 6.226 R 12.1500 50.55 *OUT POST JCT 100 7.441 12.1500 63.20 *OUT PRE JCT 1 .333 12.1500 2.18 *OUT PRE JCT 10 1.705 12.1500 19.09 *OUT PRE JCT 25 2.624 12.1000 30.36 *OUT PRE JCT 50 3.487 12.1000 41.00 *OUT PRE JCT 100 4.506 12.1000 53.44 SOUTH POST JCT 1 1.284 13.4500 1.16 SOUTH POST JCT 10 2.940 R 12.2000 21.37 SOUTH POST JCT 25 3.843 R 12.1500 33.45 SOUTH POST JCT 50 4.639 R 12.1500 42.01 SOUTH POST JCT 100 5.539 R 12.1500 50.87 SOUTH PRE AREA 1 .258 12.1500 1.74 SOUTH PRE AREA 10 1.304 12.1500 14.62 SOUTH PRE AREA 25 2.002 12.1000 23.20 SOUTH PRE AREA 50 2.658 12.1000 31.27 SOUTH PRE AREA 100 3.431 12.1000 40.70 SOUTH UT POST AREA 1 .079 12.1500 .53 SOUTH UT POST AREA 10 .400 12.1500 4.48 SOUTH UT POST AREA 25 .614 12.1000 7.11 SOUTH UT POST AREA 50 .814 12.1000 9.5B SOUTH UT POST AREA 100 1.052 12.1000 12.47 TO BMP 1 AREA 1 1.227 12.1000 14.31 TO BMP 1 AREA 10 2.565 12.1000 28.53 TO BMP 1 AREA 25 3.255 12.1000 35.70 TO BMP 1 AREA 50 3.850 12.1000 41.84 TO BMP 1 AREA 100 4.513 12.1000 48.66 SIN: Bentley Pond Pack (10.00.027.00) 8:22 AM MAY 01 2013 Bentley Systems, Inc. 4/26/2013 Type.... Master Network Summary Page 1.03 Name.... Watershed File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw MASTER NETWORK SUMMARY SOS Unit Hydrograph Method (`Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank -None; L=Left; R=Rt; LR=Left6Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs cfs ft ac-ft TO BMP 2 AREA 1 .412 ------- 12.1000 -------- 4.81 ------ TO BMP 2 AREA 10 .862 12.1000 9.58 TO BMP 2 AREA 25 1.093 12.1000 11.99 TO BMP 2 AREA 50 1.293 12.1000 14.06 TO BMP 2 AREA 100 1.516 12.1000 16.35 WET POND 1 IN POND 1 1.227 12.1000 14.31 WET POND 1 IN POND 10 2.565 12.1000 28.53 WET POND 1 IN POND 25 3.255 12.1000 35.70 WET POND 1 IN POND 50 3.850 12.1000 41.84 WET POND 1 IN POND 100 4.513 12.1000 48.66 WET POND 1 OUT POND 1 1.205 13.5500 1.03 38.43 .783 WET POND 1 OUT POND 10 2.540 R 12.2000 17.70 39.15 1.122 WET POND 1 OUT POND 25 3.230 R 12.1500 26.43 39.38 1.233 WET POND 1 OUT POND 50 3.624 R 12.1500 32.65 39.53 1.307 WET POND 1 OUT POND 100 4.487 R 12.1500 38.79 39.66 1.376 WET POND 2 IN POND 1 .412 12.1000 4.81 WET POND 2 IN POND 10 .862 12.1000 9.58 WET POND 2 IN POND 25 1.093 12.1000 11.99 WET POND 2 IN POND 50 1.293 12.1000 14.06 WET POND 2 IN POND 100 1.516 12.1000 16.35 WET POND 2 OUT POND 1 .403 13.7500 .31 41.19 .271 WET POND 2 OUT POND 10 .851 12.5000 2.23 41.89 .470 WET POND 2 OUT POND 25 1.082 12.4000 4.07 42.18 .555 WET POND 2 OUT POND 50 1.282 12.3000 6.17 42.35 .607 WET POND 2 OUT POND 100 1.504 12.2500 8.51 42.51 .657 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Design Storms Name.... Onslow Type III Page 2.01 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw Title... Project Date: 4/14/2013 Project Engineer; WR Project Title: ST Wooten Burton Park Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Storm Tag Name = 1 Onslow Type III Data Type, File, ID = Synthetic Storm Storm Frequency = 1 yr Total Rainfall Depth= 3.6800 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= Storm Tag Name = 10 ------------ TypeIII 24hr 1000 hrs End= 24.0000 hrs Data Type, File, ID = Synthetic Storm TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 6.9100 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 25 Data Type, File, ID = Synthetic Storm TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.5600 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 50 Data Type, File, ID = Synthetic Storm Storm Frequency = 50 yr Total Rainfall Depth= 9.9800 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= Storm Tag Name = 100 _____________________________ TypeIII 24hr 1000 hrs End= 24.0000 hrs Data Type, File, ID = Synthetic Storm TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 11.5600 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End- 24.0000 hrs rMA R..vE �f/ E Y 01 200 BY: SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Tc Calcs Name.... NORTH PRE Page 3.01 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ ----------------------------------------------------------------------- Segment #1: Tc: User Defined ------------------------------------------------------------------------ Segment #1 Time: .1200 hrs SIN: Bentley PondPack (10.00.027.00) Total Tc: .1200 hrs 8:22 AM Bentley Systems, Inc. 4/26/2013 Type.... Tc Celts Name.... NORTH PRE Page 3.02 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw -- - - - -- ----- ---------------------------- -- -- ----- Tc Equations used... ------------------------------------------------------------------------ ==== User Defined Tc = Value entered by user Where: Tc = Time of concentration MAY 01 2013 BV:-_------- S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Tc Calcs Page 3.03 Name.... NORTH UT POST File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined SIN: Bentley PondPack (10.00.027.00) Segment #1 Time: .1200 hrs ------------------------------ ---------------------- Total Tc: .1200 hrs 8:22 AM Bentley Systems, Inc. 4/26/2013 Type.... Tc Calcs Name.... NORTH UT POST Page 3.04 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw --------------------------------------------------------------------- Tc Equations used... --------------------------------------------------------------------- ==_= User Defined Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley PondPack (10.00.027.00) 8:22 AM MAY 0 1 2013 Jd BY; Bentley Systems, Inc. 4/26/2013 Type.... Tc Calcs Name.... SOUTH PRE Page 3.05 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .1200 hrs ------------------------------------------------------------------------ S/N: Bentley PondPack (10.00.027.00) :7F1� Total Tc: .1200 hrs Bentley Systems, Inc. 4/26/2013 Type.... Tc Calcs Name.... SOUTH PRE Page 3.06 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw ------------------------------------------------------- Tc Equations used... - - -- - - ---------------------------------- - - -------- - ----- - ---- ___= User Defined Tc = Value entered by user Where: Tc = Time of concentration FIEGEOVE h1tiY 01 1113 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Tc Calcs Name.... SOUTH UT POST Page 3.07 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .1200 hrs -------------------------------------------------------------------- ---------------------- Total Tc: .1200 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... To Calcs Name.... SOUTH UT POST Page 3.08 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ==_= User Defined To = Value entered by user Where: To = Time of concentration EGE0VE1 R MAY 0 1 2013 BY: S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Tc Calcs Name.... TO BMP 1 Page 3.09 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined -------------------------------------- SIN: Bentley PondPack (10.00.027.00) Segment #1 Time: .0830 hrs ------------------------------- Total Tc: .0830 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs 8:22 AM Bentley Systems, Inc. 4/26/2013 Type.... Tc Calcs Name.... TO BMP 1 Page 3.10 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw _______________________ _____________________ __ Tc Equations used... ------------------------------------------------------------------------ ==== User Defined Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley PondPack (10.00.027.00) 8:22 AM ECE9VE MAY 01 2013 BY: Bentley Systems, Inc. 4/26/2013 Type.... Tc CaIcs Name.... TO BMP 2 Page 3.11 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw TIME OF CONCENTRATION CALCULATOR ------------------------------------------------------------------------ Segment #1: Tc: User Defined Segment #1 Time: .0830 hrs ------------------------------------------------------------------------ S/N: Bentley PondPack (10.00.027.00) Total Tc: .0830 hrs Calculated Tc < Min.Tc; Use Minimum Tc... Use Tc - .0833 hrs 8:22 AM Bentley Systems, Inc. 4/26/2013 Type.... Tc Calcs Name.... TO BMP 2 Page 3.12 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw ----------------------------- Tc Equations used... ----------------------------- ==== User Defined Tc = Value entered by user Where: Tc = Time of concentration I;- 1ECEIVE MAY 0 9 20B SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Runoff CN-Area Name.... NORTH PRE Page 4.01 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Soil/Surface Description ___------- woods - good open space - good Impervious Area Adjustment Adjusted CN acres %C RUC CN 49 .610 49. 00 56 1.830 56.00 COMPOSITE AREA & WEIGHTED CN ---> 2.440 54.25 (54) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Runoff CN-Area Name.... NORTH UT POST Page 4.02 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... ----------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres 8C SUC CN -------------------------------- ------------- ----- ----- ------ wooded - good 49 .360 49.00 open - good 56 .570 56.00 COMPOSITE AREA & WEIGHTED CN ---> .930 53.29 (53) ........................................................................... ........................................................................... S/N: Bentley PondPack (10.00.027.00) 8:22 AM rM EOVE'' AY 01 200 BY: Bentley Systems, Inc. 4/26/2013 Type.... Runoff CN-Area Name.... SOUTH PRE Page 4.03 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres &C %UC CN ------------------------- ---- --------- woods - good 49 .630 49.00 open space - good 56 6.940 56.00 COMPOSITE AREA & WEIGHTED CN ---> 7.570 55.42 (55) ........................................................................... ........................................................................... SIN: Bentley PondPack (10.00.027.00) 8:22 AM Bentley Systems, Inc. 4/26/2013 Type.... Runoff CN-Area Name.... SOUTH UT POST Page 4.04 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... -------------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ------------- ----- ----- ------ wooded - good 49 .250 49.00 open - good 56 2.070 56.00 COMPOSITE AREA 6 WEIGHTED CN ---> 2.320 55.25 (55) ........................................................................... ........................................................................... MAy 01 2013 SIN: Bentley PondPack (10.00.027.00) 4:09 PM Bentley Systems, Inc. 4/26/2013 Type.... Runoff CN-Area Name.... TO BMP 1 Page 4.05 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... -------------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C 8UC CN ------------------------------- impervious ---- 98 --------- 4.020 ----- ----- ------ 98.00 BMP 56 .640 51.00 77.42 open - good 56 .240 56.00 future impervious area 98 .160 98.00 COMPOSITE AREA & WEIGHTED CN ---> ........................................................................... ........................................................................... 5.060 93.40 (93) SIN: Bentley PondPack (10.00.027.00) 4:09 PM Bentley Systems, Inc. 4/26/2013 Type.... Runoff CN-Area Name.... TO IMP 2 Page 4.06 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... -------------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres 8C RUC CN ------------------------------ impervious ---- 98 --------- 1.220 - ------ 98.00 BMP 56 .400 50.00 77.00 future impevious 98 .080 98.00 COMPOSITE AREA & WEIGHTED CN ---> ........................................................................... ........................................................................... 1.700 93.06 (93) ECE9VENl MAY 01 2013 BY: S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 4:09 PM 4/26/2013 Type.... Vol: Elev-Area Name.... WET POND 1 Page 5.01 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ----------------------------------------------------------------------- (sq.in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) 36.50 ----- 14224 0 .000 .000 37.00 ----- 16788 46465 .178 .178 38.00 ----- 19063 53740 .411 .589 39.00 ----- 20955 60005 .459 1.048 40.00 ----- 22910 65776 .503 1.552 41.00 ----- 26189 73594 .563 2.115 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Areal)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: Bentley PondPack (10.00.027.00) 4:09 PM Bentley Systems, Inc. 4/26/2013 Type.... Vol: Elev-Area Name.... WET POND 2 Page 5.02 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (Et) ----------------------------------------------------------------------- (sq.in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) 40.00 ----- 6078 0 .000 .000 40.50 ----- 10473 24529 .094 .094 41.00 ----- 11525 32984 .126 .220 42.00 ----- 12962 36709 .281 .501 43.00 ----- 14262 40820 .312 .813 44.00 ----- 24104 56907 .435 1.249 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Areal)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 1, MAv 0 9 202 BY. SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Outlet Input Data Name.... Outlet 1 Page 6.01 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw REQUESTED POND WS ELEVATIONS: Min. Elev.= 36.50 ft Increment = .10 It Max. Elev.= 41.00 It ++++++++++++++++++++++++++++++++++++++++++++++ OUTLET CONNECTIVITY ++++++++++++++++++++++++++++++++++++++++++++++ ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Orifice -Circular 00 ---> TW 36.500 41.000 Weir -Rectangular WO ---> TW 38.000 41.000 Weir -Rectangular W1 ---> TW 38.500 41.000 TW SETUP, DS Channel S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Outlet Input Data Name.... Outlet 1 Page 6.02 File.... K:\12\12-0330\120335.10-ST Wooten Lot 9 Burton Park\H-H\STW Burton Park Lot 9.ppw OUTLET STRUCTURE INPUT DATA Structure ID Structure Type -------------- # of Openings Invert Elev. Diameter Orifice Coeff. Structure ID Structure Type -------------- # of Openings Crest Elev. Weir Length Weir Coeff. Weir TW effects Structure ID Structure Type -------------- # of Openings Crest Elev. Weir Length Weir Coeff. Weir TW effects = 00 = Orifice -Circular -1 = 36.50 It .2083 ft .600 = WO = Weir -Rectangular ------------------ = 1 38.00 It = 1.00 ft 3.100000 (Use adjustment equation) = W1 = Weir -Rectangular = 1 38.50 ft = 9.00 ft 3.100000 (Use adjustment equation) �aa3 EGEO \49 E MAY 0 1 202 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Outlet Input Data Name.... Outlet l Page 6.03 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 CIS S/N: Bentley Systems, Inc. Bentley Pond Pack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Composite Rating Curve Name.... Outlet 1 Page 6.04 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw *'*** COMPOSITE OUTFLOW SUMMARY """* WS Elev, Total Q Notes ------------- -------- Converge ------------------------ Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures -------- 36.50 ------- .00 -------- Free ----- Outfall -------------------------- None contributing 36.60 .01 Free Outfall 00 36.70 .05 Free Outfall 00 36.80 .07 Free Outfall 00 36.90 .09 Free Outfall 00 37.00 .10 Free Outfall 00 37.10 .12 Free Outfall 00 37.20 .13 Free Outfall 00 37.30 .14 Free Outfall 00 37.40 .15 Free Outfall 00 37.50 .16 Free Outfall 00 37.60 .16 Free Outfall 00 37.70 .17 Free Outfall 00 37.80 .lB Free Outfall 00 37.90 .19 Free Outfall 00 38.00 .19 Free Outfall 00 +WO 38.10 .30 Free Outfall 00 +WO 38.20 .47 Free Outfall 00 +WO 38.30 .69 Free Outfall 00 +WO 3B.40 .94 Free Outfall 00 +WO 38.50 1.21 Free Outfall 00 +WO +W1 38.60 2.38 Free Outfall 00 +WO +W1 36.70 4.28 Free Outfall 00 +WO +W1 38.80 6.66 Free Outfall 00 +WO +W1 38.90 9.41 Free Outfall 00 +WO +W1 39.00 12.49 Free Outfall 00 +WO +W1 39.10 15.84 Free Outfall 00 +WO +W1 39.20 19.45 Free Outfall 00 +WO +W1 39.30 23.28 Free Outfall 00 +WO +W1 39.40 27.32 Free Outfall 00 +WO +W1 39.50 31.55 Free Outfall 00 +WO +W1 39.60 35.95 Free Outfall 00 +WO +W1 39.70 40.52 Free Outfall 00 +WO +W1 39.80 45.24 Free Outfall 00 +WO +W1 39.90 50.11 Free Outfall 00 +WO +W1 40.00 55.11 Free Outfall 00 +WO +W1 40.10 60.24 Free Outfall 00 +WO +W1 40.20 65.48 Free Outfall 00 +WO +W1 ECEB E4 �9 MAY 0 1 2013 BY: S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Composite Rating Curve Name.... Outlet 1 Page 6.05 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes -- Converge --------------------- Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures 40.30 ------- 70.84 -------- Free ----- Outfall -------------------------- 00 +WO +W1 40.40 76.30 Free Outfall 00 +WO +W1 40.50 81.86 Free Outfall 00 +WO +W1 40.60 87.51 Free Outfall 00 +WO +W1 40.70 93.25 Free Outfall 00 +WO +W1 40.80 99.07 Free Outfall 00 +WO +WI 40.90 104.97 Free Outfall 00 +WO +W1 41.00 110.94 Free Outfall 00 +WO +W1 SIN: Bentley PondPack (10.00.027.00) 8:22 AM Bentley Systems, Inc. 4/26/2013 Page 6.06 Type.... Outlet Input Data Name.... Outlet 2 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw REQUESTED POND WS ELEVATIONS: Min. Elev.= 40.00 It Increment = .10 ft Max. Elev.= 44.00 ft OUTLET CONNECTIVITY ++++++++++++++«a«aah*4+++4++4#+«+4«««a#+##aaaa ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall El, ft E2, ft Orifice -Circular 00 ---> TW 40.000 44.000 Weir -Rectangular W1 ---> TW 41.000 44.000 Weir -Rectangular WO ---> TW 42.000 44.000 TW SETUP, DS Channel �ECEIVEl �.E MAY 01 2013 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Type.... Outlet Input Data Name.... Outlet 2 Page 6.07 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw OUTLET STRUCTURE INPUT DATA Structure ID = 00 Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 40.00 ft Diameter = .1250 ft Orifice Coeff. _ .600 Structure ID = W1 Structure Type = Weir -Rectangular ------------------------------------ # of Openings = 1 Crest Elev. = 41.00 ft Weir Length = 1.00 ft Weir Coeff. = 3.100000 Weir TW effects (Use adjustment equation) Structure ID = WO Structure Type = Weir -Rectangular ------------------------------------ # of Openings = 1 Crest Elev. = 42.00 ft Weir Length = 4.00 ft Weir Coeff. = 3.100000 Weir TW effects (Use adjustment equation) S/N: Bentley PondPack (10.00.027.00) RI & Bentley Systems, Inc. 4/26/2013 Type.... Outlet Input Data Name.... Outlet 2 Page 6.08 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs S/N: Bentley PondPack (10.00.027.00) 8:22 AM MAY 0 1 20B BY: Bentley Systems, Inc. 4/26/2013 Type.... Composite Rating Curve Name.... Outlet 2 Page 6.09 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw ***** COMPOSITE OUTFLOW SUMMARY "'* WS Elev, Total Q Notes ---------------- -------- Converge ------------------------- Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures 40.00 .00 Free Outfall _____________ __---- None contributing 40.10 .01 Free Outfall 00 40.20 .02 Free Outfall QO 40.30 .03 Free Outfall 00 40.40 .03 Free Outfall 00 40.50 .04 Free Outfall 00 40.60 .04 Free Outfall 00 40.70 .05 Free Outfall 00 40.80 .05 Free Outfall 00 40.90 .05 Free Outfall 00 41.00 .06 Free Outfall 00 +W1 41.10 .16 Free Outfall 00 +W1 41.20 .33 Free Outfall 00 +W1 41.30 .54 Free Outfall 00 +W1 41.40 .79 Free Outfall 00 +W1 41.50 1.06 Free Outfall 00 +Wl 41.60 1.34 Free Outfall 00 +W1 41.70 1.64 Free Outfall 00 +W1 41.80 1.94 Free Outfall 00 +W1 41.90 2.25 Free Outfall 00 +W1 42.00 2.56 Free Outfall 00 +W1 +WO 42.10 3.26 Free Outfall 00 +W1 +WO 42.20 4.28 Free Outfall 00 +W1 +WO 42.30 5.50 Free Outfall 00 +W1 +WO 42.40 6.86 Free Outfall 00 +W1 +WO 42.50 8.35 Free Outfall 00 +W1 +WO 42.60 9.95 Free Outfall 00 +W1 +WO 42.70 11.64 Free Outfall 00 +W1 +WO 42.80 13.41 Free Outfall 00 +W1 +WO 42.90 15.24 Free Outfall 00 +W1 +WO 43.00 17.14 Free Outfall 00 +W1 +WO 43.10 19.09 Free Outfall 00 +W1 +WO 43.20 21.09 Free Outfall 00 +W1 +WO 43.30 23.13 Free Outfall 00 +W1 +WO 43.40 25.20 Free Outfall 00 +W1 +WO 43.50 27.31 Free Outfall 00 +W1 +WO 43.60 29.44 Free Outfall 00 +W1 +WO 43.70 31.59 Free Outfall 00 +W1 +WO SIN: Bentley PondPack (10.00.027.00) 8:22 AM Bentley Systems, Inc. 4/26/2013 Type.... Composite Rating Curve Name.... Outlet 2 Page 6.10 File.... K:\12\12-0330\120335.10-ST Wooten Lot 4 Burton Park\H-H\STW Burton Park Lot 4.ppw ««««« COMPOSITE OUTFLOW SUMMARY «««« WS Elev, Total Q Notes -------------- -------- Converge ------------------------ Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures -------- 43.80 ------- 33.76 -------- ----- Free Outfall -------------------------- 00 +W1 +WO 43.90 35.94 Free Outfall 00 +W1 +WO 44.00 38.13 Free Outfall 00 +W1 +WO �T Ta EIV MAy 01 202 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 8:22 AM 4/26/2013 Appendix A A-1 Index of Starting Page Numbers for ID Names _____ N ----- NORTH PRE... 3.01, 4.01 NORTH UT POST... 3.03, 4.02 _____ 0 _____ Onslow Type III... 2.01 Outlet 1... 6.01, 6.04 Outlet 2... 6.06, 6.09 S ---- SOUTH PRE... 3.05, 4.03 SOUTH UT POST... 3.07, 4.04 _____ T ----- TO BMP 1... 3.09, 4.05 TO BMP 2... 3.11, 4.06 _____ W ----- Watershed ... 1.01 WET POND 1... 5.01 WET POND 2... 5.02 SIN: Bentley PondPack (10.00.027.00) 8:22 AM Bentley Systems, Inc. 4/26/2013 4/26/13 Nath Cardina Secretaryof State North Carolina Elaine F. Marshall DEPARTMENT OF THE Secretary SECRETARY OF STATE PO Box 29622 Raleigh, NC 27626-0622 (919)807-2000 Date: 4/26/2013 here to: Document Filings I File an Annual Report I J Print a pre -populated Annual Report Form I Amended A Previous Annual Report I C rporation Names Name Name Type NC S. T. WOOTEN CORPORATION LEGAL NC S. T. WOOTEN CONSTRUCTION PREV LEGAL CO., INC. B isiness Corporation Information SOSID: 0164800 Status: Current -Active Effective Date: 3/19/1956 Citizenship: DOMESTIC State of Inc.: NC Duration: PERPETUAL Annual Report Status: ADM REVIEW RE gistered Agent Agent Name: WOOTEN JR, SETH T Office Address: 3801 BLACK CREEK ROAD WILSON NC 27893 Mailing Address: PO BOX2408 WILSON NC 27894 Principal Office Office Address: 3801 BLACK CREEK RD SE WILSON NC 27893-9568 Mailing Address: PO BOX2408 WILSON NC 27894 Officers Title: PRESIDENT Name: CHRISTOPHERT. WOOTEN Business Address: 4811 WIMBLEDON WILSON NC 27896 Tiflo• CFr:RFTARV EC;EIVtc'--�A MAY 0 1 2013 BY: wm.secretary.state.nc.us/capaafims/Cap.aspx?Pitemld=4857109 1/3 4/26/13 .d North Carolina Secretaryot State Name: WILLIAM R. DAWSON Business Address: 403 GRAIL PLACE GARNER NC 27529 Title: SECRETARY Name: EDITH H. EDMONSON Business Address: 8169 GLOVER ROAD FOUNTAIN NC 27829 Title: SECRETARY Name: DOUGLAS W GODWIN Business Address: 3348 NC 91 HWY WILSON NC 27893 Title: VICE PRESIDENT Name: BRIAN F. GURGANUS Business Address: 102 WINDSWEPT LANE CARY NC 27511 Title: VICE PRESIDENT Name: HENRY D. BUTTS JR. Business Address: 3521 WHETSTONE WILSON NC 27896 Title: VICE PRESIDENT Name: NANCY W HAMMOCK Business Address: 3001 FARMINGTON PLACE WILSON NC 27896 Title: VICE PRESIDENT Name: KEITH H MERRICK Business Address: 1213 WAVERLY ROAD WILSON NC 27896 Title: VICE PRESIDENT Name: RICHARD E. VICK Business Address: 7451 WOODBRIDGE STANTONSBURG NC27883 Title: VICE PRESIDENT Name: GREGORY N. NELSON Business Address: 155 BENNETT PLAZA CLAYTON NC 27520 Title: VICE PRESIDENT Name: JONATHAN K. BIVEN Business Address: 333 S. MAIN STREET WAKE FOREST NC 27587 Class Shares COMMON 50000 PREFERRED 450000 No Par Value Par Value 0 0 MAY 0 9 2013 BY: 2/3 4/26/13 North Carolina Secretary of State website is prodded to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: jE jMAY 01 2013 BY:_ 3/3 i Christine From: Nelson, Christine Sent: Monday, April 29, 2013 4:35 PM To: 'Diaz, Jennifer'; Fisher, Ryan; Werenko, Dale; Butch@stwcorp.com Cc: Russell, Janet; Scott, Georgette Subiec : RE: ST Wooton Let me clarify - the second option ends in the Division issuing a letter (not a draft permit) acknowledging a complete project, but would require the rest of the documents to be submitted in order for the permit to be approved. The permit w ould be drafted internally but would not be issued until the proper paperwork is submitted. I am not aware that this has been done before and could be tricky for both sides. If you c n turn it around that quickly, Weds is fine. Please make sure to QA/QC the package. Often times when people hurry to turn it around, numbers don't get updated, resulting in a lengthy letter requesting additional information. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Piaz, Jennifer [mailto:jdiazOwithersravenel.com] Sent: Monday, April 29, 2013 4:15 PM To: Neon, Christine; Fisher, Ryan; Werenko, Dale; Butch(a)stwcoro.com Cc: Russell, Janet; Scott, Georgette Subject: RE: ST Wooton Christi e, Thanks for meeting with us today. We would like to take you up on the second option you offered —a draft permit until the deed or purchase agreement can be submitted. As for t�e wet pond designs, BMP #1 will likely still be an 85% pond with level spreader and filter strip but BMP #2 will be upd ted to a 90%TSS removal efficiency pond. The original application, level spreader / filter strip supplement form and O&M, along with the updated plans and calcula ions will be ready to submit tomorrow. That would make the mail in date Wednesday May 1" if that works with your schedule. Please let me know when you will be able to receive our application. Thank From: Nelson, Christine [mailto:christine.nelsonCalncdenr.gov] Sent: Monday, April 29, 2013 2:14 PM To: Fisher, Ryan; Diaz, Jennifer; Werenko, Dale; Butch(d)stwcoro.com Cc: Ru sell, Janet; Scott, Georgette Subje ST Wooton All, I hope included everyone. If not, please pass it on. I spoke with Georgette, the Storrmwater Supervisor here in Wilmington, about the provided public notice. She confirmed that without the purchase agreement, the permit would have to be issued to the county and later transferred to ST Wooten. The other option that could be offered is to review the package and draft the permit but not issue the permit until the deed or purchase agreement is in place. Instead, a letter acknowledging the complete project would be issued which stipulates that the permit to ST Wooten will be issued once the required documentation is in place and provided to the Division. As for the vegetated filter strips required for the 85% ponds, this is addressed in 15A NCAC 02.1-1.1008(c)(4) which says: Vegemtive filters designed in accordance with Paragraph (l) of this Rule are required from the overflow of all infiltration systems and discharge of all stonnwater wet detention ponds. These filters shall be at least 30 feet in length, except where a minimum length of 50 feet is required in accordance with Ride. 1005(2)(b)(iii) of this Section; Paragraph f of this same section includes the design criteria of the vegetated filters to be used for the pond discharge: Vegetative Filter Requirements. Vegetative filters shall be used as a non-structural method jar providing additional infiltration, filtering fpolhdants and minimizing stormwater impacts. Requirements for these filters are as follows: (1) A distribution device such as a Swale shall be used to provide even distribution ofrunoff across the width of the vegetative filter; (2) The slope and length of the vegetative filter shall be designed, constructed and maintained so as to provide a non -erosive velocity Olow through the filter for the 10 year storm and shall have a slope offive percent or less, where practicable; and O Vegetation in the filter may be natural vegetation, grasses or artificially planted wetland vegetation appropriate for the site Based on these linked sections of the rule, the vegetated filter strip to be provided for a 85% pond is to be based on the 10-year storm event. Please I t me know if you have any questions about this and how you plan on addressing the filter strips for these two ponds. Also, let Janet or I know when you think you might be ready so we can schedule a mail in date for this project. Christin Nelson Environ ental Engineer State St rmwater Program NC Divis on of Water Quality 127 Car Iinal Drive Ext. Wilmington, NC 28405 Phone:d10-796-7323 Email coirespondence to and from this address is subject to the North Carolina Public Records Law and may, be disclosed to third parties unless the content is exempt by statute or other regulation. Icr _J I 0 -1 �I�I11I1 I C 01 WITHERS 6C� RAVENEL ENGINEERS I PLANNERS I SURVEYORS JENNIFER C. DIAZ, PE, LEED-AP ui MacKenan Drive I Cary, North Carolina 27511 tel: 919.469.3340 1 fax: 9i9.467.6008 direct: 919 535.5186 www.withersravenet.com e-mail: jdiaz@withersravenet.com WITHERS � RAVENEL ENGINEERS I PLANNERS I SURVEYORS RYAN FISHER, PE 11$ /MacKenan Drive I Cary, North Carolina 27511 tel:919.469-3340 I fax:919.467.6008 direct: 919 535 5175 www.witherstavenet.com e-mail: rfsher@withersravenet.com Fa DENR Use ONLY RReviewer:GIJ �--ARA North Carolina Department of Environment and �1 Natural Resources $e'm" NCDENR Request for Express Permit Review Time: : 00 confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (POF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296.4698;alison.davidsorQncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.leeGDncdenr.gov • Mooresville & Winston Salem Region - Patrick Grogan 704-235.2107 or patrick.arogan(rDncdenr.gov • Washington Region -Lyn Hardison 252.948.3842 or lim.hardison(adnCdenrgov • Wilmington Region -Janet Russell910-796.7302 or ianet.russell(a7ncdenr.pov • Wilmington Region -Cameron Weaver 910-796-7303 or cameron.weavea_ncdenr uov NOTE: Project application received alter 12 noon will be stamped in the following work day. Project Name: ST WOOTEN - BURTON PARK LOT 4 County: ONSLOW SW SW SW SW SW Applicant: BUTCH LAWTER Company: ST WOOTEN CORPORATION Address: 3801 BLACK CREEK ROAD City: WILSON, State: NC Zip: 27893-_ O c,e-49*i Phone: 252-291-5165, Fax: 252-243-0901, Email: Butch@stwooro.com Physical Location:BURTON PARK BOULEVARD Project Drains into UNNAMED TRIBUTARY TO NEW RIVER waters — Water classification C-NSW (please visit here to look up stream classification) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N, within Y2 mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N EngineerlConsultant: DALE WERENKO Company: WITHERS & RAVENEL t� B p pr.,, Address: 115 MACKENAN DRIVE City: CARY, State: NC Zip: 27511-_ t a o0' IC F Phone: 919469.3340, Fax: 919467-6008. Email: DWERENKO@WITHERSRAVENEL.COM APR 9 2��3 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: _ BY:__ SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization El Minor Variance El Major General Variance ❑ State Slormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ It Curb Oullet Swales ❑ Off -site [SW _ (Provide permit #)] ® High Density -Detention Pond 2 # Treatment Systems ❑ High Density -infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ElHigh Density —SW Wetlands _ # Treatment Systems El High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 9 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed: ® Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ® No Received from US ACOE ❑ Yes ® No Buffer Impacts: ® No ❑ YES: _acre(s) Isolated wetland on Property ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit For DENR use only Fees lit for multiplepermits: Check# Total Fee Amount $ SUBIAn TALDATES Fee SUBMITTAL DATES Fee CAMA $ Variance( Maj; Min) $ SW ( HD, L0, ❑ Gen) $ 401: $ LQS $ Stream Deter— $ NCDENR EXPRESS June 2011 I NCPIN6,43,57.�6,9,7,4�17 M D, DR 130 K �2' ST -N.-VAFF I S.T. WOOTEN CONCRETE PLANT — BURTON INDUSTRIAL PARK (ONSLOW COUNTY) STORMWATER NARRATIVE April 19, 2013 The ST Wooten Concrete Plant is a proposed 13.13-acre industrial development located on Burton Park Boulevard, approximately 1/10 mile southeast of the intersection of Burton Park Boulevard and Hines Farm Road, and approx. % mile east of the intersection of Richlands Highway (NC-24) and Hines Farm Road, in Onslow County, North Carolina. The site is currently undeveloped but is part of the previously approved Burton Industrial Park. There is no existing impervious area on site. The main entrance to the site will be located on Burton Park Boulevard; there is no proposed secondary entrance. The site will use existing public utilities for water and sewer service. The project includes development entirely on I parcel which will be established as a subdivision of a larger existing parcel. The parent parcel is identified on Onslow County GIS Mapping. The Parcel Identification Numbers and acreage based on GIS property lines for the parcel are as follows. 4357.02.69.7417 (543.61 ac) Total GIS Arca = 543.61 acres Calculations are attached which document the anticipated stormwater runoff volume generated by 1.5 inches of rainfall for the purpose of preliminary BMP sizing. The site generally drains from west to east. There is a drainage ditch along the eastern property line which is non -jurisdictional and will be used as a conveyance in the post development condition. The site drains to lowlands and wetlands tributary to the New River, which is classified as C, NSW at the confluence point. The project's proposed grading plan will maintain natural runoff patterns to the maximum extent practicable. The site is located approximately 13.50 miles northwest of the point where the New River is classified as SA, HQW. The site is located approximately 4.0 miles northwest of the Upper New River Primary Nursery Area (0.103 13 c xv). Site vicinity maps showing primary nursery areas and stream classifications are attached. Based on site investigations by Hal Owen (licensed soil scientist) and previous USACoE Jurisdictional Maps, the proposed site contains no natural wetlands. There are wetlands present on the parent tract, but no additional impacts will occur during construction of this development beyond what was previously permitted for construction of the roadways. Stonnwater permitting for the site will be conducted in accordance the current coastal stormwater regulations. Based on the current master plan, the entire site contains a development built upon area density of approximately 44%. The BUA limit for low density projects that are not within ECEQVEl n APR 19 2013 BY: h �y 3n i � Wiz` ti one-half mile and draining to class SA waters is 24%. Therefore the project as a whole will be permitted as a high density project. Per the Coastal Stormwater Regulations, the site will require structural Best Management Practices (BMPs) to control and treat the runoff generated by 1.5 inches of rainfall. Two stormwater wet ponds are proposed for the site, and both will be designed to remove 85% of Total Suspended Solids in the runoff. Each BMP will utilize level spreaders and filter strips on the low -flow outlet pipes. There are no stream buffers, jurisdictional surface waters or wetlands on site. The site is not subject to CAMA restrictions. Preliminary soil tests have been completed by I lal Owen and indicate primarily well drained sandy loam soils. The seasonal high water table is within 26" of the surface in the area of proposed BMP I and within 14" of the surface in the area of proposed BMP 2, which will make infiltration basins difficult to design and permit. For that reason, we anticipate using wet ponds with the normal pool elevation set at the Seasonal High Water Table elevation. A site visit has been completed with Vincent Lewis and the SHWTs for each BMP have been verified. The site is also subject to NPDES Industrial Wastewater discharge regulations. A monitoring plan will be developed in accordance with NCG-14 for ready mix concrete plants. �''i APR 1 9 202 Vlll. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer.Rvan Fisher, PE Consulting F Mailing Add City:Cary State:NC Zip:27511 Phone: (919 1 469-3340 Fax: (919 1 467-6008 Einail:rfisher@withersravenel.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, has been filled out, complete t section) ' Dh� 41- 1, (print or type name ofperson listed in Contact Information, item 2a) IeffHudson, County Manager , certify that I own the property identified in this permit application, and thus give permission to (print or type name ofperson listed in Contact Information, item la) Henry D. Butts, Jr. with (print or type name of organization listed in Contact Information, item la) S.T. Wooten Corporation to develop the project as currently proposed. A copy of Z has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner 1 acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 43-215.1 and may result in appropriate enforcement action including the assessment of civil pe Itiesyf up to C ,0 0 per day, pursuant to NCGS 143-215.6. %� f Signature: S'/%�\ �F 1 Date: I, 'Sp _ a Nota Public for the State of -Nor- A C 4m li na-County of do hereby certify that �t°i#re-q u wd bon personally appeared before me thisg,�`day of —Ap11 ID� ledge thed�/u�p ex(gcution of the application for a stormwater permit. Witness my hand and official seal, �%L(A — eye (7 f,CLC— tiOTARy. MY COMM. Fop. 12-26-2017 p' BLIC SEAL My commission expires /) " 07610/I" 07610/ I FormSWU-101 Version06Aug2012 Page 6 of 7 NOTICE OF PUBLIC HEARING The Onslow County Board of Commissioners will hold a public hearing at its regular meeting on Monday, May G, 2013 at 7:00 PM in the Council Chambers, Jacksonville City Hall, 815 New Bridge Street, Jacksonville, North Carolina, to consider an economic development project involving the expansion of a business pursuant to NCGS 158-7.1. S.T. Wooten Corporation is considering relocating and expanding its ready mix concrete plant and recycling operation in Onslow County with a total investment of $ 2,020,000 and the creation of approximately six new jobs within the first year with an average weekly wage of $623. The Board will discuss and conduct a public hearing on the company's offer to purchase a 10 acre parcel of county -owned land (a portion of Lot 4) located in Burton Industrial Park, Burton Park Blvd., Jacksonville, North Carolina at the fair market value of $200,000 ($20,000 per acre) in consideration of a five year option to purchase an approximately 30 acre parcel of land located on a mutually agreeable site within Burton Park at the fair market value of $20,000 per acre, less $220,000 and modification of restrictive covenants. If the option is exercised, the company may expand to locate an asphalt plant. Upon exercise of the option, Lot 4 would revert to the County. The tax value of the site improvements, including site preparation and utilities, and business personal property is estimated to exceed $1,800,000. All interested citizens are invited to attend and present their views. Posted: April 22, 2013 Julie S. Wand Clerk to the Board of Commissioners for the County of Onslow, North Carolina Nelson, Christine From: Nelson, Christine Sent: Monday, April 29. 2013 2:14 PM To: 'rfisher@withersravenel.com'; 'jdiaz@withersravenel.com'; 'dwerenko@withersravenel.com'; 'Butch@stwcorp.com' Cc: Russell, Janet; Scott, Georgette Subject: ST Wooton All, hope I included everyone. If not, please pass it on. I spoke with Georgette, the Storrmwater Supervisor here in Wilmington, about the provided public notice. She confirmed that without the purchase agreement, the permit would have to be issued to the county and later transferred to ST Wooten. The other option that could be offered is to review the package and draft the permit but not issue the permit until the deed or purchase agreement is in place. Instead, a letter acknowledging the complete project would be issued which stipulates that the permit to ST Wooten will be issued once the required documentation is in place and provided to the Division. As for the vegetated filter strips required for the 85% ponds, this is addressed in 15A NCAC 02.H.1008(c)(4) which says: Vegetative filters designed in accordance with Paragraph (0 of this Rule are required from the overflow of all infiltration systems and discharge of all stormwater wet detention ponds. These filters shall be at least 30 feet in length, except where a minimum length of 50 feet is required in accordance with Rule .1005(2)(b)(iii) of this Section; Paragraph f of this same section includes the design criteria of the vegetated filters to be used for the pond discharge: Vegetative Filter Requirements. Vegetative filters shall be used as a non-structural method for providing additional infiltration, filtering of pollutants and minimizing stormwater impacts. Requirements for these filters are as follows: (1) A distribution device such as a swale shall be used to provide even distribution of runoff across the width of the vegetative filter; (2) The slope and length of the vegetative filter shall be designed, constructed and maintained so as to provide a non -erosive velocity of flow through the filter for the 10 year storm and shall have a slope of five percent or less, where practicable; and (3) Vegetation in the filter may be natural vegetation, grasses or artificially planted wetland vegetation appropriate for the site characteristics. Based on these linked sections of the rule, the vegetated filter strip to be provided for a 85% pond is to be based on the 10-year storm event. Please let me know if you have any questions about this and how you plan on addressing the filter strips for these two ponds. Also, let Janet or I know when you think you might be ready so we can schedule a mail in date for this project. Thanks, Christine Christine Nelson Environmental Engineer State Stormwater Program NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Phone:910-796-7323 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 0 1 50 i )0501 DIVISION OF WATER QUALITY INFILTRATION SYSTEM INVESTIGATION Complete and email this form to Vincent.Lewis@ncmail.net. If there are more than 7 areas to be tested, attach a second sheet. State Soil Scientist Confirmation Visit date/time: Project Name: 6urion Indus 4rial County: &LS400 Street Address: fi l(r2ION �/9/tt K Qv(14 4-1 Ak'� Directions from the nearest intersection of two major roads: ftnn Nc ay & LAA1 FBsT �N No/1iHc/4u7 ('c21?A %yd/) _ rUfl,v ` C.--1 A0 /--7.v W. d �lAP.,Av !iu/0 G EFr o u 6d.P Kati �tAf >7 acre being disturbed? ❑YES ❑NO CAMA Major required? []YES [—]NO Consultant Name: H41 Owen Phone: g(2'/ S_d of Consultant Firm Name: Hat Owen � R55oc-4fe-�, :nc. Bore Difference (a m Max. lowest bottom Infiltration Rate OI Fnr nrniacts rpnnirinn more than S hand borings. manpower or eauioment t< conduct the excavation must be provided by the consultant. 'State. Soil Scientist Use ONLY _ k lj Yon g (0 4 6 " Required Attachments: 1. Legible vicinity map. 2. Complete Soils Report. 3. PDF formatted site plan with the boring locations to be tested. Site plans should be emailed or hand -delivered only. Illegible faxed maps will not be accepted. All proposed infiltration areas and existing, active utility lines located within the proposed basin4rench must be marked and Flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the proposed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of breaking through the impervious layer must be provided. The soils investigation does not take the place of a soils report prepared by an appropriate professiona). The Soils Scientist will only verify the soil conditions that are reported in the Soils Report, and make a determination as to the suitability of the site to meet the infiltration design requirements under NCAC 2H.1000, and assumes no liability should the system fail. S:\WQS\STORMWATER\FORMS\infiltration site visit Revised 3/08 HAL OWEN & ASSOCIATES, INC. SOIL & ENVIRONMENTAL SCIENTISTS P.O. Box 400, 266 Old Coats Road Lillington, NC 27546-0400 Phone (910) 893-8743 / Fax (910) 893-3594 www. ha lowensoi l.com 15 April 2013 Mr. Butch Lawler S.T.Wooten Corporation PO Box 2408 Wilson, NC 27894-2408 Reference: Soil Scientist Investigation for Stormwater Burton Industrial Park Plant Site Dear Mr. Lawter, A site investigation has been conducted for the above referenced project, located on Burton Park Boulevard, Onslow County, North Carolina. The purpose of this investigation was to determine the depth to evidence of a seasonal high water table in the area proposed for a stormwater basin. All soil characteristics were described in accordance with the USDA Field Book for Describing and Sampling Soils. This report represents my professional opinion as a Licensed Soil Scientist. Auger borings were advanced at two locations at the site (Figure 1)..Soil morphological characteristics indicating a seasonal high water table (SI-IWT) were observed at 26 inches at location #1 and at 20 inches at location 42. Soil profile descriptions were collected at each location and are attached to this report. I appreciate the opportunity to provide this service and trust that you will feel free to call on me again in the future. If you have any questions or need additional information, please contact me at your convenience. SincJWA/-� erely Hal Owen Licensed Soil Scientist Soil Science Investigations • Wetland Delineations, Permitting, and Consulting HAL OWEN & ASSOCIATES, INC. Soil Scientist Investigation for Stormwater Burton Industrial Park Plant Site 8 April 2013 Figure I I Soil Profile #1 1 7 / o Soil Science Investigations • Wetland Delineations, Permitting, and Consulting HAL OWI N & ASSOCIATES, INC. SOIL PROFILE DESCRIPTIONS FOR STORMWATER MANAGEMENT DEVICES PROJECT NAME: S.T. Wooten - Burton Site PROPOSED FACILITY: Wet Pond LOCATION OP SITE: Burton Park Boulevard COUNTY: Onslow EVALUATED BY: Hal Owen, NC Licensed Soil Scientist DATE EVALUATED: 1 I April 2013 WALUATION METHOD: Auger Boring ®, Pit ❑ PROFILE: I HORIZON DEP'H-I (IN) MATRIX MOTTLES TEXTURE STRUCTUM7 CONSIS- TENCE PIRMEABIL I'1'Y(IN/HR) NOTES A 0-5 10YR 4/1 salt & pepper 50150 fiSL 2 M GR V17R Bwl 5-22 IOYR 6/6 SI- 2 M SI3K IR 13w2 22-26 I OYR 8/6 Si- I M SBK FR C 26-36 I OYR 8/2 LS AWI' 26 inches SHWI' 26 inches SLWT SLOPE 2 % DRAINAGE SOIL SERIES VEGETATION COMMENTS: normal conditions, heavy rain six days ago. PROFILE: 2 HORIZON DEPI11 (IN) MATRIX MO'I'I'LLS TEXTURE S'I'RUC'I'UR1? CONSIS- TENCE PERMEABII" ITY (IN/HR) NOTES Al 0-10 10YR 2/2 fiSL 2 M GR FR A2 10-14 I OYR 3/2 I OYR 4/2 LS 2 M GR FR Bwl 14-20 I OYR 513 I OYR 42 1-S 2 M GR FR Bw2 20-24 10YR 6/3 10YR 52 I-S 2 M GR FR Bw3 24-30 I OYR 6/3 10YR 62 LS 2 M GR FR C 3042 10YR 62 10YR 42 I-S SG FR AWT 20 inches SIiW'I' 20 inches SI-WT SLOPE DRAINAGE SOIL SERIES VEGE'rA'HON COMMENTS: Site appears to he in normal/typical hydrology state Soil Science Investigations • Wetland Delineations, Permitting, and Consulting HAL OWEN & ASSOCIATGS, INC. LEGEND OF ABBREVIATIONS FOR SOIL PROFILE DESCRIPTIONS TEXTURE MOIST CONSISTENCE S - Sand L - Loose LS - Loamy Sand VFR - Very Friable SL - Sandy Loam FR - Friable L - Loam Fl - Firm SCL - Sandy Clay Loam VFI - Very Firm CL -Clay Loam LFI - Extremely Finn SiL -Silt Loam Si - Silt SiCL- Silt Clay Loam SC - Sandy Clay AWT — Apparent Water Table C - Clay SH WT — Seasonal High Water Table SiC - Silty Clay SLWT —Seasonal Low Water Table O - Organic MOTTLES f — few 1 - tine F - Faint c — common 2 - medium D - Distinct in — many 3 - coarse P - Prominent STRUCTU11E 0 - structureless VF - very fine G - Single Grain 1 - weak F - fine M - Massive 2 - moderate M - medium CR - Crumb 3 - strong C - coarse GR - Granular VC - very coarse SBK - Subangular Blocky ABK - Angular Blocky PL - Platy PIZ - Prismatic Soil Science Investigations • Wetland Delineations, Pennitting, and Consulting Couple Wears Duct Tape Outfits to Prom - ABC News S1�—*q"I�—Page 4 of 4 e im SuUse ONLY R FWA North Carolina Department of Environment and Submit Natural Resources : oe NCDENR Request for Express Permit Review rime: Confirm: — to FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296.4698;alison.davidson(CDncdenr.aov • Fayetteville or Raleigh Region -David Lee 919-7914203; david.lee(aDncdenr.aov • Mooresville & Winston Salem Region - Patrick Grogan 704-235-2107 or patrick.gronan(dricdenr.gov • Washington Region -Lyn Hardison 252-948-3842 or lvn.hardisonAmcdenr aciv • Wilmington Region Janet Russell 910-796.7302 or lanet.russell(rDncdenr.aov • Wilmington Region -Cameron Weaver 910-796.7303 or cameron.weaveKdncdenr.aov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: ST WOOTEN - BURTON PARK LOT 4 County: ONSLOW SW SW SW SW SW Applicant: BUTCH LAWTER Company: ST WOOTEN CORPORATION O C � ' ' 1 Address: 3801 BLACK CREEK ROAD City: WILSON State: NC Zip: 27893 Phone: 252-291-5165, Fax: 252.243-0901, Email: butch@stwcorp.com Physical Location:BURTON PARK BOULEVARD Project Drains into UNNAMED TRIBUTARY TO NEW RIVER waters - Water classification C-NSW (please visit here to look up stream classification) Project Located in WHITE OAK River Basin. Is project draining to class ORIN waters? N, within Y2 mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: HUNTER C. FREEMAN Company: WITHERS & RAVENEL Address: 115 MACKENAN DRIVE City: CARY, State: NC Zip: 27511-_ RECEIVE` e• Phone: 919-469-3340, Fax: 919-467-6008, Email: HFREEMAN@WITHERSRAVENEL.COM SECTION ONE: REQUESTING A SCOPING MEETING ONLY APR 0 9 2013 N Scoping Meeting ONLY N DWO, ❑ DCM, N DLR, ❑ OTHER: _ DV. SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear it or _acres) ❑ Riparian Buffer Authorization El Minor Variance ❑ Major General Variance ❑ State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. . ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] N High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ElHigh Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit u) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes N No Wetlands Delineation has been completed: N Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes N No Received from US ACOE ❑ Yes N No Buffer Impacts: N No ❑ YES: _acre(s) Isolated wetland on Property El Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ❑ No Permit For DENR use only Fee SDlil (or MURIDle Dermlts: (Check 0 1 Total Fee Amount $ SUBMITTAL DATES Fee SUBMRTAL DATES Fee CAMA i $ Variance( Maj; El Min) $ SW ( HD, ❑ L0, LJ Gen) $ 401: $ LQS $ Stream Deter,_ $ NCDENR EXPRESS June 2011 hup://abcnews.go.com/blogslentertainmentl20l3/04/couple-wears-duct-tape-outfits-to-prom/ 4/2/2013 "S'.T. WOOTEN CONCRETE PLANT —BURTON INDUSTRIAL PARK (ONSLOW COUNTY) STORMWATER NARRATIVE April 9, 2013 The ST Wooten Concrete Plant is a proposed 13.13-acre industrial development located on Burton Park Boulevard, approximately 1/10 mile southeast of the intersection of Burton Park Boulevard and Hines Farm Road, and approx. %2 mile cast of the intersection of Richlands Highway (NC-24) and Hines Farm Road, in Onslow County, North Carolina. The site is currently undeveloped but is part of the previously approved Burton Industrial Park. There is no existing impervious area on site. The main entrance to the site will be located on Burton Park Boulevard; there is no proposed secondary entrance. The site will use existing public utilities for water and sewer service. The project includes development entirely on 1 parcel which will be established as a subdivision of a larger existing parcel. The parent parcel is identified on Onslow County GIS Mapping. The Parcel Identification Numbers and acreage based on GIS property lines for the parcel are as follows. 4357.02.69.7417 (543.61 ac) Total GIS Area = 543.61 acres Calculations are attached which document the anticipated stormwater runoff volume generated by. 1.5 inches of rainfall for the purpose of preliminary BMP sizing. The site generally drains from west to east. There is a drainage ditch along the eastern property line which is non -jurisdictional and will be used as a conveyance in the post development condition. The site drains to lowlands and wetlands tributary to the New River, which is classified as C, NSW at the confluence point. The project's proposed grading plan will maintain natural runoff patterns to the maximum extent practicable. The site is located approximately 13.50 miles northwest of the point where the New River is classified as SA, HQW. The site is located approximately 4.0 miles northwest of the Upper New River Primary Nursery Area (0.103 13 c xv). Site vicinity maps showing primary nursery areas and stream classifications are attached. Based on site investigations by Hal Owen (licensed soil scientist) and previous USACoE Jurisdictional Maps, the proposed site contains no natural wetlands. There are wetlands present on the parent tract, but no additional impacts will occur during construction of this development beyond what was previously permitted for construction of the roadways. Stormwater permitting for the site will be conducted in accordance the current coastal stormwater regulations. Based on the current master plan, the entire site contains a development built upon area density of approximately 44%. The BUA limit for low density projects that are not within one-half mile and draining to class SA waters is 24%. Therefore the project as a whole will be permitted as a high density project. Per the Coastal Stormwater Regulations, the site will require structural Best Management Practices (BMPs) to control and treat the nmoff generated by 1.5 inches of rainfall. One stormwater wet pond is proposed for the site, and it will be designed to remove 85% of Total Suspended Solids in the runoff. There arc no stream buffers on site. Because there are no jurisdictional surface waters or wetlands on site, there are no vegetated buffer requirements as described in the coastal stormwater rules. The site is not subject to CAMA restrictions. Preliminary soil tests have been completed by Hal Owen and indicate primarily well drained sandy loam soils. The seasonal high water table is within 18" of the surface in the area of the proposed BMP, which will make infiltration basins difficult to design and permit. For that reason, we anticipate using a wet pond with the normal pool elevation set at the Seasonal Fligh Water Table elevation. The soil study is attached. A site visit has been requested with Vincent Lewis to verify the SFIWT. The site is also subject to NPDES Industrial Wastewater discharge regulations. A monitoring plan will be developed in accordance with NCG-14 for ready mix concrete plants. EGE6VE` APR 0 9 2013 ' ,4 N SUP mIT DESIGN AND ENGINEERING SERVICES Creatively Inspired - Technically Executed www.summit-engineer.com `,A Please consider the environment before printing. WITHERS 0�RAVENEL ENGINEERS I PLANNERS I SURVEYORS RYAN FISHER, PE 115 VfmacKenan Drive I Cary, North Carolina 27511 te1: 919-4693340 1 fax: 919.467.6008 direct: 919.535 5175 www.withersravenel.com email: rfisher@withersravenel.com S.T. Wooten Corporation R. S. (Butch) Lawler, Jr., P.E. Senior Engineer Environmental Engineering Site Development PO Box 2408 Wilson, NC 27894-2408 252•291.5165 Fax252•243•0901 Email butch©stwcorp.com Nextel 919.422.3182 Mobile 919.218.2834 WITHERS & RAVENEL ENGINEERS I PLANNERS I SURVEYORS DALE WERENKO, PE, Ci us MacKenan Drive I Cary, North Carolina 27511 tel: 919.469-3340 1 fax: 919.467.6008 direct: 9E9.535 5171 www.withers raven a Lco m e-mail: dwerenko®withersravenet-com S.T. Wooten Corporation R. S. (Butch) Lawter, Jr., P.E. Senior Engineer Environmental Engineering Site Development PO Box 2408 Wilson, NC 27894-2408 252•291•5165 Fax 252•243•0901 Email butchQstwcorp. com Natel 919.422•3182 Mobile 919.218.2834 11 Jo 11 abed HAL OWEN & ASSOCIATES, INC. SOIL & ENVIRONMENTAL SCIENTISTS P.O. Box 400, Lillington NC 27546-0400 Phone (910) 893-8743 / Fax (910) 893-3594 www.halowensoil.com 28 March 2013 Mr. Butch Lawler ST Wootcn Corporation 3801 Black Creek Road SE Wilson, NC 27983 Reference: Wetland Consultation — Lot 4 Burton Industrial Park Dear Mr. Lawler, A site investigation has been conducted for the above referenced property, located on the northern side of Burton Park Blvd, Onslow County, North Carolina. The purpose of this investigation was to determine the existence and extent of jurisdictional wetland areas located on the property. All wetland determinations were made in accordance with the appropriate Regional Supplement to the Corps of Engineers Wetland Delineation Manual. Stream determinations were made in accordance with the NC Division of Water Quality Methodology for Identification of Intermittent and Perennial Streams and their Origins, Version 4.11. This report represents my professional opinion as a Licensed Soil Scientist but does not guarantee or represent concurrence from the Corps of Engineers. Areas that meet the criteria for jurisdictional wetlands or streams were not observed on this property. In concurrence with the previously approved and recorded wetland delineation map (2008) for the entire industrial park, Lot 4 does not appear to contain any areas that would be considered jurisdictional wetlands or streams. I appreciate the opportunity to provide this service. Feel free to contact me should you have any questions or need additional information. Sincerely, Hal Owen Licensed Soil Scientist Soil Science Investigations 0 Wetland Delineations, Permitting, and Consulting HAL OWEN & ASSOCIATES, INC. SOIL & ENVIRONMENTAL SCIENTISTS P.O. Box 400,266 Old Coats Road Lillington, NC 27546-0400 Phone (910) 893-8743 / Fax (910) 893-3594 www.halowensoil.com 8 April 20.13 Mr. Butch Lawter S.T.Wooten Corporation PO Box 2408 Wilson, NC 27894-2408 Reference: Soil Scientist Investigation for Stormwater Burton Industrial Park Plant Site Dear Mr. Lawler, A site investigation has been conducted for the above referenced project, located on Burton Park Boulevard, Onslow County, North Carolina. The purpose of this investigation was to determine the depth to evidence of a seasonal high water table in the area proposed for a stormwater basin. All soil characteristics were described in accordance with the USDA Field Book for Describing and Sampling Soils. This report represents my professional opinion as a Licensed Soil Scientist. Auger borings were advanced at two locations within the proposed basin (Figure 1). Soil morphological characteristics indicating a seasonal high water table (SHWT) were observed at 16 inches at location #1 and at 14 inches at location #2. Soil profile descriptions were collected at each location and are attached to this report. A 20 inch deep basin can be expected to hold water most of the year and will likely go dry only during periods of drought. I appreciate the opportunity to provide this service and trust that you will feel free to call on me again in the future. If you have any questions or need additional information, please contact me at your convenience. Sincerely Hal Owen Licensed Soil Scientist Soil Science Investigations • Wetland Delineations, Permitting, and Consulting PR 0 9 200 Project Name ST Wooten - Burton Park Lot 4 City/State: Onslow County, NC Pro' : 2120355.1 Date: 9-Apr-13 Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiencv in the Coastal Plain % Impervious Cover Permanent Pool Depth (feet) 3.0 3.5 4.0 5.0 6.0 7.0 8.0 9.0 10 0.90 0.80 0.70 0.50 0.00 0.00 N/A N/A 20 1.70 1.30 1.20 1.00 0.80 0.60 N/A N/A 30 2.50 2.20 1.90 1.60 1.30 1.00 N/A N/A 40 3.40 3.00 2.60 2.10 1.60 1.10 N/A N/A 50 4.20 3.70 3.30 2.70 2.10 1.50 N/A N/A 60 1 5.00 4.50 3.80 3.20 2.60 2.00 N/A N/A 70 6.00 5.20 4.50 3.70 2.90 2.10 N/A N/A 80 6.80 5.20 4.8200 20 .80 220 . NA N/A 90 7.50 66.500 580 80 N/A N/A Source: NCDENR/DWQ Stormwater Best Management Practices,Rev 06-16-09 STORMWATER BMP 1-STORMWATER.WET POND (25%TN Removal) Land Use Area (ac) % IA Imp. Area (ac) Impervious 7.00 100 7.0 Open Space 1.00 0 0.0 Totals 1 8.00 7.0 Total % Impervious Surface Area = 87.5 Surface Area of Permanent Pool: Assumed depth - 3 feet SA/DA ratio - 7.33 % From Table 1.1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.586 acres 25526 sq. ft. Normal pool elevation - 0.0 feet Surface area provided - 0.000 acres 0 sq. ft. 1.5-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(0 where, Rv - Runoff coefficient, in./in. I - Percent impervious Rv = 0.84 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S - (Design rainfall) (Rv) (Drainage Area) S = 0.838 acre-ft 36482 cu. ft. Water quality pool elevation- 0.00 feet Storage volume provided - 0.000 acre-ft 0 cu. ft. Russell, Janet From: Freeman, Hunter [HFreeman@withersravenel.com) Sent: Tuesday, April 09, 2013 3:12 PM To: Russell, Janet Cc: Werenko, Dale; Butch Lawter (Butch@stwcorp.com) Subject: ST Wooten Concrtee Plant - Burton Industrial park Attachments: STIR Burton Park REQUEST FOR EXPRESS.pdf Janet —we would like to request a scoping meeting for a new ST Wooten Concrete Plant in Onslow County. I've attached the scoping meeting request and preliminary site information. We are available next Tuesday and Wednesday (the 161h and 171h) if those dates work for you. Let me know if you need any additional information. Hunter Freeman, PE, LEED AP WITHERS bCRAVENEL 115 MacKenan Drive I Cary, NC 27511 Phone: 919.469.3340 1 Fax: 919.467.6008 Direct: 919.535.6137 1 Mobile: 919.264.7613 hfreeman(a)withersravenel. com www.withersravenel.com NOTICE OF CONFIDENTIALITY AND NONDISCLOSURE: This electronic message, which includes any attachments and other documents referred to herein, contains information from Withers & Ravenel, Inc. that may be proprietary or confidential. The information is intended for the use of the addressee(s) only. If you are not the addressee, note that any disclosure, copying, printing, distribution, or use of the contents of this message is prohibited. If you received this message in error, please advise the sender by reply and delete this electronic message and any attachments. COPYRIGHT NOTICE: Copyright 2010 Withers & Ravenel, Inc. All Rights Reserved by Withers & Ravenel, Inc. This electronic message, any attachments thereto and all documents referred to therein are provided for the recipient's information only, and no rights are licensed, transferred or otherwise granted by the transmission of this electronic message by Withers & Ravenel, Inc. or receipt of this message by the recipient or any other party. ECEIV E APR 0 9 2013 BY: c N .££££££O 4£ N . l9 KN .0000009 KN ,£££££9 K N .999 CO£ N ,0 Z?� s I �f O n r O � ^ O � � O � v�� b 1 v c1 • � � r �o 1 O o Q v W W LL o kp o 1 a ti r. N .££££££9 KN .99999�9 K N .0 09 KN .£C£££9L Y£ N .999999L KN . p Wd 1iCOZ l :IAF 1106.1111111111 ■■ion ■■■■ i■■. .HOOMMEMENEEMN it 1■■i■■■■■■®�I■■i ■■■■■i■■■®■■■■ NMI ■■■■■■o■■ ■■■■ on I■■■■■ ■i■ Mi��■■llj■1 WOMEN ■ommom■�!■ir�l■1 III+■■■■�■■■■■{■%■■1 1 ■■■■i■■■i �r OWN il►ot ■ivilwamoll al .I 1 ■W20 ■axam!■■�0� ■■■■1�rI ■■ekniai�.■g :A9 1 cluz t 0 ON P' 29 20 D Z v a N 77" 29 O O W W Hydrologic Soil Group-0nslow County. North Carolina (ST Wooten - Burton Park Lot 4) MAPLEGEND Area of interest(AOI) Area of Interest IACII Soils Sod Map Units Soil Ratings o A Q ND ® B Q B/D o D C/o O D Not raMd or not available Political Features Goes Water Features Streams and Canals Transportation Rags N Interstate Highways US Routes Major Roads N Loral Roads I Ili•, Natural Resources � Conservation Service Web Soil Survey National Cooperative Soil Survey MAP INFORMATION Map Scale. 1:1,930 if printed on A size (8.5" r 111) sneet The soil surveys that comptee your AOI were mapped at 1:24,0W. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil lime placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map Natural Resources Conservation Service Web Soil Survey URL. http://websoilsuwey.nres.usda.gov Coordinate System: UTM Zone 18N NAD83 This product is generated from the USDA-NRCS certified data as of the version date(s) listed below_ Soil Survey Area Onslow County. North Carolina Survey Area Data Version 13. Sep 14. 2012 Dates) aenal images were photographed 6119/2006 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundanes may be evident 4/25/2013 Page 2 of 3 TO Bmp I 0 w Wet Pond 1 0 cy-m Addlink 200 To BIVIP 2 ft�m 77T O w Wet rind 2 X /d •'Xddlink 70 South In Post South st No It Post North UT Post Out Post North Pre South Ph R Out Pre PitE C cE-- I V E:-'i I MAY 0 1 "13 U ■ i ■ MEN i,. MEN MEM _ m PIN � ENJ imam, ll co II Jo II 89ed HAL OWEN & ASSOCIATES, INC. Soil Scientist Investigation for Stormwater Burton Industrial Park Plant Site 8 April 2013 Figure 1 IN4 \ \ 11 t� I 4W Soil Profile #1 I Soil Profile #2 1 T ECEIVE' APR 0 9 2013 BY: — Soil Science Investigations 4 Wetland Delineations, Pemtitting, and Consulting