Loading...
HomeMy WebLinkAboutSW8130501_CURRENT PERMIT_20220707STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 3 O S 01 DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022 07 0 7 YYYYMMDD ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director July 7'h, 2022 S.T. Wooten Corporation Aun: Amzie Hoffier, Vice President PO Box 2408 Wilson, NC 27894 NORTH CAROLINA Environmental Quality Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 130501 Burton Industrial Park —Concrete Plant Onslow County Dear Mr. 1-loffner: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on July 6', 2022. The Division is hereby notifying you that permit SW8 130501 has been renewed, updated, and re -issued on July 7`s, 2022, as attached. A requested, a copy of the current operation and maintenance agreement is also enclosed. Please be aware that the renewal and re -issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until May 30", 2029 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (ifa filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Wilmington Regional Office. If you have any questions concerning this permit, please contact Dylan McPeake in the Wilmington Regional Office, at (910) 796-7215 or dylan.mcpeake@ncderLr.gov. Sincerely, AA 99 Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: AttachmentC— PermittingHistory Renewal Application Documents Copy of the current operation and maintenance agreement DES/DM: %Stormwater\Permits & Projects\2013\130501 HD\2022 07 permit 130501 cc: Wilmington Regional Office Stormwater File tt North Carolina Department of Environmental Quality I Dlvtsion of Energy, Mineral and land Resources D_E �J/ Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 +�+•�+°�� / / 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 130501 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO S.T. Wooten Corporation Burton Industrial Park — Concrete Plant Burton Park Boulevard, Jacksonville, Onslow County FOR THE construction, operation and maintenance of two (2) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until May 301", 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.9 of this permit. The stormwater controls labeled BMP #1 and BMP #2 have been designed to handle the runoff from 197,065 and 65,340 square feet of built -upon area, respectively. Page 1 of 6 Post -Construction Stormwater Management Permit No. SW8 130501 3. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. A vegetated filter strip is not required for this pond as it has been designed to provide an average annual total suspended solids removal efficiency of 90%. The level spreaders shown on the plans are not required under the stormwater rules and therefore are not considered a part of the approved state stormwater treatment system. These additional measures are incorporated only by reference and are not enforceable parts of the permit. 6. The tract will be limited to the amount of built -upon area indicated in this permit, and per approved plans. The built -upon area for the future development within the drainage areas of BMP's #1 and #2 is limited to 7,877 and 3,414 square feet, respectively. 7. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 8. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. 9. The following design criteria have been provided in the wet detention ponds and must be maintained at design condition: Design Criteria BMP #1 BMP #2 a. Drainage Area, acres: Onsite, ftz: Offsite, ftz: 5.06 220,414 0 1.7 74,052 0 b.Total Impervious Surfaces, ftz: Onsite, ftz: Offsite, ftz: 197,065 197,065 0 65,340 65,340 0 d. Design Storm, in: 1.5 1.5 e. Average Design Depth. ft: 5.0 3.0 f. TSS removal efficiency: 90% 90% q. Permanent Pool Elev., FMSL: 36.5 40.0 h. Perm. Pool Surface Area, ftz: 14,224 8.696 i. Permitted Storage Volume, ft3: 25,657 9,583 . Temporary Storage Elev., FMSL: 38.0 41.0 k. Pre-dev.1- r, 24-hr dischar a rate, cfs: 1.74 0.45 I. Controlling Orifice , 0 Inches: 2.5 1.5 m. Orifice flow rate, cfs: 0.11 0.03 n. Permitted Forebay Volume, ft3: 11,175 4,394 o. Max. Fountain HP: 1/6 n/a p. Receiving Stream/River Basin New River / White Oak q. Stream Index Number 19- 1 r. Classification of Water Body C NSW Page 2 of 6 Post -Construction Stormwater Management Permit No. SW8 130501 10. BMP #1 will act in a temporary capacity to receive the truck wash water discharge as per NCG140428. The total additional volume associated with the truck wash operation is based on a maximum water usage of 55 gallons per truck, 15 trucks per day, each making 3 trips per day for a total of 2,475 gallons or 331 cubic feet of additional volume. For purposes of determining the additional wastewater volume over and above the state stormwater design storm of 1.5", a factor of safety of 5 was applied, resulting in a total additional volume of 1,655 cubic feet. The total minimum required storage volume in BMP #1 is below the provided volume of 25,657 cubic feet. It. SCHEDULE OF COMPLIANCE 1. No truck washing activities shall be allowed during a heavy rainstorm, or immediately after a heavy rainstorm, or during the time that BMP #1 is discharging via the weir set at the temporary pool elevation of 38.0, or during the time that the water level in BMP #1 is rising and is within one inch of going over the temporary pool weir at elevation 38.0. 2. All truck wash water discharges into BMP #1 shall enter the BMP via the forebay. 3. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 4. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 5. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. 6. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Decorative spray fountains are allowed in the pond, subject to the following criteria: a. The minimum permanent pool volume is 30,000 cubic feet. b. The fountain must draw its water from less than 2' below the permanent pool surface. C. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. d. The fountain may not be placed into the forebay. e. The falling water from the fountain must be centered in the main pond, away from the shoreline. f. The maximum horsepower for a fountain in pond 1 is 1 /6 horsepower. 8. Decorative spray fountains will not be allowed in the pond 2, as the permanent pool volume is less than 30,000 cubic feet. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data on file with and approved by the Division. Page 3 of 6 Post -Construction Stormwater Management Permit No. SW8 130501 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 14. At the time the permittee ceases operations at this site, the permittee shall restore the permitted BMP's to the permitted design condition. The permittee shall provide written certification to the Division that the BMP's have been restored to design condition and shall request that the Division inspect the restored BMP's. Failure to restore the BMP's to design condition, or failure to request an inspection of the BMP's prior to ceasing operations are considered violations of the permit. 15. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. Page 4 of 6 Post -Construction Stormwater Management Permit No. SW8 130501 Ill. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur; V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. Page 5 of 6 Post -Construction Stormwater Management Permit No. SW8 130501 b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated, reissued this the 7t" day of July, 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION .jl,. Brian Wrenn, UirectoT Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 6 of 6 Attachment C - Permitting History Burton Industrial Park - Concrete Plant Permit No. SW8 130501 Approval Permit BIMS Description of the Changes Date Action Version 5/30/2013 Original 1.0 Approval BMP # 1 will act in a temporary capacity to receive the truck wash water discharge as per NCG 140428. The total additional volume associated with the truck wash operation is based on a maximum water usage of 55 gallons per truck, 15 trucks per day, each making 3 trips per day for a total of 2,475 gallons or 331 cubic feet of additional volume. For I l/l/2013 Correction 1.1 purposes of determining the additional wastewater volume over and above the state stormwater design storm of 1.5", a factor of safety of 5 was applied, resulting in a total additional volume of 1,655 cubic feet. The total minimum required storage volume in BMP # I is below the provided volume of 25,657 cubic feet. 7/7/2022 1 Renewal 2.0 Expires 5/30/2029 Wet Detention Basin Operation and Permit Number: �lvP�3o_S )/ (Io be provided by DWQ) Drainage Area Number: To 9 \A P W I Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate theproblem: The entire BMP Trash debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 ECEI E" MAY 0 1 2013 BY: Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: IMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 MAY 0 1 2013 Page 2 of 4 BY:— Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: Flow I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 9.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 55:5 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom E 13ASIN DIAGRAM (fill in [he blankv) 31.0 + Pe anen --------------- -- volume 30.0 tt Min. Sediment Storage FORERAY Form SW401-Wet Detention Basin O&M-Rev.4 Permanent Pool Elevation 36.5 Pool Sediment Removal Elevation 27.5 volume Bottom Elevation MAIN POND F GFJVEav o s zoo Page 3 of 4 1-ft Storage Permit Number: (to be provided by DWQ) 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Projecl name: S"f Wooten - Burton Park Lot 4 6MP drainage area number: Print name: Henry D. Butts Jr. Title: Vice President Address: 3801 Black Creek Road Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, rJQ,r1101e- F. kol lahA , a Notary Public for the State of fV ny4k CCrpj Ina,, County of V_6 Isnn , do hereby certify that h SI&S personally appeared before me this J' ' day of and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official SLAL My commission expires a Form SW401-Wet Detention Basin O&M-Rev.4 MAY 0 1 2013 I Page 4 of 4 Permit Number: sCyB��GLS�/ (to be provided by DWQ) Drainage Area Number: To BpAPSVZ- Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 4� MAY 0 1 2013 Page I of 4 BY:. Permit Number: (to he provided by DWQ) Drainage Area Number: 2 BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. 9=-([;EPVE " Form SW401-Wet Detention Basin O&M-Rev.4 mAY 0 9 2013 3 Page 2 of 4 U Permit Number: (to be provided by DWQ) Drainage Area Number: 2_ BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3__0 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) 0 Permanent Pool Elevation 40.0 37.0 Ile manen Pool --------------- -- Volume Sediment Removal Elevation 35.5 36.0 ft Min. ------------------------------------------ Sediment Bottom Elevation 34.5 Storage FORF,BAY Form SW401-Wet Detention Basin O&M-Rev.4 MAIN POND lCCEI W E MAY 0.4 2M3 Page 3 of 4 za Storage Permit Number: (to he provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: ST Wooten - Burton Park Lot 4 BMP drainage area number: BMP 92 Print name: Henry D. Butts Jr Title: Vice President Address: 3801 Black Creek Road Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, I P IIn l e— F _ k 011 I ' h CL , a Notary Public for the State of �a r ((.prIIi yta, County of 1/�/ 1, Is Dn do hereby certify that flen. (3Lfis JY. personally appeared before me thisI� day of —, I e2 l3 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires ECEOVE'- Form SW401-Wet Detention Basin O&M-Rev.4 MAY 0 1 2013 Page 4 of 4 BY: Permit Number: (to be provided by DWQ) Drainage Area Number: Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. — Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. — Once a year, the soil will be aerated if necessary. — Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire filter strip Trash/debris is present. Remove the trash/debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off -site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. MAY 0 1 2013 BY: Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off -site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide time and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo a of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable . approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality focal Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. SCE., ; MAY 0 1 2013 Form SWU401-Level Spreader, Filter Strip, Restored Riparian BuffcrO&M-Rev.3 Page Permit Number: (to be provided by DWQ) 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: BAIP drainage area number: Print 'title Addy Phon Sign; Date L61 Note: "rhe legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. 1, J 2.hn i e F. 0 o 11 an d , a Notary Public for the State of y�p,4k ea✓o I t nct_. , County of gi ISDVI , do hereby certify that iJ2nru I� . Thu E i5 J r, personally appeared before me this QC&k' day of Qny t I 0101.'� , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, �j � �Jp, 4 tA v,Jn 3 SLAL My commission expires FG%ru-e ay B E C E I V E� MAY 01 2013 BY: _ Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 STATE STORMWATER: PERMIT INFORMATION UPDATE APPLICATION FORM There is NO FEE for updating project name or permittee information. This form is to only to be used by the current permittee to notify the Division of. 57 1) changes to the Point of Contact (signing official) for the current permittee (LLC, Corporation, HOA or POA, 2) changes to the mailing address, phone number or email address of the current permittee; 3) changes to the name of the project; and 4) changes to the legal corporate name as documented by a Name Change or Merger filed with the NCSOS. A. NEW PERMIT INFORMATION State Stormwater Permit Number: Sw8 13056 f Are you updating (check all that apply): If so, please provide the updated information: ❑ Project name ❑ Corporation Name' _ hermit Contact Name2,3 ❑ Permit Contact Title ❑ Mailing Address3 ❑ Phone number [2"Email address ' Provide documentation such as a Name Change / Merger filed with the NCSOS. Provide supporting documentation such as NCSOS filing. The permit contact's position must be in accordance with 15A NCAC 02H .1040(1). If more than one point of contact or mailing address is being changed, please attach a separate sheet. B. CERTIFICATION OF PERMITTEE I, AmzrtT the current permittee, hereby notify DEMLR that I am making the changes as listed in Section A above. I further attest that this application for an update to the permit information currently on file is accurate and complete to the best of my knowledge. 4- ' / Signature: :%' C.w^ Date: 0. 4P- Ov�� Public for the State of NC , County of N n-c-,h , do hereby certify that _ P17121 P_ OoTT IP r personally appeared before me this the U44-1 day of , 20 a , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) �.Q MV N CfpN'n�� o obNc NotarySignature 3Z �C 4r) My commission expires - %J7 S; l; �P ,/,,CARO�� Stormwater Permit Information Update Form Page 1 of 1 May 11, 2017 DEMLR USE ONLY Date R cei ed Fee Paid Permit Number Z] -7 as 53o8' S 0.5U NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 761) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: 5 (A) g •- 130 SO 1 2. Project name: 3i12 7'OA/ 1 VDus'TR//fy. 104RK 3. Project street address: t 0?TVAJ /watt 1361J4_wARo City: SA I!<n.A/iL County: 0A/51-ou 1 —ZIP: .2r� 'SzQ 4. What, if any, changes have been made to the project as permitted? AIQ If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deq.nc.gov/abouUdivisionss_/energy- B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/enerqv-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. Current Permit Holder's Company Name/Organization: 5 T. IA bow / C'�PPaRa rr Signing Official's Name: 3. Signing Official's Title: I �i0x Pll�z�rl�n/T 4. Mailing Address: 170 City: IAJtLSo. / State: V C ZIP: -9 70 5. Street Address: SRO/ /�ugeil �iPt�71 /Po�an City: VV;150r1 & Phone: ( 252 ) 290 Sol/Z Email: JUL 6 / ZIP : 2 Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORM. Only applications packages that include all required items listed below will be accepted and reviewed. Initial each Item below to indicate that the required information is provided in the application package: 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or I. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. _ 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration Oa�d nv L JUL 0 6 2022 Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION 1, & Z/,d /{oF/=itlER the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my Date: 9, (o- 20he2Q-- , a Notary Public for the State of Nr, County of Nas h , do hereby certify that mite personally appeared before me this the 111-4-h day of 20-Lal-, and acknowledge the due execution of the forgoing instrument. Witness m hand and official seal, (Notary Seal) Notary Signature: r-"Qrx x My commission expires �'��J L 0EIA a. Iva YPuWlc My Ccvn,ti,-°enty Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 •�. ,;t�� ```tttugpu uryrrprr . �`��.visc�riy6,,,,. -'s� ''�' � , F,un�'= ti� La,srar�i°t'�� �U.�.0 ftG1iU N= 1gctrnr b S � ,� �r- ��..;�. \ Permit No D W U 1 7JDo 1 (to be provided by DWD) TA WDENR Project name Contact person Phone number Date Drainage area number o�0p W A rf;, G ti STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Pad III) must be printed, filled out and submitted along with all of the required information. II. DESIGN INFORMATION Site Characteristics Drainage area Impervious area, post -development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pro -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post l-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 108 vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 5/7f2013 220,414 ftz 197,065 ftz 89.41 % 1.5 in 23,550 ft' 25.657 ft' Y (Y or N) in (unitless) limitless) irvhr 1.74 ft'Isec 1.16 ft'Isec -0.58 it Isec ST Woolen - Burton Park Lot 4 Jennifer Diaz, PE OK, volume provided is equal to or in excess of volume required. 38.00 fmsl 36.50 fmsl 36.88 frost 37.00 frost 36,00 fmsl 27.50 fmsl 26.50 fmsl 1A0 it Y (Y or N) 38.0 fmsl OK F-coVE May 0 9 7013 13 Form SW401-Wet Detention Basin-Rev.94118112 Lm Pans I. a II. Design Summary, Page 1 of 2 Permit No. (to be Prov,ded by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 19,063 flz Area REQUIRED, permanent pool 14,224 ft SAIDA ratio 6.45 (uniftess) Area PROVIDED, permanent pool, As,_,,, 14,224 fit` OK Area, bottom of 10ft vegetated shelf, Am ,e, 11,756 fit` Area, sediment cleanout, top elevation (bottom of pond), A, ome 1,347 ft Volumes Volume, temporary pool 25,657 fO OK Volume, permanent pool, Vp,,,,, ow 51,644 ft' Volume, forebay (sum of forebays if more than one forebay) 11,175 ft' Forebay %of permanent pool volume 21.6% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) MountaiNPiedmont SAIDA Table Used? N (Y or N) SAIDA ratio 6,45 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vp,,,, Paol 51,644 ft' Area provided, permanent pool, A... 14,224 ft` Average depth calculated It Need 3 ft min. Average depth used in SAIDA, d„, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, A... 14,224 ft` Area, bottom of 101t vegetated shelf, Aw, gw 11,756 ft` Area, sediment cleanout, top elevation (bottom of pond), A, m>aa 1,347 ft 'Depth' (distance blw bottom of 1Oft shelf and top of sediment) 8.50 ft Average depth calculated 5.20 ft OK Average depth used in SAIDA, d„, (Round to down to nearest 0.5h) 5.0 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.50n Area of entice (if -non -circular) in Coefficient of discharge (Co) 0 60 (unifiess) Driving head (Ha) 0.46 ft Drawdown through weir N (Y or N) Weir type (unitless) Coefficient of discharge (C..) (unitless) Length of weir (L) It Driving head(H) it Pre -development 1-yr, 24-hr peak flow 1.74 ft'/sec Post -development 1-yr, 24-hr peak flow 1.16 ft'Isec Storage volume discharge rate (through discharge orifice or weir) 0.11 ft/sec Storage volume drawdown time 2.42 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 If OK f'1 \ /C CC Length of Oowpath to width ratio 3 :1 OK CI!V G Length to width ratio 2,5 :1 OK V MAY Trash rack for overflow S orifice? Y (Y or N) OK 0 9 2013 Freeboard provided 1.3 ft OK Vegetated filter provided? N (Y or N) OK BY. Recorded drainage easement provided? Y (Y or N) OK Cagures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: pump Form SW401-Wet Detention Basin Rev 9-411el12 Parts m. a ram. Design Summary, Page 2 of 2 Permit III. REQUIRED ITEMS CHECKLIST (to be provided by DWO) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. J c0 2 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. J� —7 1 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. J� 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 0) J 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, JL� r QC to verify volume provided. G 0� 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 11 t� 7. The supporting calculations. L� 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. WAL9. A copy of the deed restrictions (if required). (i�41OL 0. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. y� E G lE I Vii-: 1ry,I Form SW401-Wet Detention Basin-Rev.9.4/18112 A MAY 0 1 20B 1� �! Part III. Required Items Checklist, Page 1 of 1 BY: `l��q Permit No. SWa mri 7 ) (16 be pmvbiid by D ) R0201C W ATFg0G 01 NC ENR r STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted, The Required Items Checklist (Pad III) must be printed, filled out and submitted along On all of the required information. I. PROJECT INFORMATION Project name ST Woolen - Burson Park Lot 4 Contact person Jennifer Diaz, PE Phone number 919.469,3340 Date W12013 Drainage area number 2 II. DESIGN INFORMATION Site Characteristics Drainage area 74,052 H2 Imperiiaus area, post -development 65,340 rye %impervious 88.24 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required 7,812 tt' Volume provided 9,583 ft' Storage Volume: SA Waters 1.5" runoff volume rya Pre -development 1-yr, 24-hr runoff P Post -development 1-yr, 24-hr runoff rye Minimum volume required rya Volume provided It, Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth in Rational C, pre -development (unidess) Rational C, post -development limitless) Rainfall intensity: 1-yr, 24-hr storm irVhr Pre -development 1-yr, 24-hr peak How 0.45 H'Isec Post -development 1-yr, 24-hr peak How 0.35 H'Isec PrelPost 1-yr, 24-hr peak How control -0.10 tt'Isec Elevations Temporary pool elevation 41.00 fmsl Permanent pool elevation 40.00 fmsl SHWT elevation (approx. at the perm, pool elevation) 40.26 fmsl Top of 1ott vegetated shelf elevation 40.50 fmsl Bottom of 10tt vegetated shelf elevation 39.50 fmsl Sediment cleanout, lop elevation (bottom of pond) 35.50 fmsl Sediment cleanout, bottom elevation 34.50 fmsl Sediment storage provided 1.00 H Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume OK, volume provided is equal to or in excess of volume required. Y (Y or N) 41.0 hnsl OK EGEI 1 MAY 0 9 2013 �N S. 7 /3 Form SW401-Wet Detention Basin-Rev.&41=2 — Pans I. a II. Design Summary, Page 1 of 2 Permit fro ea arovided by Dvml II. DESIGN INFORMATION Surface Areas Area, temporary pool 11,525 ft' Area REQUIRED, permanent pool 7,752 ft2 SAIDA ratio 10.47 (unitless) Area PROVIDED, permanent pool, A e,,, , , 8.696 ft` OK Area, bottom of 1 Oft vegetated shelf, A,_,,, 7,593 ft` Area, sediment cleanout, top elevation (bottom of pond), A„., 2,182 ft Volumes Volume, temporary pool 9,583 ft3 OK Volume, permanent pool, V, aid 21,993 ft3 Volume, forebay (sum of fombays if more than one forebay) 4,394 ft3 Forebay % of permanent pool volume 20.0% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 10.47 limitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vp,,,, " 21,993 ft' Area provided, permanent pool, A. per, 8,696 ft` Average depth calculated It Need 3 R min. Average depth used in SAIDA, d,,, (Round to nearest 0.5ft) It Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, A._,. 8,696 ft Area, bottom of 1 Oft vegetated shelf, Ay,, ,,,, 7,593 ft` Area, sediment cleanout, top elevation (bottom of pond), A,,_. 2,182 ft' "Depth" (distance raw bottom of 1 Oft shelf and top of sediment) 4.00 it Average depth calculated 3.04 It OK Average depth used in SAIDA, d„, (Round to down to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of onto (if circular) 1.50 in Area of orifice (il-noncircular) in2 Coefficient of discharge (Co) 0.60 (unitless) Driving head (Ho) 0.28 It Drawdown through weir? N (Y or N) Weir type limitless) Coefficient of discharge (C.) (unitless) Length of weir (L) ft Driving head (H) ft Pre -development 1-yr, 24-hr peak flow 0.45 ftllsm Post -development 1-yr, 24-hr peak flow 0.35 ft3/sec Storage volume discharge rate (through discharge onfce or weir) 0.03 ft3lsec Storage volume drawdown time 2.88 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes Vegetated shelf slope 3 :1 10 :1 OK OK C Vegetated shelf width 10.0 ft OK Length of too width ratio OK MAY 0 9 200 Length to width rah 1.8 :1 Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.5 ft OK f3Y- Vegetated filter pmvided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Captures all runoff at ultimate build -out? Y (Y or N) OK Dmin mechanism for maintenance or emergencies is: pump Fom1 SW401-Wet Detention Basin-Rev.e-4/18/12 Pads L 8 rl. Design Summary, Page 2 or 2 Permit No. (to be provided by D WQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Sheet No. �Initials s 2 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROM, - Overflow device, and - Boundaries of drainage easement. JL' 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure With trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. 1 Jl 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. )CID 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. S L�% / 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verity volume provided. &l Gt'td 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the 03 J�L entire drainage area is stabilized. '�� sec( 7. The supporting calculations. Jcb GC 6. A copy of the signed and notarized operation and maintenance (O&M) agreement. N Q 9. A copy of the deed restrictions (if required). Jc G&Lth a 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. .".-CEWE MAY 01 2013 Form SW401-Wet Detention Basin-Rev.9-4/18/12 V y Part III. Required Items Checklist, Page 1 of 1 cy: State Stormwater Management Systems Permit No. SW8 130501 Burton Industrial Park — Concrete Plant for S.T. Wooten Corporation Stormwater Permit No. SW8 130501 Onslow County Designer's Certification Jennifer Diaz, PE , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, Burton Industrial Park - Concrete Plant for S.T. Wooten Corporation (Project) for S.T. Wooten Corporation (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signs Regis Date This certification is for the following items: -BMP #1 -BMP #2 Page 7 of 8 State Stormwater Management Systems Permit No. SW8 130501 Certification Requirements: JCD 1, The drainage area to the system contains approximately the permitted acreage. JCD 2 The drainage area to the system contains no more than the permitted amount of built -upon area. JCD 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. JCD 4. All roof drains are located such that the runoff is directed into the system. JCD 5. The outlet structure elevations are per the approved plan. JCD 6. The outlet structure is located per the approved plans. JCD 7. Trash rack is provided on the outlet structure. JCD 6. All slopes are grassed with permanent vegetation. JCD 9. Vegetated slopes are no steeper than 3:1. JCD 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. JCD 11. The permitted amounts of surface area and/or volume have been provided. JCD 12, Required drawdown devices are correctly sized and located per the approved plans. JCD 13. All required design depths are provided. JCD 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. JCD 15. The required system dimensions are provided per the approved plans. JCD 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DEMLR Wilmington Regional Office Onslow County Building Inspections Page 8 of 8 RESOLUTION REGARDING THE' LOCATION OF A BUSINESS IN ONSLOW COUNTY BOARD OF COMMISSIONERS COUNTY OF ONSLOW, NORTH CAR'OLINA WHEREAS, the County of Onslow (hereinafter "the County"), is the owner of a 10 acre parcel of land (a portion of Lot 4) located is Burton Industrial Park, Burton Park Blvd., Jacksonville Township, County of Onslow, North Carolina and within the jurisdiction of the County (hereinafter "the Site'); WHEREAS, the Burton Industrial Park was established to assist the County in the public purpose of promoting economic development; WIHi RE AS, S.T, Wooten Corporation, a North Carolina corporation , (hereinafter "the Company") has made a Two Hundred Thousand Dollars ($200,000) cash offer to purchase the Site for the relocation and expansion of its business within the County in consideration of a five year option ( hereinafter "the Option") to purchase an approximately 30 acre parcel of land located on the Hines Farm Road side of the main wetlands drain the bisects the Burton Industrial Park at the fair market value of Twenty Thousand Dollars ($20,000) per acre, less Two Hundred Twenty Thousand Dollars ($220,000) and modification of restrictive covenants; WHEREAS, upon exercise of the Option, the Site would revert to the County; WHEREAS, pursuant to North Carolina General Statutes Sections 153A-149, 153A-449 and 158-7.1, the County may acquire and develop land for an industrial park, aid and encourage the location of industrial and commercial plants in the County and convey such property, and the County and the Company may enter into an agreement in connection therewith; WHEREAS, the Company has committed to invest another One Million Eight Hundred Thousand Dollars ($1,800,000) in taxable business personal property at the Site to improve the Site for location of a ready mix concrete plant and relocation of a recycling operation, trucks and other business personal properly within the next 12 months; WHEREAS, the Onslow County Tax Administrator estimates that the location of the Company in the County will generate approximately Fifty Thousand Four Hundred and Twenty Seven Dollars ($50,427) in tax revenues over the next five years; WHEREAS, the Company has committed to creating six new jobs within the County within the next six months at an expected average weekly wage of Six Hundred Twenty -Three Dollars ($623); WHERE, AS, if the Option is exercised, the Company desires to expand its operations within the Burton Industrial Park within the next five years include an asphalt plant and potentially add three new jobs; WHEREAS, the County finds that in order to aid and encourage the relocation and expansion of the Company in Onslow County, North Carolina, to stimulate the local economy and to promote business, it is necessary and desirable to contract for sale of and improvements to the Site; WHEREAS, the County finds that the real property which is to be conveyed has a fair market value of not more than Twenty Thousand Dollars ($20,000) per acre; WHEREAS, the Executive Committee of Jacksonville Onslow Economic Development has endorsed the Company's proposal as a significant economic benefit to the County; WHEREAS, the County finds that the consideration the/ receives, based on the purchase price of the Site, prospective tax revenue from the improvements to the Site and location of business personal property at the Site and prospective sales tax revenues to be generated in the area in the next five years, due to relocation of the Company within the County and the Site improvements, will be equal to or greater than the value of the property conveyed to the Company; WHEREAS, the County finds that the location and expansion df the Company within the County and the transfer of the property and Site improvements will increase taxable property, and increase business prospects in the County of Onslow, as well as result in additional jobs in the County that pay at or above the median average weekly wage of the County; and WHEREAS, pursuant to Article 1, Chapter 158 of the North Carolina General Statutes, the County has duly advertised and conducted a public hearing; and WHEREAS, a form incentive agreement between the County and the Company was presented in connection with the proposed transfer of the Site. NOW THEREFORE, THE BOARD OF COMMISSIONERS OF THE COUNTY OF ONSLOW DOTH RESOLVE AS FOLLOWS: 1. That the County hereby authorizes conveyance of the Site to the Company, pursuant to North Carolina General Statutes Section 158-7.1. 2. That the County hereby approves the form of the Incentive Agreement stated above to have been presented to the Board of Commissions at this meeting, and the Chairman and Clerk to the Board are hereby authorized to execute, attest and deliver the Incentive Agreement and all documents anticipated by the Incentive Agreement to which the County is party, in any number of signed counterparts, for and on behalf of the County in substantially such forms, with such changes therein, additions thereto and omissions therefrom as the Chairman, the Clerk to the Board and the County Attorney shall approve not inconsistent with the Incentive Agreement and this Resolution. 3. That this Resolution shall take effect upon its passage. ADOPTED this the 6th day of May, 2013. Onslow County Board of Commissioners lC0m4f,, d ram: 0. 2 : Paul Buchanan, Chairman ST: �ob•.oNa�4 �� rinU/ 4JUS,and, Cleric to the Board `I (Page 1 or 3) lnYa p9rarrftoo Yfl IMl.n.au�r 5-::)7-13 ons This deed presented to The 0 Ie Co T tflce Oates ' IberkoJ� This instrument prepared by FRANK W. ERWIN, ATTORNEY 825 Gum Branch Rd., Suite 115 Jacksonville, NC 28540 MAIL AFTER RECORDING TO GRANTEE CAROLINA ONSLOW COUNTY I�IB�10101011119118 roc ta: Ot09WO2000J rayy.: CRPa.cord.d: O6/79/201J a 12:11:57 PM Fu = {42e.00 P.e. 1 of 8 Rw.nu. T.z: pao.00 on.lav County NO a.b.... L. Poilvd 8.q. of and. BK3992 Po971-973 Index Description: Lot 4 Burton Park (MB66 P t38) Tax Stamps $ 400 -0D Tax Parcel # S23O — IL . 1 File #R 17907 SPECIAL WARRANTY DEED 7'JuS DEED, made lhis.23� day of MAY, 2013, by and between ONSLO W COUNTY, a North Carolina Political Subdivision, hereinaRercalled Grantors, whose mailing address is S.T. W OOTEN CORPORATION, a North Carolina Corporation, hereinafter called Grantee, whose permanent mailing address is PO BOX 2408, WILSON, NC 27894. Thedesignation GrantoramiGrantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable considemtiun paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Greater; in fee simple, all of that certain lot or parcel of land situated in Jacksonville Township, Onslow County, North Carolina and more particularly described as follows: Being all of that I0.00 acre tract as shown on that plat entitled "BURTON INDUSTRIAL. PARK LOT 4" as recorded in Map Book 66, Page 138, Onslow County Registry. ER W IN & SIM PSON Attorneys, PI.LC -Telephone: (910) 455-1800 825 Gum Drench Road, Suite 115, Jacksonville, NC 28540 Book: 3902 Page: 071 Page 1 of 3 Book: 3992 rose: 971 8": 1 Own 2 or n TO I IAVE AND TO I IOLD the aforesaid tot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor has done nothing to impair such title as Grantor received, and Grantor will warrant and defend the title against the lawful claims of all persons claiming by, under or through Grantor, except for the exception thereinafter stated. Title to the property hereinabove described is subject to the following exceptions: Restrictive Covenants recorded in Book 3068, Page 713, and amended in Book3, , Pagegba-990 IN WITNESS WHEREOF, as the above date, Grantor (whether person, corporation, limited liability company, general partnership, limited partnership, or other entity) has signed this instmment in the ordinary course of business, by the signature(s) below if its duly authorized mpresenlalive(s), us the act of such entity. N/A If initialed, die property includes the primary residence of at (east one of the Grantors, otherwise, note as N/A. (per NC GS § 105-317.2) ONSLOW COUNTY BOARD OF COMMISSIONERS v\�\\gUtllll/l//m b`���JaZY Ooyp� By: Q�YL- r soPAUL BUCHANAN, CHAIRMAN o = a o " �0.MQ AfR49ba3 VIA ON ON Clewto the Board of Commissioners RRW IN & SIMPSON Attorneys, PI.I.0 - Telephone: (910) 455-1800 825 Gum Branch Rood, Suite 115, Jacksonville, NC 28540 2 Hook: 3092 Page: 971 Page 2 of 3 feet: 3992 Page: 971 8": 2 (Papa 3 of 3) STATE OF NORTH CAROLINA COUNTY OF ONSLOW WLV4K , a Notary Public of the county and state aforesaid, certify that Julie S Wand, personally came before me this day and acknowledged that she is the Clerk to the Board for Onslow County, and that by authority duly given and as the act of the Hoard, the foregoing instrument was signed in its name by its Chairman, sealed with the corporate seul and attested by herself as its Clerk. WITNESS my hand and seal, this the _?I_ day of 201 NOTARY PUBLIC s My commission expires: q 13I kq • Y ,— puetiaw .ra RADEFDS\W DSPECTRM(010693)081802\RF-V01050610212094evO91409 K:\ONStAW COUNrvIOURTONPARK\2013 to 4 ST Wpptm MSTWC IABP SPF.CWO 052213.aad R 17907 ERW IN & SIMPSON Attorneys, PLLC - Telephone: (910) 455-1900 825 Gum Branch Road, Suite I15, Jacksonville, NC 28540 3 Book: 3992 Page: B%1 Page 3 of 3 nook: 3992 Pepe: 971 Do, 3 (Page 1 of 3) }�+ 52oq cr MOort. '• sNar„vm.1�Sm BOON 1365pdGE 322 SPECIAL WARRANTY DEED THIS DOCUMENT PRESENTED - C� R.E. No. SN1-CPV15 25 IN IQ 13 PATE c.'T�Ohrco 2n F, 19 ` THIS INDENTURE, made this 22nd day of April• A.D., 1997. between am w1NCOCK LU143 &k11 MUTUAL LIFE INSURANCE COMPANY, a corporation duly organized under the laws of the Commonwealth of Massachusetts and having its principal place of business at 200 Clarendon Street, Boston, Massachusetts 02117 (Grantor), and ONSLOW COUNTY, a North Carolina political subdivision, (Grantee). WITNESSETH, That the Grantor, for the sum of Ten and OO/IOD 010.00) Dollars. and other good and valuable consideration, to it paid by the Grantee, the receipt of Mich is hereby acknowledged. has GRANTED. SOLD and CONVEYED, and by these presents does GRAM. SELL and CONVEY unto the said Grantee the following land and the standing timber located thereon, (Premises), situated in Dnslow County. North Carolina, being more particularly described to Exhibit 'A' attached hereto and by this reference made a part hereof. The Premises described hereunder are hereby conveyed 'as 1s.' by the tract and rot by the acre, the acreage not being guaranteed by the Grantor, and are also 'conveyed subject to encumbrances of record: current and subsequent taxes; leases or the rights of any tenants or lessees, parties in possession: all outstanding mineral rights or reservations, oil. gas or mineral leases; water districts, water rights; restrictions or reservations; roadways, rights -of -way. easements: any contracts purporting to limit or regulate the use. occupancy or enjoyment of said Premises; and all other matters which an accurate, current survey or Inspection would Show applicable to or affecting said Premises. TO HAVE AND TO HOLD the above -described Premises, together with all and singular the rights and appurtenances thereto in anywise belonging. unto the said Grantee. its successors and assigns. forever. And Grantor does hereby warrant and forever defend all and singular the said Premises unto the Grantee. its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof by, through or under it, except as aforesaid, but against none other. IN WITNESS WHEREOF• on the day and year first -above written the Grantor. has caused its corporate seal to be hereto affixed and these presents to be .signed in Its name and behalf by Christopher M. Ford. a Vice President of HamOck Natural Resource Group. Inc., its investment manager, duly authorized to act un Grantdh's behalf by virtue of a resolution of the Board of Directors of Grantor. JOHN HANCOCK MUTUAL LIFE INSURANCE COMPANY BY: Hancock Natural Resource Group. IK. A. ,.;OdscY P by oborn. Secretary /•Xro•}- o•eeid•,,•t STAMPS: $1,250.00 COMMONWEALTH OF MASSACHUSETTS ) ) ss. COUNTY OF SUFFOLK ) 1, Maria L. DeAndrade, a Notary Public in and for said Commonwealth, hereby certify that personally came before me this day and acknowledged that heat he is � Secretary of Hancock Natural Resource Group. ` Inc., the duly authorized Investment manager of JOHN HANLOCK MUTUAL LIFE INSURANCE COMPANY, a Massachusetts corporation. and that by authority of the Board of Directors of John Hancock Mutual Life Insurance Company. the foregoing instrument Page 1 of 2 0 • 0 CEUVE MAY 01 2013 BY: Book: 1365 Page: 322 Seq: 1 (Page 2 3f 3) n 9 BOOK 1365PAGE 323 was signed and sealed an behalf of John Hancock Mutual Life Insurance Capon by Christopher M. Ford, Vice President, and attested to by himself as Assistant Secretary of Hancock Natural Resource Group, Inc. WITNESS My hand and notarial st r seal jhls 2 day o 11, 1997. (SEAL) Mar a L. GeArldrade. Note tc ttd Conuiisslan Expires: SeaertOAr. 19.� 2003 5ia, ?-5_fI,d50.e [alum STATE OP INA>Ea0STATE OP NORTH C-L).4 eO WUDOC W� C Ant CA STATx OP 4TATE ciao rlUl NORTH ARO'E)NA $50.00 _".`F.11J NORTH eA n • as x uae rea s500.00 $100.00 Ties lnsfimR;rn was prepe:ed b'/ . JOHN )UUiCOCH MUTUAL MIF INSURATICE COMPAW John li m*Ck q„ P.O. ?ua 111. eoston, 1AA 02117 Page 2 of 2 AFTER RECORDING PLEASE RETUR!' I THIS DOCUMENT TO THE GRANTEE AT THE ADDRESS SHOWN HEREIN E G E R dB' E-) ` MAY 0 1 2013 GY: Book: 1365 Page: 322 Beg: 2 (Page 3 3P 3) ... 900K.13G5pan 324 EXHIBIT 'A' PARCEL I (MAP MD. 103) All that certain tract or parcel of land shown on a map of property of International Paper Company entitled 'J.B. Dawson Tracy. surveyed by Henry M. Martin in May. 1955. Said tract contains 493.45 acres. Dore or less ant is the very same tract conveyed to International Paper Company by Cape Fear Mood Corporation by deed recorded in Book 248 at Page 403 of the Onslw County Register of Deeds. PARCEL 11 (MAP NO. 188) All that certain tract or parcel of land sham an a map of property of International Paper Company entitled "M. D. Burton Tract-, surveyed by V. W. Herlevich 1n August, 1964. Said tract contains 137.05 acres, more or less and is the very same property conveyed to International Paper Company by N. Dalton Burton and wife, Grace H. Burton by deed recorded in Book 318 at Page 482 of the Onslw County Register of Deeds. BEING those portions of the Premises identified as Tract No. 53 (Map No. 103) and Tract No. 62 (Map MD. 118) in that Deed to Grantor dated March 30. 1993. recorded in the Office of the Register of Deeds for the County of Onslw, State of North Carolina, in Book 1102. Page 392. TOGETHER WITH, but without recourse, warranty or agreement of any kind or nature being given by Grantor as to the adequacy. availability or entitlement thereof or thereto, all of Grantor's right, title or interest in and t0 all sand and gravel remaining on, in and under the above -described premises. under that certain Deed and Surface Use Agreement dated March 30, 1993. recorded with said Onslow County Registry in Book 1102, page 429. SUBJECT TO all rights and reservations of Grantor and all duties and obligations of Grantee as more specifically set forth in the aforesaid Deed and Surface Use Agreement. Mane Cwlalnt4 Owwa ramp Naria L. DeAndrade n mwyrawma.w)r N..A.) h w (n) .4.a . 4 Taw Wm - .. V« la -&.n o nmrea w eau tl w MI 1164h • 32r Tw nth ",d Ap,41 Il , tl d.l A _ u, ir....a... • r..r ��IA+ 41 MAY 0 1 2013 GY: Book: 1365 Page: 322 seq: 3