Loading...
HomeMy WebLinkAboutSW8060101_HISTORICAL FILE_20060131STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 06 01 0I DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2606 Ol 31 YYYYMMDD zi -i January 31, 2006 Mr. Jay R. Houston, Meadow Ridge, LLC P.O. Box 627 Shallotte, NC 28459 Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources P.E., Managing Member Subject: Stormwater Permit No. SW8 060101 Meadow Ridge High Density Subdivision Project Brunswick County Dear Mr. Houston: Alan W. Klimek, P.E. Director Division of Water Quality The Wilmington Regional Office received a complete Stormwater Management Permit Application for Meadow Ridge on January 24, 2006. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 060101, dated January 31, 2006, for the construction of the subject project. This permit shall be effective from the date of issuance until January 31, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, INC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Paul Bartlett, or me at (910) 796-7215. Sincerely, 1Z, DV . ddr -war' Beck Regional Supervisor Surface Water Protection Section ENB/ptb: S:\WQS\STORMWAT\PERMIT\060101.jan06 cc: Jay R. Houston, P.E., Houston & Associates, PA Delaney Aycock, Brunswick County Inspections Jeff Phillips, Brunswick County Engineering Paul T. Bartlett, P.E. Wilmington Regional Office North Carolina Division of Water Duality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Services-877.623-6748 pne Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910)350.2004 Internet: h2o.encstate.nc.us NOrtt1CN'Otln3 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Naturally State Stormwater Management Systems Permit No. SW8 060101 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Jay R. Houston, P.E. and Meadow Ridge, LLC Meadow Ridge Brunswick County FOR THE construction, operation and maintenance of three wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until January 31, 2016 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on page 3 of this permit. The subdivision is permitted for 7 lots (Outparcels), each allowed built -upon area per Attachment #1. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Pape 2 of 9 State Stormwater Management Systems Permit No. SW8 060101 5. The following design elements have been permitted for the wet detention pond stormwater facilities, and must be provided in the systems at all times. Design Criteria Pond #1 Pond #2 Pond #3 a. Drainage Area, acres: Onsite, ft2 Offsite, ft2 12.32 84,071 452,588 6.87 299,131 None 4.21 183,553 None b. Total Impervious Surfaces, fC OS Buildings, ft2: OS Streets, ft2: Future Onsite, ftz: Future Offsite Outparcels 1,2,3,6,7),ft2: 426,222 29,856 89,834 None 306,532 222,796 91,907 130,889 None None 152,003 41,195 71,417 39,392 None c. Design Storm, inches 1 1 1 d. Pond Depth, feet 6.5 6.0 6.0 e. TSS removal efficiency 90 90 90 f. Permanent Pool Elevation, FMSL 42.0 42.0 45.0 g. Permanent Pool Surface Area, ft 23,289 17,119 12,938 h. Permitted Storage Volume, ft 35,262 18,192 13,972 i. Temporary Storage Elevation, FMSL 43.4 43.0 46.0 . Controlling Orifice,' e 3.0 2.0 1.5 k. Permitted Foreba Volume, ft 18,855 14,448 8,635 I. Receiving Stream/River Basin Saw Pit Swam I Lumber m. Stream Index Number 15-25-22 n. Classification of Water Body C; Sw o. Max. horsepower for a fountain 1/3 1/6 1/8 II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. Paqe 3 of 9 State Stormwater Management Systems Permit No. SW8 060101 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 12. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 060101, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot (Outparcel) is as listed in Attachment #1. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations. h. All runoff from built upon area on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. i. Built -upon area in excess of the permitted amount will require a permit modification. j. Each lot within the subdivision whose ownership is not retained by the permittee, must submit a separate Offsite Stormwater Management Permit application package to the Division of Water Quality and receive a permit prior to any construction on the lot. Paqe 4 of 9 State Stormwater Management Systems Permit No. SW8 060101 13. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 14. Decorative spray fountains will be allowed in the wet detention pond stormwater treatment systems, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in the wet detention ponds is listed on page 3 of this permit in Section 1.5. 15. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 16. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 17. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 18. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 19. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 060101 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 31st day of January 2006. NORTI-I.t;AROLINA ENVIRONMENTAL MANAGEMENT COMMISSION e3e,el<- Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 060101 Page 6 of 9 State Stormwater Management Systems Permit No. SW8 060101 ATTACHMENT #1 MEADOW RIDGE ALLOWABLE BUILT -UPON AREA Outparcel No. Total Area, Acres Total Allowable Built -Upon Area Acres Square Feet 1 1.43 1.2155 85% 52,947 2 1.40 1.19 85% 51,836 3 1.45 1.2325 85% 53,688 4 5.88 4.90 213,444 5 13.59 5.1243 223,215 6 3.38 1.3445 58,566 7 2.73 2.3205 85% 101,081 Page 7 of 9 State Stormwater Management Systems Permit No. SW8 060101 Meadow Ridge Stormwater Permit No. SW8 060101 Brunswick County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit No. SW8 060101 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Delaney Aycock, Brunswick County Building Inspections Jeff Phillips, Brunswick County Engineering Page 9 of 9 HOUSTON and ASSOCIATES, P:A. Consulting Engineers SHALLOTTE, NORTH CAROLINA 28459 Telephone (910) 754-6324 Facsimile (910) 754-2121 Mr. Paul T. Bartlett, P.E. Division of Water Quality NCDENR 127 Cardinal Drive Extension Wilmington, North Carolina 28405 117 Pine Street Post Office Box 627 Tuesday, January 24, 2006 Subject: Meadow Ridge: SW8 060101 Ocean Isle Beach, North Carolina Stormwater Fast Track Permitting Submittal RECEIV D M00 Dear Mr. Bartlett: On behalf of Meadow Ridge, LLC, we are submitting for your review and approval these responses to your comment letter dated, January 17, 2005. Each of your comments ate addressed below. 1. Two (2) copies of the completed, dated and signed deed restriction template you provided are enclosed. 2. The enclosed deed restriction template includes a restriction that establishes a blanket easement over the entire property. This restriction has been added as a Note to Sheet 1 of the plans. Two (2) \ copies of the revised Sheet 1 are enclosed. 3. The vegetated 6:1 shelf for the three stormwater ponds is shown \ correctly on Sheet 4.. Both the plan view and the section view show a' \ 12' wide vegetated shelf below the permantent pool. A note has been \ added to Sheet 4, that specifies 12' wide. Two (2) copies of the revised Sheet 4 are enclosed. 4. The Off -Site impervious area shown on Section I11.6 of the application is for the Out Parcels that will be developed in the future. Please see Section 111.7 of the application and Sheet' 2A of the plans for explanation of the Off -Site areas. During the Pre -Application meeting, October 31, 2005, we were told to include the future Out Parcel impervious area as Off -Site area. It is included as Off -Site area so that when each Out Parcel is developed, the developer can submit for an Off -Site Stormwater Permit. The 7.04 acres of Off -Site impervious area includes the future impervious areas from Out Parcels 1, 2, 3, 6, and 7. See the Future Allowable BUA column on Sheet 2A of the plans. The Future Allowable BUA's shown for each of these Out Parcels adds up to the 7.04 acres. Mr Bartlett Page 2 Meadow Ridge Stormwater Express SW8 060101 The drainage areas Al and A2 delineated on the 11.5" x 14" drainage map are used only to size the piping through the project. The plans show that these areas are Off -Site areas that are piped through the project and by-pass Stormwater Pond # 1. The draingage area for Stonnwater Pond #1 shown on the color drainage map is correct. No other changes need to be made. 5. The forebays are sized correctly. The areas 'questioned in comment 4 do not enter Stonnwater Pond'#1. We appreciate your attention in this matter. Should you have any comments or require any additional information, please do not hesitate to contact our office at your convenience. �Sincerely, /J T. J n Clark, P.E. Houston and Associates, P.A. pc: File; 05-1065 (Meadow Ridge - EXPRESS Stormwater Permitting) HOUSTON and ASSOCIATES, P.A. Consulting Engineers SHALLOTTE, NORTH CAROLINA 28459 Telephone (910) 754-6324 117 Pine Street Facsimile (910) 754-2121 Post Office Box 627 FOR STORMWATER EXPRESS REVIEW Narrative/Project Description, (Meadow Ridge, Ocean Isle Beach, NC): The Meadow Ridge project is located in southeast Brunswick County, in Ocean Isle Beach, North Carolina. Meadow Ridge consists seven (7) commercial out parcels. Two (2) of the out parcels, Access Storage II (out parcels 4 and 5), along with roadways and parking areas are being developed in this submittal. Development of Meadow Ridge will be accompanied with a curb and guttered entrance/main roadway with catch basins/drop inlets and piping. The parking areas will include catch basins and piping. Three (3) Stormwater Ponds have been engineered for treatment. Each of the engineered BMP's is designed to store the required one (1.0) inch of runoff and to all of NCDENR's requirements. There are property line ditches on both the northern and southern property lines. Some ditches have been relocated. All wetlands are shown on the plans. The proposed Stormwater Ponds outlet into the ditches and wetlands. The stormwater ponds were designed to treat the runoff from the future out parcel developments. Four (4) of the out parcels to be developed in the future were assigned maximum impervious areas. Maximum BUA's for each out parcel are shown on the plans. The design of each BMP was done according to the NCDENR Stormwater BMP Design Manual. The project area to be disturbed is slightly rolling with a consistent slope from the southern project boundary to the northern project boundary. The Soil Survey of Brunswick County classifies the soil types within the project boundaries as Mandarin Fine Sands and Grifton fine sandy loam. Runoff drains to the Saw Pit Swamp and into the Shallotte River. Ridge. This submittal is for a High Density Stormwater Permit for Meadow SEAL r:v 030869 _ ///W1.111�` JAN 2 4 7006 ��� a6(0 FILE MODE P. 1 COMMUNICATION RESULT REPORT ( JAN.17.2006 5:33PM ) TTI NCDENR WIRO OPTION ADDRESS (GROUP) -=R�T---------PAGE ----------- ---- ------------------ 191 MEMORY TX 919107542121 OK' P. 4/4 REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-4) NO E-3) NO ANSWER FACSIMILE CONNECTION State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor Date: 1 /17/06 To: Jay Houston Company: FAX #: (910) 754-2121 William G. Ross, Jr., Secretary FAX COVER SHEET No. of Pages: 4 (Intl. Cover) From: Paul Bartlett Water Quality Section - Stormwater FAX #: 910-350-2004 Phone #: 910-796-7301 DWQ Stormwater Project Number: SW8 060101 Project Name: Meadow Ridge MESSAGE: Jay, A Request for Additional Information is attached for the subject project. The original will be mailed to you. State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor Date: 1 /17/06 To: Jay Houston Company: FAX #: (910) 754-2121 William G. Ross, Jr., Secretary FAX COVER SHEET No. of Pages: 4 (Incl. Cover) From: Paul Bartlett Water Quality Section - Stormwater FAX #: 910-350-2004 Phone #: 910-796-7301 DWQ Stormwater Project Number: SW8 060101 Project Name: Meadow Ridge ' MESSAGE: Jay, A Request for Additional Information is attached for the subject project. The original will be mailed to you. ENB\ptb: S:\WQS\STORMWATER\ADDINFO\2005\060101.jan06 127 Cardinal Drive Extension, Wilmington, NC 28405-3845 Telephone (910) 796-7215 FAX (910) 350-2004 An Equal Opportunity Affirmative Action Employer pF \NATF9 Michael F. Easley, Governor William G. Ross, Jr., Secretary v� North Carolina Department of Environment and Natural Resources as Alan W. Klimek, P.E. Director Division of Water Quality January 17, 2006 Mr. Jay R. Houston, Meadow Ridge, LLC P.O. Box 627 Shallotte, NC 28459 P.E., Managing Member Subject: Request for Additional Information Stormwater Project No. SW8 060101 Meadow Ridge Brunswick County 1crW-11- /ez . r y DG�S 1 �C t 1 1 S 'tom' e�w.. DK.�cU^LPF.�• I I ^, �, 617. Dear Mr. Houston: The Wilmington Regional Office received a Stormwater Management Permit Application for Meadow Ridge on January 3, 2006 for a scheduled review on January 10, 2006. A preliminary review of that information has determined that the application is not complete. The following information is eded to continue the stormwater review: Please provide a copy of the proposed deed restrictions to include all required % conditions and limitations; or complete, sign, date, and notarize the attached deed restriction template for a high density development with outparcels. Please loc&t pp_�r�d�J sw s,ii a recor d access/drainage easement. f 3. Please clarify the width for the vegetated, 6:1 shelf on the three detention ponds. (/The plan views on Sheet 4 illustrate a 6' width and the section elevations Pe9uIllustrate a 10' to 12' width. A minimum 10' wide shelf is required. Please add "10' Wide" to the label for the 6:1 vegetated slope on the ponds' plan view details on Sheet 4. D (� Please clarify the drainage area for Pond #1. Section 111.6 of the application l includes 306,532 sq ft of "Off -site" impervious area in the Pond #1 column. Is �17►3 llt�6 1t this impervious area from Al and A2 that is delineated on the submitted 11-1/2 x 5,Ar4 14 drainage map? If so: ry . (a) drainage area Al and A2 (48.3 ac total?) need to be added to the tt— �12.32 ac drainage area entry at the top of the table and on page 1 of tdA the supplement for Basin #1; p� I (b) the Pond #1 calculations need to be revised by adding the 48.3 ac L� drainage area; and yt I (c) the drainage outfall for areas Al and A2 needs to be clarified if they I ultimately discharge to Pond #1 (i.e., "Offsite Piping" for the Pond #1 "Access Storage 11" calculations list SD101 — SD108 and Sheet 1 illustrates the piping bypassing Pond #1 through a swale). 01 V—aA AA Please separately calculate West and East Forebay surface and volume area requirements based on the clarified drainage area of Item #4 above, and make any design/documentation revisions that may be necessary. North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Services-877-623-6748 One Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet: h2oonr.state.naus N'�ojCaro/l/ina An Equal Oppodunity/Affirmative Action Employer - 50% Recyc1ed110 % Post Consumer Paper Naturally aurally Mr. Jay R. Houston, P.E., Managing Member January 17, 2006 Stormwater Application No. SW8 060101 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to January 25, 2006, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7301. Sincer % i Paul T. Bartlett, P.E. Environmental Engineer ENB/ptb: S:\WQS\STORMWATER\ADDINFO\2005\060101.jan06 cc: Jay R. Houston, P.E., Houston & Associates, PA Paul Bartlett INFORMATION PERTAINING TO DEED RESTRICTIONS AND PROTECTIVE COVENANTS In accordance with Title 15 NCAC 21-1.1000, the Coastal Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Developments with Outparcels where lots will be subdivided and sold. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. The following deed restrictions and covenants must be recorded prior to the sale of any outparcel: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum built -upon area for the outparcel(s) or future development area shown on the approved plans is as follows: Outparcel # BUA AND/OR Future Development BUA These allotted amounts include any built -upon area constructed within the property boundaries, and that portion of the right-of-way between the lot lines and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. The runoff from all built -upon area within the outparcel or future development area must be directed into the permitted stormwater control system. 8. Built -upon area in excess of the permitted amount will require a permit modification. 9. The connection from the outparcel's collection system into the stormwater control shall be made such that short-circuiting of the system does not occur. 10. For those outparcels or future development areas whose ownership is not retained by the permittee, the new owner shall submit a separate offsite stormwater permit application to the Division of Water Quality and receive a permit prior to construction. HOUSTON and ASSOCIATES, P.A. Consulting Engineers SHALLOTTE, NORTH CAROLINA 28459 Telephone (910) 754-6324 117 Pine Street Facsimile (910) 754-2121 Post Office Box 627 Wednesday, December 21, 2005 Mr. Cameron Weaver, Fast Track Permitting Coordinator Division of Water Quality NCDENR 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: 'Meadow Ridge Ocean Isle Beach, North Carolina Od, � s Stormwater Fast Track Permitting Submittal Dear Mr. Weaver: On behalf of Meadow Ridge, LLC, we are submitting for your review and f�jlO� approval two (2) copies each of the stormwater plans, stormwater calculations, and the stormwater application and supplements. The Express Review date for this project is January 10, 2006. During our pre -application meeting, October 31, 2005, it was brought up that the permanent pool elevation in two (2) of our Stormwater Ponds may be to low. Your concerns were .that the Stormwater Ponds may be draining the adjacent wetlands. After that meeting, we consulted with Edwin Andrews & Associates, P.C., Consulting Hydrogeologists. They determined that our proposed Stormwater Ponds would not: have an adverse affect on the adjacent. wetlands. Two (2) copies of a letter from Mr. Ed Andrews are enclosed. A check written to NCDENR for $4,000.00 is enclosed to cover the application fee. , We appreciate your attention in this matter. Should you have any comments or require any additional information, please do not hesitate to contract our office at your convenience. RE C' MV ED sincerely, JAN. q ''Mb BYE JTson Clark, P.E. ton and Associates, P.A. pc: File; 05-1065 (Meadow Ridge - Fast Track Stormwater Permitting) OFFICE USE ONLY Dale Received Pee Paid Permit Number ►Q3- -0 5 ISWS OU01ol State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc, who owns the project): _M�nt�Bt�3�L L.G 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): �_manno ,_ng—mee ber 3. Mailing Address for person listed in item 2 above: City: State: NC zip: 2R'i59 Telephone Number:.( 9 (O ) '7$4 - 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): —Meo&aw 5. Location of Project (street address): _NC1Aw r 904 — Seozs %& Rood city: Ocean geach County: Bru Lik 6. Directions to project (from nearest major intersection): Fconn�! n� US 4" � 6SOLAk and NC L� m, 90L+ 4urn _IMF} on 4o NC Iiuy.9C 'ts a i o)L 1_2.5 6AIes LeT+ ,t 7. Latitude: 33� SS 3�o Longitude: -7 80 301 I u of project 8. Contact person who can answer questions about the project: Name: SQ4 R. t'rq�„5�� rt�� Telephone Number: (_�ID ) �st'i - it. PERMIT INFORMATION: 1. Specify whether project is (check one): _,X__New Renewal Modification Form SWU-101 version 3.99 Page I of 4 2. If this application is being.submitted as the result of a renewal or modification to an existing permit, list the existing permit number (y 1 py and its issue date (if known) 3. Specify the type of project (check one): _Low Density ____High Density _Redevelop _General Permit _Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major X Sedimentation/Erosion Control _404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . 1 n-kn t-he Sat..., Jp.k SL"O'�O 2. Stormwater runoff from this project drains to the LLMv,)p2(- River basin. 3. Total Project Area: 31 • 13 acres 4. Project Built Upon Area: 5 V7 5. How many drainage areas does the project have?_5 6. Complete die following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. C;4UPMWokr Onnd'16 I Ssmoev,t�a� CW --"�2 Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name En'D'Al _S lblie k e% Receiving Stream Class C sw C Sw Drainage Area 12.32 me- 53L GG4 SF &'VB a 299 1315E Existing Impervious} Area Proposed Impervious Area 9."1Sor- 4U. 2729E S.lt 4'. 2ZZ '796, sF % Impervious` Area (total) '79.V-°/, '7`h.604 Impervious' Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 0.009�_ 29,B5psF 2.11 91 90? 5F On -site Streets 2.0`�.. 99 ,614SP 3.O oz. 13O 889 5F On -site Parking _ On -site Sidewalks _ Other on -site PI — Off -site .c 3ov s3zsF Total: 9.178.. 426 2225E Total: S.112ZZ'79G SF Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number I� 1 �Q and its issue date (if known) 3. Specify the type of project (check one): _Low Density Y, High Density _Redevelop _General Permit _Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major Sedimentation/Erosion Control _404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. n". C\e k 1 r\-4-o the Saw P' A St a , p 2. Stormwater runoff from this project drains to the LL.r* toer- River basin. 3. Total Project Area: 31.13 acres 4. Project Built Upon Area: S 8; i % 5. How many drainage areas does the project have? 3 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. �e r0' e -� Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name •� _ \\ 2 r L S 1 Receiving Stream Class Sw C Drainage Area y ,z t u e 1 %3 9S3 SF 31• 1 3sco 0z3 s Existing Impervious` Area — — Proposed lmpeMous*Area 3,49ae. 152 003sF 1%.Z9'73aa. '79(0 s%sF Impervious' Area (total) 82.1;010 1$Q,'laa Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 0.95 41 %1SSF 3.741ac, I(2-9S9sF On -site Streets 1, 6404. "l 141 73F &•('05oa. Z Sv On -site Parking — On -site Sidewalks — — Otheron-site `FuTu Re' O.gOac- 39 39Z.er 0A00y 3q,39Z sv off -site t r e �,o9oc 30(o,532 Total: 3.,49ac. I SZ,pp3 SF Total: 18.28 �3ac 7 Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? 46..r5 W% M �e ru ouS Co'ero9e on n..4 PftrOk c I Z. 3 or,d h. n.A AA.v .t11Ln.., Wo FZ( 1A ^..1 IL-1 TCaIOk on Sheek ZA IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number A/f A - blew prnirek as issued by the Division of Water Quality. These covenants may not be changed or deleted wi&ut the consent of the State. '19� 59(0 �`eTp�os all beak 2. No more than r square feet of shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shalt be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenyts for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will nm with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be. submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each 6MP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) V11. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): FtD..Glnntl'.? lesl�. Mailing Address: �.�. l�Dk 4,2-7 city: Shea\\off 42 State:_&JG zip: 2-(Y S9 Phone: ( 9(0 ) '754- (o32-4 VIII. APPLICANT'S CERTIFICATION Fax: ( Ito ) 754 -y z( I, (print or type name of person listed in General Information, item 2) --MIA S.11,S�r,- , certify that the information included on this permit application form is, o the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 21-1 .1000. (\ _ . i Dale: Form S WU-101 Version 3.99 Page 4 of 4 MK Hydrologic and Hydraulic Calculations for Meadow Ridge Including j:ZFU a " - -Access Storage- �aN o zoos Stormwater Pond #1 CA SEAL r; _ 030869 Q- kM!! Illi I! IP,1l Prepared By jn �G,JSi_I!=:.i1:r9SS �iLr%I �\C,1'�ifJ(1.•Y:1S�(.`..Fi,, f�,.i.�., CONSULTING ENGINEERS Shallotte, North Carolina December 2005 �� - � / /� f '. .\�� '7, i Y -'l -`t ]: b� • l?lrI Meadow Ridge Access Storage II Stormwater Pond #1 Design October2005 Stormwater Pond #1 Design Total Drainage Area: 12.32 Acres Prepared By: TJC Checked By: C 536664 SF Impervious Area: Buildings: 0.69 Acres (v 29856 SF Pavement 2.06 Acres 89834 SF Future - OFFSITE: 7.04 Acres 306532 SF Total: 9.78J' Acres 426222 SF % Impervious: 79.4 % Permanent Pool Depth: 6.5 % TSS Removal: 90% SA/DA: 3.964 Required SA: 21,273 SF Runoff: 1 Inches "Simple Method" Rv 0.76 Volume: 34,203 CF Actual Normal Pool SA: 23,289 SF (@ 42.0' MSL) Depth of Storage: 1.36 Feet USE: 1.40 Feet SA @ Storage Pool: 27,085 SF (@ 43.4' MSL) Provided Storage: 35,262 CF Pond Elevations: Bottom Elev.: 35.5 MSL Permanent Pool: 42.0 MSL Storage Pool: 43.40 MSL EMERGENCY OVERFLOW WEIR: 44.0 MSL Top of Pond Elev.: 44.5 MSL Meadow Ridge Access Storage II Prepared By: TJC Stormwater Pond Design Checked By: October2005 Meadow Ridge Runoff Hydrograph into SW Pond (See Flowrate Calc. and Drainage Basin Data for Breakdown of Areas) Curve Number Drainage Area Land Use Soil Group NA 98 9.78 Impervious B 958.901653 61 2.54 Grassed B 154.659366 Total: 12.32 Total: 1 1 13.56102 Weighted Curve Number: 90.39 Runoff Volume: (Soil Conservation Service Method) Storm Duration: 10 Yr - 1 Hr Storm Rainfall: 5.9 Inches S: 1.06 Direct Surface Runoff: 4.75 Inches Total Runoff: 212,299 CF 4.87 Ac-Ft Peak Flowrate: Hydraulic Length: 1000 Feet Time of Concentration: 6.12 Min 10 Yr Intensity: 6.6 Inches/Hour Weighted "C": 0.80 10 Yr Peak Flowrate: 64.70 CFS Basic Hydrograph: Conversion Factors: u: 0.001477 Ac-Ft/Unit w: 0.646968636 CFS/Unit k: 1.657 Min/Unit Meadow Ridge Access Storage II Stormwater Pond Design Prepared Checked By: TJC October 2005 Time Min Flow CFS 0.0 0.0 5.0 3.2 1 1 .6 9.7 16.6 22.6 21.5 36.2 26.5 49.8 29.8 58.2 33.1 62.8 38.1 64.7 44.7 62.1 49.7 55.0 56.3 46.6 66.3 32.3 77.9 21.3 87.8 15.5 99.4 10.4 111.0 7.1 139.2 2.6 165.7 0.0 Inflow Hydrograph 70.0 60.0 50.0 N u 40.0 v 30.0 0 LL 20.0 -. 10.0 0.0 0.0 50.0 100.0 150.0 200.0 Time (MIN) Meadow Ridge Access Storage II Stormwater Pond Design Meadow Ridge Pond Stage -Discharge -Storage Pond Storage Pool Area = 27,085.00 Square Feet Pond Normal Pool Area = 23,289.00 Square Feet AT = 360 sec. ELEVATION DISCHARGE STORAGE 2S/DT + 0 42.00 0.00 0.00 43.40 0.00 35262 196 43.49 1.00 37529 209 43.65 5.00 41559 236 43.71 7.00 43070 246 43.80 10.00 45337 262 43.92 15.00 48359 284 43.97 17.00 49618 293 44.03 20.00 51130 304 44.13 25.00 53648 323 44.23 30.00 56167 342 44.31 35.00 58182 358 44.40 40.00 60449 376 44.48 45.00 62464 392 44.56 50.00 64479 408 44.71 60.00 68257 439 ** Discharge / Stage Relationship Based on 10' Weir Prepared By: TJC f`har Lcrl Rv Outflow vs 2S/AT + 0 1000 - 800 600 a N 400 - 200 - 0 0 10 20 30 40 50 60 Outflow (CFS) Meadow Ridge Access Storage II Prepared By: TJC . Stormwater Pond Design Checked By: October2005 Meadow Ridge Routing Table - SW Treatment Pond AT USED IN STAGE -DISCHARGE -STORAGE 6 (min) Time n In In + In+1 2S/DT - On 2S/DT + On+1 On+1 (min) (CFS) (CFS) (CFS) (CFS) (CFS) 0 1 0 4 6 2 4.2 15 4 4 0 12 3 10.7 37 19 19 0 18 4 26.5 70 56 56 0 24 5 43.0 102 126 126 0 30 6 58.6 122 221 227 3 36 7 63.1 126 282 342 30 42 8 63.2 121 308 408 50 48 9 57.4 107 317 429 —56 — 54 10 49.5 91 314 424 55 60 11 41.3 74 307 404 49 66 12 32.7 60 298 381 42 72 13 26.9 48 288 358 35 78 14 21.1 39 279 336 28 84 15 17.8 32 270 318 24 90 16 14.5 26 264 302 19 96 17 11.9 22 257 290 16 102 18 9.7 18 251 279 14 108 19 7.9 15 245 269 12 114 20 6.6 12 241 260 10 120 21 5.7 10 236 253 8 126 22 4.7 8 234 247 6 132 23 3.8 7 230 243 6 138 24 2.8 5 226 237 5 144 25 2.1 4 223 231 4 150 26 1.5 1.54 219 226 3 Meadow Ridge Access Storage II Stormwater Pond Design October 2005 Stormwater Pond #1 Outlet Structure HEADWATER ELEVATION CALCULATIONS Prepared By: TJC Checked By: FLOWRATE = ** 56 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 0 INCHES Weir Length = 10 FEET HEAD = #DIV/O! LENGTH OF CULVERT PIPE = 0 FEET HEADWATER ELEVAI #DIV/0! INV. IN ELEV. OF CULVERT = 0.00 FEET INV. OUT ELEV. OF CULVERT = 0.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 43.40 FEET HEAD = #DIV/0! WEIR FLOW COEF. = 4 HEADWATER ELEVAI #DIV/O! TAILWATER ELEVATION = 41.00 FEET HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = 0.6 HEADWATER ELEVAI 44.0 *Emergency Overflow Outlet Elevation Q10 Routed Flowrate equals 56.0 cfs Meadow Ridge Access Storage II Drawdown Calculations October2005 Meadow Ridge Stormwater Pond #1 Drawdown ORIFICE DIA. INCHES AREAS (FTA2) NUMBER OF ORIFICES i 2 3 4 1 3 0.049 0.098 0.147 0.1961 INPUT NORMAL POOL AREA = INCHES OF RAINFALL = BASIN AREA = IMPERVIOUS AREA = NORMAL POOL ELEVATION = ORIFICE AREA = STORAGE POOL AREA = TIME INCREMENT OF ROUTING = ORIFICE COEF. = INPUT RESULTS 0.535 ACRES 1.00 INCHES 12.32 ACRES 9.78 ACRES 42.00 FEET 0.049 FEET' 0.6220 ACRES 2.0 HOURS 0.6 RUNOFF COEF. (Rv) = 0.7648 ELEVATION OF POOL AT STORAGE = 43.40 FEET NORMAL POOL AREA - 23,289.00 FEET' VOLUME OF RUNOFF FROM RAINFALL = 34,202.75 FEET' VOLUME OF STORAGE = 35,266.84 FEET3 Prepared By: TJC . Checked By: Meadow Ridge Access Storage II Drawdown Calculations October2005 Drawdown Calculations For Pond Orfice Prepared By: TJC . Checked By: TIME ELEVATION FEET HEAD FEET FLOWRATE CFS VOLUME CIF END ELEV. FEET 0 43.40 1.4000 0.27966 2,013.54 43.31 2.0 43.31 1.3135 0.27089 1,950.38 43.23 4.0 43.23 1.2298 0.26211 1,887.18 43.15 6.0 43.15 1.1488 0.25333 1,823.94 43.07 8.0 43.07 1.0704 0.24454 1,760.67 42.99 10.0 42.99 0.9948 0.23574 1,697.36 42.92 12.0 42.92 0.9220 0.22694 1,634.00 42.85 14.0 42.85 0.8518 0.21814 1,570.60 42.78 16.0 42.78 0.7844 0.20933 1,507.14 42.72 18.0 42.72 0.7196 0.20050 1,443.63 42.66 20.0 42.66 0.6577 0.19167 1,380.05 42.60 22.0 42.60 0.5984 0.18284 1,316.41 42.54 24.0 42.54 0.5419 0.17399 1,252.70 42.49 26.0 42.49 0.4881 0.16512 1,188.90 42.44 28.0 42.44 0.4370 0.15625 1,125.01 42.39 30.0 42.39 0.3887 0.14736 1,061.01 42.34 32.0 42.34 0.3432 0.13846 996.90 42.30 34.0 42.30 0.3004 0.12954 932.65 42.26 36.0 42.26 0.2603 0.120S9 868.26 42.22 38.0 42.22 0.2230 0.11162 803.68 42.19 40.0 42.19 0.1885 0.10262 738.90 42.16 42.0 42.16 0.1568 0.09359 673.86 42.13 44.0 42.13 0.1279 0.08452 608.52 42.10 46.0 42.10 0.1017 0.07539 542.79 42.08 48.0 42.08 0.0784 0.06619 476.58 42.06 50.0 42.06 0.0580 0.05690 409.71 42.04 52.0 42.04 0.0404 0.04749 341.93 42.03 54.0 42.03 0.0257 0.03788 272.76 42.01 56.0 42.01 0.0140 0.02794 201.20 42.01 58.0 42.01 0.0053 0.01727 124.35 42.00 60.0 42.00 0.0000 #NUM! #NUM! #NUM! Drawdown-Time FOR TOTAL STORAGE VOLUME = 2.333 days Orifice Size `3_0 inches ORIFICE SIZING FOR 1" RAINFALL VOLUME - 34,202.75 CIF Q2= 0.20 CFS Q5= 0.08 CFS AVERAGE HEAD - 0.64 FEET ORIFICE FLOWRATE Q - 3.0., = 0.189 CFS OFIRCE SIZE IS O.K. DRAWDOWN TIME - 2.10 DAYS STORMWATER POND #1 DATA SUMMARY Total Built -Upon Area(Ac.)............................ 9.8 Total SW Drainage Area (Ac.)......................... 12.32 % Impervious Area .......................................... 79.4 Computed Runoff from 1" Rainfall (CF)........... 34,203 Provided Storage(CF).................................... 35,262 Required Surface Area (SF) ............................ 21,273 Surface Area of Pond @ Normal Pool (SF)....... 23,289 Surface Area of Pond @ Storage Pool (SF)..... 27,085 SW Storage Depth (Feet) ............................... 1.4 Number of Orifices .......................................... 1 Diameter of Orifice (Inch) ............................... 3 Elevation of Orifice Bottom (MSQ.................. 42.00 Approx. Time for Drawdown (Days) ................ 2.10 Overflow Weir Elev. (MSQ........................ 43.40 10-Year Routed Flowrate (CFS)...................... 56 Flood Pool Elevation @ Q10............................ 44.0 Stormwater Pond #1 West East 35.5 0 0 36 687 692 40 2428 2466 41 3066 3097 —> 42 3587 3645 43 4106 4183 43.4 4322 4407 44 4655 4750 -ALL-- ri7 35.5-36.0 / 3 6.0-41.0 ( 41.0-42.0 35.5-42.0 42.0-43.4 West orebay (CF) 0 93831t11ro 3327/ 12709 5536 Total Volume @ PP = Total Forebay Volume= % Forebay Volume - East 0 9473)170 Q 3371 12844 5636 85400 CF 22.08 % 4019 4546/7- 9042 12771 1 6057/ta 43o20) 17700 183561Z- h77S 19342 f2> %7/ 2141 11 43293I 14414 yeig24 59848 24089/1-= r1.04 Total and Main Pond SF 4019 5925 "60 13936 18934 23289 ffQ4 25989 27085 3 fvo 28747 Its 37(� Total 12141 to"7/' 62148 3/,0W 21112 NjP4 85400 35262 17,f$l 4r,fe¢ Hydrologic and Hydraulic Calculations for Meadow Ridge Including -Access Storage- J003Mb Stormwater Pond #2 _ SEAL 030869 = �O\ I III1 Prepared By CONSULTING ENGINEERS Shallotte, North Carolina December 2005 .'Jj�. ::., �= . r- � �-- _ ` _ ,i � o.: �Ci_ (,),� to �.1 Meadow Ridge Access Storage II Prepared By: TJC Stormwater Pond #2 Design Checked By: October2005 Stormwater Pond #2 Design Total Drainage Area: 6.87 Acres 299 331 —1SF Impervious Area: Buildings: [— 2.1 1 91907 SF Pavement:! 3.00 Acres 130889 iSF Future:) 0.00 Acres 0 ,SF Total: 5.11 Acres 222796 SF % Impervious: 74.5 % Permanent Pool Depth: 6 % TSS Removal: 90% SA/DA: 4.215 Required SA: 12,608 SF Runoff: 1 Inches "Simple Method" R, 0.72 Volume: 17,956 CF Actual Normal Pool SA: 17,119 SF (@ 42.0' MSL) Depth of Storage: 1.0 Feet USE: 1.0 Feet SA @ Storage Pool: 19,265 SF (@ 43.0' MSL) Provided Storage: 18,192 CF Pond Elevations: Bottom Elev.: 36.0 MSL Permanent Pool: 42.0 MSL Storage Pool: 43.00 MSL Flood Pool: 43.78 MSL Emergency Overflow Weir: 44.0 MSL Top of Pond Elev.: 44.5 MSL Meadow Ridge Access Storage II Stormwater Pond Design Prepared October 2005 Checked By: TJC Access Storage II Runoff Hydrograph into SW Pond (See Flowrate Calc. and Drainage Basin Data for Breakdown of Areas) Curve Number Drainage Area Land Use Soil Group NA 98 5.11 Impervious B 501.239853 61 1.75 Grassed B 106.897039 Total: 6.867102847 Total: 608.136892 Weighted Curve Number: 88.56 Runoff Volume: (Soil Conservation Service Method) Storm Duration: 10 Yr - 1 Hr Storm Rainfall: 5.66 Inches S: 1.29 Direct Surface Runoff: 4.36 Inches Total Runoff: 108,658 CF 2.49 Ac-Ft Peak Flowrate: Hydraulic Length: 900 Feet Time of Concentration: 5.65 Min 10 Yr Intensity: 6.8 Inches/Hour Weighted "C": 0.76 10 Yr Peak Flowrate: 35.42 CFS Basic Hydrograph: Conversion Factors: u: 0.000756 Ac-Ft/Unit w: 0.35424191 CFS/Unit k: 1.549 Min/Unit Meadow Ridge Access Storage II Stormwater Pond Design Prepared October 2005 Checked By: TJC Time Min Flow CFS 0.0 0.0 4.6 1.8 10.8 5.3 15.5 12.4 20.1 19.8 24.8 27.3 27.9 31.9 31.0 34.4 35.6 35.4 41.8 34.0 46.5 30.1 52.7 25.5 62.0 17.7 72.8 1 1 .7 82.1 8.5 92.9 5.7 103.8 3.9 130.1 1.4 154.9 0.0 Inflow Hydrograph 40.0 35.0 30.0 - is 25.0 - U 20.0 3 15.0 10.0 -- 5.0 -- 0.0 0.0 50.0 100.0 150.0 200.0 Time (MIN) Meadow Ridge Access Storage II Stormwater Pond Design Prepared By: TJC ("harlrarl Rv- Access Storage II Pond Stage -Discharge -Storage Pond Storage Pool Area = 19,265.00 Square Feet Pond Normal Pool Area = 17,119.00 Square Feet AT = 360 sec. ELEVATION DISCHARGE STORAGE ZS/DT + 0 42.00 0.00 0.00 43.00 0.00 19265 107 43.09 1.00 20999 118 43.26 5.00 24274 140 43.41 10.00 27164 161 43.54 15.00 29668 180 43.66 20.00 31980 198 43.76 25.00 33906 213 44.53 30.00 48740 301 45.81 35.00 73400 443 47.28 40.00 101719 605 48.85 45.00 131965 778 50.93 50.00 172036 1006 53.22 55.00 216153 1256 55.73 60.00 264508 1529 ** Discharge / Stage Relationship Based on 24" Barrel and 36" Riser Outflow vs 2S/AT + 0 1600 1400 1200 O 1000 - a 800 - N N 600 - 400 - - - 200 0- 0 10 20 30 40 50 60 Outflow (CFS) Meadow Ridge Access Storage II Prepared By: TJC . Stormwater Pond Design Checked By: October2005 Access Storage II Routing Table - SW Treatment Pond AT USED IN STAGE -DISCHARGE -STORAGE 6 (min) Time n In In + In+1 2S/DT - On 2S/DT + On+1 On+1 (min) (CFS) (CFS) (CFS) (CFS) (CFS) 0 1 0 3 6 2 2.59 10 3 3 0 12 3 7.11 24 12 12 0 18 4 16.42 42 36 36 0 24 5 26.02 60 78 78 0 30 6 33.60 69 129 138 5 36 7 35.31 69 158 198 20 42 8 33.83 63 175 227 —26 48 9 28.98 53 185 238 26 54 10 24.41 44 186 238 26 60 11 19.34 35 178 229 26 — 66 12 15.48 28 163 212 25 72 13 12.14 22 155 191 18 78 14 9.91 18 148 177 14 84 15 8.00 14 143 166 11 90 16 6.45 12 139 158 9 96 17 5.19 9 136 151 8 102 18 4.19 8 133 145 6 108 19 3.50 6 130 140 5 114 20 2.93 5 128 137 4 120 21 2.36 4 126 133 4 126 22 1.79 3 124 130 3 132 23 1.29 2 121 127 3 138 24 0.95 2 119 124 2 144 25 0.62 1 118 121 2 150 26 0.28 0.277 117 119 1 Meadow Ridge Access Storage II Stormwater Pond Design October2005 Stormwater Pond #2 Outlet Structure HEADWATER ELEVATION CALCULATIONS Prepared By: TJC Checked By: FLOWRATE = ** 26 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 24 INCHES DIA. FOR RISER = 36 INCHES HEAD = 2.95 LENGTH OF CULVERT PIPE = 94 FEET HEADWATER ELEVA 42.95 INV. IN ELEV. OF CULVERT = 39.00 FEET INV. OUT ELEV. OF CULVERT = 38.50 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 43.00 FEET HEAD = 2.65 WEIR FLOW COEF. = 4 HEADWATER ELEVA 43.65 TAILWATER ELEVATION = 41.00 FEET = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = 0.78 HEADWATER ELEVA 43.78 Q10 Routed Flowrate equals 26.0 cfs Meadow Ridge Access Storage II Drawdown Calculations October 2005 Access Storage II Stormwater Pond #2 Drawdown AREAS (FTA2) ORIFICE DIA. NUMBER OF ORIFICES INCHES 1 2 3 4 2 0.022 0.044 0.065 0.087 DATA INPUT NORMAL POOL AREA = 0.393 ACRES INCHES OF RAINFALL - 1.00 INCHES 13ASIN AREA - 6.87 ACRES IMPERVIOUS AREA - 5.11 ACRES NORMAL POOL ELEVATION - 42.00 FEET ORIFICE AREA - 0.022 FEET STORAGE POOL AREA - 0.4423 ACRES TIME INCREMENT OF ROUTING - 2.0 HOURS ORIFICE COEF. - 0.6 INPUT RESULTS RUNOFF COEF. (Rv) = 0.7203 ELEVATION OF POOL AT STORAGE = 43.00 FEET NORMAL POOL AREA = 17,119.00 FEET' VOLUME OF RUNOFF FROM RAINFALL - 17,956.08 FEET VOLUME OF STORAGE — 18,192.00 FEET Prepared By: T1C . Checked By: Meadow Ridge Access Storage II Drawdown Calculations October 2005 Drawdown Calculations For Pond Orifice ELEVATION HEAD FLOWRATE VOLUME END ELEV. 0 43.00 1.0000 0.10505 756.33 42.96 2.0 42.96 0.9558 0.10270 739.44 42.91 4.0 42.91 0.9126 0.10035 722.54 42.87 6.0 42.87 0.8704 0.09800 705.63 42.83 8.0 42.83 0.8292 0.09566 688.72 42.79 10.0 42.79 0.7890 0.09331 671.81 42.75 12.0 42.75 0.7497 0.09096 654.88 42.71 14.0 42.71 0.7115 0.08861 637.96 42.67 1 &0 42.67 0.6742 0.08625 621.03 42.64 18.0 42.64 0.6379 0.08390 604.09 42.60 20.0 42.60 0,6026 0.08155 587.14 42.57 22.0 42.57 0.5683 0.07919 570.19 42.54 24.0 42.54 0.5350 0.07684 553.23 42.50 26.0 42.50 0,5027 0,07448 536.26 42.47 28.0 42.47 0.4714 0.07212 519.28 42.44 30.0 42.44 0,4411 0.06976 502.30 42.41 32.0 42.41 0.4117 0.06740 485.30 42.38 34.0 42.38 0.3834 0.06SO4 468.30 42.36 36.0 42.36 0.3560 0.06268 451.28 42.33 38.0 42.33 0.3297 0.06031 434.25 42.30 40.0 42.30 0.3043 0.05795 417.21 42.28 42.0 42.28 0.2799 0.05558 400.15 42.26 44.0 42.26 0.2565 0.05321 383.08 42.23 46.0 42.23 0.2342 0.05083 365.99 42.21 48.0 42.21 0.2128 0.04846 348.88 42.19 50.0 42.19 0.1924 0.04608 331.76 42.17 52.0 42.17 0.1730 0.04370 314.60 42.15 54.0 42.15 0.1546 0.04131 297.43 42.14 56.0 42.14 0.1373 0.03892 280.22 42.12 58.0 42.12 0.1209 0.03653 262.98 42.11 60.0 42.11 0.1055 0.03413 245.71 42.09 62.0 42.09 0.0912 0.03172 228.39 42.08 64.0 42.08 0.0778 0.02931 211.02 42.07 66.0 42.07 0.0655 0.02689 193.60 42.05 68.0 42.05 0.0542 0.02446 176.10 42.04 70.0 42.04 0.0439 0.02202 158.51 42.03 72.0 42.03 0.0347 0.01956 140.82 42.03 74.0 42.03 0,0264 0.01708 122.98 42.02 76.0 42.02 0.0193 0.01458 104.95 42.01 78.0 42.01 0.0131 0.01203 86.64 42.01 80.0 42,01 0.0081 0.00943 67.91 42.00 82.0 4200 0.0041 0.00672 48.40 42.00 84.0 42.00 0,0013 0,00374 26.93 42.00 86.0 42.00 -0.0003 #NUM! #NUM! #NUM! Drawdown Time - 3.5 days (TOTAL STORAGE VOLUME DRAWDOWN) Orifice Size - 2.0 inches ORFICE SIZING FOR 1" RAINFALL VOLUME - 17,956.08 CF Q2- 0.10 CFS Q5- 0.04 CFS AVERAGE HEAD - 0.46 FEET EN ORIFICE FLOWRATE Q - 2.0" = 0.071 CFS OFIRCE SIZE IS O K. DRAWDOWN TIME - 2.92 DAYS Prepared By: TJC . Checked By: STORMWATER POND #2 DATA SUMMARY Total Built -Upon Area(Ac.)............................ 5.1147 Total SW Drainage Area (Ac.)......................... 6.8671 Impervious Area .......................................... 74.5 Computed Runoff from 1" Rainfall (CF)........... 17,956 Provided Storage(CF).................................... 18,192 Required Surface Area (SF) ............................ 12,608 Surface Area of Pond @ Normal Pool (SF)....... 17,119 Surface Area of Pond @ Storage Pool (SF)..... 19,265 SW Storage Depth (Feet) ............................... 1 Number of Orifices .......................................... 1 Diameter of Orifice (Inch) ............................... 2 Elevation of Orifice Bottom (MSL).................. 42.00 Approx. Time for Drawdown (Days) ................ 2.92 Overflow Weir Elev. (MSL)........................ 43.00 10-Year Routed Flowrate (CFS)...................... 26 Flood Pool Elevation @ Q10............................ 43.78 Stormwater Pond #2 Surface Areas Elevation Forebay Main Pond Total Forebay and Main Pond MSL SF SF SF 36 1170 2782 3952 40 3769 6175 9944 41 4609 9036 13645 42 5343 11776 17119 43 6075 13190 19265 44 6835 14634 21469 Volumes Volume Between Forebay Main Pond Total Forebay and Main Pond Ft - Ft CF CF CF 36-41 14448) 29545 4399317y31i 41-42 4976 10406 15382/ 36-42 19424 39951 59 .75 42-43 5709 12483 1) 2 Total Volume @ PP = 59375" CF Total Forebay Volume= 14448 CF % Forebay Volume = 24.33 % Hydrologic and Hydraulic Calculations for Meadow Ridge Including -Access Storage- 0 p 8 ZQ�6 Stormwater Pond #3 , ,)D. D� \\\V111CIA Il��� _ SEAL fir; 030869 - Prepared By CONSULTING ENGINEERS Shallotte, North Carolina December 2005 • !�:S'. � �� a •• :G'`\ Meadow Ridge Access Storage II Prepared By: TJC Stormwater Pond #3 Design Checked By: October 2005 Stormwater Pond #3 Design Total Drainage Area: 4.21 Acres 183553 J;SF Impervious Area: Buildings: _ 0.95 Acres _ 41195 SF Pavement: 1.64 Acres 71417 SF Sidewalk: 0.00 Acres 0 SF Future: 0.90 Acres 39392 NSF Total: 3.49 Acres 152003 SF % Impervious: 82.8 % Permanent Pool Depth: 6 % TSS Removal: 90% SA/DA: 4.768 Required SA: 8,752 Runoff: 1 Inches "Simple Method" Rv 0.80 Volume: 12,165 CIF Actual Normal Pool SA: 12,938 SF (@ 45.0' MSL) Depth of Storage: 0.87 Feet USE: 1.00 Feet SA @ Storage Pool: 15,006 SF (@ 46.0' MSL) Provided Storage: 13,972 CF Pond Elevations: Bottom Elev.: 39.0 MSL Permanent Pool: 45.0 MSL Storage Pool: 46.00 MSL Emergency Overflow Weir: 46.50 MSL Top of Pond Elev.: 47.00 MSL Meadow Ridge Access Storage II Stormwater Pond Design Prepared October 2005 Checked By: TJC Access Storage II Runoff Hydrograph into SW Pond 3 (See Flowrate Calc. and Drainage Basin Data for Breakdown of Areas) Curve Number Drainage Area Land Use Soil Group NA 98 3.49 Impervious B 341.972305 61 0.72 Grassed B 44.1813085 Total: 4.21 Total: 386.153613 Weighted Curve Number: 91.64 Runoff Volume: (Soil Conservation Service Method) Storm Duration: 10 Yr - 1 Hr Storm Rainfall: 6.01 Inches S: 0.91 Direct Surface Runoff: 5.04 Inches Total Runoff: 77,077 CF 1.77 Ac-Ft Peak Flowrate: Hydraulic Length: 600 Feet Time of Concentration: 4.13 Min 10 Yr Intensity: 7 Inches/Hour Weighted "C": 0.82 10 Yr Peak Flowrate: 24.22 CFS Basic Hydrograph: Conversion Factors: u: 0.000536 Ac-Ft/Unit w: 0.242192608 CFS/Unit k: 1.607 Min/Unit Meadow Ridge Access Storage II Stormwater Pond Design Prepared Checked By: TJC October2005 Time Min Flow CFS 0.0 0.0 4.8 1.2 11.3 3.6 16.1 8.5 20.9 13.6 25.7 18.6 28.9 21.8 32.1 23.5 37.0 24.2 43.4 23.3 48.2 20.6 54.6 17.4 64.3 12.1 75.5 8.0 85.2 5.8 96.4 3.9 107.7 2.7 135.0 1.0 160.7 0.0 Inflow Hydrograph 30.0 25.0 - 20.0 - - N U 15.0 _o " 10.0 5.0 - 0.0 0.0 50.0 100.0 150.0 200.0 Time (MIN) Meadow Ridge Access Storage II Stormwater Pond Design October2005 Access Storage II Pond Stage -Discharge -Storage Pond Storage Pool Area = 15,006.00 Square Feet Pond Normal Pool Area = 12,938.00 Square Feet AT = 240 sec. ELEVATION DISCHARGE STORAGE 2S/DT + 0 45.00 0.00 0.00 46.00 0.00 13972 116 46.09 1.00 15229 128 46.25 5.00 17465 151 46.31 7.00 18303 160 46.40 10.00 19561 173 46.52 15.00 21237 192 46.57 17.00 21936 200 46.63 20.00 22774 210 46.73 25.00 24172 226 46.83 30.00 25569 243 46.91 35.00 26687 257 47.00 40.00 27944 273 47.08 45.00 29062 287 47.16 50.00 30180 301 ** Discharge / Stage Relationship Based on a 10' WEIR Prepared By: TJC Checked By: Outflow vs 2S/AT + 0 400 - 350 - 300 p 250 - a 200 - - - N ^+ 150 1 00 ' - - 50 - - - - 0 0 10 20 30 40 so Outflow (CFS) Meadow Ridge Access Storage II Prepared By: TJC . Stormwater Pond Design Checked By: y Access Storage II Routing Table - SW Treatment Pond 3 AT USED IN STAGE -DISCHARGE -STORAGE 4 (min) Time n In In + In+1 2S/DT - On 2S/DT + On+1 On+1 (min) (CFS) (CFS) (CFS) (CFS) (CFS) 0 1 0 1 4 2 1.00 3 1 1 0 8 3 2.38 7 4 4 0 12 4 4.32 13 11 11 0 16 5 8.40 21 24 24 0 20 6 12.64 29 45 45 0 24 7 16.83 38 74 74 0 28 8 20.90 44 111 112 0 32 9 23.30 47 143 156 6 36 10 24.06 48 161 191 15 40 11 23.77 47 170 209 20 44 12 22.96 44 173 216 —22 48 13 20.71 39 173 216 22- 52 14 18.70 35 171 212 21 56 15 16.31 31 168 206 19 60 16 14.45 27 166 199 17 64 17 12.30 23 162 192 15 68 18 10.74 20 159 185 13 72 19 9.30 17 156 179 12 76 20 7.88 15 153 173 10 80 21 6.98 13 150 168 9 84 22 6.07 11 148 163 8 88 23 5.33 10 146 159 7 92 24 4.65 9 144 156 6 96 25 3.97 7 142 152 5 100 26 3.52 3.52 140 149 5 Meadow Ridge Access Storage II Stormwater Pond Design October2005 Stormwater Pond #3 Outlet Structure HEADWATER ELEVATION CALCULATIONS Prepared By: TJC Checked By: FLOWRATE = ** 22 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 0 INCHES Length of Weir= 10 FEET HEAD = #DIV/0! LENGTH OF CULVERT PIPE = 0 FEET HEADWATER ELEVAI #VALUE! INV. IN ELEV. OF CULVERT = FEET INV. OUT ELEV. OF CULVERT = FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION — 46.00 FEET HEAD = #DIV/01 WEIR FLOW COEF. = 4 HEADWATER ELEVAI #DIV/01 TAILWATER ELEVATION = 45.00 FEET HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = 0.67 HEADWATER ELEVAI 46.7 ** Q10 Routed Flowrate equals 22.0 cfs Meadow Ridge Access Storage II Drawdown Calculations October 2005 Access Storage II Stormwater Pond #3 Drawdown AREAS (FTA2) ORIFICE DIA. NUMBER OF ORIFICES INCHES 1 2 3 4 1.5 0,012 0.025 0.037 0.049 DATA INPUT NORMAL POOL AREA = 0,297 ACRES INCHES OF RAINFALL = 1.00 INCHES BASIN AREA = 4.21 ACRES IMPERVIOUS AREA. 3.49 ACRES NORMAL POOL ELEVATION = 45.00 FEET ORIFICE AREA = 0.012 FEET STORAGE POOL AREA = 0.3445 ACRES TIME INCREMENT OF ROUTING = 2.0 HOURS ORIFICE COEF. = 0.6 INPUT RESULTS RUNOFF COEF. (Rv) = 0.7953 ELEVATION OF POOL AT STORAGE = 46.00 FEET NORMAL POOL AREA = 12,938.00 FEET VOLUME OF RUNOFF FROM RAINFALL = 12,165.04 FEET' VOLUME OF STORAGE = 13,972.00 FEET' Prepared By: TJC . Checked By: Meadow Ridge Access Storage II Drawdown Calculations October 2005 0 46.00 1.0000 0.05909 425.44 45.97 2.0 45.97 0.9671 0.05811 418.39 45.93 4.0 45.93 0.9348 0.05713 411.33 45.90 6.0 45.90 0.9030 0.05615 404.28 45.87 8.0 45.87 0.8717 0.05517 397.22 45.84 10.0 45.84 0.8410 0.05419 390.16 45.81 12.0 45.81 0.8109 0.05321 383.10 45.78 14.0 45.78 0.7813 0.05223 376.04 45.75 16.0 45.75 0.7522 0.05125 368.98 45.72 18.0 45.72 0.7237 0.05027 361.92 45.70 20.0 45.70 0.6957 0.04929 354.86 45.67 22.0 45.67 0.6683 0.04830 347.79 45.64 24.0 45.64 0.6414 0.04732 340.72 45.62 26.0 45.62 0.6151 0.04634 333.66 45.59 28.0 45.59 0.5893 0.04536 326.59 45.56 30.0 45.56 0.5640 0.04438 319.51 45.54 32.0 45.54 0.5393 0.04339 312.44 45.52 34.0 45.52 0.5152 0.04241 305.37 45.49 36.0 45.49 0.4916 0.04143 298.29 45.47 38.0 45.47 0.4685 0.04045 291.21 45.45 40.0 45.45 0.4460 0.03946 284.13 45.42 42.0 45.42 0.4241 0.03848 277.05 45.40 44.0 45.40 0.4027 0.03749 269.96 45.38 46.0 45.38 0.3818 0.03651 262.87 45.36 48.0 45.36 0.3615 0.03553 255.78 45.34 50.0 45.34 0.3417 0.03454 248.69 45.32 52.0 45.32 0.3225 0.03355 241.59 45.30 54.0 45.30 0.3038 0.03257 234.50 45.29 56.0 45.29 0.2857 0.03158 227.39 45.27 58.0 45.27 0.2681 0.03060 220.29 45.25 60.0 45.25 0.2511 0.02961 213.18 45.23 62.0 45.23 0.2346 0.02862 206.06 45.22 64.0 45.22 0.2187 0.02763 198.95 45.20 66.0 45.20 0.2033 0.02664 191.82 45.19 68.0 45.19 0.1885 0.02565 184.70 45.17 70.0 45.17 0.1742 0.02466 177.56 45.16 72.0 45.16 0.1605 0.02367 170.43 45.15 74.0 45.15 0.1473 0.02268 163.28 45.13 76.0 45.13 0.1347 0.02168 156.13 45.12 78.0 45.12 0.1226 0.02069 148.97 45.11 80.0 45.11 0.1111 0.01969 141.80 45.10 82.0 45.10 0.1001 0.01870 134.63 45.09 84.0 45.09 0.0897 0.01770 127.44 45.08 86.0 45.08 0.0799 0.01670 120.24 45.07 88.0 45.07 0.0706 0.01570 113.03 45.06 90.0 45.06 0.0619 0.01470 105.81 45.05 92.0 45.05 0.0537 0.01369 98.56 45.05 94.0 45.05 0.0461 0.01268 91.30 45.04 96.0 45.04 0.0390 0.01167 84.02 45.03 98.0 45.03 0.0325 0.01065 76.70 45.03 100.0 45.03 0.0266 0.00963 69.36 45.02 102.0 45.02 0.0212 0.00861 61.97 45.02, 104.0 45.02 0.0164 0.00757 54.53 45.01 106.0 45.01 0.0122 0.00653 47.01 45.01 108.0 45.01 0.0086 0.00547 39.40 45.01 110.0 45.01 0.0055 0.00439 31.64 45.00 112.0 45.00 0.0031 0.00328 #VALUE! #VALUE! Orawdown Time FOR TOTAL STORAGE VOLUME - 4.583 days Orifice Size - 1.5 inches Prepared By: TJC . Checked By: Meadow Ridge Access Storage II Drawdown Calculations October 2005 ORFICE SIZING FOR 1" RAINFALL VOLUME - 12,165.04 CF Q2- 0.0704 CFS QS- 0.03 CFS AVERAGE HEAD — 0.47 FEET )SEN ORIFICE FLOWRATE Q - 1.5" - 0.041 CFS DRAWDOWN TIME - 3.48 DAYS Prepared By: TJC . Checked By: STORMWATER POND #3 DATA SUMMARY Total Built -Upon Area(Ac.)............................ 3.4895 Total SW Drainage Area (Ac.)......................... 4.2138 % Impervious Area .......................................... 82.8 Computed Runoff from 1" Rainfall (CF)........... 12,165 Provided Storage(CF).................................... 13,972 Required Surface Area (SF) ............................ 8,752 Surface Area of Pond @ Normal Pool (SF)....... 12,938 Surface Area of Pond @ Storage Pool (SF)..... 15,006 SW Storage Depth (Feet) ............................... 1 Number of Orifices .......................................... 1 Diameter of Orifice (Inch) ............................... 1.5 Elevation of Orifice Bottom (MSQ.................. 45.00 Approx. Time for Drawdown (Days) ................ 3.48 Overflow Weir Elev. (MSQ........................ 46.00 10-Year Routed Flowrate (CFS)...................... 22 Flood Pool Elevation @ Q10............................ 46.5 a Stormwater Pond #3 Surface Areas Elevation Forebay Main Pond Total Forebay and Main Pond MSL SF SF SF 39 487 413 900 43 2328 3699 6027 44 2967 6521 9488 45 3582 9356 12938 i 45.5 3886 10086 13972 46 4190 10816 15006,- 46.5 4509 11560 16069 47 4828 12304 17132 Volumes Volume Between Forebay Main Pond Total Forebay and Main Pond Ft - Ft CF CF CF 39.0-44.0 8635 17335 25970 44.0-45.0 3275) 7939 11213 ) 39.0-45.0 11910 25274 37183 45.0-46.0 - - 13972 Total Volume @ PP = 37183 CF Total Forebay Volume = 8635 CF % Forebay Volume = 23.22 % a® Hydrologic and Hydraulic Calculations for Meadow Ridge Including -Access Storage- \,,,ffIIIIIII/// CA i 9 SEMI T = 030669 W r /1/11111111 Prepared By i(r9fG�L;JS�GjYSS �iald, Lp"1,. CONSULTING ENGINEERS Shallotte, North Carolina December 2005 JAN 0 3 nob Il.i.11� �'r ` ;J . .1 - �� ��. . �.J i. 1 1 Meadow Ridge Access Storage II Prepared By: TJC . Drainage Basin Data Checked By: October2005 BASIN I.D. BUILDING IMPERVIOUS AREA PAVEMENT Future TOTAL AREA TOTAL IMPERVIOUS WEIGHTED "C" ac ac ac ac ac SW POND #1 100 0.0000 0.0000 0.0000 0.8618 0.0000 0.20 101 0.0000 0.0000 1.8364 ` 1.6773 1.8364 1.02 102 0.0000 0.0550 0.0000 0.1019 0.0550 0.60 103 0.0000 0.0550 0.0000 0.1036 0.0550 0.60 104 0.0000 0.0582 0.0000 0.0971 0.0582 0.65 105 0.0000 0.0582 0.0000 0.0969 0.0582 0.65 106 0.0000 0.1508 0.0000 0.2208 0.1508 0.71 107 0.0000 0.0987 0.0000 0.1489 0.0987 0.70 *108 0.0000 0.1295 0.0000 0.1722 0.1295 0.76 *109 0.0000 0.1372 0.0000 0.1845 0.1372 0.76 110 0.0552 0.0460 0.0000 0.1923 0.1012 0.59 111 0.0662 0.1650 0.0000 0.2730 0.2312 0.84 113 0.2097 0.1654 0.0000 0.4633 0.3751 0.81 114 0.0000 0.0000 0.3059 0.4088 0.3059 0.76 115 0.0000 0.0000 0.1284 0.2626 0.1284 0.57 116 0.0000 0.0000 0.5817 0.7950 0.5817 0.75 117 0.0000 0.0000 0.6766 0.6927 0.6766 0.93 118 0.0000 0.4190 0.0000 0.4941 0.4190 0.84 119 0.0000 0.1648 0.0000 0.2273 0.1648 0.74 120 0.0265 0.0736 0.0000 0.1176 0.1001 0.84 121 0.0737 0.0961 0.0000 0.1802 0.1698 0.91 122 0.1907 0.0735 0.0000 0.2643 0.2642 0.95 123 0.0634 0.1163 0.0000 0.1797 0.1797 0.95 124 0.0000 0.0000 1.1555 1.3249 1.1555 0.85 125 0.0000 0.0000 1.1200 1.2797 1.1200 0.86 126 0.0000 0.0000 1.2325 1.4996 1.2325 0.82 Meadow Ridge Access Storage II Prepared By: TJC . Drainage Basin Data Checked By: October 2005 BASIN I.D. BUILDING IMPERVIOUS AREA PAVEMENT Future TOTAL AREA TOTAL IMPERVIOUS WEIGHTED ac ac ac (ac) (ac SW POND #2 200 0.0000 0.0000 0.0000 0.8024 0.0000 0.20 201 0.0312 0.0826 0.0000 0.1864 0.1138 0.66 202 0.0429 0.0803 0.0000 0.1232 0.1232 0.95 203 0.0239 0.0703 0.0000 0.0942 0.0942 0.95 204 0.0605 0.0907 0.0000 0.1512 0.1512 0.95 205 0.0258 0.0778 0.0000 0.1162 0.1036 0.87 206 0.2533 0.1603 0.0000 0.4473 0.4136 0.89 207 0.1261 0.0946 0.0000 0.2207 0.2207 0.95 208 0.0514 0.0855 0.0000 0.1623 0.1369 0.83 209 0.0584 0.0866 0.0000 0.2331 0.1450 0.67 210 0.0206 0.1054 0.0000 0.2495 0.1260 0.58 211 0.1234 0.1563 0.0000 0.3246 0.2797 0.85 212 0.2790 0.1705 0.0000 0.4494 0.4495 0.95 213 0.0993 0.1753 0.0000 0.2746 0.2746 0.95 214 0.2805 0.1561 0.0000 0.4366 0.4366 0.95 215 0.0000 0.0521 0.0000 0.1509 0.0521 0.46 216 0.0964 0.1929 0.0000 0.3366 0.2893 0.84 217 0.2388 0.2238 0.0000 0.4626 0.4626 0.95 218 0.0918 0.2284 0.0000 0.3202 0.3202 0.95 219 0.0749 0.2061 0.0000 0.3057 0.2810 0.89 220 0.0741 0.1417 0.0000 0.2158 0.2158 0.95 221 0.0576 0.1784 0.0000 0.2360 0.2360 0.95 222 0.0000 0.0717 0.0000 0.2451 0.0717 0.42 223 0.0000 0.1174 0.0000 0.3225 0.1174 0.47 Meadow Ridge Access Storage II Prepared By: TJC . Drainage Basin Data Checked By: October2005 BASIN I.D. BUILDING IMPERVIOUS AREA PAVEMENT Future TOTAL AREA TOTAL IMPERVIOUS WEIGHTED "C" ac ac (ac) (ac ac SW POND #3 300 0.0000 0.2361 0.9043 1.3000 1.1404 0.86 301 0.0000 0.0499 0.0000 0.0999 0.0499 0.57 302 0.0000 0.1037 0.0000 0.2020 0.1037 0.59 303 0.0000 0.0398 0.0000 0.0894 0.0398 0.53 304 0.0000 0.0649 0.0000 0.1342 0.0649 0.56 305 0.1102 0.2249 0.0000 0.4896 0.3351 0.71 306 0.0695 0.1354 0.0000 0.2812 0.2049 0.75 307 0.1643 0.1027 0.0000 0.2670 0.267 0.95 308 0.0412 0.1383 0.0000 0.1795 0.1795 0.95 309 0.1517 0.1407 0.0000 0.3590 0.2924 0.81 310 0.1701 0.1063 0.0000 0.2764 0.2764 0.95 311 0.1180 0.1472 0.0000 0.2652 0.2652 0.95 312 0.1207 0.1496 0.0000 0.2704 0.2703 0.95 OVERALL 3.7410 6.7066 7.94 23.40 18.3889 0.79 STORMWATER POND #1(SF) 29856 89834 306532 5?6664 426222 ✓ 0.80 (AC) 0.69 2.06 �.04 mil" .Silo 12.32(���1 ph.�ti 9.78 0.80 STORMWATER oA POND #2 (SF) 91907 130889 0 299131 222796 0.76 (AC) 2.11 3.00 0.00 6.87 5.11 0.76 STORMWATER POND #3 (SF) 41195 71417 39392 183553 152003 0.82 (AC) 0.95 1.64 0.90 4.21 3.49 0.82 PROJECT TOTALS MEADOW RIDGE 3.7410 6.6050 7.9413 31.1300 18.2873 0.64 Meadow Ridge Access Storage II Storm Drainage Flowrate Calculations October 2005 Prepared By: TJC . Checked By: Storm Drain I.D. Contributing Area Drainage Area Impervious Area Weighted "c" Length Slope T. i10 Q10 ac ac ft ft/ft min. in/hr cfs SW POND #1 SDI 101-113,124-126 7.84 6.79 0.85 982 0.005 6.04 6.5 43.3 SD2A 102-113,124-126,(1/4)of 101 6.58 5.42 0.82 879 0.005 5.54 6.8 36.6 SD26 103-113,124-126, (1/4) of 101 6.48 5.36 0.82 852 0.005 5.41 6.8 36.2 SD3 104-113,124-126,(1/4)of 101 6.37 5.31 0.82 682 0.005 4.56 7.0 36.8 SD4 106-113,125,126 4.43 3.58 0.80 456 0.005 3.34 7.0 25.0 SDS 108,109,(1/2) 125 & 126 1.75 1.44 0.82 264 0.005 2.20 7.0 10.0 S06 109,(1/2)126 0.93 0.75 0.80 220 0.005 1.91 7.0 5.3 SD7 107,110-113. (1/2)126 1.83 1.42 0.78 373 0.005 2.87 7.0 10.0 SD8 104, (1/4) of 101 0.94 0.98 0.98 160 0.005 1.49 7.0 6.4 SDI 110-113 0.93 0.71 0.77 90 0.005 0.96 7.0 5.0 SDI 111 0.27 0.23 0.84 285 0.005 2.33 7.0 1.6 SDI 113 0.46 0.38 0.81 155 0.005 1.46 7.0 2.6 SDI 114-123 3.62 2.99 0.82 753 0.005 4.92 7.0 20.8 SDI4 115-123 3.21 2.68 0.83 598 0.005 4.12 7.0 18.6 SDI 116-123 2.95 2.56 0.85 451 0.005 3.32 7.0 17.5 SDI 117 0.69 0.68 0.93 150 0.005 1.42 7.0 4.5 SDI 118-123 1.46 1.30 0.87 434 0.005 3.22 7.0 8.9 SDI 119-123 0.97 0.88 0.88 404 0.005 3.05 7.0 6.0 SDI 120-123 0.74 0.71 0.92 376 0.005 2.88 7.0 4.8 SD24 121-123 0.62 0.61 0.94 321 0.005 2.55 7.0 4.1 SD27 122,123 0.44 0.44 0.95 198 0.005 1.76 7.0 3.0 SD27A 123 0.18 0.18 0.9f5(j 80 0.005 0.88 7.0 1.2 OFFSITE PIPING 0`C T I J Y�"'^ SDI 00 OFFSITE (Al & A2) ✓ 48.30 7.25 0.31 1402 0.005 7.94 7.0 105.7 SDI 01 112 of OFFSITE (Al & AZ) 24.15 .62 0.31 1293 0.005 7.46 7.0 52.8 SDI 02 112 of OFFSITE (Al & A2) 24A S 3.62 0.31 1000 0.005 6.12 7.0 52.8 SDI 03 112 of OFFSITE (Al & A2) 24.15 3.62 0.31 1000 0.005 6.12 7.0 52.8 SDI04 1 /2 of OFFSITE (Al & A2) 24.15 3.62 0.31 1000 0.005 6.12 7.0 52.8 SD105 112 of OFFSITE (Al & A2) 24.15 3.62 0.31 1000 0.005 6.12 7.0 52.8 SDI06 112 of OFFSITE (Al & A2) 24.15 3.62 0.31 1000 0.005 6.12 7.0 52.8 SD107 112 of OFFSITE (Al & A2) 24.15 3.62 0.31 1000 0.005 6.12 7.0 52.8 SD108 112 of OFFSITE (Al & A2) 24.15 3.62 0.31 1000 0.005 6.12 7.0 52.8 Meadow Ridge Access Storage II Storm Drainage Flowrate Calculations October 2005 Prepared By: TJC . Checked By: Storm Drain I.D. Contributing Area Drainage Area Impervious Area Weighted "C., Length Slope T� i10 Qio ac ac ft ft/ft min. in/hr cfs SW POND #2 SD32 201-223 6.06 5.11 0.83 870 0.005 5.50 6.8 34.3 SD33 202-208 1.32 1.24 0.91 467 0.005 3.41 7.0 8.4 SD34 203-206 0.81 0.76 0.91 399 0.005 3.02 7.0 5.1 SD35 204-206 0.71 0.67 0.90 269 0.005 2.23 7.0 4.5 SD36 205,206 0.56 0.52 0.89 127 0.005 1.25 7.0 3.5 SD36A 206 0.45 0.41 0.89 80 0.005 0.88 7.0 2.8 SD37 207,208 0.38 0.36 0.90 210 0.005 1.84 7.0 2.4 SD38 208 0.16 0.14 0.83 80 0.005 0.88 7.0 0.9 SD39 209-223 4.56 3.76 0.82 740 0.005 4.86 7.0 26.1 SD40 210-223 4.33 3.61 0.83 610 0.005 4.18 7.0 25.0 SD41 215-223 2.60 2.05 0.79 519 0.005 3.70 7.0 14.4 SD42 211-214 1.49 1.44 0.93 544 0.005 3.83 7.0 9.6 SD46 212-214 1.16 1.16 0.95 411 0.005 3.09 7.0 7.7 SD47 213,214 0.71 0.71 0.95 278 0.005 2.28 7.0 4.7 SD47A 214 0.44 0.44 0.95 140 0.005 1.35 7.0 2.9 SD48 216-223 2.44 1.99 0.81 460 0.005 3.37 7.0 13.9 SD49 217,218 0.78 0.78 0.95 233 0.005 1.99 7.0 5.2 SOSO 218 0.32 0.32 0.95 100 0.005 1.04 7.0 2.1 SD51 219-223 1.33 0.92 0.72 306 0.005 2.46 7.0 6.7 SD52 220,221 0.45 0.45 0.95 198 0.005 1.76 7.0 3.0 SD53 221 0.24 0.24 0.95 80 0.005 1.75 7.0 1.6 SD54 222,223 0.57 0.19 0.45 228 0.005 3.92 7.0 1.8 SD55 223 0.32 0.12 0.47 170 0.005 1.56 7.0 1.1 SW POND #3 SD56 301-310 2.38 1.81 0.77 608 0.005 4.17 7.0 12.9 SD57 311,312 0.54 0.54 0.95 173 0.005 1.59 7.0 3.6 SD58 312 0.27 0.27 0.95 70 0.005 0.79 7.0 1.8 SD60 301 0.10 0.05 0.57 487 0.005 3.52 7.0 0.4 SD61 301-307 1.56 1.07 0.71 321 0.005 2.55 7.0 7.8 SD62 309,310 0.64 0.57 0.87 183 0.005 1.66 7.0 3.9 SD63 310 0.28 0.28 0.95 80 0.005 0.88 7.0 1.8 SD64 303-307 1.26 0.91 0.74 365 0.005 2.82 7.0 6.6 SD65 306,307 0.55 0.47 0.85 187 0.005 1.68 7.0 3.2 SD66 307 0.27 0.27 0.95 80 0.005 0.88 7.0 1.8 SD67 304,305 0.62 0.40 0.68 263 0.005 2.19 7.0 3.0 SD68 305 0.49 0.34 0.71 210 0.005 1.84 7.0 2.4 Meadow Ridge Access Storage II Storm Drainage Inverts October2005 Prepared By: TJC . Checked By: Storm Drain I.D. Length Feet) Inv. In (msl) Inv. Out (msl Throat Elev. at Inv. In Culvert Diam. Inches SW POND #1 SDI 80 38.00 37.00 44.50 36 SD2A 97 38.60 38.00 45.00 36 SD26 27 38.80 38.60 45.00 36 SD3 170 39.70 38.80 46.25 36 SD4 226 41.50 39.70 46.83 36 SD5 192 42.50 41.50 47.35 24 SD6 44 43.00 42.50 47.35 24 SD7 35 41.76 41.50 46.91 30 SD8 26 40.70 39.70 46.25 18 SDI 87 42.30 41.76 47.00 18 SDI 111 43.40 42.30 47.00 12 SDI 197 43.50 42.30 47.00 12 SDI 159 39.00 37.00 45.00 30 SD14 155 40.10 39.00 45.30 30 SDI 147 40.80 40.10 45.00 30 SDI 192 42.00 40.80 46.00 18 SDI 17 41.10 40.80 45.05 24 SD18 30 41.40 41.10 45.05 24 SD19 28 41.67 41.40 47.60 18 SD24 55 42.05 41.67 47.60 18 SD27 123 42.80 42.05 47.60 15 SD27A 118 43.50 42.80 47.60 12 Meadow Ridge Access Storage II Prepared By: TJC . Storm Drainage Inverts Checked By: October2005 Storm Drain I.D. Length Feet) Inv. In (msl) Inv. Out (msl Throat Elev. at Inv. In Culvert Diam. Inches SW POND #2 SD32 131 37.30 36.00 45.80 36 SD33 98 40.00 37.30 46.80 24 SD34 68 41.00 40.00 46.80 18 SD35 130 41.80 41.00 46.80 18 SD36 142 42.70 41.80 46.10 15 SD36A 47 43.00 42.70 46.10 15 SD37 130 41.80 40.00 46.80 12 SD38 130 42.70 41.80 46.50 12 SD39 130 38.30 37.30 46.00 36 SD40 130 39.50 38.30 46.00 30 SD41 139 40.30 39.50 47.00 30 SD42 66 41.00 39.50 47.10 30 SD46 133 41.80 41.00 47.10 18 SD47 133 42.54 41.80 47.10 15 SD47A 138 43.30 42.54 47.30 12 SD48 59 41.00 40.30 47.10 24 SD49 128 42.70 41.00 47.10 15 SD50 133 43.60 42.70 47.20 12 SD51 154 41.80 41.00 46.80 18 SD52 123 42.90 41.80 47.20 15 SD53 118 43.60 42.90 47.10 12 SD54 78 42.7 41.8 46.8 15 SDSS 58 43 42.7 46.7 12 SW POND #3 SD56 105 42 41 47.5 24 SD57 144 43.5 42.7 48 15 SD58 128 44.5 43.5 48 12 SD60 110 43.4 42.4 47 12 SD61 59 42.4 42 47.5 24 SD62 138 44 42 48.1 15 SD63 103 45 44 48.1 12 SD64 120 43.14 42.4 47 18 SD65 51 43.5 43.14 47 15 SD66 107 45 43.5 48.1 12 SD67 102 43.7 43.14 47 15 SD68 56 44 43.7 47 12 Meadow Ridge Access Storage II Prepared By: TJC . Storm Drainage Inverts Checked By: October2005 Storm Drain I.D. Length Feet) Inv. In (msl) Inv. Out (msl Throat Elev. at Inv. In Culvert Diam. Inches OFFSITE PIPING SD101 169 40.00 39.70 47.50 48 SD102 284 42.50 40.00 JB-48 36 SD103 109 40.50 40.00 JB-47 36 SDI 04 289 42.50 40.50 JB-48 36 SDI 05 110 42.80 42.50 JB-48 36 SDI 06 5 44.00 43.50 JB-48 36 SDI 07 47 43.50 43.20 43.5 36 SD108 113 44.50 44.00 JB-48.2 36 Meadow Ridge Access Storage II Culvert Hydraulics October 2005 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 43.3 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 36 INCHES DIA. FOR RISER = 0 INCHES HEAD = 1.62 LENGTH OF CULVERT PIPE = 80 FEET HEADWATER ELEVATION = 41.12 INV. IN ELEV. OF CULVERT = 38.00 FEET INV. OUT ELEV. OF CULVERT = 37.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD — 1.16 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 43.16 TAILWATER ELEVATION = 42.00 FEET VELOCITY= 6.13 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW WY•T_1 ELEVATION CALCULATIONS HEAD — #DIV/0! HEADWATER ELEVATION = #DIV/01 FLOWRATE = 36.6 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 36 INCHES DIA. FOR RISER = INCHES HEAD = 1.16 LENGTH OF CULVERT PIPE = 97 FEET HEADWATER ELEVATION = 41.26 INV. IN ELEV. OF CULVERT = 38.60 FEET INV. OUT ELEV. OF CULVERT = 38.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.87 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 44.04 TAILWATER ELEVATION = 43.16 FEET VELOCITY= 5.18 FPS TAILWATER_UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! — #DIV/O! Meadow Ridge Access Storage II Culvert Hydraulics October2005 ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE — 36.2 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 36 INCHES DIA. FOR RISER = 0 INCHES HEAD = 1.13 LENGTH OF CULVERT PIPE = 27 FEET HEADWATER ELEVATION = 41.43 INV. IN ELEV. OF CULVERT = 38.80 FEET INV. OUT ELEV. OF CULVERT = 38.60 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.68 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 44.71 TAILWATER ELEVATION = 44.04 FEET VELOCITY- 5.12 FPS TAR WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! SD3 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 36.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 36 INCHES DIA. FOR RISER = 0 INCHES HEAD = 1.17 LENGTH OF CULVERT PIPE = 170 FEET HEADWATER ELEVATION = 42.37 INV. IN ELEV. OF CULVERT = 39.70 FEET INV. OUT ELEV. OF CULVERT = 38.80 INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 1.07 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 45.79 TAILWATER ELEVATION = 44.71 FEET VELOCITY- 5.21 FPS TAILWATER UNKNOWN = ZERO_ (0) HEADWATER ELEVATION ASSUMING WEIR FLOW 19x1om #DIV/0! SD4 ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October2005 Prepared By: TJC . Checked By: VRATE = 25 CFS NINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI FOR CULVERT PIPE = 36 INCHES FOR RISER = 0 INCHES HEAD = 0.54 ;TH OF CULVERT PIPE = 226 FEET HEADWATER ELEVATION = 43.54 IN ELEV. OF CULVERT = 41.50 FEET OUT ELEV. OF CULVERT = 39.70 FEET T COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW T COEF. FOR CULVERT INLET CONTROL = 0.6 1 WEIR ELEVATION = 0.00 FEET HEAD = 0.56 FLOW COEF. = 0 HEADWATER ELEVATION = 46.35 WATER ELEVATION = 45.79 FEET )CITY= 3.54 FPS WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW RISER - ZERO (0) RISER DIA. HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/01 SD5 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 10 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 24 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.44 LENGTH OF CULVERT PIPE = 192 FEET HEADWATER ELEVATION = 43.94 INV. IN ELEV. OF CULVERT = 42.50 FEET INV. OUT ELEV. OF CULVERT = 41.50 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.56 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.90 TAILWATER ELEVATION = 46.35 FEET VELOCITY= 3.18 FPS TAILWATER_UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = HEADWATER ELEVA #DIV/O! Meadow Ridge Access Storage II Culvert Hydraulics October2005 ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 5.3 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 24 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.12 LENGTH OF CULVERT PIPE = 44 FEET HEADWATER ELEVATION = 44.12 INV. IN ELEV. OF CULVERT = 43.00 FEET INV. OUT ELEV. OF CULVERT = 42.50 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.09 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.99 TAILWATER ELEVATION = 46.90 FEET VELOCITY= 1.69 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD — #DIV/0! HEADWATER ELEVATION = #DIV/0! ELEVATION CALCULATIONS VRATE = 10 CFS NINES n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI FOR CULVERT PIPE = 30 INCHES FOR RISER = 0 INCHES HEAD = 0.18 ;TH OF CULVERT PIPE = 35 FEET HEADWATER ELEVATION = 43.19 IN ELEV. OF CULVERT = 41.76 FEET OUT ELEV. OF CULVERT = 41.50 FEET r COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW r COEF. FOR CULVERT INLET CONTROL = 0.6 1 WEIR ELEVATION = 0.00 FEET HEAD = 0.11 FLOW COEF. = 0 HEADWATER ELEVATION = 46.46 WATER ELEVATION = 46.35 FEET )CITY= 2.04 FPS WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/01 Meadow Ridge Access Storage II Culvert Hydraulics October2O0S SD8 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 6.4 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 18 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.57 LENGTH OF CULVERT PIPE = 26 FEET HEADWATER ELEVATION = 42.02 INV. IN ELEV. OF CULVERT = 40.70 FEET INV. OUT ELEV. OF CULVERT = 39.70 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.39 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.17 TAILWATER ELEVATION = 45.79 FEET VELOCITY= 3.62 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW NO RISER = ZERO (0) RISER DIA. HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/01 10 TER ELEVATION CALCULATIONS LOWRATE = 5 CFS IANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CON] IA. FOR CULVERT PIPE = 18 INCHES IA. FOR RISER = 0 INCHES HEAD = 0.35 ENGTH OF CULVERT PIPE = 87 FEET HEADWATER ELEVATION = 43.40 JV. IN ELEV. OF CULVERT = 42.30 FEET JV. OUT ELEV. OF CULVERT = 41.76 FEET JLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW JLET COEF. FOR CULVERT INLET CONTROL = 0.6 ISER WEIR ELEVATION = 0.00 FEET HEAD = 0.35 JEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.82 AILWATER ELEVATION = 46.46 FEET 'ELOCITY= 2.83 FPS AILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Meadow Ridge Access Storage II Culvert Hydraulics October2005 SD11 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 1.6 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONT DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.18 LENGTH OF CULVERT PIPE = 111 FEET HEADWATER ELEVATION = 44.08 INV. IN ELEV. OF CULVERT = 43.40 FEET INV. OUT ELEV. OF CULVERT = 42.30 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.29 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 47.11 TAILWATER ELEVATION = 46.82 FEET VELOCITY= 2.04 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! SD12 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 2.6 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.47 LENGTH OF CULVERT PIPE = 197 FEET HEADWATER ELEVATION = 44.47 IINV. IN ELEV. OF CULVERT = 43.50 FEET INV. OUT ELEV. OF CULVERT = 42.30 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 1.15 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 47.97 TAILWATER ELEVATION = 46.82 FEET VELOCITY= 3.31 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW = ZERO (0) RISER DIA HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/O! Meadow Ridge Access Storage II Culvert Hydraulics October2005 SD13 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 20.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI CIA. FOR CULVERT PIPE = 30 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.77 LENGTH OF CULVERT PIPE = 159 FEET HEADWATER ELEVATION = 41.02 INV. IN ELEV. OF CULVERT = 39.00 FEET INV. OUT ELEV. OF CULVERT — 37.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.77 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 42.77 TAILWATER ELEVATION = 42.00 FEET VELOCITY= 4.24 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW = ZERO (0) RISER DIA. HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/0! Meadow Ridge Access Storage II Culvert Hydraulics OctOber2005 SD14 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 18.6 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 30 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.62 LENGTH OF CULVERT PIPE = 155 FEET HEADWATER ELEVATION = 41.97 INV. IN ELEV. OF CULVERT = 40.10 FEET INV. OUT ELEV. OF CULVERT = 39.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.61 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 43.37 TAILWATER ELEVATION = 42.77 FEET VELOCITY= 3.79 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW 15 = ZERO (0) RISER DIA. HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! ELEVATION CALCULATIONS VRATE = 17.5 CFS NINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI FOR CULVERT PIPE = 30 INCHES FOR RISER = 0 INCHES HEAD = 0.55 ;TH OF CULVERT PIPE = 147 FEET HEADWATER ELEVATION = 42.60 IN ELEV. OF CULVERT = 40.80 FEET OUT ELEV. OF CULVERT — 40.10 FEET i COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW r COEF. FOR CULVERT INLET CONTROL = 0.6 2 WEIR ELEVATION = 0.00 FEET HEAD = 0.52 FLOW COEF. = 0 HEADWATER ELEVATION = 43.90 WATER ELEVATION = 43.37 FEET )CITY= 3.57 FPS WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/0! 16 TER ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October2005 Prepared By: TJC . Checked By: VRATE = 4.5 CFS NINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CON] FOR CULVERT PIPE = 18 INCHES FOR RISER = 0 INCHES HEAD = 0.28 ;TH OF CULVERT PIPE = 192 FEET HEADWATER ELEVATION = 43.03 IN ELEV. OF CULVERT = 42.00 FEET OUT ELEV. OF CULVERT = 40.80 FEET F COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW F COEF. FOR CULVERT INLET CONTROL = 0.6 2 WEIR ELEVATION = 0.00 FEET HEAD = 0.45 FLOW COEF. = 0 HEADWATER ELEVATION = 44.35 WATER ELEVATION = 43.90 FEET )CITY= 2.55 FPS WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! SD17 ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October2005 Prepared By: TJC . Checked By: FLOWRATE - 8.9 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 24 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.35 LENGTH OF CULVERT PIPE = 17 FEET HEADWATER ELEVATION = 42.45 INV. IN ELEV. OF CULVERT = 41.10 FEET INV. OUT ELEV. OF CULVERT = 40.80 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.21 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 44.11 TAILWATER ELEVATION = 43.90 FEET VELOCITY= 2.83 FPS TAILWATER_ UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/0! SD18 HEADWATER ELEVATION CALCULATIONS FLOWRATE - 6 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 24 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.16 LENGTH OF CULVERT PIPE = 30 FEET HEADWATER ELEVATION = 42.56 INV. IN ELEV. OF CULVERT = 41.40 FEET INV. OUT ELEV. OF CULVERT = 41.10 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.10 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 44.21 TAILWATER ELEVATION = 44.11 FEET VELOCITY= 1.91 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/O! 19 ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October 2005 Prepared By: TJC . Checked By: FLOWRATE = 4.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONT DIA. FOR CULVERT PIPE = 18 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.32 LENGTH OF CULVERT PIPE = 28 FEET HEADWATER ELEVATION = 42.74 INV. IN ELEV. OF CULVERT = 41.67 FEET INV. OUT ELEV. OF CULVERT = 41.40 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.22 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 44.43 TAILWATER ELEVATION = 44.21 FEET VELOCITY= 2.72 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW = ZERO (0) RISER DIA. HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! SD24 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 4.1 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 18 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.23 LENGTH OF CULVERT PIPE = 55 FEET HEADWATER ELEVATION = 43.03 INV. IN ELEV. OF CULVERT = 42.05 FEET INV. OUT ELEV. OF CULVERT = 41.67 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.20 WEIR FLOW COEF. - 0 HEADWATER ELEVATION = 44.63 TAILWATER ELEVATION = 44.43 FEET VELOCITY- 2.32 FPS TAILWATER UNKNOWN = ZERO (Q) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/O! Meadow Ridge Access Storage II Culvert Hydraulics October2005 SD27 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 3 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 15 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.26 LENGTH OF CULVERT PIPE = 123 FEET HEADWATER ELEVATION = 43.68 INV. IN ELEV. OF CULVERT = 42.80 FEET INV. OUT ELEV. OF CULVERT = 42.05 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.37 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 44.99 TAILWATER ELEVATION = 44.63 FEET VELOCITY= 2.44 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW = ZERO (0) RISER DIA. HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! SD27A HEADWATER ELEVATION CALCULATIONS VRATE = 1.2 CFS NINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI FOR CULVERT PIPE = 12 INCHES FOR RISER = 0 INCHES HEAD = 0.10 ;TH OF CULVERT PIPE = 118 FEET HEADWATER ELEVATION = 44.10 IN ELEV. OF CULVERT = 43.50 FEET OUT ELEV. OF CULVERT = 42.80 FEET i COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW T COEF. FOR CULVERT INLET CONTROL = 0.6 2 WEIR ELEVATION = 0.00 FEET HEAD = 0.17 FLOW COEF. = 0 HEADWATER ELEVATION = 45.16 WATER ELEVATION = 44.99 FEET )CITY= 1.53 FPS WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! Meadow Ridge Access Storage II Culvert Hydraulics October2005 SD32 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 34.3 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 36 INCHES DIA. FOR RISER = 0 INCHES HEAD = 1.02 LENGTH OF CULVERT PIPE = 131 FEET HEADWATER ELEVATION = 39.82 INV. IN ELEV. OF CULVERT = 37.30 FEET INV. OUT ELEV. OF CULVERT = 36.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.84 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 42.84 TAILWATER ELEVATION = 42.00 FEET VELOCITY= 4.85 FPS TAILWATER UNKNOWN_= ZEROAM HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Meadow Ridge Access Storage II Culvert Hydraulics October2005 TER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: :LOWRATE = 8.4 CFS AANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI )IA. FOR CULVERT PIPE = 24 INCHES )IA. FOR RISER = 0 INCHES HEAD = 0.31 _ENGTH OF CULVERT PIPE = 98 FEET HEADWATER ELEVATION = 41.31 NV. IN ELEV. OF CULVERT = 40.00 FEET NV. OUT ELEV. OF CULVERT = 37.30 FEET NLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW NLET COEF. FOR CULVERT INLET CONTROL = 0.6 USER WEIR ELEVATION = 0.00 FEET HEAD = 0.28 NEIR FLOW COEF. = 0 HEADWATER ELEVATION = 43.13 rAILWATER ELEVATION = 42.84 FEET ✓ELOCITY= 2.67 FPS rAILWATER UNKNOWN - ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/O! SD34 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 5.1 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 18 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.36 LENGTH OF CULVERT PIPE = 68 FEET HEADWATER ELEVATION = 42.11 INV. IN ELEV. OF CULVERT = 41.00 FEET INV. OUT ELEV. OF CULVERT = 40.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.33 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 43.46 TAILWATER ELEVATION = 43.13 FEET VELOCITY= 2.89 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/O! SD35 ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October 2005 Prepared By: TJC . Checked By: :LOWRATE = 4.5 CFS AANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI )IA. FOR CULVERT PIPE = 18 INCHES )IA. FOR RISER = 0 INCHES HEAD = 0.28 _ENGTH OF CULVERT PIPE = 130 FEET HEADWATER ELEVATION = 42.83 NV. IN ELEV. OF CULVERT = 41.80 FEET NV. OUT ELEV. OF CULVERT = 41.00 FEET NLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW NLET COEF. FOR CULVERT INLET CONTROL = 0.6 USER WEIR ELEVATION = 0.00 FEET HEAD = 0.35 NEIR FLOW COEF. = 0 HEADWATER ELEVATION = 43.81 FAILWATER ELEVATION = 43.46 FEET ✓ELOCITY= 2.55 FPS rAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW SD36 = ZERO (0) RISER DIA. HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/0! ELEVATION CALCULATIONS FLOWRATE = 3.5 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CON1 DIA. FOR CULVERT PIPE = 15 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.35 LENGTH OF CULVERT PIPE = 142 FEET HEADWATER ELEVATION = 43.68 INV. IN ELEV. OF CULVERT = 42.70 FEET INV. OUT ELEV. OF CULVERT = 41.80 INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.54 'WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 44.36 TAILWATER ELEVATION = 43.81 FEET VELOCITY= 2.85 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/0! SD36A HEADWATER ELEVATION CALCULATIONS FLOWRATE _ MANNINGS n = DIA. FOR CULVERT PIPE _ DIA. FOR RISER = LENGTH OF CULVERT PIPE _ INV. IN ELEV. OF CULVERT = INV. OUT ELEV. OF CULVERT = INLET COEF. FOR CULV. PIPE FLOW = INLET COEF. FOR CULVERT INLET CONTROL = RISER WEIR ELEVATION = WEIR FLOW COEF. _ TAILWATER ELEVATION = VFI 0CITY= ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October2005 Prepared By: TJC . Checked By: 2.8 CFS 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL 15 INCHES 0 INCHES HEAD = 0.22 47 FEET HEADWATER ELEVATION = 43.85 43.00 FEET 42.70 FEET 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW 0.6 0.00 FEET HEAD = 0.20 0 HEADWATER ELEVATION = 44.55 44.36 FEET 2.28 FPS HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/01 VRATE = 2.4 CFS NINES n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI FOR CULVERT PIPE = 12 INCHES FOR RISER = 0 INCHES HEAD = 0.40 3TH OF CULVERT PIPE = 130 FEET HEADWATER ELEVATION = 42.70 IN ELEV. OF CULVERT = 41.80 FEET OUT ELEV. OF CULVERT = 40.00 FEET T COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW T COEF. FOR CULVERT INLET CONTROL = 0.6 2 WEIR ELEVATION = 0.00 FEET HEAD = 0.72 FLOW COEF. = 0 HEADWATER ELEVATION = 43.85 WATER ELEVATION = 43.13 FEET )CITY= 3.06 FPS WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW ENO RISER - ZERO (0) RISER DIA. HEAD = #DIV/O! SD38 ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October2005 Prepared By: TJC . Checked By: FLOWRATE - 0.9 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CON7 DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.06 LENGTH OF CULVERT PIPE = 130 FEET HEADWATER ELEVATION = 43.26 INV. IN ELEV. OF CULVERT = 42.70 FEET INV. OUT ELEV. OF CULVERT = 41.80 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.10 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 43.95 TAILWATER ELEVATION = 43.85 FEET VELOCITY= 1.15 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! SD39 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 26.1 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 36 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.59 LENGTH OF CULVERT PIPE = 130 FEET HEADWATER ELEVATION = 40.39 INV. IN ELEV. OF CULVERT = 38.30 FEET INV. OUT ELEV. OF CULVERT = 37.30 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.49 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 43.33 TAILWATER ELEVATION = 42.84 FEET VELOCITY= 3.69 FPS TAILWATER UNKNOWN ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! SD40 ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October2005 Prepared By: TJC . Checked By: FLOWRATE = 25 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 30 INCHES DIA. FOR RISER = 0 INCHES HEAD = 1.12 LENGTH OF CULVERT PIPE = 130 FEET HEADWATER ELEVATION = 41.87 INV. IN ELEV. OF CULVERT = 39.50 FEET INV. OUT ELEV. OF CULVERT = 38.30 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 1.02 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 44.35 TAILWATER ELEVATION = 43.33 FEET VELOCITY= 5.09 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW 1 = ZERO (0) RISER DIA. HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! ELEVATION CALCULATIONS VRATE = 14.4 CFS NINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONl FOR CULVERT PIPE = 30 INCHES FOR RISER = 0 INCHES HEAD = 0.37 ;TH OF CULVERT PIPE = 139 FEET HEADWATER ELEVATION = 41.92 IN ELEV. OF CULVERT = 40.30 FEET OUT ELEV. OF CULVERT = 39.SO FEET T COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW T COEF. FOR CULVERT INLET CONTROL = 0.6 1 WEIR ELEVATION = 0.00 FEET HEAD = 0.35 FLOW COEF. = 0 HEADWATER ELEVATION = 44.69 WATER ELEVATION = 44.35 FEET )CITY= 2.93 FPS WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW INO RISER = ZERO (0) RISER DIA HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Meadow Ridge Access Storage II Culvert Hydraulics October 2005 ELEVATION CALCULATIONS Prepared By: TJC . Checked By: VRATE = 9.6 CFS NINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI FOR CULVERT PIPE = 30 INCHES FOR RISER = 0 INCHES HEAD = 0.16 3TH OF CULVERT PIPE = 66 FEET HEADWATER ELEVATION = 42.41 IN ELEV. OF CULVERT = 41.00 FEET OUT ELEV. OF CULVERT = 39.50 FEET T COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW T COEF. FOR CULVERT INLET CONTROL = 0.6 1 WEIR ELEVATION = 0.00 FEET HEAD = 0.12 FLOW COEF. = 0 HEADWATER ELEVATION = 44.47 WATER ELEVATION = 44.35 FEET )CITY- 1.96 FPS WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW USER - ZERO (0) RISER DIA. HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/O! SD46 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 7.7 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 18 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.82 LENGTH OF CULVERT PIPE = 133 FEET HEADWATER ELEVATION = 43.37 INV. IN ELEV. OF CULVERT = 41.80 FEET INV. OUT ELEV. OF CULVERT = 41.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 1.05 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 45.52 TAILWATER ELEVATION = 44.47 FEET VELOCITY= 4.36 FPS TAII WATFR 11NKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! Meadow Ridge Access Storage II Culvert Hydraulics October 2005 SD47 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 4.7 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 15 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.63 LENGTH OF CULVERT PIPE = 133 FEET HEADWATER ELEVATION = 43.80 INV. IN ELEV. OF CULVERT = 42.54 FEET INV. OUT ELEV. OF CULVERT = 41.80 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.94 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.46 TAILWATER ELEVATION = 45.52 FEET VELOCITY= 3.83 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW rli ELEVATION CALCULATIONS HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/O! FLOWRATE = 2.9 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.59 LENGTH OF CULVERT PIPE = 138 FEET HEADWATER ELEVATION = 44.39 INV. IN ELEV. OF CULVERT = 43.30 FEET INV. OUT ELEV. OF CULVERT = 42.54 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 1.10 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 47.56 TAILWATER ELEVATION = 46.46 FEET VELOCITY= 3.69 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW INO RISER - ZERO (0) RISER DIA HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! Meadow Ridge Access Storage II Culvert Hydraulics October2005 SD48 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 13.9 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONi DIA. FOR CULVERT PIPE = 24 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.84 LENGTH OF CULVERT PIPE = 59 FEET HEADWATER ELEVATION = 42.84 INV. IN ELEV. OF CULVERT = 41.00 FEET INV. OUT ELEV. OF CULVERT = 40.30 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.65 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 45.11 TAILWATER ELEVATION = 44.47 FEET VELOCITY= 4.42 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/0! SD49 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 5.2 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 15 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.77 LENGTH OF CULVERT PIPE = 128 FEET HEADWATER ELEVATION = 44.10 INV. IN ELEV. OF CULVERT = 42.70 FEET INV. OUT ELEV. OF CULVERT = 41.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 1.13 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.24 TAILWATER ELEVATION = 45.11 FEET VELOCITY= 4.24 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! Meadow Ridge Access Storage II Culvert Hydraulics October 2005 SD5O HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 2.1 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.31 LENGTH OF CULVERT PIPE = 133 FEET HEADWATER ELEVATION = 44.41 INV. IN ELEV. OF CULVERT = 43.60 FEET INV. OUT ELEV. OF CULVERT = 42.70 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.56 WEIR FLOW COEF. - 0 HEADWATER ELEVATION = 46.80 TAILWATER ELEVATION = 46.24 FEET VELOCITY= 2.67 FPS TAR WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW ISD51 ELEVATION CALCULATIONS HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! FLOWRATE = 6.7 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 18 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.62 LENGTH OF CULVERT PIPE = 154 FEET HEADWATER ELEVATION = 43.17 INV. IN ELEV. OF CULVERT - 41.80 FEET INV. OUT ELEV. OF CULVERT = 41.00 INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.87 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 45.98 TAILWATER ELEVATION = 45.11 FEET VELOCITY= 3.79 FPS TAILWATER UNKNOWN = ZERO (01 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = :,.!!"T ILe 1 SD52 ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October2005 Prepared By: TJC . Checked By: FLOWRATE = 3 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 15 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.26 LENGTH OF CULVERT PIPE = 123 FEET HEADWATER ELEVATION = 43.78 INV. IN ELEV. OF CULVERT = 42.90 FEET INV. OUT ELEV. OF CULVERT = 41.80 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.37 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.35 TAILWATER ELEVATION = 45.98 FEET VELOCITY= TAII WATER UNKNOWN = ZERO (0) 2.44 FPS HEADWATER ELEVATION ASSUMING WEIR FLOW 53 ELEVATION CALCULATIONS HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! FLOWRATE = 1.6 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.18 LENGTH OF CULVERT PIPE = 118 FEET HEADWATER ELEVATION = 44.28 INV. IN ELEV. OF CULVERT = 43.60 FEET INV. OUT ELEV. OF CULVERT = 42.90 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.30 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.65 TAILWATER ELEVATION = 46.35 FEET VELOCITY= 2.04 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = 4DIV/0! HEADWATER ELEVATION = #DIV/0! SD54 ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October2005 Prepared By: TJC . Checked By: FLOWRATE = 1.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 15 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.09 LENGTH OF CULVERT PIPE = 78 FEET HEADWATER ELEVATION = 43.42 INV. IN ELEV. OF CULVERT = 42.70 FEET INV. OUT ELEV. OF CULVERT = 41.80 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.10 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.08 TAILWATER ELEVATION = 45.98 FEET VELOCITY- 1.47 FPS TAU WATFR IINKNOWN = ZFRO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW SD55 ELEVATION CALCULATIONS HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! FLOWRATE = 1.1 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.08 LENGTH OF CULVERT PIPE = 58 FEET HEADWATER ELEVATION = 43.58 INV. IN ELEV. OF CULVERT = 43.00 FEET INV. OUT ELEV. OF CULVERT = 42.70 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.09 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.18 TAILWATER ELEVATION = 46.08 FEET VELOCITY= 1.40 FPS TAII WATFR UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/O! Meadow Ridge Access Storage II Culvert Hydraulics October 2005 SD56 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC Checked By: FLOWRATE = 12.9 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 24 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.73 LENGTH OF CULVERT PIPE = 105 FEET HEADWATER ELEVATION = 43.73 INV. IN ELEV. OF CULVERT = 42.00 FEET INV. OUT ELEV. OF CULVERT = 41.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.68 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 45.68 TAILWATER ELEVATION = 45.00 FEET VELOCITY= 4.11 FPS TAR WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW 57 ELEVATION CALCULATIONS HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! FLOWRATE = 3.6 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 15 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.37 LENGTH OF CULVERT PIPE = 144 FEET HEADWATER ELEVATION = 44.50 INV. IN ELEV. OF CULVERT = 43.50 FEET INV. OUT ELEV. OF CULVERT = 42.70 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.58 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 45.58 TAILWATER ELEVATION = 45.00 FEET VELOCITY= 2.93 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW INO RISER = ZERO (0) RISER DIA. HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/0! SDS8 ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October2005 Prepared By: TJC . Checked By: FLOWRATE = 1.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.23 LENGTH OF CULVERT PIPE = 128 FEET HEADWATER ELEVATION = 45.23 INV. IN ELEV. OF CULVERT = 44.50 FEET INV. OUT ELEV. OF CULVERT = 43.50 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.40 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 45.98 TAILWATER ELEVATION = 45.58 FEET VELOCITY= 2.29 FPS TAU WATER HNKNr1WN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW ,r si ELEVATION CALCULATIONS HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! FLOWRATE = 0.4 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.01 LENGTH OF CULVERT PIPE = 110 FEET HEADWATER ELEVATION = 43.91 INV. IN ELEV. OF CULVERT - 43.40 FEET INV. OUT ELEV. OF CULVERT = 42.40 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.02 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 45.91 TAILWATER ELEVATION = 45.89 FEET VELOCITY= 0.51 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! SD61 ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October2005 Prepared By: TJC . Checked By: FLOWRATE = 7.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 24 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.27 LENGTH OF CULVERT PIPE = 59 FEET HEADWATER ELEVATION = 43.67 INV. IN ELEV. OF CULVERT = 42.40 FEET INV. OUT ELEV. OF CULVERT = 42.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.20 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 45.89 TAILWATER ELEVATION = 45.68 FEET VELOCITY= 2.48 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW = ZERO (0) RISER DIA HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! ELEVATION CALCULATIONS VRATE = 3.9 CFS NINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI FOR CULVERT PIPE = 15 INCHES FOR RISER = 0 INCHES HEAD = 0.44 ;TH OF CULVERT PIPE = 138 FEET HEADWATER ELEVATION = 45.06 IN ELEV. OF CULVERT = 44.00 FEET OUT ELEV. OF CULVERT = 42.00 FEET T COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW T COEF. FOR CULVERT INLET CONTROL = 0.6 2 WEIR ELEVATION = 0.00 FEET HEAD = 0.66 FLOW COEF. = 0 HEADWATER ELEVATION = 46.55 WATER ELEVATION = 45.89 FEET )CITY= 3.18 FPS WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! Meadow Ridge Access Storage II Culvert Hydraulics October2005 SD63 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 1.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONT DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.23 LENGTH OF CULVERT PIPE = 103 FEET HEADWATER ELEVATION = 45.73 INV. IN ELEV. OF CULVERT = 45.00 FEET INV. OUT ELEV. OF CULVERT = 44.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.35 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.90 TAILWATER ELEVATION = 46.55 FEET VELOCITY= 2.29 FPS TAR WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW NO RISER - ZERO (0) RISER DIA HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! ELEVATION CALCULATIONS VRATE = 6.6 CFS NINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONT FOR CULVERT PIPE = 18 INCHES FOR RISER = 0 INCHES HEAD = 0.60 ;TH OF CULVERT PIPE = 120 FEET HEADWATER ELEVATION = 44.49 IN ELEV. OF CULVERT = 43.14 FEET OUT ELEV. OF CULVERT = 42.40 T COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW T COEF. FOR CULVERT INLET CONTROL = 0.6 t WEIR ELEVATION = 0.00 FEET HEAD = 0.73 FLOW COEF. = 0 HEADWATER ELEVATION = 46.62 WATER ELEVATION = 45.89 FEET )CITY= 3.73 FPS WATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/0! SD65 HEADWATER ELEVATION CALCULATIONS FLOWRATE _ MANNINGS n = DIA. FOR CULVERT PIPE _ DIA. FOR RISER = LENGTH OF CULVERT PIPE _ INV. IN ELEV. OF CULVERT = INV. OUT ELEV. OF CULVERT = INLET COEF. FOR CULV. PIPE FLOW = INLET COEF. FOR CULVERT INLET CONTROL = RISER WEIR ELEVATION = WEIR FLOW COEF. _ TAILWATER ELEVATION = m ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October 2005 Prepared By: TJC . Checked By: 3.2 CFS 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL 15 INCHES 0 INCHES HEAD = 0.29 51 FEET HEADWATER ELEVATION = 44.42 43.50 FEET 43.14 FEET 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW 0.6 0.00 FEET HEAD = 0.27 0 HEADWATER ELEVATION = 46.88 46.62 FEET 2.61 FPS HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! FLOWRATE = 1.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CON1 DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.23 LENGTH OF CULVERT PIPE = 107 FEET HEADWATER ELEVATION = 45.73 INV. IN ELEV. OF CULVERT = 45.00 FEET INV. OUT ELEV. OF CULVERT = 43.50 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.36 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 47.24 TAILWATER ELEVATION = 46.88 FEET VELOCITY= 2.29 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = HEADWATER ELEVA U1117L1T Meadow Ridge Access Storage II Culvert Hydraulics October2005 SD67 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 3 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 15 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.26 LENGTH OF CULVERT PIPE = 102 FEET HEADWATER ELEVATION = 44.58 INV. IN ELEV. OF CULVERT = 43.70 FEET INV. OUT ELEV. OF CULVERT = 43.14 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.33 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.94 TAILWATER ELEVATION = 46.62 FEET VELOCITY= 2.44 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! SD68 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 2.4 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 12 INCHES DIA. FOR RISER = 0 INCHES HEAD = 0.40 LENGTH OF CULVERT PIPE = 56 FEET HEADWATER ELEVATION = 44.90 INV. IN ELEV. OF CULVERT = 44.00 FEET INV. OUT ELEV. OF CULVERT = 43.70 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 0.43 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 47.38 TAILWATER ELEVATION = 46.94 FEET VELOCITY= 3.06 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! 111111111 ELEVATION CALCULATIONS Meadow Ridge Access Storage II Culvert Hydraulics October2005 Prepared By: TJC . Checked By: FLOWRATE = 105.7 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 48 INCHES DIA. FOR RISER = 0 INCHES HEAD = 3.05 LENGTH OF CULVERT PIPE = 169 FEET HEADWATER ELEVATION = 45.05 INV. IN ELEV. OF CULVERT = 40.00 FEET INV. OUT ELEV. OF CULVERT = 39.70 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 2.43 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 44.43 TAILWATER ELEVATION = 42.00 FEET VELOCITY= 8.41 FPS TAILWATER_UNKNOW_N = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/O! Meadow Ridge Access Storage II Culvert Hydraulics October2005 SD1O2 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: LOWRATE = 52.8 CFS IANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI IA. FOR CULVERT PIPE = 36 INCHES IA. FOR RISER = 0 INCHES HEAD = 2.41 ENGTH OF CULVERT PIPE = 284 FEET HEADWATER ELEVATION = 46.41 JV. IN ELEV. OF CULVERT = 42.50 FEET JV. OUT ELEV. OF CULVERT = 40.00 FEET JLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW JLET COEF. FOR CULVERT INLET CONTROL = 0.6 ISER WEIR ELEVATION = 0.00 FEET HEAD = 2.82 /EIR FLOW COEF. = 0 HEADWATER ELEVATION = 47.87 AILWATER ELEVATION = 45.05 FEET 'ELOCITY= 7.47 FPS 'AILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! SD1O3 HEADWATER ELEVATION CALCULATIONS FLOWRATE = 52.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI CIA. FOR CULVERT PIPE = 36 INCHES DIA. FOR RISER = 0 INCHES HEAD = 2.41 LENGTH OF CULVERT PIPE = 109 FEET HEADWATER ELEVATION = 44.41 INV. IN ELEV. OF CULVERT = 40.50 FEET INV. OUT ELEV. OF CULVERT = 40.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 1.88 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 46.93 TAILWATER ELEVATION = 45.05 FEET VELOCITY- 7.47 FPS TAILWATFR UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW = ZERO (0) RISER DIA HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Meadow Ridge Access Storage II Culvert Hydraulics October2005 SDI 04 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 52.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 36 INCHES DIA. FOR RISER = 0 INCHES HEAD = 2.41 LENGTH OF CULVERT PIPE = 289 FEET HEADWATER ELEVATION = 46.41 INV. IN ELEV. OF CULVERT = 42.S0 FEET INV. OUT ELEV. OF CULVERT = 40.50 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.S HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 2.84 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 49.78 TAILWATER ELEVATION = 46.93 FEET VELOCITY= 7.47 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW 105 = ZERO (0) RISER DIA. HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/0! ELEVATION CALCULATIONS FLOWRATE = 52.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONTROL DIA. FOR CULVERT PIPE = 36 INCHES DIA. FOR RISER = 0 INCHES HEAD = 2.41 LENGTH OF CULVERT PIPE = 110 FEET HEADWATER ELEVATION = 46.71 INV. IN ELEV. OF CULVERT = 42.80 FEET INV. OUT ELEV. OF CULVERT = 42.SO FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 1.89 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 49.76 TAILWATER ELEVATION = 47.87 FEET VELOCITY= 7.47 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW NO RISER = ZERO (0) RISER DIA. HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/0! Meadow Ridge Access Storage II Culvert Hydraulics October 2005 SD106 HEADWATER ELEVATION CALCULATIONS Prepared By: TJC . Checked By: FLOWRATE = 52.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 36 INCHES DIA. FOR RISER = 0 INCHES HEAD = 2.41 LENGTH OF CULVERT PIPE = 5 FEET HEADWATER ELEVATION = 47.91 INV. IN ELEV. OF CULVERT = 44.00 FEET INV. OUT ELEV. OF CULVERT = 43.50 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 1.33 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 49.20 TAILWATER ELEVATION = 47.87 FEET VELOCITY= 7.47 FPS TAII WATER IINKNOWN = 7FRO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW ISD107 = ZERO (0) RISER DIA. HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/0! ELEVATION CALCULATIONS FLOWRATE = 52.8 CFS MANNINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONI DIA. FOR CULVERT PIPE = 36 INCHES DIA. FOR RISER = 0 INCHES HEAD = 2.41 LENGTH OF CULVERT PIPE = 47 FEET HEADWATER ELEVATION = 47.41 INV. IN ELEV. OF CULVERT = 43.50 FEET INV. OUT ELEV. OF CULVERT = 43.20 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL = 0.6 RISER WEIR ELEVATION = 0.00 FEET HEAD = 1.55 WEIR FLOW COEF. = 0 HEADWATER ELEVATION = 47.96 TAILWATER ELEVATION = 46.41 FEET VELOCITY= 7.47 FPS TAILWATER UNKNOWN = ZERO (0) HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/01 Meadow Ridge Access Storage II Culvert Hydraulics October 2005 ELEVATION CALCULATIONS Prepared By: TJC . Checked By: VRATE = 52.8 CFS NINGS n = 0.012 HEADWATER ELEVATION ASSUMING INLET CONT FOR CULVERT PIPE = 36 INCHES FOR RISER = 0 INCHES HEAD = 2.41 3TH OF CULVERT PIPE = 113 FEET HEADWATER ELEVATION = 48.41 IN ELEV. OF CULVERT = 44.50 FEET OUT ELEV. OF CULVERT = 44.00 FEET T COEF. FOR CULV. PIPE FLOW = 0.5 HEADWATER ELEVATION ASSUMING PIPE FLOW T COEF. FOR CULVERT INLET CONTROL = 0.6 2 WEIR ELEVATION = 0.00 FEET HEAD = 1.90 FLOW COEF. = 0 HEADWATER ELEVATION = 46.40 WATER ELEVATION = 44.50 FEET )CITY= 7.47 FPS WATER UNKNOWN = ZERO_(01 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/O! HEADWATER ELEVATION = #DIV/O! Meadow Ridge Access Storage II Rip Rap Protection October 2005 Outlet Pipe I.D. Outlet Pipe Size Do Rip -Rap Qio Max Outlet Protection d50 La 3Do W dmax Apron Thickness inches) (cfs) (ft ft ft ft ft ft POS 2 24 26.0 0.5 16 6.00 18.00 0.75 1.13 SO 108 36 53.0 0.6 18 9.00 21.00 0.90 1.35 SO 101 48 106.0 0.8 22 12.00 26.00 1.20 1.80 Outlet Structure 10' Weir 56.0 0.8 18 10.00 16.00 1.20 1.80 10' Weir Emergency Spillways 20' Weir 56.0 0.8 18 20.00 30.00 1.20 1.80 Talwator . Snn Piv ... R Oha ucnd rn si,e rio-ran N W Outlet Pipe d50 La 3Do W dmax Apron Size (Do) Thickness All Rip -Rap at Pipe Outlets 24 0.5 16 6 18 0.75 1.13 36 0.6 18 9 21 0.9 1.35 48 0.8 22 12 26 1.2 1.8 Stormwater Pond Outlet Structures 10' Weir 0.8 18 10 16 1.2 1.8 Stormwater Pond Emergency Spillways 20' Weir 0.8 18 20 30 1.2 1.8 *. ni...e in- ­w Ab..n.. i- - h. Ii-i,nd h. Frktinn nirrh fnnditinnc COTT rz, Er) m 111llNiX1PJ4JiiT CNI N09.y1TT'U.:i 11NM GfUI!}AY Spll_C EDWIN ANDREWS & ASSOCIATES, P.C. CONSULTING HYDROGGOLOGISTS P.O. nox 36653 aAIXIn I, U.C. 27622. 0633 PHONI4 (919) 783 -H395 FAX'. (919)783-0151 November 30, 2005 Mr. Jay Houston, P.F. �� I I louston and Associates, P.A. P.O. Box 627 Shallotte, N C. 28459 JAN © j 7006 Re: hlydrogeotogic Evaluation Storm Water Basins at Meadow Ridge, Brunswick County, N.C. Dear Mr. Houston: I have reviewed your design of the storm water basins at Mcadowridge, Brusnwick County. This review is to determine if the normal pool elevations would adversely affect neighboring wetlands. Ponds I and 2 have orifice outlet evaluations of42 feet above mean sea level and Pond 3 has an � c l at V *411101 A lilt low y Figure 1 Quite overlay on the 7.5 run. Quad, rink Co :scale 1 Mr. Jay Houston, P.E. Re: I lydrogeologic Evaluation Stonn Water Basins at Meadow Ridge, Brunswick County, N.C. November 30, 2005 page 2 orifice outlet at 45 feel -- -- ^-- above mean sea level. These outlets drain to a ;4hY`i4tFI Nb \ l!L"HLW F�JU headwater creek [lowing ' Ilt "4"11EtC.fll— ' \ / aQlrir Ark to Saw Pit Swamp. The ueelKIAW ' -- aarcal:r. M14 elevation of this headwater creek rmwvr•n;uu"G., IInx•� tofu j i��- IU. GN1 WLIgiIfkANMGN4 _ currently controls the uwl ll au•IiA \egSnlMuw __ water elevation of the �LyN' ItllD114L SF1;JI()N surficiat aquifer Wa b6f rable Ellipse suhsequently defining the AyIV 4 {O A{1JNVI eu r r e it wetlands hydrology. The addition of the storm watcrbasins will not lower the water CROSS SECTION table because the water table ellipse had already ftilt0UTLETS'1RUC IJREyolts•I•olillIMIATERB)ND been established by the — NAIR oecCS.on snow Figure 2 Cto3e ing 4ia con Cable cl Lipso creek. Figure No, ],was created by overlaying the site map on the Shallotte/Calabash 7.5 minute quadrangles which shows that the creek headwaters has it long axis parallel tothe storm water basins. It appears that the groundwater ellipse draining the water table to the creek as base Flow will not be of ected by an orifice outlet at 42 feet at Ponds I & 2 and 45 tcet at Pond 3. If you have any questions please contact my office. YYll,lllllll111l//1, ••{4'+t ,,.•� b Very truly yours, a y5 ASS ?••'- Edwin Andrews& Associates; P.C. �•G 2pf�STE RFQ. yam?^f SEAL z I G, C-224 a: cn i ,Etn 3 Edwin E. Andrews III, P.G., N.C.L.S.S.-To�.Aol Consulting Ilydrogeologist and Soil Scientist = • .OGIC! "+III N�IC I•• �v�s.0 SOIL SCF� encl. G " E. A-ZV^- 2 I Page 1 of 1 North Carolina Elaine F, Marshall DEPARTMENT OF THE Secretary SECRETARY OF STATE Corporations °Corporations Home *Important Notice *Corporate Forms/Fees OCorporations FAQ •Tobacco Manufacturers •Dissolution Reports *Non -Profit Reports *Verify Certification •Online Annual Reports Links *Secretary Of State Home *Register for E-Procurement •Dept. of Revenue Legislation 01999 Senate Bills 02001 Bill Summaries •Annual Reports 1997 •Corporations 1997 •Other Legislation Search *By Corporate Name •For New Corporation *By Registered Agent Online Orders *Start An Order *New Payment Procedures Contact Us •Corporations Division ®Secretary of State's web site Print OPrintable Page PO Box 29622 Raleigh, INC 27626-0622 (919)807-2000 Date: 10/31 /2005 Click here to: View Document Filings 1 72-1 Print apre-populated Annual Report Form I File an Annual Report I Corporation Names Name Name Type NC Meadow Ridge, LLC Legal Limited Liability Company Information SOSID: 0767297 FID: Status: Current -Active Date Formed: 2/16/2005 Citizenship: Domestic State of Inc.: INC Duration: Perpetual Registered Agent Agent Name: Registered Office Address Registered Mailing Address: Principal Office Address: Principal Mailing Address: Houston, Jay R. 117 Pine Street Shallotte INC 28459 Post Office Box 627 Shallotte INC 28459 No Address No Address For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to Webmaster. http://www.secretary.state.nc.us/Corporations/Corp.aspx?Pitenll d=7693819 10/31 /2005 02/16/2005 11:17 9105757760 02/16/'U05 10:58 9107542121 02/16/2005 1e920 . 91e57n7760 ANDERSON LAW FIRM MARY State orNlorth Carollas De artment of the Secretary of State SOS I D: 767297 Date Filed: 2/16/200511:56:00 AM Elaine F. Marshall North Carolina Secretary of State C200504500602 Limited Usta llty Coaapatty A,)tMLIKS Of 01GANITATION pursuant to f 57C-2-20 of the Oeoat*1 Statutes of North Catoiltn, the otidan411e4 does htmby 11011 t thew Articles of OrganlsANon for the purpose of fbMIAS a limited Ilahillty company 1. The natne of dw limited liability company is: 41A00W Toor'' LLO 2. if the limited liability company is to dissolve by s specific dabs, the Rust dare on which the limited liability company is m dteaotve: (,ono date for dataludon is spec#?ed thew the l be no link on the diijw on of the linalled liability company.) ]. The name sad address of etch person entcuting thews articles of'otyenlution is a fbltows' (S1Wte Winder each person is exe mhq *w w6drs of orSwOun ion M the c4may of a member, orMlsw or both. Note: f?dt doc:mrnt mutt be agmd by all persona llsted here). Jq A, Hewbn membdsant wps rdzw 77M Wllthaa Wey aW, 8hds1 oge, NC 1a4Tt1 4. The sttat addiarss and county of the Initial registamd of cs of the limped liability company is: Numbar and 9.7wt 117'Pine Sweet City, Stan, Zip Code ah"atn. NC 2643e County BrulwA t I. Tire mailing address, ifsUffmd rfFoNi the Attar ettlrean of the initial regiatemd offlct is: Pat 91111o► a" art, NwAmle, NC 7aeba 6. TM now of tile initial regleftmid agent is: Jay P. Mollon 7. Principal offm iafoiteadont (Seidel th*e a or bj a. 0 The Ilmbrd liability 40opany has a petntlpel ettlte. The sttwt a"mu and county ortM principal office of the limiled Ilablllty company Is: NwOw and Street City, S1tan, Zip Code _comfy The nisi ttgttd6"o p'st(Q?aatfhem the stttroenlfta, of the principal office of the co ioadon is: b. [?) The Ilmttid Ilablthy eampany dws net aeve a ptinelpal voice. 02/16/2005 11:17 9105757760 02/16/2005 10:58 9107542121 ANDERSON LAW FIRM MARY 82/16/2685 10:20 91.05707760 g. Check one of the following: NCV;E Del LAW FItM PAGE 03 PACE 02 PAGE 03 i (i) Mgjnkw M atgad LLC: all members by virtue of their status as members shall be mansgas of this Itmhw liability company. (14 Ahsager-manyr[ LLC: except as provided by N.C.O.S. Section SIC3-30(s), the mem�sn of this limited liability company shall not bs managers by virtue of their soaves u members. P. Any other prowislons which the limited liability company skets t0 Include are attached. 10. These articles will be eMctive upon filing, unless a date andlor time to specified: This it dw tah day of FeCNery .2008 NW40W Rld t.LO Sfgratw's Jay R. Moueton. Mambw/Mwm TYPe a Ainl Ivan and 1 }r!e NOTES: 1 • Fab" aM b $125, lib dDmMeet Masi be reed wnk the flsetetary of Stset. CORPORATIONS DIY[ ON P.O. Sox M22 RALEIGK NC 11464e22 Ierr4.d Janwy SanJ1 . fastreetleas far rates (rae LQ f) TopoZone - The Web's Topographic Map i Or.6 91 � EI� Page 1 of 1 to ozone. WDmhl tA93 Ibpf�k On0.ltc L �risxT.• - ,/. � � � i ((��"'� 1 ... .µ`me ;'�. ��. -.V. ( t / ( v , ✓ �i IS �!�•- tt` �(����\ / Jt � ';y x,.. �.. } to 21 cif r Ujc/ I w .�+'•`.,F �, � � ���...�.- ` --• -:1.. `` ram_% N .... • .. VV w..~ -Yl.. .,� `�: ,.� ..Plexwnk Vie 40 � •. ,• �\ .l �� t / 1(//J/�/,///{ /,/-r/f, ' - ,�. ///^^mow .�..��. �'.. ^-+!- 0 r�CO. ��'�`'� a •4 RZ �' 63 '"� � ors t r— ti��� A _ so hapt-view 0 0.3 0.6 0.9 1.2 1.5 km MG 0 OA 0.2 0.3 0.4 0.5 mi Map center is UT 7-73E 3756668N (WGS84/NAD83) Shallottel'quadrangle M=-8.505 Projec ' n-is-UTMZone 17 NAD83 Datum. G=1.396 1 0 http://www.topozone.com/print.asp?z=17&n=3756667.99960529&e=731138.00008629&... 10/31 /2005 AMA " P 16(�( NCDENR North Carolina Department of Environment and Natural Resources 127 Cardinal Drive, Wilmington NC 28405 (910) 796-7215 FAX (910) 350-2004 Request for Express Permit Rev,i FILL-IN all information below and CHECK required Permit(s). FAX or email to Cameron. Weaver(o)ncmail.net along with a narrative and vicinity -mar Projects must be submitted by 9:00 A.M. of the review date, unless prior arrar$t APPLICANT Name: Meadow Ridge L.L.C. Jay R. Houston — Manager Member Company: Meadow Ridge, L.L.C. Address: P.O. Box 627 City/State: Shallotte, N.C. Zip: 28459 County: Brunswick Phone : 910-754-6324 Fax : 910-754-2121 Email : jayhouston aa�atmc.net PROJECT Name: ENGINEER/CONSULTANT: T. Jason Clark, P1. / Company: Houston and Associates. P.A. Address: P.O. Box 627 City/State: Shallotte, N.C. Zip: 28459 County: Brunswick Phone : 910-754-6324 Fax : 910-754-2121 Email : lasonclarkoatmc.net ❑ STREAM ORIGINATION CERTIFICATION; Stream ® STORMWA TER ❑ Low Density Wetlands MUST be addressed below ❑ Low �r S�v �of pro]�Ct. ocdtioC er m t'J(s-oa� l�f`JGl/Vbv(r�/ Density -Detention Pond ❑ High Density -Other ❑ High Density -Infiltration ❑ Off Site ❑ COASTAL ❑ Excavation & Fill ❑ Bridges Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ LAND QUALITY ❑ Erosion and Sedimentation Control Plan with acres to be disturbed. -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- WETLANDS (401) Wetlands on Property ❑ yes ❑ No Isolated Wetlands on Property ❑ yes ❑ No Check all that apply Wetlands Will Be Impacted ❑ Yes ❑ No Wetlands Delineation has been completed ❑ Yes ❑ No USACOE Approval of Delineation completed ❑ Yes ❑ No Wetland Impacts: Acre(s) 404 Application in process w/USACOE []Yes ❑No /Permit received from USACE ❑Yes ❑No 401 Application required ❑Yes ❑ No If Yes, ❑ Regular ❑ Express The legislation allows additional fees, not to exceed 50% of the original Express Review permit application fee, to be charged for subsequent reviews due to the insufficiency of the permit applications. SUBMITTAL DATES: SW CAMA LOS 401 For DENR use only Fee Split for multiple permits: Total Fee Amount $ 10/17/2005 10:54 9107542121 MARY HOUSTON and ASSOCIATES, P.A. �■ Consultin EngQineers r� SPALLOTTE. NORM CAI�OLINA 28459 ■ Telephone (910) 754-6324 Facsimile (910) 754-2121 PAGE 1 of DATE: 10 - I'1-Zoo 5 PAGE 01 117 Pine Street Post Office Box 627 TO: �merm Aleu„er FROM: T Sason 0o,(, K PC, N�EIR �w ExQR�s�_P�m►Tr►tis,. ?i"OnC : 910 - 39S- 3900 Fax: 910- 3So -ZOOS} SUBJECT: irOR Mo;, I Address : Ro. 3�,x G2`7 �' 110.4�4eI tiIC ZS`I59 D"" : L.L.C. ofF,r-1a, : 3,ay -R- Nousion 910-'75Lj -(v3Z4 Fax 910 - "W+ - Z124 EMAIL: vi,GE)nCbr`4t�a�MC nr E' PHONE: (910) 754-6324 FAX: (910)754-2121 E(N 'IrneertrSCcin&a�or : �ov-s{on and, Assoc-14 es, PA. P.C.3cx 62r-1 ShaVaki e I �jC, ZB4f0 Mmjer4 t0artlAwe 444 xk4 10/17/2005 10:54 9107542121 MARY PAGE 02 HOUSTON and ASSOCIATES, P.A. Consulting Engineers SFIALL07M, NORTH CAROLINA 28459 Telephone (910) 754-6324 117 Pine Street Facsimile (910) 754-2121 Post Office Box 627 FOR STORMWATER EXPRESS REVIEW Narrative/Project Description, (Meadow Ridge, Ocean Isle Beach, NC): The Meadow Ridge project is located in southeast Brunswick County, in Ocean Isle Beach. North Carolina. Meadow Ridge consists seven (7) commercial oui; parcels. Two (2) of the out parcels, Access Storage II (out parcels 4 and 5). along with the roadways and parking eV are bein� developed in this submittal. j^ Development of Meadow Ridge will be accompanied with a curb and guttered entrance/main roadway with catch basins/drop inlets and piping. The parking areas will include catch ins and piping. Three (3) Stormwater Ponds have been engineered for e ent. 'ch of the engineered BMP's is designed to store the required one (1.0) ch of runoff and to all of NCDENR's requirements. There are prope line ditches on both the northern and C61111 southern property lines. ditches have been relocated. All wetlands are shown on the plans. The proposed Stormwater Ponds outlet it o t e t ches ut,u wr-Lianus. Inc stormwater ponds were designed to tre_a fffz�-rt ni o-M romthe future out parcel developments. Four (4) of the out parcels to be developed in the future were assigned maximum impervious areas. Out parcel 6 is labeled Potential Marine Dealership, because that is the current proposed use. The buildings and parking areas shown as Potential Marine Dealership are the maximum BUA's that will be allowed on that out parcel even if another use is chosen. Maximum BUA's for each out parcel are shown on the plans_-- The design --of each-BMP--was-done-according to the- NCDENR-Stormwater-BMP Design Manual. The project area to be disturbed is slightly rolling with a consistent slope from the southern project boundary to the northern project boundary. The Soil Survey of Brunswick County classifies the soil types within the project boundaries as Mandarin Fine Sands and Grifton fine sandy loam. These series of soils are considered to be poorly drained. Runoff drail2a to Uh-c aw P Swam and into the Shallotte River. Ridge. This submittal is for a Hi h Density Stormwater Permit for Meadow \11.C.A�/7/ / F s 0Ru r ��•J Lil ?mEfram ' 4 d j y� Z— l 2-of 3 e w a ♦10 LN a r NCDENR North Carolina Department of Environment and Natural Division of Land Resources James D. Simons, PG, PE Land Quality Section Director and Slate Geologist December 2, 2005 LETTER OF RECEIPT OF EROSION CONTROL PLAN Meadow Ridge, LLC Mr. Jay R. Houston PO Box 627 �I{ Shallotte, NO 28459 1 `� RE: Project Name: Meadow Ridge Project ID: Bruns-2006-163 County: Brunswick River Basin: Lumber Submitted By: Houston & Associates Date Received by LQS: November 30, 2005 Plan Type: NEW Dear Mr. Houston: OFF V °z2oo aice\Q'Pb/b/ A�-Co, Michael F. Easle)i�Govbr6or William G. Ross Jr., Secretary This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S. 113A-57 (4)). The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G.S. 113A-54(d) (4)). The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. We have performed a preliminary review of your submitted plan and have determined that additional information will be necessary before a final review can be completed. Enclosed is a checklist of items that must be submitted before we can complete the review process. Failure to provide the additional information may result in disapproval of your plan. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, �'� odd C. Walton LQuality Section cc: Jay R. Houston, Houston & Associates, PA LQS-WiRO; SWS-WiRO Wilmington Regional Office 127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845 - Phone: 910-796-72151 FAX 910-350-2004 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES LAND QUALITY SECTION EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST PROJECTNAME:PW Mt( A4GLQ DATE: II''31b oS PROJECT Nu.: COUNTY: To e;.oedne the appro :•al process, a cursory re.•ie'.,• of your submitted Erosion and Sedirnent Control Plan application has been made and has shown the need ;or additional information as specified belor:. To meet our revie'.v schedule, any additional information should he received by this office no later than JEo� �lJo.r Failure to meet this schedule foci,, result in disapproval of your plan. The follo::'mg items shall be incorporated unite respect to specific site conditions, in an erosion and sediment control plan LOCATION INFORLIATION Project location (macs. Slreels, landmarks) rJor L7 and scale GENERAL SITE FEATURES (Plan elements) —jC Legend florin arrow, scale, etc. Proper,,, lines E.ishno concurs (lopograpnic lines) Proposed contours _ Limits of msturbeo area (provide aceage total, definable horns, and lapel) Planner; and ezl sting budorng locations and elevations Planned road locations :. efevahons Lol and/or building numbers Geologic fealu:es roc'k outcrops, seeps, springs, wetland dno Ihelr limits, sirea.ms, takes, ponds. pains, etc Ezsernents and nramage'.vays Profiles df streets, utilities, cif allines, etc Stockpiled lopsoil or subsoil localions If the same person conducts Ine land-0isiurome achviN G an) retalea oono'.v or wasle aclrvlry, Ine f000i borrow or wasle aalvir. snail c0rsh:u e pan 01 the land-dsturyng activity unless be borr0•, or waste aclrvlry Is woulaisd under fire I.2nmg Aa of 19-1 1. or is a lanchli reoulaii o, the Division of %'dasie f,lanage. onr r Ine land-aislu.•Omg acimak and an, related copow or waste dcti i, are not conouided de Ine same pet5on, Me%, sr2ll be Oonsiceleo sepdraL land cslurpina ac,ilies and must de dermtlted el fhui Ihru the Sedimentation Pollution CorGlpl Act as o one use borrow she or flrougn me %lining Act -- Recuree >rr.,y CO:ds 40, tie:mil =_nc We'd, Oualip- -"" f cerofoalfon (e g sneam mslumances over 150 linear [eel) EROSION CONTROL rdEASURES (on plan) _ Legend _ LL_ Location of temporary measures Location of permanent measures Consbk1ciion drat+'ngs and deiatls for ' lempoiary and permanent measures Maintenance recu,remenls of measures Comoct person responsiple for mainlenance SITE DRAINAGE FEATURES 71WIng and planned oranage patterns (include oil -vie areas Ina! drain Inrougn project) %._ aefnod of delefr maron of and calculations for Acreage of land being 9i5urbed See and location of cujv^rls and se':cefs ;of info;in, Ion Ippe, special cra:acferisncs Son in:ouna:,on nelo, culvert storm outlels NL:ne and classification of :ece,vino wafer course (Opt, v: rare sformvrc';er oiscnarges a,e lb 06Cbr) CCL1 r.1E'JTS� 5^e hie Ipliorving page Q 1f,..ppii+N.� ii'!E%ttu/?fl rd�o acE .j�ifm.. '� F1 1rJEn� V.1ilmingion Regional Office 17 Cardmal Dave E>'tenslon, 1'vllmingjon, NC 23105 • Phone El I D 395 3900 / FAX C-10-350-2004 STORYWATER CALCULATIONS Pre -Construction runoh calculations for each outlet from me site (tit pealdisCharge points) Design calculations for peak discharges of runoff (including the construction pnase & the final runoff coeffidienls of life site) Design talcs of culverts and storm se',ers Discnarge and •.elocny deputations put open channel add cinch Oow's (easement d ngnl.oh:nays) Design talcs Of cross sections and method of staod¢afion of exising and planned channels (Include temporary finings) Design calas and consvnergy ucllon oe;aifs of edfssipalc:s below cukeo and storm sewer outlets pmamelers F. apron dimensions) Design [ales and dimension of sediment oasms Surface area and selling erfioene: in!ormalion for proposed Sediment baps and/or aasins VEGETATIVE STABILIZATION Area S acreage to be vegeiat,faiy slapihzeo r:1e;hOd of soil preparation Seed p'0a & rates pemporary 3 permanent) Ferhhcer type and rates iOuich type and fates NOTE'. Plan should include provisions for groundcover on exposed slopes within 15 working days or 30 calendar days (whichever is shunter), following completion of any phase of grading; permanent groundcover for all disturbed areas within 15 'working days or 90 calendar days (whichever is shover) following cantpiehon of construction or development, FINANCIAL RESPONi SIBILITY/Ob1'NERSHIP FORrd Completed, signed n nolanZed FR/O Form Accurate apoticalion fee (550.00 per acre rounded up fire ne,l acre with no celhnie amount) Certificate of assumed name, if the O'.,'ner is a pannersnip Name of Reglsfi -dew (d aphcadle) Copy of ;he most Current Deep for ine site NOTE For ine E..press Permhting Option, mowre at the local P.etOonal Otfice for ava,jpbddy. NARRATIVE AND CONSTRUCTION SEOUFY.CE ('ras NCT Pe-i�N pf',Wb'd n'i: F,.T 4 Na!ative cescrfwng the nature and purpose of life construction nctivhy Construction seouence rdialed to erosion and semmenl control (mclub,nb Inslallandn or cf,hcal measures prior ;o the intlfaiion of the 131C cts:urbing anivir/ $ removal of measures aher areas hey sen'e are oermaneNy' stapd¢eo) Bid spernlcahons roiatea only to erosion control -�a 31r f ,k; l Permit No. SW q cu D1 p 1 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJE, CI' INFORMATION Project Name: 91 Contact Person: Salt R. "kan E • Phone Number: (11t0 ) '754- lo321} For projects with multiple basins, specify which basin this worksheet applies to: elevations Basin Bottom Elevation 35.5 ft. Permanent Pool Elevation 4-Z.. O ft. Temporary Pool Elevation 43.q ft. (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 2312.a9 sq. ft. (water surface area at the orifice elevation) Drainage Area 12.32 ac. (on -site and off -site drainage to the basin) Impervious Area 9.`79 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 85 400 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 35, 2co2 cu. ft. (volume detained above the permanent pool) Forebay Volume I� cu. ft. (approximately 20% of total volume) Other parameters SA/DAI 3q(e4 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 3.0 in. (2 to 5 day temporary pool draw -down required) Design Rainfall I in. Design TSS Removal 2 q0 % (minimum 85% required) Form SWU-102 Rev 3.99 Page I of 4 a Footnotes: When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90%TSS removal. I1. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach Justification. Applicants Initials a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. "file basin side slopes above the permanent pool are no steeper than 3:1. It. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage casement is provided for each basin including access to nearest right - of -way. —orbs We 0,cGe"S1bIC. � I. If the basin is used for sediment and erosion control during construction, clean out of the 93�QTAW� basin is specified prior to use as a wet detention basin. p � m. A mechanism is specified which will drain the basin for maintenance or an emergency. III, WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does (Yd not incorporate a vegetated filter at the outlet. This system (check one) 0 does oes not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. It. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in it manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads y-$75 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 42.0 Sediment R\Ele l EI.Li; 75 o ----SedimentRetnovalElevation 3T1�•5 75% Bottomtion%--------------------------------------------- ----- Bottom Elevation 35 5 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that 1 am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: I R. %iowv. a P. E. Title: MO1 ng Ae ftber' Note: 'rhe legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. `{' PP a Notary Public for the State of a4L C,ra>�, ti✓ County of do hereby certify that �a R. ks �.r✓ personally appeared before me this )5 day of Gc 4-6 L-1 J 005 and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, 8. Tq�AA �pTAq` r �9G Q ` SEAL My commission expires 10. 9 2004 Form SWU-102 Rev 3.99 Page 4 of 4 Permit No. S VQ 1� DU 0 � 0 � (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORNIWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Meodhw R1bae. Contact Person: � R . 4o.,SAon P. E. Phone Number: (q10) ISLE - G32,i For projects with multiple basins, specify which basin this worksheet applies to: *2 elevations Basin Bottom Elevation 3(0. 0 ft. (floor of the basin) Permanent Pool Elevation 42.0 ft. (elevation of the orifice) Temporary Pool Elevation 43.0 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 11,WA sq. ft. (water surface area at the orifice elevation) Drainage Area (o. 6'7 ac. (on -site and off -site drainage to the basin) Impervious Area S. I i ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 59i3�?S cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume IQt, 14Z cu. ft. (volume detained above the permanent pool) Forebay Volume 14.4'-ta cu. ft. (approximately 20% of total volume) Other parameters SA/DAI 4.Z15 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 2.0 in. (2 to 5 day temporary pool draw -down required) Design Rainfall I in. Design TSS Removal 2 qO % (minimum 85% required) Form SWU-102 Rev 3.99 Page I of 4 Footnotes: When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal. The NCDENR BMP manual provides design tables for both 85%TSS removal and 90% TSS removal. IL REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 [lays. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. In. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provide([ for each basin including access to nearest right- of-way. — PUJDs os a citeesslble 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. In. A mechanism is specified which will drain the basin for maintenance or all emergency. IIL WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does (rpn not incorporate a vegetated filter at the outlet. This system (check ale) 0 does Wdoes not incorporate pretreatment other than a forebay. Fonn SWU-102 Rev 3,99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 't.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 45 feet in the forebay, the sediment shall be removed. Sediment Bottom El. 3'7S ------------ on (0.0 FOREBAY BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation i'z .O Sediment Removal Elevation 3'7S ------------------------------ Bottom Elevation 3(0.0 MAIN POND 75 % 25% 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Ponn SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Zy Q IAoO.-sAm(x i P. F Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of do hereby certify that .Jad personally appeared before me this dS day of Oe Day .3 u o 5 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, I rOTAq`�70 d R R V \494''/CK COO SEAL My commission expires 1 O - 9 • z OO4 Farm SWU-102 Rev 3.99 Page 4 of Permit No. 9-AWg MOM (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: ly\P'nc\ k `tZlL�Be Contact Person: Sav R. 1A,% k n p E Phone Number: (qtp ) 254- 6�324f For projects with multiple basins, specify which basin this worksheet applies to: �u elevations Basin Bottom Elevation -S9.0 ft. Permanent Pool Elevation 4S.o ft. Temporary Pool Elevation 4 (0.0 ft. (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) areas Permanent Pool Surface Area I Z q31R sq. ft. (water surface area dt the orifice elevation) Drainage Area 4.7-1 ac. (on -site and off -site drainage to the basin) Impervious Area 3.4 , ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 3143 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 13 ,9"7Z cu. ft. (volume detained above the permanent pool) Forebay Volume 35 cu. ft. (approximately 20% of total volume) Other parameters SA/DAI 4.q&s (surface area to drainage area ratio from DWQ table) Diameter of Orifice in. (2 to 5 day temporary pool draw -down required) Design Rainfall I in. Design TSS Removal 2 QD % (minimum 85% required) Forni SWU-l02 Rev 3.99 Page I of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal. The NCDENR BMP manual provides design tables for both 85%TSS removal and 90%TSS removal. D. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 21-1 .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws clown in 2 to 5 days. c. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) F. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. It. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. — Pwos c re Acce55-b1e I. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT 'file wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does (4oes not incorporate a vegetated filter at the outlet. This system (check one) 0 does does not incorporate pretreatment other than a forebay. Form S W U-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: it. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads LE 5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 45 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation Sediment Ren oval EI, r}O.5 75 0 --- _ Sediment Removal Elevation 40.5 75% Bottom Ele ation 39.0 %--------------------------------------------- ---- Bottom Elevation 39.0 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: SS R_ et.sion �Q£ Title: lancin\,o� Member Address: p 0. RoK (o27 f 5� wcG 2,pg69 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of .r r--S,..-Cil do hereby certify that J4 4,,cJ- .l personally appeared before me this J 5 day and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, y ^•y� q ic�coo SEAL My commission expires 10 • 9 • Z 00 6 Porm SWU-102 Rev 3.99 Page 4 of 4 OUT TOTAL **EXISTING PARCEL AREA BUILT -UPON I.D. (AC.) AREA (AC.) 1 1.43 0.0585 2 1.41 0.0765 3 1.45 0.00 4 5.88 4.99 5 13.59 5.26 6 3.45 0.00 7 2.79 0.135 R/W 1.27 0.98 TOTALS 31.27 11.5 FUTURE ALLOWABLE BUILT -UPON AREA (AC.) 1.1141 1.0797 1.1745 0.0 0.9043 1.9776 1.6936 0.0 TOTAL ALLOWABLE BUILT -UPON AREA (AC.) 1.1726 (82%) 1.1562 (82%) 1.1745 (81%) 4.99 6.1643 1.9776 1.8286 0.98 7.9438 19.44 ++ EXISTING BUILT -UPON AREA REFLECTS BUILT AND APPROVED OR CURRENTLY PROPOSED UNDEI DEVELOPMENT TBD TBD TBD Access Storage II Access Storage II FLEX -SPACE FLEX -SPACE