HomeMy WebLinkAboutNCC223927_ESC Approval Submitted_20221122ROY COOPER
Governor
ELIZABETH S. BISER
secretary
BRIAN WRENN
Director
Starlight Homes North Carolina, LLC
ATTN: Raymond Rinker
4025 Lake Boone Trail, Suite 200
Raleigh NC 27607
NORTH CAROLINA
Environmental Quality
November 3, 2022
LETTER OF APPROVAL
RE: Project Name: Lynn Ridge Lots 8-33
Acres Approved: 4.88
Project ID: HARNE-2022-148
County: Harnett
City: Angier
Address: Meadow Vista Lane
River Basin: Cape Fear
Stream Classification: Other
Submitted by: Sanderson Engineering, Inc.
Date Received by LQS: October 12, 2022
Plan Type: REVISED - Residential
Dear Mr. Rinker:
The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution
Control Act (hereinafter "Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans)
prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days ( 15
days for revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving authority fails to
approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will be
deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After
the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual
permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party
shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land
disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the e-
NOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes
in the future, the new responsible party must obtain a new COC.
D��� North Carolina Department of Environmental Quality : Division of Energy, Mineral and Land Resources
FMFayetteville Regional Office ' 225 Green Street. Suite 714 - Fayetteville North Carolina 28301
ticam ina �
410.433 3300