Loading...
HomeMy WebLinkAboutNCC204947_MODIFICATION Supporting Documents_20221115 (8)Iw `` • II III -\'a�w�M�aWM' \ \ _ MHo�/Maw/ Q3V . -_` - I I VIIII �\ \ \ \ _°WM v v MHo ' ° I II N/F \ A i�� i �a'vN i A \ IWM� \ \ \ \ \ / I 163802-77-8109 \ _ _ _ _�__ii / LUCAS INVESTMENTS LTD 3O 326 PHASE 1 C01�1-TRUCTION\ -7/ M \\ e M RIM INV=302.40 f !- EDITCH 32 X1 sr Rom- i 3? _ 30'� - 488 LF @ 3.69% w/3:1 SIDE SLOPES \ / RISER 5 \ I / / ,�v 15 NAG IDS 75 TEMPORARY LINER 110, �3�i V 01 DITCH 31 256 LF @ 5.35% w/3:1 SIDE SLOPES I I \ \ NAG IDS 75 TEMPORARY LINER \ \\ 1 \\ PHASE / ONSTRUCyl / \\\\\ / ✓ �� / / \ 0 RET \ 72 H T (T \I i \o\\, C)�I I _✓ / / \ \\ / / NTRA E ( YP. \ \\\\ / / \ / II\in \\ \ N/F 163802-76-6747 DB339HPG36S ` \\ \\ KENNETH LUCAS \ / \\\ �^ \ 0 ��0 \\��\ 163802-76-2902 DB3305PG214 PB 89 PG 337 (1 R) \�\ \ PHASE1 / /\ \5QNSTRUCTION \ \ _ �\ \ // /- i \� \\ \ \ \ \\ �\\\ \DITCH 30 I \ I I 72 LF @ 2.78% w/3:1 SIDE SLOPES \ \ \ \ I \ \\\\ \\ \ NAG IDS 75 TEMPORARY LINER / I \ \ I \ \ I \ \ \ \ N/F \ 30_ o� i- i / \ \ sn / \ \ I / / \ \ \ \ \ 11 I i \ I \\ \ l lB38909 PG6654 677 � � � \K�NNETH LUCAS DITcH221 I I / / / / \ \ \ \� II �. I \\\ \ \ ❑7 \ ��/%/�/ \ \ \ \ \ \moo \ \ \ \ �, i / \ I\ I NAG129 �DS@75 TEMPpRARY LIN PES I / / / / 32� 325 I I I \\ \ \ �- / - 1 i DITCH 29 I I i� C421. O'RCP FES2C I I IIII \ \ o � 121 I I 381 LF @ 3.41% w/3:1 SIDE SLOPES I I I I rJ ///// Rc o° RC 12 I NAG IDS 75 TEMPORARY LINER I \ I I III I - � 331 295 I I I I I \ \ 32 330 i I II \\ W�1I33 C. UMSTEAD 3 R V*ABLE TRUST 799 DB P49J PG 788 7)/ 325 / \ -\ / / / 162 % ,...p� 1 5 / / 163 V A / / / 324 324 ES 3 3V\ I I\ I\II\I \ \III \ 68� D5�L)�x//7/' �7JA_�/ 313 /-;n r I I � I I fl �� / \ �� i `�` / / / / / --- 322 24 / 324 / - 323 � 324 I - I / \ 171A 321 �15 11 I \\ \\ \ 313 5 3151 70 I I x 3 / T 0 R SEAS \ \ \ 0 3A \ \ 7 )\ \ \ 1 7 \ \ I I I I I 324 324 323 / 321 I I I \\\\\\ \\ v\\ - I -T \ 1 \ \ I- \ 324 I I I I \\\\ 6'�Qx .5'(W) (9"qD o \ \ 318 D=41' D� -6" QG 2g� \ �� \ 15 RC \ 3 14�� s' 316 \ \ \ \ \ CLASIS A ITRAF 3 \ \ \ \ / / 1 6 / 1 I WIG OT�X ILE S 8 \ \ 29 �G \ \ \ \ o 312 \ \ \ \ \ \ \ I \ / P \ \ I I I I I I ` S \ �5 \ \ 310� \ \ \ \ \ \ 7 321 /318 I I \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \\ \ \ II I \ 1150 149 14 323/J if ES 1 1 \ 1 324 324 / o_ , H I ✓ / �` \ ;I 7' \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 \ 1 324 324 \ \ \ \ \ \ \ 154Z2 I \\ \ I 176A o \ \ \ \ \ \ \ \ \ 30S �f2r77D - - \ \ \\ \ \ \ \ 159 58 4 D YD 12 \ 31316 \ 325 / / ISER 51 II \ LLI )x-247) 1 P x€\i D 14 24 \ I II I I I1 86 \ o b I 1 1 �1 ITCH25 \ \ \ 193/tF @ 6.9Q/o /3 SI E �LOWES 2 2 LFi 2.05%\ w/3:1 SIDE SLOPES \ NA� DS 75 TEMP Y IIV�R \ \ \\ \ ID o=pp" DM x-61"C I \ \ \\ I\ NA DS TEMPORAf�Y LINER - - - \ \ I 1 GLA9S A �PRAI � o 1 I I I \ \ \ \ \ s 1 I I 1 \ \ \ \ \ Q\ \ \ \ \ W/GEPTEX+TILE I 11\ \ I \ 177 \ \ I I \ \ \ I 0^ RC 1 ES 77A/ I \ I I I \ \ \ \ \ \ \ \ \ \ ` 1 1 \ l N/1- v \ R" P II I\ \ \\ \ / \ \ \ I I MICHAEL H6-6193 ARRIS 1�- DB 51094 PG 721 \ \ >\ < 1 N/F N/F 18163802-76-1035 163802-76 -2071 CI8FELICIAHOLDER MARTHA HARRIS \ 1\ y\ \ \\ DB 2329 PG 827 m N/F DB 1831 PG 911 163802-66-9062 REGINALD N PG 859I` m DB CONSTRUCTION SEQUENCE STAGE 1 1. SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH JOHNSTON COUNTY PUBLIC UTILITIES. 2. AFTER THE PRE -CONSTRUCTION MEETING IS HELD, THE CONTRACTOR CAN DELINEATE THE TREE LINE / DISTURBANCE LIMIT LINE AND INSTALL INITIAL EROSION CONTROL MEASURES ONLY. THIS INCLUDES, BUT IS NOT LIMITED TO, CONSTRUCTION ENTRANCE, SILT FENCE/TREE PROTECTION FENCE, AND EXISTING INLET PROTECTION. ONCE THE SILT FENCE IS SECURE, DRAIN THE EXISTING PONDS WITH PUMPS AND HIGH -FLOW SILT BAGS. ONCE PONDS HAVE BEEN DRAINED, INSTALL TEMPORARY STONE COFFER DAMS AND BYPASS SYSTEMS TO ENSURE DRY WORKAREAS. RECONSTRUCT AND EXCAVATE TRB-3 AND FILL IN THE PORTIONS OF THE OTHER EXISTING POND. ONCE THESE MODIFICATIONS TO THE EXISTING STRUCTURES ARE COMPLETE, EXCAVATE THE TEMPORARY RISER BASINS AND THE TEMPORARY SKIMMER BASINS AND ADD THE FAIRCLOTH SKIMMERS AND THE COIR BAFFLES. ONCE THESE BASINS ARE INSTALLED AND OPERATIONAL, CONSTRUCT THE TEMPORARY DIVERSION CHANNEUBERM. LIMIT CLEARING AND LAND DISTURBING ACTIVITY TO ONLY THE AREA NECESSARY TO INSTALL THE PERMITTED MEASURES. 3. CALL JOHNSTON COUNTY PUBLIC UTILITIES FOR AN ONSITE INSPECTION TO CONTINUE CONSTRUCTION. 4. UPON APPROVAL OF THE STORMWATER SITE INSPECTION, COMMENCE PERMITTED LAND DISTURBING ACTIVITY - CLEARING AND GRUBBING FOR STAGE 1. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED, IF NEEDED, AT LEAST ONCE PER WEEK AND AFTER EVERY RAINFALL EVENT. STAGE 2 1. BEGIN ROUGH GRADING OF SITE. 2. BEGIN ROAD WIDENING AND INSTALL THE ASSOCIATED SUBSURFACE DRAINAGE SYSTEM. 3. ONCE ROUGH GRADES ARE ESTABLISHED, INSTALL THE SUBSURFACE DRAINAGE AND OTHER INFRASTRUCTURE AS APPROPRIATE AND PROTECT ALL NEW INLETS WITH TEMPORARY BLOCK AND GRAVEL OR SILT BAG MEASURES AS SHOWN. 4. FILL AROUND SKIMMER BASINS AS STORM DRAINAGE BECOMES OPERATIONAL AND DIRECTS DRAINAGE INTO THE RISER BASINS. MAINTAIN CONTROLLED FLOW WITH THE 24" SLOPE DRAINS AS SHOWN. 5. STABILIZATION IS REQUIRED WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON PROJECT SITE. 6. ONCE ALL SUBGRADES HAVE BEEN ESTABLISHED, INSTALL SANITARY SEWER SERVICES AND THE PROPOSED WATER MAINS AND SERVICES. ONCE ALL UTILITIES HAVE BEEN INSTALLED, FINISH FINE GRADING OF SITE AND INSTALL CURB AND GUTTER AND PAVING. 7. STABILIZATION IS REQUIRED WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON PROJECT SITE. 8. SITE STABILIZATION IS REQUIRED PRIOR TO FINAL APPROVAL OF GRADING PERMIT AND ISSUANCE OF CERTIFICATE OF OCCUPANCY. GRASS UTILIZED AS PERMANENT GROUND COVER MUST BE AT A MOWABLE HEIGHT THAT GENERALLY PROVIDES AT LEAST 80% COVERAGE THROUGHOUT THE SITE, WITH NO LARGE BARE PATCHES OR EVIDENCE OF EROSION. ONCE THE SITE HAS BEEN STABILIZED AND INSPECTED, CONVERT THE TEMPORARY RISER BASINS TO PERMANENT WET PONDS WITH THE APPROVAL OF THE INSPECTOR. 9. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR A FINAL SITE INSPECTION BY THE JOHNSTON COUNTY PUBLIC UTILITIES. OBTAIN A CERTIFICATE OF COMPLETION. GROUND STABILIZATION " SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS Perimeter dikes, swales, ditches 7 days None and slopes High Quality Water (HOW) 7 days None Zones Slopes steeper 7 days If slopes are 10' or less in length and than 3:1 are not steeper than 2:1, 14 days allowed Slopes 3:1 or 14 days 7-days for slopes greater flatter than 50-feet in length All other areas None with slopes flatter 14 days (except for perimeters and than 4:1 HOW Zones) * "Extensions of time may be approved by the permitting authority based on weather or other site -specific conditions that make compliance impracticable." (Section ILB (2)(b) BASIN REMOVAL SEQUENCE 1. SCHEDULE A SITE MEETING WITH THE ENVIRONMENTAL INSPECTOR TO DETERMINE IF A BASIN CAN BE REMOVED. INSTALL SILT FENCING OR OTHER TEMPORARY EROSION CONTROL MEASURES AS NEEDED PRIOR TO REMOVAL OF THE BASIN. 2. REMOVE BASIN(S) AND ASSOCIATED TEMPORARY DIVERSION DITCHES. IF CULVERT PIPES NEED TO BE EXTENDED, PERFORM THIS OPERATION AT THIS TIME. FINE GRADE AREA IN PREPARATION FOR SEEDING. 3. PERFORM SEEDBED PREPARATION, SEED, MULCH AND ASPHALT TACK ANY RESULTING BARE AREAS IMMEDIATELY. 4. INSTALL VELOCITY DISSIPATORS AND/OR LEVEL SPREADERS AS REQUIRED ON THE EROSION CONTROL PLAN. 5. WHEN SITE IS FULLY STABILIZED, CONTACT ENVIRONMENTAL INSPECTOR FOR APPROVAL OF REMOVING REMAINING TEMPORARY EROSION CONTROL MEASURES AND ADVICE ON WHEN SITE CAN BE ISSUED A CERTIFICATE OF COMPLETION. EROSION CONTROL NOTES ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. SUFFICIENT EROSION CONTROL PRACTICES MUST BE INSTALLED AND MAINTAINED TO RETAIN SEDIMENT WITHIN THE BOUNDARIES OF THE SITE. GROUND COVER STABILIZATION SHALL BE IN ACCORDANCE WITH NPDES PERMIT AND STABILIZATION CHART ABOVE. TEMPORARY GROUND COVER WILL BE INSTALLED ON ALL EXPOSED SLOPES IN 7 OR 14 DAYS. MAINTENANCE: ALL EROSION AND SEDIMENT CONTROL PRACTICES TO BE INSPECTED WEEKLY AND AFTER EVERY RUNOFF PRODUCING RAINFALL EVENT. NEEDED REPAIRS WILL BE MADE IMMEDIATELY. MAXIMUM GRADED SLOPE SHALL NOT EXCEED THREE (3) TO ONE (1). TOTAL DISTURBED SOIL AREA 1 45 ACRES. STOCKPILE NOTES: 1. HEIGHT SHALL NOT EXCEED 35 FEET. 2. SLOPES SHALL NOT EXCEED 2:1 STOCKPILE MAINTENANCE REQUIREMENTS 1. SEEDING OR COVERING STOCKPILES WITH TARPS OR MULCH IS REQUIRED AND WILL REDUCE EROSION PROBLEMS. TARPS SHOULD BE KEYED IN AT THE TOP OF THE SLOPE TO KEEP WATER FROM RUNNING UNDERNEATH THE PLASTIC. 2. IF A STOCKPILE IS TO REMAIN FOR FUTURE USE AFTER THE PROJECT IS COMPLETE (BUILDERS, ETC.), THE FINANCIAL RESPONSIBLE PARTY MUST BE NOTIFY WAKE COUNTY OF A NEW RESPONSIBLE PARTY FOR THAT STOCKPILE. 3. THE APPROVED PLAN SHALL PROVIDE FOR THE USE OF STAGED SEEDING AND MULCHING ON A CONTINUAL BASIS WHILE THE STOCKPILE IS IN USE. 4. ESTABLISH AND MAINTAIN A VEGETATIVE BUFFER AT THE TOE OF THE SLOPE (WHERE PRACTICAL). EROSION CONTROL LEGEND DITCH TEMPORARY SILT FENCE ��`GK811 BFFO� p REINFORCED SILT FENCE OUTLET F O , #W* TEMPORARY SILT BAG INLET PROTECTION a v G) HORSESHOE N INLET PROTECTION ING?P'� TEMPORARY BLOCK & GRAVEL INLET PROTECTION - - - - LIMIT OF DISTURBANCE EXISTING TREE LINE NEW TREE LINE TEMPORARY ROCK CHECK DAM 13 CONCRETE WASH AREA RIPRAP NORTH ® VE OCI YPRON DISSIPATOR 60' 0 60' 120' SCALE: 1 " = 60' 0 w z > w O CO> W z O O z O CO z O w w UJ w -0 CE GROUP 301 GLENWOOD AVE. 220 RALEIGH,NC 27603 PHONE. 919-367-8790 FAX 919-322-0032 www.cegroupinc.com License # C-1739 ������Unuumtluu4ioii®e x �10 'x %lFy 0 Q J Z 0 J v) Qz z� J 0 U� zQ z 0 0 VJ � O UJ��� 0LU Z LL O U) z N U z wo 00 �0 U CU < U) VJ 0 Date: MARCh 3 1 , 2021 Scale: I"=Ga Drawn: RJ h Checked: AJF Project No. 1 27-239 Computer Dwg. Name 1 27-239 ph2-4 stage 2 ec Sheet No: 12 Of 41