Loading...
HomeMy WebLinkAboutSW8070303_Historical File_20131008NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Tracy E. Davis, PE, CPM Director October 8, 2013 Mr. David Lee, Vice President DR Horton, Inc 4073 Belle Terre Blvd, Myrtle Beach, SC 29579 Pat McCrory, Governor John E. Skvarla, III, Secretary Subject: State Stormwater Management Permit No. SW8 070303 and Name / Ownership Change The Overlook at Middle Sound High Density Subdivision Wet Pond Project (Class SA waters) New Hanover County Dear Mr. Lee: - The Wilmington Regional Office received a complete; modified State Stormwater Management Permit Application for The Overlook at Middle Sound on October 3, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 070303 dated October 8, 2013, for the construction, operation and maintenance of the BMP's and built - upon area associated with the subject project. The following modifications are included and covered by this permit: 1. Transfers the permit from Gateway Bank & Trust to DR Horton, Inc. 2. Re -designs the road and lot layout. 3. The stormwater management system has been redesigned to meet the latest set of rules and includes 2 wet detention ponds, 2 dry detention ponds to act as a secondary BMP, and 2 level spreaders and vegetated filter strips to handle the excess flow from the wet detention pond. This permit shall be effective from the date of issuance until March 26, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information conceming this matter, please contact Christine nelson, at (910) 796-7215. Sinc ely, S� �.n Tracy D is, , P . E., Director Division of Energy, Mineral and Land Resources GDS/can: S:\WQS\Stormwater\Permits & Projects\2007\070303 HD\2013 10 permit 070303 cc: Gateway Bank & Trust; cto Pat G. Davis, Senior Vice President; Special Assets / OREO Department John Richards, Thomas & Hutton New Hanover County inspections Beth E. Wetherill, New Hanover County Engineering Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: (910) 796-7215 / Fax: (910) 350-2004 State Stormwater Management Systems Permit No. SW8 070303 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO DR Horton, Inc. The Overlook at Middle Sound 3210 Middle Sound Loop Road, Wilmington, New Hanover County FOR THE construction, operation and maintenance of two (2) wet detention ponds discharging to Class SA Waters in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter separately and collectively referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division and considered a part of this permit. This permit shall be effective from the date of issuance until March 26, 2021 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The subdivision is permitted for 42 lots, each allowed a maximum of 4,000 square feet of built -upon area. 3. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control systems. The wet ponds labeled as Pond 1 and Pond 2 have been designed to treat the runoff from 185,600 and 150,000 square feet of built -upon area, respectively. 4. The maximum built -upon area allowed for the entire subdivision is 335,600 square feet. 5. The drainage areas will be limited to the amount of built -upon area indicated in Sections 1.3 and 1.8 of this permit, and per approved plans. The built -upon area available for the future development within the drainage areas of Pond 1 and Pond 2 is limited to 8,800 and 7,100 square feet, respectively. Page 2 of 10 State Stormwater Management Systems Permit No. SW8 070303 6. A 50' wide vegetative buffer must be provided adjacent all surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 7. The volume in excess of the design storm must flow overland through a level spreader and 50 foot vegetative filter stria, designed ,per NC,"C 2H.1008 i i to pass the peak flow from the 10 year storm in a non -erosive manner. 8. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. Pond 1 Pond 2 a. Drainage Area, acres: 9.91 7.50 Onsite, ft: 431,700 326,700 Offsite, : 0 0 1:57 Total Im ervious Surfaces, ft : 185,600 150,000 Onsite, ft : 176,800 142,900 Future, ft: 8,800 7,100 Offsite, ft : 0 0 c. Design Storm, inches: 3.8 3.8 d. Average Pond Design Depth, feet: 4.0 4.5 e. TSS removal efficiency: 90% 90% f. Permanent Pool Elevation, FMSL: 6.5 7.2 g. Permitted Surface Area PP, ft : 21,750 23,900 h. Permanent Pool Volume, ft 77,206 96,836 i. Forebay Volume, ft: 15,570 19,736 j. Temporary Storage Elevation FMSL: 8.6 8.8 k. Permitted Temporary Storage Volume, ft : 55,393 45 479 I. Predevelo ment 1 r-24 hr. discharge rate, cfs: 1.83 5.69 m. Controlling Orifice: 3.0" 0 pipe 3.0" 0 pipe n. Orifice Flowrate, cfs 0.19 0.17 o. Maximum Fountain Horsepower: 1/4 1/3 p. Receiving Stream/River Basin: Pages Creek / Ca a Fear q. Stream Index Number: 18-87-22 r. Classification of Water Body: SA, HQW 9. The discharge from all wet ponds must be directed to a secondary BMP. The following design elements have been permitted for the required secondary BMP, dry detention basins, and must be provided in the system at all times. Dry Pond 1 Dry Pond 2 a. Basin Bottom Elevation, FMSL: 6.0 7.0 b. Sediment Storage Elevation, FMSL: 7.25 8 c. Stora a Elevation, FMSL: 11.0 10.8 d. Sediment Storage Provided, ft : 16,278 12,384 e. Water Volume Provided, ft: 63,270 45,731 f. Controlling Orifice: 2.5" QJ pipe 2.5" D Pi e II. SCHEDULE OF COMPLIANCE 1. No person or entity, including the permittee, shall alter any component of the approved stormwater system shown on the approved plans unless and until the Division has approved of the revised plan. 2. The permittee is responsible for the routine monitoring of the project for compliance with the built -upon area limits, grading and storm drainage system established by this permit, the permit documents, the approved plans and the recorded deed restrictions. Page 3 of 10 State Stormwater Management Systems Permit No. SW8 070303 3. The permittee shall review all individual proposed and modified lot plans for compliance with the conditions of this permit. The permittee shall not approve any lot plans where the maximum allowed built -upon area has been exceeded, where the revisions to the grading or to the storm drainage system are proposed, unless and until a permit modification has been approved by the Division. 4. The permittee shall notify any lot owner that is found to be in noncompliance with the conditions of this permit, in writing and shall require remediation within a reasonable time frame. 5. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 6. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 7. All stormwater collection and treatment systems must be located in either public rights -of -way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required rights -of -way, common areas and easements, in accordance with the approved plans. B. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Redesign or addition to the approved amount of built -upon area. C. Further development, subdivision, acquisition, or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Alteration of any aspect of the approved stormwater drainage system and/or the approved stormwater BMPs. e. The construction of built -upon area within any permitted future development areas shown on the approved plans. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 4 of 10 State Stormwater Management Systems Permit No. SW8 070303 12. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 13. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. 14. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 15. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The project and the stormwater facility must be in substantial compliance with all permit conditions. Any items not in substantial compliance must be repaired, replaced or restored to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 16. If the permanent pool volume is greater than 30,000 cubic feet, a decorative spray fountain will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in Pond 1 and Pond 2 is 1/4 and 1/3 horsepower, respectively. Page 5 of 10 State Stormwater Management Systems Permit No. SW8 070303 17. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 070303, as issued by the Division under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent ^ecessa r to maintain aintain compliance with i he Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. f. The maximum built -upon area per lot is 4,000 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the pond or to the street, grading the lot to drain toward the pond or street, or grading perimeter swales and directing them into the pond or street. h. Built -upon area in excess of the permitted amount will require a permit modification. i. All affected lots shall maintain a 50' wide vegetative buffer adjacent to all surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. j. Any individual or entity found to be in noncompliance with the provisions of the stormwater management permit or the requirements of the Stormwater Rules is subject to enforcement procedures as set forth in G.S. 143, Article 21. 18. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 19. If permeable pavement BUA credit is desired, the permittee must submit a request to modify the permit to incorporate such language as required by the Division. The request to modify must include a soils report identifying the type of soil, the Seasonal High Water Table elevation and the infiltration rate. Upon the successful completion of a permit modification, the individual lot owners that request to utilize permeable pavements shall submit the necessary forms and documentation to the permittee, or a designated agent, and receive approval prior to construction of the permeable pavement. Page 6 of 10 State Stormwater Management Systems Permit No. SW8 070303 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. At least 30 days prior to the sale of the property, or a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change form to the Division, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Energy, Mineral and Land Resources, in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. The permittee shall maintain a copy of the permit, O&M agreements, and the approved plans at all times. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Page 7 of 10 State Stormwater Management Systems Permit No. SW8 070303 Permit modified and reissued this the 8th day of October 2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION racy u2vis, r.�., viro=r Division of -Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 070303 Page 8 of 10 State Stormwater Management Systems Permit No. SW8 070303 The Overlook at Middle Sound Stormwater Permit No. SW8 070303 New Hanover County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 9 of 10 State Stormwater Management Systems Permit No. SW8 070303 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DEMLR Regional Office New Hanover County Building Inspections Page 10 of 10 DWQ USE ONLY Date Received Fee Paid Number a- //� �� n / �PSermit �GV Z .ice Al plicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph lI - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): The Overlook at Middle Sound (Formerly known as Ridge Field at Middle Sound) 2. Location of Project (street address): 3210 Middle Sound Loop Road City:Wilmington County:New Hanover Zip:28403 2991 1 3. Directions to project (from nearest major intersection): approx. 3.2 miles north on US 17 (Market Street) from the intersection of US 17 & US 74 (Eastwood Rd) turn right on SR 1403 (Middle Sound Loop Road) & travel approx. 135 miles Site is on the east side of SR 1403 4. Latitude:34°15'W N Longitude:-I-F-W W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU 102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 070303 , its issue date (if known)—________, and the status of construction: ®Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Ntunber, issue date and the type of each permit: 5. Is the project located within 5 miles of a public a If yes, see S.L. 2012-200, Part VI: MAR 18 Form SWU-101 Version 06Aug2Ol2 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:DR Horton, Inc. Signing Official & Title:Brad Brundage, City Manager for David Lee Vice President b. Contact information for person listed in item 1a above: Street Address:4073 Belle Terre Blvd City:Myrtie Beach State:SC 29579 Zip:2 Mailing Address (if applicable): City: State: Zip: Phone: (704 ) 804-9781 Fax: ( ) Email:bcbrundage@drhorton.com Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: Phone: ( ) Email: State: Zip: Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits: New Hanover County Point of Contact:Reggie Hucks Phone #: (910 ) 798-7175 Form SWU-101 Version 06Aug2012 n CEIVE Page 2 of OCT 0 3 2013 BY. IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Runoff from all impervious surfaces in each of the two drainage basins will be treated initially by a wet detention pond. Discharge from each wet detet ion pond will be directed to either a secondary dry detention basin, level spreader w/ engineered filter strip or to existing drainage conveyance as applicable 2. a. If claiming vested rights. identify the supporting documents provided and the date they -were approved; ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 30.706 acres 5. Total Coastal Wetlands Area: 0 _acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:30.706 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal Hi h Water (NW line or Mean High Water (MH1M line, and coastal wetlands landward from the NHW (or ZA line. The resultant project area :s used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHIM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 25 % 9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Receiving Stream Name Drainage Area Pages Creek Dr"ge Area 2 Pages Creek Drainage Area Dr ' . e Area Stream Class * SA; HQW SA; HQW Stream Index Number * 18-87-22 18-87-22 Total Drainage Area (sf) 431,700 326,700 On -site Drainage Area (sf) 431,700 326,700 Off -site Drainage Area (sf) 0 0 Proposed Impervious Area** s 185,600 150,000 % Impervious Area** total 42.99 46 im ery ous' * Surface Area Drainage Area 1 Drainage Area 2 1 Dramage Area Drainage Area On -site Buildings/Lois (sib 92,000 76,000 On -site Streets (sf) 73,300 58,400 WEE On -site Parking (sf) 0 0 On -site Sidewalks (sf) 11,500 8,500 Other on -site (so 0 0 Future (sf) 8,800 7,100 Off -site (sf) 0 1 0 Existing BUA*** (so 0 0 Total (sf): * S 185,600 150,000 tream Class and Index Number can be determined at: httpI&ortal.ncdenr.or fwg ebAvg&slcsu/classifications Impervious area is defined as the built upon area including. but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that UA is to be removed and which will be replaced by new B. Form SWU-101 Version 06Aug2012 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Proieets in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 1 SA NCAC 02B . 0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplCM= t and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://Portal.ncdenr.org/web/wq/ws/su/bmn-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hiW://portal.ncdenr.org/web/wq/ws/su/statesw/forms--docs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http:/ /portal.ncdenr.org/web/IvA/ws/su/mal2s.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from htt2:/-_portal.ncdenr.org/web/3yq/ws/su/statesw/forms does. I}ials % 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhely.org/12a&es/onestopexl2ress.hbnl for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and -to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 2� 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. �C �G C j. Site Layout with all BUA identified and dimensioned. NfF k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control m urER 2 8 2013 m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated b qualified person. Provide documentation of qualifications and identify the person ho made the determination on the plans. BY:- n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). Form SWU-101 Version 06Aug2012 Page 4 of 6 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: j5' jq 4 Page No: 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretaa.state.nc.us/CorRorations/CSearch.aWx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from h=://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer John Richards, PE Consulting Firm: Thomas &Hutton Mailing Address:1350 Farrow Parkway _ City:Myxtle Beach Phone: (843 ) 839-3545 Email:richards.i@thomasandhutton.com State:SC Zip:29577 Fax: 843 839-3565 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization Iisted in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. EGI�� G MAR 2 8 200 BY: Form SWU-101 Version 06Aug2012 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their Tease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of County of do hereby certify that before me this _ day of personally appeared . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) Brad Brundage certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwai rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. C C ll Date: eG`�/J JIll I, yo w �. I L i/1 si'I'I�i�l' , a Nota Public for the State of SG ,County of t'(V il'y do hereby certify that 'n �' nin personally appeared before me thi day of JOB , and ac wledge the ue e�gcijtigp of the application for a stormwater %Mitr+,Witness my hand and official seal, V v lA s V W Ems'% _ 2� �.10TAPy+�p:m _ SEAL PUBLIC 4",H CARa ���`� My commission expires I��h I �30 1_ 1ECEIvEgk Form SWU-101 Version 06Aug2012 Page 6 of 6 OCT 0 3 2013 BY: High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. ` I, Brad Brundage , acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 070303, as issued by the Division of Water Quality under the Stormwater Management Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is 4.000 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA Lot # BUA Lot # BUA Lot # BUA This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. Each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface waters. **50 foot for projects located in the 20 coastal counties. 8. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swa/es to collect the lot ru off and directing them into a component of the stormwater collection system. Lots that will naturally drai into the system are not required to vrovide these additional measures Form DRPC-3 Rev.2 05Nov2009 IEC 1VL rm ECIFIVE MAR 1 2013 14AR 2 8 2013 v. Page 1 of 2 High Density Residential Subdivisions Deed Restrictions & Protective Covenances Signature: 4,44 C• Date: u Notary Public in i tl ie State of & L , County of `AQC'rH do hereby certify that � (� C VkAn ( personally appeared before me this the _� 3 4'� day of V #-\n 0 , 20 j� and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal SEAL Signature My Commission expires Pamela J Jarvis NOTARY PUBLIC State of South Carolina My Commission Expires 7/19/2021 For, DRPC-3 Rev.2 05Nov2009 Page 2 of 2 THOMAS & HUTTON 1350 FARROW PARKWAY I MYRTLE BEACH, SC 29577 POST OFFICE BOX 8000 1 MYRTLE BEACH, SC 29578-8000 843.839.3545 1 WWW.THOMASANDHUTTON.COM October 2, 2013 Ms. Christine Nelson NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Stormwater Management Revisions The Overlook at Middle Sound, NC 24039.0001.303 Dear Ms. Nelson: Per review comments dated September 30, 2013, we offer the following responses: 1, The person identified on the application, Brad Brundage, is not the president or vice president of DR Horton, Inc. 15A NCAC 02H.1003(e) requires a principle executive officer of at least the level of vice present or his authorized representative to sign the permit applications. I will need the president or vice president of DR Horton, Inc to be listed on the application and to either sign all the applicable forms or provide a letter of authorization allowing Mr. Brundage to sign on his or her behalf. The NC Secretary of State currently lists Mr. Donald Tomnitz and the President and both Mr. Thomas Montano and Mr. Bill Wheat as Vice Presidents. The Certificate of Assistant Secretary provided on July 15, 2013 indicates that Mr. David Lee is also a Vice President. See attached Letter of Authorization from David Lee, Vice President, D.R. Horton, Inc. 2. The signatures on the O&M agreements provided for wet detention pond 1, dry detention pond 1, and level spreader / vegetated filter strip 1 are not the originals. The original signatures on these documents need to be provided. Please review the application, and if everything is in order, we respectfully request NCDENR approval. Please feel free to contact me at (843) 839- 8424 should you have any questions or comments. Thank you for your time and assistance with this project. The original O&M Agreements for Ponds 1 and 2 and the Stormwater Management Permit Application are attached. Sincerely, THOMAS & HIIiTO Qvz_ � John Richards, P.E. ��� Principal/Project Manager OCT 0 3 2013 Enclosures: as listed above Hy; cc: DR Horton, Inc. Jack Reel, P.E./Thomas and Hutton SAVANNAH, GA I CHARLESTON, SC I WILMINGTON, NC I BRUNSWICK, GA ,'i THOMAS & HUTTON F1 Engineering I Surveying I Planning I GIs I Consulting TO: Ms. Christine Nelson NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Letter of Transmittal Date: 10/2/13 Job 24039.0001.500 ;Ze; The Overlook at Middle Sound WE ARE SENDING YOU THE FOLLOWING ITEMS ( ® attached) (❑ under separate cover via UPS ❑ Shop Drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ® Other: Resubmittal Copies Date I Description 1 10/2/13 Comment Response Letter 1 10/ l / 13 Letter of Authorization 1 10/2/13 Operation & Maintenance Agreements - Pond 1 1 10/2/13 Operation & Maintenance Agreements - Pond 2 1 10/2/13 Stormwater Management Permit Al2plication Form THESE ARE TRANSMITTED AS CHECKED BELOW: ® For Approval ❑ Approved as Submitted ❑ For Your Use ❑ Approved as Noted ❑ As Requested ❑ Returned for Corrections ❑ For Review and Comment Remarks Please find the attached requested information. ® Resubmit Copies for Approval ❑ Submit Copies for Distribution ❑ Return Corrected Prints ECF,1V' OCT 0 3 206 Copy to _ - Signed S0-v" W9°�'.' 1350 Farrow Parkway 1 PO Box 80001 Myrtle Reach, SC 295781 8"3.839.35451 Fax 843.339.3565 B-H-HOMN NONSE! October 1, 2013 Christine Nelson NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Overlook at Middle Sound Dear Ms. Nelson: Please be advised that this letter is to serve as my letter of authorization allowing Brad Brundage, City Manager, DR Horton, Inc. to sign all documents and applications relating to the Overlook at Middle Sound project on my behalf. Sincerely, David Lee D.R. Horton, Inc. Vice President CCEIVE ocr COY• - — Nelson, Christine From: Weisgerber, Sharon [weisgerber.s@thomasandhutton.com] Sent: Wednesday, October 02, 2013 3:48 PM To: Nelson, Christine Cc: Reel, Jack; Richards, John; Hussey, Ida Subject: FW: Overlook at Middle Sound Attachmenis: 24039.0001.500 NCDENR Nelson 10-2-13 Resubmlttal.PDF Christine, Requested info will go out today via UPS, so be on the lookout to receive package sometime tomorrow. I am attaching a copy of the resubmittal for your reference. Thanks, Sharon Sharon B. Weisgerber Thomas & Hutton weisgerber.s@thomasandhutton.com (P) 843-839-8450 (F) 843-839-3565 Website I vCard From: Nelson, Christine[mailto:christine.nelson(dncdenr.gov] Sent: Monday, September 30, 2013 12:15 PM To: Reel, Jack; Richards, John Subject: RE: Overlook at Middle Sound Jack / John, I have finished going through the submittal for the Overlook at Middle Sound. I did find 2 issues that will prevent me from issuing the permit: The person identified on the application, Brad Brundage, is not the president of vice president of DR Horton, Inc. 15A NCAC 02H.1003(e) requires a principle executive officer of at least the level of vice present or his authorized representative to sign the permit applications. I will need the president or vice president of DR Horton, Inc to be listed on the application and to either sign all the applicable forms or provide a letter of authorization allowing Mr. Brundage to sign on his or her behalf. The NC Secretary of State currently lists Mr. Donald Tomnitz and the President and both Mr. Thomas Montano and Mr. Bill Wheat as Vice Presidents. The Certificate of Assistant Secretary provided on July 15, 2013 indicates that Mr. David Lee is also a Vice President. The signatures on the O&M agreements provided for wet detention pond 1, dry detention pond 1, and level spreader / vegetated filter strip 1 are not the originals. The original signatures on these documents need to be provided. Are these items something that can be provided in a couple days? If they would take longer, I will technically need approval from a supervisor for a third request for additional information. Thanks, Christine ** Please note the new direct phone number ** Christi -- Nelson NC Division 3f Energy, 'Minerai and Land Resources 127 Cardinal Drive Ext., Wilmir-"ton, IBC 28 05 Di-Ect:910-796-7345! Mein:9'10-r96-7522; Rnx:510-350-200ti Er,?ofl correspondence to and from ibis ad Yre.s h: subject to ti•re North Carol na Pubiic Records Laiv and miry be dis-closed to Mird parties uniess the content is exempt by statute or other reguh;tima. From: Nelson, Ch rlstine Sent: Monday, September 23, 2013 1:04 PM To: 'Reel, Jack' Subject: RE: Overlook at Middle Sound Jack, I'm sorry it has taken me a while to get to this project. Things have been very busy. I promise it's the next project I will look at. I hope to start looking at this afternoon. Christine ** Please note the new direct phone number Mx. Christ ene Nelson Environmental E-Oneer State Stormwater Program NC Division of Energy, Miinera; and Laird Rcs�ul,cos 127 Cardinal Drive Ext., Wilmington, NC 28405 Direct: 910-796-7345 / Main: 910-795-25'2! Fax: 910-350-2004 Emeii correspondence to and from. this crldress is subject to the North Carolina Pubiic Records Law and may be discicsed to third parties unless the ccrtent is exempt by statute or other regula. tion. From: Reel, Jack fmailto:reel.pthomasandhutton.com] Sent: Monday, September 23, 2013 12:46 PM To: Nelson, Christine Subject: Overlook at Middle Sound Christine, I have a call today with the client and would like to see if I can get an update from you on this project. Thanks Jack D. Reel, P.E., LEEDw AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhutton.com reel.iD.thomasand h utton. com (P) 910-332-3400 (F)910-332-3361 "Relationships and Solutions for Success" 2 North Carolina Secretary of State Page 1 of 2 North Carolina N4 Elaine j// DEPART ENS" OF TFIE Secretary SECRETARY OF STATE PO Sox 29622 Ra;ekjh, NC 27626"622 1919j807-2000 Account Login Register Date: 9/26/2013 Click here to: View Document Filings I File an Annual Report I JPrint a pre -populated Annual Report Form I Amend A Previous Annual Report I Corporation Names Name Name Type NC D.R. HORTON, INC. LEGAL Business Corporation Information SOSID: Status: Effective Date: Citizenship: State of Inc.: Duration: Annual Report Status: Registered Agent Agent Name: Office Address: 0296009 Current -Active 11/5/1991 FOREIGN DE PERPETUAL CURRENT CT CORPORATION SYSTEM 150 FAYETTEVILLE ST., BOX 1011 RALEIGH NC 27601 Mailing Address: Principal Office 150 FAYETTEVILLE ST., BOX 1011 RALEIGH NC 27601 Office Address: 301 COMMERCE STREET, SUITE 500 FORT WORTH TX 76102 Mailing Address: 301 COMMERCE STREET, SUITE 500 FORT WORTH TX 76102 Officers Title: CHAIRMAN OF THE BOARD Name: DONALD R. HORTON Business Address: 301 COMMERCE STREET SUITE 500 FORT WORTH TX 76102 Title: PRESIDENT Name: DONALD J. TOMNITZ Business Address: 301 COMMERCE STREET SUITE 500 FORT WORTH TX 76102 Title: TREASURER http://www.secretary.state.nc.us/corporations/Corp.aspx?PitemId=4988929 9/26/2013 North Carolina Secretary of State Page 2 of 2 Name: Business Address: Title: Name: Business Address: Title: Name: Business Address Stock STACEY H. DWYER 301 COMMERCE STREET SUITE 500 FORT WORTH TX 76102 VICE PRESIDENT THOMAS B. MONTANO 301 COMMERCE STREET SUITE 500 FORT WORTH TX 76102 VICE PRESIDENT BILL W. WHEAT 301 COMMERCE STREET SUITE 500 FORT WORTH TX 76102 Class Shares No Par Value Par Value 99 SEE CERT 0 0 This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 1630 http://www.secretary.state.nc.us/corporations/Corp.aspx?PitemId=4988929 9/26/2013 w 14F-7 �LMG LAND MANAGEMENT GROUP n4c. Environmental Consultants TO: Jack Reel P.E. Thomas & Hutton 215 South Kerr Avenue Unit B Wilmington, NC 28403 CO: David G. Lee DR Horton, Inc. 1001 Old Waterford Way Leland, NC 28451 August 16, 2013 AUG 2 8 2M RE: Proposed Stormwater BMP areas the Overlook at Middle Sound S/D located off of Middle Sound Loop Rd near Ogden, NC. Jack, On Tuesday, August 13, 2013, Land Management Group, Inc. had the pleasure of evaluating the proposed stormwater best management practice (BMP) areas the Overlook at Middle Sound S/D located off of Middle Sound Loop Rd near Ogden, NC. The purpose of the evaluation was to describe the soil profile, quantify the depth to the seasonal high water table and to inform the project engineer of any potential limitations of this project, at seven preselected locations previously evaluated by others in the proposed retention (wet basin) BMP area and 2 locations were selected for evaluation in the proposed dry basin BMP area. I offer the following guidance. The soils at this site are mapped as the Wrightsboro and Pantego soil series in the Soil Survey of New Hanover County (USDA, 1977). Actual soil borings 1-6 and 9 confirm the soil to be taxajunct variant of the Wrightsboro series that is similar to the Mapped Marvyn-Craven Complex map unit series from adjacent counties. These soil borings have a 4-6% slope and have a moderately well drained to well drained drainage class that is masked by relict soil colors due to the origin of parent material present. Soil borings 7 and 8 confirm the soil to be a drained/disturbed variant of the Pantego soil series with a poorly to somewhat poorly drained drainage class (see Test Area Map Appendix A and soil profile description in Appendix B). The Wrightsboro soil series can best be described as soils that formed from moderately well drained loamy and clayey fluviomarine sediments on broad interstream divides with slopes typically less than 4%. The Marvyn-Craven Complex map unit can best be described by moderately well drained to well drained tine loamy and clayey marine sediments on slopes of marine terraces that typically exceed 4%. The Pantego soil series can best be described as soils that formed from very poorly drained fine loamy fluviomarine sediments on broad flats www.lmgroup.net • info@lmgroup.net • Phone: 910:452.0001 o Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402 and flood plains. The official published description and physical and chemical data for the Wrightsboro, Marvyn, Craven and Pantego soil series are shown in Appendix C for comparison. The seasonal high water table is normally evident by observation of redoximorphic features suggesting past conditions of saturation and reduction. This site has been subject to enhanced drainage features in the low lying adjacent wetland areas from historic sivicultural practices that has altered the regional drainage effect of the area. Prior to these drainage features this soil type and landscape position would have a seasonal high water table (SHWT) of less than a foot from the soil surface in soil borings 7 and 8 and would be 1 to 2 feet in borings 1-6 and 9; however, there was no evidence of contemporary fluctuation of water in the upper 37 inches boring 1, 36 inches in boring 2, 26 inches in boring 3, 30" in boring 4, 34" in boring 5, 24" in boring 6, 18" in boring 7, 22" in boring 8 and 27" in boring 9 from the existing soil surface (see Test Area Map Appendix A, soil profile descriptions in Appendix B). According to the Castle Hayne Horticultural Research Station (CAST) there has been 2.38 inches of rainfall in the last 7 days (8/6 to 8/12/13) and a 30 day total of 11.10 inches. This shows the site reacts well to stressed rainfall conditions and we have concluded that the contemporary SHWT is conservatively accurate in reference to the above referenced depths and the encountered observed physical water table levels from the soil surface. All recorded depths are from the existing surface as noted in the soil profile descriptions, Appendix B. See tables 1 and 2 below for the SHWT estimation compared with the elevations provided by your office. Table 1. Seasonal High Water Table Estimation in the proposed Retention (Wet Basin) neon .. J� �Bong 1 Elevation 12.00 �--�- SHWT (ft) _ 3.08 SWHT Elev. 8.92 2 ' 3 11.00 9.50 ! 3.00 I 2.17 ; 8.00 7.33 ' 4 9.00 2.50 6.50 -- 5 10.00 6 9.00 2.83 2.00 .-� -_ _ 7.17 _ 7.00 7 7.50 1.50 6.00 Geometric Mean: 7.22 Table 2. Seasonal High Water Table Estimation in the proposed Dry Basin BMP area. Boring Elevation SHWT (ft) 8 7.50 1.83 7.50 �2.25._-_. Geometric Mean: SWHT Elev. -5.67 —_- -- 5.25 5.45 In summary, this site has two separate proposed areas that are proposed for stormwater BMP placement. This area has soils that have seasonal high water tables 18 to 37 inches from the existing soil surface to the contemporary seasonal high water table. If the proposed permanent pool elevation is more than o" beiow the seasonal high water table elevation, then additional testing and analysis may be required to determine an adverse affect of adjacent wetlands, surface waters; and/or buffers where applicable. Please refer to the NC DENR DWQ February 19, 2009 Memo Article 2 subsections a-d for further guidance. If you have any questions about this report or need any additional information I may be reached at 910-452-0001, 910-471-0505 or at nhowell a�llmgroup.net . Sincerely, Nicholas Howell NC Licensed Soil Scientist #1294 IMAM Appendix A Test Area Maps wridutprfle"L L7f-uuju ;nvironmental Consultants PO BOX 2522 Wilmington, N.C. 2a402 www.LMGroup.net I-RM-LMG-In78 I4( OW 5 .I =am 0 mi VV. 18 1-1 Appendix B Soil Profile Description Boring 1 Shoulder Slope 2-3°% adjacent to large disturbed recess/borrow area? A — 0-12" Loamy Sand, granular, very friable, non sticky non plastic, 10YR 3/1. BE—12-21" Sandy Loam, subangular blocky, friable, non sticky non plastic, 10YR 6/6. Btl — 21-25" Sandy Loam, subangular blocky, friable, slightly sticky non plastic, 10YR 6/6 with 10YR 4/3 mottles. Bt2 — 25-37" Sandy Clay Loam, friable slightly sticky slightly plastic, 10YR 5/6 with 10YR 4/3, 10YR 6/2 and 7.5YR 5/8 mottles. 2Bg — 37-65" Sandy Clay, firm, moderately sticky moderately plastic, 5Y 6/1 with 5YR 5/8 and 7/5YR 5/8 mottles. Physical Water: 52" rising 8/13/13 SHWT: 37" Boring 2 — Side Slope 3-5% eroded A — 0-3" Loamy Sand, granular, very friable non sticky non plastic, 10YR 3/1. Bt1— 3-13" Clay Loam, angular blocky, firm, moderately sticky moderately plastic, 10YR 5/4. Bt2—13-30" Sandy Clay Loam subangular blocky slightly sticky slightly plastic, 10YR 5/4 with 10YR 5/8, 10YR 4/3 and 10YR 6/2 mottles. Bt3 — 30-36" Sandy Loam, subangular blocky, friable slightly sticky slightly platic, 10YR 5/6 with 10YR 7/4 thin strata lamelle. 2Bg— 36-65" Sandy Clay, massive parting to subangular blocky, firm, moderately sticky moderately plastic, 5Y 6/1 with 10YR 5/6 mottles. Physical Water: 52" stabilized 8/13/13 SHWT: 36" Boring 3 — Side Slope 3-5% eroded A — O-2" Loamy Sand, granular, very friable non sticky non plastic, 10YR 3/1. Bt1— 2-17" Clay Loam, angular blocky, firm, moderately sticky moderately plastic, 10YR 5/4. Bt2—17-26" Sandy Clay Loam subangular blocky slightly sticky slightly plastic, 10YR 5/4 with 10YR 5/8, 10YR 4/3 and lOYR 6/2 mottles. 213g1— 26-56" Sandy Clay, massive parting to subangular blocky, firm, moderately sticky moderately plastic, 5Y 6/1 with 10YR 5/8 and 7.5YR 5/8 mottles. 2Bg2 — 56-65" Clay Loam, massive parting to subangular blocky, friable, moderately sticky slightly plastic, 2.5Y 6/2 with 2.5Y 5/6 mottles. Physical Water: 51" rising 8/13/13 SHWT: 26" Boring 4 — Side Slope 3-5% eroded A — 0-3" Loamy Sand, granular, very friable, non sticky non plastic, IOYR 3/1. BE — 3-20" Sandy Loam, subangular blocky, friable, non sticky non plastic, 10YR 6/6. Btg — 20-30" Sandy Clay Loam subangular biocky siightiy sticky slightly plastic, IOYR 6/2 with IOYR 5/6, 10YR 4/3 and IOYR 6/6 mottles. 2Bg — 30-65" Sandy Clay, massive parting to subangular blocky, firm, moderately sticky moderately plastic, 10YR 5/8 with 7.SYR 5/8 and 5Y 6/1 mottles. Physical Water: 52" rising 8/13/13 SHWT: 30" Boring 5 — Side Slope 3-5% severely eroded Bt —0-10" Sandy Loam,. subangular blocky friable slightly sticky non plastic 10YR 5/6. Btg—10-34" Sandy Clay Loam subangular blocky slightly sticky slightly plastic, IOYR 6/2 with 10YR 5/6, 10YR 4/3 and 10YR 6/6 mottles. 213g — 34-52"+ Sandy Clay, massive parting to subangular blocky, firm, moderately sticky moderately plastic, 10YR 5/8 with 7.5YR 5/8 and 5Y 6/1 mottles. Physical Water: 45" stabilized 8/13/13 SHWT: 34" Boring 6 — Side Slope 2-3% severely eroded BE — 0-8" Sandy Loam, non sticky non plastic, 10YR 6/6. Bt — 8-19" Sandy Clay Loam, slightly sticky slightly plastic, IOYR 5/4 with 10YR 5/8, 7.5YR 5/8 and 10YR 6/2 mottles. Btg—19-24" Sandy Clay Loam subangular blocky slightly sticky slightly plastic, 10YR 6/2 with IOYR 5/6, 10YR 4/3 and 10YR 6/6 mottles. 2Bg — 24-52"+ Sandy Clay, massive parting to subangular blocky, firm, moderately sticky moderately plastic, IOYR 5/8 with 7.5YR 5/8 and 5Y 6/1 mottles. Physical Water: 41" stabilized 8/13/13 SHWT: 24" Boring 7 — Foot slope 1-2% colluvial deposition over natural soil Bw— 0-11" Loamy Sand colluvium, granular, very friable, non sticky non plastic, 10YR 4/3. Ab—11-18" Sandy Loam, granular, friable slightly sticky non plastic, IOYR 2/1. Btg—18-36"+ Clay Loam, subangular blocky, friable moderately sticky moderately plastic, 2.5Y 4/2 with 10YR 3/6 and 5YR 5/8 mottles. Physical Water: 28" stabilized 8/13/13 SHWT: 18" Boring 8 — Foot Slope 1-2% A — 0-6" Sandy Loam, granular very friable non sticky non plastic, 10YR 3/3. Btg1— 6-22" Sandy Clay Loam, subangular blocky friable slightly sticky slightly plastic, 10YR 6/2 with few 10YR 5/6 mottles. Btg2 — 22-36"+ Sandy Clay Loam, subangular blocky friable slightly sticky slightly plastic, 2.5Y 6/2 with common distinct 10YR 5/8 and 7/5YR 5/8 mottles. Physical Water: 34" stabilized 8/13/13 Boring 9 — Foot Slope 1-2% A — 0-4" Loamy Sand, granular very friable non sticky non plastic, 10YR 3/3. Bt — 4-17" Sandy Clay Loam, angular blocky, firm moderately sticky moderately plastic. 10YR 5/4 with 10YR 5/8 and 10YR 6/3 mottles. Btg-17-27" Sandy Clay Loam, subangular blocky, friable slightly sticky slightly plastic, 10YR 6/2 with 10YR 5/8 and 7.5YR 5/8 mottles. 2Bg — 27-65" Sandy Clay, massive parting to subangular blocky, firm, moderately sticky moderately plastic, 5Y 6/1 with 7.5YR 5/8 and 5YR 5/8 mottles. Physical Water: 60" rising 8/13/13 SHWT: 27" Appendix C Published Description and Chemical and Physical Properties Of the Wrightsboro, Marvyn, Craven and Pantego Soil Series LOCATION WRIGHTSBORO NC+VA Established Series Rev. HJB-JAK 12/2002 WRIGHTSBORO SERIES The Wrightsboro series consists of very deep, moderately well drained soils on broad interstream divides in the lower Coastal Plain. These soils formed in loamy and clayey marine sediments. Slopes range from 0 to 4 percent and are dominantly less than 2 percent. Mean annual precipitation is about 53 inches and mean annual temperature is about 63 degrees F., near the type location. TAXONOMIC CLASS: Fine -loamy, siliceous, semiactive, thermic Aquic Paleudults TYPICAL PEDON: Wrightsboro fine sandy loam --cultivated; elevation of 30 feet. (Colors are for moist soil unless otherwise stated.) Ap--O to 6 inches; grayish brown (10YR 5/2) fine sandy loam; weak medium granular structure; very friable; few fine roots; moderately acid; clear smooth boundary. (6 to 10 inches thick) E--6 to 9 inches; very pale brown (10YR 7/4) fine sandy loam; weak fine granular structure; very friable; few fine roots; strongly acid; clear smooth boundary. (2 to 10 inches thick) Bt1--9 to 24 inches; brownish yellow (10YR 6/6) sandy clay loam; weak medium subangular blocky structure; friable; few distinct clay films on faces of peds and in pores; strongly acid; gradual wavy boundary. Bt2--24 to 36 inches; brownish yellow (10YR 6/6) sandy clay loam; common medium distinct light gray (10YR 7/2) and very pale brown (10YR 6/3) mottles; weak medium subangular blocky structure; friable; slightly sticky, slightly plastic; few distinct clay films on faces of peds and in pores; very strongly acid; gradual wavy boundary. Bt3--36 to 48 inches; brownish yellow (10YR 6/6) sandy clay loam medium; many medium distinct light gray (10YR 7/1) and common medium distinct yellowish red (5YR 5/8) mottles; moderate medium subangular blocky structure; firm, slightly sticky, slightly plastic; common prominent clay films on faces of peds; very strongly acid; clear smooth boundary. (combined thickness of the Bt horizon is 32 to 72 inches) 2Bg--48 to 65 inches; light gray (10YR 7/2) clay with few strata of very fine sand and silt; many coarse distinct yellow (10YR 7/8) and common prominent reddish yellow (SYR 6/6) mottles; common reddish yellow (7.5YR 7/6) mottles surround old root channels; weak fine angular blocky structure; very firm, very sticky, very plastic; few fine flakes of mica; strongly acid. TYPE LOCATION: New Hanover County, North Carolina; 3.5 miles north of Wilmington on U.S. Highway 117,110 feet west of U.S. Highway 117, 50 feet north of Secondary Road 1329. RANGE IN CHARACTERISTICS: Solum thickness is more than 60 inches. Depth to bedrock is more than 60 inches and is commonly more than several hundred feet. The clayey 2B horizon is at a depth of 40 to 80 inches. Soil reaction ranges from very strongly acid to moderately acid, except where surface layers have been limed. Limed soils typically have slightly acid or neutral surface layers. Flakes of mica range from none to common in the B and C horizons. The A or Ap horizon has hue of 10YR to 5Y, value of 4 to 6, and chroma of 1 or 2, or is neutral with value of 4 to 6. It is fine sandy loam, sandy loam, loamy fine sand, or loamy sand. The E horizon has hue of 10YR to 2.5Y, value of 6 or 7, and chroma of 3 to 8. It is fine sandy loam, sandy loam, loamy fine sand, or loamy sand. The BE or BA horizon, where present, has 10YR to 2.5Y, value of 5 or 7, and chroma of 3 to 8. It is fine sandy loam, sandy loam, or loam. The Bt horizon has hue of 10YR or 2.5Y, value of 5 to 7, and chroma of 3 to 8. Mottles are in shades of red, brown, yellow, or gray. Texture is sandy clay loam, clay loam, or loam. Clay content averages 24 to 35 percent and silt content is less than 30 percent. The Btg horizon, where present, has hue of 10YR or 2.5Y, value of 5 to 7, and chroma of 1 or 2, or is neutral with value of 4 to 7. Mottles are in shades of red, brown, yellow, or gray. Texture is sandy clay loam, clay loam, or loam. Clay content averages 24 to 35 percent and silt content is less than 30 percent. The 2Bg horizon has hue of 10YR or 2.5Y, value of 5 to 7, and chroma of 1 or 2, or is neutral with value of 4 to 7. Mottles are in shades of red, brown, yellow, or gray. Texture is clay or sandy clay. Most pedons have lenses or fine strata of sandy or silty material. The 2BCg or 2Cg horizon, where present, has hue of 10YR to 5Y, value of 5 to 7, and chroma of 1 or 2, or is neutral with value of 4 to 7. Mottles are in shades of red, brown, yellow, or gray. Texture is clay or sandy clay. Must pedons have lenses or fine strata of sandy or silty material. COMPETING SERIES: These are the G I�dsto_n Izaeora• Kullit, Quitman and Whitwell soils in the same family, and the Altavista, Tetotum. Craven, Duplin, Foreston Stallings, Johns, Kempsville, and Ogeechee soils in similar families. Goldston and Whitwell soils do not have a lithologic discontinuity within 40 to 80 inches. Altavista and Tetotum soils have mixed mineralogy. Craven and Duplin soils have a clayey particle -size control section. Foreston and Stallings soils have a coarse -loamy particle -size control section. Kullit soils have hue of 5YR in part of the Bt horizon. Johns soils have solum thickness less than 40 inches and have a fine -loamy over sandy or sandy -skeletal particle -size control section. Kempsville soils do not have low chroma mottles in the upper subsoil.. Ogeechee soils have mottles with chroma of 2 or less throughout the upper subsoil. Quitman soils have a Btx horizon, and in addition do not have a lithologic discontinuity and a clayey 2B horizon. GEOGRAPHIC SETTING: Wrightsboro soils are on broad interstream divides in the lower Coastal Plain. Slopes range from 0 to 4 percent, but are dominantly less than 2 percent. The soils formed in fluvial and marine sediments that have mixed mineralogy. The average annual rainfall ranges from about 38 to 55 inches, the frost free season ranges from about 220 to 256 days, and the mean annual air temperature ranges from 59 to 71 degrees F. GEOGRAPHICALLY ASSOCIATED SOILS: These are the competing Cram, Fagg,KOREAN 9929A and agili series and the Pactolus. Pax,rii aTo jhV and fton soils. Pactolus soils are sandy throughout. Paxville and Torhunta soils have an umbric epipedon and Torhunta and Woodington soils have a coarse -loamy particle -size control section. DRAINAGE AND PERMEABILITY: Moderately well drained; slow runoff; and moderate permeability in the upper subsoil (Bt) and slow permeability in the lower subsoil (213g). USE AND VEGETATION: Most area are cleared and used for cultivated crops and pasture. Many areas are used for residential and industrial development. Forested areas are in mixed hardwood and pines with understory of myrtle, gallberry, dogwood, and holly. DISTRIBUTION AND EXTENT: The lower Coastal Plain of North Carolina and possibly South Carolina and Virginia. The series is of small extent. MLRA SOIL SURVEY REGIONAL OFFICE (MO) RESPONSIBLE: Raleigh, North Carolina SERIES ESTABLISHED: New Hanover County, North Carolina; 1974. REMARKS: This series was formerly mapped with Goldsboro and Johns soils. Diagnostic horizons and features recognized in this pedon are: Ochric epipedon - the zone from the surface to a depth of 9 inches (A and E horizons) Argillic horizon - the zone from a depth of 9 to a depth of 48 inches (Bt1, Bt2, and Bt3 horizons) TABULAR SERIES DATA: SOI-5 Soil Name Slope Airtemp FrFr/Seas Precip Elevation NC0011 WRIGHTSBOR 0- 4 59- 70 220-256 38- 55 25- 95 SOI-5 Floodl- FloodH Watertable Kind Months Bedrock Hardness NC0011 NONE 2.0-3.0 APPARENT DEC-FEB 60-60 SOI-5 Depth Texture NC0011 0- 9 LS LFS NC0011 0- 9 SL FSL NC0011 9-48 SCL CL L NC001148-65 C SC 3-Inch No-10 Clay% -CEC- 0- 0 95-100 4-12 1- 5 0- 0 95-100 5-18 1- 6 0- 0 95-10018-35 3- 8 0- 0 95-100 35-60 7-13 SOI-5 Depth -pH- O.M. Salin Permeab Shnk-Swll NC0011 0- 9 4.5- 6.0 .5-2. 0- 0 6.0- 20 LOW NC0011 0- 9 4.5- 6.0 .5-2. 0- 0 2.0- 6.0 LOW NC0011 9-48 4.5- 6.0 0:.5 0- 0 0.6- 2.0 LOW NC001148-65 4.5- 6.0 0.-.5 0- 0 0.06- 0.2 MODERATE National Cooperative Soil Survey U.S.A. LOCATION MARVYN AL+NC Established Series Rev. RBM-PGM; GRB 02/2013 MARVYN SERIES The Marvyn series consists of very deep, well drained, moderately permeable soils on uplands of the Southern Coastal Plain (MLRA 133A). They formed in loamy marine sediments. Near the type location, the mean annual temperature is about 65 degrees F., and the mean annual precipitation is about 54 inches. Slope ranges from 0 to 15 percent TAXONOMIC CLASS: Fine -loamy, kaolinitic, thermic Typic Kanhapludults TYPICAL PEDON: Marvyn loamy sand, on a smooth convex 2 percent slope in a cultivated field (Colors are for moist soil). Ap--O to 7 inches; dark grayish brown (10YR 4/2) loamy sand; weak fine granular structure; very friable; many fine roots; about 5 percent, by volume, rounded pebbles less than one inch in diameter; moderately acid; abrupt smooth boundary. (5 to 12 inches thick) Bt1--7 to 15 inches; yellowish brown (10YR 5/6) sandy loam; weak medium subangular blocky structure; very friable; common fine roots; sand grains bridged and coated with clay; strongly acid; clear smooth boundary. Bt2--15 to 30 inches; strong brown (7.5YR 5/6) sandy clay loam; weak medium subangular blocky structure; friable; few fine roots; common faint clay films on faces of peds; strongly acid; clear smooth boundary. Bt3--30 to 44 inches; brownish yellow (10YR 6/6) sandy clay; moderate medium subangular blocky structure; friable; few fine roots; common faint clay films on faces of peds; many medium prominent red (2.5YR 4/8) mottles; very strongly acid; clear smooth boundary. (Combined thickness of the Bt horizons ranges from 25 to 50 inches) BC--44 to 53 inches; yellowish red (5YR 5/8) sandy clay; weak medium subangular blocky structure; friable; few fine roots; few faint clay films on faces of peds; few fine flakes of mica; common medium prominent brownish yellow (10YR 6/6) discontinuous bands; very strongly acid; abrupt smooth boundary. (4 to 12 inches thick) C--53 to 60 inches; 35 percent red (2.5YR 4/8), 35 percent light olive brown (2.5Y 5/6) and 30 percent light gray (10YR 7/2) sandy clay loam; massive, grading to weak platy; friable; red and light brown portions are sandy loam and sandy clay loam and the light gray portions are sandy clay and clay; colors and textures are in horizontal bands about one centimeter thick; few to common flakes of mica; the areas in red and light olive brown are relict iron accumulations and the areas of light gray are relict iron depletions; very strongly acid; abrupt smooth boundary. (5 to 15 inches thick) 2C--60 to 72 inches; reddish yellow (7.5YR 6/8) sandy loam; massive; friable; few pockets of white (10YR 8/1) clay; very friable; common to many flakes of mica; common medium prominent red (2.5YR 4/8) masses of iron accumulation; very strongly acid. TYPE LOCATION: Lee County, Alabama. Approximately 2.5 miles west of Marvyn on U.S. Highway 80, about 375 feet southwest of the northeast corner of the SW1/4, SE1/4, Sec. 23, T. 17 N., R. 26 E. RANGE IN CHARACTERISTICS: Solum thickness ranges from 40 to 60 inches. Reaction is very strongly acid to moderately acid throughout, except where the surface has been limed. Flakes of mica in the lower part of the Bt horizon range from few to common and from few to many in the BC and C horizons. The upper 20 inches of the kandic horizon averages less than 20 percent silt. The A or Ap horizon has hue of 10YR, value of 3 to 5, and chrome of 2 to 4. Texture is loamy sand, loamy fine sand, sandy loam or fine sandy loam. The E horizon, where present, has hue of 10YR, value of 5 or 6, and chroma 3 or 4. Texture is sand, loamy sand, loamy fine sand, sandy loam or fine sandy loam. The BA or BE horizon, where present, has hue of 7.5YR or 10YR, value of 4 or 5, and chroma of 4 to 8. Texture is sandy loam or sandy clay loam. The upper part of the Bt horizon has hue of 7.5YR or 10YR, value of 4 to 6, and chroma of 4 to 8. Texture is dominantly sandy loam or sandy clay loam. The lower part of the Bt horizon has hue of 7.5YR or 10YR, value of 4 to 6, and chroma of 4 to 8; or there is no dominant color and it is variegated in shades of yellow, brown or red. Mottles in the shades of yellow and red range from one to common. Texture is sandy clay loam or sandy clay. The BC horizon has hue from 5YR to 10YR, value of 5 or 6, and chroma of 4 to 8; or there has no dominant matrix color and is multicolored in shades of yellow, brown, red and gray. Texture is mainly sandy clay or sandy clay loam but ranges to sandy loam and is often stratified. The C horizon is generally thinly stratified and has no dominant matrix color. Color of the strata ranges from a hue of 1OR to 5Y, value of 4 to 7, and chroma of 1 to 8. The coarser -textured strata are generally reddish or brownish in color, while the finer - textured strata are generally grayish in color. Texture ranges from sandy loam to clay. The 2C horizon, where present, is stratified and variegated and has the same range of colors as the C horizon. Texture is loamy sand or sandy loam. COMPETING SERIES: These include the Barnwell, Cowarts and Springhill series in the same family and the Ca g§a, I?rr IMEJ& Kempsville, Smithdale, Stringtown and Suffolk series in similar families of the Southern Coastal Plain. Barnwell and Cowarts soils are on similar positions. In addition, Barnwell soils have densic horizons and Cowarts soils have a solum thickness of less than 40 inches. Springhill soils are on similar to higher positions and have redder subsoils. Cahaba soils are on lower terrace positions that are subject to rare flooding and have redder subsoils. Emporia, Kempsville, Suffolk and Stringtown soils are on similar positions. In addition, Emporia soils have a seasonal high water table within 60 inches of the surface and Kempsville soils have subsoil layers in which 20 to 60 percent of the matrix is brittle. Smithdale soils are on similar to higher positions and have redder subsoils. Suffolk soils have moderately rapidly permeable to rapidly permeable C horizons. Stringtown soils are in the western coastal plain of Texas and contain fragments or strata of shale and sandstone in the BC and C horizons. GEOGRAPHIC SETTING: Marvyn soils are on nearly level to strongly sloping topography on uplands of the Southern Coastal Plain. Dominant slopes are 2 to 5 percent but range from 0 to 15 percent. They formed in marine sediments. The climate is humid subtropical. Near the type location, the average annual temperature ranges from 62 to 68 degrees F, and the average mean annual precipitation ranges from 52 to 56 inches. GEOGRAPHICALLY ASSOCIATED SOILS: These include the competing Cowarts series and theM ftgngk Uchee and Wagram series. Marlboro, Rumford, Uchee and Wagram soils are on similar positions. Marlboro soils have clayey particle -size control sections. Rumford soils have coarse -loamy particle -size control sections. Uchee and Wagram soils have sandy surface and subsurface layers 20 to 40 inches thick. Wmbam soils are on lower adjacent stream terraces and have mixed mineralogy. DRAINAGE AND PERMEABILITY: Well drained; slow to medium runoff; permeability is moderate in the subsoil and moderate to moderately slow in the substratum. USE AND VEGETATION: Most areas of Marvyn soils have been cleared and are used for the production of row crops, mainly cotton. A few small areas are in pasture or in forests of mixed hardwoods and pines. DISTRIBUTION AND EXTENT: Coastal Plain of Alabama and North Carolina; possibly in Georgia and South Carolina. The series is of moderate extent. MLRA SOIL SURVEY REGIONAL OFFICE (MO) RESPONSIBLE: Auburn, Alabama. SERIES ESTABLISHED: Lee County, Alabama;1979. REMARKS: Diagnostic horizons and features recognized in this pedon: Ochric epipedon - the zone from the surface of the soil to a depth of 7 inches (Ap horizon). Kandic horizon - the zone from 7 to 53 inches (Bt1, W, Bt3 and BC horizons). ADDITIONAL DATA: Laboratory data for typifying pedon from Auburn University, Sample Number S73AL-041-3-(1-7), and from the Alabama Highway Department S73AL- 041-3-(1, 4, 7). Laboratory data is available on the National Soil Survey website at: http://ncssiabdatamart.sc.egov.usda.gov/querypage.aspx National Cooperative Soil Survey U.S.A. LOCATION CRAVEN NC+AL GA SC VA Established Series RAG-ENH, Rev. MHC 05/2004 CRAVEN SERIES MLRA(s): 133A, 153A MLRA SOIL SURVEY REGIONAL OFFICE (MO) RESPONSIBLE: Raleigh, North Carolina Depth Class: very deep Drainage Class (Agricultural): moderately well drained Internal Free Water Occurrence: moderately deep, common Index Surface Runoff: negligible to very high Permeability: slow Landscape: Coastal Plain Landform: Uplands Hillslope Profile Position: Geomorphic Component: flats Parent Material: marine sediments Slope: 0 to 12 percent Elevation (type location): 20 to 100 feet Mean Annual Air Temperature (type location): 63 degrees F. Mean Annual Precipitation (type location): 54 inches TAXONOMIC CLASS: Fine, mixed, subactive, thermic Aquic Hapludults TYPICAL PEDON: Craven silt loam - cultivated. (Colors are for moist soil.) Ap--O to 7 inches; grayish brown (10YR 5/2) silt loam; weak medium granular structure; very friable; common fine and medium roots; slightly acid; clear smooth boundary. (4 to 10 inches thick) E--7 to 9 inches; light yellowish brown (10YR 6/4) silt loam; weak medium subangular blocky structure; very friable; few fine and medium roots; very strongly acid; clear wavy boundary. (0 to 5 inches thick) Bt1--9 to 12 inches; brownish yellow (10YR 6/6) silty clay loam; moderate fine and medium subangular blocky structure; firm; slightly sticky, slightly plastic; thin discontinuous clay films on faces of peds;.few fine and medium roots; common fine and medium pores; very strongly acid; clear wavy boundary. Bt2--12 to 22 inches; brownish yellow (10YR 6/6) silty clay; common fine distinct yellowish red (5YR 5/8) mottles; moderate fine angular blocky structure; very firm, sticky, plastic, thin continuous clay films on faces of peds; few fine roots; common fine pores; very strongly acid; clear wavy boundary. Bt3--22 to 36 inches; brownish yellow (10YR 6/6) silty clay; common fine and rriediurn distinct gray (10YR 6/1) and common fine distinct yellowish red (5YR 5/8) mottles; moderate fine and medium angular blocky structure; very firm, sticky, plastic; thin continuous clay films on faces of peds; few fine pores; very strongly acid; gradual wavy boundary. BM-36 to 46 inches; light yellowish brown (10YR 6/4) clay; many medium distinct gray (10YR 6/1), common medium distinct reddish yellow (7.5YR 6/8), and common fine distinct red (2.5YR 4/8) mottles; weak medium angular blocky structure; very firm, sticky, plastic; thin continuous clay films on faces of peds; very strongly acid; gradual wavy boundary. (Combined thickness of Bt ranges from 24 to 50 inches.) BC--46 to 54 inches; gray (10YR 6/1) clay; common medium faint pale brown (10YR 6/3), common fine and medium distinct reddish yellow (7.5YR 6/8), and common fine prominent red (2.5YR 4/8) mottles; weak medium platy structure; very firm, sticky, plastic; very strongly acid; clear wavy boundary. (0 to 25 inches thick) C1--54 to 70 inches; brownish yellow (10YR 6/6) sandy loam; common lenses and pockets of sandy clay loam; common fine faint reddish yellow (7.5YR 6/8) and few fine and medium distinct light gray (10YR 7/1) mottles; massive; very friable; very strongly acid; gradual wavy boundary. C2--70 to 80 inches; brownish yellow (10YR 6/6) loamy sand; common fine and medium faint reddish yellow (7.5YR 6/8) and few fine and medium distinct light gray (10YR 7/1) mottles; massive; very friable; very strongly acid. TYPE LOCATION: Craven County, North Carolina; 4 miles northwest of Vanceboro on N.C. 43; 0.6 mile east on S.R. 1644; 30 feet west of road in cultivated field. RANGE IN CHARACTERISTICS: Depth to Bedrock: Greater than 60 inches Depth to Seasonal High Water Table: 24 to 36 inches, December to April Rock Fragment content: 0 to 3 percent, by volume, throughout Soil Reaction: extremely acid to strongly acid, except where limed RANGE OF INDIVIDUAL HORIZONS: A or Ap Horizon: Color --hue of 10YR or 2.5Y, value of 3 to 6, and chroma of 1 to 3 Texture (fine -earth fraction)-- loam, silt loam, very fine sandy loam, or fine sandy loam. Eroded pedons are clay loam, sandy clay loam or silty clay loam. E horizon: Color --hue of 10YR to 5Y, value of 5 to 7, and chroma of 2 to 4 Texture (fine -earth fraction)-- loam, silt loam, very fine sandy loam, or fine sandy loam. BE or BA horizon (if it occurs): Color --hue of 10YR or 2.5Y, value of 4 to 7, and chroma of 3 to 8 Texture (fine -earth fraction)-- loam, clay loam, silt clay loam, or sandy clay loam. Bt horizon (upper part): Color --hue of 7.5YR to 2.5Y, value of 5 to 7, and chroma of 3 to 8 Texture (fine -earth fraction)-- clay loam, silty clay loam, silty clay, or clay Other features-- average clay content of the Bt horizon is 35 to 55 percent and silt plus the very fine sand content is more than 30 percent Bt horizon (lower part): Color --hue of 7.5YR to 2.5Y, value of 5 to 7, and chroma of 3 to 8 with few to many mottles of chroma 2 or less or hue of 10YR or 2.5Y, value of 5 to 7, and chroma of 1 to 2 with iron masses in shades of red, yellow, and brown Texture (fine -earth fraction)-- clay loam, silty clay loam, silty clay, or clay Other features-- average clay content of the Bt horizon is 35 to 55 percent and silt plus the very fine sand content is more than 30 percent BC or BCg horizon: Color --hue of 10YR or 2.5Y, value of 5 to 7, and chroma of 1 or 2 with mottles in shades of red, yellow, or brown. Some pedons have BC horizons with dominant chroma of 3 or more and many mottles of chroma 2 or less Texture (fine -earth fraction)-- silty clay loam, clay loam, silty clay, clay, sandy clay, or sandy clay loam C horizon: Color --hue of 10YR to 2.5Y, value of 5 to 7, and chroma of 1 to 6. Pedons with dominant chroma of 3 or more have many mottles of chroma 2 or less Texture (fine -earth fraction)-- clay loam, loam, sandy clay loam, sandy loam, or loamy sand. Redoximorphic features -- in shades of red, brown, and yellow are in most pedons COMPETING SERIES: Eulonia soilshas less than 30 percent silt in the PSCS Maubila soilshave fragments of ironstone Nevarc soilshas a perched water table GEOGRAPHIC SETTING: Landscape: Coatal Plain Landform: Upland Geomorphic Component: Flat Parent Material: Marine sediments Elevation: 20 to 100 feet Mean Annual Air Temperature: 59 to 67 degrees Mean Annual Precipitation: 40 to 60 inches Frost Free Period: GEOGRAPHICALLY ASSOCIATED SOILS: Bayboro soils— have poorer drainage and are on lower landscape positions Biaden soils-- have poorer drainage and are on lower landscape positions Exurn soils— have less clay Goldsboro soils-- have less clay Grantham soils-- have poorer drainage and are on lower landscape positions Leaf soils-- have poorer drainage and are on lower landscape positions Lenoir soils-- have poorer drainage and are on lower landscape positions Lynchburg soils— have poorer drainage and are on lower landscape positions Nahunta soils-- have poorer drainage and are on lower landscape positions Norfolk soils-- have less clay and occur on higher, well drained landscape positions Rains soils-- have poorer drainage and are on lower landscape positions DRAINAGE AND PERMEABILITY: Drainage class (Agricultural): moderately well drained Index Surface Runoff: negligible to very high Internal Free Water Occurrence: moderately deep, common Permeability: slow USE AND VEGETATION: Major Uses: crops and woodland Dominant Vegetation: Where cultivated-- corn, soybeans, tobacco, cotton, small grain, peanuts, and pasture. Where wooded-- loblolly pine (Pinus taeda), red maple (Acer rubrum), sweetgum (Liquidambar styraciflua), water oak (Quercus nigra), southern red oak (Quercus falcata), yellow -poplar (Liriodendro tulipifera), blackgum (Nyssa sylvatica), white oak (Quercus alba), post oak (Quercus stellata), American holly (Ilex opaca), and other overstory species. Understory species include bitter gallberry (Ilex glabra), sourwood (Oxydendrum arboreum), flowering dogwood (Cornus florida), wax myrtle (Myrica cerifera), blueberry (Vaccinium spp.), grape (Vitus spp.), Carolina jessamine (Gelsemium sempervirens), large gallberry (Ilex coriacea), honeysuckle (Lonicera spp.), and summersweet ciethra (sweet pepperbush) (Clethra alnifolia).. DISTRIBUTION AND EXTENT: Distribution: Coastal Plain of North Carolina, South Carolina, Georgia, Virginia, and perhaps other southern states Extent: large MLRA SOIL SURVEY REGIONAL OFFICE (MO) RESPONSIBLE: Raleigh, North Carolina SERIES ESTABLISHED: Craven County, North Carolina, 1930. REMARKS: Newseries soils were previously mapped as... Diagnostic horizons and soil characteristics recognized in this pedon are: Ochric epipedon--the zone from 0 to 9 inches (Ap & E horizon) Argillic horizon --the zone from 9 to 46 inches (Bt horizons) Aquic conditions --the soil has redox depletions and concentrations within the upper 24 inches of the argillic horizon, with periodic saturation and reduction at some time during the year Series control section --the zone from 0 to 60 inches ADDITIONAL DATA: (1) This series is among Benchmark soils; characterization data at type location exists in S77NC-49-1 and on alternate site S78NC-49-44. (2) North Carolina State University (a) Swelling pressure and COLE data on undisturbed B horizon samples at the type location in Craven Co., North Carolina. Bt1 Bt2 Bt3 Swelling pressure (lbs/sq in) 1081002 141 COLE .04.06.04 (b) Saturated hydraulic conductivity (K) data from 1 pedon Craven Co., North Carolina; from undisturbed 3-inch cores collected for cooperative research by N.C.S.U., SCS, and the Craven County Health Department. Horizon Depth (in.) K (in./hr.) Ap 1-4 1.88-2.16 A2 6-9 0.18-0.32 Bt1 13-16 0.09-0.10 Bt1 20-23 0.16 Bt2 29-32 0.14 Bt3 40-43 0.13 Data Map Unit ID (type location): 00000 TABULAR SERIES DATA: Soil Name Slope Airtemp FrFr/Seas Precip Elevation CRAVEN 0-12 59- 64 190-240 40- 52 20- 100 FloodL FloodH Watertable Kind Months Bedrock Hardness NONE 2.0-3.0 APPARENT DEC -APR 60-60 Depth Texture 3-Inch No-10 Clay% -CEC- 0- 9 L FSL SIL 0- 0 95-100 7-27 - 0- 9 CL SICL SCL 0- 0 95-100 27-40 - 9-54 C SiC SICL 0- 0 95-100 35-60 - 54-80 CL SL LS 0- 0 95-100 5-35 - Depth -pH- O.M. Salin Permeab Shnk-Swll 0- 9 3.5- 6.5 .5-2. 0- 0 0.2- 2.0 LOW 0- 9 3.5- 5.5 .5-2. 0- 0 0.06- 0.2 MODERATE 9-54 3.5- 5.5 0.-0. 0- 0 0.06- 0.2 MODERATE 54-80 3.5- 5.5 0.-0. 0- 0 0.2- 6.0 LOW National Cooperative Soil Survey U.S.A. LOCATION PANTEGO NC+FL SC VA Established Series Rev. AG 07/1999 PANTEGO SERIES The Pantego series consists of very deep, very poorly drained, moderately permeable soils that formed in thick loamy sediments on the Southern Coastal Plain and Atlantic Coast Flatwoods. Slopes are less than 2 percent. Near the type location mean annual temperature is 62 degrees F., and mean annual precipitation is 48 inches. TAXONOMIC CLASS: Fine -loamy, siliceous, semiactive, thermic Umbric Paleaquults TYPICAL PEDON: Pantego loam --cultivated field. (Colors are for moist soil unless. otherwise stated.) Ap--O to 10 inches; black (10YR 2/1) loam; weak fine granular structure; very friable; many fine roots; very strongly acid; gradual wavy boundary. (0 to 12 inches thick) A--10 to 18 inches; very dark gray (10YR 3/1) loam; weak fine granular structure; friable; very strongly acid; clear smooth boundary. (4 to 14 inches thick) Bt--18 to 27 inches; very dark gray (10YR 3/1) sandy clay loam; weak fine subangular blocky structure; friable; few faint clay films on faces of peds and in pores; very strongly acid; gradual wavy boundary. (0 to 18 inches thick) Btg1--27 to 42 inches; gray (10YR 5/1) sandy clay loam; few fine and medium distinct mottles of brownish yellow (10YR 6/6); weak fine and medium subangular blocky structure; friable; slightly sticky; few faint clay films on faces of peds; very strongly acid; gradual smooth boundary. Btg2--42 to 55 inches; gray (10YR 6/1) sandy clay loam; few medium and coarse distinct mottles of yellowish brown (10YR 5/6); weak fine subangular blocky structure; friable, slightly sticky; few faint clay films on faces of peds; very strongly acid; gradual wavy boundary. Btg3--55 to 65 inches; gray (10YR 6/1) sandy clay loam; weak coarse subangular blocky structure; friable; few faint clay films on faces of peds; very strongly acid. (Combined thickness of the Btg horizons is 30 to more than 60 inches.) TYPE LOCATION: Pitt County, North Carolina; 1/2 mile south of Winterville, North Carolina, on Highway 11, 100 feet west from road. RANGE IN CHARACTERISTICS: Solum thickness is greater than 60 inches. The soil is strongly acid, very strongly acid, or extremely acid except where the surface has been limed. Some pedons have an Oa horizon that has hue of 10YR, value of 2 or 3, and chroma of 1; or it is neutral and has value of 2. It is less than 8 inches thick. The A or Ap horizon has hue of 10YR or 2.5Y or is neutral, value of 2 or 3, and chroma of 0 to 2. It js loamy fine sand, loamy sand, fine sandy loam, sandy loam, loam, or mucky analogues of these textures. Some pedons have an Eg horizon that has hue of 10YR or 2.5Y or is neutral, value of 4 to 6, and chroma of 0 to 2. It is loamy sand, loamy fine sand, sandy loam, fine sandy loam, or loam. Some pedons have a BEg horizon that has hue of 10YR or 2.5Y, value of 4 or 6, and chroma of 1 or 2. It is loam, sandy loam, fine sandy loam, or sandy clay loam. The Bt horizon, where present, has hue of 10YR or 2.5Y, value of 3, and chroma of 1 or 2. It has the same textures as the Btg horizon. The Btg horizon has hue of 10YR to 5Y, value of 4 to 7, and chroma of 1 or 2 with few to common mottles of higher chroma. The Btg horizon is sandy clay loam, sandy loam, sandy clay, or clay loam, fine sandy loam, or sandy loam. Some pedons have a BCg horizon that has hue of 10YR or 2.5Y, value of 4 to 7, and chroma of 1 or 2. It is sandy clay loam, clay loam, sandy clay, sandy loam, or fine sandy loam. The Cg horizon, where present, has hue of 10YR or 2.5Y, value of 5 to 7, and chroma of 1 or 2 with higher chroma mottles. It is sandy clay loam, clay loam, sandy loam, fine sandy loam, loamy fine sand, fine sand, loamy sand, or sand. COMPETING SERIES: There are no other series in the same family. lffift Dim m. QM i ear belie.y ft Lumbe Pg !i td, Pov rno_ut Reim r Torhunta, and Week,�uilfe series are in closely related families. Bayboro, Byars, and Cape Fear soils have Btg horizons containing more than 35 percent clay. Ellabelle and Surrency soils have arenic umbric epipedons_ Hyde soils have mixed mineralogy. Johnston, Torhunta, and Weeksville soils lack Btg horizons. Lumbee and Rains soils have ochric epipedons and, in addition, Lumbee soils have thinner sola. Pocomoke soils have sandy BCg horizons at depths of 40 to 60 inches. Portsmouth soils have mixed mineralogy and a decrease in clay of 20 percent or more within 60 inches of the surface. GEOGRAPHIC SETTING: Pantego soils are in nearly level and slightly depressional areas of the Southern Coastal Plain and Alantic Coast Flatwoods. Slope gradients are less than 2 percent. The soil formed in medium -textured -Coastal Plain deposits. Mean annual temperature is 62 degrees F. near the type location, and mean annual rainfall is about 48 inches. GEOGRAPHICALLY ASSOCIATED SOILS: In addition to the competing Byars. Rains, and TPAUM series, these include Coy QLq hard. Dunbar. Du lin Goldsboro. Lynchburg. Marlboro, Norfolk and Rutlege series. Except for Rutlege, these soils lack umbric epipedons and are better drained than Pantego soils. Rutlege soils are sandy throughout. DRAINAGE AND PERMEABILITY: Very poorly drained; ponded to very slow runoff; moderate permeability. The water table is at or near the surface during wet seasons. USE AND VEGETATION: Most of the areas are in forests and the native vegetation consists of water tupelo, water, oaks, willow oak, sweetgum, blackgum, red maple, bald cypress, and pond, loblolly and slash pines. The understory includes inkberry, gallberry, sweetbay, greenbrier, southern bayberry, swamp cyrilla, switch cane and ferns. Cleared areas are used primarily for corn, soybeans, small grain, truck crops, hay, and pasture. DISTRIBUTION AND EXTENT: Coastal Plain of Alabama, Florida, Georgia, Louisiana, Mississippi, North Carolina, South Carolina, and Virginia. The series is of moderate extent. MLRA SOIL SURVEY REGIONAL OFFICE (MO) RESPONSIBLE: Raleigh, North Carolina SERIES ESTABLISHED: Pitt County, North Carolina; 1969. REMARKS: Diagnostic horizons and features recognized in this pedon are: Umbric epipedon - the zone from the surface to a depth of 27 inches (the Ap, A and Bt horizons) Argillic horizon - the zone from a depth of 18 to 65 inches (the Bt, Btg1, Btg2, and Btg3 horizons) MLRA: 133A, 153A SIR: NCO051, NCO218 (Flooded), NCO217 (Ponded) TABULAR SERIES DATA: SOI-5 Soil Name Slope Airtemp FrFr/Seas Precip Elevation NCO051 PANTEGO 0- 2 59- 70 190-310 38- 60 25- 450 NCO217 PANTEGO 0- 1 59- 70 190-310 50- 60 25- 300 NCO218 PANTEGO 0- 2 59- 70 190-310 38- 60 25- 300 S01-5 FloodL FloodH Watertable Kind Months Bedrock Hardness NCO051 NONE RARE 0-1.0 APPARENT NOV-MAY 60-60 NCO217 NONE - APPARENT - 60-60 NCO218 COMMON 0-1.0 APPARENT JAN-DEC 60-60 SOI-5 Depth Texture 3-Inch No-10 Clay% -CEC- NC0051 0-18 MK-L MK-FSL 0- 0 95-100 5-15 11-18 NCO051 0-18 L FSL SL 0- 0 95-100 5-15 5-13 NCO051 0-18 LFS LS 0- 0 95-100 4-10 4-12 NCO051 18-42 SCL SL CL 0- 0 95-10018-35 4- 8 NCO05142-65 CL SC SCL 0- 0 95-100 20-40 4- 9 NCO217 0- 5 MK-LS LS LFS 0- 0 95-100 4-10 11- 18 NCO217 0- 5 L FSL SL 0- 0 95-100 5-15 5-13 NCO217 0- 5 MUCK 0- 0 - 0- 0 4-12 NCO217 5-32 SL SCL CL 0- 0 95-10018-35 4- 8 NCO217 32-64 SC SCL CL 0- 0 95-100 20-40 4- 9 NCO218 0-18 MK-L MK-FSL MK-SL 0- 0 95-100 5-15 11= 18 NCO218 0-18 L FSL SL 0- 0 95-100 5-15 5-13 NCO218 0-18 MK-LS MK-FSL 0- 0 95-100 4-10 4-12 NCO21818-42 SCL SL CL 0- 0 95-10018-35 4- 8 NCO218 42-65 CL SC SCL 0- 0 95-100 20-40 4- 9 SOI-5 Depth -pH- O.M. Salin Permeab Shnk-Swll NCO051 0-18 3.5- 5.5 10-15 0- 0 0.6- 2.0 LOW NCO051 0-18 3.5- 5.5 4: 10 0- 0 2.0- 6.0 LOW NCO051 0-18 3.5- 5.5 3: 10 0- 0 2.0- 6.0 LOW NC005118-42 3.5- 5.5 .5-2. 0- 0 0.6- 2.0 LOW NCO05142-65 3.5- 5.5 0.-.5 0- 0 0.6- 2.0 LOW NCO217 0- 5 3.5- 5.5 6.45 0- 2 2.0- 6.0 LOW NCO217 0- 5 3.5- 5.5 4: 10 0- 2 2.0- 6.0 LOW NCO217 0- 5 3.5- 5.5 25-99 0- 2 6.0- 20 LOW NCO217 5-32 3.5- 5.5 .5-2. 0-2 0.6- 2.0 LOW NCO217 32-64 3.5- 5.5 .5-1. 0-2 0.2- 0.6 LOW NCO218 0-18 3.5- 5.5 10-15 0-0 0.6- 2.0 LOW NCO218 0-18 3.5- 5.5 4.40 0- 0 2.0- 6.0 LOW NCO218 0-18 3.5- 5.5 10-15 0- 0 2.0- 6.0 LOW NCO21818-42 3.5- 5.5 .5-2. 0-0 0.6-2.0 LOW NCO218 42-65 3.5- 5.5 0.-.5 0-0 0.6-2.0 LOW National Cooperative Soil Survey U.S.A. THOMAS & HUTTON 1350 FARROW PARKWAY I MYRTLE BEACH, SC 29577 POST OFFICE BOX 8000 1 MYRTLE BEACH, SC 29578-8000 843.839.3545 1 WWW.THOMASANDHUTTON.COM August 27, 2013 Ms. Christine Nelson NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Stormwater Management The Overlook at Middle Sound, NC 24039.0001,500 Dear Ms. Nelson: At the Owner's request, Land Management Group (LMG) has prepared a second opinion on the SHWT for this project. A copy of their report is attached for your review. LMG provided a range for the seasonal high water table, We established the normal pool elevation for Pond 2 based on their geometric mean of 7.2' MSL instead of the 8.0' MSL that was submitted previously. We have revised the Pond 2 stormwater wet detention supplements, dry detention supplement, level spreader supplement, stormwater report, calculations, and plans to reflect the SHWT of 7.2' for Pond 2. Attached please find 2 copies of the revised Pond 2 supplements, stormwater report, construction plans, and LMG's report for your review. Please let me know if you have any questions or if you need any additional information. Please feel free to contact me at (843) 839-8424 should you have any questions or comments. Thank you for your time and assistance with this project. Sincerely, THOMAS & HUTTON CA I a� !ohn Richards, PE Principal/Project Manager j DECEIVED AUG 2 a zop BY: SAVANNAH, GA I CHARLESTON, SC I WILMINGTON, NC I BRUNSWICK, GA ' R 1' THOMAS & HUTTON Engineering I Surveying I Planning I GIS I Consulting TO: Ms. Christine Nelson NCDENR Division of Water Quality 127 C ardlnd Drive Extension Wilmington, NC 28405 Letter of Transmittal Date: 8/27/ 13 Job 24039.0001.500 Re: Overlook WE ARE SENDING YOU THE FOLLOWING ITEMS (❑ attached) (❑ under separate cover via UPS ) ❑ Shop Drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ❑ Other: Copies Date Description 1 8-27-13 Cover Letter 1 Pond 2 information 1 Land Management Group Report 1 8-27-13 Stormwater report 2 sets 8-27-13 Site Plans THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ For Approval ❑ Approved as Submitted ❑ For Your Use ❑ Approved as Noted ❑ As Requested ❑ Returned for Corrections ❑ For Review and Comment Remarks Copy to ❑ Resubmit Copies for Approval ❑ Submit Copies for Distribution ❑ Return Corrected Prints RECEIWE�j AUG 18 ZOq I' Y BY: Signed IcialNumey 1350 Farrow Parkway I PO Sox 80001 Myrtle Beach, SC 295781843.839.35451 Fax 843.839.3565 9oee00000eoo�� • ti• i n 2 THOMAS &HUTTON: Z m ; ENGINEERS •OF H STORMWATER MANAGEMENT REPORT AND EROSION CONTROL DESIGN CONSIDERATIONS FOR: THE OVERLOOK AT MIDDLE SOUND ANEW HANOVER COUNTY, NORTH CAROLINA PREPARED FOR: D.R. HORTON, INC 24039.0001 ��•�wnxiw�wiwti °••�' FEBRUARY 2013 - = REVISED AUGUST 2013 ay: Is►+�a�A'�1NE��`A`A� Q a Prepared by: I I I �v THOMAS Sc HUTTON Savannah, GA I Charleston, SC I Myrtle Beach, SC I Brunswick, GA I Wilmington, NC STORMWATER MANAGEMENT REPORT and EROSION CONTROL DESIGN CONSIDERATIONS The Overlook at Middle Sound Project: The Overlook at Middle Sound T&H Job Number: 24039.0001.406 Location: 3210 Middle Sound Loop Road, Wilmington, NC Date Prepared: February 2013 Revised: Owner: DR Horton, Inc. Address: 4073 Belle Terre Blvd Myrtle Beach, SC 29579 Phone: 704-804-9781 Engineer: Thomas & Hutton Engineering Co. Address: 215 S. Kerr Avenue Wilmington, NC 28403 Phone: 910-332-3400 Report Prepared By: Brian Riley Report Reviewed By: John D. Richards, P.E. Date: 2/28/13 Date: 2/28/13 Page The Overlook at Middle Sound Stormwater Management Report and Erosion Control Design Considerations TABLE OF CONTENTS Section 1 -Summary of Results.........................................................................................................Page 1 Section2 - Project Narrative............................................................................................................. Page 2 Section3 - Purpose............................................................................................................................. Page 3 Section 4 - Proposed Drainage System........................................................................................... Page 3 Section 5 - Stormwater Quantity Methodology............................................................................. Page 4 Section6 Hydrology.........................................................................................................................Page 5 Section 7 Pre -Development Runoff Calculations........................................................................Page 5 Section 8 - Post -Development Runoff Calculations...................................................................... Page 6 Section 9 Pre -Development Conditions........................................................................................Page 6 Section 10 - Tail water Conditions.................................................................................................... Page 7 Section 1 1 - Post -Development Conditions.................................................................................... Page 7 Section12 Conclusions.................................................................................................................... Page 7 ADDendice5 USGSVicinity Map..................................................................................................................... Appendix A Pre and Post -Development Time of Concentration and Curve Numbers .......................Appendix B Pre and Post -Development ICPR Model Input.....................................................................Appendix C Pre and Post -Development [CPR Model Output.................................................................. Appendix D Offsite Drainage Design Considerations................................................................................Appendix E Post -Development Stormwater Piping and Inlet Design Considerations ........................... Appendix F Water Quality Design Considerat[ons (Wet Ponds, Dry Ponds & Level Spreaders) ......... Appendix G Rip Rap Outlet Structure Design Considerations.................................................................. Appendix H Sediment Basin Design Considerations....................................................................................Appendix I Pond Routing Calculations (Primary Outlet Structure Non-Functional).........................Appendix J County Swale, Culvert, and Sediment Trap Calcs ......................................................Appendix K Page it Page Z:\24039\24039.0001\Enginee6ng\Calculaflons\Storm Water\OLD\24039 Stormwater Management Report revised 5-16-13.doc The Overlook at Middle Sound Stormwater Management Report and Erosion Control Design Considerations The following can be found in pockets at the end of this report: Pre -Development Drainage Exhibit...................................................................................11"x 17" Exhibit Post -Development Drainage Exhibit.................................................................................11 " x 17" Exhibit Page ;ii ,.y.. - File: Z:\24039\24039.0001\Engineering\Calculations\Storm Water\OLD\24039Stonnwater Management Report.doc The Overlook at Middle Sound Stormwater Management Report and Erosion Control Design Considerations SECTION 1 - SUMMARY OF RESULTS The development plan includes piping a portion of the existing ditch that conveys appio irnalely 38.1 acres of off site runoff from the existing single family development along Sandybrook Road. The offsite drainage area was estimated based on the statewide 2' Lidar Topography provided by the North Carolina Department of Transportaiton. The offsite runoff volume was calculated using the rational method and therectical headwater elevations at the culverts were estimated using Hydraflow. Headwater elevations were evaluated for the 100-year storm event and estimated to below the existing grade along Sandybrrok Road. See Appendix E in this report for the design considerations. Table 1 A below demonstrates the design of the on site stormwater management system meets the intent of the County's ordinance to limit the post -development runoff to the pre -development rates for the 2, 10 and 25-year events. Table 2 provides a summary of peak lake stages and water quality draw down times. TABLE 1 A Summary of Results - Peak Runoff Condition Peak Runoff Ws 1- r 2- r 10- 25- r 100- r BNDY1 Pre -development 1.83 3.94 13.15 21.43 38.80 BNDY1 Post -development 0.16 0.82 12.10 21.19 50.19 BNDY2 Pre -development 5.69 8.51 18.33 25.89 40.51 BNDY2 Post-deveio ment 0.64 2.81 16.29 25.54 4500 TABLE 2 Summary of Results - Peak Pond Stages Basin/Pond NWL ft TOB ft Peak Pond Sta e ft - results from watershed model Water Quality Drawdown Time i- r 2- r 10- r 25- r 100- r Days Wet # 1 6.50 11.00 8.26 8.69 9.17 9.72 10.12 3.22 Dry # 1 6.00 12.00 7.11 7.28 7.31 7.33 7.35 3.06 WE#2 7.2 __f i I.00 8.85 8.95 9.36 966 989 3.01 D 7.00 1180 l .801 7.95 7.96 7.98 7.99 301 2.56 Pi T14019AS & .60`Tm Z:\24039\24039.0000\Engineering\Calculations\Storm Water\24039 Stormwater Management Report.doc Page 1 The Overlook at Middle Sound Stormwater Management Report and Erosion Control Design Considerations SECTION 2 - PROJECT NARRATIVE The Overlook at Middle Sound is a 30.6-acre single-family development located at 3610 Middle Sound Loop Road that was previously designed by Maplass Engineering, P.C. and partially constructued in 2007. The stormwater management system was permitted under New Hanover County ATC # GP 6-07 and North Carolina Department of Natural Resources Division of Water Quality (NCDENR DWQ) Permit SW8 070303. The site has been abandoned and repossessed by the bank after being partially cleared with gravity sewer installed and several stormwater ponds partially constructed. The developer of the new site plan is D.R. Horton Inc. The new development plan will consist of 42 lots, new road layout and a new stormwater management system. The new plan will utilize the existing sewer installed. The site currently consists of partial clearing, wooded uplands and wetlands, with terrain ranging from 0 to 5 percent slopes. This tract drains to the northeast to an unnamed tributary of Pages Creek that is part of the Cape Fear River Basin. Pages Creek is classified as SA/HQW, index # 18- 87-22. Based on the above referenced NCDENR DWQ permit, the site is within '/2 mile and draining to the SA/HQW waters of Pages Creek. The predominant soil types on site are classified as hydrologic soil group A, B, B/D and C. The proposed project will remain a High Density project under the State Stormwater Rules established by NCDENR DWQ. A piped collection system will route runoff of all impervious surfaces to the two proposed wet detention ponds. Each wet detention pond will consist of three separate discharges. The water quality volume (the difference between the 1-year pre and post runoff) will discharge via orfice flow to a secondary dry detention basin before being released to the adjacent wetlands over a 2-5 day period. The excess volume above the water quality volume up to the 10-year runoff volume, will discharge to a level spreader with a 50' engineered filter strip. Each level spreader will have an engineered flow splitter box to act as a high flow bypass. The volume above the 10-year event will discharge over a wide rip rap wier along the bank of the wet detention pond. The area of land disturbance for the proposed improvements is approximately 21.79 acres. Erosion control devices will consist of, but not limited to, temporary silt fencing, temporary gravel construction entrance/exit, two sediment skimmer basins, inlet protections, grassing, and energy dissipaters at outlets and areas of concentrated flows. Silt fence will be installed around the perimeters of the disturbance areas where practical to prevent sediment from leaving the construction areas. The two sediment skimmer basins will be converted to permanent wet detention ponds once the site is stabilized. The site has an existing jurisdictional ditch that is currently being permitted for a culvert crossing by the ACOE. The ditch will be preserved during initial clearing & grubbing operations until such time the culvert is installed. Culvert installation will be scheduled during around a forecasted dry period. The fill slopes from the culvert installation will be permanently stabilized immediately after culvert installation. The anticipated construction sequence consists of the following: 1. Install gravel construction entrance/exit, silt fence and tree protection. 2. Culvert installation at ditch crossing including stabilization. 3. Clearing and grubbing. 4. Install sediment basins. 5. Install remaining drainage conveyances and erosion control. 6. Site rough grading and infrastructure. N THOMAS & HUTTON Z:\24039\24039.0001 \Engineering\Calcu!ations\Storm Water\OLD\24039 Stormwater Management Report.doc Page 2 The Overlook at Middle Sound Stormwater Management Report and Erosion Control Design Considerations 7. Sidewalks and paving. 8. Final grassing and stabilization. 9. Restore drainage conveyances to design specifications, convert sediment basins to permanent wet detention ponds & remove temporary erosion control measures once site is permanently stabilized. SECTION 3 - PURPOSE ■ To define the limits of the drainage basin or basins that contain this project. ■ To define the tailwater conditions for the project. • To analyze 100-year storm events to demonstrate function of ponds beyond the required storm events relative to elevations of finished floor elevations of structures and performance of emergency overflow structures. ■ To document that major drainage infrastructure such as road crossings, drainage connectors, ponds, and outfalls are adequate for the proposed development within the site. ■ To document compliance with the New Hanover County Soil Erosion and Sedimentation Control Ordinance. ■ To document compliance with regulatory requirements summarized as follows: New Hanover County • Post Development peak runoff rates shall be detained for 2, 10 and 25- year storm. • Peak stages in lakes shall be below the minimum Finished Floor Elevations. • Drainage culverts shall be sized to accommodate runoff from at least the 25-year storm. The conveyance systems for this project will be privately owned and maintained. NCDENR D WQ • Control systems are designed for the States water quality requirements of 1.5 inches of runoff or the difference between the 1-year, 24 hour pre and post development runoff volume, whichever is greater with a drawdown time between 2-5 days. • Control systems designed for a minimum of 85% average annual removal for total suspended solids, (TSS). SECTION 4 - PROPOSED DRAINAGE SYSTEM The components of the proposed system are roads, pipe collection system, wet detention ponds, dry detention ponds, level spreaders with vegetative filter strips and outfalls. All impervious surfaces proposed in this project are routed to the wet detention ponds for treatement prior to discharge. The outfall consists of culverts draining through 2 outfall structures containing weirs sized to provide the necessary detention of runoff. An emergency overflow is provided for both ponds. A THOMAS & HUTTON Z:\24039\24039.0001\Engineering\Calculations\Storm Water\OLD\24039 Stormwater Management Report.doc Page 3 The Overlook at Middle Sound Stormwater Management Report and Erosion Control Desian_Considera tions SECTION 5 - STORMWATER QUANTITY METHODOLOGY The existing and proposed conditions will be analyzed using the Advanced Interconnected Channel and Pond Routing (ICPR) computer program developed by Streamline Technologies. The program is used to model rainfall and stormwater runoff and to perform hydraulic routing through the storm drainage system. The ICPR program is a FEMA approved model that has the ability to analyze complex interconnected drainage systems dynamically over extended time periods. The hydrologic input data consists of information for each drainage basin, or subwatershed, within the project. Input variables include runoff curve number, rainfall distribution pattern, hydrograph peaking factor, area of each drainage basin, and time of concentration (see below section "Hydrology" for specifics on the values of these variables that were used in this model). The ICPR program generates runoff hydrographs for each subwatershed based on the user -specified variables. Hydrographs are generated by ICPR using the SCS Unit Hydrograph Method. The model hydraulic input data consists of a system of nodes and links. Nodes represent locations where flows enter or exit the system, pipe or channel characteristics change, or where stage/storage/time relationships are provided. Links represent traditional types of hydraulic conveyance such as pipes, channels, drop structures, weirs, etc. The sizes, inverts, lengths, and Manning n values for all pipes connecting the lagoons are input into the model. In addition to Dioe information, all lagoon and detention area stage -storage information and the respective outfall structure information is input into the model. The node and link conditions are analyzed within the model for a given storm, and flow conditions are determined. The basic equation used by ICPR to route flows through the system is: es= Pin - Qout) At Where: As = Change in storage for time step Qin Flow into a node at time "t" Qout Flow out of a node at time "t" At = Length of time step; user defined range from 1.0 sec to 0.1 sec. Hydrographs for each drainage area are merged within the ICPR program, and the hydrologic results are then combined with the hydraulic information to model the hydraulic interactions of the entire drainage system. The results include lagoon and detention area discharge rates and stage/storage information during the design storm. For the design of the storm drainage system, a warning stage elevation is set for each lagoon and detention area and structure to assure no stormwater ponding. In addition, the ultimate discharge rate from the system cannot exceed the pre -developed runoff rate. Knowing these two factors, the drainage system is designed by trial and error. R THOMAS & HUTTON Z:\24039\24039.0001\Engineering\Calculations\Storm Water\OLD\24039Stormwater Management Report.doc Page The Overlook at Middle Sound Stormwater Management Report and Erosion Control Design Considerations SECTION 6 - HYDROLOGY ■ SCS Unit Hydrograph Method is used. ■ Amount of rainfall for each storm frequency is based on NOAA Atlas 14, Volume 2 rainfall depths for the Wilmington Airport. The following design storms are used in the model simulations: TABLE 3 Rainfall Amounts Storm Event Duration Rainfall inches 1- ear 24-hour Design Storm 3.83 2-year 24-hour Design Storm 4.65 10- ear 24-hour Design Storm 7.22 25- ear 24-hour Design Storm 9.08 100- ear 24-hour Design Storm 12.60 ■ SCS Type III Statistical Rainfall Distribution is used. This distribution pattern is determined by the Soil Conservation Service comparing regional rain -gage data. ■ A 484 Hydrograph Peaking Factor is used for this report SECTION 7 - PRE -DEVELOPMENT RUNOFF CALCULATIONS Pre -development peak flow rates for each design storm are calculated by the ICPR program. The pre -development drainage basins are shown in an attached exhibit at the end of this report. Pre -development calculations and model results are included in the Appendices. 7.1 Curve Numbers Curve numbers are generated according to procedures set forth in SCS TR-55. The composite curve numbers for each drainage basin are calculated using soils information from the SCS Soil Survey of New Hanover County. Pre -Development Curve Numbers were weighted based on the type and amount of soil within the basin. 7.2 Time of Concentration Times of concentration were calculated according to procedures set forth in SCS Hydrology Technical Note No. N4 as referenced in TR-55. The travel times (Tt) for overland flow, shallow concentrated flow, and channel flow are added together for the drainage basin to get the time of concentration Tc. Travel times for each sub -basin were then added together to determine the time of concentration for each pre -developed drainage area. The time of concentration for each sub -basin can be found in the Appendices of this report. THO AS & HUTTON Z:\24039\24039.0001\Engineering\CalculationAStorm Water\OLD\24039Stormwater Management Report.doc Page 5 The Overlook at Middle Sound Stormwater Management Report and Erosion Control Design Considerations The minimum time of concentration used for any basin is ten (10) minutes. Times of concentration are generated according to procedures set forth in SCS Technical Release 55. SECTION 8 - POST -DEVELOPMENT RUNOFF CALCULATIONS Post -development peak flow rates for each design storm are calculated by the ICPR program. The post -development drainage basins are shown in an attached exhibit at the end of this report. Post -development calculations and model results are included in the Appendices. 8.1 Curve Numbers Curve numbers are generated according to procedures set forth in SCS TR-55. The composite curve numbers for each drainage basin are calculated using soils information from the SCS Soil Survey of New Hanover County. Post -Development Curve Numbers were weighted based on the type and amount of soil within the basin and shown in the appendices with the on -site and watershed pre - development CN's. 8.2 Time of Concentration Times of concentration for post -development are determinded according to the longest anticipated travel path within each basin. The travel times (Tt) for overland flow, shallow concentrated flow, and pipe flow are added together for each drainage basin to calculate the time of concentration Tc. Travel times for each sub -basin were then added together to determine the time of concentration for each post -developed drainage area. The time of concentration for each sub -basin is shown in the appendices with the post - development times. The minimum time of concentration used for any basin is ten (10) minutes. Times of concentration are generated according to procedures set forth in SCS Technical Release 55. The specific hydrology theory is described in the Soils Conservation Services National Handbook, Section 4, "Hydrology." SECTION 9 - PREDEVELOPMENT CONDITIONS The site is currently partially cleared and wooded. The site ultimately drains to Pages Creek via overland flow and ditches to adjacent wetlands. N THOMAS & HUTTON Z:\24039\24039.0001 \Engineering\Calculations\Storm Water\OLD\24039 Stormwater Management Report.doc Page 6 The Overlook at Middle Sound Stormwater Management Report and Erosion Control Design Considerations SECTION 10 - TAILWATER CONDITIONS The tail water condition used in the overall watershed model was a static elevation taken from the adge of the adjacent wetland for which the ponds discharge. The tailwater is slightly different for each pond. The pipe sizing calculations use the maximum Pond elevation from the 25 - year 24 hour storm event taken from the ICPR model. SECTION 11 - POST -DEVELOPMENT CONDITIONS Post -development drainage basins are shown in an attached exhibit at the end of this report. See Appendices for post -development ICPR model input and results. See Summary of Results (Pre -Development vs. Post -Development Conditions) at the beginning of report in Table 1. The hydraulic grade line (peak stage elevation) and the recovery time for the ponds or lakes in the drainage system are shown in Table 2 at the beginning of the report. SECTION 12 -CONCLUSIONS The post -developed runoff is detained on site and released at less than pre -developed rates for the required storm events. The storm drainage system design meets the requirements of New Hanover County and NCDENR DWQ. The stormwater runoff from the proposed project is not anticipated to have a detrimental impact to proposed structures, or to receiving drainageways downstream. N THOMAS & HUTTON Z:\24039\24039.0001\Engineering\Calculations\Storm Water\OLD\24039Stormwater Management Report.doc Page STORMWATER MANAGEMENT REPORT THE OVERLOOK AT MIDDLE SOUND APPENDIX A VICINITY MAP 24039.0001 H THOMAS Sc MUTTON THE OVERLOOK AT MIDDLE SOUND PROPOSED ACTIVITY: SINGLE FAMILY SUBDIVISION - VICINITY MAP CLIENT: D.R. HORTON INC. LOCATION: NEW HANOVER COUNTY, NC DATE: December4, 2012 SHEET: E0' JOB NUMBER: J - 24039.0001 SCALE: = 2�00 Engineering I Surveying I Planning I GIS I Consulting 215 South Kerr Avenue • Unit B Wilmington, NC 28403 • 910.332.3360 www.thomosandhutton.com Savannah, GA I Brunswick GA I Chadeston, SC I Myrtle Beach, SC STORMWATER MANAGEMENT REPORT THE OVERLOOK AT MIDDLE SOUND APPENDIX B PRE AND POST -DEVELOPMENT TIME OF CONCENTRATION AND CURVE NUMBERS 24039.0001 R THOMAS Sc HUTTON TSTORMWATER DESIGN CONSIDERATIONS PROJECT: The Overlook PREPARED BY: Thomas and Hutton Engineering Company PREPARED FOR: 1 DR Horton, Inc THOMAS 1 HUTTON DR;_rna;,,r:r zat�yr!y Calculate Pre -Development "Ten and Composite "CN" Calculate Time of Concentration: Use Travel Time Concept: Overland Sheet Flow: t =(0.007(nl)A0.8)1((P2A0.5)*(SA0.4)) where: t = Travel time for Overland Flow (min) n = Manning's coefficient - from TR-55 1= Length of flow (ft) P2 = 2-yr rainfall depth (in) S = Hydraulic slope (ft/fl) n= Woods: Light Underhmsh 1= 100ft P2 = 4.65 in S = 0,0200 ft/ft tt = 17.8 min Shallow Concentrated Flow: t=1/60v where I = 1289 ft Paved 7 No Slope, S = 0.0060 ft/ft v = 1.25 ft/s tZ = 17.2 min Bwb 1Pre-P°l;. TC 3 0 miu Job: 24039 Date: 10/18/12 Revised: 6/26/13 By. BDR/JDR ✓RATE2,L Ga. Z"'St , 1T• e_ne "Pre" Channel Flow: t=1/60v where: t--Travel time for Pipe Flow (min) 1=Length of flow (ft) S=Average watercourse slope (ft/ft) n = Manning's Coefficient for Channel Flow A=Cross-Sectional Area 00) P=Wetted Perimeter (ft) = 0.400 R=Hydraulic Radius (ft) v=Velocity (ftts)- From TR-55 1= Oft S = 0.0000 ft/ft n = Not maintained, clean bum, brush on sides = 0.0750 A = 0.00 sf P = 0.00 ft => Hydraulic Radius, R = n/a v = n/a t3 = n/a Pipe Flow: t=1/60v 1= 0 ft v— 2.00 ft/s t= 0.0 min Determine Composite Curve Number Description HSG CN A (acres) CN x A Woods: Good (no grazing or burning) A 30 2.99 90 Woods: Good (no grazing or burning) B 55 3.22 177 Woods: Good (no grazing or burning) C 70 1.57 110 Woods: Goad (no grazing or burning) D 77 2.12 163 Boo Pre -PI; Composite CN - 55 1 of 2 TSTORMWATER DESIGN CONSIDERATIONS PROJECT: The Overlook PREPARED BY: Thomas and Hutton Engineering Company PREPARED FOR: I DR Horton, Inc THOMAS & HUTTON DR,%INAGE BASIN - Calculate Pre -Development "Tc" and Comnosite "CN" Calculate Time of Concentration: Use Travel Time Concept: Overland Sheet Flow: t =(0.007(nl)AO.8y((P2A0.5)•(SA0.4)) where: t = Travel time for Overland Flow (min) n = Manning'. coefficient - from TR-55 I = Length of flow (ft) P2 = 2-yr rainfall depth (in) S = Hydraulic slope (ft/ft) n = Woods: light Underbrush 1= 100 ft P2 = 4.65 in S = 0.0050 ft/ft tr = 31.0 min Shallow Concentrated Flow: t=1/60v where 1= 450 ft Paved 7 No Slope, S = 0.0150 ft/ft v = 1.98 ft(s t2 = 3.8 min Job: 24039 Date: 10/19/12 Revised: 6126/13 By. BDRlJDR DRAINAGE BASIN Prc-P2; rrP"n Channel Flow: t=1/60v where: t--Travel time for Pipe Flow (min) 1=Length of flow (ft) S=Average watercourse slope (Rift) n = Manning's Coefficient for Channel Flow Across -Sectional Area (ft) P=Wetted Perimeter (ft) = 0.400 R=Hydraulic Radius (ft) v=Velocity (ft/s)- From TR-55 1= Oft S = 0.0000 ft/ft n = Not maintained, clean btm, brush on sides = 0.0750 A = 0.00 sf P = 0.00 ft => Hydraulic Radius, R = n/a v= n/a t3 = n/a Pipe Flow: t=1/60v 1= 0 ft v-- 2.00 ft/s t— 0.0 min Bain Pre-P2: Tc = 3ffi:p min (Use Te = 6.0 min per TR-55) Determine Composite Curve Number Description HSG CN A (acres) CN x A Woods: Good (no grazing or burning) C 70 6.31 442 Woods: Good (no grazing or burning) D 77 1.19 92 7.50 533 ]Darin Pre-P2:- Compoxite CN = 71 2ot2 'T' STORMWATER DESIGN CONSIDERATIONS PROJECT: The Overlook 14 PREPARED BY: Thomas and Hutton Engineering Company PREPARED FOR: 1 DR Horton, hie TMOMAS & MUTTON rexr�t�a4r_p.^:gcr�l Post -PI Calculate Pre -Development "Tc" and Composite "CN" Calculate Time of Concentration: Use Travel Time Concept: Overland Sheet Flow: t =(0.007(nl)^0.8)/((P2^0.5)■(S^0.4)) where: t = Travel time for Overland Flow (min) n = Manning's coefficient - from TR-55 1= Length of flow (ft) P2 = 2-yr rainfall depth (in) S = Hydraulic slope (ft/ft) n= Grass: Bermuda 1= 100 ft P2 = 4.65 in S _ 0.0100 ft/ft ti = 24.0 min Shallow Concentrated Flow: t=1/60v where l = 22 ft Paved ? No Slope, S = 0.0100 tuft v= 1.61 ft/s tZ = 0.2 min Vn. post-P2s fie 36.1 mua Job: 24039 Date: 10/19/12 Revised: 6/26113 By. BDR/3DR "Post" Channel Flow: t=1/60v where: t--Travel time for Pipe Flow (min) 1=Length of flow (ft) S=Average watercourse slope (ft/ft) n = Manning's Coefficient for Channel Flow A—CrossSectional Area (f ) P=Wetted Perimeter (ft) = 0.410 R=Hydraulic Radius (ft) v—Velocity (ft/s)- From TR-55 1= Oft S = 0.0000 fun n = Not maintained, clean him, brush on sides 0.0750 A = 0.00 sf P = 0.00 ft => Hydraulic Radius, R = n/a v = n/a t3 = n/a Pipe Flow: t=1/60v 1= 1460 ft v— 2.00 ft/s t= 12.2 min Determine Composite Curve Number Description HSG CN A (acres) CN x A Pavement, roofs, etc. (no grass) A 98 4.26 418 Open Space, Good (grass > 7511o) A 39 1.63 64 Open Space, Good (grass > 75" o) B 61 2.65 162 Open Space, Good (grass > 75%) C 74 0.86 64 Wet Ponds or Saturated Wetlands D 98 0.50 49 Y.Y1 /Do I. Basbt ft"1: Compooft CN 76 1 of 2 Mr. THOMAS & HUTTON DR„ !N kC,F T2AS5N STORMWATER DESIGN CONSIDERATIONS PROJECT: The Overlook PREPARED BY: Thomas and Hutton Engineering Company PREPARED FOR: 1 DR Horton, Inc Calculate Pre -Development "Te" and Composite "CN" Calculate Time o£Concentration: Use Travel Time Concept: Overland Sheet Flow: t = (0.007(nl)Ao.8y((P2AO.5)•(S%4)) where: t = Travel time for Overland Flow (min) n = Manning's coefficient - from TR-55 1= Length of flow (ft) P2 = 2-yr rainfall depth (in) S = Hydraulic slope (ft/ft) n = Grass: Bermuda 1= 100ft P2 = 4.65 in S = 0.0100 ft/ft tt = 24.0 min Shallow Concentrated Flow: t=1/60v where 1= 20 ft Paved ? No Slope, S = 0.0100 JIM V = 1.61 ftts tZ = 0.2 min BaAn Past-P'2::'C - 32.Q min Job: 24039 Date: 10/18/12 Revised: 6,16/13 By. BDRlJDR r9. ?e:•:'� F BAST:: ri" P2 "Post" Channel Flow: t=1/60v where: t--Travel time for Pipe Flow (min) 1=Length of flow (ft) S=Average watercourse slope (ft/ft) n = Manning's Coefficient for Channel Flow A=Cross-Sectional Area ffe) P=Wetted Perimeter (ft) = OA10 R=Hydraulic Radius (ft) v--Velocity (ft/s)- From TR-55 l= Oft S = 0.0020 ft/ft n = Not maintained, clean btm, brush on sides = 0.0750 A = 2.00 sf P = 4.00 ft => Hydraulic Radius, R = 0.50 ft v = 0.56 ft/s y = 0.0 min Pipe Flow: t=1/60v l= 880 ft v=— 2.00 ft/s t- 7.3 ntin Determine Composite Curve Number Description HSG CN A (acres) CN x A Pavement, roofs, etc. (no grass) A 98 3.44 337 Open Space, Good (grass > 75%) B 61 0.59 36 Open Space, Good (grass> 750o) C 74 2.92 216 Wet Ponds or Saturated Wetlands D 98 0.55 54 /.av "-I 2of2 STORMWATER MANAGEMENT REPORT THE OVERLOOK AT MIDDLE SOUND APPENDIX C PRE AND POST -DEVELOPMENT ICPR MODEL INPUT 24039.0001 H TFiOMAS �c HUTTON m p m W U [7 U E OI ��N� rop �7z-.�i� al \ 0 6 RU qC7 N M M (3 m m H � 'O Co CO EE --H to > OM UJ UI Ul ,zg> E$ MOQUlN N N U1 Q Q m u o or Hit it N U3 IL)rm-I N E to q U O a)rl mMEaro-.+mua�-k M P4 H m 0 -ri V N it ri W it i4 m S4 0 -A % d $UMm P: m mNW W .]WSUMW P4MW Wk The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 08/20/13) x xxxxxxxxxx++:xx+++xx+axxxx INPUT REPORT xxxxxxxxxxxxxxxxxx+xx++++++x+x+x++++ Basina =----------------------------------------------------------------------------- ----------------------------------------------------- ____________ Name: POST-P1 Node: Pond 1 Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh484 Peaking Factor: 484.0 Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): 0.000 Time of Conc(min): 36.00 Area(ac): 9.910 Time Shift(hrs): 0.00 Curve Number: 76.00 Max Allowable Q(cfs): 999999.000 DCIA(%-): 0.00 ---------------------------------------------------------------------------------------------------- . Name: POST-P2 Node: Pond 2 Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh484 Rainfall File: Rainfall Amount(in): 0.000 Area(ac): 7.500 Curve Number: 86.00 DCIA(%-): 0.00 Peaking Factor: 484.0 Storm Duration(hrs): 0.00 Time of Conc(min): 32.00 Time Shift(hrs): 0.00 Max Allowable Q(cfs): 999999.000 ---------------------------------------------------------------------------------------------------- Name: PRE -PI Node: PRE-BNDY1 Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh484 Rainfall File: Rainfall Amount(in): 0.000 Area(ac): 9.910 Curve Number: 55.00 DCIA(%): 0.00 Peaking Factor: 484.0 Storm Duration(hrs): 0.00 Time of Conc(min): 35.00 Time Shift(hrs): 0.00 Max Allowable Q(cfs): 999999.000 ---------------------------------------------------------------------------------------------------- Name: PRE-P2 Node: PRE-BNDY2 Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh484 Rainfall File: Rainfall Amount(in): 0.000 Area(ac): 7.500 Curve Number: 71.00 DCIA(%-): 0.00 Peaking Factor: 484.0 Storm Duration(hrs): 0.00 Time of Conc(min): 35.00 Time Shift(hrs): 0.00 Max Allowable Q(cfs): 999999.000 Nodes Name: Dry Pond 1 Group: BASE Type: Stage/Area Stage(ft) Area(ac) 6.000 0.2780 7.000 0.3114 8.000 0.3460 9.000 0.3819 10.000 0.4191 11.000 0.4576 12.000 0.4974 Base Flow(cfs): 0.000 Init Stage(ft): 6.000 Warn Stage(ft): 11.000 ------------------------------------------------------------------------------------------ Name: Dry Pond 2 Base Flow(cfs): 0.000 Init Stage(ft): 7.000 Group: BASE Warn Stage(ft): 10.000 Type: Stage/Area Stage(ft) Area(ac) ------------------------------ Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 1 of 9 The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised OB/20/13) ++++++++++++++++++++++++a++ INPUT REPORT 7.000 0.2612 8.000 0.3074 9.000 0.3550 10.000 0.4040 10.800 0.4441 11.800 0.4954 ------------------------------------------------------------------------------------------ Name: Flow Split#1 Base Flow(cfs): 0.000 Init Stage(ft): 5.810 Group: BASE Warn Stage(ft): 9.260 Type: Stage/Area Stage(ft) Area(ac) ------------------------------ --------------------------------------------------------------------------------------- Name: Flow Split#2 Base Flow(cfs): 0.000 Init Stage(ft): 4.900 Group: BASE Warn Stage(ft): 10.000 Type: Stage/Area Stage(ft) Area(ac) ------------------------------ ------------------------------------------------------------------------------------------ Name: Pond 1 Base Flow(cfs): 0.000 Init Stage(ft): 6.500 Group: BASE Warn Stage(ft): 10.000 Type: Stage/Area Stage(ft) Area(ac) 6.500 0.4993 7.000 0.5836 8.000 0.6359 9.000 0.6895 11.000 0.8006 ------------------------------------------------------------------------------------------ Name: Pond 2 Base Flow(cfs): 0.000 Init Stage(ft): 7.200 Group: BASE Warn Stage(ft): 11.200 Type: Stage/Area Stage(ft) Area(ac) 7.200 0.5490 7.700 0.6427 8.000 0.6621 9.000 0.7275 10.000 0.8018 11.000 0.8582 11.200 0.8696 ------------------------ Name: POST-BNDY1 Group: BASE Type: Time/Stage Time(hrs) Stage(ft) ------------------------------ 0.00 5.000 24.00 5.000 36.00 5.000 ---------------------------------------------------------- Base Flow(cfs): 0.000 Init Stage(ft): 5.000 Warn Stage(ft): 5.000 ------------------------------------------------------------------------------------------ Name: POST-BNDY2 Base Flow(cfs): 0.000 Init Stage(ft): 5.000 Group: BASE Warn Stage(ft)! 5.000 Type: Time/Stage Time(hrs) Stage(ft) Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 2 of 9 The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 08/20/13) x++++xxxxxxx++x++++x++x+xxx INPUT REPORT+xxxxxxx+xx+xxxxxx+xxxx+xx+xx+xx+xxx --------------- --------------- 0.00 5.000 24.00 5.000 36.00 5.000 ------------------------------------------------------------------------------------------ Name: PRE-BNDY1 Base Flow(cfs). 0.000 !nit Stage(ft): 5.000 Group: BASE Warn Stage(ft): 5.000 Type: Time/Stage Time(hrs) Stage(ft) ------------------------------ 0.00 5.000 24.00 5.000 36.00 5.000 -------------------------------------------- ----------------- Name: PRE-BNDY2 Base Flow(cfs): 0.000 Init Stage(ft): 5.000 Group: BASE Warn Stage(ft): 5.000 Type: Time/Stage Time(hrs) Stage(ft) --------------- --------------- 0.00 5.000 24.00 5.000 36.00 5.000 ------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------ ___= Pipes ------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------ Name: Pipe lA Group: BASE From Node: Flow Split#1 Length(ft): 12.00 To Node: POST-BNDY1 Count: 1 UPSTREAM DOWNSTREAM Geometry: Circular Circular Span(in): 24.00 24.00 Rise(in): 24.00 24.00 Invert(ft): 5.810 5.800 Manning's N: 0.013000 0.013000 Top Clip(in): 0.000 0.000 Bat Clip(in): 0.000 0.000 Upstream F11WA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting Friction Equation: Automatic Solution Algorithm: Most Restrictive Flow: Both Entrance Loss Coef: 0.00 Exit Loss Coef: 1.00 Bend Loss Coef: 0.00 Outlet Ctrl Spec: Use do or tw Inlet Ctrl Spec: Use do Stabilizer Option: None ---------------------------------------------------------------------------------------------------- Name: Pipe lb From Node: Flow Split#1 Length(ft): 55.00 Group. BASE To Node: POST-BNDY1 Count: 1 Friction Equation: Automatic UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive Geometry: Circular Circular Flow: Both Span(in): 15.00 15.00 Entrance Loss Coef: 0.00 Rise(in): 15.00 15.00 Exit Loss Coef: 1.00 Invert(ft): 6.800 5.500 Bend Loss Coef: 0.00 Manning's N: 0.013000 0.013000 Outlet Ctrl Spec: Use do or tw Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use do Bat Clip(in): 0.000 0.000 Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting --------------------------------------------------------------------------------------------- Name: Pipe 2A From Node: Flow Split#2 Length(ft): 71.00 Group: BASE To Node: POST-BNDY2 Count: 1 Friction Equation: Automatic UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive Interconnected Channel and Fond Routing Model (ICPR) C2002 Streamline Technologies, Inc. Page 3 of 9 The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 08/20/13) ++++++++++++xx+xx+xx+x+++++ INPUT REPORT +++xx+++++++x+++++++x+++++++x+xxx+x+ Geometry: Circular Circular Span(in): 24.00 24.00 Rise(in): 24.00 24.00 Invert t �.400 �.250 Manning's N: 0.013000 0.013000 Top Clip(in): 0.000 0.000 Hot Clip(in): 0.000 0.000 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting Flow: Both Entrance Loss Coef: 0.00 Exit Loss Coef: 1.00 Bend Loss Coaf: 0.0 Outlet Ctrl Spec: Usedc or tw Inlet Ctrl Spec: Use do Stabilizer Option: None ---------------------------------------------------------------------------------------------------- Name: Pipe 2B From Node: Flow Split#2 Length(ft): 14.00 Group: BASE To Node: POST-BNDY2 Count: 1 Friction Equation: Automatic UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive Geometry: Circular Circular Flow: Both Span(in): 24.00 24.00 Entrance Loss Coef: 0.00 Rise(in): 24.00 24.00 Exit Loss Coef: 1.00 Invert(ft): 5.900 5.800 Bend Loss Coef: 0.00 Manning's N: 0.013000 0.013000 Outlet Ctrl Spec: Use do or tw Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use do Bot Clip(in): 0.000 0.000 Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting ------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------ ___= Drop Structures ------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------ Name: DS-lA Group: BASE UPSTREAM Geometry. Circular Span(in): 15.00 Rise(in): 15.00 Invert(ft): 6.400 Manning's N: 0.013000 Top Clip(in): 0.000 Bot Clip(in): 0.000 From Node: Pond 1 To Node: Dry Pond 1 DOWNSTREAM Circular 15.00 15.00 6.000 0.013000 0.000 0.000 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting xxx Weir 1 of 1 for Drop Structure DS-lA xxx Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Circular Span(in) : 3.00 Rise(in): 3.00 Length(ft): 115.00 Count: 1 Friction Equation: Automatic Solution Algorithm: Most Restrictive Flow: Both Entrance Loss Coef: 0.000 Exit Loss Coef: 0.000 Outlet Ctrl Spec: Use do or tw Inlet Ctrl Spec: Use do Solution Incs: 10 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 6.500 Control Elev(ft): 6.500 TABLE ---------------------------------------------------------------------------------------------------- Name: DS-1B From Node: Dry Pond 1 Length(ft): 240.00 Group: BASE To Node: POST-BNDY1 Count: 1 UPSTREAM DOWNSTREAM Geometry: Circular Circular Span(in): 15.00 15.00 Rise(in): 15.00 15.00 Invert(ft)% 5.800 5.500 Friction Equation: Automatic Solution Algorithm: Most Restrictive Flow: Both Entrance Loss Coef: 0.000 Exit Loss Coef: 0.000 Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 4 of 9 The Overlook at Middle Sound ICPR Stormwater'Model Pre vs. Post Development January 4, 2013 (Revised 08/20/13) ++t+++++t++++t++++++t+tt++t INPUT REPORT ttttt+tttt+++ttt+t+++t++++++++tt tttt Manning's N: 0.013000 0.013000 Top Clip(in): 0.000 0.000 Bot Clip(in): 0.000 0.000 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting *** Weir 1 of 1 for Drop Structure DS-1B *** Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Circular Span(in): 2.50 Rise(in): 2.50 Outlet Ctrl Spec: Use do or tw Inlet Ctrl Spec: Use do Solution Inca: 10 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 6.000 Control Elev(ft): 6.000 TABLE -------------------------------------------------------- Name: DS-IC From Node: ---------------------------------- Pond 1 Length(ft): 340.00 Group: BASE To Node: Flow Split#1 Count: 1 UPSTREAM DOWNSTREAM Friction Equation: Automatic Geometry: Circular Circular Solution Algorithm: Most Restrictive Span(in): 24.00 24.00 Flow: Both Rise(in): 24.00 24.00 Entrance Loss Coef: 0.000 Invert(ft): 6.400 5.810 Exit Loss Coef: 0.000 Manning's N: 0.013000 0.013000 Outlet Ctrl Spec: Use do or tw Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use do Bot Clip(in): 0.000 0.000 Solution Inca: 10 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall *** Weir 1 of 1 for Drop Structure DS-lC *** Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Rectangular Span(in): 108.00 Rise(in): 6.00 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 8.600 Control Elev(ft): 8.600 TABLE ---------------------------------------------------------------------------------------------------- Name: DS-2A From Node: Pond 2 Length(ft): 39.00 Group: BASE To Node: Dry Pond 2 Count: 1 UPSTREAM DOWNSTREAM Friction Equation: Automatic Geometry: Circular Circular Solution Algorithm: Most Restrictive Span(in): 15.00 15.00 Flow: Both Rise(in): 15.00 15.00 Entrance Loss Coef: 0.000 Invert(ft): 7.200 7.000 Exit Loss Coef: 0.000 Manning's N: 0.013000 0.013000 Outlet Ctrl Spec: Use do or tw Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use do Bot Clip(in): 0.000 0.000 Solution Inca: 10 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting *** Weir 1 of 1 for Drop Structure DS-2A *** Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Circular Span(in): 3.00 Rise(in): 3.00 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 7.200 Control Elev(ft): 7.200 TABLE Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 5 of 9 The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 08/20/13) ++x+++++x+xx++x+x+++x++x+++ INPUT REPORT x+++++++x+x++x++++++++++++++x+xx+x++ ---------------------------------------------------------------------------------------------------- Name: DS-2B From Node: Dry Pond 2 Length(ft): 40.on Group: BASE To Node: POST-BNDY2 Count: 1 UPSTREAM DOWNSTREAM Friction Equation: Automatic Geometry: Circular Circular Solution Algorithm: Most Restrictive Span(in): 15.00 15.00 Flow: Both Rise(in): 15.00 15.00 Entrance Loss Coef: 0.000 Invert(ft): 6.000 5.500 Exit Loss Coef: 0.000 Manning's N: 0.013000 0.013000 Outlet Ctrl Spec: Use do or tw Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use do Bot Clip(in). 0.000 0.000 Solution Inca: 10 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting *** Weir 1 of 1 for Drop Structure DS-2B *** Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Circular Span(in): 2.50 Rise(in): 2.50 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 7.000 Control Elev(ft): 7.000 ------------------------------------------------------------------------------- Name: DS-2C From Node: Pond 2 Length(ft): 55.00 Group: BASE To Node: Flow Split#2 Count: 1 UPSTREAM DOWNSTREAM Geometry: Circular Circular Span(in): 24.00 24.00 Rise(in): 24.00 24.00 Invert(ft): 6.700 6.100 Manning's N: 0.013000 0.013000 Top Clip(in): 0.000 0.000 Sot Clip(in): 0.000 0.000 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting *** Weir 1 of 1 for Drop Structure DS-2C *** Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Rectangular Span(in): 180.00 Rise (in): 7.20 TABLE Friction Equation: Automatic Solution Algorithm: Most Restrictive Flow: Both Entrance Loss Coef: 0.000 Exit Loss Coef: 0.000 Outlet Ctrl Spec: Use do or tw Inlet Ctrl Spec: Use do Solution Inca: 10 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 8.800 Control Elev(ft): 8.800 TABLE Weirs Name: W1A From Node: Pond 1 Group: BASE To Node: POST-BNDY1 Flow: Both Count: 1 Type: Vertical: Gravel Geometry: Trapezoidal Bottom Width(ft): 20.00 Left Side Slope(h/v): 5.0U Right Side Slope(h/v): 5.00 Invert(ft): 9.500 Control Elevation(ft): 9.500 Struct Opening Dim(ft): 9999.00 TABLE Bottom Clip(ft): 0.000 Top Clip(ft): 0.000 Weir Discharge Coef: 3.200 Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 6 of 9 The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 08/20/13) +++++++++++++++++++++++++++ INPUT REPORT Orifice Discharge Coef: 0.600 ---------------------------------------------------------------------------------------------------- Name: W2A From Node: Pond 2 Group: BASE To Node: POST-BNDY2 Flow: Both Count: 1 Type: Vertical: Gravel Geometry: Trapezoidal Bottom Width(ft): 30.00 Left Side Slope(h/v): 5.00 Right Side Slope(h/v): 5.00 Invert(ft): 9.500 Control Elevation(ft): 9.500 Struct Opening Dim(ft): 9999.00 TABLE Bottom Clip(ft): 0.000 Top Clip(ft): 0.000 Weir Discharge Coef: 3.200 Orifice Discharge Coef: 0.600 Hydrology Simulations Name: 001YR Filename: Z:\24039\24039.0000\Engineering\Calculations\Storm Water\ICPR\001YR.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsiii Rainfall Amount(in): 3.83 Time(hrs) Print Inc(min) ------------------------------ 36.000 5.00 ----------------------=----------------------------------------------------------------------------- Name: 002YR Filename: Z:\24039\24039.0000\Engineering\Calculations\Storm Water\ICPR\002YR.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsiii Rainfall Amount(in): 4.65 Time(hrs) Print Inc(min) --------------- --------------- 36.000 5.00 ---------------------------------------------------------------------------------------------------- Name: 010YR Filename: Z:\24039\24039.0000\Engineering\Calculations\Storm Water\ICPR\D10YR.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsiii Rainfall Amount(in): 7.22 Time(hrs) Print Inc(min) --------------- --------------- 36.000 5.00 ---------------------------------------------------------------------------------------------------- Name: 025YR Filename: Z:\24039\24039.0000\Engineering\Calculations\Storm Water\ICPR\025YR.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsiii Rainfall Amount(in): 9.08 Time(hrs) Print Inc(min) --------------- --------------- 36.000 5.00 ---------------------------------------------------------------------------------------------------- Name: 100YR Filename: Z:\24039\24039.0000\Engineering\Calculations\Storm Water\ICPR\100YR.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Interconnected Channel and Pond Routing Model (ICPR) C2002 Streamline Technologies, Inc. Page 7 of 9 The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 08/20/13) ++++ttt+tt+t+t++ttt+ttt++tt INPUT REPORT********++tt+++tttttttttt+ttt++ttttt Rainfall File: Scsiii Rainfall Amount(in): 12.60 Time(hrs) Print Inc(min) ------------------------------ 36.000 5.00 Routing Simulations Name: 001YR Hydrology Sim: 001YR Filename: Z:\24039\24039.0000\Engineering\Calculations\Storm Water\ICPR\001YR.I32 Execute: Yes Restart: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) --------------- --------------- 72.000 5.000 Group Run --------------- ----- BASE Yes Patch: No Delta Z Factor: 0.00500 End Time(hrs): 72.00 Max Calc Time(sec): 60.0000 Boundary Flows: --------------------------------------------------------------------------------------------------- Name: 002YR Hydrology Sim: 002YR Filename: Z:\24039\24039.0000\Engineering\Calculations\Storm Water\ICPR\002YR.I32 Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) ------------------------------ 72.000 5.000 Group Run --------------- ----- BASE Yes Delta Z Factor: 0.00500 End Time(hrs): 72.00 Max Calc Time(sec): 60.0000 Boundary Flows: ---------------------------------------------------------------------------------------------------- Name: 010YR Hydrology Sim: 010YR Filename: Z:\24039\24039.0000\Engineering\Calculations\Storm Water\ICPR\OIOYR.I32 Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Cale Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) --------------- --------------- 72.000 5.000 Group Run --------------- ----- BASE Yes Delta Z Factor: 0.00500 End Time(hrs): 72.00 Max Calc Time(sec): 60.0000 Boundary Flows: ---------------------------------------------------------------------------------------------------- Name: 025YR Hydrology Sim: 025YR Filename: Z:\24039\24039.0000\Engineering\Calculations\Storm Water\ICPR\025YR.I32 Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 8 of 9 The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 08/20/13) x++++++x xxx+x+xxxxxx+x+xxx+ INPUT REPORT x+xxxxxx xxxxx++x+++x+x++++xxxxxxxxx Execute: Yes Restart: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000. Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) --------------- --------------- 72.000 5.000 Group Run --------------- ----- BASE Yes Patch: No Delta Z Factor: 0.00500 End Time(hrs): 72.00 Max Calc Time(sec): 60.000D Boundary Flows: ---------------------------------------------------------------------------------------------------- Name: 100YR Hydrology Sim: 100YR Filename: Z:\24039\24039.0000\Engineering\Calculations\Storm Water\ICPR\100YR.I32 Execute: Yes Restart: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): O.ODO Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) --------------- --------------- 72.00D 5.000 Group Run --------------- ----- BASE Yes Patch: No Delta Z Factor: 0.00500 End Time(hrs): 72.00 Max Calc Time(sec): 60.0000 Boundary Flows: Interconnected Channel and Pond Routing Model (ICPR) C2002 Streamline Technologies, Inc. Page 9 of 9 STORMWATER MANAGEMENT REPORT THE OVERLOOK AT MIDDLE SOUND APPENDIX D PRE AND POST -DEVELOPMENT ICPR MODEL OUTPUT 24039.0001 H THOMAS ScHUTTON The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 06/26/13) x+xx+++xxx+xx++x+xx++++x+++ BASIN MAX REPORT ++x++++++++xx+++++++++x+x+x++++++x++ Simulation Basin Group Time Max Flow Max Volume Volume hrs Cfs in ft3 001YR POST -PI BASE 12.48 9.80 1.607 57818 002YR POST-P1 BASE 12.40 13.83 2.247 80B37 010YR POST-Pl BASE 12.40 27.56 4.448 160001 025YR POST-P1 BASE 12.40 37.B4 6.142 220931 100YR POST -PI BASE 12.40 57.43 9.457 340205 001YR POST-P2 BASE 12.37 11.77 2.389 65031 002YR POST-P2 BASE 12.37 15.36 3.136 853B5 010YR POST-P2 BASE 12.37 26.66 5.568 151588 025YR POST-P2 BASE 12.37 34.78 7.369 200629 100YR POST-P2 BASE 12.37 50.01 10.819 294547 001YR PRE-P1 BASE 12-52 1.84 0.463 16642 002YR PRE -PI BASE 12.52 3.97 0.809 29114 010YR PRE -PI BASE 12.44 13.41 2.260 81304 025YR PRE -PI BASE 12.44 21.72 3.539 127303 100YR PRE-Pl BASE 12.44 39.12 6.266 225413 001YR PRE-P2 BASE 12.44 5.80 1.276 34752 002YR PRE-P2 BASE 12.44 8.62 1.852 50419 010YR PRE-P2 BASE 12.44 18.45 3.902 106228 025YR PRE-P2 BASE 12.44 25.99 5.519 150264 100YR PRE-P2 BASE 12.44 40.56 8.734 237782 Interconnected Channel and Pond Routing Model (1CPR) C2002 Streamline Technologies, Inc. Page 1 of 1 The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 06/26/13) x++x++x+++++++++++a+a++x++a BASIN SUMMARY REPORT+xa+a+aaaax+x+x+x+++x+a+++x++++++a++ Name: POST-P1 POST -P2 PRE -Pi PRE -P2 POST-P1 Group: BASE BASE BASE BASE BASE Simulation: 001YR 001YR 001YR 001YR 002YR Node: Pond 1 Pond 2 PRE-BNDY1 PRE-BNDY2 Pond 1 Type: SCS SCS SCS SCS SCS Unit Hydrograph: Uh484 Uh484 Uh484 Uh484 Uh484 Peaking Factor: 484.0 484.0 484.0 484.0 484.0 Spec Time Inc(min): 4.80 4.27 4.67 4.67 4.80 Comp Time Inc(min): 4.80 4.27 4.67 4.67 4.80 Rain File: Scsiii Scsiii Scsiii Scsiii Scsiii Rain Amount(in): 3.830 3.030 3.830 3.830 4.650 Duration(hrs): 24.00 24.00 24.00 24.00 24.00 Status: Onsite Onsite Onsite Onsite Onsite TC(min): 36.00 32.00 35.00 35.00 36.00 Time Shift(hrs): 0.00 0.00 0-00 0.00 0.00 Area(ac): 9.910 7.500 9-910 7.500 9.910 Vol of Unit Hyd(in): 1.001 1.000 1.000 1.000 1.001 Curve Num: 76.000 86.000 55.000 71.000 76.000 DCIA(%): 0.000 0.000 0.000 0.000 0.000 Time Max(hrs): 12.48 12.37 12.52 12.44 12.40 Flow Max(cfs): 9.80 11.77 1.84 5.80 13.83 Runoff Volume(in): 1.607 2.389 0.463 1.276 2.247 Runoff Volume(ft3): 57818 65031 16642 34752 80837 Name: POST-P2 PRE -Pi PRE-P2 POST-Pl POST-P2 Group: BASE BASE BASE BASE BASE Simulation: 002YR 002YR 002YR 0laYR 010YR Node: Pond 2 PRE-BNDY1 PRE-BNDY2 Pond 1 Pond 2 Type: SCS SCS SCS SCS SCS Unit Hydrograph: Uh484 Uh484 Uh484 Uh484 Uh484 Peaking Factor: 484.0 484.0 484.0 484.0 484.0 Spec Time Inc(min): 4.27 4.67 4.67 4.80 4.27 Comp Time Inc(min): 4.27 4.67 4.67 4.80 4.27 Rain File: Scsiii Scsiii Scsiii Scsiii Scsiii Rain Amount(in): 4.650 4.650 4.650 7.220 7.220 Duration(hrs): 24.00 24.00 24.00 24.00 24.00 Status: Onsite Onsite Onsite Onsite Onsite TC(min): 32.00 35.00 35.00 36.00 32.00 Time Shift(hrs): 0.00 0.00 0.00 0.00 0.00 Area(ac): 7.500 9.910 7.500 9.910 7.500 Vol of Unit Hyd(in): 1.000 1.000 1.000 1.001 1.000 Curve Num: 86.000 55.000 71.000 76.000 86.000 DCIA(%): 0.000 0.000 0.000 0.000 0.000 Time Max(hrs): 12.37 12.52 12.44 12.40 12.37 Flow Max(cfs): 15.36 3.97 8.62 27.56 26.66 Runoff Volume(in): 3.136 0.809 1.852 4.448 5.568 Runoff Volume(ft3): B5385 29114 50419 160001 1515B8 Name: PRE -PI PRE-P2 POST-P1 POST-P2 PRE-P1 Group: BASE BASE BASE BASE BASE Simulation: 010YR 010YR 025YR 025YR 025YR Node: PRE-BNDY1 PRE-13NDY2 Pond 1 Pond 2 PRE-BNDY1 Type: SCS SCS SCS SCS SCS Unit Hydrograph: Uh484 Uh484 Uh484 Uh484 Uh484 Peaking Factor: 484.0 484.0 484.0 484.0 484.0 Spec Time Inc(min): 4.67 4.67 4.80 4.27 4.67 Comp Time Inc(min).- 4.67 4.67 4-80 4.27 4.67 Rain File: Scsiii Scsiii Scsiii Scsiii Scsiii Rain Amount(in): 7.220 7.220 9.080 9.080 9.080 Duration(hrs): 24.00 24.00 24.00 24.00 24.00 Status: Onsite Onsite Onsite Onsite Onsite TC(min): 35.00 35.00 36.00 32.00 35.00 Time Shift(hrs): 0.00 0.00 0.00 0.00 0.00 Area(ac): 9.910 7.500 9.910 7.500 9.910 Vol of Unit Hyd(in): 1.000 1.000 1.001 1.000 1.000 Curve Num: 55.000 71.000 76.000 86.000 55.000 DCIA(%): 0.000 0.000 0.000 0.000 0.000 Time Max(hrs): 12.44 12.44 12.40 12.37 12.44 Flow Max(cfs): 13.41 18.45 37.84 34.78 21.72 Runoff Volume(in): 2.260 3.902 6.142 7.369 3.539 Runoff Volume(ft3): 81304 106228 220931 200629 127303 Name: PRE-P2 POST-P1 POST-P2 PRE-P1 PRE-P2 Group: BASE BASIS BASE BASE BASE Simulation: 025YR 100YR 100YR 100YR 100YR Node: PRE-BNDY2 Pond 1 Pond 2 PRE-BNDY1 PRE-BNDY2 Type: SCS SCS SCS SCS SCS Unit Hydrograph: Uh484 Uh484 Uh484 Uh484 Uh484 Peaking Factor: 484.0 484.0 484.0 484.0 484.0 Spec Time Inc(min): 4.67 4.B0 4.27 4.67 4.67 Comp Time Inc(min). 4.67 4.80 4.27 4.67 4.67 Rain File: Scsiii Scsiii Scsiii Scsiii Scsiii Interconnected Channel and Pond Routing Model (ICPR) ®2002 Streamline Technologies, Inc. Page 1 of 2 The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 06/26/13) +++++++++++++++++++++++<+++ BASIN SUMMARY REPORT Rain Amount(in): 9.080 12.600 12.600 12.600 12.600 Duration(hrs): 24.00 24.00 24.00 24.00 24.00 Status: Onsite Onsite Onsite Onsite Onsite TC(min): 35.00 36.00 32.00 35.00 35.00 Time Shift(hrs): 0.00 0.00 0.00 0.00 0.00 Area(ac): 7.500 9.910 7.500 9.910 7.500 Vol of Unit Hyd(in): 1.000 1.001 1.000 1.000 1.000 Curve Num: 71.000 76.000 86.000 55.000 71.000 DCIA(,'): 0.000 0.000 0.000 0.000 0.000 Time Max(hrs): 12.44 12.40 12.37 12.44 12.44 Flow Max(cfs): 25.99 57.43 50.01 39.12 40.56 Runoff Volume(in): 5.519 9.457 10.819 6.266 8.734 Runoff Volume(ft3): 150264 340205 294547 225413 237782 Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 2 of 2 x �; W wm m mm mm m Lnw od' h m i wm mN0 Oh d'mw mm.PI O1 OOOOo OOOOO OOoOO OoOO H U Ho W HH e-,'-I e-I HHH HH Oh P,N m 0 hN 01N PI O d'mm mO mmN OOOOO OOOOO 00000 OOOO W O O O o o O O O O O O O N d' m O N l D m 0 O H N H O O P I N, (1 , I 1 O O O o 0 O o 0 0 0 O O O O O O O O O 8 ` H H H H H N H N m H N E O S-I E 41 1 Y! 7 roo s x 3 W ro0W El u G H 0 m0 m m v w m N m o w li 01O h O. om N b o.w w oO o 01 00000 00000 00000 0000 Hd W W w hvh NN ovmr-w mPIwwv N W ml m lDPIww-w 00000 00000 0O000 0000 h Ol mmh PI NN NH OIp NNN mPIN NN OID NNN mPINNN OOOOO 00000 OOOOO OOOO dr d'cM d' W d•d• d' d•d• HHHH HHHHH NHHHH HH HH.� O PI h H PI m 01 N m w O v h m H - m N O m N N N M N N W H PI l0 N O Ol Ol H Ol O PI d' m N O M H" 101 . PI P1 PI d'd' NN PI PI PI 0h O PIN , hN 01N hEO ill CO tpHHHH HmH HH l0mN mO mm.��m 1p m Pl m 0 0 0 0 0 O O O O o O O N W m O N w m 0 O1 PI h h h H m w d' m O O N H O O N w m m H N N H m m m m m ri Hri HHN HN P,m HHNm d, HN,A .-i Nd� HNm HN mwomw 01Oh O101 ow o. D wa ho01 NNNNN NN r4mm O mIl. p NHmO01 mOONN NNN N N d'O,hm d'N�0 md� Od' mh m 1p Pl l0 1p d' d'd' d' d'd' d'd• d'PI PI Hd'mhm hNbbd' mmmd'd' W d' W d• owNNN mPIN NN owN NN mPINNN NNNNN NNNNN hwNNN U PmN NN NNNNN NNN N NH H.-1H HHHHH HH H'-I HHHHH HHHHH HHHHH vH HHH HHH HH HHHHH HHH H Od'melm as 0 d' d' mm N d'H hHh md' OI vHmo 01.HN m NNN NN d'd' d' dew 00000 0OOO N.mw 1 O1 HmhH HN md' d' wmw d'd' momh v w T d' d' h h 01000 NPImmv HHHHH HH HHH N m " h Nm mmm N N d' d' d' m mmm PI m 01 O H N H H N m d' H H H H H H H H H H N N N m m m m m m m N PIN N H N N 0 m 0 00000 00000 h m O o 0 0 0 0 0 0 00000 00000 00000 0 0 0 0 H H H H H H H H 0 0 O m m m m o 0 0 0 o d' d' m m m m m m m m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00000 00000 000Oo O0000 c0000 00000 00000 00000 O000 O O O O O O O O O o 99999 m m m m m 99999 0000 O O O O O 99999 0000 99999 OOOO O O O o O 9999 O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O U O O O O O O O O O 00000 0 0 0 0 o w W w ww 00000 00000 00000 00000 00000 00000 0000 09999 OOOO 99999 0000 N N N N N 0 0 0 0 0 0 0 0 0 0 N N N N N O O O O O 0 0 0 0 0 O O O O o 9999 . . H H H H H 00000 O1 01 O� O1 O, 00000 O O. . O O O H H H H H m m m m m m m m m m m m m m m ,A m m m H H H H H H H H H H H H H H H H H H H H H H H H H H m H N m m ,O m O H H m of M H m H O m m w m h N N ,fI m w w m O O O O O O o O O o 0 0 0 0 0 O O O O H N PIN M 0101 G, 1 1 O mN,D a011 h N P, d' m NIGH h H m T P110 m 00000 00000 00000 0000 h h h h h h h h h m m N h h h m l0 h h h m m m m 0 m m O\ m m m m m m m m m m m m m m m m m m m m m H + m m W 0 m. m m d' W m N m O W H M O h O m O. w w O m w w o h O T 00000 00000 00000 0000 * e w. j H d . v w h d' h N N O d' m h 10 �D m lD l0 d' d' d' m h m 10 PI 1p 1p d' O O O O O O O O O O O O O O O 0 0 0 0 # H 11 r O Cm NPINNH O10 NNN mPI NNN N�ONNN mPl NNN HHHHH OOo 00 0OOOO 0000 i m d' d'd' d'd' d'd''r r.0 H HHH HHHHH N H H H H HHHHH E a O 0 aaaaa aaaaa as as aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaa a 0 NNNNN NNNNN NNNN NNNNN NNNNN NNNNN NNNNN NNNN,, NNNNN NNNN W -rl H N O m 0 H N O m 0 H N O m 0 H N O m 0 H N o m O H N O m o H N O m o H N O m 0 H N O m 0 H N O m a 11 O O H N O o o H N 0 O O H N O O O H No O O H No O O H N o O O H No O O H No o O H N O o O H N ro O O O O H o o O O H 00 0 o H O O O O H 00001 O O O O H 000011 O U O O H 0000,4 O o 0 0 E \ -H z m H m H W \ q 00 a W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W O + m V U # m Oi W 4 ro m Ba>+ ro o o m k -HOHak s # LI H m H# m H H H H H N N N N N H H H H H N N N N N H H H H H N N N N N H H H H H N N N N N H H H H H N N N N ro j D i 6 ak �k �k ak �k ik Xk 3k Xk# NNNNN NNNNN NNNNN NNN N rd O# ro a'orororo rororob o 11L JJ 1111 4141111'4J 'Q 'U 'U'0'U 'd'dbroro p'�p�pg'yq ,q7, '(T�y zq zq ❑pzp zg zq Zp '�p�zp 'yQ x ro W N # z q 0. vo 0 00 C q o C.' Fi •'I .,i -'i -'I -'I -H .H .H .H •'I q SHE 4: q q C. C'. Li % (� 'T�- LQ P9 L4 P4 P4 z z PC fA m m (A C4 LQ O$ W # 00000 HHHHH H'-IHHH HrIHHH Oo000 0000o mm O O �# wwwww aaawa aaaaa aaaaa wwwww ww0,aA. , , H ad,+ mmmmm mmmmm EEFE E+ EE[I E+ W W W W W IA WW W W w m # >4>,>1>,a, ��>, �.y, mmmmm mmm(Am as aaa aCia a m11 + si t, Si sip si s4 $4l+ 3 3 3 3 3 3 3 3 3 3 HHHHH OOOo wwwww wawa +mr:S�i'- ppgq„ ,^�QpM= 0000c coc c wwwww waaa� �cd wwwww wwwww m w m q # ,quNro# EHa I']i W j O 0 O m 3 m E O sa I�4 EW 4J X O �xxtl0 N O W 4 U W C'. N wroN H a) aJ ;J sue{ w W x ro rowN V bi w r-i ro a> w A O x ro s X m u rnw ro ,3 f9 as w N E Ot w an a E 1 uurn �d 0 0 u ro a 0 0 0 C U 0 i : o 0 O .m N W N 0 0 0 0 0 0 0 0 N o 0 ui O O 0 0 0 w 9 N W O N Caa) ro Cl. •O C 6 m t o z° t t ic t ic 4. x _. m 'a W \ Q N Zi l0 # 0 of � a�rot qwt w W m � E•�t rorooayi« u S4 N cm Id dl Q ri +J 0 t 03mNt aO w s k 0 t N1J }* Pa] m Sat O r wd t was tUa 41aha 0 rn w I-- (u)96e s _ O . O O co 0 It N �O -- 6 m H W \ Q to N ,7, �O # O� # al a) O # G � w4 41Ha�imx rowca�# (d # O 3 m N a 0 O # i o aru ?# ycn m sa# C pro:: ma(1)�« u 4 Hah# 0 0o MOBBIS O O O cc v 0 N -,�0 The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 08/20/13) NODE GRAPH 11 Nods Pond 2 002YR 025YR 010YR 10 0 20 40 60 80 Time fts) Interconnected Channel and Pond Routing Model ([CPR) C2002 Streamline Technologies, Inc. The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 08/20/13) NODE GRAPH 10 Node Dry Pond 2 - 002YR 025YR - 010YR 6 L �. 0 20 40 60 80 Time(hrs) Interconnected Channel and Pond Routing Model (ICPR) C2002 Streamline Technologies, Inc. �� # N wLnwm + #❑ W i # m d to o H m b * x E 1-1 N N N N + W ri ri ri ri + En # X m 11 aT O1 O O + W + s W � p i YES 1 I O� 01 �D �0 i + -rl Id ii E-E V I N N N N * X W .-I H ri .4 of N m n tz7 �m £ N 4 o li o O o H Y4 • W w o Qj m G U O En ro > m 9. to .-li m1 n a £ w m " r N �rn Pin O W 1 £ pa W ri .0 • E W a rN If .Ni H N y� G £ r# a a a a E 0 o -ri ? o N r N 0 0 0 a .o 0 W 0 i 0 0 0 o a 4 -rl t4 �z Z e �a o w w w o ► t; O # W q d i m i v ro m a>+ °10 o r°l a + 4J $4 W t+1 i m Id m❑rii r ri N N N 0 Id 3 m N# z a a s a O E O - # H s,wmi •rl a -rl -rl -rl s w W p o W U 7 + ox>FC�s mC U H Efa W + h3 re r F « F F + K v y o o m o (d w o o m m # # m + + q + + m w m E [n o o o oH m o n q + x Id E 4J En O O N N 1 # k # N 1J of rn N m * 16 W M 0 m C k x u m n n n n + + x m p + F= W M -A it A -0 N n 1p z Elw ' o w .Nco •b7 % d m o o m m U RUC Itl w $� U o O o O 0 a r-I O O O O W Q I I a x 3 m m N N . H IU O W w o o m r O W 0 H Ea ,I O im-I •r+—f7 w cNv nm e E a m N N N Ifl N csK� ry; ILn Ln In I„n a li N N N N O Z 0 O O O Cl. a .a ca �x �z O H QI W ro \ a o ul ,m,yy ul � m rmm o s � c4 cq pi O x ul 4� 10 x q N x d w m # +gig-ti« ro m R S x roroom« •.+ova+ 0 a) O 3 W N OHO .# PI PI N N a w« p O k a a 'Oi rn rq + O ? Id f AU FI tl+ E rla h« STORMWATER MANAGEMENT REPORT THE OVERLOOK AT MIDDLE SOUND APPENDIX E OFFSITE DRAINAGE DESIGN CONSIDERATIONS 24039.0001 F THOMAS ScHUTTON The Overlook at Middle Sound Offsite Drainage Considerations 6/25/2013 To determine the needed pipe capacity for the basin north of Middle Sound Loop, the following calculations were performed: 1. Basin was determined using 2' contours In GIS. (Map Enclosed) 2. Discharge from the basin was determined using the rational method, Q = CIA. C = 0.3 runoff coefficient for single family, residential area i = 6.5 [ph (10-yr) (from NOAA Atlas 14, ILM Airporrt, Time of Concentration assumed 7.4 !ph (25-yr) to be 15 minutes) 8.0 iph (50-yr) 8.6 !ph (100-yr) A = 38.1 acres Qio = 74.75 cfs Ws = 84.35 cfs Woo = 98.64 cfs 3. Six pipes are being proposed to convey the subject drainage area of the proposed development. The first set of pipes are two 24" pipes in the existing ditch under proposed Overlook Dr that will convey runoff for the smaller storm events. The second set of pipes are four 360 pipes under proposed Sent Blade Lane. The 36" pipes will be installed at slightly higher elevation than the existing ditch to provide an emergency outlet for the larger storm events. 4. Scenarios were run in Hydraflow to analyze water surface elevations at the proposed pipe inlets for the varying storm events. The scenarios only took Into account the four 36" proposed pipes. The results indicate that the proposed pipes will not cause upstream flooding. With the additional two 24" pipes, the six culverts are adequate for conveyance of the subject drainage area. Results from Hydraflow output: (Existing elevation upstream approximately 8-9 ft) Storm Event Ponding Elevation (ft) 4-36" RCP 10-yr 6.95 25-yr 7.10 100-yr 7.31 8 ipa n : - = THoN[Ai3 & Hurm ® EN61NM _a O�� ya,yilNE, *�O'ee • a • r'W/� e o,+Iy�•• Ge go °'o°e A101 fill Culvert Report HydroAow Express Extension %rAutoCAO® Civil 3t7O 2012 by Autodesk. Inc. Tuesday. Jun 26 2013 Circular Culvert Invert Elev Dn (ft) = 4.80 Calculations Pipe Length (ft) = 60.00 Qmin (cfs) = 70.00 Slope (%) = 0.33 Qmax (cfs) = 75.00 Invert Elev Up (ft) = 5.00 Tailwater Elev (ft) = 5.85 Rise (in) = 36.0 Shape = Circular highlighted Span (in) = 36.0 Qtotal (cfs) = 75.00 No. Barrels = 4 Qpipe (cfs) = 75.00 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veioc Dn (ftfs) = 5.87 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 5.83 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 6.19 HGL Up (ft) = 6.39 Embankment Hw Elev (ft) = 6.95 Top Elevation (ft) = 11.00 Hw/D (ft) = 0.65 Top Width (ft) = 40.00 Flow Regime = Inlet Control Crest Width (ft) = 100.00 at, in) 12.00 1100 to 6E 9 0. 9 0D 1Do Sao 9 00 400 too shame* ciitrbrCWrM HOL Embeft Ma Otpin ,n) 7 OD 4:0 310 2X �x a r. •2.00 Room 114 Culvert Report Hydra0ow Expreae Extension forAutoCAD®CWII3092012 by Autodesk, Inc. Tuesday, Jun 252013 Circular Culvert Invert Elev Dn (ft) = 4.80 Calculations Pipe Length (ft) = 60.00 Qmin (cfs) = 80.00 Slope (%) = 0.33 Qmax (cfs) = 85.00 Invert Elev Up (ft) = 5.00 Tailwaater Elev (ft) = 6.01 Rise (in) = 36.0 Shape = Circular Highlighted Span (in) = 36.0 Qtotal (cfs) = 85.00 No. Barrels = 4 Qpipe (cfs) = 85.00 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 6.12 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 6.12 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 6.28 HGL Up (ft) = 6.48 Embankment Hw Elev (ft) = 7.10 Top Elevation (ft) = 11.00 Hw/D (ft) = 0.70 Top Width (ft) = 40.00 Flow Regime = Inlet Control Crest Width (ft) = 100.00 DIV la m Oama► Gimlar Q&en HOL EmbV* RI66M (al 700 fig: IM . 00 300 M Culvert Report HydmRow ftmae Extension forAuloCAD®Civil 3DO2012 byAutodook, Inc. Tuosday, Jun 282013 Circular Culvert Invert Elev Dn (ft) Pipe Length (ft) Slope (%) Invert Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n•Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) 6w = 4.80 = 60.00 = 0.33 = 5.00 = 36.0 = Circular = 36.0 �4 = 0.013 = Circular Concrete = Groove end projecting (C) = 0.0045, 2, 0.0317, 0.69, 0.2 11.Oto 40.00 Calculations Qmin (cfs) Qmax (cfs) Tallwater Elev (ft) Highlighted Qtotal (cfs) Qplpe (cis) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime ( lf-i •� :� �i . %ti• 'i ,�: �! 'Y..... 44. a �.. ,• r. H.• •'7.-yi+s;..''. {t •� � :. �.w ��.., >r� •• •'mow .: '�,, '' .ax:.r {°rr :iS'•!-�.f "v:,'.. t�i�;!4. J'_ti 55.. r�1�, :ri.ir: �''ti y,.•' 6 GD d Ou 0 6 ID IS 20 26 Ci1rCWV Cul+On- HOL Embank t6 K. 76 6: = 95.00 = 100.00 = 6.27 = 100.00 = 100.00 = 0.00 = 6.46 = 6.46 = 6.41 = 6.61 = 7.31 = 0.77 = Inlet Control Ow DOp1h ID) 700 6M 5w - a% 300 InI,I:On p 2.M — 1w 0w .150 % 60 QQocn 41 STORMWATER MANAGEMENT REPORT THE OVERLOOK AT MIDDLE SOUND APPENDIX F POST -DEVELOPMENT STORMWATER PIPING AND INLET DESIGN CONSIDERATIONS 24039.0001 R THOMAS & HUTTON r. _03 C4 TM !V C) 0 ANN ohm 40. r. .0 AMR w i 0 �7 E W� T C O GY d r— Q +iris W 0 4-1 co a (t) h- to J r T O W) D 4 r CP O rD D 4 O O O 0 0 T W co Co Go co 0 0 0 Go v .-- LO W W W CO (D Co CO CO Co n N � T O N n 0 (D. Co• CO, — yy v r T T T T CV T O O n r Co T Ch r CV T r r �j 0 O 0 0 pp 9 Cl CD a CD 0 0 n Co 0 o a O 00 T O CC) O O O O O O Co q C Co Co M O Co N Cn BUY T T r T r T r T T T r r T T r CV O d M M M M M M M M M M M M M M M M M M M O O O O O O O O O O O O O O O O O O O Z> O O O O O O O O O O O O O O O O O O O a � c t U U U U U U U U U U U U U U U U U U U a ❑ J � C a O W N N r O CA O Co GD NV m T T r T T N Cl)C07 Cl M z J CA Y a a❑ o 0 0 0 0 o a o o v o 0 o a o 0 0 0 0 C O N O T O Co o O - r O O Cn N iF � � N W ar' r` n r` tO N f` GO m— T GO r: CO O It CV CV C ) W 0) Co 't C) m CA W CAM 0 W O) 0 0) (p 0) co Cl) M CD M c0 1-0)CO co Go M CC) m W G C G^ J am° O O O O O O O O C O O O O O O O M O Co O o 0 O O O O O O O o M N O O O co O O O O O ^ Go O r M Go m Go co O N Cn Co n a N O C W (O n tO CO CO n t: O T O r CO LL") C'M- CV CV m E c to M CR N. (q M to Co CO CO LO Co vi O 6 -WT Go T ui v r, Go Go Co W in o C E T N T N N N N N N It N 0) T r T N T '- Co O O Cn a a O Cl O O 0 O O W Cn Cn o M Co o CA n CO CA Co CO co Co CO Nt O) (o O q O q (O q q 3 V O O G O G O O O C. O 0 O 0 O O O O 0 O ❑ e 10 T O a W n N N O W n W N Co M O N N N N M Q a v O O O O r T C O O O O O O O G C T O O c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ❑' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Y O O O O O O O O O O O O O O O O O O O E a a n a a .n M .n 0 .n n a E E E E E E E E E E E E E E E E E E E Ul 0 U 0 U 0 U 0 U 0 Ci 0 U 0 U 0 U 0 U 0 Ci 0 0 0 0 0 0 0 0 0 C U U U U U U U U U Eq ao O O O O CD 0 E O I iL O oo O w O co a O 0 0 a a`-o ' r 60�1 6n�! m O 605 O O O C0 o o n w GNo o O oo O w w d C 0 0 001 O) 001 r N CO T N C C W O It: c am a o 4S! o 0 0 0 0 a R7 4 O Ir! "r O O C}r Ui SO _ O O o a O O O O O P- V3 q 0 0 0 0 0 1 0 O of O CD as O O 0i O O O O O Oi � r v O e J $ N N N [*+ N N 0i i f 0i N of CV of CV of N �n r m r r N N N N 0 N a M cs Co G O C ❑ -i Z T N M Cc) W n O1 W n tD Cq .c} M N W CI} W R? a T W Co M N T O p C JZ 0W n (o 0M N r m m a r. 0 CL 0/) 1.L E E co co E IL 4-M co a o g a a a a o 0 o a a o a a a a a a a a o a a a a a a a a a a 0 a a c s c c c g c c c c c c s c s c s M 7a, 9 9 a a m a m m a m a m ju :a a a a 9 :a E E E E E E E E E E E E E E E E E E E O O O O O O O O O O O O O O O O O O O (*+ N zi Ql Ot C r-O � fro 'a m 0:3 z N M O to h CA co h (O N v Cl) N r W ni 16 d C J Cyj CO O CO M O co v h Cl) O M CA r C � CO l f) M CC1 OD O O O) M N O1 � CO C � - - < O O O O O O r O — — r — O N O a O CO O OD O M r M r M r O O O N M (O CO O O M O n O N r r _ 47 N CO O v a CJ C� 0 CD 0 a a O C c O O a n C7 a 0 a r • x r x r r Ck7 J N co O O M O M r M M M r CO r O r N r r a$ "t lA U� Cl � n O O � Of N O [A I- lO N M V7 !A o 0 0 0 0 0 o r r o 0 o c CR n a r x CO r CA x r r x O) r M O st O r N x 01 x v x a x N r x m C J R M M r M CO A 07 n n r O A CO M r N 3 O O O O O O O O N r O O O O W n M N 0 0 O � � � Of a 0) CO A Cl) C M CD CO 01 CO 0OI CO CO 0) 0 0) CO C7 M M Cn M Cl) (n �N�jj M (D N O E 0" J Co 'e o c o c o 0 0 0 o c o 0 0 0 o c Cl) o CO c 47 o t' C L O O O O O O O O CWO � Lq O O O O O O O O d:3 O N O r O It) O O O It N O O M N It It 't N C A a C` r- r- CO n n OD m r r r r OD n CD LO q CV CV 'L O o 0 o O O O O O M O N O O O O O O O O O o y O O r frJ M M M W C7 �' N CC1 q n V: 'ItCn N O r,:OO r r r O) n CD w v m N N W 0 0 0 0 0 0 a r G f� O ifl pp N N N N M M J N N N N N N r r N N N N N Cl) E O U a e E U U U U U U U U U U U U U U U U U U U C M OD N N M Lo M Cn M M OD N C:3 CCpp Nd' 04 [OM C`O7 M C J U) W (O CO o0 n o O f` N h n O O (Np L7 _ 3a °� . Un OD aD O rn LP n M Ln a LL v r N V N V) M Cl CV r N N v (ti CA N N N W w a � m c a as wi O II i 7 N C;1 �5 Sy % C.b r p 0 .a mL, f Cu r O ps w 47 lei N N Wit C w D 0 C � r r I( I Z Z O ;s- CO CO vJ M N r a d) w 7�1 w ME CL d C o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e 0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m r- CN n n O 'r N n O O t• W N O r O M m � O O LP t. N N n W f` q N n W LL'f N C W y :o T r lii T r co U) Lo Go % Lo gn Ili T Lo n 1;N N M 0`D :. m CO M M M CA st M O n M r` b Co Lo T ly qi C O C O 0 O O O 0 0 N O M 0 O O O N 0 ors O .v C N O L.1 C a N � �' t• W n n O t~ O O W N N M n O M N W W T CA Cn a ro M r r m M W m r` 0 m M M r- CD Cl) � Cn m m m M CA It Cl) O r.- Cl) ti w Co M r O .4 0 0 0 0 0 0 0 0 M M M M M o 0 0 0 0 0 0 0 0 0 0 0 0 o r o 0 0 0 0 0 ) � C O O O O O O O O O O O O O O O O O O o 0 N vi O O O O O O O O O O O O O O O O O O O C ` K N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O C O O O O O O O O O O O O O o O o O O O 3 � u M m M Co M m Cl) M Cl) M M M M M CM Cl) M M Cl) Cl) M O �^. NO m m m Co Co m m m m m m Co m m m N O O O O O O O O O O O O O O O O O C] :3 z -d O O O O O O O O O O C. O O O O O O O O Cep 3 O N O O O O O O O O O O O O O O O O O O N N N N CN CV CN N N N CV N N N CN N CN CV c 3 W W W W W W W Cl) O N N O O CO c 0 l0 W W N t6 C11 W CD O O O O O W C N q 1 m m m m m m m m m m m m m m co m m m m 13 N N N N N N N N N N N N N N N N N N N C O O O O O O O O O O O O O w O O >- a J C7 CCl)r) m r) r) Cl) Cl) m C7 ch Ch r) Cl) CCl)Cn Cl) M N M R m m m m CD m m m O O O O O CD m m m m m II Q O O O O r r r T O O O O O O O O O O O Q :r r) m Cl) r) 0 0 0w o 0 0 0 0 Cl) Cl) CV)Cl)M r) O a 0 0 0 0 0 o 0 0 0 o o 0 0 J M Cl) (7 Cl) Cl) M Cl) M (1) N N M C7 r) co Cl) r) m CM dl O O O O O Y O = lw It a a a a a m a m m m a a a a a a a a a t o c e. E E E E E E E E E E E E E E E E E E E U U 0 U U U U U U U 0 L) 0 0 0 0 0 0 0 a o 0 0 0 0 o O o M m m m m CD 0 0 0 0 m O O O O O O O O a N T ar N O O O O O O (� m O O O O O CJ O O O O O O O C7 O O O O O C m m m Lo m o rn O W N nO m It M to Co Lo m Y -' .L cr v Tj V T m N CO N N LC1 M 1n r) In r) mq1tr-: fV r r r O r 1n r N T IA M• N T M r ELn w LU O O O O O O O O O O O O O O m O O O O r -u W II ('f O O O O O O O O O O O O o O O O CD,C) O a- N c 4! m CD W m m m O r` N p- Ph m b CO m CO Cp m m N W 4D an OR CO o m 01 a O N N Un N Cq c C'J i.i v T N N r M M M N N T r r r r r M T r •� o Io C n o � z CD 11, T N I CM N a= r � W d C O I — - - - - - - � I I Z J Z O In co m m r Cp O N N O OrNOO C G C O C O C O O C C 0 0 0 0 0 0 0 0 O O O O O 0 0 0 O O O n O O 0 0 O uO O J O r O 1n In O O O O O O I m In )O In M O N to v P P T P T r O• T P P T N 0 M m n M m W n T El m m wOO w m Na m M T n In 0 0 r N N O O r O O O O W 03 M O T O T O O Y W O O O O O O O O O C C O O O O O O O O O t� P m M Lfl m n O m d1 n O O O M n N m m m O) m t C. O M N N T O O n N l[') M m m m pj - Qw.r Cs 0 0 0 0 0 0 c7 00 c 0 0 0 0 0 0 0 0 p T M w n 10 n O O N n N m m It m m m0 m O m O 0) O O O N m M 1C) v m m CC _ O O M N N T O O Co P O O O O O O O N O O O O O O O O O O c O O O O O O O O m 1O M m M OD p O M v O O o O 0 N O O N N Id: N O a1 0 n 0 to o M O N W N < 01 N a M w M M M w O N m m m m In m r O7 O O O O P T P O N N r O O O O O O t 0 O O O O 0 O O 0 O O O O O O O O O O O O O V' m in v N n 0) v n O N o 0) eri OD m OR m M (q n M m7 M Il� N T m � q� > P CV IV N CV M CM M N T r fV CV CV N O M n M M M M O 1n m n W Of n n N N N 0 OS N r• P T N N N N m m OR CD O O m m m Q v P M M O O O n ti Q) 0) 0) 0 l0 N O Lq O O O O 0 N WO . 1O . In N � * M n LL) r O 0 O 0 O O O O O 0 O 0 O 0 z �^r P N N e- O O C r CV CV M 6 M 6 07 N OD m O m O M M It O n OO CR IO O V O n M N to m O O O N n O M co m � d q 7 0" 0 n O O O O O O O O M v in O O O O O O O O O N O P O In O O O 4 N 0 O In P O r O O O C4 O O O O O r O O O O O O w m C O O o O O O O O O 0} N T 6 g � O g O1 0) O) w m 0) 0) W 0) 0) 0) In M SJ' r Co st O) W J N N N N N N N N N N r N N N N N M P LO M tO m n O m O) N n (D O O O C. n N N u') m M m u•� CO fD m O O O M N N O O la O O O O O O O y ;e O O O O O O O CD O C O O O O O O O 0 M W M O n N n O m d• O O N O v m v N v n O O 0 0) O) O m m V' N N V' W> y d� O O o O O O O - T O O O O O) P T T T T P P T 0) O � N � co 10 M M M co O N OO It M m m m n P N ja O O O P P T O N N T O O O O O O O C O C O O O O O O C o 0 0 0 O o o a _ N m m v O O ao O n O N ao O Q7 Op OD M N 1� N T m n M n 1� M M M M O iO m O n n N N N U N N N N N LO OO m O O m m m r O N I� • - 156 ln O O O O O In N m N m N O O O co O O O O O b T � OO m n m m IO O 0 w 0 m .0 N N P T O O O P N N M M M M M a H 'a C � 'It M N ..i o G M C O OD N n ' U C � M d> C. 0 0 O o 0 0 c, N o 0 o O O 0 O 0 0 ❑ > d1 OR O r M m M tID OD o N UO m n tO N O co T O n m m V' M N N r w' O7 0 n O coo 01 Ci O Q d t4 "It CR In 4') to W OR O O In n V+ m � P N M) M M M N T N N V W 0 N N N l7 11 N E N N - In In In co 4 P T eU-) T T — r P — T N M M M � v � � - of O m T m O � N O a1 O n m 0 t* Cl) N T 0 N J T � � � � � 0 L. a. r. 0 � � � CL E 0 � � � � . k 0 \ k k8 B.- a &4 k :3 ■■0 o 0) �a £ . A -r 0 V E ■MaL you @ "g' 5EC� §■/� kkjF= E9mR /j�\ ■� �� 2&§a 2tE � s- ■ §t$k ,An -0 .mom] E & ]D § �I. d co }$\£ �a k§ 2$©� ,kCL §]A§ %]R§ f=ems � R k � L) L) k § $ \ a / Ed 2 $ \ a k k k ) 0 \ 0 r r w f \ � a d 3 � � g � K 2� � \ k a � i La k k c E | k do KP B k N J � � R FIE§ k d � Q L) r. _cc N TM N 0 INN INN 47� x LLI E I- 0 ■ CL r- M � � 0 � � � � � � � � � U) � Lo 0 U) 2 k ■ Q a a a a a 9 e ? m cm L'i U n I I I s I I $ 2 t LU § © R % § Iq $ q @ _ - - _ - - - 4u£ e n n n n Cl) n d d d z» a d d d a @ � 3 § § A § § / 2 �� - � \ 2 ■�2 m m R f E k >- B g q q e q I ■ £ w Fl: pl: 6 w _ CY) § o o C%l @ � � 2 2 2 q o G G@ 2 R 2 ] w E K K K w+ a 7 E rl� e m C 9 $ -�- r� 0 k § § § k k - u� 1 LL CD to D d d a d§ 3 k ■ 0 § § § § § § . j k \ k k k \ � § o o § R % § M ° § $ § d 8 q d . " . E o■$ . 8 8 8 d n A § $ g R R qr% ■ _ m m m , § C 3j£ § _ § $@ci 2 m u z CN n c w E 2 m n n CN _ ��| §) ■ � LE 0 � � � LE � 4-a � � � � $ eq qq 1£ Lei � S A:3 cO § 00 § Ja --- 0 f CD J §2 m� mW § § j § k � KD d 0 _ r C §§§§ A: 3 d 2 � ) . 2 © a a m R m cc le V ■£ 8 _ 8 8 8 8 8 c 0 Of 2 2 0 0 m iz w & ` § C S § G § ■ ' � � � � � ) \ k \ k \ / ) a Cu k � I§� CD � © 9 9 - n C� * E OR ? I to to n §z ��� ■ � � O M � � � � E E � � � � � co E I= -W co § .5 § . § . 2 § . § . \ \ k k k 0 k k G o O u o o m � ■ d / � Cl) � 2 w cl z � 5 E -j § q Co q o § £ Imo_ d k■- § G G q# G§ d a o 0 6 6 § § § k k O \ 2 �- 2 c B § § ® B % ) k ■ § � Q § 2 § 8 S § § & §. 7 2 o 6 d C) q j■- � § § § \ £ � � LLI- o -- - CD g e q 2 i-£ w_ r I r, w_ w § § § d k k @$- ' m m g k 2§ � 2 E & § d § § Am § 4, -g � 2 m m Cl) @§2 2 2 q ■ Q - 2 § q co � 2 w \ ) � k � ] / � � ) � § I£± I i o k 3 9 f f f 5 § L cm C4U_ a a I = = a = . } E ) § ƒ 9 @ 2z (D « It n N � CL |� a CL 0 � � CL 0 £§z CL 0 k 2 2 2 2 2 2 CN k §§§/§ 7 m E f e k£ § § § § § § k � % % 9 9 m I% LO to co » � 6 a I-B / q q q § £ 0 0 0 0 0 0 � § § § 0 0 0 $ C d d d 0 d d - k E § § § § § § mo t d a d d d d % § ( GClo)0 / k k k k k 3 0cGoo z 2 8 8 0 0 8 8 2 ■ E w w w w w& o B g ' D ) 0 (00 k § § \ § § \ ■ E ƒ � a a a 8 a A a £ W� w w Cl) Cl) C4 e g q s@§ 43 cr « a (6 (n n w or) a al a cn # #ItIt n m V) § o 0 Cl C. o o- 2 E ?$ f f i E k r2 / v A o G = + �£ % 8 8 8# 0 2 CY■ a o d d a o o ® s q to q R as - w k $ R $ § § § k § § ) Al ~ � § § § CY§ a d ci ) i o m 3 — � 2 � ƒ § o co Lo IT n C— § nz ■ a § ■ CM G & @ 8 a § 11.2 £� 0 0 0 0 d 0 � % 7 § % 8 q § % El e CD 0) 8 m m S n m & o E� 0 0 0 G§ d 0 d G 0 $ 8 _ k k $ k k k ® k &� E § / § k � a j k & � w E� a / � a 11-:� j d 0 d 8§ d ' G £� Cl > d 0¥ d d d k r= � q q q I.- % % -0 « a E E g q q 8 8 8 S g q q# 7 ■ —� 2 2 g q 2 q I£ w& r- LO m qw k k k q §R C E m E� m m m 4 m[ CO cm n C. rl- § 0 / § / 0 0 % CM § % � ■ / } § 0 § k § > 2 £� 0 E LO 0 k { / § §. ; k�� § § § § D J 2 8 8 8 j ` § § § k � » a q @ § � E k � co to Cl) § § Cd E� It to g q .§ r, 0 ƒ in CY n 6 . , 2 . ¥ w In U) m co , . m z - � � 2 w m_ n c- ƒ .- S 0 Lo � � � � 0 L. CL r. 0 � ANN � CL E 0 � � X� � 0 � � � � � a k 8 Cl. $_ k a k �g a &2 a e©0'Q _ ■■§— U,$\k (D �r\ou f2«u $:r g7 %p%k k0ZU f ' ki E9 E cri /) §La §_ »/ 2$I2 k -aE E�f| ■§2§ K2b� w I dD LLMk0 CL 4§ E a¥®� La/ 0,2§} k) u � a in -0t§ £ ±38� B � 0 k � J 0 0 k i § k § § � k � L) E § 2 } � G tv 2 I d d d 0 3 66 � � A 2 d k | D ] E k k do � B � § @ a u G G R c co K C4 CD C4 cq r� V 0 0 0 o� ANN x w i E 0 _0 4— cc � a r OL � � _0 � � � � � � � U) � Lo 4a U) e 7 I I Z 2 a o 0 9 2 Q a © I I I s I e e■ I § 2 ~ a $ t_ g q k k§ 2 § 8 C. ■ $ % § 7 § § 4u6 e a d z>£ d d d d d d $ § § § § § § G § § co ) m� k � 2� aw v m m f z ; m_ S r- g k w m 8 p 8 S £ w r-� r-� P-� K d (6 w + , R m § q m n n kg S ■ oa o d 6 6 d 2 CD CD g 0 a p a 2 t Slu-£ w q F- P- I- 1, 0 w L+ ,2 J\ �& 04 R c § d Q ■ §§# G g 2 G 8 q 0 E a a o d o d(3 d o U-._ e a k G p t SR 8$ & I$ d d d d d d d d k 8§ # o g ' 8 8 8 8 E 2 o 0 o d d a d a Si f @ a k\ k k k 0= CL r G o 0 0 o Q G■ 0 0 9 w It o 0 0 a_ k / a tz ■ d % § o3 � § 8 aE 8 C3§ K 2 9 ) ci � $_ 2 § k § ■ 0 N, CM ~ r4 o / \ I3 £ I § I § Fohlz n w � C; - Im Go I, c LO V n N �z ■ a LE 0 CL W � LE � � � � � � CO) 2 k Bq m0 Rk c® 1, (DI- In I.- LOr- 2 E c M § § 3§ 3§ §§ § � .. ■ 2 _ § a 2 -co (DLO Co� @£ � n_ n� / ) r- § § § § F f d � I I 3 § § § § § § § §zi d V K z e Lo W a v w co CV a — N n n U)+ a 8 8 8 8 8 8 8 a § _ � � � ¥ � � � w � §£ � ■ w E 8 8 8 8 8 8 8 Cl $ R # ¥ c � 2 7 w w m m w w m .0 E ; q Cl)G I ■ ■ { . . . . § j § � t cc co co { . \ Ir ] 3 t k k k k E k k$ G 30 G o � g \ d I w I I . L a r ft, ® U U & � § E 0) co 1, co U) v n C ■z ■ CL �c 0 rl a) � 2.11 cc E E :3 � � � � � � E I= 0 +j co . § . § § . 2 § . . § . § . § r. E \ k k k k k k i a 0 0 0 o u o 02 Q a U @§ d =-Sz - N CO It n N_ w a § . c£ § g k� q r q§ k £ k § § § § § § § k § § k _k § § § § & e 2 § E - - - - - - - - - / k to It*CD -0 to) g§ z . S - § § § \ § § § @�— 2§ o d d d d o d 2�£ EL g K S k G 8 8 m# 2 k q$ a k 8 p R% f u£ w_ 1 R� a 8 8 8 8 8■§ g e« w m R(D k o m%§ o§ k$§ §■ F m [ § § § § v § § § § 2 2g \R m � ■2 § o 2 j § m a c § L q f / � � w / < 2 U. G § e e d - \ $ g b t § m f I I I 2 3 2 2 2 D - V � - 2 / m U ej ej U N Ucm Q U 2 t I x x x � x 2■ e » ) ) ) , (L z = a M oo l- W O-e m�_ iz a CL CL 0 � z ■ ■ ■ ■ ■ ■ CL k 0 2 2 0 0 0 0 n 2 CN r I § § § § / § § � 7 F � is,g q q� q q 8 ) £ o d o e 0 o 0 0 o c § cm N § I % � � 8 @ E to -T+ 6 m- M 0 a q§§ q 8 \ q o 0 0 0 q 0 0 6 d £ 4 0 0 § § § § o § § c o 0 d e d 0 d 0 0co - k ) § § § § § 2 § § ; k 2 . a d 0 a d d n o = t j k n n § n @ n k m § o m 7 k § $ § f 3 d e 0 o 0 CD 0 2 2 ■ E § § § § § 0 § o § § B g g E 7 2 ak ; ) § § § § \ § § § \ ■ E k a a a a a A 8 3 £ a w w Cl) w m k 0 w f Go 8@- OD cos- \ r e 8 n « a ® w w e w cd(d 0 m I ICL a a a E a# a 8 a K s � a Cl) Cl) V) m n a d a ■ I � 0 0 0 0+ 0 0 0 0 0 k \ k k k k k k k : k I Iw Q o 0 0 0 0 0 o { + £ # 8 8 8 8 0 8 8 8 m CY ■ o d d d o 0 d 0 _ § k § § § § § k § § o o $ J 0 % wi 8 8 8 8 8 8 0 0 k e f d d 0 0 d d 8 G e d 0 0 ƒ ) a R w a 0 0 ( § $ A Or $ Cl 0 w w w w 0 w ) § � ! 12 ® } ` - - 2 f 0 U 0 U d 4(& e k ~ 2 - $ § . �z O O O O O O O O C O C O G O C g M J Y v o o ff�i• o o fon• O o �roi• 7 v �--� y N yyy N r O ti I,- M r fO r co W M r Cl O M r C O O Y W O� O C O O O O O O C GVf r h el' o n O M O O O O O O O O a� O O tD O O f7 n u7 u n N M N� O O O O O O O O O J M v N en- M O O W of r r r r 0 0 0 0 o 0 0 >tvcoo g— o 0 0 0 0 0 0 0 0 rn v O fop O N N M � N N c > r r r - •7 $ O N � I -- I-- O O Q r v N N fND Q � r r fri I: ti m � N N N O O O O O LO z r r r r N M M CM O N Or CM7 N O O Cm _M ... fop n O v, [00 N O n COD, m n n n n f0 fD 12 of O O 0 O O O 007 to O t--, co, O of v J N co N N N Or - r �_ st O O O cm o ` O C, O O O N O O O O O O O O CD J r0 O N A M v o O O O o o O O •_ � O O O C O O O O O v f7 r c- r r r m �37 Q r r M I- 1- M E N fp N lop O O O c CV C7 CM f7 N v O _ N O f0 O O O01 C li �> r r r r r r 4� C Y d ^•_• O O O O O N O ? Cl M I. Co .S O oO N Q n n n 0 Ld ff3 Nr r O � M �hco � N N M n ~V fV 0 11 � Q r a0 O r N fV W M M 4i M cS N � II .N.i ff) to m O CD fp co N da ID 41 L' C V n a► o 0 C M OD n CO fp IT M N r a •- J W L a. CL E 0 J _0 e 0 m c � n o us o M a)s d�oa�i N C 0 mv H 0 r fd A w .s2 U C_ N F W 9] RDa 0 � o � 0 tp m 3 Cu L �mu J L "-^ m E o mt = E IN = OI po w w .0 .E -�•- C 7 m=`c rn to o �a °wE'v = E Gm rn a� G' N C _ � U 0 ` 10 cMM 41 C 1a 0 CL w Cm 7 A E J a— 5 L7 m c a= � = w w � Ewc°ii7 g c a �{0E bco w w rt E c 0 m 4 H 47 0 L] 0 L? n o R v {0 `L m c m m m c5 M V— t �m- O 0 0 m W 4 U ID r Q D N L] L1 a Ci3 K N CD 0 long ees c 4) ANN x W W E L 0 _0 2 m o ■ a r— CL cp � � ANN � � � � � � � � E am 4A cn � § � 2 § n_ n S § q @ $ _ I t © w 6 0 j@- # 4u� & , n n m zzj § § G o o d r 7 § § §ivi 2 �� __ N a k t! a k a C> 2 2 2 § £ w . 2 n co co cn ■ -i_i 3 3 /V. o 2 e w E w wi w k § § 2 7 m § � , IM k § § Co § § � — � q k ) z 2 Go co � a Cc co § � 06 d m CM o @ & @ n $ § @ c § \ Cl I 12� E is § A Q2z W ) E to @6 iz n 2 � � � 0 � � � 2.11 w E E � � � � � � E am 0 � � § k/ $ © f z 2 ® § c c o 2 L Ql k 5 � � � LO \ § 0, n � e E N / a a k ` 2 ) . m 2 f 3 2 3 2co @ R a 1 d £ In w w c LO � e - £ a a to _w_ e CD Cl) 0) ■ q C14 G 6 @ :32£ ° c" I § § § ; :3_ 2 CM @2 § ��� Co ) $ § § I � CD0 ƒ E 3 \ & � ZLo § � § g m � § E 2 k aCY _ 2 q ■ z o n — �z � � � � CL � � Q CL It§2 © CL o 0 0 � a 8 \ CL It % £E 2 g q § $ id £ 0 0 o a § � r-� o 0 I£ 2 0 � £ o 0 0 � CD CD § 0 0 0 o e c d d 0La - ° 8 a C.4 ; 2 k 2 = 0 J { 2 _ a 2 k § § / 3 2 t ■ E 0 0 0 � 2 2 2 0 B � m 2k M cmn k 2 % 3 ■ E w o o / Q 0 C. 7 £ w e d j 8 2 § % 8 « a to d n 2 k 8 £ # 8 C3, 0 a K � I f d d 6 / c CL k \ z + ■ # # ■ ■ 3 o a d { 0 0 § 2 G $ 2 2 \ £ a a a 3 w , § a O d d k ƒ § to w e _ 6d, a 2 I 'A � R � co 2 a ■ » a r m` - ` [ § _ ƒ o 2z n 0- CL z ■ CL § § / R # 4 § , & cm o w C3 & I £ 2 § § § ■ # © § J7R WO)m k 93 6 d d � CD § j ■ § & § £ _E n CN e 2 2 >2E� d Lo Cl)Ui ) 2 > _ cr § § § f E q a q Cl) A 0 � K o ■■�� q Cl) & t L6 L6 k co Cl) Im _& m & E� d m ci § k k 23 § _ o o 0 n � � � m . E K co \ 2 E Cl)CD § § � LP � w § r- § CO vi C Col. § § § E� 7 § \ § \ I LO § § 3 E� § 2 , § . g � £ E & q q G a m n� 2 » a ¥ $ v � F \ ■ . n C14 � 2 2 a c C o M 00 Od Q- -0 o3���c a�>oar- 'D '' a` m c o w N 4) = O a) C m = a. - _ E OO)!!:: •C'z wn' C M L 7 C m RL R- L C r_ C m m U O O m € m m 3 m a w _ LM M $ O m - m m c rn 3--0E m c SEEa cowwr J a •- .j C7 m o m = C a r L'a Lai LE g m t ci ,8 N E E m m °" m a a sa m a }' E w m ti 'MArn a v}EL ' E 1 aC CL -0 m uc w g J U m= � r a r � 2 c mN 0 a n m j N dP ~ @ ^ W _, �a 101, m �j E m m EL O E 2. M, _ a) m Eg ANNL m 3 m a w G CNl • a�Q, Lm N d. 8 ;5 W0'a `a m c o�ca U m cm J p m �42 3 C G S rn m C E ♦R rn L CL E O M G7 4J 1 j c a — O �' ai C O tP. a "L m m m Q 3 r m ms In w �) Q o O C m s O C 'u t mo S c c : °°CL ° w m ai H F- F- W FF$' F C} - } 1- _ [•J )� Sr Le) to )- CO M co T m O O D O $ O O O O O O O W M m cl a a m a 4 m m m N c a U !O L) 0 cn IZ G] O N L) Laa F M a 0 V M m N L) STORMWATER MANAGEMENT REPORT OF HE OVERLOOK AT MIDDLE SOUND APPENDIX G WATERQUALITY DESIGN CONSIDERATIONS 24039.0001 H THOMAS Sc HUTTON Mr.PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB No.: 24039 CALCULATED BY: BDR DATE: 1 O/8/2012 (REV 06/26/ 13) CHECKED By, JDR THOMAS & HUTTON SUPPLEMENTAL CALCULATIONS . WET DETENTION POND f Site Characteristics Drainage area 431.700.00 ftZ 9.91 acre Impervious area 185,600.00 ftZ 4.26 acre Impervious Breakdown: % impervious 42.99 % Design rainfall depth 1.50 in SA Watershed Y Water Ouality Volume Reauired The greater of either the 1.5" runoffvolume or the difference between the 1-year, 24 hour pre & post development runoff. 1 i" Vnfimr- Volume of Runoff= V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where: Rv = 0.05+0.009(IA) Rv = Runoff Coefficient = Storm Runoff (inches) / Storm Rainfall (inches) TA = Impervious Fraction = Impervious Portion of the Drainage Area (acres) / Drainage Area (acres) IA= 42.99 % Rv= 0.437 Design Rainfall Depth = 1.50 in. Drainage Area = 9.91 acres 1.5" Volume 23,578 fl? 1-Year, 24 Hour Pre- Development Runoff Volume Volume of Runoff= V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where: Rv= 0.05+0.009(IA) Rv = Runoff Coefficient = Storm Runoff (inches) / Storm Rainfall (inches) TA = Impervious Fraction = Impervious Portion of the Drainage Area (acres) / Drainage Area (acres) Pre -Development Impervious Area = 0 ftz Pre -Development Drainage Area = 431.700 ftZ IA= 0.00 % Rv= 0.050 I-yr, 24-hr Design Rainfall Depth = 383 in. Drainage Area = 9.91 acres 1-yr, 24 hr Pre Volume = 6,889 ft 1-Year, 24 Hour Post- Development Runoff Volume Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where: Rv = 0.05+0.009(IA) Rv = Runoff Coefficient = Storm Runoff (inches) / Storm Rainfall (inches) IA = Impervious Fraction = Impervious Portion of the Drainage Area (acres) / Drainage Area (acres) Post -Development Impervious Area = 185,600 fl Post-Development Drainage Area = 431,700 fP IA= 42.99 % Rv= 0.437 Design Rainfall Depth = 3.83 in. Drainage Area = 9.91 acres 1-yr, 24 hr Post Volume = 60,203 tir Pre/Post Volume Difference = 53,314 fe greater than 1.5" Vol. Volume Required = 53,314 fe Pre/Post Difference 92,000 SF - Lots 73,300 SF -Roads 11,500 SF -Walks 8,800 SF -Future Page 1 of 7 PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JoE No.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REV 06/26/ 13) CHECKED BY: JDR THOMAS SUPPLEMENTAL CALCULATIONS • WET DETENTION POND 'I Stora¢e Volume - Actual Volume Provided Insert elevation and corresponding surface area Start with permanent pool elevation and work to freeboard elevation (min. F from top of bank) Label Basin Elevations ELEV. AREA ft= INCR. VOLUME fN CUM. VOLUME f 3 Permanent Pool 6.5 21.750 0 0 Top of Veg Sbelf 7.0 25,422 11,793 11,793 - 8.0 27.700 26,561 38,354 Bottom of Freeboard 8.6 29.095 17,039 55,393 Top of Bank 1 11.0 1 34,875 76,764 1 132,157 Volume Provided = 55,393 fe OK Peak Flow Calculation - Rational C, Pre-Develoument Area Description Table 3-2 Runoff Coefficient, C Area (ac Wooded 015 9.91 Composite Runoff Coefficient, C = 0.15 Peak Flow Calculation - Rational C, Post -Development Area Description Table 3-2 Runoff Coefficient, C Area ac Lawns sandy soil flat 0.1 5.65 Im ous 0.95 4.26 Composite Runoff Coefficient, C = 0.47 Peak Flow Calculation - Pre -Development Peak Flowrate, Q = C*I*A C = 0.15 I = 016 hAr A = 9.91 acres Q = 0.24 cfs Elevation of next outlet above Permanent Pool Pago 2 of 7 PROJECT NAME: THE OVERLOOK Mr. PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB No.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REv 06/26/ 13) CHECKED BY. JDR THOMAS & HUTTON SUPPLEMENTAL CALCULATIONS • WET DETENTION POND 1 Peak Flow Calculation - Post -Development The basic equation for 51fitACt'ti iC>: 0=Cr,A 2gH 1" IV. -Le. Q - 1. 66ars' (CIS) Cr, = Coefficient of discharge (dimensionless) - see Table 3-b A = Cross.sectional area of flaw at the orifice entrance (sq ft) S - Acceleration of gravity (32.2 ft/sect H,,.. = Drie ins head (ft), measured from the centrutd. of the orifice area to the wakes surface - Note: Usually use RW3 to compute drawdow°na through an arlflce to reflect the fart that head iv decreasing as the drawdown occurs. NOTE: For peak flow, use maximum driving head, Ho hy,�sc �ehomalirrcre�on quroueh re a.us+^� Table 3.8 Values of Coefficient of Uiscbmge, Cn (`_41.d emn,1989) Futxame cauditian Vs, Typical default value: 0,60 Square -edged marance 0,39 Coneraw pil-., grooved end 0.65 Comtg. bA girt tl pipe, mitred to slope 0.52 Corruaas�wi tnetsl pipe, projecting�from 0 UW Page 3of7 PROJECT (NAME: THE OVERLOOK Mr. PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB No.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REv 06/26/ 13) CHECKED BY: JDR THOMAS & SUPPLEMENTAL CALCULATIONS • WET DETENTION POND I All variables to calculate maximum discharge, Q ate known except driving head, Ho Need temporary pool in detention pond for design storm Label Basin Elevations ELEV. AREA ft') INCR. VOLUME W CUM. VOLUME (ft' Permanent Pool 6.50 21,750.00 0.00 0.00 Top of Veg Shelf 7.00 25,422.00 11 793.00 11,793.00 8.00 27 700.00 26,561.00 38,354.00 Bottom of Freeboard 8.60 29,095.00 17,038.50 55,392.50 Top of Bank 11.00 34 875.00 1 76,764.00 132,156.50 Volume required to contain from design storm (fO) = 53,314 Therefore, temporary pool elevation is between stages and cumulative volumes: Sta a Cum. Volume 8.00 38,354.00 8.60 55,392.50 Using Interpolation to Determine Temporary Pool elevation at Volume = 53,314 Calculated Temporary Pool Elevation (feet) = 8.53 Provided Temporary Pool Elevation (feet) = 8.60 (Elevation of next outlet above Permanent Pool) Other Variables for Orifice Equation CD = 0.6 Diameter of Orifice (in.) = 3 Normal Pool Elevation (ft) = 6.50 Head (ft) = 1.98 (Based on 'Provided" temporary pool elevation) Max Discharge, Q (cfs) = 0.33 Page 4of7 Mr. PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB NO.: 24039 CALCULATED BY: BDR DATE: 1 O/8/2012 (REV 06/26/ 13) CHECKED By: JDR SUPPLEMENTAL CALCULATIONS - WET DETENTION POND i Basin Elevations Label Basin Elevations ELEV. AREA ft' INCR. VOLUME ft' CUM. VOLUME (ft' Bottom 8W, StDlagC 0.00 7.41100 0.00 0.00 TOP Snd Story C L00 8,973.00 0.00 0.00 2.00 10,650.00 9,811.50 9,811.50 - 3.00 12,413.00 11,531.50 21343.00 - 4.00 14,273.00 13 343.00 1 34,686.00 5A0 16,231.00 15,252.00 49,938.00 Bottom ofVeg Shelf 6.00 18,286.00 17,258.50 67,196.50 Permenant Pool 6.50 21 750.00 10,009.00 77,205.50 Label Basin Elevations ELEV. 'gyp' ft VOLUME INCR fN CUM. VOLUME (ft' Permanent Pool 6.50 21,750.00 0.00 0.00 Top of Veg Shelf 7.00 25,422.00 11,793.00 11,793.00 - 8.00 27 700.00 26,561.00 38,354.00 Bottom of Freeboard 8.60 29,095.00 17,038.50 55 392.50 Top of Bank 1 11.00 1 34,875.00 1 76 764.00 1 132,156.50 Information as shown in Figure 10-2b Sediment Cleanout Bottom = Sediment Cleanout Top (Bottom Pond) = Bottom of Vegetated Shelf = Permenant Pool = Seasonal High Water Table = Top of Vegetated Shelf= Temporary Pool (Peak During Design Storm) = Elevation Area (if) Incr. Vol. Cum. Vol 0.00 7,411.00 0.00 0.00 1.00 8,973.00 0.00 0.00 6.00 18,286.00 17,258.50 67,196.50 6.50 21,750.00 10,009.00 77,205.50 6.00 6.50 25,422.00 11,793.00 11,793.00 8.53 Page 5 of 7 Mr.PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD FJOB No.: 24039 CALCULATED BY: BDR DATE: 1 O/8/2012 (REV 06/26/ 13) CHECKED BY: JDR THOMAS & HUTTON SUPPLEMENTAL, CALCULATIONS - WET DETENTION POND 1 Volume and Surface Area Calculations - SA / DA Ratio Figure 10-2b from BMP Manual Errata (8-5-08) 'rogatamw not showy: d_: Average depth o£permanent pool to use in the SA/DA tables (ft) Option 1: de„ = ''*Ha-dsued emergence cmetflow not Shown Option 2: d = 0.25:. 1+ 111I+-,tryr_ Depth *•'Side 4-pe c[ab ii md-qs,--ta )j per PE.p dement Tmmporaty pool Vegetated"' I'reebiat!t level Permanentpool Side slope (1 ft above ma-: stagel Boteort. of vegetated shelf 31. t utlet ary p f.r. ttom of Pend (Sediment Vegetated' 'Y Max -4rage temporary pnc l ' r.lean-out to elevation i p he1C Fseebry Ciutletorifice edam elan- nit , -loft i[i 1 eleva"`tt��ioFe` bottom esrati.+n Stile slope*' i 1 5fty Forebay Perm Sedimr..nt atnrage (ttiin. 1 ft) Depth Distance between bonom of shelf and Lomotn ofpond (excludes cedtment) (a) � - -. Ai,,,i_ y�r `:wfacr area ae t-:•tram �f chef! (in•.lu.les rna.si F�sr11@ C ic>ray(a)) (fib 41 0 b A ymt Surface area at pertnanent pool (inctudev tnasn pond & forebayfs)) (ft2) C7 �� Ab�__.„d; Surface area at bottom of pond excluding itdtrnent storage (miun pond only) (FP) V,.n„_,_[ Volume of pgrimRn! .(in[ Iudet main pond & foreba)p(s). axeludes sediment) (ft3) Permanent Pool Volume (ft) 77,205.5 Permanent Pool Area (fiz) 21,750.0 Option 1 - Average Depth (ft) 3.55 Bottom Vegetated Shelf Area (ft) 189..86.0 Permanent Pool Area (ft) 21750.0 Bottom Pond Area (ft) 8973.0 Depth (ft) 5.0 Option 2 - Average Depth (ft) 4.1869 Average Depth for use in Table (ft) 4 (rounded down to nearest 0.5) Impervious Area (ft) 185,600.00 Drainage Area (fe) 431,700.00 hnpervious Area % (Use in Table) 42.99% Use 43% TSS Removal Required (%) 90 SA / DA Ratio (Table 1. 1) 3.80 Page 6 of 7 T PROJECT NAME: 3NE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB NO.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REV 06/26/ 13) CHECKED BY: JDR TH► MAS & HUTTON SUPPLEMENTAL, CALCULATIONS • WET DETENTION POND 1 Volume and Surface Area Calculations - Surface Area Required SA / DA Ratio (Table 1.1) 3.80 Drainage Area (ft) 431,700.00 SA Required (f0) 16,405 SA Provided (f') 21,750 OK Volume and Surface Area Calculations - Forebav Volume Label Basin Elevations ELEV. AREA ft' INCR. VOLUME (W) CUM. VOLUME fP Bottom Sed. Storage 0.00 1.227.00 0.00 0.00 Top Sed Storage 1.00 1569.00 0.00 0.00 - 2.00 1,947 00 1,758.00 1 758.00 - 3.00 2,360.00 2153.50 3,911.50 - 4.00 2.810.00 2.585.00 6A96.50 Petmenant Pool 6.50 4.449.00 9.073.75 15 570.25 From AutoCAD Forebay Volume (ft) = 15,570 Percentage of Permanent Pool Volume= 20% Volume and Surface Area Calculations - Temn Pool SA Provided Use interpolation to find surface area provided by temporary pool: Elevations and areas around temporary pool surface area: Elevation Surface Area 8.00 25,422.00 8.60 27.700.00 Temp Pool Elevation = 8.60 Temp Pool Surface Area (ft) = 27,700.00 Drawdown Calculations - Treatment Volume Drawdown Time Using Orifice Equation and driving head of Ho / 3 to account for head decreasing over time Co = 0.6 Diameter of Orifice (in.) = 3 Driving Head (ft) = 0.66 Average Discharge (cfs) = 0.19 To get drawdown time, divide design volume by average discharge: Required Design Volume (ft) = 53,314 Average Discharge (cfs) = 0.19 Drawdown Time (sec) = 278,003.97 Drawdown Time (days) = 3.22 Page 7 of 7 Mr.PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB NO.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REv 06/26/ 13) CHECKED BY: JDR & HUTTON SUPPLEMENTAL, CALCULATIONS • DRY DETENTION POND # 1 Site Characteristics Drainage area 431 700.00 ft' 9.91 acre Impervious area 185.600.00 ft 4.26 acre % impervious 42.99 % Design rainfall depth 150 in Storage Volume Required: The Dry Detention Basin will be a Secondary BMP in series with Wet Detetion Pond #1 to meet the NCDENR DWQ requirements for high density in a SA waterdshed and therefore must be sized for the Wet Pond Discharge Volume. Wet Detention Pond #1 Discharge Volume = 55,393 ft3 Storaee Volume Provided Insert elevation and corresponding surface area Start with permanent pool elevation and work to freeboard elevation (min. P from top of bank) Label Basin Elevations ELEV. AREA ft ]NCR. VOLUME ft3 CUM. VOLUME ft' Bottom 6.0 12.111 0 0 Top of Sediment Storage 7.25 13,934 16,278 0 8.0 15,070 10,877 10,877 9.0 16,635 15,853 26,729 10.0 18,256 17,446 44,175 Bottom of Freeboard 1 110 19,934 19,095 63,270 rup of Bank 12.0 21,363 20,649 1 83,918 Volume Provided= 63,270 ft, OK Peak Flow Calculation - Rational C. Pre -Development Area Description Table 3-2 Runoff Coefficient, C Area (ac) Wooded 0 15 9.91 Composite Runoff Coefficient, C = 0.15 Peak Flow Calculation - Rational C. Post -Development Area Description Table 3-2 Runoff Coefficient, C Area ac Lawns, sandy soil.. flat 01 5.65 Impervious 0.95 4.26 Composite Runoff Coefficient, C = 0.47 Page 1 of 4 PROJECT DAME: THE OVERLOOK Mr. PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB No.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REv 06/26/ 13) CHECKED BY: JDR TF4€ OAS & HUTTON SUPPLEMENTAL CALCULATIONS - DRY DETENTION POND # 1 Peak Flow Calculation - Pre -Development Peak Flowrate, Q = C*I"A C= 0.15 I = 0.16 in/hr A = 9.91 acres Q = 0.24 cfs Peak Flow Calculation - Post -Development The basic equation for orifices iw. CfA4igH. Where- Q - Discharge (cfs) Cn = Coefficient of discharge (dimensionless) _ see table 3-8 A - Cwss-: ectiorwi area of dow at the orifice untrazwe (spy ft) g = Acceleration of gravity 132.2 ft/secY) If ., . Driving head (ft), nua-,umd fix+tot the cwntfcaid of thr orific.-c area to tlx: water surface Note: Usually use Hco to compute drawdowPn through art orifice to reflect the fact that head ii: demasing an the drawdmrn oorum NOTE: For peak flow, use maximum driving head, Ho `�Chefll�ix`pW1770m61i4reas: f;:ia v-;T,.^. Tablo 3" Values of Coefficient of Discharge. Co (Malcom,1989) FAtraoce cb"d 000 . _ _ Cp Typical default value 0.60 Square -edged entrance 11.P' Concrete pipe grooved end 0.65 Coxrugatedi nwial pipe, tnitred to slope 0.52 Cororeueated o� petal, pip�a� ra ech'n r �uon fill LtXI Page 2 of 4 Mr.PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD Joe No.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REV 06/26/ 13) CHECKED BY: JDR THOMAS & HUTTON SUPPLEMENTAL CALCULATIONS • DRY DETENTION POND # i All variables to calculate maximum discharge, Q are known except driving bead, Ho Need temporary pool in detention pond for design storm Label Basin Elevations ELEV. AREA ft' INCR VOLUME w CUM. VOLUME (fe Bottom 6.00 12111.00 0.00 0.00 Top of Sediment Storage 7.25 13,934.00 16,278.13 0.00 8.00 15,070.00 10, 876.50 10, 876.50 9.00 16,635.00 15 852.50 26,729.00 10.00 18,256.00 17445.50 44,1.74.50 Bottom of Freeboard 1 11.00 19,934.00 19 095.00 63,269.50 0.00 0.00 0.00 0.00 Top of Bank 1 12.00 21 363.00 20,648.50 83,918.00 Volume required to contain from design storm (fP) = 55,393 Therefore, temporary pool elevation is between stages and cumulative volumes: Stage Cum. Volume 10.00 44,114.50 11.00 63,269 50 Using interpolation to Determine Temporary Pool elevation at Volume = 55,393 Calculated Temporary Pool Elevation (feet) = 10.59 Provided Temporary Pool Elevation (feet) = 11.00 (Elevation of next outlet above Orfice Elev) Other Variables for Orifice Equation Cm = 0.6 Diameter of Orifice (in.) = 2.5 Normal Pool Elevation (ft) = 6.00 Head (ft) = 4.90 (Based on 'Provided" temporary pool elevation) Max Discharge, Q (cfs) = 0.36 Volume and Surface Area Calculations - Temp Pool SA Provided Use interpolation to find surface area provided by temporary pool: Elevations and areas around temporary pool surface area: Elevation Surface Area 10.00 18,256.00 11.00 19.934.00 Temp Pool Elevation = 11.00 Temp Pool Surface Area (e) = 19,934.00 Page 3 of 4 Mr.PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB No.: 24039 CALCULATED BY: DATE: 1 O/8/2012 (REV 06/26/ 13) CHECKED BY: THOMAS & HUTTON SUPPLEMENTAL CALCULATIONS - DRY DETENTION POND #'I Drawdown Calculations - Treatment Volume Drawdown Time Using Orifice Equation and driving head of Ho / 3 to account for head decreasing over time CD= 00.6 Diameter of Orifice (in.) _ Driving Head (ft) Average Discharge (cfs) = 0.21 To get drawdown time, divide design volume by average discharge: Wet Pond Discharge Volume - Design Volume (fi;) = 55,393 Average Discharge (cfs) = 0.21 Drawdown Time (sec) = 264,178.03 Drawdown Time (days) = 3.06 Page 4 of 4 PROJECT NAME: THE OVERLOOK AT MIDDLE SOUND .1 C PROJECT LOCATION: 321 O MIDDLE SOUND LOOP Rr) JOB NO.: 24039 CALCULATED BY: BDR F1 DATE: 1 /8/2013 (REv 06/26/ 13) CHECKED BY: JDR SUPPLEMENTAL LS HIGH FLOW BYPASS DESIGN LS#1 High Flow Bypass Determine 10-Year Flow for Channel Level Spreader #1 receives flow from Wet Detention Pond #1 in which an engineered flow splitter box is provided to limit the flow to the level spreader and provide a high flow bypass. The high flow bypass is a 15" pipe that is at a higher elevation than the discharge pipe to the Level Spreader. During high flows, the 15" pipe will act as a bypass for the level spreader. The bypass pipe was modeled in the ICPR report enclosed in Appendices C & D of this report. The Link Maximum Conditions report in Appendix D provides the 10-year design flow for the bypass pipe (Link "Pipe 1 B'). Ql, = 2.41 cfs From Link Max Report of ICPR output for link "Pipe 1B" (attached) Size Rio Ran Outlet Stabilization at Pine End Pipe Dia (in) = Qrs = 2.41 cfs From Above Velocity= 1.96 ft/sec < 2.5 fps (Permissible Velocity of Bare Soil) Therefore, an energy dissipator IS NOT required. Provide anyway as an extra measure. Zone of Apron: t (See Figure 50-14, pg. 50-25 in NHC Stormwater Manual) Length of Apron (4*pipe dia., 5' min.): 5 ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Width (3*pipe dia., 5' min.): 5 ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Minimum Stone Size: 3 in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Depth of Rip -Rap: 12 in. (See Figure 50-15, pg. 50-26 in NHC. Stormwater Manual) Z:\24039\24039.0000\Engineering\Calculations\Storm Water\24039 By Pass Swale Calc.x!sx Page 1 of 1 The Overlook at Middle Sound ICPR Stormwater Model Pre vs. Post Development January 4, 2013 (Revised 06/26/13) +++++++«+++++++++«+++*+++++ LINK MAX REPORT - 10 YEAR STORM FOR LSVFS DESIGN ***********+********++++++++++++++++ Max Time Max Max Max Time Max Max Time Max Name Group Simulation Flow Flow Delta Q US Stage US Stage DS Stage DS Stage hrs Cfs Cfs hrs ft hrs ft Pipe lA BAFR 010YR. 12.91 9.66 0.025 12.91 7.69 12.91 6.31 Pipe lb BASE 010YR 12.91 2.41 0.012 12.91 7.69 12.91 5.92 Pipe 2A BASE 010YR 12.68 9.81 -0.038 12.68 7.30 12.68 6.37 Pipe 2B BASE 010YR 12.68 6.49 -0.035 12.68 7.30 12.68 6.70 Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page I of 1 PROJECT NAME: THE OVERLOOK Mr. PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB NO.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REV 08/20/ 13) CHECKED BY: JDR SUPPLEMENTAL CALCULATIONS • WET DETENTION POND 2 Site Characteristics Drainage area 326,700.00 ft2 7.50 acre Impervious area 150,000.00 ftz 3.44 acre Impervious Breakdown: % impervious 45.91 % Design rainfall depth 1.50 in SA Watershed Y Water Ouality Volume Required The greater of either the 1.5" runoff volume or the difference between the 1-year, 24 hour pre & post development runoff. 1.5" Volume: Volume of Runoff= V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where: Rv=0.05+0.009(iA) Rv = Runoff Coefficient = Storm Runoff (inches) / Storm Rainfall (inches) IA = Impervious Fraction = Impervious Portion of the Drainage Area (acres) / Drainage Area (acres) IA 45.91 % Rv = 0.463 Design Rainfall Depth = 1.50 in. Drainage Area = 7.50 acres 1.5" Volume= 18,917 ft 1-Year, 24 Hour Pro- Development Runoff Volume Volume of Runoff= V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where: Rv=0.05+0.009(I,) Rv = Runoff Coefficient = Storm Runoff (inches) / Storm Rainfall (inches) IA = Impervious Fraction = Impervious Portion of the Drainage Area (acres) / Drainage Area (acres) Pre -Development Impervious Area = 0 ft Pre -Development Drainage Area = 326;700 ft IA= 0.00 % Itv = 0.050 1-yr, 24hr Design Rainfall Depth = 3.83 in. Drainage Area = 7.50 acres 1-yr, 24 hr Pre Volume = 5,214 fP 1-Year, 24 Hour Post- Development Runoff Volume Volume of Runoff= V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where: Rv=0.05+0.009(IA) Rv = Runoff Coefficient = Storm Runoff (inches) / Storm Rainfall (inches) IA = Impervious Fraction = Impervious Portion of the Drainage Area (acres) I Drainage Area (acres) Post -Development Impervious Area = 150,000 f Z Post -Development Drainage Area = 326,700 ft2 IA= 45.91 % Rv= 0.463 Design Rainfall Depth = 3.83 in. Drainage Area = 7.50 acres 1-yr, 24 hr Post Volume = 48,301 ft Pre/Post Volume Dif.erence — 43,088 ftr greater than 1.5" Vol. Volume Required = 43,088 W Pre/Post Difference 76,000 SF - Lots 58,400 SF -Roads 8,500 SF -Walks 7,100 SF -Future Page 1 of 7 T. PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD Jos No.: 24039 CALCULATED BY: BDR DATE: 1 O/8/2012 (REV 08/20/ 13) CHECKED By* JDR THOMAS SUPPLEMENTAL CALCULAMONS - WET DETENTION POND 2 Stora¢e Volume - Actual Volume Provided Insert elevation and corresponding surface area Start with permanent pool elevation and work to freeboard elevation (min. F from top of bank) Label Basin Elevations ELEV. AREA ft2 INCR. VOLUME (ftj CUM. VOLUME fN Permanent Pool 7.2 23,900 0 0 Top of Vt;g Sbelf ?.7 27,990 12,973 12,973 - 8.0 28:840 8,524 21,497 Bottom of Freeboard 8.8 31,115 23,982 45,479 - 9.0 1 31,680 1 6.279 1 51,759 10.0 34,920 1 33,300 85,059 Top of Bank. 1 11.0 1 37,380 1 69,060 1 120,819 Volume Provided = 45,479 ft OK Peak Flow Calculation - Rational C, Pre -Development Area Description Table 3-2 Runoff Coefficicn C Area (ac Wooded 0.15 750 Composite Runoff Coefficient, C = 0.15 Peak Flow Calculation - Rational C. Post -Development Area Description Table 3-2 Runoff Coefficient, C Area ac Lawns.. sandy soil, flat 0.1 406 Impenioub 0.95 344 Composite Runoff Coefficient, C 0.49 Peak Flow Calculation - Pre -Development Peak Flowrate, Q = C'I'A C = 0.15 1= 016 inlhr A = 7.50 acres Q = 0.18 cfs Elevation of next outlet above Permanent Pool Page 2of7 Mr.PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD Jos NO.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REV 08/20/ 13) CHECKED BY: JDR THOMAS & HUTTON SUPPLEMENTAL CALCULATIONS - WET DETENTION POND 2 Peak Flow Calculation - Post -Development 'l l,re lra ac equation for oriftees 6- () _: C'A:1,J2. Whoru': Q = IXwhargl; (efa) C i,. = Coefficient of disehar& (dimensionleuf - we "Fable 3-8 A = Cross -sectional area of f1mv at the orifice entrance (sq ft) S. = ,Acceleration of gravity (32.2 ft/,--1 li,,> = Driving head (ft), measured from the centroid of Lhe orifice area to the water surface - Note: Usually use Aa/3 to. compute drawdown through an orifice to reflect the fact that head its decreasing, as the drawdown occurs. NOTE: For peak flow, use maximum driving head, Ho hpc 3.t rfCfw"infirW1Cl6CMdI Rj'. all gelf�.. Q 'Fable 3-8 Values of C oeff civitt of DiEwbarge CD Q'Wallcunr, l ) Fertrant'e Condition C.t3 Typical default valor 0.60 Square -edged entrance (�i9 Concrete pike, grooved end 0.65 Corrugated metal pipe; nutted to slope 0.52 Corr Wted metal Biers, proiectirrg from fill_ 1.00 Page 3 of 7 PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB No.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REv 08/20/ 13) CHECKED BY: JDR THOMAS & HUTTON SUPPLEMENTAL, CALCULATIONS • WET DETENTION POND 2 All variables to calculate maximum discharge, Q are known except driving head, Ho Need temporary pool in detention pond for design storm Label Basin Elevations ELEV. AREA (ft' INCR. VOLUME (W) CUM. VOLUME R' Permanent Pool 7.20 23,900.00 0.00 0.00 Top of Veg Shelf 7.70 27,990.00 12,972.50 12,972.50 8.00 28,840.00 8,524.50 21,497.00 Bottom of Freeboard 8.80 31,115.00 23,982.00 45 479.00 - 9.00 31,680.00 6,279.50 51,758.50 10.00 34,920.00 33,300.00 85,058.50 T of Bank 11.00 37,380.0 669,060.00 120,818.50 Volume required to contain from design stonn (fe) = 43,088 Therefore, temporary pool elevation is between stages and cumulative volumes: Stage Cum. Volume 8.00 21,497.00 9.00 51 758.50 Using Interpolation to Determine Temporary Pool elevation at Volume = 43,088 Calculated Temporary Pool Elevation (feet) = 8.71 Provided Temporary Pool Elevation (feet) = 8.80 (Elevation of next outlet above Permanent Pool) Other Variables for Orifice Equation CD = 0.6 Diameter of Orifice (in.) = 3 Normal Pool Elevation (ft) = 7,20 Head (ft) = 1.48 (Based on "Provided" temporary pool elevation) Max Discharge, Q (cfs) = 0.29 Page 4 of 7 Mr.PROJECT NAIVE: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB No.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REv 08/20/ 13) CHECKED BY: JDR THOMAS SUPPLEMENTAL CALCULATIONS • WET DETENTION POND 2 Basin Elevations Label Basin Elevations ELEV. AREA fta INCR VOLUME W CUM. VOLUME(W) Bottom Sod. Stma a -1.00 4,484.00 0.00 0.00 Top Sod Storage 0.00 6,196.00 0.00 0.00 1.00 8,012.00 7,104.00 7,104.00 2.00 9,921.00 9,966.50 16,070.50 - 3.00 11,917,00 10,919.00 26,989.50 4.00 13,995.00 12,956.00 39,945.50 Bottom of%;cg Shelf 6",0 20,014.00 45,912.15 85,857.65 Permenent Pool 7.20 23,900.00 10,978.50 96,836.15 Label Basin Elevations ELEV. AREA ftz INCR. VOLUME fY CUM. VOLUME ft' Permanent Pool 7.20 23,900.00 0.00 0.00 Top of Veg Shelf 7.70 27,990.00 12,972.50 12,972.50 8.00 28,840.00 8,524.50 21,497.00 Bottom of Freeboard 8.80 31,115.00 23,982.00 45,479.00 9.00 31,680.00 6,279.50 51758.50 10.00 34,920.00 33,300.00 85,058.50 To of Bank 1 11.00 37,380.00 69,060.00 120,818.50 Information as shown in Figure 10-2b Sediment Cleanout Bottom = Sediment Cleanout Top (Bottom Pond) = Bottom of Vegetated Shelf = Pcrmenant Pool = Seasonal High Water Table = Top of Vegetated Shelf= Temporary Pool (Peak During Design Storm) = Elevation Area (if) Iner. Vol. Cum. Vol -1.00 4,484.00 0.00 0.00 0.00 6196.00 0.00 0.00 6.70 20,014.00 45,912.15 85,857.65 7.20 23,900.00 10,978.50 96,936.15 720 - - - 7.20 27,990.00 12,972.50 12,972.50 8.71 Page 6 of 7 Mr PROJECT NAME: THE OVERLOOK F1PROJECT LOCATION: MIDDLE SOUND LOOP ROAD Joe No.: 24039 CALCULATED By, BDR DATE: 10/8/2012 (REv 08/20/ 13) CHECKED BY: JDR THOMAS & HUTTON SUPPLEMENTAL CALCULATIONS • WET DETENTION POND 2 Volume and Surface Area Calculations - SA / DA Ratio Figure 10-2b from BMP Manual Errata (8-5-08) *Kegetatton not skown d ,,: Average depth ofpermanent pool to use in the $AIDA tables (ft) Option 1: de �tiaxr+„Y `4P..,R Poor -nor ahcwrr Option 2: _ = 0.25 x rl+ -,i p + x_, r _P� Die th w"'Stde alcg a �ta8ri?zed AP,., -,.. )] L� 2 (Ai ,a, , I per PE,-dr ne.zt Ten porarvpool Vegetated" Freeb:+azd level E'z-rmaaent fiaol �tidr �loPs {1$ ab•�ve max ctage Outlet above Bottom of vegetated shelf �� tem Drat noI— Bottom of pond (Sediment Vegetated"' Ma.: Stage p 9 p clean-«ot tcT rin.•atvan) _ neif Fcrebav utletorifice eduneat clean -AA �1c[ft.1[)l Sideslopea b mo,n elevatx n Side iope — _ T a r- fi Farehay Berm r Sft aedisnr ht ptoragr. (tnm 1 ft) >r Depth Distance between bottom of ahelf and bottorn ofpond (excludes sediment) (a) Ayo, Syr Sul £�c! ae•ea of h •,r1.>su �•f sticlf (iit�lullra tt,ain y�trl foret.ay(r}] ltl �� _-..-- Ap__,_, Surface area at permanent pool (ntcludas main pond & P)rebay(t)] —A6veyv„d: Surface area at bottom o£pnnd excluding sediment storage (ntaln pond only) (fk') Vr,,,, _j—1 Volume of. permanent pool uriCIUAti main pond & forA-ay(i), excludes sediment) (ft� Permanent Pool Volume (ft3) 96,836.2 Permanent Pool Area (ft) 23,900.0 Option I - Average Depth (ft) 4.05 Bottom Vegetated ShelfArea (ftZ) 20014.0 Permanent Pool Area (fe) 23900.0 Bottom Pond Area (ft) 6196.0 Depth (ft) 6.7 Option 2 - Average Depth (ft) 4.9465 Average Depth for use in Table (ft) 4.5 (rounded down to nearest 0.5) Impervious Area (ftZ) 150,000.00 Drainage Area (ftZ) 326,700.00 Impervious Area % (Use in Table) 45.91 % Use 46% TSS Removal Required (%) 90 SA / DA Ratio (Table L1) 3.58 Page 6 of 7 Mr.PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB NO.: 24039 CALCULATED BY: BDR DATE: 1 O/8/2012 (REv 08/20/ 13) CHECKED BY: JDR Tt•HOMAS & Ml`YiTON SUPPLEMENTAL, CALCULATIONS - WET DETENTION POND 2 Volume and Surface Area Calculations - Surface Area Required SA / DA Ratio (Table I.1) 3.59 Drainage Area (fF) 326,700.00 SA Required (ft') 11,696 SA Provided (fe) 23,900 OK Volume and Surface Area Calculations - Forebav Volume Label Basin Elevations ELEV. AREA ft2 INCR. VOLUME (W) CUM. VOLUME fN Bottom Sod. Storage 4.00 991.00 0.00 0.00 Top Sed Storage 0.00 1,290.00 0.00 0.00 1.00 1,629.00 1,459.50 1,459.50 - 2.00 2,00300 1,816.00 3,275.50 - 3.00 2.408.00 2.205.50 5A81.00 Pormenant Pool 7.20 4,390.00 14.254.80 19.735.80 From AutoCAD Forebay Volume (ft) = 19,736 Percentage of Permanent Pool Volume = 20% Volume and Surface Area Calculations - Temn Pool SA Provided Use interpolation to find surface area provided by temporary pool: Elevations and areas around temporary pool surface area: Elevation Surface Area 8.00 27.990.00 9.00 28,940.00 Temp Pool Elevation = 8.80 Temp Pool Surface Area (fe) = 28,670.00 Drawdown Calculations - Treatment Volume Drawdown Time Using Orifice Equation and driving head of Hs / 3 to account for head decreasing over time Co = 0.6 Diameter of Orifice (in.) = 3 Driving Head (ft) = 0.49 Average Discharge (cfs) = 0.17 To get drawdown time, divide design volume by average discharge: Required Design Volume (fP) = 43,088 Average Discharge (cfs) = 0.17 Drawdown Time (sec) = 259,987.12 Drawdown Time (days) = 3.01 Page 7 of 7 Mr.PROJECT DAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD FJOB NO.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REV 08/20/ 13) CHECKED BY: JDR T OMAS & HUTTON SUPPLEMENTAL CALCULATIONS • DRY DETENTION POND 92 Site Characteristics Drainage area 326,700.00 ft 7.50 acre Impervious area 150,000.00 a 3.44 acre % impervious 45.91 % Design rainfall depth 1.50 in Storaae Volume Reauired: The Dry Detention Basin will be.a Secondary BMP in series with Wet Detetion Pond #2 to meet the NCDENR DWQ requirements for high density in a SA waterdsbed and therefore must be sized for the Wet Pond Discharge Volume. Wet Detention Pond #2 Discharge Volume = 45,479 ft3 Storatre Volume Provided Insert elevation and corresponding surface area Start with permanent pool elevation and work to freeboard elevation (min. F from top of bank) Label Basin Elevations ELEV. AREA ft' INCR. VOLUME ft' CUM. VOLUME W Bottom 7.0 11,379 0 0 Top of Sediment Stmage 8.00 13,388 12,384 0 9.0 15,463 14,426 14,426 10.0 17,596 16,530 30,955 108 19,345 14,776 45,731 1 I of Bank 1 118 21,580 20,463 66,194 Volume Provided= 45,731 ft° OK Peak Flow Calculation - Rational C. Pre -Development Area Description Table 3-2 Runoff Coefficient, C Area ac Wooded 015 750 Composite Runoff Coefficient, C = 0.15 Peak Flow Calculation - Rational C. Post -Development Area Description Table 3-2 Runoff Coefficient C Area ac Lawns, sandy soil; flat 0.1 4.06 Itn eivious 0.95 3.44 Composite Runoff Coefficient, C = 0.49 Page 1 of 4 T. PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD JOB No.: 24039 CAI..cULATED BY: BDR DATE: 10/8/2012 (REv 08/20/ 13) CHECKED BY: JDR THOMAS & HUTTON SUPPLEMENTAL CALCULATIONS - DRY DETENTION POND #2 Peak Flow Calculation - Pre -Development Peak Flowrate, Q = C'I"A C = 0.15 I= 0.16 in4ir A = 7.50 acres Q = 0.18 cfs Peak Flow Calculation - Post -Development The basic equation for orifices is: Q 140wre: ( Visdiargp(efs) Ci� = Coefficient of di*charge (dimensionless) - see IabPe ," A - Cross -sectional aroa of flow at tlu orifice vatranw, (.sy it) g Acceleration of gravity 132.2 ft/secz) li. � - Driving head (ft), nu mitavd fret tha c troid of the orificx- trim to the water surfacx- • • Note: L'sually use HqG to compute drawdown through an orifice tit reflect the fact that head is decreasing a; the drawdown crease. NOTE: For peak flow, use maximum driving head, He k-j me 3W'Z sdwwAtir a row fiWW.0 m orifr Table Values of Coefficient of Discharge. CD (Malcom, 1989w [atrxince Coatdittort Co i"ypiC.alde.Martvalue (ttrit --- Sgvinr.-cdg i entrance Q59 Cuncmte pipe, Smoved end 0.0 Conugawd awtal pipe, mitred to slope. (XW C'orrujated tt ceWj ipe, po'ec#M fiM fill,- 1.00 Page 2 of 4 PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD Joi3 No.: 24039 CALCULATED BY: BDR DATE: 10/8/2012 (REV 08/20/ 13) CHECKED BY: JDR T? OMA-33 & KF i.a —0',' ; SUPPLEMENTAL CALCULATIONS - DRY DETENTION POND #2 All variables to calculate maximum discharge, Q are known except driving head, Ho Need temporary pool in detention pond for design storm Label Basin Elevations ELEV. AREA (W [NCR. VOLUME (W) cum. VOLUME (ft ) Bottom 7.00 11,379.00 0.00 0.00 Top of Sediment Storage 8.00 13,388.00 12,383.50 0.00 9.00 15,463.00 14,425.50 14,425.50 10.00 17,596.00 16,529.50 30,955.00 10.80 19,345.00 14,776.40 45,731.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 To of Bank 11.80 21,580.00 20,462.50 66,193.90 Volume required to contain from design storm (ft) = 45,479 Therefore, temporary pool elevation is between stages and cumulative volumes: Stage Cum. Volume 11.00 30,955.00 11.80 45,73140 Using Interpolation to Determine Temporary Pool elevation at Volume = 45,479 Calculated Temporary Pool Elevation (feet) = 11.79 Provided Temporary Pool Elevation (feet) = 11.80 (Elevation of next outlet above Orfice Elev) Other Variables for Orifice Equation Co = 0.6 Diameter of Orifice (in.) = 2.5 Normal Pool Elevation (ft) = 7.00 Head (ft) = 4.70 (Based on 'Provided' temporary pool elevation) Max Discharge, Q (cfs) = 0.36 Volume and Surface Area Calculations - Temu Pool SA Provided Use interpolation to find surface area provided by temporary pool: Elevations and areas around temporary pool surface area: Elevation Surface Area 11.00 17-596.00 11.80 19,345.00 Temp Pool Elevation = 11.80 Temp Pool Surface Area (ft2) = 19,345.00 Page 3 of 4 Mr PROJECT NAME: THE OVERLOOK PROJECT LOCATION: MIDDLE SOUND LOOP ROAD Joe No.: 24039 CALCULATE DATE: 1 O/8/2012 (REV 08/20/ 13) CHECKE THOMAS & HUTTON SUPPLEMENTAL CALCULATIONS • DRY DETENTION POND #2 Drawdown Calculations - Treatment Volume Drawdown Time Using Orifice Equation and driving head of Ho / 3 to account for head decreasing over time Co = 0.6 Diameter of Orifice (in.) = 2.5. Driving Head (ft) 157 Average Discharge (cfs) = 0.21 To get drawdown time, divide design volume by average discharge: t . Wet Pond Discharge Volume - Design Volume (ft') = 45,479 Average Discharge (cfs) = 0.21 Drawdown Time (sec) = 221,469.34 Drawdown Time (days) = 2.56 Page 4 of 4 a PROJECT NAME: THE OVERLOOK AT MIDDLE SOUND PROJECT LOCATION: 3210 MIDDLE SOUND LOOP RD JOB NO.: 24039 CALCULATED BY: BDR DATE: 1 /8/2013 (REv 08/20/ 13) CHECKED BY: JDR SUPPLEMENTAL LS HIGH FLOW BYPASS DESIGN LS#2 High Flow Bypass Determine 10-Year Flow for Channel Level Spreader #2 receives flow from Wet Detention Pond #2 in which an engineered flow splitter box is provided to limit the flow to the level spreader and provide a high flow bypass. The high flow bypass is a 24" pipe that is at a higher elevation than the discharge pipe to the Level Spreader. During high flows, the 24" pipe will act as a bypass for the level spreader. The bypass pipe was modeled in the ICPR report enclosed in Appendices C & D of this report. The Link Maximum Conditions report in Appendix D provides the 10-year design flow for the pipe (Link "Pipe 213'). Qis = 6.47 efs From Link Max Report of ICPR output for link "Pipe 2B" (attached) Size Rip Rao Outlet Stabilization at Pipe End Pipe Dia (in) = 24 Qis = 6.47 efs From Above Velocity = 2.06 fUsec < 2.5 fps (Permissible Velocity of Bare Soil) Therefore, an energy dissipator IS NOT required. Provide anyway as an extra measure. Zone of Apron: 1 (See Figure 50-14, pg. 50-25 in NHC Stonmwater Manual) Length of Apron (4*pipe dia., 5' min.): 8 ft (See Figure 50-15, pg. 50-26 in NHC Stonnwater Manual) Width (3*pipe dia., 5' min.): 6 ft (See Figure 50-15, pg. 50-26 in NHC Stonmvater Manual) Minimum Stone Size: 3 in. (See Figure 50-15, pg. 50-26 in NHC Stonmwater Manual) Depth of Rip -Rap: 12 in. (See Figure 50-15, pg. 50-26 in NHC Stonnwater Manual) Z:\24039\24039.0000\Engineering\Calculations\Storm Water\24039 By Pass Swale Calc.xlsx Page 1 of 1 x m JJ Id bi w • H I m N m h O en n u �n CA In ca m a! m I .4 O m I m h �o E 11 N N N N V} rl co N H H A � X 0 a.l h m h n h En @P E 1 N m -rl C m e b E WN N N N V] cn X r r �G I X Ol m w N m h 41 U O O O O '4 O CD I I A O O O x I rt 3 n I �n i m m n r• a � ,°m o W i m N m w m 3 m H o m m aO W m m w %D E W N N N N ro A E a w w w w 0 j E N z Q A m N N N a w a w .H -4 .A _4 m m a a STORMWATER MANAGEMENT REPORT THE OVERLOOK AT MIDDLE SOUND APPENDIX H RIP RAP OUTLET STRUCTURE DESIGN CONSIDERATIONS 24039.0001 Fj THOMAS Sc HUTTON The Overlook at Middle Sound Job: 24039.0001.402 3210 Middle Sound Loop Road Date: 12/3/12 H Thomas & Hutton Engineering Co. Revised: 8/20/13 Rip Rap Outlet Design Considerations By: BDR/JDR RIP RAP OUTLET #1 DESIGN - Dual 24" Culverts Calculate Max Capacity of Culvert Use Mannings Equation to Calculate Maximum Allowable Flow Qm=(1.49/n)x A x R^.67 x S^.5 where: Qm = Maximum Flowrate (cfs) n = Mannings Roughness Coefficient A = Cross Sectional Area (sf) R = Hydraulic Radius (ft) S = Slope (ft/ft) Calculate Cross Sectional Area of Pipe Dia (in) = 24 (Single Pipe) A(sf)=PIxd^2/4 A (sf) = Calculate Hydraulic Radius R(ft) = Area / Wetted Perimeter R(ft) = (PI x d^2 / 4)/(PI x d) R(ft) = 0.50 Select Variables n= 0.013 S (ft/ft) = 0.0027 Q. (cfs) = 11.75 per 24" pipe Total flow for dual pipes 23.51 Velocity = 3.74 ft/sec > 2.5 fps (Permissible Velocity of Bare Soil) Therefore, an energy dissipator required. Zone of Apron: (See Figure 50-14, pg. 50-25 in NHC Stormwater Manual) Length of Apron (4*pipe dia., 5' min.): ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Width (3*pipe dia., 5' min.): ft Width has been doubled to accommodate dual pipes Minimum Stone Size: in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Depth of Rip -Rap: in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Z:124039124039.00001EngineeringlCalculationslStonn WaterX24039 - Rip Rap Calcs.xlsx The Overlook at Middle Sound Job: 24039.0001.402 3210 Middle Sound Loop Road Date: 12/3/12 Thomas & Hutton Engineering Co. R Revised: 8/20/13 THcMa#, z, . o, , : Rip Rap Outlet Design Considerations By: BDR/JDR RIP RAP OUTLET #2 DESIGN - Quadruple 36" Culverts Calculate Max Capacity of Culvert Use Mannings Equation to Calculate Maximum Allowable Flow Qm=(1.49/n)x A x R^.67 x S^.5 where: Qm = Maximum Flowrate (cfs) n = Mannings Roughness Coefficient A = Cross Sectional Area (sf) R = Hydraulic Radius (ft) S = Slope (ft/ft) Calculate Cross Sectional Area of Pipe Dia (in) = 36 (Single Pipe) A(sf)=PIxd^2/4 A (sf) = 7.07 Calculate Hydraulic Radius R(ft) = Area / Wetted Perimeter R(ft) _ (PI x d^2 / 4)/(PI x d) R(ft) = 0.75 Select Variables n= 0.013 S (ft/ft) = 0.0033 Q. (cfs) = 38.36 per 36" pipe Total flow for quadruple pipes = 153.45 Velocity = 5.43 ft/sec > 2.5 fps (Permissible Velocity of Bare Soil) Therefore, an energy dissipator IS required. Zone of Apron: 2 (See Figure 50-14, pg. 50-25 in NHC Stormwater Manual) Length of Apron (6*pipe dia., 5' min.): 18 ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Width (3*pipe dia., 5' min.): 23 ft Width has been modified to accommodate quadruple pipes Minimum Stone Size: 6 in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Depth of Rip -Rap: 18 in. (See Figure 50-1.5, pg. 50-26 in NHC Stormwater Manual) Z:124039124039.00001EngineeringlCalculationslStorm Water124039 - Rip Rap Calcs.xlsx !� The Overlook at Middle Sound Job: 24039.0001.402 Middle Sound Loop Road Date: 12/3/12 H3210 Thomas & Hutton Engineering Co. Revised: 8/20/13 T6AOMAS Rip Rap Outlet Design Considerations By. BDR/JDR RIP RAP OUTLET #3 DESIGN -15" Outlet from Dry Pond #1 The Pipe was modeled in ICPR report that can be found in Appendices C & D of this report. The 25^year peak flow was taken from the model output and listed below. Pipe Dia (in) = 15 Q25 = 0.18 cfs From Link Max Report of ICPR output for link "DS1B" (Appendix D) Velocity = 0.15 ft/sec < 2.5 fps (Permissible Velocity of Bare Soil) Therefore, an energy dissipator IS NOT required. Provide 5' x 5' apron as an extra measure. 3" minimum stone size, 12" depth Zone of Apron: (See Figure 50-14, pg. 50-25 in NHC Stormwater Manual) Length of Apron (6*pipe dia., 5' min.): ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Width (3*pipe dia., 5' min.): ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Minimum Stone Size: in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Depth of Rip -Rap: in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) RIP RAP OUTLET #4 DESIGN -15" Outlet from JB #1 B-3 The Pipe was modeled in ICPR report that can be found in Appendices C & D of this report. The 25 year peak flow was taken from the model output and listed below. Pipe Dia (in) = 15 Q25 = 3.12 efs From Link Max Report of ICPR output for link "Pipe 113" (App. D) Velocity = 2.54 ft/sec > 2.5 fps (Permissible Velocity of Bare Soil) Therefore, an energy dissipator IS required. Zone of Apron: 1 (See Figure 50-14, pg. 50-25 in NHC Stormwater Manual) Length of Apron (4*pipe dia., 5' min.): 5 ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Width (3*pipe dia., 5' min.): 5 ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Minimum Stone Size: 3 in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Depth of Rip -Rap: 12 in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Z:124039124039.00001EngineeringlCalculations\Storm Water124039 - Rip Rap Calcs.xlsx The Overlook at Middle Sound Job: 24039.0001.402 3210 Middle Sound Loop Road Date: 12/3/12 Thomas & Hutton Engineering Co. Revised: 8/20/13 Rip Rap Outlet Design Considerations By: BDR/JDR RIP RAP OUTLET #5 DESIGN -15" Outlet from Dry- Pond #2 The Pipe was modeled in ICPR report that can be found in Appendices C & D of this report. The 25 year peak flow was taken from the model output and listed below. Pipe Dia (in) _ Q25 = Velocity = 15 0.15 efs From Link Max Report of ICPR output for link "DS 2B" (Appendix D) 0.12 ft/sec < 2.5 fps (Permissible Velocity of Bare Soil) Therefore, an energy dissipator IS NOT required. Provide 5' x 5' apron as an extra measure. 3" minimum stone size, 12" depth Zone of Apron: i (See Figure 50-14, pg. 50-25 in NHC Stormwater Manual) Length of Apron (4*pipe dia., 5' min.): 5 ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Width (3*pipe dia., 5' min.): 5 ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Minimum Stone Size: 3 in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Depth of Rip -Rap: 12 in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) RIP RAP OUTLET#6 DESIGN -15" Outlet from JB #2C-1 The Pipe was modeled in ICPR report that can be found in Appendices C & D of this report The 25 year peak flow was taken from the model output and listed below. Pipe Dia (in) = 24 Q25 = 7.89 efs From Link Max Report of ICPR output for link "Pipe 2B" (App. D) Velocity = 2.51 ft/sec > 2.5 fps (Permissible Velocity of Bare Soil) Therefore, an energy dissipator required. Provide 5' x 5' apron as an extra measure. 3" minimum stone size, 12" depth Zone of Apron: 1 (See Figure 50-14, pg. 50-25 in NHC Stormwater Manual) Length of Apron (4*pipe dia., 5' min.): 8 ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Width (3*pipe dia., 5' min.): 6 ft (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Minimum Stone Size: 3 in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Depth of Rip -Rap: 12 in. (See Figure 50-15, pg. 50-26 in NHC Stormwater Manual) Z:124039124039.00001Engineering\CalculationslStorm Water124039 - Rip Rap Calcs.xlsx STORMWATER MANAGEMENT REPORT THE OVERLOOK AT MIDDLE SOUND APPENDIX SEDIMENT BASIN DESIGN CONSIDERATIONS 24039.0001 Fl THOMAS Sc HUTTON THE OVERLOOK AT MIDDLE SOUND Wet Pond 1 Sediment Basin 3210 Middle Sound Loop Road Design Considerations New Hanover County, NC Skimmer Basin Okay 9.91 Disturbed Area (Acres) 47-6,11299 Peak Flow from 10-year Storm (cfs) 17838 Required Volume ft3 (1800 ft3 per disturbed acre) 15484 Required Surface Area ft2 (325 ft2 per Q10 inflow) 88.0 Suggested Width ft 176.0 Suggested Length ft Storage volume - Actual Volume Provided Surface areas taken from CAD Label Basin Elevations ELEV. AREA INCR. VOLUME CUM.ftZ VOLUME ft3 Permanent Pool 6.5 21,750 0 0 Top of Veg Shelf 7.0 25,422 11,793 11,793 80 27,700 26,561 38,354 Weir Elev. above Orfice 8.6 29,095 17,039 55,393 Top of Bank 11.0 34,875 76,764 132,157 Volume Provided = 18 Trial Weir Length ft 1.5 Trial Depth of Flow ft 99.2 Spillway Capacity cfs 55,393 ft3 OK Emergency Spillway length Okay Prepared By: BDR/JDR Thomas Hutton Engineering Co. 12/03/2012 Size Skimmer based on actual storm water volume THE OVERLOOK AT MIDDLE SOUND Wet Pond 1 Sediment Basin 3210 Middle Sound Loop Road Design Considerations New Hanover County, NC Selection of Sediment Control Measure 9 P,1 Total Drainage Area Do Not Use Temporary Sediment Trap Okay Rock Dam, Okay Skimmer Sediment Basin Okay Temporary Sediment Basin 9.91 Disturbed Area (Acres) 47.E. Peak Flow from 10-year Storm (cfs) 10-Year Peak Inflow Description C Area ac Graded" 0.45 5.65 Impervious 0.95 4.26 Woods 0.15 0 User entry Prepared By: BDR/JDR Thomas Hutton Engineering Co. 12/03/2012 Calculated Value * For Graded areas, a C value range for smooth, bare packed soil was used. Compusiie Runoff Coefficient, C = 0.66 Peak Flowrate, Q10 = C * I * A where: C = 0.66 1 = 7.23 in/hr** A = 9.91 acres Q10 = 47.64 cfs ** Table 40-3B, Page 40-5 of New Hanover County Storm Water Design Manual (Tc = 5 min) THE OVERLOOK AT MIDDLE SOUND Wet Pond 1 Sediment Basin 3210 Middle Sound Loop Road Design Considerations New Hanover County, NC Prepared By: BDR/JDR Thomas Hutton Engineering Co. 12/03/2012 Calculate Skimmer Size Basin Volume in Cubic Feet I.. 55,30Cu.Ft Skimmer Size Inch Days to Drain* 3 Days Orifice radius 41.5 Inch[es] Orifice Diameter 3.8 Inch[es] In NC assume 3 days to drain Estimate Volume of Basin Length width Top of water surface in feet Feet VOLUME 0 Cu. Ft. (Bottom dimensions in feet Feet Depth in feet Feet THE OVERLOOK AT MIDDLE SOUND Wet Pond 2 Sediment Basin 3210 Middle Sound Loop Road Design Considerations New Hanover County, NC Selection of Sediment Control Measure 7.65 Total Drainage Area Do Not Use Temporary Sediment Trap Okay Rock Dam, Okay Skimmer Sediment Basin Okay Temporary Sediment Basin 7.5 Disturbed Area (Acres) 6.84 Peak Flow from 10-year Storm (cfs) 10-Year Peak Inflow Description C Graded* 0.45 Impervious 0.95 13-44] Woods 0.15 User entry Prepared By: BDR/JDR Thomas Hutton Engineering Co. 12/03/2012 (Rev 08/20/13) Calculated Value * For Graded areas, a C value range for smooth, bare packed soil was used. Composite Runoff Coefficient, C = 0.68 Peak Flowrate, Q10 = C * I * A where: C = 0.68 1 = 7.23 in/hr** A = 7.5 acres Qio = 36.84 cfs ** Table 40-313, Page 40-5 of New Hanover County Storm Water Design Manual (Tc = 5 min) THE OVERLOOK AT MIDDLE SOUND Wet Pond 2 Sediment Basin 3210 Middle Sound Loop Road Design Considerations New Hanover County, NC Skimmer Basin Okay 7.11 Disturbed Area (Acres) 36.r '�68. Peak Flow from 10-year Storm (cfs) 13500 Required Volume ft3 (1800 ft3 per disturbed acre) 11972 Required Surface Area ft2 (325 ft2 per Quo inflow) 77.4 Suggested Width ft 154.7 Suggested Length ft Storage Volume - actual Volume Provided Surface areas taken from CAD Label Basin Elevations ELEV. AREA INCR. VOLUME CUM.ft2 VOLUME ft' Permanent Pool 7.2 23,900 0 0 Top of Veg Shelf 7.7 27,990 12,973 12,973 Weir Elev. above Orrice 8.8 31,115 32,508 45,480 - 10.0 34,920 39,621 85,101 Top of Bank 12.5 37,870 90,988 176,089 Volume Provided = 25 Trial Weir Length ft 1 Trial Depth of Flow ft 75.0 Spillway Capacity cfs 45,480 ft3 OK Emergency Spillway length Okay Prepared By: BDR/JDR Thomas Hutton Engineering Co. 12/03/2012 (Rev 08/20/13) Size Skimmer based on actual storm water volume THE OVERLOOK AT MIDDLE SOUND Wet Pond 2 Sediment Basin 3210 Middle Sound Loop Road Design Considerations New Hanover County, NC Prepared By: BDR/JDR Thomas Hutton Engineering Co. 12/03/2012 (Rev 08/20/13) Calculate Skimmer Size Basin Volume in Cubic Feet I 45,480 Cu.Ft Skimmer Size 4.0 Inch Days to Drain* 1 31 Days Orifice Radius 11.7 inches] Orifice Diameter 3.5 Inch[es] In NC assume 3 days to drain 'Estimate Volume of Basin Length width Top of water surface In feet Feet VOLUME 0 Cu. Ft. Bottom dimensions in feet Feet Depth in feet Feet STORMWATER MANAGEMENT REPORT THE OVERLOOK AT MIDDLE SOUND APPENDIX J POND ROUTING CALCULATIONS (PRIMARY OUTLET STRUCTURE NON-FUNCTIONAL) 22667 H THOMAS ScHUTTON w a U U D a F U) i c i O + + +# M ,J ) # # rI ro m ai+ o ° a « #+ 41 si eJ m # # ro N A H # # 0 3 m o O -+ # Hsi Ow �a 0 rd a 4 L)p fd++ 9 3 W � o 0 0 0 o O o 0 0 o m m m m N a a a a a m m m m w o inin w o a a a a a a a a a a a a a a a 0 0 0 £ O 4 0 0 0 0 0 0 0 0 0 0 N H D m N 0 0 0 0 0 N H 1O N Cn O O 1.- I W m O O O O O O O O O O O 009 O O O O W cocoa 00000 O H N V In Cocoa O H N N O O O v m h 00000 00000 o 0 0 0 0 0 0 0 H H H H N N H N d. O 00000 cocoa O N O. f n cocoa m v f n h U l O O " u l u l cocoa cocoa cocoa C 0 0 cocoa cocoa N m m h N cocoa H m m h In O v h N C cocoa cocoa cocoa O O O O O O O O O O O O O V' fn N N N 0 0 0 0 0 4 L1 N N N O l O N N N O O O O O O O O p O O O O O O O O O N ri ri HH NHHHH li Hr-I H cocoa 00000 m m mmN 00000 wNwww NN VIHm mmmmw O mmvo m V mm0 O Hm 90099 OOOO 99999 OOOO N H 10 m N 99999 0000 h m V' �p O Ip H H H H N H ,O N l O IT ri V• m cR Oi r-1 V' m \O N m 00000 00000 OH NpN 00000 rnm hh HIn fn O H NN O 00 mh Hmmm M..m NmHN H H.'-� HN Hm V' H H N N Nd' HNm H V 3 ro cocoa cocoa m d' 01 h t o 00000 N N N N N H N N m m O ma h m 0 0 v I n m m a a N N N N N 110 1 .N 00000 00000 H m m h fll 00000 V} d• d' W V V V fn M N m M h In O j h N V M M ill o V V V W E W 0 0 0 0 0 O O O O O d' N N N N O O O O O N N N N N N N 'Ni N N 4 M, N N N O 1p N N N N N N N N N N N M NH HHH HH ri HH r-IH riH NHHHH H H -IH HHHHH H HH W ro N cocoa 01 M t n m m N t n O W H h h h h h m m f n v N h h o u i u I N N N N N a v d 00000 C 0 0 ii WiJ H H H H H hhr hh NN In d'v HHHHH m aN lG H m m m Ln y s4 W H H H H H m m m m m H H H H H H H H H H H m m m h O V H W H rnQ NNNNN HHHHH m m a liN mm V' V' N H H H H H H H HId H H N N m m m m m m m m iS ro fU 1J cocoa cocoa cocoa 00000 1n m o 0 0 00000 cocoa 00000 cocoa 000 JJ 01 W 00000 cocoa In In In In N cocoa � v N N N m m N In In cocoa cocoa cocoa 000 ri f6 00000 cocoa cocoa cocoa cocoa cocoa 00000 cocoa 00000 c o o ON 0 0 0 0 0 O O O O O O O O O O 1I I N N I f 1 f n O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O 099 ..... ..... ..... ..... ..... ..... ..... ..... ..... . 00000 00000 cocoa cocoa cocoa 00000 cocoa 00000 cocoa O o o b N JJ 0.000 00 ... ..... cocoa cocoa cocoa cocoa cocoa 00000 C o o M W O O O O O 00999 N N Cl N N O O O O O 99999 N N N Cl N 99999 O O O O O O O o 0 0 999 V HHHHH 00000 MO1O Mm 00000 OOOOO H HHHH In In In Nm m NNN N In In Vf mm NIn In w H H H H H H H H H H H H H H H H H H H H H H H H H ro 3 d nw ro 41 zro 00000 cocoa m N m I n H 00000 v N O l m m H u l h m f n 00000 cocoa 00000 000 0 0 0 0 0 0 0 0 0 0 O W h m O t d• d• C C l n h H h H C f n h f T 0 0 0 0 0 0 0 0 o O o 9999 O 999 ww w w w h hhhh wwhhh In In In In In mm(T (!\a mfTmmo NNmmN mmmmm In NNm m In 1n fn H H 00000 00000 O u l O m i n H H H H H m � I n O O W I n V l cocoa cocoa cocoa C 0 0 cocoa cocoa N a n m h V l cocoa H m m h f n W " h V 1 d• cocoa cocoa cocoa Cool . . . O O O O O O O O O O C 1 n N N N O O O O O V g I n N N N u 1 N 1 N N N O O O O O O O O p 0 0 0 0 0 0 0 0 0 N H H H H N H H H H N H H H H aaaaa aaaaa aaaaa aaaaa aaaaa Ix aaaaa aaaaa aaaaa aaa N N N N N H N N N N H N N N N N N N N N H N N N N N N a if N N N N N N N N N N N N N N N N N N Na H N O N O H N O N O H N O N O H N O In O H N O m O H N N H N O N O H N O N O H N O In O H N O O O H N O O O H N O o 0 H N 0 O O H N O O O H N O O C H N O O O H N O O C H N O O O H N O O O H O O O O H 0000H O O O O H O O O O H O O O O H O O O O H O O O O H O O O O H O O O O H 000 wwwww wwwww wwwww wwwww wwwww wwwww wwwww wwwww wwwww www H H H H H N N N N N H H H H H N N N N N H H H H H N N N N N H H H H H N N N N N H H H H H N N N at ae xkaa at at aaa aC NNNNN NNNNN NNNNN NNN ro Co ov b ororororo 11 L 1144JJ 11 1 11 11 b O O O O rorororov [F� (T�y LI Cy Ly C1 ❑ ❑❑ Q ca ca�y0 ❑ Q[a [��a O 0 0 0 0 0 0 0 0 O ri ri ri�'i -i-�I -i-,I -i-�I -i-"I -.! O O O 0 0 0 0 0 O Rl RI�w((� a"`.w wwwww aaasP; WP,P4QL" aaaaa aaaww wwmwN W NNrnN EEEEE EFEEE W W W W W W pq W i. i. �.Ai+ wmm rn U)wrn mm to aaaaa aaa moo"aA GA00A 00000 00000 owoopRRMR owowowowow `wawa aaa H HH ri ri r-I r-I H r-IH wwwww wwwww O H E zU P m z 0 z ED W 0.' U ae F W E a 0 0 Ir. H aK a E D w 0 0 .H HA EW 00 41 xo roo x (xa O w to c uL i r U W u o F N v H cu $ m N N E O H w a •N H F W N N Fri H H H W (tl N O O S-I (1) 11 N i W E ro a) 0 0 aJ dt w 0 0 H ro O 0 a)u o0 a 00 mm+J 00 q Ol w 0 0 ro .1 m CD ro a £ N w o 0 41 m m w E Ol H 0 0 -N ro f9 E N o 0 co x x� q a a o LO 0 41 N � N o ro off i E as STORMWATER MANAGEMENT REPORT THE OVERLOOK AT MIDDLE SOUND APPENDIX K COUNTY SWALE, CULVERT, AND SEDIMENT TRAP CALCS 22667 Fl THOMAS Sc HUTTON -01 Overlook at Middle Sound Loop Road DR Horton, Inc Thomas & Hutton Engineering Co. Job: 24039.0001 Date: 5/14/13 Revised: Swale Design Considerations By: BDR/JHR Rear Lot Swale (Uts 24/34) I. Determine Design Flow usine Rational Method 10 Year 25 Year Draiange Area (A)= 36154.8 sf Draiange Area (A)= 36154.8 sf Runoff Coefficient C = 0.2 (Lots & streets) Runoff Coefficient C = 0.2 (Lots & streets) 10 Year Intensity (I)= 9.7 in/hr (Tc = 5min) 25 Year Intensity (I)= 11.0 in/hr (Tc = 5min) Q10= CIA = 1.6 cfs Q25 CIA = 1.8 cfs U. Check Swale Permissible Velocity and Flow Proposed Channel Grade = 0.01 ft/ft Proposed Vegitation = Grass - Legume Mixture Soil Type = Easily Erodable Permissable Velocity, Vp = 3.5 ft/sec (Table 8.05a, NCDENR Erosion and Sediment Control Planning and Design Manual) Retardance Class = "D" cut (Table 8.05c) Trapezoidal Shape Channel Dimensions: designing to meet low retardance condition (class "D") design to meet Vp Note: All Grass Swales have Z = 5:1 (max) and d = 1.5 ft (min) Z=5 T = b+2dZ = 1 Oft A = bd + Zd2 R _ (bd + Zd2)/((b + (2d(Z2 + 1)os) S = 0.01 *from Figure 8.05c **from Manning's Eq. 10 Year "max Flow Wet Area Hydr. **V10 **V.. Qmax b (ft) d (ft) A (ft) (ft) Depth (ft) (ft) R (ft) *n (fps) (ft/sec) (ft3/sec) Comments 0 1.50 11.25 0.74 0.14 0.10 0.07 0.059 0.43 2.06 23.15 V10 < Vp, OK Qmax > Q10, OK 25 Year R.. Flow Wet Area Hydr. **V25 **Vma Qmn b (ft) d (ft) A (ftz) (ft) Depth (ft) (ftz) R (R) *n (fps) (ft/sec) (ff/sec) Comments 0 1.50 11.25 0.74 0.16 0.13 0.08 0.059 0.47 2.06 23.15 V2s < Vp, OK Qmax > Q25, OK III. Evaluate need for Temporary Liner Permissable Velocity for bare earth, Vp = 2.5 ft/sec (Table 8.05d) 2 Year Intensity (I)= 7.4 in/hr (Tc = 5min) Q2= CIA = 1.2 cfs Determine Velocity and Depth of Flow for 2 year, 24 hour Storm. Use mannings "n" of 0.022 Wet Flow Area **V2 **Vmax Q.. A. (ftz) R. (ft) Depth (ft) (ftz) R2 (ft) n (fps) (ft/sec) (ft3/sec) Comments 11.25 0.74 0.11 0.06 0.05 0.022 0.96 5.52 62.08 Q > Q2i OK V2 < Vp, Temp Liner Not Needed 5/23/2013 Z:124039124039.0001\Engincaing\Calc"fftimslStm Wate,124039.0001-Appm&xK-Co,mtySWe=dSedim=1TtapCales.xlsx Page 1 of (K) Overlook at Middle Sound DR Horton, Inc. Thomas & Hutton Engineering Co. Job: 24039.0001 Date: 5/14/13 Revised: Sediment Storage Design Considerations By: BDR/JHR TEMPORARY SEDIMENT TRAM' Check Capacity of Trap (Lot 34) Required Capacity: Minimum Volume = 3600 ft3 per acre of disturbed area where: Disturbed area (ac) = 0.83 Min. Volume = 2988 ft3 Minimum Surface Area 435 sf per cfs of Q10 peak inflow where: Q10 = 1.6 (from swale calculations - Lots 24/34) Min Surface Area = 696 ft2 Design Dimensions: Width = 20 ft Length = 50 ft Depth = 3.0 ft Volume Provided = 2990 ft3 Surface Area Provided= 1000 ft2 5/23/2013 Z:124039\24039.00011Engineering\Calmlatiom\Stom Water124039.0001-Appendix K- County Swale and Sediment Tree Caks.xlsx Page 2 of 2 c C4 C4 TM Cp N M t� 3 LLB i fl? 4) 0 E �.r C lw 0 2 0 r- 0 �M�i ryrW O +1� C U) E 60 a I 0 m 00 m 111 ao m 00 m rn 0 0) co 0 co co 0 0 co co Lo ao co co ui E CO (O CD CO CD r (D (A r r O O n Co r CO c0 CO 9 ^ C r r - - - - - - - - - — - -- W O O O O O O O O O O O 1- O O O O O Ln O O O Ln Ln O O O O O o LL) CD Ln Ln LC) Ln Ln N Ln .J p r r r r r r r r r r r O r r r r r N O -BUY Q1 co cn M co M co M M M M M (M M M ro cn cn M co Z " O 6 O O O O O O O O O O O O O O O O O caCL r CD U U U U U U U U U U U U U U U v U U S W O J U) 0 `m '07 Ln w V Ln Ln 0 O Ln Ln 00 V O O CD Co N N N m _ r r N N r r r r r r r N M M M M cr V V CL C N C z J U) C 0 = O O O O O O O 0 LO LO U) O O O O O O O O Ln O O 6 M N O O Ln N ;� v N C W I- n 1, CD n n co C)) r r CD 1� (D LO V N N @ C Q m CO 0) (D CA co 0) CD M (D CA O O m O CD Cl) M CD CM LO M n CO co Cl) Ln M CD M 0) CD to ^ e O O O O O O O O O O O O O O O O O O O � d e O O O O O O O O M M O CD O O O O O CD .J .� co O r M O M 00 Go O M N to In I� V N N O C Mu (6 r.:(O Ln CO r,: P.:C6 r CA � CO lt) V M N N m •y' C CD Cl) Co n (n N (D CD O V r r n m 00 Ln Ln CO E E r N. r Co N w N Ln N m (N M N m N It N N M r r r CO N r r tg Ln O O Ln O O O O O O in O L() LL) V) 0 O Ln Ln CA I-: (D q CO O q q q V; CA q W CA q M q O CA 3 0^ O O O O O O O O O O O O O O 0 O C7 O C7 VU U- W O 00 N N O 00 I- M N O M v O N N N N m = r to r O O (A 01 r Ln r r r r O r r Q Q v 0 C)C)C) r C O O O O O 0 O O O r O O C O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Y u' o 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o o cO E c a E E E E E E E E E E E E E E E E E E E 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 0 0 .m)FT U U U 0 0 0 0 LO o # 0 0 co 0 0 Ln m co Ln o 0 o ao ow O ti 6 Oi O O CA O W O O 0) O a) O N N Ln M � cq O C7 O O O Ca c E C C .0 N O M o V r Nn V O O O O O O O O O O CO O O t m o 0 0 r o 0 0 0 0 o r- M V N c M 0) O o O) 'm O M O CD m Cj O of O 0) O O O T O r Oj N Lo � w O M Ln T O C r N N N m N N N LT N 07 N N 0) N Ln r M r N rm N La N v N N M o M v y C _0 N O —1Z (r0 r — N M V 0 0 h O M ti W to V M N W � W U 0) CA 00 (D Ln r O ? p C i O .�-- r J2 L 0 CL �4q/ L yTu. �.i o 41 o O 00 00 00) 0m 00 00 00 00 00 0 _ r (O CO I- CD V M V; W N (q N 1� COO CD CA I- O (O I, Lf) n CO M M N m e � d i{) E a rJ 0C) U ci UC) L) J (q 07 � rN f1 C 7 CC O OO P g In N T N r co r V (O N r O (O M P O N) M T CO (O M T (O 0 M T N It V N N N C V O O O O O O O O (O CO CO O O O O O O O O O N O P O CO O O O M N O O Wn N V V N > C' Co 11 1� co (j P P r r O lfJ N CV 47 3 � Q V � n c i C) J (q O L O17 CD E 10 W V 40 (O LO N (O 10 co V' O 0 0 O N N N O^ r T N C O O O O O O O O O O O O O O O O O O 0 L O O O O O O O O O O O O O O O O O O O v v 'fit V V V v C V V V V V (n ^ 3� s o 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 cm Q 4) (D N O 0 0 m 4) 0 0 47 N N 4) N O 0 0 N a a of of a a a a of of a a a a a a of a Of 0o 0 do OD m (O (A w O w 0 O O CO do u) do 0o 0o E N W Co q (O (Q I� q r W CO (O �/ {S. W � r r T {'� r N T N T eM- V' {� h T Cp T T m CN N r T T D O ❑ O 8 8 8 O O O O CS O O O O O O O O ++ (A N OO (4 W N W N W N N W (4 OO N W N N OC E 9 9 9 9 9 9 M 9 9 9 9 m 9 9 9 9 .!0 9 9 �? AFT E E E E E E E E E E E E E E E F E F E O C3 O Ci O Ci O C3 O U O C.1 O 0 O 0 O 0 O a O U O f1 O U O a O C) O U O C3 O U O U C o as 0 0 a � I o CA W I- Co (f) v M N O V i i i i i i OD Pr CO V fV r N T r P T T T T P T T T T P r r r T r T V u P m w I-- to (C1 M N r Cii Z r. O CL E E r3 �I v� E L O 4-a / r G £ £ C £ £ £ C £ £ £ £ C £ C C £ £ £ C 0 a 0 a a o a a a 0 0 o a a a a a o 0 a C c £ a 0 0 0 0 a a 0 a a a 0 0 0 0 0 0 0 0 m U U U U U U U U U U U U U U U U U U U C. N its C! C C O -0 N M a O O h O co h co CN v M N r W pj £ J v co co h 0) co (D If co v h m CD O It m O CD 0) C V: CD O M O O O O O c l N s- O O (D M O _ O 0 0 0 O 2 7 r r r 0) a b) N -C O co m m m W O CD O m co N O CD C M �^ O O O O r r r O N l`9 Ic O O O O r r N p aC� o O O O O O O O O C C O o O O O 0 O O 6) J v O N O M N O r- N O r O O m O # # .. V' U') O m � r-m r 0 CD N 0)h O N M O en _? O O O O 0 0 0 O O O O W h C s- 01 m O # # #_ # # # # # # # # (0 N h CD co O m (1Y It a O r- m I (D m # # C d: O � � M CD SO r W r; O o (D m r N � 30 o c o 0 0 0 o o o o o oR h r r r r r r O O Z O O O 0) O O O O O O O 0) O W N— C) CD Ch O 0) v m W O CA M 0) O m O O h h O co m O O Ci C? (D CD CD (O (D (D m M M M m m q CC) O C O O O O O O O O 0 O O O O O O O O O 0 O J pq Q O O O O O CD C) O N N N O O O O O O O O y 7 O N , O _O N O C)0 cn N O C? N N V V N C W IR CD r. r- od CA r r r r CC) I- (D O 'Q N CV t' C O O O O O O O O Cl) M O O O O O O O O O a) 0 co r M co Cl)h co a0 o C N O O h V V O N O C W^. q °r° o m o 0 0 Lo +=i O O e r MCD m m ai 0i ai rn m ai r b pi w rn ?. J@ N N N N N N N N N N T N N N N N M L a U E U U U U U U U U U U 0 U U U U U U U U r Fa _ m _ •C co g v Lo O O W)Ln O co � O O (D (D N N N r N N r r N co co m m �' W to CD co h co O h N h N O h O W co O ( M N w 2 3 4f v, CD co h O (n Loco ao O 0) (D co cD LL `u r N V O H M CM N r N N •0• O 6 r N N N N O W j c) � 0 O C tp t cp c I I a r m a [A O h [fl N O v f [A 0.7 f M1• K7 '�t ITi N N 7 .E d Z (A W L—n r r N r Or O W h W O V m N r A A? o w F• U Z CL d :ft J Z It '� !G tk It It d o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m a N V Ih N Cl) h O (D O N h h T h r N h O O CA o o O h M h O (() N O Q7 N O) tO —0 a co r r LO r r r OD CD (o N] CO h (n (D Kj r M I, LN C pq OD (D M V 4) M M Cl) O O M O h M h (D O 0 r N M M N M M (i M N N N M N N N N M N N 0 O O O O 0 O O O O 0 0 0 O O 0 Cl O 0 C a N v -T h m h h 0 C O N t` h QN) h h O O O O O O h M h O q •. N O) M N 0� 117 CL 0 r r r r r W a0 4'7 1n O h 0 M O r 0 n cog co M v LO M M M O M v M 0 h M h (P) co 0 N M M N M M Ci (h N N N M N N N N C? N N ^a o 0 0 O 0 o O O O 0 0 0 0 0 0 O O CD O ,L N O O O O O O O O (M M M M M O O O O 0 O = O 0 O O O O O 0 r O O O O O O ci C O O O O O O 0 0 0 O O O O O O O O O O co N O O O O O O O O O O O O O O C O O O O N C O O 0 0 O O O O O O O O O O O p O O O 0 = ,� 3 _ L) M Cl) Cl) M M co M M M M M M M M Cl) M M Cl) O Ofl 3 m 0 OD o 00 C?o co co 0 00 0 CD 0 co O co 0 0 00 0 CD o O co o co o c0 0 c0 o 0 Lo 0 E N o 0 0 0 0 0 Co 0 0 0 0 0 0 0 0 0 o 0 o = z •o a) v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o m S O O O O O O N O O N O O O O O O O O O O p � ? N N N N N N N N N N N N N N N N N C 3 m D) 0)m CA 0) pl Zn O N N O O O Y f (O N N p3 w @ l6 p7 O O O O O N N W N N N N N �N�pp O fD f0 O O (D CD CD (D (D (D p O (D (P (D (D CD (q a ?� N N N N N N N N N N N N N N (V N N N N t C v O v O co O co O Go00 O O d• O v O It O It O 't V It m M C!O O O O O J 9 Cl) m (o Co O (C m C7 m () m M M C7 Cl) M M LO cc � N C7 W co co co co O co co CD C)O O O O co co OD 00 co 00 II 0 0 0 0 r r r r o 0 0 0 0 0 0 0 0 o O W Q M C7 M M (D co(D cofD (D O 0 0 0 O m (o Cl)CM M M cu a V 0 It 0 a 0 0 0 ao 0 co 0 OD 0 v v $ v v v v v v E 0 0 0 0 0 0 0 0 C � O O O O O O O O O O O O O O O O O O O .d" {� 2 ::, o a a a a a a a a a a a a a a a a n a a i o C a E E E E E E E E E E E E E E E E E E E UUUUUUUU '- H 0 U U U 0 0 U 0 — (� O O 0 0 O O 0 o O 0 O O 0 O O 0 C 0 O m C +d+ (D (D O N O O h O O N (n O V M IA co (n O (� v r (D N LD (C) (N CR -t h LO Ln N yj O O O O O O O O O O O O O 0 00 O O C. O II O O O O O O O O O O O O O O N O O O O C (� V 0 0 O 0 O O O O O O 0 0 O 0 C 0 O O 0 c OS O co (o co N O O h N h h r (D (n (D W N (D II Q v (o (D 04 M N U) Go co C) co CD N N (n N CM C V N N M M (M N r N r r r r r M r r •� SD � a u o m rD v N m r aD p tD � 1 C 7 N Qi c r- r r r r � 4 m W H C O 07 � � � ate-• r r r � J Z r O) OD h p LL7 V M N r (L z 0 C N V N O M cocoN coCD O O m W N O com y 0 CD O O r r r O N c0 T O O O O r r N O ��-' O O O O O O O O O C O O O O O O O O � o p O O o O O O O O o n O O C) o o LO O J C Y O O t0 t0 O O O O O O to p tD tD t0 t0 � N to r r r r O r N O m g O (O Ln h O M O aD O v N O CD 0 ++ y) r to CD CD co to N 0) V r CD w r N N N wyy O fir' O O O O r O r O O O O O O O O O l`C C W C M O O O O O r O O O O r O O O O O �y Y CO to v n O O h Co In n CD LO CD L In (D V' p O W a) m O O (D N to M 4 V e O O O O O O O O M N N O r O O N C O O O O O O O O 16 N T Cl t� O O rj O O O O O O O O i ri . r t M N n to h O O M co t1) n co L.)CD r j t0 (D V (D O a) O O O a) N u) M U) v p n d' w e O O O O M N N r O O CS O O O O O O O O Cn O O O O O O O O O O C O O O O O O O O J> I co � M (D t0 t0 O M CD Ln co a0 O CD r v N O M <= V: M N V r r O O to (O N M t0 h � W 4) O O O O O O :.t �2 O Q O ( m r N Cl) LO (M M Cl) co O N CO a) co (D to co co N N (0 O O O O r r r O N N r O O O O O O _ _ ? t O O O O O O O O O O O O O O O O O O O to W W W � N n D) to O aD N n N M O ui � m (O h M M 'V; a� a0 N N h n � r r N N N N M M M N N N N N _ 4 Q w Cl) n Q N f r r N N N N N lD CD C� q 01 O O (O (O (O Sy a¢1 y.. N O O O t0 U7 tD (D * * O O O O O O O O Z p, N to O O N N N N N n N N to O O LO LO Lo O r CV (V (7 M CM ai (h O O O_ V n O u7 t0 M to M M V: tD U� M V; h W O O N N M n 47 N W n > O O O O O O O O LQ tpn- t00 O O O O O O O O > y O N O r O t0 O O O V) r O O (n N V v, V- N C �) r. r- m f- Imo- CD Q7 CO f- (O N v N N r O O O O O O r O O O O O O O O O O n M O O O O C O O O O O O O O r Dj N ri ,: tb O tt) y a) Di tom a) Di Di of Di Di to � � co v M M N N N N N N N N N N N N N N N M r V M to h to V n O O N CD to n CD to CD O O O O M N r O O t0 O O O O O O O p a O O O O O O O O O O C O O O O O O O O V r V• O n p N (O (O r O O M N V' J> V (D � N V' n Q) d O O O O O O O V' N O O O O a) O CO W 4) r r r 01 O a N V' Cl) N Cl) M M O N CO V to LO co N_ N_ m IC O p O O r r r 0 N N r O 0 O O 0 O OL W O N m N p tD V' lf1 W O h O (D N h N M m CD D) CD CD Ci O p M q V: q aD N N n n II > r r N N N N N V M r r N N N N Cf � N A Cl) n V' V• M M M Cl) O p W r r n n N N N V CD n q D) O O q (O (D It O O O N V V- n I- O) M 0 q LO O O O t0 LO LO to tD d. to O O O O O O O -- N U- O O N OD lD n (O (D Lq O O to (D 4f E L 9�7 r N N . r O p O r N N co Cl) co co m CY O N p J> N 11: n to m (D M t0 M CD v N a a (n n M n m M Q 0. U _ O O O r O O q O CD O CD n O CD O (D O q O r O N c U 0 r � - r r 00) c > O O O O O o O O Cl) (1 o CD O O O O p O p` E > d CD O r M CD M CD CD O M N to � n V: V: t0 N O C 41 O h (D tD (D n n co r r a) n (D t0 V' M N N ay (O O co �- CD O I'-N I-- N tD h O co O M N COD A t] a f0 (D n U0 t(7 Lq CD CD O to (D CD (D N (O O O m y N � E LO co V st to U') tD (O U) to CD V- O O (D p N N N O C N D C Or ch- ram- r V N r r O M w n (D to V m N r d � J 1�C 7E CL m CO J Z G C it tk tk tk tt 2t C o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o p p ac 0 0 0 0 a 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 m n N (NO. W) O N (D O C() N ti n I� N M n Or O V Cn CM O OR O Cl � M ({i m a I- r r CD r r r °i CD ui CA 00 ari 00 CO (D OD e! c 67 cD 00 CD n w O (D (D Cl) Cn r O V CA (D N CDV) N M M N M ( J M M M N N M N N N N :� N N 16 O O O O O O O O O O O O O C7 O O O d O C 7 n- - n (NQ u 7 O 1D r CO O Lo h N fl- n f- UC I- o O ll) M O CO O � a$ n r r (p r r r r (A ID (ri CA OD N W CD r O a0 +„ CO (D 1- CD (D CD CO CO C() V M V 0) CD N (D M N M M N M M M M M N N M N N N N V O O C) C7 C] O O o O O C7 O O C7 O O O C) C) Li ❑ O O O O O O O O M M M M M O O O O O O O = O O o O O O O O O O O O O O p} O O O O O O O O O O O O p O O O O O O C ) O CD O CD O O ra Ce dT O O O O O O O O O O O O O O O O O O O G C �^a N N N N N N N N N N N N N N N N N N N c ' 7 N O O C) CD 10 O O O O O O (D O C) C7 O n 0 O O u M Cl) m Cl) M Cl) M CO r1 M C 1 M M M rl Cl) (n M O M Q �^a CD O 00 O co O 00 O c0 0 p 0 co 0 O co 00 CO GO 00 co CD CO CO co Cf) fn C7 C O C7 0 0 C7 CD C) CD C) C) > Z -d m a O O O O O O O O O O O O O O O O O O O (.°p O O O O O O O O O O O O O O O O O O O N N N N N N N N N N N N N N N N N N N C 3 _ u) u) If) u) (° ° 0) CA CT m Im CA CD (A O N N O O Cp Om p O O O Y N N l0 m m m m m m O O O O O C0 (0 Cp m m m h (m�pp (D CD (D CO (D (D (O CO CD CD CO CD O (D o p (D O p 1U 3 N N N N N N (N N N N N N N N N N N N N i C V V aD O O to V V V V V V V V V s} V (u O C7 w Go co OD (D (O O CO O O O O O 0O CO W W W OD II Cr Q O Cl) O M O ri O ri r (6 r (d r (d r (D O 0 O 0 O ci O 0 O 0 O ri O M O ri O pi O ri O Cri 0 O O O O Cl) C7 CO M (D O O to O (O O Cl) O M O M p Cl) CO M O CO O Cl) O M O M O CO j m C O O O O O O O O O O O O O O O O O O O O C V V V V V V V V V V V V V V V V v v v Y c c E E E E E E E E E E E E E E E E E E E y. O O O O O O O O O O O O O O O O O O O N ') F U 0 0 0 U 0 U U 0 U C) U U C.)CL U U U U U ca O O O O O O O O CA (D V Cl) 00 O O O O O OIt O O O O O O O O U) lq: N (O M O O O O O O _ cy m O co C) C] O CD O O O O O O C7 O O O O O O m c ++ O. U7 N N I, O M" N O N co V O CO V O N I� to CO V M N NCR U) I- � O M P. V 0 U0 . CO M r V' I7 V M N r r r Ln N p) O O O O O O O O O O C7 O O O co O O O O M II O O O O O O O O O O O O O O O O C. Cl) O O O O, Cf C7 O O O O 6 O O O ci O O 6 p O O N � c ay _m Cn N h O N O M 0D O CO m N M � 0 C D II- Q H n r N M N N V r N O) N CV dU o` � a O II o 0 g O m � m N � C p CO � O to V M N r O m i CA c0 I� (t1 (li I C7 N r r r r r r r r r r a= r r r r r iz V Ld W m C O f)1 nD p U) r Nr O [V H O J Z r CA O CO Cfy V M N r Z O co - O co N O Cl) M_ N C O — W N O - — O 0 0 0 0 0 a O 0 0 0 0 h 0 0 0 a 0 N o _ J C Y C) C) U) U) 0 a O O C)0 L co N U) U) U) U) NU) V r r r 1 r O r N a m O CD N CA CA N O co n n F H N O N O CD N N N co Cl)) COD lOD M N C W g 0 0 .- . 0 N 0 r 0 r C. r 0 O 0 O 0 20 r_ tM 0 O 0 O 0 r 0 r 0 N 0 r 0 O 0 ci [S5 y0 O O N h h V• m U) O N r O co 0 h r t h O m C)O to m O N V' N V' Ca N .- C)tD CD a U) co h O r pj V O O O r N 0 O O O O r 42 ... O O O O O O04 0) 0 N M O N r U) 0 h r co N CD O CD �' coCD U) co h 0 r O O O O O O O O O O C O O O O O O O 0 J > U) a O N O 'a Cn a0 N 5F O O Cn m U) CD tN N U) c0 r M m vM U) N r h O V m W d r r er- N a 2 �t V �2 e2 �2 r r O O N O O O O [A. O CO U) U) c. U) V' m w N N co CA _N O N N C) C)0 O _ O en E N U) CR Il U) I-: CD M N CD h V: 41 �j N M M m N v M N N N N M m c _ O Q C7 m v Cl) M Cl) m M N O V h h N N N CT N I'� r- r N N N N N U) O r O O O O U) CD CD Q M m r r O cr) h h CA CA CA u7 N O U) O O O O N U) U) U) U) : m N O a O O O 'O O O a Z •" r N N N r N r N r N r N O CD O O N U) N U) N O m m U) Cl) U) Cl) Cl) N U) U) v U) CD w N V' m N (" r O N U) O N M r m M N C—?I m O) m r _� - - - - CO N T - r O O O r i- r r r r r r r t' C)O O CD O O O l U0 N O O O O O O O a C dF O N a r a U) O 0 M O N N : N O O l' O O a O O O O 00 C) C)ri O O O O O O O p O O C m Dm)' 0 M ai m ai a) C) of C) 0) in 0 V F T2 m -t m m J N N N N N N N N N N r N N N N N M O O N h h m w (D N r CO CD a h r h m (0 0) N N CD r 0 CD c aD N a h O r C?O O O 4 t: N r O l0 O O O O O r r C) O O 0 O O 0 0 0 O c CD 0 0 O O 0 0 C] M h M O V U) fD U) N U) M N h V O V7 J N N CO fM h O N c! r O M N CA (p N a0 V' m W 1 O r �2 �E �2 O O O ID 1- r r D O O O O O) co W N LO U) C) Ln v Cl) CD N N CD O L O N N O O O 0 _ _ L C)0 a O 0 C) O ID O 0 C) O O O O O O O L O co a) V Cl) O co C) v T C) CD Cl) O co N 0) ; t` t` N U) V V; CC) N I� N U) I� CO M N CD h V V IER r N m m M m N N N N m m II 0) N N C) M h It Cl) CO m M Cl) CD 0) V• h h N N N U N f� r r N N N N N U) CD r O O CD CD CD D O O M V V h I, M O M C) U) N O U) O O O O U) U) U) U) U) fV O O O O O O O a a N N N N N CD CD O UJ 0 O O U) N U) rC L 0 N N N m Cl) m Cl) M d LO 41 N C CD U) C)N r aD m O N h h N O r CD r m r O �2 CD m �2 r N a CD - h O N O r O CL U S 0) r r .N r p) c 70 4D 0 CD` O C)o 0 0 0 0 O a0) Cl)0 0 0 0 0 C) o 0 0 p E CO O r M CD M CD OR 0 C7 N U) U) h � U) N O ISC as CD N. CD U) CD h h CD r r r M h U) U) V' m N N r y) I I M yy v 0 N c.m 0O m CD b I: co a o OCL � h r fD O M N N vr U) w CD N m 0 CD N M CJ V m U) h V V V M N N M 0 M r r N M m m p N E U) a v v U) U) to U) U) U) CD 't N N ts ca �' r N N r r r r r r r CD MCOD pa) V LL- Z M C m CD m V m N r 0} C1 J IL z 0 N r O N 0 AMR r. _0 x W �T. W E L 0 �w T� V m m a N M N O � e 2 = 2 2 O N 4k N 9k N 9k N qk N ik N # M � S 2 S 2 2 2 to [47 ca � W CD co co co co co E E CC o o r o o 0 o 0 o w u0i, u0i, -J 0 r — r r r r N M M M P7 M M O O O O O O O Z>" O O O O O N 4) u U U U U U U CD O ; t r r r r N N � C a � O O O q N M m CL O CD CA CD 01 CD m li N M CA N C Q ^ O C7 O O C O J 09 a1 C co co W On co O C r CV CV N N � � � q (q CR m =3 O^ O C� O O 0 O lL CA ip O T O M Cry 00 V C'7 O O (7 Q C7 0 0 C 3p O O O O O 0 O C7 O w e (Y O U 0 U 0 U 0 U 0 U 0 U C14 0 0 0 0 0 a d7 O 0 o ww rn rn O CD O 0 iM T pi 10 m Oi�a� s o 0 0 o rn _I # 0 0 0 C N N N N N r Op C,h O N d .D N O J Z N Ch N W Qf V 47 C p CD N Iq M N r C] J ZEL No 0 CL � � � � � 44 � � � � � > qq § ' f2 /£ e .4c m S § .s g § Gg §G § 2 ) � e e 2 - ® ■- ~� e� k § § § LQ § § - 2E § f / J , a § § § § § § d � a 2 � k § e f 2 v §2 a m k� _ % � q q § § a_ *. ■£ 8 CD % 8 8 8 0 k} E ® ¥ ¥ 4 � 2 7 � 2 2 _ _ rya) E2 ° (0S R w £ k ¥ { { e � k g ) ) ) k k \ C k/ k k k\ k 0 0 0 0 0 0 0 0 IL / g § b I I e g I03I z \ o Cl)- ) � a r. 0 CL (D � � � E E :3 � � � � � � E LM O � � § § § a S § § ) 0. k ) E-k ) k k k k k E 3 G 30 3 0 [ $ w § 2$ d oez N n N M § \ § \ / § \ q £ k • ■ 2 £ § § § � / � � & 6 6 & § k § § - 9 2 £ ] ¥ ¥ e f ) } CO \ � k — a)\ § k z =c£ 0 0 0 � � § k k § § § ) — -jcoE � § § § § § § — 2u£ = 2 00 00 0 §£ _w_ a 2 2§ v 2 § § § § k k § £ C N N § § § § � § § § § § § -a k e e e �2 @2£ § 2 �� { g � @ e r 3 § 0 ƒ t1l / \ r� I ) ° k d k � J11 m 2± z I I 3 § |� § } ) f qi cri k . g U«( m U e 4 E 2 \ z d CO L nC14 � � c >, © ■ tt-- 4-- ■ ■ ■ m2z o 0 0 0 0 / d d d a 0 ' k § § § § § . § \ a 2£� g § A q§ m q ro £ 0 0 0 0 6 c % G OR § LO w a K £ I � cok 0 a § A q§ £ 0 0 0 0 0 o f k k k k FU §\ ' 0 0 0 o e 2 0 0 0 0 0 0$ E @ @ "a G G � a d a § - k CNDo © o � k , k § 0 k k 0 k \ � d o 0 0 2 a ■ E § § § § cli� § B . { § § § \ \ § § ■ E Q G 3 a§ f £ co co w Cl) Cl) CIA . E $Go go � 2I 5 n § k n w k CL § § § § § ) a £ Cl) M o o 0 o 0 o k ¥ ¥ § d I f f f E \ 2 a 2) G G ] o o G 3 + g 8 q 8 8 \ >,# 2 Z o cou o 0 o d e E f § § § § { \ o ® ® 2 q La S qo f g q 8 8 8 c o e CD o o d a d \ § © Go § r o § - » ) § § 9 9 f n e % 5 I I I I I I [ W / .@ o c LO� coN CL z z � a § . . k . § $ E d CD CD0 0 D o q $ § § � � § e n w n It [ £ 2 o o o § C3§ CD k§�u § § �d 0 0 i) _» <� � n .n d c; § k k m co� § */ 0 0 o 0 d » 0 8 � � R CD @ a) E 2£ § k¥¥ f 2 2- 0 § G§ > _� 6 6 d c 6 k > ci 14 \ # r q q § § 4 \ « £ - - w w \ § § § § F j \ \ \ § 2■- 8#$ q K q £ E K r- w Ln 4 ° 0 8 0 n § N \ £ m § § t \ k § k § Cl) k §\ o 0 0 0 0 0 2 ° f 0 - w.E § ¥ § ¥ $ q ® § > I£ o d d o' § - cl § E 2 k 0 { § ■ � § § co3 § $ § o r ) \ § § § § § § E , k » Gom e I,-m f z 2 £ ¥ § § q 2 ƒ >» / co Q S m R° 7 2£ 5 6 6 w § § 9 m q ^ o k - & ¥ to ) » � f In to to 2 & - _ a v j / \ § w 0 v n N � � � a CL m \ z © ■ ■ ■ ■ o g 0 0 \ 6 0 2 6 a . m ~ R G O § % C— / k a R w \ 2 ori£ m �£ § 0 § 0 § 0 � J R � G I 2 § ' ¥ to (D � £ t 13 ° g q§ q§ m £ 0 0 0 0 o 0 f o m n f•o k ra §§§ § § c d d La 0 0 0 0 0 \ C14 2 k 2 2 0§§§ k o - ' § k k Go C) co 0 \ �k a d 2 $ ■ £ § § § § § § / K CD e 2 2 2 $ , U) § § \ § § § k ■ £ G q a £ m Cl) w CO m w / ■ fGo co co co G J k 2 m 2 V) 2 6 7 k § a £ m m w m a § / J o g o 0 0 0 0 Ik 6 2 i f f t f f] A ] 3 G o G G o + CL $ o o o 0 8 a m Z o m £ o 0 o d ci d E § § § \ R / \ o _ ® � $ 7 0# 0 0 8 c £ 0 0 o u d o o d d a ƒ ) r ) q § § ° e �2 w w 2 \ k / ) _ ) 9 9 f 9 C- a ) C g q k k q U a I I I I I I r 0 ` w - b = o o LD v n N / z 2z / U) r. 0 4-0 � � � � E 0 � � C � � � � � : � � � � � 0 ■ 2 £ d d o o d a ID � Ui � % / § § m ) m ) o £ § § § ci d q [ 2 Cl) co) 2 Cl © � } 2 § / CO/ / § d Cl CD o d -j> a 2- 2 G g w £ k # ¥ § § § §\ Cl) k k ci ■ f 2 o ci c k q � Lq § 2 > - Im E. E Cl) Cl) 2 n 2 \ / w w w w t § §® �qI q§ z £ ~ ~ q% A g p e § 0 a L co > E K w w 4 § § § k 9 c E E CN CN EN§§§ . ' � co E j k § § \ j \ g co 2 m 8 § E e e § § § § N n w > R£ 2 2 2 2§\ c § § E ; cr § § § \ 2 R } k q§ m? CD 9 CD S £ - C'i w , > k 7 g A q 0 k a 2 2£ a a e a/ 2 Q � /e £ o 2 e o § R o 2 / ] C6 (6 Ni § m q $ § \ o ' - 2 © e a a * ID e � � � E t ƒ- to LO v n N- � m m Cf n r _ c O 9 fV m "7 Cl) n co 2 thl �k 2 V O � 2 ril N N L C O a v rn w O v 0 c� 0 v N U @ .O " a` (D 2 00. m S S 2 m -7) = O J o a a o o a � S lT 4 T N r .- 7 O T �+ M1 N M co co S� W m cCR co 0 0 0 0 cri C E o o c r o p w O O N O O N U O d m m m m m m m m m C7 O O O O O O O C) _ cu 0) �� U U U U U U U U U O }� t� r W w N F i 01 .O- Co7 Col Col d C N C N Z J fA '- a or CD v n C lL coo n r: LO n r, wrn r CO o 0 0 coo V Ch 41 SL O CD f� IA m m Co O co N Cl) m N m N O N J co C N O N 't O ti Ci N C l!J n n r, I- n w N LO V d E N V; q ^ m � CD w ^ O r co SP N N N O N LO LO h LO 0 LO a LO +� 7 0^ � O � O f00 0 Co a q O q O q O O C] q O C LL C7 {p O N U F N o t� QQ O O O O O r M q M 3 O O O o O O O O O E C O O 0 0 O o O p O w Y nj F U U U U U U U U o c n 0 v o o o w T 00 ti ol E QCD� r T COD N N sv o 0 0 o 0 0 m v rn _ o 0 0 0 co m N co N N Co r O m N O J Z h N C7 v m N W U C Cn CD CO LOm N r d J Z NM 0 � � � � LE � � � � � � i CD > q §§ §§ §� , » � � m g G § 00 § § § § § � k � _ 2 �_ co e� o Ln n� o U n� d\ 4 q\ g k 2 7 q q > F rl r-r� K« w LO N m d ƒ K § § § § § § § § 0 u 2 � � G e e e _ 2° m R Cl) n kk $ $ $ $ $ v n - �E ■ W $ $ $ $ $ k n 4 E t t t V (D)) 2 J J X J CD m$ g q q q q r; E § a e w — [ § § § § § § f f 6 E . . - . ) § kCL k k k k k k a 0 a 0 0 0 0 0 0 0 2 0 E a § § § . G ) 7/$ / ` f 7 2 ¥ K U B k� k @ 4 z ) d cn o� Co L_ n � �z v O CL � � � � E E � � � � � � � E I= O -W co § $ $_ 5 j j 5$ j E k ) 9 ) ) ) k k k k k k k k{ 0 r e 0 0 0 0 0 0 20 - d 2 2 c@ d - r,(N m'T n N- w CD 2 z FO ; 0 � 5 I � m § Q g q q A§ 2 j E 6- o- o- 0 0 k;— G a§ G 0/ q s set d ci 6 a a a 6 o a . I § § o %) o ) CL_ - - - -�) \ _ - M % j k\ 2 k§ o o o k 2 o £ ° - - - - - - 2 § j § § § § § § § § CL § § § § § § § § § § � � �uE § r. § � § § § u § £ _m_ ui § § k § § o S m § � R k E m§ k m m t) k§ §£ § § § § § § § § § r Gg § e e e a 10 R m m ; oe_ q q ) ° , g I� Cr) t ƒ k f#/ a CM w W - - - \ ) ) 2 \ Q m ;No \ m $ 2 CA CDi m $ N $ j § k I R ) £ I I e I I e d Q \ f / ) m # n J Orr 0 5iI CL d 5 J Z � 1 CL o 0 0 0 0 0 0 0 0 4) t= 0 0 0 0 0 0 0 0 0 a n N N N � C5 ONO O N t'ri to V' Co to 0 CA Qq C M n N Ntu N N O N CM CCi M N �^r ❑ O CD O O C7 C7 C7 C) C7 C a : CA r 9 ttR CCR I` W O N CL to v v m to 0 cn Ogg A Cy N N N N CM cq N O (i 9 O O O 0 O O O O O N O O O O O O m O O O = O O O O O O O O 2 O O O O O O O O O t6 C C] C7 C] C] O O O 0 O �y N O O O O O QI C o 0 0 0 0 0 0 0 0 x 0 0 CD 0 0 0 0 0 0 C9 n — 3 0 0 0 0 0 0 0 0 0 � y" 0 0 0 0 0 0 0 0 CD Z o y 0 0 0 0 0 0 m 3 0 0 o Q3 N N N N N N N 0 N b _ N � cep <O t�0 t0 CO t0 CO (O O CD ?� N N N N N N N O N c O O O O O Go O O O O J Cl) CO C7 w m to co 0 C7 LO CC N C7 to w to co m tC� tc to o m II a o o 0 a o 0 o a Q .w.. t7 t7 vi to vi Co to O vi a o g co co 0 0 E J M o [h m w 0 m 0 to 0 Co 0 m N � C O O O O O O O O O O c 0E E E E E E E E cl -�i U U U U U U U U a L o 0 0 0 0 0 0 0 0 m Zi 0 0 0 0 0 0 0 Or 0 0 m w c M 'DRN O 0v0 N O N Cr s- O O N CV C+7 N O N Q[ cp Ct7 �' O a a O O CD O O O V II 0 O O 0 a Cl O O O C � 0 0 0 0 0 0 p 0 p a u � W O VO N of LV c II Q Cr1 0�0 OR q O p O II u7 I CD m C L ems- r r Or 1 OD ti N C N N V � W t0 0 CA 00 1,- t0 LD v co N e- p., z J Z r m a G 0 0 o CD o 0 w �O o 0 r 0 0 0 0 0 0 0 0 0 d O O N O O N N O N jj >7 N LD cor N O r M O El O O O O N O ryry�� O O N 0 O O O O C7 O O O O Y pj (D N = d O O O r.- Go O w O O O V O 0 0 0 0 ru y? O 0 _ O O ❑ c ~ M COCOO It � (14 e O O LO O O O O (D O O JI co C) 0 C) O O O O O C7 -J > CO N N M (�D I� � O co Wd E CR O O O O O O O (D IC O O O O O O O O > t O C) O C) C) C) O O O 0} E N O (OD W (D �-- CC. W 91 > r N N N c CLfur Cl) Cl) O) � N n .�- 01 O 9 Q uP N N N Lq O Y), O OD LQ O W N GO N 3. V rCl) n J> 0 0) � Oj O O O C) C7 O c6 Oj 0) = W r r '- 0) r- (D f- IO Nr (O O COO. C I� r-: (D O In V Cl co O C) co O O (D LA C O O O O 0) N N N N N J I� r- M 0) IT N N� O O O p O Q O O N o 0 0 0 0 0 0 0 0 0 Cl) J> n M O M aM- 07 N T O O O O O O M Wd M O O O O O O O O O 4) � L O O O O 0 O O O O W n CO CO -I- r O 1D e- O v . O) EO O N N N `7 N N N Ire, � 0? O O r= D Q r r r r r M h w Il N O 00 d N N N LD. LP MN O = ❑ N N N Cl) N J> ID N Or N CR N O M C O a 0 d CR o o O o o o °D (] 2 m CD r .- r M M � M O N O � N IOD COS), r- I- n f` P, w In ID v r I O II ID N 'ri CO`) N fD O O M CO O CO r- it N 4) ID CO CO 't O O O N M M M N W II V 0) w I- (D LD V m N 0. . s d m � z° CL o 0 0 0 0 0 0 0 0 d C O O O O O O O O C m a N r- NI- N n(0 N O 1N N 9 O 1� 0) (7 10 n N r Co O O O ('fl C CT SY7 n r IZ O Cl 00 Go co v N N N M N O M O C a CDW CD 6 I O q (q n Ci N S O Q V (n n � O 67 .. N Cl) co co M co D N CCi O Vv w 4��^a O O O O O O O O O N ❑ O O O O O O m O O O = O S Ff S S O S S O O C O O O O O O C)O C)16 ffy N d K O O O O O O O O O O O O O O O O O O 0 3 Cl) o CO m u coo O coo O coo O coo O CMo O coo O O S O N O CD C) C) C) O C)O z y v S S S S 3 S S S S S d N N N N N N N O N 3 0 (n Ncn N (0 N N N (0 l0 0 UM) N N r r r r r r O r [0 V O O (D O (O O O O q N N N N N N N O N y c o 0 0 0 o S o w J Cl) m co co Co w to O Cl) Q se o C7 Ip 00 0o co m ao (p 0 o co II o 0 o O r o o a Q m m IY7 (0 m co (O O m 0 J cq C) Cl) (G co (O (O O 0 � C _ _ O a a a a a a a a O 7 T 0 0 O O 0 0 O = 0 N S S S S S o o S S — m ii O O O O O o o O o E m w c CL .L (�f1. N OMQ, NV co CD CD(00 (J 0 �j r O N M 7 N O N m l] M O O O O O O O O O L h II O O O O O O O O O O C (� V O O O O O O O O n. •N C o co 41 C u ¢ U 0co O Ct V � O c0 _ O r N (h N O Ncy � Q O di 03 VD Oi— C m c 2 2 = 2 2 2 2 2 LL Q7 W � 6! o O J z C) Co rl w LO tt M N r- ILz a 0 0 0 0 0 0 0 0 0 J C Y I O O LN O O (n Uf O ((1 "7 V r r r r r r r M T ! 1� m co (o r m N m W p J O O O O r O m O m M O r N N m O N W O ��' O O O O O O O O O Y V Co O O O O N O O V Q 6 6 6 6 16 ah' Cfy O _ O C` � C LO N cc}} O O O O r r O O N o O O O O O M.CN O O O J i N � (o 9 N M M w O O N 0 10 O O O O O r r r O t O O 0 O O O O O O m E N N COO v co cl T um (j W M dl > O N N N N O N ZD j p N N r P: NN N lOf). N O V�O (C7 O M N N CNIm n (Oo r } J N CMD N (h N CD O tn OD IUo (� U( V; ( m I: COD, C der' I`- h pph O O (D O O O (P CO C O O O O N co N N O J N N N w e O O O O O C7 O O C] m J N n LO co cn coc (C) N N LU O C O O O G O M 'a N M M W O O N m 10 .� O O O O O O t O O O O O O O O O N v M q N M COD Uh CD o r r r N N N N 07 C N "t � p N N N n 0 L C NN N LONOLONO c y d � r r r r r N N N M N U 0 W CRD rn m v o ° > aii LOi. N v CDt- r� Lo K C h h f-- h h (. (N Ni A_ O II Nco I- 17 CD a, cli � Cn VM• 7 N c6 (O M Cl (� O N M CO N II 4') m N co co V O o to y CY NN r r r r r Cl)M M c •� V C m co h m N v Cl) N J 4 p. m Icy. �-- - 21 /- a . r - 3 ' � � Y'pOLpplmpp --- (p pYIY p'31YpO3p i Z M .m TT�_ CP s A W Z 11 ❑ ��� 11� 0 CO) X �1 6 SgO J WOU' J NO =U' IOW 6a. UOm� W m W Ip Q O mt~2 pis UN2 Ou J J Z W J mod uz o ~ 0 z a 0� W z fii7 uj Q a se a O W o Z � 4 i `Lu O O a 4 W O 0ga po t, a LU H �a U❑ SO00 0 ai ZI 05 lot ❑ --. I j a X 0 T. m n z n 3 03.6 0 d'i FZ 0 K J m 0 0 z 3 Ll F, j wL1 z 30' CERTIFICATE OF ASSISTANT SECRETARY The undersigned hereby certifies as follows: 1. He is a duly elected, qualified and acting Assistant Secretary of D.R. Horton, Inc., a Delaware corporation (the "C npaBy"), is familiar with the facts herein certified and is duly authorized to certify the same. 2. The following is a true, correct and complete copy of resolutions related to the subject matter as adopted by the Consent of Executive Committee of the Board of rNri-ctors of the Company dated April 22, 2013 (the "Resolutions"). The Resolutions have not been amended, rescinded or modified and remain in full force and effect as of the date hereof. Election of Vice President of City Operations RESOLVED, that David G. Lee is hereby elected to the office of Vice P ' ent of the Company (the "Vice President ") in the Company's Coastal Carolina Division (the "Division "), to serve until the next annual meeting of the directors of the Company and until his successor is duly elected and qualified or until his earlier death, resignation or removal. RESOLVED FURTHER, that the Vice President is hereby authorized and empowered, in the Wilmington area (the "Area") of the Division and in the name and on behalf of (A) the Company, (B) any partnership of which the Company is a general partner, manager or agent, and (C) any limited liability company of which the Company is a member, manager or agent (collectively the " Entities "), (i) subject to written approval by any one of the following officers of the Company: (a) Chairman, of the Board, (b) President, (c) Senior Executive Vice President, (d) Executive Vice President or (e) the Region President of the Division (the "Approving (fficers"), to execute and deliver contracts, agreements and other documents and instruments (other than promissory notes) for the purchase of real property, and any improvements or appurtenances constructed thereon or affixed thereto, or any interest therein, including without limitation any right-of-way, easement, leasehold or other tangible or intangible property, right or interest, and any personal property relating or incident thereto, (ii) subject to written approval by any one of the Approving Officers, to execute and deliver contracts, agreements, deeds, conveyances or other obligations of the Entities, closing statements and other documents and instni Tents` for the sale of improved or unimproved real property, or any interest or right therein, owned, leased or otherwise controlled by the Entities and (iii) to execute and deliver model home leases and such other agreements, instruments or documents as the Approving Officers shall direct. RE SOLVED FURTHER, that in connection with the manage m �IVE Entities' business, the Vice President is hereby authorized and empowe e name and on behalf of the Entities in the Area, to execute and deliver (i) 5 ��3 BY: !: ti agreements and other documents and instruments for the subdivision, development and/or improvement of real property, (ii) contracts, agreements, deeds, closing statements and other documents and instruments for the sale, transfer and/or conveyance of mineral rights, groundwater and other water rights owned, leased or controlled by any of the Entities to DRH Energy, Inc., an affiliate of the Entities, (iii) home sales contracts, sales person employment agreements and similar or equivalent agreements, documents or instruments and (iv) personal property leases for, among other things, office equipment and construction trailers. RESOLVED FURTHER, that in connection with the management of the Entities' business in the Area, the Vice President shall be authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver any and all documents and instruments necessary to sell and convey title to single-family homes. IN WITNESS WHEREOF, the undersigned has set his hand on the 26`h day of April, 2013. ltWtE- 1 Thomas B. Montano Assistant Secretary U:UTEWAL'ilMADMI3Apr26-COAS3.wpd 2 CERTIFICATE OF.sSECRETARY The undersigned hereby certifies as follows: 1. He is a duly elected, qualified and acting Secretary of C. Richard Dobson Builders, Inc., a Virginia corporation (the "Compaq"), is familiar with the facts herein certified and is duly authorized to certify the same. 2. The following is a true, correct and complete copy of resolutions related to the subject matter as adopted by the Co ole Director of the Company dated April 22, 2013 (the "Resolutions "). The Resolutions have not been amended, rescinded or modified and remain in full force and effect as of the date hereof. Election of Vice President of City Operations RESOLVED, that David G. Lee is hereby elected to the office of Vice President of the Company (the "Vice President ") in the Company's Coastal Carolina Division (the "Division "), to serve until the next annual meeting of the directors of the Company and until his successor is duly elected and qualified or until his earlier death, resignation or removal. RESOLVED FURTBER, that the Vice President is hereby authorized and empowered, in the Wilmington area (the "Area") of the Division and in the name and on behalf of (A) the Company, (B) any partnership of which the Company is a general partner, manager or agent, and (C) any limited liability company of which the Company is a member, manager or agent (collectively the "Entities"), (i) subject to written approval by any one of the following officers of the Company: (a) Chairman of the Board, (b) President, (c) Senior Executive Vice President, (d) Executive Vice President or (e) the Region President of the Division (the "Approving O 'cers "), to execute and deliver contracts, agreements and other documents and instruments (other than promissory notes) for the purchase of real property, and any .i nprovements or appurtenances constructed thereon or affixed thereto, or any interest therein, including without limitation any right-of-way, easement, leasehold or other tangible„or intangible property, right or interest, and any personal property relating or incident thereto, (ii) subjc*t to written.. ' , ' val. by any one o -- ie Approving Officers,, execute and delive( contracts, ag ents, deeds, con ` ces or other obligations of the Entities, closing statements'a :d other documents- - fd instruments for the sale of improved or unimproved real property, or any interest or right therein, owned, leased or otherwise controlled by the Entities and (iii) to execute and deliver model home leases and such other agreements, instruments or documents as the Approving Officers shall direct. RESOLVED ]FURTHER, that in connection with the management of the Entities' business, the Vice President is hereby authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver (i) contracts, agreements and other documents and instruments for the subdivision, development and/or improvement of real property, (ii) contracts, agreements, deeds, closing statements and other documents and instruments for the sale, transfer and/or conveyance of mineral rights, groundwater and other water rights owned, leased or controlled by any of the Entities to DRH Energy, Inc., an affiliate of the Entities, (iii) home sales contracts, sales person employment agreements and similar or equivalent agreements, documents or instruments and (iv) personal property leases for, among other things, office equipment and construction trailers. RESOLVED FURTHER, that in connection with the management of the Entities' business in the Area, the Vice President shall be authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver any and all documents and instruments necessary to sell and convey title to single-family homes. IN WITMESS WHEREOF, the undersigned has set his hand on the 26`h day of April, 2013. Thomas B. Montano Secretary LI. VTE WAL7MIin1Oo&onV.3Apr26-COS.NNd 2 CERTIFICATE OF SECRETARY The undersigned hereby certifies as follows: 1. He is a duly elected, qualified and acting Secretary old D.R. Horton, Inc. - Torrey, a Delaware corporation (the "Corrapany"), is familiar with the facts herein certified and is duly authorized to certify the same. 2. The following is a true, cornet and complete copy of resolutions related to the subject matter as adopted by the Consent of Sole Director of the Company dated April 22, 2013 (the "Resolutions"). The Resolutions have not been amended, rescinded or modified and remain in full force and effect as of the date hereof. Election of Vice President of City Operations RESOLVER, that David G. Lee is hereby elected to the office of Vice President of the Company (the "Vice President ") in the Company's Coastal Carolina Division (the "Division "), to serve until the next annual meeting of the directors of the Company and until his successor is duly elected and qualified or until his earlier death, resignation or removal. RESOLVED FURTHER, that the Vice President is hereby authorized and empowered, in the Wilmington area (the "Area ") of the Division and in the name and on behalf of (A) the Company, (B) any partnership of which the Company is a general partner, manager or agent, and (C) any limited liability company of which the Company is a member, manager or agent (collectively the "Entities"), (i) subject to written approval by any one of the following officers of the Company: (a) Chairman of the Board, (b) President, (c) Senior Executive Vice President, (d) Executive Vice President or (e) the Region President of the Division (the "AR,2roving_Q icers"), to execute and deliver contracts, agreements and other documents and instruments (other than promissory notes) for the purchase of real property, and any improvements or appurtenances constructed thereon or affixed thereto, or any interest therein, including without limitation any right-of-way, easement, leasehold or other tangible or intangible property, right or interest, and any personal property relating or incident thereto, (ii) subject to written approval by any one of the Approving Officers, to execute and deliver contracts, agreements, deeds, conveyances or other obligations of the Entities, closing statements and other documents aM instruments for the sale of improved or unimproved real. property, or any interest or right therein, owned, leased or otherwise controlled by the Entities and (iii) to execute and deliver model home leases and such other agreements, instruments or documents as the Approving Officers shall direct. RESOLVED FURTHER, that in connection with the management of the Entities' business, the Vice President is hereby authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver (i) contracts, agreements and other documents and instruments for the subdivision, development and/or improvement of real property, (ii) contracts, agreements, deeds, closing statements and other documents and instruments for the sale, transfer .and/or conveyance of mineral rights, groundwater and other water rights owned, leased or controlled by any of the Entities to DRIB Energy, Inc., an affiliate of the Entities, (iii) home sales contracts, sales person employment agreements and similar or equivalent agreements, documents or instruments and (iv) personal property leases for, among other things, office equipment and construction trailers. RIES®1'i..V1ED FURTHER, that in connection with the management of the Entities' business in the Area, the Vice President shall be authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver any and all documents and instruments necessary to sell and convey title to single-family homes. IN WITNESS W'IIrRICiGF, the undersigned has set his hand on the 261h day of April, 2013. OWt - felt Thomas E. Montano Secretary r t. U.VTEWALMiinWORREYV.iApr26-COS2 up] 2 CERTIFICATE OF ASSISTANT SECRETARY The undersigned hereby certifies as follows: 1. He is a duly elected, qualified and acting Assistant Secretary of DRHI, Inc., a Delaware corporation (the "Company "), is familiar with the facts herein certified and is duly authorized to certify the same. 2. The following is a true, correct and complete copy of resolutions related to the subject matter as adopted by the Consent of Sole Director of the Company dated April 22, 2013 (the "Resolutions"). The Resolutions have not been amended, rescinded or modified and remain in full force and effect as of the date hereof. Election of Vice President of City Operations RESOLVED, that David G. Lee is hereby elected to the office of Vice President of the Company (the "Vice President ") in the Company's Coastal Carolina Division (the "Division "), to serve until the next annual meeting of the directors of the Company and until his successor is duly elected and qualified or until his earlier death, resignation or removal. RESOLVED FURTHER, that the Vice President is hereby authorized and empowered, in the Wilmington area (the "Area") of the Division and in the name and on behalf of (A) the Company, (B) any partnership of which the Company is a general partner, manager or agent, and (C) any limited liability company of which the Company is a member, manager or agent (collectively the "Entities "), (i) subject to written approval by any one of the following officers of the Company: (a) Chairman of the Board, (b) President, (c) Senior Executive Vice President, (d) Executive Vice President or (e) the Region President of the Division (the "Approving Offcers "), to execute and deliver contracts, agreements and other documents and instruments (other than promissory notes) for the purchase of real property, and any improvements or appurtenances constructed thereon or affixed thereto, or any interest therein, including without limitation any right-of-way, easement, leasehold or other tangible or intangible property, right or interest, and any personal property relating or QW dent thereto, (ii) subject to writtch approval by any one of the Approving OffWrs, to execute and deliver contracts; agreements, deeds, conveyances or other obligations of the Entities, closing statenlents'and other documents and instruments for the sale of improved or unimproved real property, or any interest or right therein, owned, leased or otherwise controlled by the Entities and (iii) to execute and deliver model home leases and such other agreements, instruments or documents as the Approving Officers shall direct. RESOLVED FURTHER, that in connection with the management of the Entities' business, the Vice President is hereby authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver (i) contracts, agreements and other documents and instruments for the subdivision, development and/or improvement of real property, (ii) contracts, agreements, deeds, closing statements and other documents and instruments for the sale, transfer and/or conveyance of mineral rights, groundwater and other water rights owned, leased or controlled by any of the Entities to DRIB Energy, Inc., an affiliate of the Entities, (iii) home sales contracts, sales person employment agreements and similar or equivalent agreements, documents or instruments and (iv) personal property leases for, among other things, office equipment and construction trailers. RESOLVED FUR' Y-1ER, that in connection with the management of the Entities' business in the Area, the Vice President shall be authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver any and all documents and instruments necessary to sell and convey title to single-family homes. IN WITNESS WHEREOF, the undersigned has set his hand on the 26" day of April, 2013. GtMA� th1CA Thomas E. Montano Assistant Secretary U:UTEWALnMjn%DRH[U 3AK26-COAS2 wpd 2 or THOMAS Sc HUTTON 1350 FARROW PARKWAY I MYRTLE BEACH, SC 29577 POST OFFICE BOX 8000 1 MYRTLE BEACH, SC P-9578-8000 843.839.3545 1 WWW,THOMASANDHUTTON.COM July 10, 2013 Ms, Christine Nelson NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 EC E IVE JUL 15 2013 By: Re: Stormwater Management Permit Application Comment responses The Overlook at Middle Sound, NC 24039,0001.303 Dear Ms. Nelson: Per review comments dated May 24, 2013 we offer the following responses: 1, In Section IV,3 of the application, please complete the river basin associated with this project. RESPONSE: The application has been revised to correct the river basin and the current property owner (Dr Horton, Inc.). Attached is a copy of the revised application and current deed. We understand a permit transfer will be processed by DWQ concurrently with issuance of the permit to modify to DR Horton. 2. The provided deed restriction form has been signed by Mr. Bradford Brundage, Please either have Pat G. Davis sign this form or provide a letter of authorization from Pat G. Davis authorizing Mr. Brundage to sign on his behalf, RESPONSE: Please see #1 above. Mr. Brundage is signing on behalf of DR Horton, Inc. 3. 3. Please explain how the seasonal high water table (SHWT) elevations were determined for the basins. a. Basin 1: In an e-mail from Jack Reel, Thomas and Hutton dated April 3, 2013 it was noted that, for wet detention basin 1, the "normal pool pretty much matches their design, and pretty much matches the top of water that exists out there now in the partially constructed pond". Please expand this response to provide a detailed, site specific evaluation used to arrive at the identified SHWT, Please add this discussion to the narrative. RESPONSE: Pond 1: According to the report from ECS, the SHWT is 52" from existing grade, or 4.33'. The existing grade where the test was taken is approximately 11.0 so the SHWT elevation is approximately 6.7. The normal pool for Pond 1 is proposed at 6.5 so the pond appears to meet the intent of the DENR's requirements. Dry Pond from Pond 1: According to the report from ECS, the SHWT is 48" from existing grade, or 4'. The existing grade where the test was taken is approximately 10.0 so the SHWT elevation is SAVANNAH, GA I CHARLESTON, SC I WILMINGTON, NC I BRUNSWICK, GA Ms. Christine Nelson NCDENR July 10, 2013 Page 2 approximately 6.0. The bottom elevation of the dry pond is proposed at 6.0 so the dry pond appears to meet the intent of the DENR's requirements. Please see the attached ECS report for the SHWT for Pond 1. b. Basin 2; The supplements indicate a SHWT elevation of 6 ff for the two basins associated with the second drainage area. The submitted soils report indicates that the depth to the SHWT is 12 inches within the vicinity of the wet detention basin. The contours provided on the SHWT map appear to indicate the corresponding elevations of the borings range from 12 to 8 ft, which would put the SHWT elevations between 11 and 7 ft. RESPONSE: Pond 2: According to the report from ECS, the average SHWT for Pond 2 is approximately 8.0'. The normal pool elevation for Pond 2 is has been revised to 8.5. Dry Pond from Pond 2: Based on the average SHWT for Pond 2 of 8.0', the bottom elevation of dry pond 2 has been revised to 8.0'. 4. Although the rules do not require a minimum separation from the seasonal high water table (SHW D for the secondary BMPs, the bottom of the dry detention basin may not be set below the SHWT, Please re -consider the design of the dry detention basins such that the bottom elevations are set at or above the SHWT. RESPONSE: The bottom elevation of Dry Pond 2 is set at 8.0' based on Item 3.b above. 5. The drawdown time listed for wet detention basin 2 is slightly slower than expected given the provided design. Ploase re-evaluate the drawdown calculation, especially the driving head. Also, please note that the volume used to determine the drawdown time is the required storage volume, not the provided storage volume, For this project, the two volumes are very close so it likely will not impact the time, but it is something to keep in mind for future projects. RESPONSE: Drawdown times were recalculated using the "required" volume and a driving head based on "provided" volume (Elevation of next outlet). New calculations are included in the Stormwater Report Appendix G. 6, Please clarify the designs of the dry detention basins 1 and 2, The information seems to be mislabeled and/or is inconsistent between the calculations, supplements, and plans; a. Plan sheet C3,11 lists the temporary pool elevations to be 6 and 5.5 ff for dry detention basins 1 and 2, respectively, which are the same elevations reported in the dry detention basin supplements for the basin bottom. RESPONSE: Temporary pool elevations have been updated. Plans, supplements, and calculations have been revised to match. b. The calculations identify that both dry detention basins have a normal pool elevation of 6.5 ff; however the water storage volume starts at the top of the sediment storage elevation, which is 7,25 ff and 6A ff for dry detention basins 1 and 2, respectively. RESPONSE: Normal pool and sediment storage elevations have been updated. Plans, supplements, and calculations have been revised to match. c. The supplements and calculations indicate that the required storage volume in dry detention basins 1 and 2 is contained at an elevation of 11 and 9 ff respectively. However the plans indicate that the top of the control structure is set at 8 and 7 ff, respectively. In order to control the required volume, please adjust the contro! structure to contain the entire required storage volume. RESPONSE: The control structure top elevations have been revised to be equal to or above the required storage volume elevation. Plans, supplements, and calculations have been revised to match. Ms. Christine Nelson NCDENR July 10, 2013 Page 3 d. Please provide additional detail labels for the dry detention basin control structure on plan sheet C3.11 in order to clarify the outlet design. RESPONSE: Outlet detail has been updated. 7. Please ensure the information presented in the submittal documents is accurate and consistent. The following differences were noted: a. There appears to be a typo on the storage volume listed in Section II (page 2) of the supplement for wet detention basin 2. RESPONSE: Supplement has been revised and a copy is attached for review. b. For dry detention basin 2, the supplement reports the sediment storage volume as 14,228 ff3; however the calculations indicate that this value may be the surface area at the storage elevation. RESPONSE: Supplement has been revised and a copy is attached for review. c. The elevations associated with the vegetated filter strips are reported different between the supplements and plan sheet EC1.5. RESPONSE: Plans have been revised to match supplements. 8. Plan sheet C1.2 includes a grey lined feature within the wetlands on the east side of the property. Please identify this feature and if it is considered surface waters, provide the necessary 50 foot buffer from the delineated top of bank, normal pool elevation, or the mean high water line. RESPONSE: The grey line is considered a seasonal RPW by the Corps of Engineers. The 50' buffer is shown on sheet C3.4. 9. Please indicate how the roof drainage and any impervious areas constructed at the rear of the lots will be directed to the stormwater collection system. The grading is pretty evident for lots 1-19 however it is unclear if roof drain lines are being proposed or if other means of directing the runoff to the collection system will be used for the remainder of the site. RESPONSE: The impervious areas for lots 1-42 are graded to drain toward the front of the lot. The roof drains will be directed toward the front of the lot. 10. It appears that the sides and/or the rear of the lots will be used as the stormwater collection system and have been provided with a standard width easement, However the grading plan appears to indicate that portions of the collection system exlend beyond the limits of the drainage easements. Please ensure the drainage easements encompass the swales, pipes, and other features of the stormwater collection system. RESPONSE: Please see C3.1-C3.4 as drainage easements are shown. Also attached is the preliminary subdivision plat with drainage easement locations. 11. Plan sheet EC 1.6 provides a detail for an existing road side swale with 2:1 side slopes, Please confirm where this existing road side swale is located as swales and vegetated slopes are generally required to have 3:1 side slopes. RESPONSE: The detail has been removed per County/NCDOT comments. All proposed swales have a minimum 3:1 side slope. 12. Plan sheets C3.3 and 3A appear to indicate that a portion of the vegetated shelf and temporary pool side slopes will be covered in rip rap. Piease note that the stormwater rules require these areas to be vegetated. Please reconsider the material used in this vicinity and if necessary, the inlet design such that the rip rap is not needed, RESPONSE: The rip rap has been removed from the vegetated shelf and temporary pool side Ms. Christine Nelson NCDENR July 10, 2013 Page 4 slopes. 13, The vegetated shelf planting plan listed on plan sheet C3.12 identifies that cattails are a sample species that may be planted, Please note that Chapter 9 of the BMP manual does not recommend cattails as they can quickly take over the wet detention basin. It is recommended to select a different sample species, RESPONSE: Please see revised notes on sheet C3.12. Note #4 has been rewritten to address your comment. 14. The Division understands that it is desired to phase this project to allow the construction of a model home prior to the installation of the high density stormwater treatment devices. It is possible to permit a phased construction so that the project will initially be considered a low density development and will transition to a high density development at an agreed upon level of construction. In order to permit a phased approach, you must submit application forms, plans, specifications, and any other required documentation in order to demonstrate that the first phase meets the low density requirements, RESPONSE: The Owner has decided not to phase this project at this time. Please feel free to contact me at (843) 839-8424 should you have any questions or comments, Thank you for your time and assistance with this project. Sincerely, '7�.UTT?ILL John Richards, PE Principal/Project Manager Enclosures; as listed above cc; DR Horton, Inc, Jack Reel, PE/Thomas and Hutton THOMAS & HUTTON Engineering I Surveying I Planning I GIS I Consulting TO: Ms. Christine Nelson NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Letter of Transmittal Date: 7/11 /13 Job 24039.0001,500 Re: Overlook WE ARE SENDING YOU THE FOLLOWING ITEMS (❑ attached) (❑ under separate cover via UPS ) ❑ Shop Drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ❑ Other: Copies Date Description 1 7/10/13 Cover Letter 1 Revised application 1 Current deed 1 Pond 1 information 1 Pond 2 information 1 6/12/13 ECS report 1 7/ 10/ 13 Stormwater report 2 sets Site Plans THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ For Approval ❑ Approved as Submitted ❑ For Your Use ❑ Approved as Noted ❑ As Requested ❑ Returned for Corrections ❑ For Review and Comment Remarks Copy to ❑ Resubmit Copies for Approval ❑ Submit Copies for Distribution ❑ Return Corrected Prints RECEIVE JUL 15 2013 BY.• Signed Idalhu4sey 1350 Farrow Parkway I P© Box 80001 Myrtle Beach, SC 295781843.839.35451 Fax 843.839.3565 r ECS C A R O L f N A S; L L P -Setting the. Standard for Sc; r," Ice • a�■�,. S, Ceotechnical - Construction Materials -, Environmental • i' arilit:ics June 12, 2013 Mr. David G. Lee D.R. Horton 4073 Belle Terre Boulevard Myrtle Beach, South Carolina 29579 FEC E IVE Reference: Report of Seasonal High Water Table Estimation JUL 15 20B The Overlook at Middle Sound Loop Wilmington, New Hanover County, North Carolina By; ECS Project No. 22.19029 Dear Mr, Lee: ECS Carolinas, LLP (ECS) recently conducted an estimation of the Seasonal High Water Table (SHWT) along side of the existing stormwater best management practice (BMP) areas at the Overlook at Middle Sound Loop site in Wilmington, New Hanover County, North Carolina. This letter, with attachments, is the report of our est-, ation. Field Testing On June 10, 2013, ECS conducted an exploration of the subsurface soil and groundwater conditions at four requested locations shown on the attached Boring Location Plan (Figure 1). The purpose of this exploration was to estimate the SHWT of the in place soils along side of the existing stormwater BMP areas. A boring location plan was provided to ECS by Thomas & Hutton Engineering. ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS recorded the SHWT and groundwater level observed at the time of each hand auger boring. The attached SHWT sheet provides a summary of the subsurface conditions encountered at each hand auger boring location. The groundwater level and the SHWT were estimated at each boring location below the existing grade elevation. Below is a summary of each boring location. Location Water Level SHWT 1 65 inches 48 inches 2 65 inches 48 inche_s 3 65 inches 52 inches 4 65 inches 521nches The SHWT may vary within the proposed site due to changes in subsurface conditions and elevation. 7211 Ogden Rusiness Perk., Staite 201, Wilmington, NC 28411 T: 910-686-9114 • '. � l.r•Rs � � www,e�slitl E +:+i„,;�11a Y. -fir ,, �. Pl F k,hC.a l t(: e E i_ Ai,;7 r1U,�1.r. PLC - t1.5 ,1 :.. F i.;5 Srx�ih c Report of SHWT Estimation The Overlook at Middle Sound Loop Wilmington, New Hanover County, North Carolina ECS Project No. 22.19029 June 12, 2013 Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. Our testing of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us at (910) 686-9114. Respectfully, ECS CAROLINAS, LLP K. Brooks Wall Project Geologist CC: Jack Reel, P.E. — Thomas & Hutton Engineers Attachments: Boring Location Plan SHWT sheet )L r Kris J. Stamm Principal Season High Water Table Estimation The Overlook at Middle Sound Wilmington, New Hanover Co., North Carolina ECS Project No. 22.19029 June 10, 2013 Location Depth Soil Description 1 0-48" Gray silty SAND w clay lenses (fill) 48 -65" Tan/gray/orange sandy CLAY Seasonal High Water Table was estimated to be at 48 inches below the existing grade elevation. Groundwater was encountered at 65 inches below the existing grade elevation. Location Depth Soil Description 2 0-48" Gray silty SAND w clay lenses (fill) 48"-65" Tan/gray/orange sandy CLAY Seasonal High Water Table was estimated to be at 48 inches below the existing grade elevation. Groundwater was encountered at 65 inches below the existing grade elevation.. Location Depth Soil Description 3 0-65" Tan/gray/orange sandy CLAY (fill) Seasonal High Water Table was estimated to be at 52 inches below the existing grade elevation. Groundwater was encountered at 65 inches below the existing grade elevation. Location Depth Soil Description 4 0-65" Tan/gray/orange sandy CLAY (fill) Seasonal High Water Table was estimated to be at 52 inches below the existing grade elevation. Groundwater was encountered at 65 inches below the existing grade elevation. Nit 1s� #a� t . �� .. 4 • ! ' '•�i j ! . f did A j i I O.R. NOR AMR. MC. ovENL001t �7 NIDCLE 4oUN0 "�•c»'��� ': ' —_ ' _� t .,, Q51 GUINKY YOWROL PLAN ^--�—� 0) APPROXIMATE BORING LOCATIONS The Overlook at Middle Sound Wilmington, NC ECS Project # 19029 June 10, 2013 KBW Figure 1— Boring Location Plan Provided by: Thomas & Hutton Engineers r r Nelson, Christine From: Nelson, Christine Sent: Monday, June 24, 2013 4:09 PM To: 'Richards, John' Cc: Reel, Jack; Hussey, Ida Subject: RE: Overlook at Middle Sound The 30 days extension is granted. Thanks for keeping me up to date on the status. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Richards, John fmailto:richards.jC&thomasandhutton.com] Sent: Monday, June 24, 2013 3:37 PM To: Nelson, Christine Cc: Reel, Jack; Hussey, Ida Subject: RE: Overlook at Middle Sound We request an extension to July 24, 2013. Thanks, John John H. Richards, P.E. Principal/Project Manager Thomas & Hutton richards.IgDthomasandhutton.com (P) 843-839-8424 (F) 843-839-3565 (M) 843-458-0455 Website From: Nelson, Christine[mailto:christine.nelsonOncdenr.govl Sent: Monday, June 24, 2013 12:20 PM To: Richards, John Cc: Reel, Jack; Hussey, Ida Subject: RE: Overlook at Middle Sound John Within the regular stormwater review program, an extension of 30 days may be granted. If you need more than a 30 day extension, then justification must be submitted for review and approval. The requested information was due today. A 30 day extension would put the new due date as July 24. Please re -consider the requested extension date and if you need more than the 30 days, please provide additional justification. Christine Christine Nelson Environmental Engineer State Stormwater Program NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Phone:910-796-7323 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Richards, Johnfmailto:richards.j@thomasandhutton.com] Sent: Monday, June 24, 2013 11:28 AM To: Nelson, Christine Cc: Reel, Jack; Hussey, Ida Subject: Overlook at Middle Sound Christine, We respectfully request a time extension to respond to your comments on this project. We anticipate resubmittal to you no later than July 31, 2013. Thanks, John John H. Richards, P.E. Principal/Project Manager Thomas & Hutton richards.i@thomasandhutton.com (P) 843-839-8424 (F) 843-839-3565 (M) 843-458-0455 Website Nelson, Christine From: Nelson, Christine Sent: Wednesday, June 12, 2013 8:57 AM To: 'Reel, Jack' Subject: RE: Overlook at middle sound Jack, I haven't looked at the plans in detail, but what you have described sounds ok to me. We just need to make sure the documentation / justification supports the selected SHWT. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Reel, Jack[mailto:reel.j@thomasandhutton.com] Sent: Tuesday, June 11, 2013 1:06 PM To: Nelson, Christine Subject: RE: Overlook at middle sound Christine, In reference to your letter I am navigating my way through these comments. Under #3.b. you estimate a range of SHWT from 11 to 7. 1 actually have 11 to 6.5 which is close, and which is why we set the PPool at 6. Since you are saying we should average and I think more of the shots are in the 8 range, will you accept 8 for the permanent pool? A lot of things snowball out of control for us by making this change so I wanted to make sure you agree before we go through that heartache. Thanks Jack D. Reel, P.E., LEED® AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhutton.com rreel.igbthomasandhutton.com (P) 910-332-3400 (F) 910-332-3361 From: Nelson, Christine fmailto:christine.nelson(&ncdenr.aov] Sent: Wednesday, June 05, 2013 12:41 PM To: Reel, Jack Cc: Richards, John; Scott, Georgette Subject: RE: Overlook at middle sound Jack, As I mentioned before, DWQ can't have 2 open applications at the same time on a permit. (A modification and a transfer are both considered types of applications) Ideally, the transfer would have been submitted prior to the modification request. However since the approach for this project is a bit backwards, I think we have come up with a solution for this project that will please everyone. DWQ will accept and review the modification on behalf of DR Horton. However, instead of issuing the permit to the bank or DR Horton once the modification is found to be complete, we will draft the modified permit for DR Horton in preparation for its approval once the transfer is finalized. At this point, the transfer can be processed. The final, approved permit will be issued as part of the transfer approval. Depending on when the transfer paperwork is submitted, these two actions can be processed fairly consecutively. Please let me know if you have any questions. Nelson, Christine From: Reel, Jack [reel.j@thomasandhutton.com] Sent: Tuesday, June 04, 2013 3:55 PM To: Nelson, Christine Cc: Richards, John Subject: RE: Overlook at middle sound Please do ask if we can transfer, keep the clock going and just do it while we are working on the comments. We can't afford to lose any time but we would lose more time having to explain the modfications to the bank for the phased permit that they don't even care about. Jack D. Reel, P.E., LEED® AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhutton.com reel.16thomasandhutton.com (P)910-332-3400 (F) 910-332-3361 From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Tuesday, June 04, 2013 3:49 PM To: Reel, Jack Cc: Richards, John Subject: RE: Overlook at middle sound That is certainly one option. If that is how you want to proceed, I would have to check with Georgette (who isn't here today) to ask how she would want to move forward as we already have an application open to modify the permit. We can't have 2 open applications at once and I'm not certain how that open application would transition to a transfer, if it can even transition to a transfer. Now you could ask to withdraw the application in order to submit the transfer, but that would likely start the clock over. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Reel, Jack fmaiito:reel.jCalthomasandhutton.com] Sent: Tuesday, June 04, 2013 3:45 PM To: Nelson, Christine Cc: Richards, John Subject: RE: Overlook at middle sound I am doing everything I can to keep from having to return to the bank since they are not the property Owner. Why don't we just transfer the existing permit to DR Horton so that when we revise this application, we can have it in Horton's name? Jack D. Reel, P.E., LEED® AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhufton.com reel. UMthomasandhutton.com (P) 910-332-3400 (F) 910-332-3361 From: Nelson, Christine fmailto:christine.nelson(dncdenr oovl Sent: Tuesday, June 04, 2013 3:37 PM To: Reel, Jack Cc: Richards, John Subject: RE: Overlook at middle sound Jack, It looks like I have not done a good job explaining the phased permitting on this one very well. The high density and low density will be the SAME permit. Each section and condition of the permit will have an indicator as to whether it applies to phase 1(LD) or phase 2 (HD) as well as a condition that identifies when the project is no longer considered LD and the HD BMPs will be required. There is only 1 application needed, but it will have multiple sets of pages. For instance, there will be 2 versions of page 3, one documenting the LD conditions and one for the HD conditions. I hope this is clearer. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Reel, Jack[mailto:reel.j(&thomasandhutton.com] Sent: Tuesday, June 04, 2013 9:26 AM To: Nelson, Christine Cc: Richards, John Subject: RE: Overlook at middle sound Good point, I forgot that we were modifying a permit in the bank's name. Can we do the low density part in Horton's name so we don't have to get the bank to sign again? Horton is the Owner now. We can just transfer the high density part post -modification. Jack D. Reel, P.E., LEEUP AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhutton.com reel. i@thomasandhutton.com (P) 910-332-3400 (F) 910-332-3361 From: Nelson, Christine Finailto:christine.nelson(&ncdenr.gov] Sent: Tuesday, June 04, 2013 9:01 AM To: Reel, Jack Cc: Richards, John Subject: RE: Overlook at middle sound Jack, A transfer is different than a modification. They cannot be combined in the same action but can be done subsequently. In other words, right now you are set up to modify the permit under the current permittee. Once the modification is found complete and the modification is issued, then the transfer can be processed once all of the appropriate transfer documents are submitted. I was just looking for the one or two pages of the application that describes the type of project to add to the one already submitted - a page for each scenario. The LD limits would be applied across the entire project area, but it would be ideal to demonstrate that any areas of higher density are located in upland areas and away from surface waters and drainageways to the maximum extent practicable (required by the rules). Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Reel, Jack fmailto:reel.jC&thomasandhutton.com] Sent: Monday, June 03, 2013 4:30 PM To: Nelson, Christine Cc: Richards, John Subject: Overlook at middle sound Christene, Since the time that we submitted, DR Horton has since just closed on the property. Considering that we are going to need to add applications for low density for the model home, we have decided that when we resubmit to you, we will change all the applications to DR Horton. Please let us know if the attached is sufficient to do so and for David Lee to sign. On another note, for the low density application, do we show the model and parking impervious as a ratio of the entire development tract? Jack D. Reel, P.E., LEED® AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhufton.com reel. Athomasandh utton.com (P) 910-332-3400 (F) 910-332-3361 From: David G Lee [mailto:DGL.eeCaldrhorton.coml Sent: Monday, June 03, 2013 1:47 PM To: Richards, John; Reel, Jack Subject: Corp Resolutions David G. Lee Vice President of City Operations - Wilmington, NC 1001 Olde Waterford Way Leland, NC 28451 Mobile: (843) 315-9399 Office: (910) 859-7406 D. R. Horton, Inc. ,. #1 FOR 11 YMS IN A ROW AMERICA'S #1 HOMEnBUIL DER e� a BUILDER MAGAZINr * R5 REPORTED BY BUILDER MR6R2I11JE This e-mail and any files transmitted with it are confidential and are Intended solely for the use of the Individual or entity to which they are addressed. This communication may contain PRIVILEGED CLIENT COMMUNICATIONS. If you are not one of those Intended recipients, any use, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited. Please immediately destroy all copies of versions you have of this message and notify the sender at 843-367-8400 or dglee&drhorton.com in order that we can take steps to prevent any further inadvertent disclosure. N C D F R N,' North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. John E. Skvarla, III Governor Director Secretary May 24, 2013 Pat G. Davis, Senior Vice President Gateway Bank & Trust Company Attn: Special Assets / OREO Department 112 Corporate Drive Elizabeth City, NC 27909 Subject: Request for Additional Information Stormwater Project No. SW8 070303 The Overlook at Middle Sound (formerly Ridge Field at Middle Sound) New Hanover County Dear Mr. Davis: The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for The Overlook at Middle Sound on April 3, 2013. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: A' In Section IV.3 of the application, please complete the river basin associated with this project. The provided deed restriction form has been signed by Mr. Bradford Brundage. Please °� ,.zr either have Pat G. Davis sign this form or provide a letter of authorization from Pat G. Davis authorizing Mr. Brundage to sign on his behalf. 3. Please explain how the seasonal high water table (SHWT) elevations were determined ✓for the basins. a. Basin 1: In an e-mail from Jack Reel, Thomas and Hutton, dated April 3, 2013, it was noted that, for wet detention basin 1, the "normal pool pretty much matches their design, and pretty much matches the top of water that exists out there now in the partially constructed pond". Please expand this response to provide a detailed, site specific evaluation used to arrive at the identified SHWT. Please add this discussion to the narrative. Basin 2: The supplements indicate a SHWT elevation of 6 ft for the two basins associated with the second drainage area. The submitted soils report indicates that the depth to the SHWT is 12 inches within the vicinity of the wet detention basin. The contours provided on the SHWT map appear to indicate the corresponding elevations of the borings range from 12 to 8 ft, which would put the SHWT elevations between 11 and 7 ft. If the permanent pool elevation of the wet detention basin is desired to be set below a conservatively selected SHWT elevation, then a detailed, site speck evaluation discussing the items identified on pages 10-9 and 10-10 of the BMP manual must be provided. �4. Although the rules do not require a minimum separation from the seasonal high water table (SHWT) for the secondary BMPs, the bottom of the dry detention basin may not be set below the SHW T T. Please re -consider the design of the dry detention basins such that the bottom elevations are set at or above the SHWT. Wilmington Regional Orifice 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX 910-350-20041 DENR Assistance:1-877-623-6748 NOrthCarolina Internet www.ncwaterqualigr.org � I��/�� An Equal Opportunlq 1 Afflnnallve Action Employer ���u ` Pat G. Davis May 24, 2013 Stormwater Application No. SW8 070303 �., 5. The drawdown time listed for wet detention basin 2 is slightly slower than expected given j the provided design. Please re-evaluate the drawdown calculation, especially the driving head. Also, please note that the volume used to determine the drawdown time is the required storage volume, not the provided storage volume. For this project, the two volumes are very close so it likely will not impact the time, but it is something to keep in mind for future projects. 6. Please clarify the designs of the dry detention basins 1 and 2. The information seems to be mislabeled and/or is inconsistent between the calculations, supplements, and plans: ✓a. Plan sheet C3.11 lists the temporary pool elevations to be 6 and 5.5 ft for dry detention basins 1 and 2, respectively, which are the same elevations reported in the dry detention basin supplements for the basin bottom. mob. The calculations identify that both dry detention basins have a normal pool elevation of 6.5 ft; however the water storage volume starts at the top of the sediment storage elevation, which is 7.25 ft and 6.4 ft for dry detention basins 1 and 2, respectively. L,Ao The supplements and calculations indicate that the required storage volume in dry detention basins 1 and 2 is contained at an elevation of 11 and 9 ft, respectively. However the plans indicate that the top of the control structure is set at 8 and 7 ft, respectively. In order to control the required volume, please adjust the control structure to contain the entire required storage volume. ;d. Please provide additional details/labels for the dry detention basin control structure on plan sheet C3.11 in order to clarify the outlet design. 7. Please ensure the information presented in the submittal documents is accurate and consistent. The following differences were noted: There appears to be a typo on the storage volume listed in Section II (page 2) of the supplement for wet detention basin 2. b. For dry detention basin 2, the supplement reports the sediment storage volume as 14,228 ft3; however the calculations indicate that this value may be the surface area f at the storage elevation. Vc. The elevations associated with the vegetated filter strips are reported different between the supplements and plan sheet EC1.5. A Plan sheet C1.2 includes a grey lined feature within the wetlands on the east side of the property. Please identify this feature and if it is considered surface waters, provide the necessary 50 foot buffer from the delineated top of bank, normal pool elevation, or the mean high water line. 9. Please indicate how the roof drainage and any impervious areas constructed at the rear of the lots will be directed to the stormwater collection system. The grading is pretty evident for lots 1-19 however it is unclear if roof drain lines are being proposed or if other means of directing the runoff to the collection system will be used for the remainder of the site. /10. It appears that the sides and/or the rear of the lots will be used as the stormwater collection system and have been provided with a standard width easement. However the grading plan appears to indicate that portions of the collection system extend beyond the limits of the drainage easements. Please ensure the drainage easements encompass the swales, pipes, and other features of the stormwater collection system. �1. Plan sheet EC1.6 provides a detail for an existing road side swale with 2:1 side slopes. Please confirm where this existing road side swale is located as swales and vegetated slopes are generally required to have 3:1 side slopes. IVII2. Plan sheets C3.3 and 3.4 appear to indicate that a portion of the vegetated shelf and temporary pool side slopes will be covered in rip rap. Please note that the stormwater rules require these areas to be vegetated. Please reconsider the material used in this vicinity and if necessary, the inlet design such that the rip rap is not needed. Page 2 of 3 Pat G. Davis May 24, 2013 Stormwater Application No. SW8 070303 13. The vegetated shelf planting plan listed on plan sheet C3.12 identifies that cattails are a sample species that may be planted. Please note that Chapter 9 of the BMP manual does not recommend cattails as they can quickly take over the wet detention basin. It is recommended to select a different sample species. v414. The Division understands that it is desired to phase this project to allc.,r the con 3tructicn of a model home prior to the installation of the high density stormwater treatment devices. It is possible to permit a phased construction so that the project will initially be considered a low density development and will transition to a high density development at an agreed upon level of construction. In order to permit a phased approach, you must submit application forms, plans, specifications, and any other required documentation in order to demonstrate that the first phase meets the low density requirements. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms to ensure that the numbers are consistent throughout. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to June 25, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmission of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at christine.nelson@ncdenr.gov. Sincerely, Christine Nelson Environmental Engineer GDS/can: S:1WQS1StormwaterlPermits & Projects120071070303 HD12013 05 addinfo 070303 cc: John Richards, Thomas & Hutton - Myrtle Beach Jack Reel, Thomas & Hutton - Wilmington Wilmington Regional Office Stormwater File Page 3 of 3 Nelson, Christine From: Reel, Jack [reel.j@thomasandhutton.com] Sent: Thursday, May 23, 2013 10:40 AM To: Nelson, Christine Cc: Richards, John Subject: RE: Overlook at Middle Sound Thanks much. Please recall that we want to try and implement a model home into the permit with allowance to have some impervious prior to certification of the stormwater. Thanks Jack D. Reel, P.E., LEED® AP BD+C Wilmington Regional Director Thomas S Hutton www.thomasandhufton.com reel. itiidtthomasandh utton.com (P) 910-332-3400 (F) 910-332-3361 From: Nelson, Christine fmailto:christine.nelson(&ncdenr.gov] Sent: Thursday, May 23, 2013 10:33 AM To: Reel, Jack Cc: Richards, John Subject: RE: Overlook at Middle Sound Jack, This project has been on my desk for several days undergoing its review, I hope to wrap it up today. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Reel, Jack fmailto:reel.jCabthomasandhutton.com] Sent: Thursday, May 23, 2013 10:20 AM To: Nelson, Christine Cc: Richards, John Subject: Overlook at Middle Sound Christine, Can you please update us on where you are with review of this project? It has been in the stack for a while. Thank you much. Jack D. Reel, P.E., LEED® AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhufton.com reel.i0thomasandhutton.com (P) 910-332-3400 (F)910-332-3361 "Relationships and Soludons for Success" P1V'LF=G<4JAiVU + 7i'11"tt)�f�1Tt/1L. ]lil:; C:6'CIr(d;, ul ....:.7 aoa 61ly ' "I", N+Of i.ifnff'<'o .+ irt�; iliir.,7r+curUrr r_, rarer;tied only for Lire use of the person to •vhom it is eddrassod. Any O hor i; 7te,cepv0 a copying, ac,aassir�q, of d sciosure of this rness:,ge is ptohioilv(i f you Frave received Ihrs `+s.' r : error alcas! inarner9i:,tety notif, 7honmq r: NntMr) ,and nurse tiro + iccived. Uo ,,t fr.>n.,arri /�Gtrmis 'on Nelson, Christine From: Reel, Jack [reel.j@thomasandhuffon.com] Sent: Tuesday, May 07, 2013 9:17 AM To: Nelson, Christine Cc: Richards, John Subject: Overlook at Middle Sound Christine, Per our conversation this morning, please place this email with the referenced file that is in line for your review. We would love the opportunity to work with DENR on a creative solution for how to begin our model home construction prior to the stormwater management system being fully operational and certified. We look forward to a meaningful dialogue concerning the matter. As we discussed, the intended homebuilder will also be the developer of the site so hopefully that mitigates any concern over a disconnect. Thank you much. Jack D. Reel, P.E., LEED® AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhufton.com reel. i 0th omasand h utton. corn (P) 910-332-3400 (F) 910-332-3361 Completeness Review Checklist Project Name: pee�—eiv(tctDate: �� N 13 Project Location:iLmNnR-,�u� Accepte Date:�c�l Rule(s) ®loos Coastal ®1995 Coastal ®Phase II (WiRO) ®Universal 1:31988 Coastal Type of Permit: New or ; MQ or PR Existing Permit # (Mod or PR): �PE Cert on File? Density: HD or LD Type: Commercial or Residential EJNCG: %: (% 00) Stream Class: ®SA Map ®Offsite to SW8 Subdivided?: Subdivision or Single Lot FJORW Map MExempt Paperwork Emailed Engineer on: 7%I Ji :, , 44 L f ®Supplement(s) (1 original per BMP) BMP Type(s): a 90MO 5 ®O&M with correct/original signatures (1 original per BMP except LS/VFS and swales) ®Application with correct/original signatures ®Corp or LLC: Sig. Auth. Der SoS or letter Deed ✓�505 (within 6mo) 11 Soils Report with SHWT Hate W Rewtevwer, Calculations (signed/sealed) of No obviI �� Sous obvious errors \ Tii5Ou,E 4* 3 Lcn S MDensity includes common areas, etc \� j � 1�('�1(V�j� oA D " Deed Restrictions, if subdivided: ;1- (DI 1-t� S1� 1�M A4 ES ° 1' v kau- T(? AN3rEdZ ®Signed & Notarized -WtAn Ta A4 ®Correct Template (Comm/Res & HD/LD) or Dec. Covenants & Rest. - NO '5k6mvU RE 6 ffOQ-'Z �S ON VkLc- -a N6--D CE'? 5C- Plans ED2 Sets Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Grading ®Wetlands: Delineated or No Wetlands ®Vicinity Map Layout (proposed BUA dimensions) ®Legend ®DA Maps El Project Boundaries Infiltration Wet Pond Offsite 71 Soils Report Soils Report ®PE Cert for Master Lot #: SHWT: SHWT: ®Deed Rest for Master ®Lot # Matches Master Bottom: PP: BUA Permitted (Master): sf Visited: BUA Proposed (Offsite): sf Additional Information: BUA (sf) DA (sf) PP (el) CI-IWT (el) Depth (ft) SA (sf) Johnson, Kelly From: Johnson, Kelly Sent: Wednesday, April 03, 2013 2:46 PM To: 'Reel, Jack' Cc: Richards, John; Hussey, Ida; Riley, Brian Subject: RE: SW8 070303, The Overlook at Middle Sound Jack, This is more than I want to get into at this stage. I will give it to admin to login, and then once it is assigned the reviewer will go through the data in detail. Thanks, Kelly From: Reel, Jack [mailto:reel.j@thomasandhutton.com] Sent: Wednesday, April 03, 2013 2:44 PM To: Johnson, Kelly Cc: Richards, John; Hussey, Ida; Riley, Brian Subject: RE: SW8 070303, The Overlook at Middle Sound Kelly, The existing permit had infiltration basins associated with it for sure, but from our review of DENR's file, we understand the pond you reference, (in the same location as our proposed pond), was designed wet... and there was a pump that was supposed to pump water up to the highest elevation of the site where infiltration could be achieved. Our pond normal pool pretty much matches their design, and pretty much matches the top of water that exists out there now in the partially constructed pond. Please let me know if we need to discuss on the phone. Jack D. Reel, P.E., LEED® AP BD+C Wilmington Regional Director Thomas B Hutton www.thomasandhutton.com reel.igOthomasandhutton.com (P) 910-332-3400 (F) 910-332-3361 From: Johnson, Kelly fmailto:kelly.p.johnson@)ncdenr.gov� Sent: Wednesday, April 03, 2013 2:10 PM To: Reel, Jack Cc: Richards, John; Hussey, Ida; Riley, Brian Subject: RE: SW8 070303, The Overlook at Middle Sound Jack, Why are all of the borings in Pond #2, and not Pond #1 as well? Pond 1 is labeled as previously permitted, but the permit was written for 5 infiltration basins? KJ From: Reel, Jack rmailto:reel.j@)thomasandhutbon.com Sent: Tuesday, April 02, 2013 5:29 PM To: Johnson, Kelly Cc: Richards, John; Hussey, Ida; Riley, Brian Subject: RE: SW8 070303, The Overlook at Middle Sound Kelly, Please find the attached exhibit in response to your #1 comment below. Please let us know if this project can now move to a reviewer while we continue to work with the bank to satisfy #2. Thanks again. .lack D. Reel, P.E., t-EEV AP ED+C Wilmington Regional Director Thomas & Hutton www.thomasandhutton.com reel.iAthomasandhutton.com (P) 910-332-3400 (F)910-332-3361 From: Johnson, Kelly [mailto:kelly.p.johnson(&ncdenr.00vl Sent: Tuesday, April 02, 2013 9:06 AM To: Reel, Jack Cc: Richards, John Subject: RE: SW8 070303, The Overlook at Middle Sound Jack, 1.) Soils: The soils report includes a map of boring locations, but the map isn't overlaid with the BMP locations. We will need a boring in the footprint of each BMP. Has that been done? If so, which boring(s) are in each BMP? The soils report shows the depth to the SHWT (121n for each boring), but it does not show the existing grade elevations where the boring were taken. Please submit a summary of this data (see the list in Section VI(9) of the application). 2.) Signature Authority: The current permit is written to Gateway Bank, but the signature authority documents showing the connection between Gateway Bank and the Bank of Hampton Roads as well as the signature authority for Pat Davis to sign for permit is not on file. It looks like the Attorney General's Office was involved in this, and so I am sure that it can be worked out. But, we will need to get that paperwork before the modification can be issued. 3.) Other: If there are other items from the 3/13/13 letter the person assigned to this project will go through them during the review. If #1 has been addressed, please send me that information and then I will give it to admin to log in so that it can be assigned to someone. Thanks, Kelly From: Reel, Jack fmailto:reel.j(dthomasandhutton.com1 Sent: Monday, April 01, 2013 11:43 AM To: Johnson, Kelly Cc: Richards, John Subject: FW: SW8 070303, The Overlook at Middle Sound Kelly, John Kuske has been working for the bank and he told us that all this had been worked out when the permit was transferred to Gateway Bank. Attached is the information he sent with the Trustee's Deed. Gateway Bank is a Division of Hampton Roads. We understand Pat Davis still has signature authority. Gateway is still the applicant because they are the permittee. I thought the SHWT report was in the package, but if not, I have attached it to this email. Please let us know if this email and its contents are not sufficient to proceed. Jack D. Reel, P.E., LEEO AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhutton.com reel.00thomasandhutton.com (P) 910-332-3400 (F) 910-332-3361 From: Richards, John Sent: Monday, April 01, 2013 11:29 AM To: Reel, Jack Subject: FW: SW8 070303, The Overlook at Middle Sound John H. Richards, P.E. Principal/Project Manager Thomas & Hutton richa rds.i@thomasand hutton.com (P)843-839-8424 (F)843-839-3565 (M) 843-458-0455 From: Johnson, Kelly [mailto:kelly.p.johnson(dncdenr aovl Sent: Monday, April 01, 2013 11:11 AM To: Richards, John Subject: FW: SW8 070303, The Overlook at Middle Sound John, Did you mean to include a cover letter with this submittal? I see that the applicant is now Gateway Bank, but what about the other items in the 3/13/13 letter (attached)? For instance, what is the connection between Gateway and the Bank of Hampton Roads? I looked quickly at the Sec of State's website, and it looks like the two merged and Hampton is the surviving entity? If so, why is Gateway the applicant for this application? Does Pat Davis still have signature authority? Also, did you mean to also submit the soils info? There may be other items in the letter as well. Perhaps the full package did not get mailed? KJ From: Johnson, Kelly Sent: Wednesday, March 13, 2013 1:09 PM To: Casmer, Jo Cc: 'reel.j@thomasandhutton.com' Subject: FW: SW8 070303, The Overlook at Middle Sound Jo, I have prepared this return letter. Will you please email Jack Reel (cc'd) when it is ready for pick up? Thanks, KJ From: Reel, Jack fmailto:reel.j(&thomasandhutton.com] Sent: Wednesday, March 13, 2013 10:17 AM To, Johnson, Kelly Subject: RE: SW8 070303, The Overlook at Middle Sound Kelly, Can you call me about this at your convenience? 332-3400 Jack D. Reel, P.E., LEED® AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhutton.com reel.60thomasandhutton.com (P) 910-332-3400 (F) 910-332-3361 From: Richards, John Sent: Tuesday, March 12, 2013 11:45 AM To: Hussey, Ida Cc: Reel, Jack; Riley, Brian; Landen, Kenneth Subject: Fwd: SW8 070303, The Overlook at Middle Sound Sent from my iPhone John Richards Thomas & Hutton www.thomasandhutton.com (P) 843.839.8424 (F) 843.839.3565 Begin forwarded message. From: "Johnson, Kelly" <kellv.D.iohnson0ncdenr-Rov> To: "Richards, John"<richards.i@thomasandhutton.com> Subject: SW8 070303, The Overlook at Middle Sound John, We received this application, and I have a few questions for you: 1.) Applicant: The current permit is written to Gateway Bank and Trust (attached). The applicant on the application is DR Horton, Inc. a. If there will be a change in the permittee (which appears to be the case from Gateway Bank and Trust to DR Horton, Inc) please submit a name/ownership change form. This form is available on our website under "miscellaneous forms", http://Portal.ncdenr.ore/web/wa/ws/su/statesw/forms docs. b. There is a letter submitted dated 12/11/12 addressed to land Quality stating that DR Horton can develop on behalf of the Bank of Hampton Roads. I have two questions about this: Please see Section III(c) of the application. If DR Horton, Inc. is the lessee, purchaser, or the developer developing on behalf of Gateway Bank and Trust (or any entity that Gateway may transfer to) then, please fill out the application following the instructions in this section and have the appropriate individuals sign the application. Please keep in mind the NC regulations require that an individual with signature authority sign the forms. A person has signature authority if they are the President or VP of a corporation, a manager of a manager -managed LLC, or a member of a member -managed LLC. Or, a person with signature authority can designate a different individual to sign on his/her behalf. Please submit the annual report from each entity signing the form 4 showing the individuals who have signature authority. These reports are available online, http://www.secretary.state.nc.us/corporations/. And, if applicable, please also submit any letters designating signature authority. ii. What is the connection between the Bank of Hampton Roads and Gateway Bank and Trust? I see that a CEO's certification from Hampton Roads Bankshares, Inc. and The Bank of Hampton Roads has been submitted which designates several people to sign documents for that bank but I am not sure how this document and the proposed permit are related? 2.) Signature Authority: I have attached the NC Secretary of State's Annual Report for DR Horton, Inc. Do you have a letter showing that Brad Brundage has been designated to sign for the permit that you can send me (he signed the application)? 3.) Signatures on Other Forms: If the required signatures on any of the forms (application, O&M, deed restrictions, etc) change as a result of the items above, please submit updated forms. 4.) BMPs: a. SHWT v/s Permanent Pool Elevations: Please submit a soils report showing soil borings in the footprint of the BMP determining the SHWT elevation. b. History: It took quite a bit of time to review the history of this permit, and so I want to leave the following notes on file for the DWQ review engineer who ends up reviewing this file. Both the original 2007 permit (as well as its most recent modification/ownership transfer on 12/17/12), and the current application cover —30.71ac. The permit was originally written in 2007 for 5 infiltration basins close together along Middle Sound Loop Road under the 1995 rule. The permitted plans also show three ponds which, according to the file, are/were permitted by the county and collect/store water that is then pumped to the infiltration basins. I understand that that design has not been built. The current application shows that the 5 infiltration basins will not be built, and instead two wet ponds will be built. These ponds have not previously been permitted for treatment and so they will be permitted under the 2008 rule which requires that wet ponds subject to SA requirements discharge to a secondary BMP. c. Secondary BMP: You have proposed two 90% ponds each draining to a dry pond which then drains to a level spreader/filter strip. This is an unusual set-up (with the dry pond in the middle), and so the review engineer will have to review the various flows to determine compliance with the "SA no discharge" rule under 2008. That is more than I go through at this stage. We need to have this information before we can accept the permit for review. These items may or may not be time-consuming to obtain. Can this information be submitted by COB Thursday? If not, I will have to return the application so that you can have some additional time to pull the information together because we cannot hold uncashed checks for very long. Just let me know. Thanks, Kelly I.-�.eLL�Johwsovi. Kelly Johnson Environmental Engineer Division of Water Quality Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 5 Office: 910.796.7331 Fax: 910.350.2004 V7�I�NIVN1I���I�2013017221 ;FOR REGISTRRTION REGISTER OF DEED NEIRJMMMT 4EER COBER EyC 2013 MY 13 c 27, 5 BK 5736 FG 1422-1429 FEE $26 00 9C REV ST" $1,400 00 INSrI�r 2�f917221 NORTH CAROLINA SPECIAL WARRANTY DEED THIS INSTRUMENT WAS PREPARED BY CHRISTOPHER H ROEDE. ATTORNEY AT LAW, POYNER SPRUILL LLP, P O BOX 1801, RALEIGH, NC 27602-1801, WHO IS A LICENSED NORTH CAROLINA ATTORNEY Return to Christopher A. Crowson, Bagwell Holt Smith P A., 111 Cloister Court, Suite 200, Chapel Hill, NC 27514 *Without Title Examination* NORTH CAROLINA • PIN(s) R04400-004-006-002, R04400- 004-006-000, R04400-004-004-001 NEW HANOVER COUNTY Revenue $1,400 00 Grantor states that the Property does not include the primary residence of Grantor This Special Warranty Deed is made as of " -"' - bbjpiWFwby THE BANK OF HAMPTON ROADS, a Virginia banking corporation ("Grantor"), and successor in interest to Gateway Bank & Trust Co, via merger, being the same entity as Gateway Bank & Trust Company, a division of The Bank of Hampton Roads, successor in interest by merger to Gateway Bank & Trust Company, with a mailing address of 112 Corporate Drive, Elizabeth City, North Carolina, 27909, a►.: --1 �,�..... xLA - ", =' a Delaware corporation ("Grantee"), whose mailing address is 503 Wando Park Blvd,, Ste 200, Mount Pleasant, SC 29464 The designations "Grantor" and "Grantee" as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine, or neuter as required by context. WITNESSETH That Grantor, for a valuable consideration paid by Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto Grantee in fee simple, all that certain lot or parcel of land situated in New Hanover County, North Carolina ("property"), and more particularly as follows TRACT ONE All of that certain lot or parcel of land, lying and being in New Hanover County, and being more particularly described as follows To arrive at the true point of beginning, commence at the intersection of the center -line of Wellington Drive (100 foot right-of-way at this point), also known as SR 1814 and the northerly right-of-way line of Middle Sound Loop Road (60 foot right-of-way), also known as SR 1403 and sometimes known as Queens Point Road Go thence South 58 degrees 43 minutes 17 seconds East 707 43 feet, as measured along said northerly right-of-way line to a point Said point being the southernmost corner of Lot 1, as shown on a map of "Queens Point -Section 1" recorded in Map Book 10 at Page 6 of the New Hanover County Registry Go thence North 40 degrees 49 minutes 43 seconds East 1,209 30 feet, along the easterly line of said Section 1, Queens Point and along the easterly line of "Queens Point -Section 2A" as shown on a map recorded in Map Book 11 at Page 20 of said Registry to a point Continuing along last said easterly line, and beyond, North 42 degrees 19 minutes 33 seconds East 823.81 feet, to a new iron pipe, THE TRUE POINT OF BEGINNING Said beginning pipe being the westernmost corner of a tract deeded to Renee Mallette by deed recorded in Deed Book 1815 at Page 1023 of the New Hanover County Registry Said beginning point being on the easterly line of a tract deeded to William E Lewis by deed recorded in Book 3146 at Page 269 of said Registry Running thence from said point North 40 degrees 18 minutes 06 seconds East 612.36 feet, along the easterly line of said Lewis Tract to a new iron pipe, thence 2 South 46 degrees 56 minutes 12 seconds East 1,605 49 feet, along the northerly line of said Mallette Tract to a new iron pipe Last said pipe being the easternmost corner of said Mallette Tract Last said pipe also being the northernmost corner of a tract deeded to Inland Harbour Properties, LLC by deed recorded in Book 2997 at Page 590 of said Registry, thence 3 South 48 degrees 01 minute 56 seconds West 57133 feet, along the southerly line of said Mallette Tract to an old iron pipe, thence 4 North 47 degrees 33 minutes 14 seconds West 116 24 feet, along the southerly line of said Mallette Tract to a point at the easternmost corner of the dividing line between Lot 19A and Lot 20B of Sandybrook Subdivision, as shown on a map -2- recorded in Map Book 26 at Page 45 of the New Hanover County Registry, thence 5 North 48 degrees 02 minutes 17 seconds West 912 11 feet, along the northerly line of Sandybrook Subdivision to an old iron pipe on the northerly line of Lot 37A of said Sandybrook, thence 6 North 49 degrees 18 minutes 24 seconds West 293 86 feet, continuing along the northerly line of said Sandybrook Subdivision to an old iron pipe at the northernmost corner of said Sandybrook Subdivision and at the northernmost comer of Lot 38B of said Sandybrook, thence 7 North 50 degrees 09 minutes 42 seconds West 205 04 feet to the point of beginning The same being all of that tract deeded to Renee Mallette by deed recorded in Book 1815 at Page 1023 of the New Hanover County Registry The above described tract contains 2103 acres, more or less Bearings are relative to NC GRID NAD 83 TRACT TWO All of that certain lot or parcel of land, lying and being in New Hanover County, and being more particularly described as follows To arrive at the true point of beginning at the intersection of the center -line of Wellington Drive (100 foot right-of-way at this point), also known as SR 1814 and the northerly right-of-way line of Middle Sound Loop Road (60 foot right-of-way), also known as SR 1403 and sometimes known as Queens Point Road Go thence South 58 degrees 43 minutes 17 seconds East 707.43 feet, as measured along said northerly right-of-way line to a point Said point being the southernmost comer of Lot 1, as shown on a map of "Queens Point -Section 1" recorded in Map Book 10 at Page 6 of the New Hanover County Registry Go thence North 40 degrees 49 minutes 43 seconds East 19191 feet, along the easterly line of said Queens Point Subdivision to the point of beginning Running thence from said beginning point North 40 degrees 49 minutes 43 seconds East 1,017 39 feet, along the easterly line of said Queens Point Subdivision and along the easterly line of "Queens Point -Section 2A" recorded in Map Book 11 at Page 20 of said Registry to a new iron pipe, thence 2 North 42 degrees 19 minutes 33 seconds East, continuing along said Section 2A, and beyond, 823 81 feet, to a new iron pipe at the northernmost comer of a tract deeded to Ketner by Commissioners Deed recorded in Book 940 at Page 731 of said Registry to a new iron pipe, thence 3 South 50 degrees 09 minutes 42 seconds East 205.04 feet, to an old iron pipe Usi said point being the northernmost comer of Lot 38 B, Sandybrook, as shown on a map -3- recorded in Map Book 29 at Page 45 of the New Hanover County Registry Last said point also being the northeasterly corner of a tract deeded to Ketner by Commissioners Deed recorded in Book 940 at Page 731 of said Registry, thence 4 South 41 degrees 34 minutes 39 seconds West 2,002 84 feet, along the westerly line of said Sandybrook and along the westerly line of Sandybrook as shown on maps recorded in Map Book 24 at Page 60 and Map Book 23 at Page 44 of said Registry to a new iron pipe on the northerly right-of-way line of said Middle Sound Loop Road, thence 5 North 58 degrees 43 minutes 17 seconds West 103 17 feet, along last said northerly line to a point Last said point being the intersection of said northerly right-of-way line with the easterly line of a tract deeded to Steven W McCartney and wife Tonya K. McCartney recorded in Book 1338 at Page 1093 of said Registry, thence 6 North 40 degrees 49 minutes 43 seconds East 166 89 feet, along the easterly line of said McCartney Tract to a point, thence 7 North 44 degrees 22 minutes 47 seconds West 98 93 feet, along the northerly line of said McCartney Tract to a point of beginning The above described tract contains 9 28 acres more or less The same being all of those tracts deeded to Billy Ketner and wife Evola G Ketner by deed recorded in Book 838 at Page 815, Book 1387 at Page 1562, Book 1167 at Page 966, and Book 940 at Page 731 of the New Hanover County Registry, excepting however the tract deeded to Steven W McCartney and wife Tonya K McCartney by deed recorded in Book 1438 at Page 1093 of said Registry The said Evola G Ketner died in 1996 thereby vesting all of her right, title and interest in said property in Billy E Ketner TRACT THREE All of that certain lot or parcel of land, lying and being in New Hanover County, and being more particularly described as follows Beginning at a point in the northerly right-of-way line of Middle Sound Loop Road (60 foot right-of-way), also known as SR 1403 and sometimes known as Queens Point Road Said beginning point being the southernmost corner of Lot 1, as shown on a map of "Queens Point - Section 1" recorded in Map book 10 at Page 6 of the New Hanover County Registry Said beginning point being located South 58 degrees 43 minutes 17 seconds East 70743 feet, as measured along said northerly right-of-way line from the intersection of said northerly right-of- way line with the center -line of Wellington Drive (100 foot right-of-way at this place) Said beginning point being in the westerly line of a tract deeded to Steven W McCartney and wife Tonya K. McCartney by deed recorded in Book 1438 at Page 1093 of said Registry Said beginning point being North 40 degrees 49 minutes 43 seconds East 8 09 feet, from the intersection of the westerly line of said McCartney Tract with the old (22 feet from center -line) - 4 - The right-of-way line of said Middle Sound Loop Road Running thence from said beginning point North 40 degrees 49 minutes 43 seconds East 19191 feet, along the easterly line of said Queens Point Subdivision to a point, thence 2 South 44 degrees 22 minutes 47 seconds East 98 93 feet, to the point, thence 3 South 40 degrees 49 minutes 43 seconds West 166.89 feet, to a point on the northerly right-of-way line of said Middle Sound Loop Road (30 feet from its center -line), thence 4 South 40 degrees 49 minutes 43 seconds West 8.09 feet, to a point on the old northerly right -of --way line of said Middle Sound Loop Road (22 feet from its centerline), thence 5 North 58 degrees 43 minutes 17 seconds West 100 00 feet, along the old northerly right- of-way line of said Middle Sound Loop Road to a point Last said point being the point of beginning of said deed recorded in Book 1438 at Page 1093 of said Registry, thence 6 North 40 degrees 49 minutes 43 seconds East 8 09 feet to the point of beginning The same being all of that tract described in said deed recorded in Book 1438 at Page 1093 of the New Hanover County Registry Bearings are relative to NCGRID, NAD 83 Subject however to an 8 foot wide strip lying between the old northerly right-of-way line of said Middle Sound Loop Road and the present right-of-way line of said Middle Sound Loop Road The above described tract contains 0 42 acres, including said 8 foot wide Right-Uf-Way Exception The property hereinabove described was acquired by Grantor by instruments recorded in Book 5544, Page 462, New Hanover County Registry, and in Book 5544, Page 467, New Hanover County Registry To Have and To Hold the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to Grantee in fee simple And Grantor covenants with Grantee, that Grantor has done nothing to impair such title as Grantor received to such land, and that Grantor will warrant and defend such title against the lawful claims of all persons claiming by, under, or through Grantor, except that title is conveyer! -5. subject to the lien for any and all taxes for the year 2013 and all subsequent years not yet due and payable, and all easements, restrictions, rights of way, covenants, encumbrances and other matters appearing of record SIGNATURE ON NEXT PAGE fn Witness Whereof, the Grantor has caused this instrument to be signed the day and year 'rst above written. GRANTOR THE BANK OF HAMPTON ROADS, successor in interest by merger to Gateway Bank & Trust Comp P Marshall, Real Estate Coordinator * 0LLok STATE OF COUNTY OF ra ii a 1" v--zmjr 1 certify that the following person(s) personally appeared before me this day, each acknowledging. to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated Gregga P Marshall Real Estate Coordinator and authorized anent for The Bank of Hampton Roads, successor m interest by merger to Gatewav ank & Trust Corn Date- hday of tASW1 2013 Official Signature o`fNotary Notary's Printed or Typed Name �10.YY1 S P.rYi h�r� , Notary Public My Commission Expires I-,qj- I U (Official Seal) EPAto ai''EMPLEZ'ON NOTARY PUBLICmonwealth of Virginia Reg #234709 -7- 0 r N �9�IItIif��� TAMMY THEUSCH BEASLEY REGISTER OF DEEDS, NEW HANOVER 216 NORTH SECOND STREET WILMINGTON, NC 28401 Filed For Registration, 0511312013 04.27:51 PM Book, RE 5736 Page- 1422-1429 Document No.. 2013017221 8 PGS $26.00 NC REAL ESTATE EXCISE TAX $1,400.00 Recorder- JOHNSON, CAROLYN State of North Carolina, County of New Hanover PLEASE RETAIN YELLOW TRAILER PAGE WITH ORIGINAL DOCUMENT. *2013017221* 2013017221 ATiLA MDE-14k North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. Governor Director March 13, 2013 Mr. Brad Brundage, City Manager— Myrtle Beach & Wilmington DR Horton, Inc. 4073 Belle Terre Blvd Myrtle Beach, SC 29579 Subject: APPLICATION RETURN: SW8 070303 Ridge Field at Middle Sound (Future Name: The Overlook at Middle Sound) New Hanover County Dear Mr. Brundage: John E. Skvarla, IN Secretary On March 11, 2013, the Division received an incomplete State Stormwater Management Application for the project listed above. The application and check number 490367, in the amount of $505 are being returned because the application package lacked the necessary elements to accept it for review. Please provide the following information upon the next submittal of this application package: 1.) Applicant: The current permit is written to Gateway Bank and Trust. The applicant on the application is DR Horton, Inc. a. If there will be a change in the permittee (which appears to be the case from Gateway Bank and Trust to DR Horton, Inc) please submit a name/ownership change form. This form is available on our website under "miscellaneous forms http://portal.ncdenr.org/webtm/ws/Su/Statesw/forms dots. b. There is a letter submitted dated 12/11 /12 addressed to land Quality stating that DR Horton can develop on behalf of the Bank of Hampton Roads. I have two questions about this: i. Please see Section III(c) of the application. If DR Horton, Inc. is the lessee, purchaser, or the developer developing on behalf of Gateway Bank and Trust (or any entity that Gateway may transfer to) then, please fill out the application following the instructions in this section and have the appropriate individuals sign the application., Please keep in mind the NC regulations require that an individual with signature authority sign the forms. A person has signature authority if they are the President or VP of a corporation, a manager of a manager -managed LLC, or a member of a member -managed LLC. Or, a person with signature authority can designate a different individual to sign on his/her behalf. Please submit the annual report from each entity signing the form showing the individuals who have signature authority. These reports are available online, http:/ANwww.secretary.state.nc.us/corporations/. And, if applicable, please also submit any letters designating signature authority. ii. What is the connection between the Bank of Hampton Roads and Gateway Bank and Trust? I see that a CEO's certification from Hampton Roads Bankshares, Inc. and The Bank of Hampton Roads has been submitted which designates several people to sign documents for that bank but I am not sure how this document and the proposed permit are related? 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St Raleigh, North Carolina 27604 ne Phone: 919-807-63001 FAX 919-807-64921 DENR Assistance:1-877-623-6748 N°�o� Carohna Internet: www.n=teMW tv oro a vlatmalill adage arch 13, 2013 Page 2 of 2 2.) Signature Authority: Please submit a letter showing that Brad Brundage of DR Horton, Inc. has been designated to sign for the permit (he signed the application). 3.) Signatures on Other Forms: If the required signatures on any of the forms (application, 0&M, deed restrictions, etc) change as a result of the items above, please submit updated forms. 4.) BMPs: a. SHWT v/s Permanent Pool Elevations: Please submit a soils report showing soil borings in the footprint of the BMP determining the SHWT elevation. b. History: Both the original 2007 permit (as well as its most recent modification/ownership transfer on 12/17/12), and the current application cover—30.71ac. The permit was originally written in 2007 for five infiltration basins close together along Middle Sound Loop Road under the 1995 rule. The permitted plans also show three ponds which, according to the file, are/were permitted by the county and collect/store water that is then pumped to the infiltration basins. I understand that that design has not been built. The current application shows that the five infiltration basins will not be built, and instead two wet ponds will be built. These ponds have not previously been permitted for treatment and so they will be permitted under the 2008 rule which requires that wet ponds subject to SA requirements discharge to a secondary BMP. c. Secondary BMP: You have proposed two 90% ponds each draining to a dry pond which then drains to a level spreader/filter strip. This is an unusual set-up (with the dry pond in the middle), and so the review engineer will have to review the various flows to determine compliance with the "SA no discharge" rule under 2008. Please visit DWQ's website at htto://h2o.enr.state.nc.us/su/bmo forms htm to download the latest available forms. Please provide the requested information and return the package to the address below. Note that the 90-day statutory permit review time begins upon receipt of a complete application. If you have any questions, please do not hesitate to call me at (910) 796-7331 or email me at kelly.p.johnson@ncdenr.gov. Sincerely, I ell �Joh on Environmental Engineer GDS/kpj: S:IWQS1StormwaterlPermits & Projects120071070303 HD12013 03 retum_app 070303 cc: John Richards, PE, Thomas & Hutton Wilmington Regional Office Stormwater File Johnson,Kelly From: Johnson, Kelly Sent: Wednesday, March 13, 2013 1:09 PM To: Casmer, Jo Cc: Ireel.j@thomasandhutton.com' Subject: FW: SW8 070303, The Overlook at Middle Sound Jo, i have prepared this return letter. Will you please email Jack Reel (cc'd) when it is ready for pick up? Thanks, KJ From: Reel, Jack [mailto:reel.j@thomasandhutton.com] Sent: Wednesday, March 13, 2013 10:17 AM To: Johnson, Kelly Subject: RE: SW8 070303, The Overlook at Middle Sound Kelly, Can you call me about this at your convenience? 332-3400 Jack D. Reel, P.E., LEER® AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhutton.com reel.00thomasandhutton.com (P) 910-332-3400 (F) 910-332-3361 From: Richards, John Sent: Tuesday, March 12, 2013 11:45 AM To: Hussey, Ida Cc: Reel, Jack; Riley, Brian; Landen, Kenneth Subject: Fwd: SW8 070303, The Overlook at Middle Sound Sent from my iPhone John Richards Thomas & Hutton www.thomasandhutton.com (P) 843.839.8424 (F) 843.839.3565 Begin forwarded message: From: "Johnson, Kelly" <kellv.D.iohnson@ncdenr.gov> To: "Richards, John"<richards.iLtDthomasandhutton.com> Subject: SW8 070303, The Overlook at Middle Sound John, We received this application, and I have a few questions for you: Completeness Review checklist �,aL e Project Name: O'�EZLOO+-0 m♦7-OF �ns ntl Received Date: Project Location: Accepted Date: Paperwork u pplement(s) (1 original per BMP) Emailed Engineer on: BMP Type(s): oN,pS V_ LO&M with correct/original signatures (1 original per BMP except LS/VFS and swales) ®Application with correct/original signatures �OCorp or LLC: Sig. Auth. per SoS or letter F 1 Deed 505 (within 6mo) OOSoils Report with SHWT Note ',?a Rayk�gan rt culations (signed/sealed) No obvious errors 15MO-7 17 �� i�m5�,$ SEN`7 133k (yym� n1�� Cw�n 'ram �S 'Cl CI�rr1n;G� �D.a a 4Y ir'r nee nn fr ..n�e�� ,,,.,lud,.� COii'iiYinvi, 'ar2a5, �c�% � "�1-i��Q ♦ 1�1� rr. i 1 Teed Restrictions, if subdivided: V L,(j'TS ned & Notarized .C� Va nsl - SVnglle�c S �rect Template (Comm/Res & HD/LD) or Dec. Cove,iants &Rest. �- Plans ��2 Sets EJ,Details (roads, cul-L -sacs, curbs, sidewalks, BMPs, Buildings, etc) Grading Wetlands: Delineated or No Wetlands ®Vicinity Map Layout (proposed BUA dimensions) Legend ®DA Maps Project Boundaries Infiltration Wet Pond Offsite Soils Report ®Soils Report ®PE Cert for Master Lot #: SHWT: SHWT: Deed Rest for Master ®Lot # Matches Master Bottom: PP: BUA Permitted (Master): sf Visited: BUA Proposed (Offsite): sf Aaaitionai mtormation: Permitted BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) (Proposed: (.au NILF-W71 ... OF NP CAVIL i ECHNICAL 3PECIFICATIONS ECEIVE MAR 1 1 20f3 BY: IS FOR: OVERLOOK PREPARED FOR: DR HORTON, INC. FEBRUARY 2013 J -24039 Prepared by: TH0MAS & HUTTON Savannah, GA I Charleston. SC I Myrtle Beach. SC I Brunswick. GA I Wilmington, NC INDEX TO SECTION 02902 - GRASSING Paragraph Title Page PART 1 - GENERAL 1.1 Section Includes 02902-1 1.2 Related Work 02902-1 1.3 Delivery, Storage & Handling 02902-1 1.4 Planting Dates 02902-1 1.5 Measurement and Payment 02902-1 PART 2 - PRODUCTS 2.1 Seed 02902-2 2.2 Fertilizer 02902-2 2.3 Seeding Schedule 02902-2 2.4 Lime 02902-2 2.5 Sod 02902-2 2.6 Accessories 02902-2 2.7 Product Review 02902-3 PART 3 - EXECUTION 3.1 Preparation 02902-3 3.2 Stand of Grass 02902-3 3.3 Seeding Dates 02902-3 3.4 Application Lime and Fertilizer 02902-3 3.5 Seeding 02902-4 3.6 Seed Protection (Straw Mulch) 02902-4 3.7 Seed Protection (Excelsior Mulch) 02902-4 3.8 Seed Protection (Wood Cellulose Fiber Mulch) 02902-5 3.9 Sodding 02902-5 3.10 Maintenance 02902-5 3.11 Acceptance 02902-5 Z:\24039\24039.0001 \Documents\Specifications\02902.doc Revised July 2009 SECTION 02902 GRASSING PART 1 —GENERAL 1.1 SECTION INCLUDES 02902-1 A. Seeding, planting grass, and fertilizing graded areas behind the structures, pipeline rights -of -way, roadway shoulders and other disturbed areas. B. Seed protection. C. Maintaining seeded areas until final acceptance. 1.2 RELATED WORK A. Section 02204 - Earthwork: Grading. 1.3 DELIVERY, STORAGE, AND HANDLING A. Deliver grass seed in original containers showing analysis of seed mixture, percentage of pure seed, year of production, net weight, date of packaging, and location of packaging. Damaged packages are not acceptable. B. Deliver fertilizer in waterproof bags showing weight, chemical analysis, and name of manufacturer. Damaged bags are not acceptable. C. Deliver sod on pallets. D. All material shall be acceptable to Engineer prior to use. 1.4 PLANTING DATES A. This specification provides for the establishment of a permanent grass cover between the dates of March 1 and September 30. If finished earth grades are not completed in time to permit planting and establishment of the permanent grass during the favorable season between the dates specified above unless otherwise accepted, the Contractor will be required to plant a temporary cover to protect the new graded areas from erosion and to keep windbome dust to a minimum. The temporary cover shall be planted between October 1 and February 28 unless otherwise permitted. 1.5 MEASUREMENT AND PAYMENT A. As specified in contract. 7:\24039\24039.0001 \Documents\Specifications\02902.doc Revised July 2009 02902-2 PART 2 — PRODUCTS 2.1 SEED A. Permanent Cover: Per Landscape Plan. Temporary seeding per plan. All seed shall conform to all State Laws and to all requirements and regulations of the State Department of Agriculture. C. The several varieties of seed shall be individually packaged or bagged, and tagged to show name of seed, net weight, origin, germination, lot number, and other information required by the State Department of Agriculture. D. The Engineer reserves the right to test, reject, or accept all seed before seeding. 2.2 FERTILIZER A. 4-12-12, commercial fertilizer of approved type, conforming to state fertilizer laws. 2.3 SEEDING SCHEDULE A. Per the Landscape Plan. B. In areas where existing grass is to be matched, Contractor shall sow seed at the rate and dates recommended by seed distributor. 2.4 LIME A. Agricultural grade, ground limestone. 1.5 tons/acre 2.5 SOD A. Sod shall be densely rooted, good quality centipede grass, free from noxious weeds. The sod shall be obtained from areas where the soil is reasonably fertile. The sod shall be raked free of all debris and the grass mowed to 2 inches before cutting. The sod shall contain practically all of the dense root system and not be less than 1-inch thick. Sod shall be cut in uniform strips not less than 12 inches in width and not less than 24 inches in length. 2.6 ACCESSORIES A. Straw Mulch: Oat or wheat straw, reasonably free from weeds, foreign matter detrimental to plant life, and in dry condition. B. Excelsior Mulch: Excelsior mulch shall consist of wood fibers cut from sound, green timber. The average length of the fibers shall be 4 to 6 inches. The cut shall be made in such a manner as to provide maximum strength of fiber, but at a slight angle to the natural grain of the wood to cause splintering of the fibers when weathering in order to provide adherence to each other and to the soil. C. Wood cellulose fiber shall be made from wood chip particles manufactured particularly for discharging uniformly on the ground surface when dispersed by a hydraulic water sprayer. It shall remain in uniform suspension in water under Z:\24u3y\24039.0001 \Documents\Specifications\02902.doc Revised July 2009 02902-3 agitation and blend with grass seed and fertilizer to form a homogenous slurry. The mulch fibers shall intertwine physically to form a strong moisture holding mat on the ground surface and allow rainfall to percolate into the underlying soil. The mulch shall be heat processed to contain no germination or growth -inhibiting fc-tors. It shall be dyed (non -toxic) an appropriate color to facilitate metering of material. 2.7 PRODUCT REVIEW A. The Contractor shall provide products before ordering. Th ordered. PART 3 - EXECUTION 3.1 PREPARATION e the Engineer with a complete description of all Engineer will review all products before they are A. The areas to be seeded shall be made smooth and uniform and shall conform to the finished grade indicated on the plans. B. Remove foreign materials, plants, roots, stones, and debris from surfaces to be seeded. C. Grassing areas, if not loose, shall be loosened to a minimum depth of 3 inches before fertilizer, seed or sod is applied. 3.2 STAND OF GRASS A. Before acceptance of the seeding performed for the establishment of permanent vegetation, the Contractor will be required to produce a satisfactory stand of perennial grass whose root system shall be developed sufficiently to survive dry periods and the winter weather and be capable of re-establishment in the spring. B. Before acceptance of the seeding performed for the establishment of temnnrnry vegetation, the Contractor will be required to produce a stand of grass sufficient to control erosion for a given area and length of time before the next phase of construction or the establishment of permanent vegetation is to commence. 3.3 SEEDING DATES A. Seeding shall be performed during the periods and at the rates specified in the seeding schedules. Seeding work may, at the discretion of the Contractor, be performed throughout the year using the schedule prescribed for the given period. Seeding work shall not be conducted when the ground is frozen or excessively wet. The Contractor will be required to produce a satisfactory stand of grass regardless of the period of the year the work is performed. 3.4 APPLYING LIME AND FERTILIZER A. Following advance preparation and placing selected material .for shoulders and slopes, lime, if called for based on soil tests and fertilizer, shall be spread uniformly over the designated areas, and shall be thoroughly mixed with the soil to a depth of approximately 2 inches. Fertilizer shall be applied at the rate of 500 pounds per acre 7:\24039\24039.0001 \Documents\Specifications\02902.doc Revised July 2009 02902-4 for the initial application unless otherwise directed by the Engineer. Lime shall be applied at the rate specified on the plans. Unless otherwise provided, lime will not be applied for temporary seeding. In all cases where practicable, acceptable mechanical spreaders shall be used for spreading fertilizer. On steep slopes subject to slides and inaccessible to power equipment, the slopes shall be adequately scarified. Fertilizer may be applied on steep slopes by hydraulic methods as a mixture of fertilizer and seed. When fertilizer is applied with combination seed and fertilizer drills, no further incorporation will be necessary. The fertilizer and seed shall be applied together when Wood Cellulose Fiber Mulch is used. Any stones larger than 2'/2 inches in any dimension, larger clods, roots, or other debris brought to the surface shall be removed. 3.5 SEEDING A. Seed shall be sown within 24 hours following the application of fertilizer and lime and preparation of the seedbed as specified in Section 3.4. Seed shall be uniformly sown at the rate specified by the use of acceptable mechanical seed drills. Rotary hand seeders, power sprayers or other satisfactory equipment may be used on steep slopes or on other areas inaccessible to seed drills. The seeds shall be covered and lightly compacted by means of cultipacker or light roller if the drill does not perform this operation. On slopes inaccessible to compaction equipment, the seed shall be covered by dragging spiked chains, by light harrowing or by other satisfactory methods. C. Apply water with fine spray immediately after each area has been sown. D. Do not sow seed when ground is too dry, during windy periods or immediately following a rain. E. If permitted by the special provisions, wood cellulose fiber mulch or excelsior fiber mulch may be used. 3.6 SEED PROTECTION (STRAW MULCH) A. All seeded areas seeded with permanent grasses shall be uniformly mulched in a continuous blanket immediately following seeding and compacting operations, using at least 2 tons of straw per acre. Mulch shall be anchored by weighted farm disc and/or suitable mechanical equipment. Bond straw mulch by spraying with asphalt emulsion at a rate of 10 to 13 gal/1000 sq. ft. Take precautions to prevent damage or staining of adjacent structures. 3.7 SEED PROTECTION (EXCELSIOR MULCH) A. Seed shall be sown as specified in Section 3.5. Within 24 hours after the covering of seed, excelsior mulch shall be uniformly applied at the rate of 2 tons per acre. The mulch may be applied hydraulically or by other acceptable methods. Should the mulch be placed in a dry condition, it shall be thoroughly wetted immediately after placing. The Engineer may require light rolling of the mulch to form a tight mat. Z:\24039\24039.0001 \Documents\Specifications\02902.doc Revised July 2009 02902-5 3.8 SEED PROTECTION (WOOD CELLULOSE FIBER MULCH) A. After the lime hos been applied and ground prepared as specified in Section 3.4, wood cellulose fiber mulch shall be applied at the rate of 1,500 pounds per acre in a mixture of seed and fertilizer. Hydraulic equipment shall be used for the application of fertilizer, seed, and slurry of the prepared wood pulp. This equipment shall have a built-in agitation system with an operating capacity sufficient to agitate, suspend, and homogeneously mix a slurry of the specified amount of fiber, fertilizer, seed, and water. The slurry distribution lines shall be large enough to prevent stoppage. The discharge line shall be equipped with a set of hydraulic spray nozzles which will provide an even distribution of the slurry on the various areas to be seeded. The slurry tank shall have a minimum capacity of 1,000 gallons. The seed, fertilizer, wood pulp mulch, and water shall all be combined into the slurry tank for distribution of all ingredients in one operation by the hydraulic seeding method specified herein. The materials shall be combined in a manner recommended by the manufacturer. The slurry mixture shall be regulated so the amounts and rates of application shall result in a uniform application of all materials at rates not less than the amount specified. Using the color of the wood pulp as a guide, the equipment operator shall spray the prepared seedbed with a uniform visible coat. The slurry shall be applied in a sweeping motion, in an arched stream to fall like rain, allowing the wood fibers to build upon each other until an even coat is achieved. 3.9 SODDING A. Sod shall be placed between March 1 st and December 1 st. B. Sod shall be placed within 48 hours of cutting. C. Sod shall be moist when laid and placed on moist ground. The sod shall be carefully placed by hand, beginning at the toe of slopes and working upwards. The length of the strips shall be at right angles to the flow of surface water. All joints shall be tightly butted and end joints shall be staggered at least 12 inches. The sod shall be immediately pressed firmly into the ground by tamping or rolling. Fill all joints between strips with fine screened soil. Sod on slopes shall be pegged with sod pegs to prevent movement. The sod shall be watered, mowed, weeded, repaired, or otherwise maintained, to insure the establishment of a uniform healthy stand of grass until acceptance. 3.10 MAINTENANCE A. Maintain seeded surfaces until final acceptance. B. Maintenance shall consist of providing protection against traffic, watering to ensure uniform seed germination and to keep surface of soil damp, and repairing any areas damaged as a result of construction operations or erosion. 3.11 ACCEPTANCE A. Before acceptance of the seeding performed for the establishment of permanent vegetation, the Contractor will be required to produce a satisfactory stand of Z:\24039\24039.0001\Documents\Specifications\02902.doc Revised July 2009 02902-6 perennial grass whose root system shall be developed sufficiently to survive dry periods and the winter weather and be capable of reestablishment in the spring. B. A minimum coverage of 907o is required before project acceptance. END OF SECTION Z:\24039\24039.0001\Documents\Specifications\02902.doc Revised July 2009 INDEX TO SECTION 02720 -STORM DRAINAGE Paragraph Title Page PART 1 - GENERAL 1.1 Section Includes 02720-1 1.2 Related Sections 02720-1 1.3 Options - Omitted 02720-1 1.4 References 02720-1 1.5 Quality Assurance 02720-2 1.6 Product Delivery, Storage, and Handling 02720-3 1.7 Sequencing and Scheduling 02720-3 1.8 Alternatives 02720-3 1.9 Guarantee 02720-3 1.10 Existing Utilities 02720-3 1.11 Measurement and Payment 02720-3 1.12 Testing 02720-4 PART 2 - PRODUCTS 2.1 Pipe 02720-4 2.2 Drainage Structures 02720-5 2.3 Filter Fabric 02720-6 2.4 Soils and Stone Aggregates 02720-7 2.5 Product Review 02720-8 PART 3 - EXECUTION 3.1 On Site Observations of Work 02720-8 3.2 Excavation for Pipe and Structures 02720-8 3.3 Trenching for Pipe 02720-9 3.4 Protection of Utility Lines 02720-9 3.5 Foundation and Bedding 02720-9 3.6 Haunching, Initial Backfill, and Final Backfill 02720-10 3.7 Placing Pipe 02720-11 3.8 Joints in Pipes 02720-12 3.9 Field Quality Control 02720-13 3.10 Drainage Structures 02720-14 3.11 Remove and Replace Pavement 02720-14 3.12 Connect Pipe to Existing Structures 02720-14 Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 SECTION 02720 STORM DRAINAGE PART 1 — GENERAL 1.1 SECTION INCLUDES 02720-1 A. Construction of pipes, drainage inlets, manholes, headwalls, and various drainage structures. 1.2 RELATED SECTIONS A. Section 03305 -Site Concrete 1.3 OPTIONS - Omitted 1.4 REFERENCES (Latest Revision) A. ASTM D 3740 - Minimum Requirements for Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction. B. ASTM E 329 - Agencies Engaged in Construction Inspection and/or Testing. C. ASTM C 76 - Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe. D. ASTM C 443 - Joints for Concrete Pipe and Manholes, Using Rubber Gaskets. E. ASTM B 745/B 745M - Corrugated Aluminum Pipe for Sewers and Drains. F. ASTM D 1056 - Flexible Cellular Materials - Sponge or Expanded Rubber. G. ASTM F 2306/F 2306M - 12 to .60-Inch (300 to 1,500 mm) Annular Corrugated Profile -Wall Polyethylene (PE) Pipe and Fittings for Gravity -Flow Storm Sewer and Subsurface Drainage Applications. H. ASTM D 1751 - Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Non -extruding and Resilient Bituminous Types). I. ASTM D 1752 - Preformed Sponge Rubber Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction. J. ASTM D 2321 - Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity Flow Applications. K. ASTM C 150 Portland Cement. L. ASTM C 144 Aggregate for Masonry Mortar. M. ASTM C 207 Hydrated Lime for Masonry Purposes. Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 02720-2 N. ASTM C 62 - Building Brick (Solid Masonry Units Made From Clay or Shale). O. ASTM C 55 - Concrete Brick. P. ASTM C 478 - Precast Reinforced Concrete Manhole Sections. Q. ASTM C 1433 - Precast Reinforced Concrete Box Sections for Culverts, Storm Drains, and Sewers. R. ASTM D 1557 - Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort. S. ASTM D 2922 - Test Methods For Density Of Soil and Soil Aggregate In Place by Nuclear Methods (Shallow Depth). T. ASTM F 405 - Corrugated Polyethylene (PE) Tubing and Fittings. U. ASTM C 913 - Precast Concrete Water and Wastewater Structures. V. ASTM D 3212 - Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals. W. ASTM F 477 - Elastomeric Seals (Gaskets) for Joining Plastic Pipe. X. AASHTO M 294 - Corrugated Polyethylone Pipe, 300 to 1500-mm Diameter. Y. ASTM F667 - Large Diameter Corrugated Polyethylene Pipe and Fittings. 1.5 QUALITY ASSURANCE A. Material Review - Contractor will furnish the Engineer and Owner a description of all material before ordering. Engineer will review the Contractors submittals and provide in writing an acceptance or rejection of material. B. Manufacturer - Material and equipment shall be standard products of a manufacturer who has manufactured them for a minimum of 2 years and provides published data on their quality and performance. C. Subcontractor - A subcontractor for any part of the work must have experience on similar work, and if required, furnish the Engineer with a list of projects and the Owners or Engineers who are familiar with their competence. D. Design - Devices, equipment, structures and systems not designed by the Engineer and the Contractor wishes to furnish, shall be designed by either a Registered Professional Engineer or by someone the Engineer accepts as qualified. If required, complete design calculations and assumptions shall be furnished to the Engineer or Owner before ordering. E. Testing Agencies - Soil tests shall be taken by a testing laboratory operating in accordance to ASTM D-3740 and E-329 and be acceptable to the Engineer prior to engagement. Mill certificates of tests on materials made by manufacturers will be accepted provided the manufacturer maintains an adequate testing Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 02720-3 laboratory, makes regularly scheduled tests, spot checked by an outside laboratory and furnishes satisfactory certificates. F. Codes and Standards - Contractor responsible for compliance with all local, state and federal permits on behalf of the Owner for this project including, but not limited to, sediment and erosion control monitoring inspection logs, etc. 1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING A. Material shall be unloaded in a manner avoiding damage and shall be stored where it will be protected and will not be hazardous to traffic. Contractor shall repair any damage caused by the storage. Material shall be examined before installation. Neither damaged nor deteriorated material shall be used in the work. 1.7 SEQUENCING AND SCHEDULING A. Contractor shall arrange the work so sections of pipes between structures are backfilled, checked, pavement replaced and the section placed in service as soon as reasonable after installation. 1.8 ALTERNATIVES A. The intention of these specifications is to produce the best system for the Owner. If the Contractor suggests alternate material, equipment or procedures will improve the results at no additional cost, the Engineer and Owner will examine the suggestion, and if accepted, it may be used. The basis upon which acceptance of an alternate will be given is its value to the Owner and not for the Contractor's convenience. 1.9 GUARANTEE A. Contractor shall guarantee the quality of materials, equipment and workmanship for a minimum period of 12 months or as required by the local governing agency after acceptance. Defects discovered during this period shall be repaired by the Contractor at no cost to the Owner. 1.10 EXISTING UTILITIES A. All known utility facilities are shown schematically on the construction drawings, and are not necessarily accurate in location as to plan or elevation. Utilities such as service lines or unknown facilities not shown, will not relieve the Contractor of responsibility under this requirement. "Existing Utilities Facilities" means any utility existing on the project in its original, relocated or newly installed position. Contractor will be held responsible for the cost of repairs to damaged underground facilities; even when such facilities are not shown on the drawings. B. The Contractor shall contact all utility companies and request locations of their respective utility lines. 1.11 MEASUREMENT AND PAYMENT A. As specified in contract. [:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 02720-4 1.12 TESTING A. Laboratory tests for moisture density relationship for fill materials shall be in accordance with ASTM D 1557, (Modified Proctor). B. In place density tests in accordance with ASTM D 1556 or ASTM D 2922. C. Testing laboratory shall operate in accordance with ASTM D 3740 and E 329 and be acceptable to the Engineer. D. Testing laboratory and Project Engineer/Project Representative shall be given a minimum of 48 hours notice prior to taking any tests. E. Owner shall select and engage the testing laboratory. Testing laboratory shall be responsible to the Owner and Owner's Engineer. Payment for laboratory and all tests shall be by the Owner, except Owner specifically reserves the right to deduct from Contractor's payment, expenses and charges of testing laboratory when: Contractor gives notice the work is ready for inspection and testing, and fails to be ready for the test, and/or 2. testing of the Contractor's work, products, or materials fail, and retesting is required, and/or 3. Contractor abuses the services or interferes with the work of the testing laboratory in the conduct of this work. F. Test results shall be furnished to the Owner prior to continuing with associated or subsequent work. PART 2 - PRODUCTS 2.1 PIPE A. Concrete Pipe - Shall be reinforced Class III, Class IV, or Class V and shall conform to ASTM Specification C-76. Pipe less than 48 inch inside diameter shall be manufactured without lifting holes. Joints shall be either 'O' ring watertight flexible rubber, or tongue and groove as indicated on the plans. Gasketed single offset joints may be used in lieu of 'O' ring joints if approved by the Engineer. 1. 'O' Ring Joints - Shall be water tight flexible rubber gasket and shall meet ASTM Specification C-443. 2. Gasketed single offset joint shall be soil tight and shall meet ASTM Specification C-443. 3. Tongue and groove joints shall utilize mastic sealant and the exterior shall be wrapped with geotextile material. Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 02720-5 B. Corrugated Aluminum Alloy Pipe - Shall conform to ASTM B745. Pipe may be annular or helical. Joints - Coupling bands shall be one piece lap -type, having a width conforming to the pipe manufacturer's recommendations. They shall be of the angle lug, rod and lug, or U-bolt type. The type, size and gauge of the bands and size of angles, bolts and rods shall be as specified in the applicable standards or specifications for the pipe. The exterior rivet heads in the longitudinal seam under the coupling band shall be countersunk or the rivets shall be omitted and the seam welded. 2. Gaskets - Gaskets shall be made of 3/8 inch thick by 6 '/2 inch minimum width closed cell expanded synthetic rubber, fabricated in the form of a cylinder with a diameter approximately 107o less than the nominal pipe size. The gasket material shall conform to the requirements of ASTM D1056, Grade Number SBE-43. Bends - Where specified, shall be shop fabricated to the angles and dimensions shown on the construction drawings. C. Polyethylene - Shall be high density polyethylene corrugated pipe having an integrally formed smooth interior, equivalent to Advanced Drainage Systems N- 12WT, N-12STIB or Hancor Blue Seal or Sure-Lok ST. Pipe shall conform to ASTM F667 and F2306. 1. Joints - Pipe shall be joined using an integral bell and spigot joint meeting ASTM F2306 specifications. The joint shall be soil tight and gaskets, when applicable, shall meet the requirements of ASTM F477. A joint lubricant supplied by the manufacturer shall be used on the gasket and bell during assembly. D. Subgrade Drain - Shall be heavy duty corrugated polyethylene perforated pipe manufactured by Advanced Drainage Systems (ADS) or equivalent and shall conform to ASTM F-405. 2.2 DRAINAGE STRUCTURES A. Details - See plans. B. Concrete - Reinforced and non -reinforced. Minimum compressive strength = 3,000 p.s.i. at 28 days. Reinforcing shall be covered by a minimum 1 inch of concrete for top slabs and 1 '/2 inches for walls and bases and 3 inches where concrete is deposited directly against the ground. 3. Expansion joint filler materials shall conform to ASTM D 1751 or D 1752. C. Mortar - Connection of pipe and drainage structures shall be composed of one part by volume of Portland cement and two parts of sand. The Portland cement shall conform to ASTM C-150, Type I or II. The sand shall conform to ASTM C-144 Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 02720-6 and shall be of an approved gradation. Hydrated lime may be added to the mixture of sand and cement in an amount equal to 25% of the volume of cement used. Hydrated lime shall conform to ASTM C-207, Type S. The quantity of water in the mixture shall be sufficient to producc a workable mortar, but shall in no case exceed 7 gallons of water per sack of cement. Water shall be clean and free of harmful acids, alkalies and organic impurities. The mortar shall be used within 30 minutes from the time the ingredients are mixed with water. D. Brick Masonry - Brick shall conform to ASTM Specification C-62, Grade SW or C-55, Grade S. Mortar for jointing and plastering shall consist of one part Portland cement and two parts fine sand. Lime may be added to the mortar in the amount not more than 25% of the volume of cement. The joints shall be completely filled and shall be smooth and free from surplus mortar on the inside of the structure. Brick structures shall be plastered with '/2 inch of mortar over the entire outside surface of the walls. For square or rectangular structures, brick shall be laid in stretcher courses with a header course every sixth course, and for round structures, brick shall be laid radially with every sixth course a stretcher course. E. Precast - Shall be constructed in accordance with ASTM C-478, C-913, or C-1433 and conform to the details on the project drawings. 1. Joints - Shall be tongue and groove sealed with flexible gaskets or mastic sealant. Gaskets shall be O-Ring or Type A or B "Tylox" conforming to ASTM C443 and mastic shall be "Ram-nek" or equivalent with primer. The primer shall be applied to all contact surfaces of the manhole joint ai the factory in accordance with the manufacturer's instructions. 2. Steps - Shall be polypropylene equivalent to M.A. Industries, Type PS-1 or PS-1-PF. The steps shall be installed at the manhole factory and in accordance with the recommendations of the step manufacturer. Manholes will not be acceptable if steps are not installed accordingly. 3. Leaks - No leaks in the manhole will be acceptable. All repairs made from inside the manhole shall be made with mortar composed of one part portland cement and two parts clean sand; the mixing liquid shall be straight bonding agent equivalent to "Acryl 60." Frame, cover & grating shall conform to the details shown on the project drawings. Grates in pavement and in other flush -mounted type surfaces shall be of a "bicycle -safe" configuration consisting of 45 degree diagonal bars or slotted grates with a maximum clear opening of 1 inch and a maximum length of 9- inches. In any case, the long dimension of the openings should be located transverse to the direction of traffic when possible. 2.3 FILTER FABRIC A. Shall be a non -woven heat -bonded fiber of polypropylene and nylon filaments equivalent to Mirafi 140 N. The fabric shall be finished so the tilaments will retain their relative position with respect to each other. The fabric shall contain stabilizers and/or inhibitors added to the base plastic to make the filaments resistant to deterioration due to ultraviolet and/or heat exposure. The product shall be free of flaws, rips, holes, or defects. Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 0272oa 2.4 SOILS AND STONE AGGREGATES A. Stone aggregate shall be clean crushed granite or concrete meermg the gradation requirements of grade No. 57. B. Soils used for bedding, haunching, and initial backfill shall be as shown in the following table and shall meet the requirements and classifications of ASTM D2321 and ASTM D2487. Percentage Passing Sieve Sizes Soil 1-1 /2 No. Group inch No.4 200 Symbol (40 (4.75 (0.075 Class Type D 2487 Description mm) mm) mm Angular, crushed stone (or Manufactured, other Class lA materials) and IB Processed Aggregates; None stone/sand mixtures with 100% :550% <5% gradations selected to minimize dense -graded, migration of adjacent soils; clean. contain little or no fines. Well -graded gravels and GW gravel -sand mixtures, little or no <50% of fines. "Coarse Fraction Poorly -graded gravels and Coarse Grained Soils, GP gravel -sand mixtures; little or no 100% <570 fines. clean Well -graded sands and gravelly >50% of II SW sands; little or no fines. "Coarse Fraction Poorly -graded sands and SP ravel) sands; little or no fines. " Coarse -Grained Eg• Sands and gravels that are 5% Soils, borderline GW- borderline between clean and 100% Varies to clean to w/fines. GC, SP- with fines. 12% SM. Silty gravels, gravel -sand -silt <50% of GM mixtures. "Coarse Fraction Clayey gravels, gravel -sand- III Coarse -Grained GC clay mixtures. 100% fy 5% SM Silty sands, sand -silt mixtures. >50% of Soils with Fines Clayey sands, sand -clay "Coarse SC mixtures. Fraction Inorganic silts and very fine sands, rock flour, silty or clayey ML fine sands, silts with slight IVA Fine-grained soils g plasticity. 100% 100% >50% (inorganic) Inorganic clays of low to CL medium plasticity, gravely clays. sandy clays, silty clays, Z:\24039\24039.0001\Documents\Specifications\02720.doc Revised January 2010 02720-8 2.s PRODUCT REVIEW A. The Contractor shall provide the Owner with a complete description of all products before ordering. The Owner will review all products by the submittal of shop drawings before they are ordered. PART 3 — EXECUTION 3.1 ON SITE OBSERVATIONS OF WORK A. The line, grade, deflection, and infiltration of storm sewers shall be tested by the Contractor under the direction of the Owner or Engineer. The Owner's Representative or Engineer will have the right to require any portion of the work be completed in their presence and if the work is covered up after such instruction, it shall be exposed by the Contractor for observation. However, if the Contractor notifies the Engineer such work is scheduled and the Engineer fails to appear within 48-hours, the Contractor may proceed. All work completed and material furnished shall be subject to review by the Engineer or Project Representative. All improper work shall be reconstructed. All materials that do not conform to the requirements of the specifications shall be removed from the work upon notice being received from the Engineer for the rejection of such materials. Engineer shall have the right to mark rejecied materials to distinguish them as such. Contractor shall give the Project Engineer or Project Representative a minimum of 48-hours notice for all required observations or tests. Storm sewers shall be dry for observation by the Engineer. Lines under water shall be pumped out by the Contractor prior to observation, at no additional cost to the Owner. It will also be required of the Contractor to keep accurate, legible records of the location of all storm sewer lines and appurtenances. These records will be prepared in accordance with the paragraph on "Record Data and Drawings" in the Special Conditions. Final payment to the Contractor will be withheld until all such information is received and accepted. 3.2 EXCAVATION FOR PIPE AND STRUCTURES A. Excavated material shall be piled a sufficient distance from the trench banks to avoid overloading to prevent slides or cave-ins. Remove from site all material not required or suitable for backfill. C. Grade as necessary to prevent water from flowing into excavations. D. Remove all water accumulating in the excavation, from surface flow, seepage, or otherwise, by pumping or ether approved rnethod. E. Sheeting, bracing or shoring shall be used as necessary for the protection of the work and safety of personnel. Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 02720-9 3.3 TRENCHING FOR PIPE A. Trenching for Pipe - The width of trenches at any point below the top of pipe shall be not greater than the outside diameter of the pipe plus 4 feet to permit satisfactory jointing and thorough bedding, haunching, backfilling and compacting under and around pipes. Sheeting and bracing where required shall be placed within the trench width as specified. Care shall be taken not to over - excavate. Where trench widths are exceeded, redesign with a resultant increase in cost of stronger pipe or special installation procedures shall be necessary. Cost of this re -design and increased cost of pipe or installation shall be borne by the Contractor without additional cost to the Owner. When installing pipe in a positive projecting embankment installation, the embankment shall be installed to an elevation of at least 1 foot above the top of the pipe for a width of five pipe diameters on each side of the pipe before installation of the pipe. B. Removal of Unsuitable Material - Where wet or otherwise unstable soil, incapable of supporting the pipe is encountered in the bottom of the trench, such material shall be removed to the depth required and replaced to the proper grade with stone or sand foundation as determined by the Owner's Geotechnical representative. This foundation shall be compacted to 95% modified proctor. 3.4 PROTECTION OF UTILITY LINES A. Existing utility lines shown on the drawings or the locations of which are made known to the Contractor prior to excavation, and are to be retained, as well as utility lines constructed during excavation operations, shall be protected from damage during excavation and backfilling, and if damaged, shall be repaired at the Contractor's expense. If the Contractor damages any existing utility lines not shown on the drawings or the locations of which are not known to the Contractor, report thereof shall be made immediately. If the Engineer determines repairs shall be made by the Contractor, such repairs will be ordered under the clause of the GENERAL CONDITIONS of the contract entitled "CHANGES." When utility lines to be removed are encountered within the area of operations, the Contractor shall notify the Engineer in ample time for the necessary measures to be taken to prevent interruption'of service. 3.5 FOUNDATION AND BEDDING A. Stone Foundation - Where the subgrade of the pipe is unsuitable material, the Contractor shall remove the unsuitable material to a depth determined by the Engineer or Geotechnical Consultant and furnish and place stone foundation in the trench to stabilize the subgrade. Sand Foundation - Where the character of the soil is unsuitable, even though dewatered, additional excavation to a depth determined by the Engineer or Geotechnical Consultant shall be made and replaced with clean sand furnished by the Contractor. C. Bedding for the pipe shall provide a firm surface of uniform density throughout the entire length of pipe. Before laying pipe, the trench bottom shall be de -watered by the use of well points. Where well points will not remove the water, the Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 02720-10 Contractor shall construct sumps and use pumps to remove all water from the bedding surface. The pipe shall be carefully bedded in stone accurately shaped and rounded to conform to the lowest 1 /3 of the outside portion of circular pipe, or to the !ower curved portion of arch pipe for the entire length of the pipe. Bell holes and depressions. for joints shall be only of such length, depth, and width as required for properly making the particular type joint. D. Concrete Pipe: Materials for bedding concrete pipe shall be either Class II, Class III, or Class IB if processed, to minimize migration of adjacent material. The depth of bedding shall be equal to 1/24 the outer diameter of the pipe or 3 inches, whichever is greater. 3. The bedding area under the center of the pipe for a width of 1 /3 the outer diameter of the pipe, known as the middle bedding, shall be loosely placed. The remainder of the bedding for the full width of the trench shall be compacted to a minimum density of 85% for Class II bedding and 90% for Class III bedding as determined by ASTM D1557. Polyethylene and Corrugated Aluminum Alloy Pipe Materials for bedding polyethylene and corrugated aluminum alloy pipe shall be either Class II, Class III, or Class IB if processed to minimize migration of adjacent materials. 2. The depth of bedding shall be equal to 1/10 the outer diameter of the pipe or a minimum of 6 inches, whichever is greater. 3. The bedding area under the center of the pipe for a width of 1/3 the outer diameter of the pipe, known as the middle bedding shall be loosely placed. The remainder of the bedding for the full width of the trench shall be compacted to a minimum density of 90% for Class II bedding and 95% for Class III bedding. 3.6 HAUNCHING, INITIAL BACKFILL, AND FINAL BACKFILL A. Haunching - After the bedding has been prepared and the pipe is installed, Class II or Class III soil shall be placed along both sides of the pipe in layers not exceeding 6 inches in compacted depth. Care shall be taken to insure thorough compaction and fill under the haunches of the pipe. Each layer shall be thoroughly compacted with mechanical tampers and rammers. Haunching shall extend up to the spring line of the pipe and be compacted to the following densities: RCP: Minimum density shall be 90% as determined by ASTM D1557. 2. HDPE and Corrugated Aluminum Alloy Pipe: Minimum density shall be 95% as determined by ASTM D1557. Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 02720-1 1 Initial Backfill HDPE and corrugated aluminum alloy pipe require initial backfill material of either Class II or Class III soils to be placed from the spring line to a minimum of 6 inches above the top of the pipe in 6 inch lifts. This initial backfill shall be compacted to a minimum density of 95% as determined by ASTM D1557. Reinforced concrete pipe does not specifically require initial backfill. Initial backfill for reinforced concrete pipe can be the same as final backfill. C. Final Backfill - For all pipes, it should extend to the surface and shall be select materials compacted to a minimum of 98% as determined by ASTM D1557 if the pipe is under pavement. If the pipe is in grassed areas final backfill may be native materials compacted to a minimum density of 90% as determined by ASTM D 1557. 3.7 PLACING PIPE A. Each pipe shall be carefully examined before being laid, and defective or damaged pipe shall not be used. Pipe lines shall be laid to the grades and alignment indicated. Proper facilities shall be provided for lowering sections of pipe into trenches. Under no circumstances shall pipe be laid in water, and no pipe shall be laid when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided as necessary. All pipe in place shall have been checked before backfilling. When storm drain pipe terminates in a new ditch, the headwall or end section together with ditch pavement, if specified, shall be constructed immediately as called for on the plans. Ditch slopes and disturbed earth areas shall be grassed and mulched as required. The Contractor will be responsible for maintaining these newly constructed ditches and take immediate action subject to approval to keep erosion of the ditch bottom and slopes to a minimum during the life of the contract. No additional compensation will be given to the Contractor for the required diversion of drainage and/or dewatering of trenches. Grassing the trench backfill shall conform to requirements of Section 02902 - "Grassing." Concrete Pipe: Laying shall proceed upgrade with the spigot ends of bell and spigot pipe and the tongue ends of tongue and groove pipe pointing in the direction of the flow. Place pipe in trench with the invert conforming to required elevations, slopes and alignment. Provide bell holes in pipe bedding in order to insure uniform pipe support. Fill all voids under the pipe by working in backfill material. C. Corrugated Aluminum Pipe: Shall be laid with the separate sections joined firmly together, with the outside laps of circumferential joints pointing upstream and with longitudinal laps on the side. Lifting lugs; where used, shall be placed to facilitate moving the pipe without damage to the exterior or interior coatings. Place pipe in trench with the invert conforming to required elevations, slopes and alignment. Fill all voids under the pipe by working in backfill material. D. Polyethylene Pipe - Laying shall proceed upgrade with the spigot ends of the bell and spigot pipe pointing in the direction of the flow. Place pipe in trench with the invert conforming to required elevations, slopes, and alignment. Provide bell holes in pipe bedding in order to ensure uniform pipe support. Fill all voids under Z:\24039\24039.0001\uoc:uments\Specifications\02720.doc Revised January 2010 02720-12 the pipe by working in bedding material. Pipe shall be installed in accordance with ASTM D-2321. E. Subgrade Drain Tubing - Shall be laid as detailed on the construction � drawings with the invert conforming to required elevations and alignment. 3.8 JOINTS IN PIPES A. Concrete Pipe - Joints in concrete pipe shall be either 'O' ring watertight flexible rubber or tongue and groove as indicated on the plans. Gasketed, single offset joints may be used if approved by the Engineer. Maintain pipe alignment and prevent infiltration of fill material at joints during installation. 'O' ring and single offset joints shall meet the requirements of ASTM C443. They shall utilize either a rubber gasket with a circular cross section or a rectangular cross section. Gaskets shall have no more than one splice, except two splices of the gasket will be permitted if the nominal diameter of the pipe exceeds 54 inches. Manufacturer's recommendations and requirements shall be followed. 2. Tongue and groove joints shall utilize a bituminous mastic such as Ram-Nek or approved equal. The joint surfaces shall be primed according to manufacturer's recommendations. Care shall be taken to insure the mastic material completely and uniformly seals the joint. 3. All tongue and groove joints shall receive one layer of filter fabric completely around the exterior of the joint. The filter fabric shall be a minimum of 2 feet wide, centered on the ,joint, and overlapped a minimum of 1 foot. B. Corrugated Aluminum Pipe - Maintain pipe alignment and prevent infiltration of fill material at joints during installation. Installation of Gaskets - Shall be in accordance with the recommendations of the manufacturer in regard to the use of lubricants and cements and other special installation requirements. The gasket shall be placed over one end of a section of pipe for half the width of the gasket. The other half shall be doubled over the end of the some pipe. When the adjoining section of pipe is in place, the double -over half of the gasket shall then be rolled over the adjoining section. Any unevenness in overlap shall be corrected so the gasket covers the ends of the pipe sections equally. Connecting bands shall then be centered over the adjoining sections of pipe, and rods or bolts placed in position and nuts tightened. The band shall be tightened evenly. Tension shall be kept on the rods or bolts and the gasket shall be closely observed to see it is seating properly in the corrugations. 2. Installation of Filter Fabric at Joint - After the connecting band has been tightened; the Contractor shall place one layer of filter fabric completely around the exterior of the joint, a minimum of 2 feet wide, centered on the joint, and overlapped a minimum of 1 foot. Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 3.9 02720-13 C. Polyethylene Pipe Maintain pipe alignment and prevent infiltration of fill material at joints during installation Joints shall be gasketed soil -tight bell and spigot meeting ASTM F2306. Gaskets shall meet the requirements of ASTM F477. A joint lubricant supplied by the manufacturer shall be used on the gasket and bell during assembly. Pipe shall be inserted into the bell using methods recommended by the manufacturer. Pipe shall be kept true to line and grade during assembly. 2. Installation of Filter Fabric at Joint - All polyethylene pipe joints shall receive one layer of filter fabric completely around the exterior of the joint. The filter fabric shall be a minimum of 2 feet wide, centered on the joint, and overlapped a minimum of 1 foot. D. Subgrade Drain Tubing - Joints shall be joined using snap couplings. When installing sock wrapped pipe, overlap sock ends over coupling and secure with polyethylene tape. FIELD QUALITY CONTROL A. Soil and density tests shall be made by a testing laboratory approved by the Engineer and shall be made at the Contractor's expense. Laboratory tests of the soil shall be made in accordance with ASTM D 1557. In -place density tests shall be made in accordance with ASTM D 2922. Results of the tests shall be furnished to the Engineer. The minimum number of tests required shall be: Haunching and Initial Backfill in all areas.... 1 per 100-linear feet of pipe, minimum of one per run of pipe for both the haunching and initial backfill zones. Final Backfill over pipe in traffic areas........... 1 per 100-linear feet or less for each 4-feet of depth or portion thereof. Final Backfill over pipe in non -traffic areas..... 1 per 500-linear feet or less for each 6-feet of depth or portion thereof. The minimum percent of compaction of the backfill material (in accordance to ASTM D1557) shall be the following: In traffic Areas....... 98% of maximum laboratory density. In non -traffic Areas ... 90% of maximum laboratory density, unless otherwise approved by the Engineer. It is the Contractor's responsibility to assure Backfill is sufficient to limit pipe deflection to no more than 5%. When flexible pipe is used, a deflection test shall be made by the Contractor on the entire length of installed pipeline, not less than Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 02720-14 30-days after completion of all backfill and placement of any fill. Deflection shall be determined by use of a deflection device or by use of a spherical, spheroidal, or elliptical ball, a cylinder, or circular sections fused to a common shaft. The ball, cylinder, or circular sections shall have a diameter, cr minor diameter as applicable, of 95% of the inside pipe diameter. The ball, cylinder, or circular sections shall be of a homogeneous material throughout, shall have a density greater than 1.0 as related to water at 39.2 degrees F, and shall have a surface brinell hardness of not less than 150. The device shall be center bored and through bolted with a '/4 inch minimum diameter steel shaft having a yield strength of 70,000 p.s.i. or more, with eyes at each end for attaching pulling cables. The eye shall be suitably backed with flange or heavy washer, a pull exerted on the opposite end of the shaft shall produce compression throughout the remote end of the ball, cylinder, or circular section. Circular sections shall be spaced so the distance from the external faces of the front and back sections shall equal or exceed the diameter of the circular section. Failure of the ball, cylinder, or circular section to pass freely through a pipe run, either by being pulled through by hand or by being flushed through with water, shall be cause for rejection of that run. When a deflection device is used for the test in lieu of the ball, cylinder, or circular sections described, such device shall be approved prior to use. The device shall be sensitive to 1.0% of the diameter of the pipe being measured and shall be accurate to 1.0% of the indicated dimension. Installed pipe showing deflections greater than 5% of the normal diameter of the pipe shall be retested by a run from the opposite direction. If the retest also fails, the suspect pipe shall be repaired or replaced at no cost to the Owner. C. 50% of pipes under roadways shall be televised and video recorded. The video observation shall include a complete pan view of each joint. If the video observation indicates problems, further televising may be required. Additional televising and video recording will be at no additional cost to the Owner. 3.10 DRAINAGE STRUCTURES A. Drainage structures shall be constructed of the materials specified for each type and in accordance with the details shown on the drawings. 3.11 REMOVE AND REPLACE PAVEMENT A. Pavement shall only be removed after prior written authorization by the Owner. Pavement removed and replaced shall be constructed in accordance with the latest specifications of the State Department of Transportation. Traffic shall be maintained and controlled per State Department of Transportation regulations.. 3.12 CONNECT PIPE TO EXISTING STRUCTURES A. The Contractor shall connect pipe to the existing structure where indicated. For brick or precast structures, a hole not more than 4 inches larger than the outside diameter of the new pipe shall be cut or cored neatly in the structure, the new pipe laid so it is flush with the inside face of the structure, and the annular space around the pipe filled with a damp, expanding mortar or groui to snake a watertight seal. Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 02720-15 END OF SECTION Z:\24039\24039.0001 \Documents\Specifications\02720.doc Revised January 2010 THOMAS► & HUTTON 1350 FARROW PARKWAY I MYRTLE BEACH, SC 29577 POST OFFICE BOX 8000 1 MYRTLE BEACH, SC 29578-8000 843.839.3545 1 WWW.THOMASANDHUTTON.COM March 8, 2013 Ms. Christine Nelson NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Stormwater Management Permit Application The Overlook at Middle Sound, NC 24039.0001.303 Dear Ms. Nelson: On behalf of DR Horton, Inc. we are pleased to submit the Stormwater Management Permit Application for the. above referenced project for your review. The following items are included for your review: • Application fee • One (1) original and one (1) copy of the completed Stormwater Management Application Form; • One (1) copy of the Certificate of Authority for DR Horton, Inc.; • One (1) High Density Residential Subdivisions Deed Restrictions & Protective Covenances; • One (1) original copy of the Wet detention Basin Supplement including the required item checklist and executed Operation and Maintenance agreement, • One (1) original level spreader -vegetated filter strip (LS-VPS) supplement and executed Operation and Maintenance agreement; • One (1) original copy of the Dry extended detention Basin Supplement and executed Operation and Maintenance agreement; • One (1) copy of current deed; • One (1) copy of the Letter of Agency from the property owner; • One (1) copy each of the ACOE letter and plat • One (1) copy of Stormwater and Erosion Control Design Considerations including Project Narrative, USGS Vicinity Map; and • Two (2) copies of Site Development. Plans. Please review the application, and if everything is in order, we respectfully request NCDENR approval. Please feel free to contact me at (843) 839-8424 should you have any questions or comments. -I hank you for your time and assistance with this project. IECEsVED MAR 1 1 1013 BY• SAVANNAH, GA I CHARLESTON, SC I WILMINGTON, NC 1 ORUNSWICK, GA Ms. Christine Nelson NCDENR March 8, 2013 Page 2 Sincerely, TH S & HUTT Jo Richards, PE Principal/Project Manager Enclosures: as listed above cc: Jack Reel, PE/Thomas and Hutton Johnson, Kelly From: Johnson, Kelly Sent: Tuesday, March 12, 2013 11:38 AM To: 'Richards, John' Subject: SW8 070303, The Overlook at Middle Sound Attachments: SW8 070303�Current Permit.pdf: DR Horton_ Signature Authority.pdf John, We received this application, and I have a few questions for you: 1.) Applicant: The current permit is written to Gateway Bank and Trust (attached). The applicant on the application is DR Horton, Inc. a. If there will be a change in the permittee (which appears to be the case from Gateway Bank and Trust to DR Horton, Inc) please submit a name/ownership change form. This form is available on our website under "miscellaneous forms", http:/Iportal.ncdenr.ore/web/wci/ws/su/statesw/forms dots. b. There is a letter submitted dated 12/11/12 addressed to Land Quality stating that DR Horton can develop on behalf of the Bank of Hampton Roads. I have two questions about this: i. Please see Section 111(c) of the application. If DR Horton, Inc. is the lessee, purchaser, or the developer developing on behalf of Gateway Bank and Trust (or any entity that Gateway may transfer to) then, please fill out the application following the instructions in this section and have the appropriate individuals sign the application. Please keep in mind the NC regulations require that an individual with signature authority sign the forms. A person has signature authority if they are the President or VP of a corporation, a manager of a manager -managed LLC, or a member of a member -managed LLC. Or, a person with signature authority can designate a different individual to sign on his/her behalf. Please submit the annual report from each entity signing the form showing the individuals who have signature authority. These reports are available online, http://www.secretary.state.nc.us/corporations/. And, if applicable, please also submit any letters designating signature authority. ii. What is the connection between the Bank of Hampton Roads and Gateway Bank and Trust? I see that a CEO's certification from Hampton Roads Bankshares, Inc. and The Bank of Hampton Roads has been submitted which designates several people to sign documents for that bank but I am not sure how this document and the proposed permit are related? 2.) Signature Authority: I have attached the NC Secretary of State's Annual Report for DR Horton, Inc. Do you have a letter showing that Brad Brundage has been designated to sign for the permit that you can send me (he signed the application)? 3.) Signatures on Other Forms: If the required signatures on any of the forms (application, O&M, deed restrictions, etc) change as a result of the items above, please submit updated forms. 4.) BMPs: a. SHWT v/s Permanent Pool Elevations: Please submit a soils report showing soil borings in the footprint of the BMP determining the SHWT elevation. b. History: It took quite a bit of time to review the history of this permit, and so I want to leave the following notes on file for the DWQ review engineer who ends up reviewing this file. Both the original 2007 permit (as well as its most recent modification/ownership transfer on 12/17/12), and the current application cover—30.71ac. The permit was originally written in 2007 for 5 infiltration basins close together along Middle Sound Loop Road under the 1995 rule. The permitted plans also show three ponds which, according to the file, are/were permitted by the county and collect/store water that is then pumped to the infiltration basins. I understand that that design has not been built. The current application shows that the 5 infiltration basins will not be built, and instead two wet ponds will be built. These ponds have not previously been permitted for treatment and so they will be permitted under the 2008 rule which requires that wet ponds subject to SA requirements discharge to a secondary BMP. c. Secondary BMP: You have proposed two 90% ponds each draining to a dry pond which then drains to a level spreader/filter strip. This is an unusual set-up (with the dry pond in the middle), and so the review engineer will have to review the various flows to determine compliance with the "SA no discharge" rule under 2008. That is more than I go through at this stage. We need to have this information before we can accept the permit for review. These items may or may not be time- consuming to obtain. Can this information be submitted by COB Thursday? If not, 1 will have to return the application so that you can have some additional time to pull the information together because we cannot hold uncashed checks for very long. Just let me know. Thanks, Kelly K,CLLIW DVI IASOIA, Kelly Johnson Environmental Engineer Division of Water Quality Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Office: 910.796.7331 Fax: 910.350.2004 Hussey, Ida From: Reel, Jack Sent: Monday, February 04, 2013 10:35 AM To: Richards, John; Hussey, Ida Subject: Fwd: Overlook at Middle Sound (COD Field Check) For comet. Sent from my iPhone Begin forwarded message: From: "Burgess, Sam" <sbureess@nhceov.com> Date: February 4, 2013, 10:32:50 AM EST To: "Reel, Jack" <reel.' 2thomasandhutton.com> Subject: Overlook at Middle Sound (COD Field Check) Jack, The following information confirms our field visit to determine the presence and amount of the conservation resource Swamp Forest (WSF) located on the Overlook residential project site, on Friday, February 1, 2013: In conjunction with Section 59.4 (Conservation Overlay District) of the County's Zoning Ordinance, a field visit was made to the Overlook at Middle Sound residential project located near the 3100 block of Middle Sound Loop Road to determine the amount of Swamp Forest (WSF) on site. Based on an empirical observation of the site, specifically in the south/southwest portion of the project and adjacent to Demarest Village, it was determined that the resource swamp forest was present and followed the 404 wetland jurisdictional boundary as depicted on a site map of the project dated December 11, 2012. The only additional County requirement based on Section 59.4 will be a twenty-five foot setback (25') from the resource. As noted in the draft approval of the 42 lot proposal of Overlook, please remit four full size paper copies of the plan for TRC signature reflecting our field visit. If you have questions, please contact me. Sam Burgess 02/04/13 Saris Burgess I Senior Planner Planning & Inspections - Planning & Zoning I New Hanover County 230 Gove-Mcnent Center Dive, Suite 110 WilmiI�gton, NC 28403 The Overlook at Middle Sound Stormwater Management Report and --Erosion Control Desian Considerations SECTION 2 - PROJECT NARRATIVE The Overlook at Middle Sound is a 30.6-acre single-family development located at 3610 Middle Sound Loop Road thQrI was previously designed by Mapiass Engineering, P.C. and partially constructued in 2007. The stormwater management system was permitted under New Hanover County ATC # GP 6-07 and North Carolina Department of Natural Resources Division of Water Quality (NCDENR DWQ) Permit SW8 070303. The site has been abandoned and repossessed by the bank after being partially cleared with gravity sewer installed and several stormwater ponds partially constructed. The developer of the new site plan is D.R. Horton Inc. The new development plan will consist of 42 lots, new road layout and a new stormwater management system. The new plan will utilize the existing sewer installed. The site currently consists of partial clearing, wooded uplands and wetlands, with terrain ranging from 0 to 5 percent slopes. This tract drains to the northeast to an unnamed tributary of Pages Creek that is part of the Cape Fear River Basin. Pages Creek is classified as SA/HQW, index # 18- 87-22. Based on the above referenced NCDENR DWQ permit, the site is within '/2 mile and draining to the SA/HQW waters of Pages Creek. The predominant soil types on site are classified as hydrologic soil group A, B, B/D and C. The proposed project will remain a High Density project under the State Stormwater Rules established by NCDENR DWQ. A piped collection system will route runoff of all impervious surfaces to the two proposed wet detention ponds. Each wet detention pond will consist of three separate discharges. The water quality volume (the difference between the 1-year pre and post runoff) will discharge via orfice flow to a secondary dry detention basin before being released to the adjacent wetlands over a 2-5 day period. The excess volume above the water quality volume up to the 10-year runoff volume, will discharge to a level spreader with a 50' engineered filter strip. Each level spreader will have an engineered flow splitter box to act as a high flow bypass. The volume above the 10-year event will discharge over a wide rip rap wier along the bank of the wet detention pond. The area of land disturbance for the proposed improvements is approximately 21.79 acres. Erosion control devices will consist of, but not limited to, temporary silt fencing, temporary gravel construction entrance/exit, two sediment skimmer basins, inlet protections, grassing, and energy dissipaters at outlets and areas of concentrated flows. Silt fence will be installed around the perimeters of the disturbance areas where practical to prevent sediment from leaving the construction areas. The two sediment skimmer basins will be converted to permanent wet detention ponds once the site is stabilized. The site has an existing jurisdictional ditch that is currently being permitted for a culvert crossing by the ACOE. The ditch will be preserved during initial clearing & grubbing operations until such time the culvert is installed. Culvert installation will be scheduled during around a forecasted dry period. The fill slopes from the culvert installation will be permanently stabilized immediately after culvert installation. The anticipated construction sequence consists of the following: 1. Install gravel construction entrance/exit, silt fence and tree protection. 2. Culvert installation at ditch crossing including stabilization. 3. Clearing and grubbing. 4. install sediment basins. 5. Install remaining drainage conveyances and erosion control. 6. Site rough grading and infrastructure. R THOM AS & HUTTON Z:\24039\24039.0001 \Engineering\Calculations\Storm Water\01 D\94039 Stormwater Management Report.doc Page 2 All r Ys L LATITUDE:, 34-se5o "' N LONGITUDE: 77 D47'34" 1N 1 i.. r Y',� t �. (�f I•y,� 3 _fir ^ 17M•�ic 5� -04 �•�• YY ��ifir+ Middle Sound Loop r r -k{"Mf � 'rfe -��#t ��� -..t =eK� �, r �f�j� '-� f � ', t ;,.-a•, �.r'� 1;s7 � v¢tY� �—' .1 .fit-i, , K•� rm.. t ( i" y '� �• '� tyl, �' +..' 1 7 d )•fir.[ TJ '� • ''� + _' i"� :* �-�'�Gc** _ J � � 3 � .fit sa �` Diu,✓ h �"" 4� {, J �!f r� �• � � � 3� '4� � js'. tt f ".*t:'"r ` f f. r.,`. ""� t lF R�..� r r 5 ` ' `i.. r {.','..F' _ `1• jy.:, f �`.>'}. 'S,.. #4 ���' � s-. '^� t � L{�Tl `�� f✓ 9. ,�, �.'s r''�'�.�{. T ,/® * ' n� ,r, Y k y r.r s. sa '�`4 { S� Y , .. � .' �1 io-,�r .. ' yp,� �' i� `"~ �'-,'...fw,,� �ijr� r '•�' . - ,t , 2'` �.'�-,`� ��P �' X +t� {{a,_<. �� p j:, r' _{,J'� M.,,���{�.y �.M '.y y. 1 ��' `iG'..-. 1, f •.. •i�.W��(��i�,� � � �,� � '�'E - yl• �G��''��ij'�'.r3'f f �( r.- e 1 N.�+..r-+� l4"`a s. dy t • L. , -s- Vt'.�t, r '�':� "". [[ 'iist4'"� _ - 7.. •��* T`F4� � A, r i �, .! f ,t eT�ad� �,{r t � 1'i 447 i i i�� CA: f •` L �r 7f 4 ..� Q♦�^l�� ,� J '�'rR� ��' '�`��ss jj `jam ; � 3/`. fp'y+ �� a " s � toµ Vicinity Map PROPOSED ACTIVITY: Overlook at Middle Sound CLIENT: D.R. Horton, Inc. LOCATION: Wilmington, North Carolina DATE: February 19, 2u i 3 JOB NUMBER: J - 24039.0001 SI'IEEi: 1 of 1 SCALE: 1" = 2000' NTHOMAS & HUTTON Engineering I Surveying I Manning I GIS I Consulting 1350 Farrow Parkway • PO Box 8000 Myrtle Beach, SC 29578-8000 • 843.839-3545 www.thomosandhutton.com Savannah, GA I Brunswick GA I Charieston, SC I Wilmington, NC I ECS CAROLINAS, LLP -L 3 ()'70 303 "Setting the Standard for Service" Geotechnical • Construction Materials • Environmental • Facilities NC Regiderod Engineering Flrm F-1078 January 16, 2013 Mr. David G. Lee D. R. Horton 4073 Belle Terre Boulevard Myrtle Beach, South Carolina 29579 Reference: Report of Seasonal High Water Table Estimation The Overlook at Middle Sound Wilmington, New Hanover County, North Carolina ECS Project No. 22.18475 Dear Mr. Lee: ECS Carolinas, LLP (ECS) recently conducted an estimation of the Seasonal High Water Table (SHWT) for the proposed stormwater best management practice (BMP) areas at the proposed The Overlook at Middle Sound in Wilmington, New Hanover County, North Carolina. This letter, with attachments, is the report of our estimation. Field Testing On January 4, 2013, ECS conducted an exploration of the subsurface soil and groundwater conditions at seven requested locations shown on the attached Boring Location Plan (Figure 1). The purpose of this exploration was to estimate the SHWT of the in place soils for the design of for the proposed stormwater BMP areas. The borings were located with GPS equipment. ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS recorded the SHWT and groundwater level observed at the time of each hand auger boring. The attached SHWT sheet provides a summary of the subsurface conditions encountered at each hand auger boring location. The groundwater level and the SHWT were estimated at each boring location below the existing grade elevation. Below is a summary of each boring location. Location Water Level SHWT 1 65 inches 12 inches 2 65 inches 12 inches 3 65 inches 12 inches 4 65 inches 12 inches 5 65 inches 12 inches 6 65 inches 12 inches 7 65 inches 12 inches 7211 Ogden Business Park, Suite 201, Wilmington. NC 28411 T: 910-686-9114 F: 910-686-9666 www.ecslimited.com ECS Carolinas. LLP • ECS Florida, LLC • ECS ?AdAvest, LLC • ECS Mid -Atlantic, LLC ECS Southeast, LLC ECS Texas. LLP Report of SHWT Estimation The Overlook at Middle Sound Wilmington, New Hanover County, North Carolina ECS Project No. 22.18475 January 16, 2013 The Si-ivvT may vary within the proposed site due to changes in subsurface conditions and elevation. Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. Our testing of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us at (910) 686-9114. Respectfully, ECS CAROLINAS, LLP K. Brooks Wall Project Geologist Attachments: Boring Location Plan SHWT sheet 2 ?e�' �0� Kris J. Stamm Principal Season High Water Table Estimation The Overlook at Middle Sound Wilmington, New Hanover Co., North Carolina ECS Project No. 22.18475 January 4, 2013 Location Depth Soil Description 1 0-12" Gray clayey SAND 12"-65" Tan/gray/orange mottled CLAY Seasonal High Water Table was estimated to be at 12 inches below the existing grade elevation. Groundwater was encountered at 65 inches below the existing grade elevation. Location Depth Soil Description 2 0-12" Gray clayey SAND 12"-65" Tan/gray/orange mottled CLAY Seasonal High Water Table was estimated to be at 12 inches below the existing grade elevation. Groundwater was encountered at 65 inches below the existing grade elevation. Location Depth Soil Description 3 0-12" Gray clayey SAND 12"-65" Tan/gray/orange mottled CLAY Seasonal High Water Table was estimated to be at 12 inches below the existing grade elevation. Groundwater was encountered at 65 inches below the existing grade elevation. Location Dew Soil Description 4 0-12" Gray clayey SAND 12"-65" Tan/gray/orange mottled CLAY Seasonal High Water Table was estimated to be at 12 inches below the existing grade elevation. Groundwater was encountered at 65 inches below the existing grade elevation. Season High Water Table Estimation The Overlook at Middle Sound Wilmington, New Hanover Co., North Carolina ECS Project No. 22.18475 jan nary 4, 2013 Location Depth Soil Description 5 0-12" Gray clayey SAND 12"-65" Tan/gray/orange mottled CLAY Seasonal High Water Table was estimated to be at 12 inches below the existing grade elevation. Groundwater was encountered at 65 inches below the existing grade elevation. Location Death Soil Description 6 0-12" Gray clayey SAND 12"-65" Tan/gray/orange mottled CLAY Seasonal High Water Table was estimated to be at 12 inches below the existing grade elevation. Groundwater was encountered at 65 inches below the existing grade elevation. Location Depth Soil Description 7 0-12" Gray clayey SAND 12"-65" Tan/gray/orange mottled CLAY Seasonal High Water Table was estimated to be at 12 inches below the existing grade elevation. Groundwater was encountered at 65 inches below the existing grade elevation. I w * w w SECONDARY wwwww �� BMP (DRY DIET.) www w ww w .ww ww� YX 10 / `, 1 -'---4- / ►I ` I I 1 ' � 1 � I w w w SECONDARY \` ` 1 w • BMP (DRY DET.)_ NOTE: SHWT BORING LOCATIONS ARE BASED ON LAT/LONG COORDINATES PROVIDED BY ECS 04/02/13 THAT CORRESPOND TO THE LOCATIONS REPORTED IN FIGURE I OF THEIR REPORT DATED 01/16/13. THE OVERLOOK AT MIDDLE SOUND PROPOSED ACTIVITY: SINGLE FAMILY SUBDIVISION - SHWT MAP CLIENT: D.R. HORTON INC. LOCATION: NEW HANOVER COUNTY, NC DATE: April 2, 2013 SHEET: SHWT-1 JOB NUMBER: J - 24039.0001 SCALE: V = 200' POND 1F2 SCALE: I"=200' 0 100 200 400 WET POND 01 PROPOSED NWL ■ ORIGINAL DESIGNED d PERMITTED NWL OF 6.5 Li � NTHOMAS & HUTTON 'cnglneedng i Sunreying I Planning I GIS I Consulttng 215 South Kerr Avenue • Unit B Wilmington, NC 28403 • 910.332.3360 www.thomosandhufon.com Savannah, GA I Brunswick, GA I Charleston, SC I Myrtle Beach, SC U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2012-01185. County: New Hanover U.S.G.S: Quad: Scotts Hill NOTIFICATICN OF jyJRYSDICTIONAI, 'DETE'' .ZMINATION Property Owner: Bank of Hampton Roads Agent: ECS Carolinas. LLP Attn: Mr. David Twiddv Attu: Paul Pascarosa Address: 112 Corporate Drive Address: 7211 Ogden Business Park, Ste 201 Elizabeth City NC 27909. Wilmington. NC 28411 (252)331-4009 (9101686-9114 Property description Size 0.7 (acres) 3Nearest Town Wilmington Nearest Waterway Pages Creek . River Basin White Oak USGS HUC 03030001 Coordinates N 34:265481, W 77.793292 Location description: Property is located within the address range of 3208 and 3216 Middle Sound Loop Road, Wilmington. New Hanover Countv. North Carolina. PINs R04400-004-006-002, R04400-004-006-000 and R04400-004- 004-001. Indicate Which of the Following Apply: A. Preliminary Determination _ Based on preliminary. information, there maybe wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be' considered final, a jurisdictional.determination must be verified by the Corps. This preliminary determination is not an appealable action' under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for farther consideration by the Corps to reevaluate. the JD. B. Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water'Act: Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are waters of the U.S. including wetlands on the above described property subject to the peg of this notification. We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To. be zonsidered final-, any delineation must be verified by the Corps. _ The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. X The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps ReRplatory Official identified below on 1/14/2013. Unless there is a change in the law or our published regulations this, determination may relied upon for a period not to exceed five years from the date LA this notification. There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our Pege 1 of 2- published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X The aropyc[V is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Wilmington, NC at (910) 796-7215 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Emily- Hughes at (910) 251-4635. C. Basis For Determination This site exhibits wetland criteria as described in the 1987 Corps Wetland Delineation Manual and Coastal Plain Supplement and is adjacent to Pages Creek, a tributary to the Atlantic Intrcoastal Waterway, a Navigable Water of the U.S. The property also contains features that exhibit an ordinary high water mark and are unnamed tributaries to Pages Creek. This determination is based on information provided by ECS Carolinas. LLC and a site visit by Emily- Hughes on 7/12/2012. D. Remarks E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This Information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations of 33. CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic.Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by 3/14/2013. **It is not necessary to su 't an RFA form to a Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: Date: 1/14/2013 Exp a Date . 1/14/2018 The Wilmington District is committed to providing the highest level of support to. the public.. To.help us ensure -we continue to do so, please complete the attached customer Satisfaction Survey or visit M://pert.riwp.usace.army.mil/survey.ruiil to complete the survey online. Copy furnished: Brad Brundage, D.R. Horton, 4073 Belle Terre -Boulevard, Myrtle Beach, SC 29579 1��K"', RI ` illy - ►• .. .. �.1r,�r p/ • ,Rt ' ------- r I i MWO�E fpVMO - �.- @@y $e6� Qe�B• •SEdd�y''J�g�{E3nY€� I"a a x a a I i MWO�E fpVMO - �.- @@y $e6� Qe�B• •SEdd�y''J�g�{E3nY€� I"a a x a a Johnson, Kelly From: Reel, Jack [reel.j@thomasandhutton.com] Sent: Tuesday, January 08, 2013 8:40 AM To: Johnson, Kelly Cc: Bradford C Brundage; David G Lee (DGLee@drhorton.com); Richards, John; Spruill Thompson (Spruill@capefearcommercial.com); Riley. Brian Subject: Overlook at Middle Sound, SW8 070303 Attachments: Untitled.PDF Kelly, On behalf of the applicant to New Hanover County's TRC, DR Horton, we acknowledge receipt of the attached letter and the need for a stormwater permit modification. Please consider this as written notice as indicated in your letter that we intend to submit for a modification no later than February of this year. Thank you for your attention to this matter. Jack D. Reel, P.E., t-EED® AP BD+C Wilmington Regional Director Thomas & Hutton www.thomasandhutton.com reel.0(&thomasandhutton.com (P) 910-332-3400 (F) 910-332-3361 From: WIL Docman Sent: Tuesday, January 08, 2013 8:35 AM To: Reel, Jack Subject: Untitled.PDF MCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director December 28, 2012 Gateway Bank & Trust C/o Pat G. Davis, Senior Vice President Special Assets / OREO Department,112 Corporate Drive Elizabeth City, NC 27909 Subject: Request for State Stormwater Management Permit Application Ridge Field (Alternate Name: Overlook at Middle Sound) Stormwater Project No. SW8 070303 New Hanover County Dear Mr. Davis, Dee Freeman Secretary The Wilmington Regional Office was notified by New Hanover County on December 27, 2012 that the subject project will be undergoing modification to reduce the number of lots, change the road configuration, and to make several other changes. Please be advised that these changes will require a permit modification to State Stormwater permit number SW8 070303. Any unpermitted construction on the subject site, prior to receipt of the required permit, will constitute a violation of 15A NCAC 21-1.1000 and may result in appropriate enforcement action by this Office. Either a Stormwater Permit Application Package including 2 sets of plans, completed application form, fee, and supporting documentation, or a written response regarding the status of this project and the expected submittal date must be received in this Office no later than January 28, 2013. Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay. The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan approval letter must NOT be considered the Coastal Stormwater Management Permit, which will be signed by the Supervisor of the Surface Water Protection Section. Please reference the Project Number above on all correspondence. If you have any questions, please call me at (910)-796-7215. Sincerply, I I yyVos Environmental Engineer GDS/kpj: S:IWQSIStormwateAPermits & Projects120001001104\201212 req_swapp 070303 cc: New Hanover County Building Inspections Jack Reel, PE, Thomas & Hutton Sam Burgess, NHC Senior Planner (sburgessenhcarov.com, via email only) Division of Coastal Management Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance:1-877-623-6748 Internet: www.ncwaterquality.org Nne orthCarolina NwAtrall- NEW HANOVER COUNTY �• o PLANNING & INSPECTIONS 3. DEPARTMENT I2 AGENCY CHECKLIST •��ast�ewtn+5� :5w-3 c 303 Sam Burgess Senior Planner C� 230 Government Center Dr, Suite 110 )Wilmington, NC 28403 910-798-7441 phone 910-798-7053 fax sburgess@nhcgov.com www.nhcgov.com Project Name: Q,01,t tj�) miaa1tg, S0,118 Date: p2c,�b2.t 2t� tIL ✓ Preliminary Plan (Conventional, Performance, High Density) • Engineering/ Jim lannucci/Jason Clark • Soil & Water Conservation District/ Dru Harrison • Emergency Services/ Warren Lee • Fire Services/ Matt Davis/Tom Sosebee • E91 l/ Deborah Cottle • Environmental Health/Cathy Timpy (only if plan proposes well or septic tank) • Cape Fear Public Utility Authority/ Bernice Johnson/Ken Harrell V Additional Agencies: • Corps of Engineers/ Emily Hughes • School System/ Mick Wayne • NCDOT/ David Leonard • MPO/ Tara Murphy • Division of Coastal Management/ Robb Mains (plan sent if land is adjacent to coastal water) • D.E.M./ Linda Lewis • City of Wilmington Development Services/ Ron Satterfield Minor Subdivisions are sent to the following agencies for additional comments. • Engineering/ Jim lannucci/Jason Clark • Environmental Health/ Cathy Timpy E C E f V E • CFPUA/ Bernice Johnson/Kent Harrell DEC 2 7 2012 Final subdivisions are sent to the following agencies for additional comments. • Fire Services/ Matt Davis/Tom Sosebee • Engineering/ Jim lannucci/Jason Clark • CFPUA/ Bernice Johnson/Kent Harrell Upon receipt, please provide your written comments on the attached site plan back to Planning & Inspections within (3) three weeks. Sender Comments: P lteo_b),el' �DQ r-V C" `Lk cttl ac Ld A m zuv,c k.-/a a.. �Q ©, tt+ U) CLtLo,ckcl , Mr. FJ THOMAS & HUTTON Engineering I Surveying I Planning I GIS I Consulting Overlook of Middle .So �n (.formerly ,Rldgefie d,' Middle Sound Loop Road, New Hanover County 12117112 DR Horton, Inc. J-24039.0001 PROJECT NARRATIVE Overlook at Middle Sound is a partially -constructed subdivision off of Middle Sound Loop Road in New Hanover County, North Carolina. The project was approved as a Low Impact Development, (LID), Performance Subdivision by TRC allowing for 60 single family units as indicated on the letter dated November 16, 2009. Since the time of the approval, some activity has taken place on the site such as construction of 2 ponds, clearing and limited gravity sewer work. Work ceased on the site some time ago and the property is now owned by the Bank. DR Horton, Inc. has the property under contract to purchase. The intent of this re -submittal of the preliminary plan to New Hanover County TRC is to request approval of modifications to the plan including, but not limited to reduction of the number of lots to 42, to slightly reconfigure the street network, to change the subdivision name, to remove the LID components of the plan and to redesign aspects of the stormwater, potable water and sewer and grading. The following bullet items represent general summary of the updates to the plan since 2009: 1. Thomas & Hutton is now the Engineer and Surveyor of record for the subdivision, 2. The streets are proposed to be privately owned maintained, 3. Approval of this plan will necessitate transfer of permits, and in all cases modification to those permits for water, sewer, land disturbance, stormwater and wetland impacts. The permit numbers on file are as follows: County Land Disturbance GP 6-07, DEH Water ATC Serial Number 07-01162, DENR Sewer W00030320, and DWQ Stormwater SW8 070303, 4. DOT encroachment permits were not previously obtained. The project will necessitate application for permits. As the project is proposed now, the driveway connection on Middle Sound Loop will not require a left turn lane with symetrical widening as determined by NCDOT thresholds, 5. Street names proposed are consistent with what was previously approved except for the proposed change from Ridgefield Drive to Overlook Drive, 6. We have re -surveyed trees and the tree save plan has been updated, 7. The wetlands have been re -delineated and a new US Army Corps of Engineers signed plat is forthcoming. The new wetlands are illustrated on the plan. Impact permits for proposed crossing will be requested, 8. The stormwater concept has been revised to eliminate infiltration, and 9. The plan illustrates other modification. The project will adhere to the requirements as defined by New Hanover County. In addition, the setbacks for the project will be as shown on the plat as defined by New Hanover County Zoning Ordinance for Performance Residential, z:\24039\24039.0001\documents\applications\hanover county\trc\overlook zoning prof narative.docx Page 1 of 1