Loading...
HomeMy WebLinkAboutSW3220601_Plansheet C400 - Misc. Detail_202206170 3 \ \\ \ ,\ \ \ \ I� PIPE #8 \\ 0 644 I \ \ `\ \ 4 \ \ N \ \ \ 644 64,3 I \ \ \ \ 6 \ -6343.55 `` i \ � �` I , \ 643.80 + _ 643.8� x \ \ 1 \x 643.50 ____________-`643.36 (D \ �643.70 _ _ _ _ _ _ 643.50 '64 3.50 \x -x x x -x -x -x -x x 643.35 643.25 / \\ \ , x + 16% % to I I I I 00 6, 1-1\ \ N, x i CB#6 i .643.70 i / CB)'K + \� 1143.30 x I E #* ��fl t�t q w I I �--c----- ;50- 643.50PIPE #5 643.50 - - - 643.60 - - -� x 0 0 \..643.50 I I I \ I ;4 x � 643.50 I 643.35 \ \ I F----------, r-:643.25--- -----1 I I I Cg #2 I I 648 \ / I I I x l I 647 \ PIPE #6 x I p 9 I 644.00 71�x 1 646 tO \\ I I /\ Ix --- - - - - - - I L - - - - - - - --- I x I / 00 t -5 O%\ 6,13.50 643.50 04 \ \ 643.60 ' 643.50 643.70 ww I x E-------643.25-, � �43.25-- x x CB#4 i '\ 643.75 i C13#3 i I ►� PIPE #3 c"I I I x .643.50 0 t 643.30 x L - - - - - - - - - - - J L - - - - - - - - - - - - -J \ 0 f O \ / X x =x�64p= x= x =x it it x= x- x =x = x= x x -� xJ I L J 643.50 -6 43.50 t \ 643.30 _ _ _ _ .643.31-643.30-643.30 I I -0.5% / / I 650 640 630 660 650 640 STORM 1 CB#5 (72"x72" REINFORCED CONCRETE) RIM:642.90' INV IN:638.95' 24" (CB#6) INV IN:638.95' 24" (CB#4) INV OUT:640.25' 24" (FES) EXIS ING RADE 104' of 24" HDPE ­7 ADS PIPE N12 0 #6 0.5% ADS N1 PIPE 65' of #5 24" HDPE 630 0+25 vtvv utDu ltuv PROFILE SCALE: HORIZ: 1 " = 20' VERT: 1 " = 10' J-t Jv 660 650 CB#6 (24"x36" REINFORCED CONCRETE) RIM:642.90' INV OUT:638.95' 24" (CB#5) 640 2 O 0.0% 1+7530 GENERAL NOTES: LEGEND: 1. FOR RIP RAP APRON SIZING, SEE SHEET 211. 2. FRAME AND GRATE - NCDOT STANDARD 840.29 LIMITS OF DISTURBANCE 3. TRAFFIC RATED PRECAST STRUCTURE NCDOT STANDARD 840.46 PROPERTY LINE 4. STORM DRAINAGE STRUCTURE DIMENSIONS ARE INNER LENGTH AND WIDTH. PROPOSED ACCESS - CENTERLINE 5. ALL PIPES TO BE CLASS V RCP OR HDPE ADS N12 (WT) UNLESS PROPOSED ACCESS - EDGE OF OTHERWISE SPECIFIED. PAVEMENT 6. 6. UNDERGROUND OIL CONTAINMENT SYSTEM (DRAINAGE PIPES 1, 2, 3, 4, AND 5) IS DESIGNED FOR THE 25 YEAR RAINFALL STORM EVENT WHILE PROPOSED ACCESS - SHOULDER ---------------------------------- RETAINING 4,760 GALLONS OF OIL. STATION FENCE x -x -x -x -x -x 7. UNDERGROUND OIL CONTAINMENT SYSTEM REQUIRES 0% PIPE SLOPE TO MAXIMIZE THE SYSTEM STORAGE CAPABILITIES IN THE EVENT OF A EXISTING MAJOR CONTOUR - - - - - - - - - TRANSFORMER FAILURE. SEE CB#5 OIL CONTAINMENT OUTLET PROPOSED MAJOR CONTOUR STRUCTURE DETAIL (SHEET C910) FOR ADDITIONAL DETAILS. EXISTING MINOR CONTOUR - - - - - - �tiu+ulurrgr ,.```�N•^!�b��% �o�4oEt ,dl,••.'y� fix.. r.p~ PROPOSED MINOR CONTOUR a tea PROPOSED SPOT ELEVATION 930.00 P xrt PROPOSED CULVERT INSTALLATION IfI"' CATCH BASIN - BOX n Z W� J J g. LL �0 Frz )Z W w�U¢ W w �tno Z z ==@ 0- wM o m _ Z w wNU W Y� r a o z m GRAPHIC SCALECL w 30 0 15 30 60 120 d OUTLET PROTECTION) I I I I I NCDOT STD 840.14 PRECAST DROP INLET CB#1 (24"x36" REINFORCED CONCRETE) RIM:642.90' INV OUT:638.95' 24" (CB #2) FINISH D GR PIPE 159' DE PIPE 69' #4 of 24" HDPE ADS N12 @ 0.0% #2 of 24" HDPE ADS N12 ® 0.0% PIPE 68' #1 of 24" HDPE ADS N12 @ 0.0% PIPE 66' #3 of 24" HDPE ADS N12 ® 0.0% NCDOT STD 840.14 PRECAST DROP INLET C13#4 (24"x36" REINFORCED CONCRETE) RIM:642.90 INV IN:638.95' 24" (CB#3) INV OUT:638.95' 24" (CB 5) NCDOT STID 840.14 PRECAST DROP INLET CB #2 (24"x36" REINFORCED CONCRETE) RIM:642.90' INV IN:638.95' 24" (CB#1) INV OUT:638.95' 24" (CB#3) 6' SQ PRECAST CONCRETE DROP INLET C13#5 RIM: 642.90' SUMP = 637.41' INV IN:638.95' 24" (CB#6) INV IN:638.95' 24" (CB#4) INV OUT:640.25' 24" (FES) NCDOT STD 840.14 PRECAST DROP INLET C13#3 (24"x36" REINFORCED CONCRETE) RIM:642.90' INV IN:638.95' 24" (CB #2) INV OUT:638.95' 24" (CB#4) 620 0+25 utuu PERMIT REVIEW ISSUE ituu I DU ctuu PROFILE SCALE: HORIZ: 1 " = 20' VERT: 1 " = 10' ctz)u atuu atz)v It uu 650 640 630 4+25 20 ( IN FEET) 1 INCH = 30 FT. mo .2 mN U p C U � N a 7 0 U O C J N aZ boa 111 p N 7 LU Z cc 3 3-' to E c ZLU Z LU a2Y_ U cwc G N a a o m' O N 82 ti U C pU 0 a N j LU mL z U Q£ 3 Q w Z U LU H z 0-1 O w d U O � w O W II Wo w oCO oU) Q _ N N o O w N O � LP) 00 w w z U) 0 z o _o 5 m LU w w LU w af or- 1 0 0 pW O N 't Co Y0 rn =O�Ow" U 00 CDO _ofo ■�� � �z4 02i = 0 z L0 N to w z O z O z Q z J LLJ LL �z rrwnn0 V �O z� 0o U Q 0 z 0 Q 0 Dz _J W > Z 3: a p � SHEET C400 PAGE 12 of 18 Jun 08, 2022 - 8:54am R:\FPS\PROJECTS\Union-Power\Willoughby Substation\06-DWG\Chris\Wllloughby.dwg