Loading...
HomeMy WebLinkAboutSW3220202_Stormwater Report_20221101Storm Water Managemen Erosion and Sedimentatio Waxhaw Town Campus Kensington Drive & Waxhaw-Marvin Road Waxhaw, North Carolina PREPARED FOR: ADW Architects January 26, 2022 Revised: June 9, 2022 �; benesch �i l Corporate Certifications: NC P.E.: F-1320 NC L.A.: C-454 OF CONTENTS SECTION 1 Narrative Project Description Erosion and Sedimentation Control Plan Post Construction Storm Water Management Topography/Drainage Soils Model Parameters/Analysis/Detention Summary SECTION 2 Erosion and Sedimentation Control Calculations Sediment Basin Worksheets* Swale Liner Calculations* Rip -Rap Outlet Sizing Worksheet* SECTION 3 Storm Drainage Calculations Waxhaw IDF Table Closed Conduit Calculations - Conduit Table* Swale Capacity Calculations* SECTION 4 Water Quality / Detention Design Calculations Sand Filter Sizing Worksheet* Waxhaw Precipitation Depth Table Detention Routing Report* SECTION 5 Appendix USGS Topographic Map Union County Hydrologic Soils Map Geotechnical Report & SHWT Determination Preliminary Jurisdictional Determination Pre -Development Drainage Area Map DA-1* Post -Development Drainage Area Map DA-2* Component Drainage Area Map DA-3* *Indicates revision benesch Waxhaw Town Campus I Storm Water Management Report / Erosion and Sedimentation Control Plan NARRATIVE PROJECT DESCRIPTION This site development is for the proposed Town Hall and Parks and Recreation center for the Town of Waxhaw. The development is on a predominantly undisturbed parcel with only a single older residence that will be demolished. The site located Southwest of the intersection of Kensington Drive and Waxhaw Marvin Road of Parcel No. 06192003A approximately 2.1 miles Northwest of Waxhaw, NC. This property will be adjacent to both roads and current property of the Union County Board of Education. This site is 18.406 acres and owned by the Town of Waxhaw per deed book 7686 and page 0838. The Town of Waxhaw is financially responsible, and the total denuded area is 9.78 Acres. There are two proposed buildings with parking and necessary infrastructure. The Town Hall is a single story with 13,360 SF building. The Parks and Recreation Building will be a single story with 17,000 SF building. There is also a planned location for an 8,000 SF future building and 2 building additions that total 2,600 SF. TOPOGRAPHY AND DRAINAGE The site naturally drains from the roadways towards a stream that begins on site. The stream directly connects to Twelvemile Creek which is also the Southern property line. Twelvemile Creek eventually connects to the Catawba River. An existing portion of a ditch that connects to this stream will be by-passed on site to connect at the beginning of the stream. The proposed sand filter BMP will eventually drain into the Twelvemile creek. Twelvemile creek is classified as WS-IV, use classification C. There is no impact made onsite to the Twelvemile creek and its buffer. A small portion of the sand filter and its outlet is built with in the FEMA 100 flood plain line. The 0.2%, 500 Year Flood plain has a roughly 50% of the BMP with that defined area. The remainder of the project is outside of those boundaries. EROSION AND SEDIMENTATION CONTROL PLAN Erosion and sedimentation will primarily be handled through a combination of two sediment basins, excavated inlet protection, and silt fence with stone openings in the initial stages of construction, and sediment basins, excavated inlet protection, and inlet protection once the storm drainage system has been installed and as the site is brought to final grade. Smaller areas that cannot be diverted to the basin will be captured by silt fence with stone openings. As the storm drainage is installed, temporary inlet protection and silt sacks will be installed. Matting will be installed on all slopes 3:1 or greater. Peak flows were calculated using the Rational Method (Monroe IDF curve for 10-year frequency). Design of the erosion control measures was completed using Benesch's spreadsheets based on methods outlined in the NCDEQ Erosion and Sedimentation Control Design Manual. One benesch Waxhaw Town Campus I Storm Water Management Report / Erosion and Sedimentation Control Plan of these Sediment basins will be converted to a sand filter BMP and will be the only measure required to meet the permanent post construction site developed for stormwater quality. SOILS The soil survey of Union County indicates that soils on the site are as follows: Tatum gravelly Silty Clay Loam, 2-8% slopes eroded (TbB2) • Secrest-Cid complex, 0-3% slopes (ScA) POST -CONSTRUCTION STORM WATER MANAGEMENT Proposed storm water management for this project will be accomplished by utilizing a combination of Stormwater Control Measures (SCMs) to provide runoff quantity control (peak flow) and water quality treatment (pollutant removal). One permanent primary SCM is proposed for this project, which will be a sand filter. The sand filter will function for water quality, and peak flow attenuation. The majority of the site's proposed impervious areas will be physically treated and detained by the proposed primary SCM in accordance with the NCDEQ Stormwater Design Manual. There is a small amount of impervious area at the connecting drive to Waxhaw Marvin Road that is unable to be captured by the proposed SCM due to grade constraints. The proposed SCM has been sized for all future impervious areas shown on the plans. Refer to the drainage area maps in the Appendix for more information. MODEL PARAMETERS / ANALYSIS / DETENTION SUMMARY Capacity analysis for proposed on -site storm water conveyance system design was done using the Rational Method (10-year frequency). Model analysis and results for the closed conduit storm conveyance system were generated by Bentley's StormCAD. The time of concentration values varied and were determined by either the SCS Method, FAA Method, or user input. The water quality SCM was designed to comply with the NCDEQ Stormwater Design Manual. For purposes of detention calculations, the area of the SCM was counted as impervious. Detention routing calculations were completed using Bentley's PondPack. Drainage areas for the model were named as DA-PRE, and DA-POST for the pre and post -developed conditions. The pre - developed condition was assumed to be a combination of brush and open space in fair condition. For simplicity of comparison, the pre and post drainage areas have been matched. Events modeled for peak flow attenuation were the 1-year, 2-year, and 10-year, 24-hour storms. The 50 and 100-year, 24-hour storms were modeled to show that the SCM could route it safely. Refer to Section 4 of this report for full routing calculations. benesch Waxhaw Town Campus I Storm Water Management Report / Erosion and Sedimentation Control Plan Total Pre Event SCM IN (efs) SCM OUT (efs) SCM Stage Flow efs 1-yr, 24- hr 2.69 19.72 1.96 509.60 2-yr, 24- hr 5.10 25.99 4.131 510.06 10-yr,24- hr 13.24 43.12 12.36 511.26 50-yr, 24- hr 23.94 62.34 47.43 511.87 100-yr, 24-hr 29.43 71.38 59.37 512.01 *Top of SCM is 513.00 benesch Waxhaw Town Campus I Storm Water Management Report / Erosion and Sedimentation Control Plan Section 2 Erosion and Sedimentation Control Calculations SKIMMER BASIN W/ PERM. OUTLET STRUCTURE #1 POST PROJECT NAME: Waxhaw Town hall BY: MRW COUNTY: Union DATE: 10/5/2021 PROJECT NUMBER: 17000405 REV: 3.30.22 THE SEDIMENT BASIN IS DESIGNED IN ACCORDANCE WITH THE N.C. SEDIMENT AND EROSION CONTROL MANUAL, SECTION 6.64 AND SECTION 8.07. DRAINAGE AREA= 7.13 ac. DENUDED AREA- 7.13 ac. PEAK FLOW: Q2 = CCI2A WHERE: I2= 5.93 in/hr (2yr) 5 min. ToC Q2 = 21.14 cfs Ito= 7.58 In/hr (10yr) I25= 8.39 in/hr (25yr) Qio= CclioA A= 0.00 ac. Woods C= 0.25 Q10= 27.02 cfs A= 0.00 ac. Grass C= 0.30 A= 7.13 ac. BARE SOIL C= 0.50 Q25= CclioA A= 0.00 ac. Offsite (farmland) C= 0.30 Q25 = 29.91 cfs A= 0.00 ac. Buildg/pavt C= 0.95 A= 7.13 ac. TOTAL DRAINAGE AREA Cc= 0.50 COMPOSITE C BASIN STAGE/STORAGE: DWG. SCALE:1"= 1 (NOTE MAX FILLHEIGHT=5') ELEV. PLANIMETER READING AREA (sf) AVG. AREA (sf) VOL (cf) ACCUM. VOL (cf.) 507 0 0 0 0 0 508 9832 9832 4916 4916 4916 509 10987 10987 10410 10410 15326 510 12200 12200 11594 11594 26919 511 13468 13468 12834 12834 39753 512 14793 14793 14131 14131 53884 513 16175 16175 15484 15484 69368 REQUIRED BASIN VOL. (1800xDA) = 12,834 cf DETERMINE ELEV. OF SEDIMENT STORAGE ELEV. VOLUME (cf) BASED ON REQUIRED BASIN VOLUME: 508 4916 X 12834 X= 508.76 509 15325.5 H= 1.76 REQUIRED SURFACE AREA (435xQlo) = 11,755 Sq.Ft. DETERMINE ELEV. OF SEDIMENT STORAGE: ELEV. AREA (sf) BASED ON REQUIRED SURFACE AREA: 509 10987 X 11755 X= 509.63 510 12200 H= 2.63 H= 2.63 DESIGN ELEVATION OF SEDIMENT STORAGE: USE H= 3.00 RISER DESIGN: DETERMINE HEAD ON RISER FOR VARIOUS DRAINAGE STRUCTURES Hr=[Qp / Cw x L]2(3 WHERE: Qp= 27.02 cfs Cw= 3.3 WEIR COEFF. RISER DIM. (L x W) HEAD (Hr) L= WEIR LENGTH (INTERIOR) 4 ft. 0.64 ft. 5 ft. 0.55 ft. 6 ft. 0.49 ft. 7 ft. 0.44 ft. NOTE: MAX. HEAD ALLOWED =1. 1 USE 5 ft. SQ. RISER, Hr= 0.55 ft. Qr= 27.02 cfs SKIMMER BASIN W/ PERM. OUTLET STRUCTURE #1 POST PROJECT NAME: Waxhaw Town hall COUNTY: Union PROJECT NUMBER: 17000405 BY: MRW DATE: 10/5/2021 REV: 3.30.22 BARREL DESIGN: DETERMINE THE REQUIRED BARREL SIZE Q = Cd x A x (2GHb) 0.5 WHERE: Cd= 0.59 A= PIPE AREA (sf.) Hb= "Z" + "Hr"-DIA./2 BARREL DIA. HEAD (Hb) DISCHARGE 15 in. 2.93 ft. 9.94 cfs 18 in. 2.80 ft. 14.00 cfs 24 in. 2.55 ft. 23.76 cfs 30 in. 2.30 ft. 35.26 cfs 36 in. 2.05 ft. 47.93 cfs 42 in. 1.80 ft. 61.14 cfs 48 in. 1.55 ft. 74.11 cfs USE 36 in. BARREL, Qb= 47.93 cfs 1 BARREL(S) SKIMMER SIZING: Required Volume= 26,919 cf Min. Dewatering Time (days)= 3 days Optimal Skimmer Size= 3" Orifice Area Required (sq. in.)= 6.49 sq. in. Skimmer Orifice Size (RADIUS)= 1.4 " Skimmer Orifice Size (DIAMETER)= 2.9 " Provided Volume= 26919 cf Dewatering Time (days)= 2.8 days (5 days max.; 3 days optimal) From Faircloth Skimmer Design Manual 11/07 Skimmer Size (inches) Cap./Day (cf) Head (ft) 1.5 1,728 0.125 2.0 3,283 0.167 2.5 6,234 0.208 3.0 9,774 0.25 4.0 20,109 0.333 5.0 32,832 4" head 0.333 6.0 51,840 5'head 0.417 8.0 97,978 6" head 1 0.5 Skimmer Orifice Size (in) 1.5 960 cf 2.0 1,123 cf 2.5 1,270 cf 3.0 1,382 cf 4.0 1,601 cf 5.0 1,642 cf 6.0 1,814 cf 8.0 1,987 cf SKIMMER BASIN W/ PERM. OUTLET STRUCTURE #1 POST PROJECT NAME: Waxhaw Town hall BY: MRW COUNTY: Union DATE: 10/5/2021 PROJECT NUMBER: 17000405 REV: 3.30.22 Qjo= CcIjoA WHERE: Cc= 0.50 COMPOSITE C Q10= 27.02 cfs 110= 7.58 in/hr (10 YR STORM) A= 7.13 ac. Qp= FLOW THRU THE PRINCIPLE STRUCTURE RISER CAPACITY= 27.02 cfs BARREL CAP.= 47.93 cfs RISER CONTROLS Qp= 27.02 cfs FLOW TO BE DISCHARGED BY EMERGENCY SPILLWAY Qe= 0.00 cfs SPILLWAY NOT REQUIRED DETERMINE LENGTH OF SPILLWAY AND DEPTH OF FLOW OVER SPILLWAY He=[Qe/ (C x L)]213 WHERE: C= 2.7 LENGTH HEAD (He) 10 ft. 0.00 ft. 15 ft. 0.00 ft. 20 ft. 0.00 ft. 25 ft. 0.00 ft. 30 ft. 0.00 ft. USE 10 ft. SPILLWAY, He= 0.00 ft. TEMPORARY SEDIMENT BASIN #1 POST SUMMARY TOP OF DAM EL. 513.00 S RISER DIA. (IN.) BARREL DIA.(IN.) BARREL SLOPE (%) I (in.) S (ft.) Z (ft,) Y (ft.) H (ft.) L (ft.) STORAGE REQ'D (cf.) 5 36 0.73 1 12 8.00 6.00 3.55 3.00 10 12834 SKIMMER BASIN W/ PERM. OUTLET STRUCTURE #1 POST PROJECT NAME: Waxhaw Town hall BY: MRW COUNTY: Union DATE: 10/5/2021 PROJECT NUMBER: 17000405 REV: 3.30.22 SHEET NOT NEEDED- DISCARD EMERGENCY SPILLWAY: DESIGN FLOW: Qe=Q,O-Qp Q10= CcI10A WHERE: Cc= 0.50 COMPOSITE C Q10= 27.02 cfs 110= 7.58 in/hr (10 YR STORM) A= 7.13 ac. Qp= FLOW THRU THE PRINCIPLE STRUCTURE RISER CAPACITY= 27.02 cfs BARREL CAP.= 47.93 cfs RISER CONTROLS Qp= 27.02 cfs FLOW TO BE DISCHARGED BY EMERGENCY SPILLWAY Qe= 0.00 cfs SPILLWAY NOT REQUIRED TEMPORARY SEDIMENT BASIN #1 POST SUMMARY TOP OF DAM EL. 513.00 RISER DIA. (IN.) BARREL DIA.(IN.) BARREL SLOPE (%) I (in.) S (ft.) Z A Y (ft.) H (ft.) L (ft.) STORAGE REQ'D (cf.) 5 36 2.45 12 8.00 6.00 3.55 3.00 N W 12834 SKIMMER BASIN W/ PERM. OUTLET STRUCTURE #1 POST PROJECT NAME: Waxhaw Town hall BY: MRW COUNTY: Union DATE: 10/5/2021 PROJECT NUMBER: 17000405 REV: 3.30.22 Detail Information: 6" min Freeboard Spill.Eev (ft.) (ft.) 0.50 1.95 DATA BLOCK (For Plans): BASIN # DRAINAGE AREA (AC) DENUDED AREA (AC) Qio (CFS) BASIN VOLUME BASIN SURFACE AREA REQ'D (CF) PROV. (CF) REQ'D (SF) PROV. (SF) #1 POST 7.13 7.13 27.02 12834 26919 11755 12200 CLEANOUT H Z L T W SKIMMER SKIMMER DEPTH (H/2) PIPE DIAM ORR. DIAM (FT) (FT) (FT) (FT) (FT) (FT) (IN) (IN) 1.50 3.00 6 NA 3.00 NA 3.0 2.9 TEMPORARY SKIMMER BASIN 2 PROJECT NAME: WAXHAW TOWN HALL BY: Benesch PROJECT NUMBER: 17000405 DATE: 12.10.21 REV 4.1.22 THE SKIMMER SEDIMENT BASIN IS DESIGNED IN ACCORDANCE WITH THE NORTH CAROLINA SEDIMENT AND EROSION CONTROL MANUAL, SECTION 6.64 Pre Post DISTURBED AREA= 2.28 ac. NA DRAINAGE AREA= 2.28 ac. NA USED: 2.28 ac. REQ'D BASIN VOL.= DISTURBED AREA X 1800 cf/ac = 4,104 cf ROCIN CTOf,F/ CTnROf,F- rNNf, gr.Al F- 9"= 9 rninTF nnvx ru i WP-WT-F9 ELEV. PLANIMETER READING AREA s AVG. AREA s VOL c ACCUM. VOL cf. 512 1444 1444 0 0 0 513 1796 1796 1620 1620 1620 514 2171 2171 1984 1984 3604 515 2571 2571 2371 2371 5975 516 2996 2996 2784 2784 8758 517 3445 3445 3221 3221 11979 DETERMINE ELEV. OF SEDIMENT STORAGE PEAK FLOW: Qp = CC12A Qp = 7.65 cfs ELEV. VOLUME (cf) 514 3604 X 4104 515 5975 WHERE: 110= 6.71 in/hr (10 YEAR STORM) A= 0.00 ac. GRASS A= 2.28 ac. BARE SOIL A= 0.00 ac. WOODS A= 0.00 ac. BLDG/PVM'T A= 2.28 ac. TOTAL DETERMINE REQ'D SURFACE AREA: Qjo = Ccl,oA= 7.65 cfs AR= 325 sf/cfs x Q 1 o AR= 2,486 sf DETERMINE SURFACE AREA ELEV. OF THE 10 YR RAINFALL AREA (sf) 512 1444 X 2486 513 1796 DEPTH OF SEDIMENT STORAGE (H) BASED ON VOL. REQUIREMENT = 2.21 ft DEPTH OF SEDIMENT STORAGE (H) BASED ON AREA REQUIREMENT= 2.96 ft USE H= 3.00 SKIMMER SIZING: Required Volume= 4,104 cf Min. Dewatering Time (days)= 2.0 days Optimal Skimmer Size= 2 " Orifice Area Required (sq. in.)= 1.8 sq. in. Skimmer Orifice Size (RADIUS)= 0.8 Skimmer Orifice Size (DIAMETER)= 1.5 Provided Volume= 5,975 cf Dewatering Time (days)= 3 days (5 days max., 3 days optimal) From Faircloth Skimmer Design Manual 11/07 Skimmer Size (inches) ;ap./Day (cf) Head (ft) 1.5 1,728 0.125 2.0 3,283 0.167 2.5 6,234 0.208 3.0 9,774 0.25 4.0 20,109 0.333 5.0 32,832 4" head 0.333 6.0 51,840 5" head 0.417 8.0 97,978 6" head 0.5 Skimmer Orifice Size (in) 1.5 960 cf 2.0 1,123 cf 2.5 1,270 cf 3.0 1,382 cf 4.0 1,601 cf 5.0 1,642 cf 6.0 1,814 cf 8.0 1,987 cf X= 514.21 H= 2.21 ft 8 min TC C= 0.30 C= 0.50 C= 0.25 C= 0.95 Cc= 0.50 X= 514.96 H= 2.96 ft Page 1 of 2 EMERGENCY SPILLWAY: DESIGN FLOW: QQ Qio WHERE Qio= 7.65 cfs Qe 7.65 cfs DETERMINE LENGTH OF SPILLWAY AND DEPTH OF FLOW OVER SPILLWAY HQ [QQ/ (C x L)I "' WHERE: C= 2.7 LENGTH HEAD (He) loft 0.43 ft 15 ft 0.33 ft 20 ft 0.27 ft 25 ft 0.23 ft 30 ft 0.21 ft USE loft SPILLWAY, HQ 0.43 ft TEMPORARY SKIMMER BASIN 2 SUMMARY plan Vi¢w wief�°n9`w .Pis' L rcnaf burinsmfacem Baffles tep of rrcipM sg-llwcy alevellen yy_5' MIN. I' F�aboor•d Emba� Influx Baffles maw, sM1ticfure / 1 � _ �T-,.S IN 'n9 6" min, in H=2 Iwa E ancy p llway Sadimant Cross Section PMI—SEEP . arvga mna View wlf r.1r-TvffNrsrrj-pwnr. pis 6" min Freeboard SpiII.Eev ft. ft. 0.50 1.07 nATO RI nr'.V /far alone\ BASIN DRAINAGE AREA AC DENUDED AREA AC) Q10 (CFS) BASIN VOLUME BASIN SURFACE AREA REQ'D (CF PROV. CF REQ'D SF PROV. SF 2 2.28 ac. 2.28 ac. 1 7.65 cfs 4104 5975 2486 2571 CLEANOUT H Z L T W SKIMMER SKIMMER DEPTH (H/2) PIPE DIAM ORIFICE DIA. FT FT FT FT FT FT IN IN 1.50 3.00 5.00 10 2.00 5 2.0 1.5 Page 2 of 2 12/16/21, 8:58 AM 6 NORTH AMERICAN GREEN CHANNEL ANALYSIS > > > South-B Name DI-4 to DI 2A Discharge 3.09 Channel Slope 0.0242 Channel Bottom Width 2 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class D 2-6 in Vegetation Type Sod Former Vegetation Density Excellent > 95% Soil Type Clay Loam (CL) S150 ECMDS 7.0 North American Green 5401 St. Wendel -Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern S150 Straight 3.09 cfs 2.3 ft/s 0.41 ft 0.044 1.8 Ibs/ft2 0.63 Ibs/ft2 2.87 STABLE D Unvegetated Underlying Straight 3.09 cfs 2.3 ft/s 0.41 ft 0.044 1.96 Ibs/ft2 0.44 Ibs/ft2 4.46 STABLE D Substrate Unreinforced Vegetation Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated Safety Remarks Staple Depth Shear Stress Shear Stress Factor Pattern lnreinforced Straight 3.09 cfs 2.32 ft/s 0.41 ft 0.044 4 Ibs/ft2 0.62 Ibs/ft2 6.44 STABLE Vegetation Underlying Straight 3.09 cfs 2.32 ft/s 0.41 ft 0.044 4 Ibs/ft2 0.44 Ibs/ft2 9.16 STABLE Substrate https://ecmds.com/project/l 50547/channel-analysis/215605/show 1 /1 12/16/21, 8:52 AM 6 NORTH AMERICAN GREEN CHANNEL ANALYSIS > > > South -A Name DI 5 - DI 4 Discharge 3.36 Channel Slope 0.006 Channel Bottom Width 2 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class D 2-6 in Vegetation Type Sod Former Vegetation Density Excellent > 95% Soil Type Clay Loam (CL) S150 ECMDS 7.0 North American Green 5401 St. Wendel -Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern S150 Straight 3.36 cfs 1.16 ft/s 0.7 ft 0.058 1.8 Ibs/ft2 0.26 Ibs/ft2 6.83 STABLE D Unvegetated Underlying Straight 3.36 cfs 1.16 ft/s 0.7 ft 0.058 1.96 Ibs/ft2 0.17 Ibs/ft2 11.68 STABLE D Substrate Unreinforced Vegetation Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated Safety Remarks Staple Depth Shear Stress Shear Stress Factor Pattern lnreinforced Straight 3.36 cfs 1.09 ft/s 0.73 ft 0.063 4 Ibs/ft2 0.27 Ibs/ft2 14.6 STABLE Vegetation Underlying Straight 3.36 cfs 1.09 ft/s 0.73 ft 0.063 4 Ibs/ft2 0.17 Ibs/ft2 23.07 STABLE Substrate https://ecmds.com/project/l 50547/channel-analysis/215604/show 1 /1 12/15/21, 6:05 PM NORTH AMERICAN GREEN CHANNEL ANALYSIS > > > East Name East Discharge 2.79 Channel Slope 0.0596 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class D 2-6 in Vegetation Type Sod Former Vegetation Density Excellent > 95% Soil Type Clay Loam (CL) SC150 ECMDS 7.0 North American Green 5401 St. Wendel -Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern SC150 Straight 2.79 cfs 3.79 ft/s 0.49 ft 0.036 2 Ibs/ft2 1.84 Ibs/ft2 1.09 STABLE D Unvegetated Underlying Straight 2.79 cfs 3.79 ft/s 0.49 ft 0.036 2.18 Ibs/ft2 0.87 Ibs/ft2 2.5 STABLE D Substrate Unreinforced Vegetation Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated Safety Remarks Staple Depth Shear Stress Shear Stress Factor Pattern lnreinforced Straight 2.79 cfs 4.04 ft/s 0.48 ft 0.033 4 Ibs/ft2 1.78 Ibs/ft2 2.24 STABLE Vegetation Underlying Straight 2.79 cfs 4.04 ft/s 0.48 ft 0.033 4 Ibs/ft2 0.85 Ibs/ft2 4.73 STABLE Substrate https://ecmds.com/project/l 50547/channel-analysis/215596/show 1 /1 12/15/21, 5:19 PM NORTH AMERICAN GREEN CHANNEL ANALYSIS > > > North Name North Discharge 3.35 Channel Slope 0.0933 Channel Bottom Width 3 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class D 2-6 in Vegetation Type Sod Former Vegetation Density Excellent > 95% Soil Type Clay Loam (CL) S150 ECMDS 7.0 North American Green 5401 St. Wendel -Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern 5150 Straight 3.35 cfs 4.22 ft/s 0.22 ft 0.034 1.8 Ibs/ft2 1.27 Ibs/ft2 1.42 STABLE D Unvegetated Underlying Straight 3.35 cfs 4.22 ft/s 0.22 ft 0.034 1.96 Ibs/ft2 1.06 Ibs/ft2 1.86 STABLE D Substrate Unreinforced Vegetation Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated Safety Remarks Staple Depth Shear Stress Shear Stress Factor Pattern lnreinforced Straight 3.35 cfs 4.51 ft/s 0.21 ft 0.031 4 Ibs/ft2 1.2 Ibs/ft2 3.35 STABLE Vegetation Underlying Straight 3.35 cfs 4.51 ft/s 0.21 ft 0.031 4 Ibs/ft2 1.01 Ibs/ft2 3.98 STABLE Substrate https://ecmds.com/project/l 50547/channel-analysis/215592/show 1 /1 RIP RAP OUTLET PROTECTION PROJECT NAME: WAXHAW TOWN HALL BY: MRW PROJECT NUMBER: 17000405 DATE: 12.10.21 REV: 4.6.22 DESIGN OF RIP RAP OUTLET PROTECTION IN ACCORDANCE WITH THE N.C. SEDIMENT & EROSION CONTROL MANUAL. ASSUME TAILWATER DEPTH < 0.5 Do RIP RAP GRADATION PER NCDOT SPECIFICATIONS RIP RAP CLASS MINIMUM MIDRANGE MAXIMUM (IN) (IN) (IN) A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 FES 1 DISCHARGE (Q)= PIPE DIA. (Do)= LENGTH (La)= WIDTH W=Do + La= WIDTH Wl= 3Do = d50= 27.65 cfs 3.00 ft. FROM FIGURE 8.06A 20.0 ft. 3.00 + 20.0 = 23.00 ft. 9.00 = 9.00 ft. 0.65 ft. = 7.80 in USE CLASS ©RIP RAP d50= 8 in. dMAx= 12 in. APRON THICKNESS= 1.5 x dMAx APRON THICKNESS= 18.0 in. MIN. HEIGHT OF RIP RAP @ PIPE OPENING (H) = 2/3 x PIPE DIA.= 24 in SIDE SLOPE OF RIP RAP APRON (M)= 2 H:1V FES 28 DISCHARGE (Q)= 14.03 cfs PIPE DIA. (Do)= 3.00 ft. FROM FIGURE 8.06A LENGTH (La)= 20.0 ft. WIDTH W=Do + La= 3.00 + 20.0 = 23.00 ft. WIDTH Wl= 3Do = 9.00 = 9.00 ft. d50= 0.65 ft. = 7.80 in USE CLASS ©RIP RAP d50= 8 in. dMAx= 12 in. APRON THICKNESS= 1.5 x dMAx APRON THICKNESS= 18.0 in. MIN. HEIGHT OF RIP RAP @ PIPE OPENING (H) = 2/3 x PIPE DIA.= 24 in SIDE SLOPE OF RIP RAP APRON (M)= 2 H:1V FES 29 DISCHARGE (Q)= 54.19 cfs PIPE DIA. (Do)= 3.00 ft. FROM FIGURE 8.06A LENGTH (La)= 20.0 ft. WIDTH W=Do + La= 3.00 + 20.0 = 23.00 ft. WIDTH Wl= 3Do = 9.00 = 9.00 ft. d50= 0.65 ft. = 7.80 in USE CLASS ©RIP RAP d50= 8 in. dMAx= 12 in. APRON THICKNESS= 1.5 x dMAx APRON THICKNESS= 18.0 in. MIN. HEIGHT OF RIP RAP @ PIPE OPENING (H) = 2/3 x PIPE DIA.= 24 in SIDE SLOPE OF RIP RAP APRON (M)= 2 H:1V FES 100 USE CLASS ©RIP RAP DISCHARGE (Q)= 5.00 cfs d50= 8 in. PIPE DIA. (Do)= 1.50 ft. dMAx= 12 in. FROM FIGURE 8.06A riprapoutlet.xls Page 1 RIP RAP OUTLET PROTECTION PROJECT NAME: WAXHAW TOWN HALL BY: MRW PROJECT NUMBER: 17000405 DATE: 12.10.21 REV: 4.6.22 LENGTH (La)= 10.0 ft. APRON THICKNESS= 1.5 x dMAx WIDTH W=Do + La= 1.50 + 10.0 = 11.50 ft. APRON THICKNESS= 18.0 in. WIDTH Wl= 3Do = 4.50 = 4.50 ft. d50= 0.40 ft. = 4.80 in MIN. HEIGHT OF RIP RAP @ PIPE OPENING (H) = 2/3 x PIPE DIA.= 12 in SIDE SLOPE OF RIP RAP APRON (M)= 2 H:1V riprapoutlet.xls Page 2 Section 3 Storm Drainage Calculations NOAA Atlas 14, Volume 2, Version 3 Location name: Waxhaw, North Carolina, USA* Mt Latitude: 34.9456°, Longitude:-80.7731 Elevation: 517.32 ft** *source: ESRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hourp Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 5-min 5.03 (4.63-5.46) 5.93 (5.45-6.46) 11 6.88 (6.31-7.49) 11 7.58 (6.95-8.23) 11 8.39 (7.66-9.10) 8.95 1 (8.12-9.70) 9.46 1 (8.54-10.2) 9.92 1 (8.92-10.8) 10.5 1 (9.31-11.4) 10.8 1 (9.58-11.8) 4.01 4.74 5.51 6.06 6.68 7.12 7.52 7.87 8.27 8.53 10-min (3.70-4.36) 1 (5.56-6.58) 11 (6.10-7.25) 1 (6.47-7.73) 1 (6.79-8.15) 1 (7.07-8.53) 1 (7.37-8.99) 1 (7.54-9.29) 3.34 3.97 4.64 5.11 5.64 6.01 6.34 6.62 6.94 7.14 15-min (3.08-3.63) 11 (3.65-4.33) 11 (4.26-5.06) 1 (5.15-6.12) 1 (5.46-6.52) 1 (5.72-6.86) 1 (5.95-7.18) 1 (6.18-7.54) 1 (6.31-7.78) 2.29 2.74 3.30 3.70 4.18 4.53 4.85 5.15 5.52 5.78 30-min (2.11-2.49) (2.52-2.99) (3.03-3.59) 11 (3.39-4.02) 11 (3.82-4.54) 1 (4.11-4.91) 1 (4.38-5.26) 1 (4.63-5.59) 1 (4.92-6.00) 1 (5.11-6.30) 1.43 1.72 2.12 2.41 2.78 3.07 3.34 3.61 3.96 4.22 60-min (1.32-1.55) (1.58-1.88) (1.94-2.30) (2.21-2.62) (2.54-3.02) 1 (2.79-3.33) 1 (3.02-3.62) 1 (3.25-3.92) 1 (3.53-4.31) 1 (3.73-4.60) 0.826 0.998 1.24 1.42 1.66 1.84 2.02 2.21 2.45 2.63 2-hr (0.756-0.904) (0.914-1.09) 1 1 (1.50-1.81) (1.66-2.00) 1 (1.82-2.20) 1 (1.97-2.40) 1 (2.16-2.67) 1 (2.31-2.88) 0.585 0.705 0.878 1.01 1.20 1.35 1.49 1.65 1.86 2.03 3-hr (0.534-0.643) (0.645-0.776) (0.802-0.966) (0.923-1.11) 11 (1.08-1.31) 1 (1.21-1.47) 1 (1.34-1.63) 1 (1.46-1.80) 1 (1.63-2.03) 1 (1.76-2.22) 0.352 0.424 0.529 0.612 0.726 0.817 F 0.911 1.01 1.14 1.25 6-hr (0.322-0.387) (0.389-0.466) (0.484-0.581) (0.558-0.670) (0.658-0.792) (0.736-0.890) (0.814-0.991) (0.893-1.10) (0.999-1.24) (1.08-1.36) 0.207 0.249 0.312 0.363 0.434 0.491 0.551 0.615 0.704 0.777 12-hr (0.190-0.227) (0.229-0.274) (0.286-0.343) (0.331-0.398) (0.393-0.474) (0.442-0.536) (0.491-0.600) (0.541-0.668) (0.610-0.765) (0.664-0.845) 0.123 0.148 0.186 0.216 0.258 0.292 0.327 0.364 0.416 0.458 24-hr (0.113-0.133) (0.137-0.160) (0.172-0.201) (0.199-0.234) (0.237-0.279) (0.267-0.316) (0.298-0.354) (0.331-0.395) (0.375-0.451) (0.411-0.498) 0.072 0.087 0.108 0.126 0.149 0.168 0.188 0.209 0.238 0.261 2-day (0.067-0.078) (0.081-0.094) (0.100-0.118) (0.116-0.136) (0.137-0.162) (0.154-0.183) (0.172-0.204) (0.190-0.227) (0.215-0.259) (0.234-0.286) 0.051 0.061 0.076 0.088 0.104 0.117 0.131 0.145 0.165 0.181 3-day (0.047-0.055) (0.057-0.066) (0.071-0.083) (0.081-0.095) (0.096-0.113) (0.108-0.127) (0.120-0.142) (0.132-0.158) (0.149-0.180) (0.163-0.198) 0.041 0.049 0.060 0.069 0.082 0.092 0.102 0.113 0.129 0.141 4-day (0.038-0.044) (0.045-0.053) (0.056-0.065) (0.064-0.075) (0.075-0.088) (0.084-0.099) (0.094-0.111) (0.103-0.123) (0.117-0.140) (0.128-0.154) 0.027 0.032 0.039 0.045 0.052 0.059 0.065 0.072 0.081 0.089 7-day (0.025-0.029) (0.030-0.034) (0.036-0.042) (0.042-0.048) (0.049-0.056) (0.054-0.063) (0.060-0.070) (0.066-0.077) (0.074-0.088) (0.081-0.096) 0.021 0.026 0.031 0.035 0.040 0.045 0.049 0.054 0.060 0.066 10-day (0.020-0.023) (0.024-0.027) (0.029-0.033) (0.033-0.037) (0.038-0.043) (0.042-0.048) (0.046-0.053) (0.050-0.058) (0.055-0.065) (0.060-0.071) 0.014 0.017 0.020 0.022 0.026 0.028 0.031 0.034 0.037 0.040 20-day (0.013-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.026-0.030) (0.029-0.033) (0.031-0.036) (0.034-0.040) (0.037-0.043) 0.012 0.014 0.016 0.018 0.020 0.022 0.024 0.025 0.028 0.030 30-day (0.011-0.012) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.030) (0.027-0.032) 0.010 0.012 0.013 0.014 0.016 0.017 0.019 0.020 0.021 0.023 45-day (0.009-0.010) (0.011-0.012) (0.013-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.018-0.020) (0.019-0.021) (0.020-0.023) (0.021-0.024) 0.009 0.010 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.019 60-day (0.008-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.015) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PD5-based intensity -duration -frequency (IDF) curves Latitude: 34.9456 Longitude:-80.7738' 1161616I6161 10.000 C 41 1.000 C GJ a-� C � 0.100 L Ld a 0.010 0.001 t t Jr t L N N O r{4 N rq rq rq N rq N Alb A q r, O O O Ln O ,1 r-I rn w � N rn v Ln Duration 100.000 10.000 L k 1.000 w c e 0.100 4.1 49 0.010 0.001 i 1 1 1 1 1 1 1 1 1 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created {GMTY Thu Dec 2 19:19:43 2021 Back to Top Maps & aerials Small scale terrain Average recurrence interval {years} — 1 2 — 5 — 10 — 25 50 100 200 500 1000 Duration — 6-min — 2-day — 10-min — 3-day 15-min — 4-day — 30--min — 7-day — 66-min — I"ay — 2fir — 20-day — 3-trr — 30-day — Bfir — 45-day — 12-hr — 60-eay 24-hr •,5 Large scale terrain Inson City :r-!�' .ram *e{: e- . V q Winston-Salem I � • [�uii7am y' Greensboro • • Ashe)iile NORTH C A R O L I N A +harlotte Fayette'rille , •Greenville 7 SOUTH CAROLINA + } s 100km Columbia 60mi f n� Large scale map J VS�inston-Salern Large scale aerial Greensboro _•�D ort h rolina Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions noaa.gov Disclaimer FlexTable: Conduit Table Label Start Node Invert (Start) (ft) Stop Node Invert (Stop) (ft) Has User Defined Length? Length (Scaled) (ft) Slope (Calculated) (ft/ft) Diameter (in) Manning's n Flow (cfs) Depth (Out) (ft) Capacity (Full Flow) (cfs) Flow / Capacity (Design) M Velocity (ft/s) 2-1 (1) (N- DI 2(N-STORM) 508.87 FES-1 508.50 False 65.4 0.006 36.0 0.013 38.24 1.96 50.24 76.1 7.82 STORM) 2-1 (N-STORM) DI 2A (N- STORM) 509.45 DI 2(N-STORM) 508.87 False 100.9 0.006 36.0 0.013 38.54 1.96 50.70 76.0 7.89 3-2 (N-STORM) DI 3 (N-STORM) 511.08 DI 2A (N- STORM) 510.45 False 124.7 0.005 24.0 0.013 9.29 1.09 16.08 57.8 5.30 3A-3 (N-STORM) CI 3A (N- STORM) 514.55 DI 3 (N-STORM) 511.83 False 114.7 0.024 15.0 0.013 3.40 0.50 9.95 34.2 7.34 4-2 (N-STORM) DI 4 (N-STORM) 510.49 DI 2A (N- STORM) 509.45 False 172.1 0.006 36.0 0.013 29.02 2.02 51.76 56.1 7.53 5-4 (N-STORM) DI 5 (N-STORM) 511.58 DI 4 (N-STORM) 510.49 False 131.2 0.008 30.0 0.013 27.55 1.60 37.36 73.8 8.32 6-5 (N-STORM) MH 6 (N- STORM) 512.09 DI 5 (N-STORM) 511.58 False 53.5 0.010 30.0 0.013 26.61 1.79 40.06 66.4 8.73 7-6 (N-STORM) MH 7 (N- 512.35 MH 6 (N- 512.09 False 51.7 0.005 30.0 0.013 26.73 1.76 29.10 91.8 6.73 STORM) STORM) 8-7 (N-STORM) CI 8 (N-STORM) 512.75 MH 7 (N- STORM) 512.35 False 60.6 0.007 30.0 0.013 26.86 1.87 33.29 80.7 7.55 9-8 (N-STORM) CI 9 (N-STORM) 516.30 CI 8 (N-STORM) 516.00 False 56.3 0.005 18.0 0.013 2.70 0.61 7.67 35.2 3.96 10-8 (N-STORM) CI 10 (N- STORM) 512.97 CI 8 (N-STORM) 512.75 False 36.7 0.006 30.0 0.013 23.58 1.77 31.84 74.0 7.10 11-10 (N- CI 11 (N- 519.10 CI 10 (N- 518.75 False 22.2 0.016 18.0 0.013 7.27 0.84 13.19 55.1 7.65 STORM) STORM) STORM) 11A-11 (N- DI 11.1 (N- 519.79 CI 11 (N- 519.10 False 68.6 0.010 18.0 0.013 6.76 1.04 10.53 64.2 6.33 STORM) STORM) STORM) 1113-11 (N- CI 11.2 (N- 521.87 DI 11.1 (N- 520.04 False 45.9 0.040 15.0 0.013 1.83 0.76 12.90 14.2 7.44 STORM) STORM) STORM) 12-10 (N- CI 12 (N- 522.71 CI 10 (N- 520.04 False 74.0 0.036 15.0 0.013 4.01 0.49 12.27 32.7 8.95 STORM) STORM) STORM) 13-12 (N- DI 13 (N- 526.66 CI 12 (N- 522.71 False 151.2 0.026 15.0 0.013 3.02 0.81 10.44 28.9 7.36 STORM) STORM) STORM) 14-13 (N- DI 14 (N- 527.50 DI 13 (N- 526.66 False 166.9 0.005 15.0 0.013 1.82 0.70 4.58 39.7 3.52 STORM) STORM) STORM) 15-14 (N- DI 15 (N- 527.65 DI 14 (N- 527.50 False 30.4 0.005 15.0 0.013 1.05 0.55 4.53 23.2 3.01 STORM) STORM) STORM) 16-15 (N- DI 16 (N- 527.85 DI 15 (N- 527.65 False 31.3 0.006 15.0 0.013 0.61 0.42 5.16 11.8 2.82 STORM) STORM) STORM) 17-10 (N- CI 17 (N- 513.52 CI 10 (N- 512.97 False 91.3 0.006 24.0 0.013 12.37 1.65 17.52 70.6 6.05 STORM) STORM) STORM) 18-17 (N- CI 18 (N- 522.43 CI 17 (N- 517.12 False 75.8 0.070 15.0 0.013 2.69 0.34 17.09 15.8 10.16 STORM) STORM) STORM) 20-17 (N- CI 20 (N- 517.39 CI 17 (N- 517.13 False 52.1 0.005 24.0 0.013 8.07 1.01 16.00 50.5 5.10 STORM) STORM) STORM) 21-20 (N- CI 21 (N- 518.12 CI 20 (N- 517.39 False 146.2 0.005 18.0 0.013 6.27 1.01 7.43 84.4 4.71 STORM) STORM) STORM) 22-21 (N- CI 22 (N- 518.55 CI 21 (N- 518.12 False 86.7 0.005 15.0 0.013 3.70 1.06 4.55 81.3 4.13 STORM) STORM) STORM) 23-21 (N- MH 23 (N- 525.05 CI 21 (N- 518.37 False 113.3 0.059 15.0 0.013 2.13 0.81 15.69 13.6 8.93 STORM) STORM) STORM) 24-23 (N- DI 24 (N- 527.01 MH 23 (N- 525.05 False 110.6 0.018 15.0 0.013 2.15 0.43 8.59 25.0 5.82 STORM) STORM) STORM) 25-24 (N- DI 25 (N- 527.25 DI 24 (N- 527.01 False 49.0 0.005 15.0 0.013 1.63 0.59 4.52 36.0 3.38 STORM) STORM) STORM) StormCAD Waxhaw P&R Storm REV1.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2022 76 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 Page 1 of 2 FlexTable: Conduit Table Label Start Node Invert (Start) (ft) Stop Node Invert (Stop) (ft) Has User Defined Length? Length (Scaled) (ft) Slope (Calculated) (ft/ft) Diameter (in) Manning's n Flow (cfs) Depth (Out) (ft) Capacity (Full Flow) (cfs) Flow / Capacity (Design) M Velocity (ft/s) 26-25 (N- DI 26 (N- 527.44 DI 25 (N- 527.25 False 36.8 0.005 15.0 0.013 1.02 0.52 4.64 22.0 3.03 STORM) STORM) STORM) 27-26 (N- DI 27 (N- 527.65 DI 26 (N- 527.44 False 38.4 0.005 15.0 0.013 0.38 0.40 4.78 7.9 2.32 STORM) STORM) STORM) 30-29 (N- MH 30 (N- 518.72 FES-29 518.50 False 29.6 0.007 36.0 0.013 43.34 1.99 57.54 75.3 8.94 STORM) STORM) 31-30 (N- MH 31 (N- 519.88 MH 30 (N- 518.72 False 154.2 0.008 36.0 0.013 43.56 1.94 57.84 75.3 8.99 STORM) STORM) STORM) 32-31 (N- MH 32 (N- 526.50 MH 31 (N- 520.38 False 249.6 0.025 30.0 0.013 43.78 1.51 64.22 68.2 14.07 STORM) STORM) STORM) 33-32 (N- OTCB 33 (N- 528.00 MH 32 (N- 526.70 False 54.6 0.024 30.0 0.013 43.82 1.68 63.31 69.2 13.92 STORM) STORM) STORM) 101-100 (N- MH 101 510.30 FES 100 (N- 510.00 False 53.9 0.006 18.0 0.013 2.92 0.63 7.82 37.3 4.11 STORM) STORM) 102-101 DI 102 510.65 MH 101 510.55 False 10.9 0.009 15.0 0.013 0.35 0.40 6.18 5.6 2.72 103-102 (N- OTCB 103 518.00 MH 101 510.55 False 133.5 0.056 15.0 0.013 2.60 0.35 15.26 17.0 9.28 STORM) StormCAD Waxhaw P&R Storm REV1.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2022 76 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 Page 2 of 2 Hydrology Report Hydraflow Express Extension for Autodesk0 Civil 3DO by Autodesk, Inc. <Name> Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (in/hr) OF Curve Q (cfs) 4.00 3.00 rM 1.00 X1 11 I = Rational = 10 = 0.490 = 7.238 = SampleExpress.IDF Runoff Hyd - Qp = 3.37 (cfs) Peak discharge (cfs) Time interval (min) Runoff coeff. (C) Tc by User (min) Rec limb factor Runoff Hydrograph 10-yr frequency 5 Thursday, Dec 16 2021 = 3.369 = 1 = 0.95 = 5 = 1.00 Hydrograph Volume = 1,011 (cult); 0.023 (acft) Q (cfs) 4.00 3.00 2.00 1.00 '- 0.00 10 Time (min) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. <DI 5 TO DI 4> Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 520.50 Slope (%) = 0.60 N-Value = 0.002 Calculations Compute by: Known Q Known Q (cfs) = 3.36 Elev (ft) Section 522.00 521.50 521.00 520.50 520.00 1 2 3 4 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 5 6 Reach (ft) Thursday, Dec 16 2021 = 0.12 = 3.360 = 0.28 = 11.86 = 2.76 = 0.37 = 2.72 = 2.31 Depth (ft) 1.50 1.00 0.50 wixffel 7 8 9 10 - -- Hydrology Report Hydraflow Express Extension for Autodesk0 Civil 3DO by Autodesk, Inc. <Name> Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (in/hr) OF Curve Q (cfs) 4.00 3.00 rM 1.00 e = Rational = 10 = 0.450 = 7.238 = SampleExpress.IDF Runoff Hyd - Qp = 3.09 (cfs) Peak discharge (cfs) Time interval (min) Runoff coeff. (C) Tc by User (min) Rec limb factor Runoff Hydrograph 10-yr frequency 5 Thursday, Dec 16 2021 = 3.094 = 1 = 0.95 = 5 = 1.00 Hydrograph Volume = 928 (cult); 0.021 (acft) Q (cfs) 4.00 3.00 2.00 1.00 %- 0.00 10 Time (min) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. <DI 4 TO D12A> Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 516.50 Slope (%) = 2.42 N-Value = 0.002 Calculations Compute by: Known Q Known Q (cfs) = 3.09 Elev (ft) Section 518.00 517.50 517.00 516.50 516.00 1 2 3 4 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 5 6 Reach (ft) Thursday, Dec 16 2021 = 0.08 = 3.090 = 0.18 = 17.24 = 2.51 = 0.36 = 2.48 = 4.70 Depth (ft) 1.50 1.00 0.50 wixffel 7 8 9 10 - -- Hydrology Report Hydraflow Express Extension for Autodesk0 Civil 3DO by Autodesk, Inc. <Name> Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (in/hr) OF Curve Q (cfs) 3.00 rM 1.00 X1 11 I = Rational = 10 = 0.428 = 7.238 = SampleExpress.IDF — Runoff Hyd - Qp = 2.79 (cfs) Peak discharge (cfs) Time interval (min) Runoff coeff. (C) Tc by User (min) Rec limb factor Runoff Hydrograph 10-yr frequency 5 Wednesday, Dec 15 2021 = 2.788 = 1 = 0.9 = 5 = 1.00 Hydrograph Volume = 836 (cult); 0.019 (acft) Q (cfs) 3.00 2.00 1.00 X- 0.00 10 Time (min) Channel Report Hydraflow Express Extension for Autodesk0 Civil 3DO by Autodesk, Inc. <East Channel> Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 524.00 Slope (%) = 5.96 N-Value = 0.002 Calculations Compute by: Known Q Known Q (cfs) = 2.79 Elev (ft) 526.00 525.50 525.00 524.50 524.00 523.50 0 1 2 3 Section Wednesday, Dec 15 2021 Highlighted Depth (ft) = 0.17 Q (cfs) = 2.790 Area (sqft) = 0.09 Velocity (ft/s) = 32.18 Wetted Perim (ft) = 1.08 Crit Depth, Yc (ft) = 0.56 Top Width (ft) = 1.02 EGL (ft) = 16.27 4 5 Reach (ft) 6 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Hydrology Report Hydraflow Express Extension for Autodesk0 Civil 3DO by Autodesk, Inc. <Name> Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (in/hr) OF Curve Q (cfs) 4.00 3.00 rM 1.00 X1 11 I = Rational = 10 = 0.520 = 7.238 = SampleExpress.IDF Runoff Hyd - Qp = 3.39 (cfs) Peak discharge (cfs) Time interval (min) Runoff coeff. (C) Tc by User (min) Rec limb factor Runoff Hydrograph 10-yr frequency 5 Wednesday, Dec 15 2021 = 3.387 = 1 = 0.9 = 5 = 1.00 Hydrograph Volume = 1,016 (cult); 0.023 (acft) Q (cfs) 4.00 3.00 2.00 1.00 '- 0.00 10 Time (min) Channel Report Hydraflow Express Extension for Autodesk0 Civil 3DO by Autodesk, Inc. <North Channel> Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 533.00 Slope (%) = 9.33 N-Value = 0.002 Calculations Compute by: Known Q Known Q (cfs) = 3.35 Elev (ft) Section 535.00 534.50 534.00 533.50 533.00 532.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Dec 15 2021 = 0.05 = 3.350 = 0.16 = 21.27 = 3.32 = 0.31 = 3.30 = 7.08 1 2 3 4 5 6 7 8 9 10 11 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 wixffel Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. SWALE #1 Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 1.00 Slope (%) = 5.60 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 2.81 Elev (ft) 3.00 2.50 2.00 1.50 1.00 0.50 0 1 2 3 Section Thursday, Jun 9 2022 Highlighted Depth (ft) = 0.47 Q (cfs) = 2.810 Area (sqft) = 0.66 Velocity (ft/s) = 4.24 Wetted Perim (ft) = 2.97 Crit Depth, Yc (ft) = 0.56 Top Width (ft) = 2.82 EGL (ft) = 0.75 4 5 Reach (ft) 6 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. SWALE #2 Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 1.00 Slope (%) = 4.10 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 2.42 Elev (ft) 3.00 2.50 2.00 1.50 1.00 0.50 0 1 2 3 Section Thursday, Jun 9 2022 Highlighted Depth (ft) = 0.47 Q (cfs) = 2.420 Area (sqft) = 0.66 Velocity (ft/s) = 3.65 Wetted Perim (ft) = 2.97 Crit Depth, Yc (ft) = 0.53 Top Width (ft) = 2.82 EGL (ft) = 0.68 4 5 Reach (ft) 6 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. SWALE #3 Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 1.00 Slope (%) = 7.20 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 3.39 Elev (ft) 3.00 2.50 2.00 1.50 1.00 0.50 0 1 2 3 Section Thursday, Jun 9 2022 Highlighted Depth (ft) = 0.48 Q (cfs) = 3.390 Area (sqft) = 0.69 Velocity (ft/s) = 4.90 Wetted Perim (ft) = 3.04 Crit Depth, Yc (ft) = 0.61 Top Width (ft) = 2.88 EGL (ft) = 0.85 4 5 Reach (ft) 6 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Section 4 Water Quality / Detention Design Calculations SAND FILTER CALCULATIONS PROJECT NAME: Waxhaw P&R Town Hall BMP ID: 1 PROJECT NUMBER: 17000405 DESIGNER: MRW DATE: 12.7.21 REV.: 05/27/22 NOTE: This spreadsheet has been designed to comply with the revised North Carolina Department of Environmental Quality Stormwater Design Manual (January 2017). Drainage Area Characteristics: Physical Drainage Area: 7.25 ac Existing Impervious Area: 0.00 ac Proposed Impervious Area: 3.96 ac Future Impervious Area: 1.01 ac 4benesch WATER QUALITY VOLUME CALCULATION BMP ID Pervious Area Impervious Total Imperv. Runoff. Coeff. Rainfall Depth Drainage Area Water Quality Area Fraction IA Rv P (A) Volume (WQv) 1 2.28 ac 1 4.97 ac 7.25 ac 0.69 1 0.67 1 1.00 inj 7.25 acl 17,552.94 c Simple Method Water Quality Volume: R, =0.05+0.9x1A WQ, =(PxR, xA)/12 BMP SURFACE AREA CALCULATIONS BMP ID Discounted Sand Media Coeff. of Permeability Avg. Ht of Design Drain *Minimum **Minimum Sand Surface Water Quality Depth (df) (k) Water Above Time (tf) Required Area Required Area Area Provided Volume Filter Bed (Ha) of Total BMP of Sand Media (As) (0.75*WQv) (As + Af) 1 13,164.70 cf 2.00-ft 5.00-ft/day 1.00-ft 0.500 days 6,582.35-sf 2,632.94-sf 2,700.00 sf ACCEPTABLE Required Minimum Sediment Chamber (Forebay) Area Calculation: A s = 240 * Rv * Drainage Area * Runoff Depth As: 1,160.52 sf (min. per Camp Hazen Equation) As: 3,882.35 sf Target area per (As + Aq *Determine Sand Filter and Forebay Surface Areas with respect to WQ volume and maximum head (hmax): hmax=(0.75*WQJ/(As +Af) Ha=hmax/2 Available Combinations- Hmax Ha As+Af 0.50 0.25 26,329 1.00 0.50 13,165 1.50 0.75 8,776 2.00 1.00 6,582 3.00 1.50 4,388 4.00 2.00 3,291 5.00 2.50 2,633 6.00 3.00 2,194 'Use Hmax = 2.00 **Darcy's Law Surface Area Calculation (Required Area of Sand Media): A f = (0. 75*WQ J /(d f) / I(k) (h f + d f) (t f)] (Drawdown Adjusted 1-Inch WQ Runoff at rate of 2" of sand media per hour.) 2898-RG Calcs-8-14-07.xls Page 1 SAND FILTER ELEVATION AREAS Elevation Sediment Chamber Area Sand Chamber Area Avg.Sed. Chamber Area Incremental Sed. Chamber Vol. Acc. Sed. Chamber Vol. Avg. Sand Chamber Area Incremental Sand Chamber Vol. Total Acc. Sand Filter Vol. 507 2,700.00-sf 0.00 sf 0.00 cf 0.00 cf 2,700.00 sf 0.00 cf 0.00 cf 508 2,031.00-sf 4,247.00-sf 1,015.50 sf 1,015.50 cf 1,015.50 cf 3,473.50 sf 3,473.50 cf 4,489.00 cf 508.5 1 5,500.00-sf 4,708.00-sf 3,765.50 sf 1,882.75 cf 2,898.25 cf 4,477.50 sf 1 2,238.75 cf 8,610.50 cf 509 5,798.00-sf 4,989.00-sf 5,649.00 sf 2,824.50 cf 5,722.75 cf 4,848.50 sf 2,424.25 cf 13,859.25 cf 510 12,200.00-sf 0.00 sf 0.00 cf 5,722.75 cf 8,594.50 sf 8,594.50 cf 22,453.75 cf 511 13,468.00-sf 0.00 sf 0.00 cf 5,722.75 cf 12,834.00 sf 12,834.00 cf 35,287.75 cf 512 14,793.00-sf 0.00 sf 0.00 cf 5,722.75 cf 14,130.50 sf 14,130.50 cf 49,418.25 cf 513 16,175.00-sf 0.00 sf 0.00 cf 5,722.75 cf 15,484.00 sf 15,484.00 cf 64,902.25 cf WQv Elev.: 509 Sed. Chamber Vol. Provided: 5,722.75 cf Approx. Sed. Chamber Vol. Req.: 6,929.63 cf Tolerance ±20% ACCEPTABLE Calculate the Stage -Discharge for the Sand Filter o� m E E m o E s WQ ,Ar = Q. = A r (k) (h r+d r)7(d r) Af: 2, 632.94-sf Ar: 2,632.94-sf (Provided Surface Area of Filter Bed) k: 5.0 ft/day (Coeff. Of Permeability) df: 1.5 ft (Filter Bed Depth) Elevation (ft) Depth above sand filter (hf) (ft) Discharge (cfs) 507.00 0 0.000 508.00 1.00 0.254 509.00 2.00 0.356 510.00 1 3.00 1 0.457 511.00 4.00 0.559 512.00 5.00 0.660 513.00 6.00 0.762 Calculate the Underdrain Outflow and Minimum Drawdown Calculate Minimum Drawdown (Q min) Q min = (INQv / to / 86,400 sec/day Qmin: 0.32 cfs Size Underdrain System for BMP Calculate Perforation Capacity Pipe Perforations: 8/If Linear Ft of Pipe 94.00 Total Perforations: 752 50% Perforations: 376 Dia. of Perforation: 0.38-in Total Head Above Drain: 2.00-ft Capacity Per Perforation 0.02-cfs Total Capacity: 8.12-cfs 2 rows/ft. 4 holes/row ca(2gh)0 5 c = 0.62 ACCEPTABLE WQv Provided: 13,859.25 cf WQv Req'd: 13,164.70 cf ACCEPTABLE 6,278.00 10,208.00 10,787.00 12,200.00 13,468.00 14,793.00 16,175.00 2898-RG Calcs-8-14-07.xls Page 2 NOAA Atlas 14, Volume 2, Version 3 Location name: Waxhaw, North Carolina, USA* Mt Latitude: 34.9456°, Longitude:-80.7731 Elevation: 517.32 ft** *source: ESRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 0.419 0.494 0.573 0.632 0.699 0.746 0.788 0.827 0.871 0.903 5-min (0.386-0.455) (0.454-0.538) (0.526-0.624) (0.579-0.686) (0.638-0.758) (0.677-0.808) (0.712-0.854) (0.743-0.897) (0.776-0.947) (0.798-0.983) 0.669 0.790 0.918 1.01 1.11 1.19 1.25 1.31 1.38 1.42 10-min (0.616-0.726) (0.727-0.861) (0.842-1.00) (0.926-1.10) (1.02-1.21) 1 (1.08-1.29) 1 (1.13-1.36) 1 (1.18-1.42) 1 (1.23-1.50) 1 (1.26-1.55) 0.836 0.993 1.16 1.28 1.41 1.50 1.58 1.65 1.73 1.78 15-min (0.770-0.908) (0.913-1.08) (1.07-1.26) 11 (1.17-1.39) 11 (1.29-1.53) 1 (1.37-1.63) 1 (1.43-1.72) 1 (1.49-1.79) 1 (1.55-1.89) 1 (1.58-1.94) 1.15 1.37 1.65 1.85 2.09 2.26 2.43 2.58 2.76 2.89 30-min (1.06-1.25) (1.26-1.49) (1.51-1.80) (1.70-2.01) 11 (1.91-2.27) 1 (2.06-2.46) 1 (2.19-2.63) 1 (2.31-2.79) 1 (2.46-3.00) 1 (2.56-3.15) 1.43 1.72 2.12 2.41 2.78 3.07 3.34 3.61 3.96 4.22 60-min (1.32-1.55) (1.58-1.88) (1.94-2.30) (2.21-2.62) (2.54-3.02) (2.79-3.33) (3.02-3.62) (3.25-3.92) (3.53-4.31) (3.73-4.60) 1.65 2.00 2.48 2.84 3.32 3.68 4.05 4.41 4.89 5.27 2-hr (1.51-1.81) 11 (1.83-2.19) 11 (2.26-2.71) (2.59-3.10) 11 (3.01-3.62) (3.32-4.01) (3.63-4.41) (3.94-4.81) (4.32-5.34) (4.61-5.75) 1.76 2.12 2.64 3.05 3.60 4.04 4.48 4.95 5.58 6.09 3-hr (1.61-1.93) (1.94-2.33) (2.41-2.90) (2.77-3.34) (3.26-3.94) (3.63-4.41) (4.01-4.89) (4.39-5.40) (4.89-6.10) (5.28-6.65) 2.11 2.54 3.17 3.67 4.35 4.89 5.45 6.04 6.85 7.50 6-hr (1.93-2.32) (2.33-2.79) (2.90-3.48) (3.34-4.01) (3.94-4.74) (4.41-5.33) (4.88-5.94) (5.35-6.57) (5.98-7.44) (6.47-8.15) 2.49 3.01 3.76 4.37 5.23 5.92 6.64 7.41 8.48 9.36 12-hr (2.29-2.73) 11 (2.76-3.31) 11 (3.45-4.13) 1 (4.74-5.71) (5.32-6.45) (5.92-7.23) (6.52-8.05) (7.35-9.22) (8.00-10.2) 2.94 3.55 4.46 5.18 6.19 7.00 7.85 8.74 9.98 11.0 24-hr (2.72-3.19) (3.29-3.85) (4.12-4.83) (4.78-5.61) (5.69-6.70) (6.42-7.58) (7.16-8.50) (7.94-9.48) (9.01-10.8) (9.86-11.9) 3.47 4.17 5.21 6.03 7.17 8.09 9.04 10.0 11.4 12.5 2-day (3.21-3.76) (3.87-4.53) (4.82-5.65) (5.56-6.54) (6.59-7.77) (7.41-8.77) (8.25-9.81) (9.11-10.9) (10.3-12.5) (11.2-13.7) 3.68 4.42 5.48 6.33 7.51 8.45 9.43 10.5 11.9 13.0 3-day (3.41-3.98) (4.10-4.79) (5.08-5.94) (5.85-6.85) (6.91-8.12) (7.76-9.15) (8.63-10.2) (9.52-11.4) (10.8-12.9) 1 (11.7-14.2) 3.89 4.67 5.76 6.63 7.85 8.82 9.83 10.9 12.4 13.6 4-day (3.62-4.20) (4.34-5.04) (5.34-6.23) (6.14-7.17) (7.24-8.48) (8.11-9.54) (9.01-10.6) (9.93-11.8) (11.2-13.4) (12.2-14.7) 4.51 5.38 6.56 7.50 8.81 9.86 10.9 12.1 13.7 14.9 7-day (4.21-4.84) (5.03-5.77) (6.12-7.03) (6.99-8.04) (8.18-9.45) (9.12-10.6) (10.1-11.7) (11.1-13.0) (12.5-14.7) (13.6-16.1) 5.15 6.13 7.38 8.37 9.71 10.8 11.9 13.0 14.5 15.7 10-day (4.83-5.52) (5.74-6.56) (6.91-7.90) (7.82-8.95) (9.04-10.4) (10.0-11.5) (11.0-12.7) (12.0-13.9) (13.3-15.6) (14.4-16.9) 6.88 8.12 9.59 10.8 12.3 13.6 14.8 16.1 17.8 19.2 20-day (6.48-7.33) (7.64-8.65) (9.01-10.2) (10.1-11.5) (11.6-13.2) (12.7-14.5) (13.8-15.8) 1 (15.0-17.2) 1 (16.5-19.1) 1 (17.7-20.6) 8.44 9.93 11.6 12.8 14.5 15.8 17.1 18.3 20.0 21.3 30-day (7.97-8.96) (9.37-10.5) (10.9-12.3) (12.1-13.6) (13.6-15.4) (14.8-16.8) (16.0-18.1) (17.1-19.5) (18.6-21.4) (19.8-22.8) 10.6 12.4 14.2 15.6 17.4 18.8 20.1 21.4 23.1 24.4 45-day (10.1-11.2) (11.8-13.1) (13.5-15.0) (14.8-16.4) (16.5-18.3) (17.8-19.8) (19.0-21.2) (20.2-22.6) (21.7-24.4) (22.9-25.9) 12.6 14.7 16.7 18.2 20.1 21.6 23.0 24.3 26.1 27.4 60-day (12.0-13.2) (14.0-15.5) (15.9-17.5) (17.3-19.1) (19.1-21.1) (20.5-22.6) (21.8-24.1) (23.0-25.6) (24.6-27.5) (25.8-28.9) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Pas -based depth -duration -frequency (DDF) curves Latitude: 34.9456'. Longitude:-30.7738' 25 c t 20 C a di U 15 49 10 a 5 n t t Jr t L N N O r{4 N rq rq rq N rq N Alb N rV A q r, O O O Ln O ,1 r-I rn w � N rn v Ln Duration M 25 c s 20 a m a 15 A, 49 a 10 CL a 5 n 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created {GMTY Thu Dec 2 19:20:47 2021 Back to Top Maps & aerials Small scale terrain Average recurrence mtwa I {years} — 1 2 — 5 — 14 — 25 54 100 200 500 1000 Duration — 6-min — 2-day — 10-min — 3-day 15-min — 4-day — 30-min — 7-day — 64-min — 14-day — 2fir — 20-day — 3-fir — 30-0ay — Bfir — 45-day — 12-hr — 60-eay 24-hr •,5 Large scale terrain Inson City :r-!�' .ram *e{: e- . V q Winston-Salem I � • [�uii7am y' Greensboro • • Ashe)iile NORTH C A R O L I N A +harlotte Fayette'rille , •Greenville 7 SOUTH CAROLINA + } s 100km Columbia 60mi f n� Large scale map J VS�inston-Salern Large scale aerial Greensboro _•�D ort h rolina Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions noaa.gov Disclaimer Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 2.699 5.098 ------- ------- 13.24 ------- 23.94 29.43 pre 2 SCS Runoff ------ 19.72 25.99 ------- ------- 43.12 ------- 62.34 71.38 post 3 Reservoir 2 1.956 4.131 ------- ------- 12.36 ------- 47.43 59.37 Thru SCM Proj. file: 405 Detention.gpw Thursday, 06 / 9 / 2022 Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.699 2 730 12,945 ------ ------ ------ pre 2 SCS Runoff 19.72 2 716 39,963 ------ ------ ------ post 3 Reservoir 1.956 2 744 39,946 2 509.60 19,640 Thru SCM 405 Detention.gpw Return Period: 1 Year Thursday, 06 / 9 / 2022 Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hyd. No. 1 pre Hydrograph type = SCS Runoff Peak discharge = 2.699 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 12,945 cuft Drainage area = 7.250 ac Curve number = 65 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 22.30 min Total precip. = 2.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 pre Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 4 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 pre Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.56 0.00 0.00 Land slope (%) = 3.10 0.00 0.00 Travel Time (min) = 19.77 + 0.00 + 0.00 = 19.77 Shallow Concentrated Flow Flow length (ft) = 424.00 0.00 0.00 Watercourse slope (%) = 3.05 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.82 0.00 0.00 Travel Time (min) = 2.51 + 0.00 + 0.00 = 2.51 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 22.30 min 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hyd. No. 2 post Hydrograph type = SCS Runoff Peak discharge = 19.72 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 39,963 cuft Drainage area = 7.250 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.970 x 98) + (2.280 x 61)] / 7.250 Q (cfs) 21.00 18.00 15.00 12.00 •M 3.00 post Hyd. No. 2 -- 1 Year 0.00 1---J— ' ' ' ' ' 0 120 240 360 480 600 720 840 — Hyd No. 2 Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 0.00 960 1080 1200 1320 1440 Time (min) A Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hyd. No. 3 Thru SCM Hydrograph type = Reservoir Peak discharge = 1.956 cfs Storm frequency = 1 yrs Time to peak = 744 min Time interval = 2 min Hyd. volume = 39,946 cuft Inflow hyd. No. = 2 - post Max. Elevation = 509.60 ft Reservoir name = SCM 1 Max. Storage = 19,640 cuft Storage Indication method used. Thru SCM Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) — Hyd No. 3 — Hyd No. 2 Total storage used = 19,640 cult Pond Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Pond No. 1 - SCM 1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 507.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 507.00 2,700 0 0 1.00 508.00 6,278 4,365 4,365 2.00 509.00 10,787 8,431 12,795 3.00 510.00 12,200 11,485 24,280 4.00 511.00 13,468 12,827 37,108 5.00 512.00 14,793 14,124 51,232 6.00 513.00 16,175 15,477 66,709 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 30.00 0.00 0.00 0.00 Crest Len (ft) = 19.00 1.00 Inactive 0.00 Span (in) = 30.00 0.00 0.00 0.00 Crest El. (ft) = 511.25 509.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 502.00 0.00 0.00 0.00 Weir Type = 1 Rect Broad --- Length (ft) = 61.20 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 2.45 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 507.00 0.00 --- --- --- 0.00 0.00 --- --- --- --- 0.000 0.10 436 507.10 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.026 0.026 0.20 873 507.20 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.052 0.052 0.30 1,309 507.30 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.077 0.077 0.40 1,746 507.40 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.103 0.103 0.50 2,182 507.50 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.129 0.129 0.60 2,619 507.60 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.155 0.155 0.70 3,055 507.70 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.181 0.181 0.80 3,492 507.80 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.206 0.206 0.90 3,928 507.90 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.232 0.232 1.00 4,365 508.00 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.258 0.258 1.10 5,208 508.10 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.268 0.268 1.20 6,051 508.20 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.279 0.279 1.30 6,894 508.30 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.289 0.289 1.40 7,737 508.40 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.299 0.299 1.50 8,580 508.50 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.310 0.310 1.60 9,423 508.60 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.320 0.320 1.70 10,266 508.70 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.330 0.330 1.80 11,109 508.80 45.76 ic --- --- --- 0.00 0.00 --- --- --- 0.340 0.340 1.90 11,952 508.90 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.351 0.351 2.00 12,795 509.00 45.76 is --- --- --- 0.00 0.00 --- --- --- 0.361 0.361 2.10 13,944 509.10 45.76 is --- --- --- 0.00 0.11 --- --- --- 0.371 0.477 2.20 15,092 509.20 45.76 is --- --- --- 0.00 0.30 --- --- --- 0.382 0.680 2.30 16,241 509.30 45.76 is --- --- --- 0.00 0.55 --- --- --- 0.392 0.939 2.40 17,389 509.40 45.76 is --- --- --- 0.00 0.84 --- --- --- 0.403 1.245 2.50 18,538 509.50 45.76 is --- --- --- 0.00 1.18 --- --- --- 0.413 1.590 2.60 19,686 509.60 45.76 is --- --- --- 0.00 1.55 --- --- --- 0.423 1.971 2.70 20,835 509.70 45.76 is --- --- --- 0.00 1.95 --- --- --- 0.434 2.384 2.80 21,983 509.80 45.76 is --- --- --- 0.00 2.38 --- --- --- 0.444 2.827 2.90 23,132 509.90 45.76 is --- --- --- 0.00 2.84 --- --- --- 0.455 3.298 3.00 24,280 510.00 45.76 is --- --- --- 0.00 3.33 --- --- --- 0.465 3.795 3.10 25,563 510.10 45.76 is --- --- --- 0.00 3.84 --- --- --- 0.475 4.317 3.20 26,846 510.20 45.76 is --- --- --- 0.00 4.38 --- --- --- 0.486 4.863 3.30 28,129 510.30 45.76 is --- --- --- 0.00 4.94 --- --- --- 0.496 5.432 3.40 29,411 510.40 45.76 is --- --- --- 0.00 5.52 --- --- --- 0.506 6.022 3.50 30,694 510.50 45.76 is --- --- --- 0.00 6.12 --- --- --- 0.516 6.634 Continues on next page... 0 SCM 1 Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 3.60 31,977 510.60 45.76 is 3.70 33,260 510.70 45.76 is 3.80 34,542 510.80 45.76 is 3.90 35,825 510.90 45.76 is 4.00 37,108 511.00 45.76 is 4.10 38,520 511.10 45.76 is 4.20 39,933 511.20 45.76 is 4.30 41,345 511.30 45.76 is 4.40 42,757 511.40 45.76 is 4.50 44,170 511.50 45.76 is 4.60 45,582 511.60 45.76 is 4.70 46,995 511.70 45.76 is 4.80 48,407 511.80 45.76 is 4.90 49,819 511.90 49.61 is 5.00 51,232 512.00 58.18 is 5.10 52,779 512.10 64.48 is 5.20 54,327 512.20 67.83 is 5.30 55,875 512.30 68.99 is 5.40 57,423 512.40 69.85 is 5.50 58,970 512.50 70.57 is 5.60 60,518 512.60 71.20 is 5.70 62,066 512.70 71.77 is 5.80 63,614 512.80 72.29 is 5.90 65,161 512.90 72.78 is 6.00 66,709 513.00 73.25 is ... End Clv B Clv C cfs cfs PrfRsr Wr A Wr B Wr C cfs cfs cfs cfs --- 0.00 6.74 --- --- 0.00 7.38 --- --- 0.00 8.04 --- --- 0.00 8.72 --- --- 0.00 9.42 --- --- 0.00 10.13 --- --- 0.00 10.87 --- --- 0.71 11.62 --- --- 3.68 12.38 --- --- 7.91 13.16 --- --- 13.10 13.96 --- --- 19.10 14.77 --- --- 25.81 15.60 --- --- 33.16 16.45 --- --- 41.10 17.08 s --- --- 49.58 14.89 s --- --- 55.62 s 12.21 s --- --- 57.65 s 11.34 s --- --- 59.14 s 10.71 s --- --- 60.37 s 10.20 s --- --- 61.42 s 9.78 s --- --- 62.34 s 9.42 s --- --- 63.18 s 9.11 s --- --- 63.95 s 8.83 s --- --- 64.66 s 8.59 s --- Wr D Exfil User Total cfs cfs cfs cfs --- --- 0.527 7.266 --- --- 0.537 7.918 --- --- 0.547 8.590 --- --- 0.558 9.279 --- --- 0.568 9.987 --- --- 0.578 10.71 --- --- 0.589 11.45 --- --- 0.599 12.92 --- --- 0.609 16.67 --- --- 0.619 21.69 --- --- 0.630 27.69 --- --- 0.640 34.52 --- --- 0.650 42.06 --- --- 0.661 50.27 --- --- 0.671 58.85 --- --- 0.681 65.16 --- --- 0.692 68.52 --- --- 0.702 69.69 --- --- 0.712 70.56 --- --- 0.722 71.29 --- --- 0.733 71.93 --- --- 0.743 72.50 --- --- 0.753 73.04 --- --- 0.764 73.54 --- --- 0.774 74.02 Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 5.098 2 728 20,991 ------ ------ ------ pre 2 SCS Runoff 25.99 2 716 53,084 ------ ------ ------ post 3 Reservoir 4.131 2 726 53,067 2 510.06 25,105 Thru SCM 405 Detention.gpw Return Period: 2 Year Thursday, 06 / 9 / 2022 Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 pre Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 7.250 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.56 in Storm duration = 24 hrs Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor pre Hyd. No. 1 -- 2 Year Thursday, 06 / 9 / 2022 = 5.098 cfs = 728 min = 20,991 cuft = 65 = 0 ft = 22.30 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1 " ' ' ' ' ' ' %, ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hyd. No. 2 post Hydrograph type = SCS Runoff Peak discharge = 25.99 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 53,084 cuft Drainage area = 7.250 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.970 x 98) + (2.280 x 61)] / 7.250 Q (cfs) 28.00 24.00 20.00 16.00 12.00 post Hyd. No. 2 -- 2 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 ' —' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 2 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hyd. No. 3 Thru SCM Hydrograph type = Reservoir Peak discharge = 4.131 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 53,067 cuft Inflow hyd. No. = 2 - post Max. Elevation = 510.06 ft Reservoir name = SCM 1 Max. Storage = 25,105 cuft Storage Indication method used. Thru SCM Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 Time (min) — Hyd No. 3 — Hyd No. 2 Total storage used = 25,105 cult Hydrograph Summary Report 13 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 13.24 2 728 47,896 ------ ------ ------ pre 2 SCS Runoff 43.12 2 716 90,156 ------ ------ ------ post 3 Reservoir 12.36 2 724 90,139 2 511.26 40,805 Thru SCM 405 Detention.gpw Return Period: 10 Year Thursday, 06 / 9 / 2022 Hydrograph Report 14 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 pre Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 7.250 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.20 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 ItM M 4.00 ItM Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor pre Hyd. No. 1 -- 10 Year Thursday, 06 / 9 / 2022 = 13.24 cfs = 728 min = 47,896 cuft = 65 = 0 ft = 22.30 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 . �� 4.00 of 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hyd. No. 2 post Hydrograph type = SCS Runoff Peak discharge = 43.12 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 90,156 cuft Drainage area = 7.250 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.970 x 98) + (2.280 x 61)] / 7.250 Q (cfs) 50.00 40.00 20.00 10.00 post Hyd. No. 2 -- 10 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 2 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hyd. No. 3 Thru SCM Hydrograph type = Reservoir Peak discharge = 12.36 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 90,139 cuft Inflow hyd. No. = 2 - post Max. Elevation = 511.26 ft Reservoir name = SCM 1 Max. Storage = 40,805 cuft Storage Indication method used. Q (cfs) 50.00 40.00 20.00 10.00 0.00 0 240 — Hyd No. 3 Thru SCM Hyd. No. 3 -- 10 Year 480 720 960 1200 1440 1680 1920 — Hyd No. 2 Total storage used = 40,805 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 ---6- 0.00 2160 Time (min) Hydrograph Summary Report 17 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 23.94 2 728 83,939 ------ ------ ------ pre 2 SCS Runoff 62.34 2 716 133,336 ------ ------ ------ post 3 Reservoir 47.43 2 720 133,319 2 511.87 49,331 Thru SCM 405 Detention.gpw Return Period: 50 Year Thursday, 06 / 9 / 2022 Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 pre Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 7.250 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.04 in Storm duration = 24 hrs Q (cfs) 24.00 20.00 16.00 12.00 m 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor pre Hyd. No. 1 -- 50 Year Thursday, 06 / 9 / 2022 = 23.94 cfs = 728 min = 83,939 cuft = 65 = 0 ft = 22.30 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hyd. No. 2 post Hydrograph type = SCS Runoff Peak discharge = 62.34 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 133,336 cuft Drainage area = 7.250 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(4.970 x 98) + (2.280 x 61)] / 7.250 post Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 70.00 70.00 11I111I1Z� i �M1111I11 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 2 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hyd. No. 3 Thru SCM Hydrograph type = Reservoir Peak discharge = 47.43 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 133,319 cuft Inflow hyd. No. = 2 - post Max. Elevation = 511.87 ft Reservoir name = SCM 1 Max. Storage = 49,331 cuft Storage Indication method used. Q (cfs) 70.00 40.00 20.00 10.00 Thru SCM Hyd. No. 3 -- 50 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 — Hyd No. 2 Total storage used = 49,331 cult Hydrograph Summary Report 21 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 29.43 2 726 102,371 ------ ------ ------ pre 2 SCS Runoff 71.38 2 716 154,060 ------ ------ ------ post 3 Reservoir 59.37 2 720 154,044 2 512.01 51,361 Thru SCM 405 Detention.gpw Return Period: 100 Year Thursday, 06 / 9 / 2022 Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 pre Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 7.250 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.91 in Storm duration = 24 hrs Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor pre Hyd. No. 1 -- 100 Year Thursday, 06 / 9 / 2022 = 29.43 cfs = 726 min = 102,371 cuft = 65 = Oft = 22.30 min = Type II = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 '1 1 1 --0- ' ' ' ' ' ' '� ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hyd. No. 2 post Hydrograph type = SCS Runoff Peak discharge = 71.38 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 154,060 cuft Drainage area = 7.250 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.970 x 98) + (2.280 x 61)] / 7.250 Q (cfs) 80.00 70.00 40.00 20.00 10.00 post Hyd. No. 2 -- 100 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hyd. No. 3 Thru SCM Hydrograph type = Reservoir Peak discharge = 59.37 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 154,044 cuft Inflow hyd. No. = 2 - post Max. Elevation = 512.01 ft Reservoir name = SCM 1 Max. Storage = 51,361 cuft Storage Indication method used. Thru SCM Hydraflow Rainfall Report 25 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 66.8196 12.9000 0.8963 -------- 2 71.1962 12.5000 0.8678 -------- 3 0.0000 0.0000 0.0000 -------- 5 0.0000 0.0000 0.0000 -------- 10 75.5517 12.4000 0.8036 -------- 25 0.0000 0.0000 0.0000 -------- 50 0.0000 0.0000 0.0000 -------- 100 54.8500 9.3000 0.6596 -------- File name: Waxhaw.IDF Intensity = B / (Tc + D)^E Thursday, 06 / 9 / 2022 Return Period Intensity Values (in/hr) (Yrs) 6 min 10 16 20 26 30 36 40 46 60 66 60 1 5.03 4.04 3.38 2.92 2.57 2.30 2.08 1.91 1.76 1.63 1.52 1.43 2 5.94 4.78 4.01 3.47 3.07 2.75 2.50 2.29 2.12 1.97 1.84 1.73 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 7.61 6.21 5.28 4.62 4.11 3.72 3.40 3.14 2.92 2.73 2.56 2.42 25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100 9.49 7.78 6.69 5.91 5.33 4.87 4.50 4.19 3.93 3.71 3.52 3.35 Tc = time in minutes. Values may exceed 60. lame: Y:\Charlotte\17000400S\17000403.01 Waxhaw CP Desian\Ena Docs\Calculations\Detention\Waxhaw NC.DCD Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 6-yr 10-yr 26-yr 60-yr 100-yr SCS 24-hour 2.95 3.56 0.00 0.00 5.20 0.00 7.04 7.91 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.20 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydraflow Table of Contents 405 Detention.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 06 / 9 / 2022 Hydrograph Return Period Recap............................................................................. 1 1 -Year SummaryReport......................................................................................................................... 2 HydrographReports................................................................................................................... 3 Hydrograph No. 1, SCS Runoff, pre......................................................................................... 3 TR-55 Tc Worksheet........................................................................................................... 4 Hydrograph No. 2, SCS Runoff, post....................................................................................... 5 Hydrograph No. 3, Reservoir, Thru SCM................................................................................. 6 PondReport - SCM 1.......................................................................................................... 7 2 - Year SummaryReport......................................................................................................................... 9 HydrographReports................................................................................................................. 10 Hydrograph No. 1, SCS Runoff, pre....................................................................................... 10 Hydrograph No. 2, SCS Runoff, post..................................................................................... 11 Hydrograph No. 3, Reservoir, Thru SCM............................................................................... 12 10 -Year SummaryReport....................................................................................................................... 13 HydrographReports................................................................................................................. 14 Hydrograph No. 1, SCS Runoff, pre....................................................................................... 14 Hydrograph No. 2, SCS Runoff, post..................................................................................... 15 Hydrograph No. 3, Reservoir, Thru SCM............................................................................... 16 50 - Year SummaryReport....................................................................................................................... 17 HydrographReports................................................................................................................. 18 Hydrograph No. 1, SCS Runoff, pre....................................................................................... 18 Hydrograph No. 2, SCS Runoff, post..................................................................................... 19 Hydrograph No. 3, Reservoir, Thru SCM............................................................................... 20 100 - Year SummaryReport....................................................................................................................... 21 HydrographReports................................................................................................................. 22 Hydrograph No. 1, SCS Runoff, pre....................................................................................... 22 Hydrograph No. 2, SCS Runoff, post..................................................................................... 23 Hydrograph No. 3, Reservoir, Thru SCM............................................................................... 24 OFReport.................................................................................................................. 25 Section 5 Appendix 520400 34' 56' 53" N 0 m Hydrologic Soil Group —Union County, North Carolina (Waxhaw Town Hall) 520490 520580 520670 520760 k '► Sail Map may not he valiel at this scale. r 34o 56' 28" N 520400 520490 520580 520670 520760 Map Scale: 1:3,760 if printed on A portrait (8.5" x 11") sheet. Meters $ N 0 50 100 200 300 Feet 0 150 300 600 900 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 520850 520850 520940 34o 56' 53" N 0 m It34o 56' 28" N 520940 1 /5/2022 Pagel of 4 Hydrologic Soil Group —Union County, North Carolina (Waxhaw Town Hall) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Union County, North Carolina Survey Area Data: Version 21, Sep 15, 2021 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 18, 2011—Nov 25, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 1/5/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Union County, North Carolina Waxhaw Town Hall Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ChA Chewacla silt loam, 0 to B/D 14.2 20.3% 2 percent slopes, frequently flooded ScA Secrest-Cid complex, 0 C 11.2 16.0% to 3 percent slopes TbB2 Tarrus gravelly silty clay B 33.4 47.8% loam, 2 to 8 percent slopes, moderately eroded TbC2 Tarrus gravelly silty clay B 11.0 15.8% loam, 8 to 15 percent slopes, moderately eroded Totals for Area of Interest 69.8 100.0% USDA Natural Resources Web Soil Survey 1/5/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina Waxhaw Town Hall Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 1/5/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 �I STEWART GEOTECHNICAL ENGINEERING REPORT Waxhaw Town Campus 4220 Waxhaw Marvin Road Waxhaw, North Carolina July 23, 2021 sfcwor}in[.tam GEOTECHNICAL ENGINEERING REPORT Waxhaw Town Campus 4220 Waxhaw Marvin Road Waxhaw, North Carolina July 23, 2021 Prepared For: Town of Waxhaw 1150 N. Broome Street Waxhaw, NC 28173 Prepared BY: STEWART 9801-E Southern Pines Blvd Charlotte, NC 28273 Stewart Project No.: F21025.00 DOGUSigned by: 6� F-1 D2E4BA42D-.. Justin B. Nance, PE Manager of Testing & Inspections NC PE License No. 040805 SEAL r 028422 r 7/23/2021 uSigned by: 17F5F770411... Donald W. Brown Jr., PE, LEED AP Practice Leader Geotechnical & Construction Services NC PE License No. 28422 Stewart License No. C-1051 TABLE OF CONTENTS EXECUTIVE SUMMARY................................................................................................ 1 2 PROJECT INFORMATION............................................................................................ 2 2.1 Project Understanding........................................................................................ 2 2.2 Site Location and Description.............................................................................. 2 2.3 Geologic Area Overview...................................................................................... 2 3 SUBSURFACE EXPLORATION...................................................................................... 4 3.1 Field Testing..................................................................................................... 4 3.2 Current Exploration............................................................................................ 4 3.3 Past Exploration................................................................................................ 4 3.4 Laboratory Services........................................................................................... 4 3.5 Subsurface Conditions........................................................................................ 5 3.5.1 Ground Cover......................................................................................... 5 3.5.2 Residuum.............................................................................................. 5 3.5.3 Weathered Rock..................................................................................... 6 3.5.4 Rock..................................................................................................... 6 3.5.5 Groundwater..........................................................................................6 4 ENGINEERING ASSESSMENT AND RECOMMENDATIONS ............................................. 7 4.1 Site Grading...................................................................................................... 7 4.1.1 Subgrade Preparation.............................................................................. 7 4.1.2 Structural Fill......................................................................................... 7 4.1.3 Difficult Excavations................................................................................ 8 4.1.4 Groundwater..........................................................................................9 4.2 Foundations...................................................................................................... 9 4.2.1 Design.................................................................................................. 9 4.2.2 Construction.......................................................................................... 9 4.3 Slab-On-Grade.................................................................................................10 4.3.1 Design.................................................................................................10 4.3.2 Construction.........................................................................................10 4.4 Seismic Design Considerations...........................................................................11 4.5 Pavement........................................................................................................11 4.5.1 Flexible (Asphalt) Design........................................................................11 4.5.2 Construction.........................................................................................12 Appendix A Site Vicinity Map Boring Location Diagram Appendix B Boring Snapshot Boring Logs (Stewart, 2021) Boring Logs (F&R, 2019) Boring Summary Table Legend to Soil Descriptions Appendix C Laboratory Results Appendix D SHWT Evaluation Report Appendix E Site Photographs I EXECUTIVE SUMMARY Stewart has completed a geotechnical exploration for the proposed Waxhaw Town Campus development at 4220 Waxhaw Marvin Road in Waxhaw, North Carolina. This Executive Summary is provided as a brief overview of our geotechnical engineering evaluation for the project and is not intended to replace more detailed information contained elsewhere in this report. A summary of our findings, opinions, and recommendations is provided below. • The current plans for this project include the construction of two new buildings - a two-story Town Hall and a one-story Parks & Recreation building. • A total of 24 soil test borings were performed for this geotechnical exploration. Borings were advanced to depths ranging from approximately 5.9 to 15 feet below the existing grade. The subsurface soils encountered at the boring locations consist of residual soils. The USCS soil types encountered onsite include Sandy SILT (ML), Lean CLAY (CL), and Silty SAND (SM), with lesser amounts of Elastic SILT (MH). o Weathered rock was encountered in 12 borings at depths ranging from approximately 2 feet to 14 feet below the current grade (el. 507.5t feet to 535.5t feet) o Auger refusal was encountered in 10 borings at depths ranging from approximately 5.9 feet to 14.9 feet below the current grade (el. 512.9t feet to 530.1t feet). • A seasonal high water table (SHWT) evaluation was conducted on soil samples collected from two borings in the proposed BMP areas. Indicators of a SHWT were identified in both borings. We recommend a Seismic Site Class C for design of the Town Hall, and a Seismic Site Class D for design of the Parks & Recreation building. • The use of conventional spread footings and concrete slab -on -grade are recommended for both buildings. The owner/designer/contractor should not rely solely upon the summary above. This report should be read in its entirety prior to implementing the recommendations in the preparation of design and construction documents. Stewart should be retained to perform sufficient services to determine plan/specification compliance with the recommendations in this report. Waxhaw Town Campus - Waxhaw, North Carolina Page 1 2 PROJECT INFORMATION 2.1 Project Understanding As we understand it, current plans for the project involve the construction of two new buildings - a Town Hall (TH) and a Parks & Recreation (P&R) building. The Town Hall will be an approximately 22,300f SF, two story, steel -framed building. The Parks & Recreation building will be an approximately 11,500f SF, one-story, pre-engineered metal building with an approximately 2,100f SF covered parking structure. Based on the current grading plan provided by Benesch, the finished floor elevations (FFE) will be 533.5f feet for the Town Hall and 522.5f feet for the Parks & Recreation building. Additional site amenities include heavy- and light -duty asphalt pavement for driveways and parking spaces, gravel pavement, public greenspace, two stormwater BMPs, and trash/recycling dumpster enclosures. 2.2 Site Location and Description The site is located at 4220 Waxhaw Marvin Road in Waxhaw, North Carolina. Please refer to Figure Al in Appendix A of this report for the site vicinity map. The site is currently undeveloped land, most of which is covered with trees and moderate underbrush, with the exception of an existing brick structure located on the east side of the property along Waxhaw Marvin Road. Small amounts of miscellaneous household garbage and construction debris (bricks, concrete, conduit) were observed scattered throughout the site. A cleared trail was observed entering the property near its northwest corner, which is assumed to be associated with previous subsurface exploration activities. Photographs of general site conditions are included in Appendix D of this report. According to the provided topographic map, the site gradually slopes downward from north to south and has a relief of approximately 48 feet. Steeper slopes were observed along a drainage swale located near center of the property. 2.3 Geologic Area Overview The project site is located within Union County, North Carolina, and lies within the Charlotte and Milton Belts of the Piedmont Geologic Province of North Carolina. Review of the 1985 Geologic Map of North Carolina shows that the site is characterized by metamorphic rocks from the Late Proterozoic - Cambrian era. More specifically, the map indicates that the site is underlain by phyllite and schist (CZph). Waxhaw Town Campus - Waxhaw, North Carolina Page 2 Based on our local experience, differential weathering of bedrock often results in highly variable subsurface conditions over relatively short horizontal and vertical distances. Furthermore, suspended boulders, discontinuous rock layers/lenses, rock pinnacles and/or zones of weathered and fractured rock are commonly encountered within residual soils in this area. Waxhaw Town Campus - Waxhaw, North Carolina Page 3 3 SUBSURFACE EXPLORATION 3.1 Field Testing 3.2 Current Exploration The subsurface conditions below the site were explored with a total of 24 soil test borings (S-1 thru S- 24). The boring layout is illustrated in Figure A2 in Appendix A of this report. The borings were advanced to the depths ranging from approximately 5.9 to 15 feet below the current ground surface. The borings were performed by HPC of Albemarle, NC with a track -mounted Diedrich D-50T drill rig using 21/4-inch (ID) hollow -stem, continuous flight augers in general accordance with ASTM D6151. Sampling operations were conducted in general accordance with ASTM D1586. At predetermined intervals, soil samples were obtained with a split -barrel sampler (standard 2-inch O.D.). The sampler was rested on the bottom of the borehole and driven to a penetration of 18 inches (or fraction thereof) with blows of a 140-pound automatic drop hammer falling a distance of 30 inches. Of the 18 inches, the number of hammer blows required to achieve 6 inches of penetration is recorded for three consecutive segments. The sum of the blow counts for the second and third 6-inch segment is termed the Standard Penetration Test (SPT) resistance, or N-value. The N-values presented on the Boring Logs and Boring Snapshot are the actual, field -recorded blow counts and do not include correction factors for hammer energy or overburden soil pressures. Soil test borings were backfilled with auger cuttings (soil) 24t hours after drilling, following stabilized groundwater measurements. The Boring Logs are included in Appendix B of this report. A season high water table (SHWT) evaluation was conducted by Soil & Forestry Services of the Carolinas, P.A. in the areas of the proposed BMPs. The evaluation was performed using split spoon soil samples collected from borings S-23 and S-24. Please refer to the report prepared by Soil & Forestry Services in Appendix D of this report. 3.3 Past Exploration Stewart was provided a Report of Subsurface Exploration and Geotechnical Engineering Services prepared by Froehling & Robertson, Inc. (F&R) dated November 12, 2019. This report was prepared for a fire station and publics works building that were once planned for this site; however, neither were constructed. The F&R exploration consisted of 15 soil test borings (B-01 thru B-15), primarily concentrated along the western half of the site. These borings were taken into consideration in preparing this report, in conjunction with our 24 soil test borings. As such, the associated F&R boring logs are also included in Appendix B of this report. 3.4 Laboratory Services The soil samples obtained during the drilling operations were placed in labeled containers and transported to our Charlotte laboratory where they were visually -manually classified in general accordance with ASTM D2488 and logged by a member of Stewart's geotechnical engineering staff. The Boring Logs are included in Appendix B of this report. Laboratory testing was performed on select soil samples to aide in our geotechnical evaluation. Atterberg Limits test (ASTM D4318) and #200 washes (ASTM D1140) were performed on split -spoon soil samples from three borings as well as one bulk soil sample. Additionally, a Standard Proctor Waxhaw Town Campus - Waxhaw, North Carolina Page 4 (ASTM D698) test was performed on the bulk soil sample. The results of these tests are summarized in Table 1. Table 1: Summary of Lab Classification Testing Boring Sample Depth, ft Atterberg Limits < #200 Sieve, % Water Content, % USCS Class. MDD, pcf Opt. WC LL, PL, % % PI S-10 1-2.5 32 23 9 88.4 16.8 CL --- --- S-11 1-2 30 18 12 83.4 14.2 CL 112.1 14.0 S-12 1-2.5 45 21 24 95.0 19.8 CL --- --- S-22 1-2.5 36 18 18 85.4 16.0 CL --- --- Water content tests (ASTM D2216) were also performed on 11 near -surface soil samples. The results of the lab tests are presented on the individual boring logs in Appendix B and/or the lab reports in Appendix C. All soil samples will be stored for two months before discarding. 3.5 Subsurface Conditions The following is a subsurface description of a generalized nature, provided to highlight the major soil strata encountered. The stratification of the subsurface materials illustrated on the Boring Logs and Boring Snapshot represent the conditions at the actual test locations; therefore, variations should be expected between borings. Stratigraphy boundaries only represent the approximate depth/elevation of a noticed material change but the transition between material types is typically gradual. The soil types are based on the Unified Soil Classification System (USCS). Please note that the ground surface elevations in this report, including those shown on logs and other illustrations in the appendices, were interpolated from available grading plan and should therefore be considered approximate. If greater elevation accuracy is necessary, the boreholes should be surveyed by a professional land surveyor. 3.5.1 Ground Cover Topsoil was encountered in all 24 borings at ground surface. The approximate thickness of this layer was generally 4 to 7 inches. Please note that the clearing/mulching performed to provide drill rig access disturbed the surface topsoil layer to varying degrees. As such, thicker topsoil layers are likely present in the undisturbed portions of the site. For wooded sites like this, it is not uncommon to encounter a topsoil layer on the order o 8 to 10 inches thick. The term topsoil is used to describe the organic -laden surficial material as mentioned above. No organic or nutrient testing was performed for this exploration; therefore, the topsoil should not be assumed capable of establishing or maintaining vegetation of any kind. 3.5.2 Residuum Residual soils are the fully weathered remains of the parent rock. Residual soil was encountered in all 24 soil test borings. Residuum encountered at the site primarily consists of soft to very stiff lean CLAY (CL) underlain by soft to hard sandy SILT (ML) and/or medium dense to very dense silty SAND (SM). Medium stiff Elastic SILT (MH) was encountered in one boring (S-24). The SPT N-values within the Waxhaw Town Campus - Waxhaw, North Carolina Page 5 residuum range from 3 to 72 bpf. Borings S-1, S-9, S-12 thru S-17, and S-21 thru S-24 were terminated in residuum. 3.5.3 Weathered Rock Weathered rock (WR) is a transitional geomaterial between the parent rock and soil. Weathered rock is identified by SPT N-values of 50 blows per 6 inches or less of penetration. Weathered rock was encountered in 12 of the 24 borings at approximate depths of 2 feet to 14 feet below the current grade (el. 507.5t feet to 535.5t feet). The weathered rock encountered was classified as phyllite and sampled as Silty SAND (SM). Boring S-2 and S-19 were terminated in WR. 3.5.4 Rock Rock is defined as material of sufficient hardness to refuse mechanical drilling equipment. Auger refusal was encountered in 10 of the 24 borings at approximate depths of 5.9 feet to 14.9 feet (el. 512.9t feet to 530.1t feet). The rock was not sampled but is expected to be phyllite based on the WR samples and the local geology map referenced earlier in this report. 3.5.5 Groundwater At the time of drilling, groundwater was not encountered in any of the 24 borings. All 24 borings were left open for a stabilization period of 24t hours, after which groundwater was not encountered. All 24 borings were backfilled with auger cuttings (soil) after water level measurements were completed. The groundwater conditions represent the conditions at the time of the exploration. Fluctuations in groundwater levels are common and should be expected. Common factors that influence groundwater levels include, but are not limited to, soil stratification, climate/weather, nearby bodies of water (lakes, ponds, etc.), underground springs, streams, rivers and surface water discharge. At the onset, as well as continually throughout the construction process, the contractor should monitor groundwater levels if determined to be detrimental to the project. Although no groundwater was encountered to the depths explored by the soil test borings, evidence of a SHWT was identified in the areas of the proposed BMPs. The SHWT elevations should be considered 502.5 feet in the area of boring S-23 and 508.5 in the area of boring S-24. Waxhaw Town Campus - Waxhaw, North Carolina Page 6 4 ENGINEERING ASSESSMENT AND RECOMMENDATIONS 4.1 Site Grading 4.1.1 Subgrade Preparation All vegetation, topsoil, and any other unsatisfactory or deleterious materials should be removed from the limits of new construction. Such material should be considered unsuitable for reuse as structural fill. After stripping the site in areas at or below the finished subgrade elevation, the exposed ground should be thoroughly compacted with a large roller to densify the near -surface soils and to achieve a stiff, stable surface. Moisture conditioning (wetting or drying) may be required to achieve proper compaction, depending on the conditions at the time of construction. Areas of the site to receive fill or directly support new construction should be proofrolled with a tandem -axle dump truck weighing between 15 and 20 tons. Proofrolling should occur prior to fill placement or after reaching final grade in cut areas but must be in the presence of Stewart personnel so that recommendations can be provided for areas that rut, pump, or deflect excessively. Proofrolling should not be performed on frozen or excessively wet subgrades. Based on the low N-value (3 bpf) at the surface in boring S-1, we anticipate that this area will require additional densification efforts to render it stable and suitable for fill placement and/or foundation support. This should be accomplished by using large, ride -on, vibratory rollers with multiple overlapping passes throughout the area until adequately densified. Testing to verify densification should consist of proofrolling as well as before -and -after DCP testing to quantify the degree of improvement. If these soils cannot be adequately densified/stabilized, shallow undercutting and replacement will be necessary. The depth and lateral extents of such remedial work will depend on the site condition at the time of construction. If similar soft conditions are encountered in unexplored areas of the site, the same treatment should be considered for repair. Given the fine/clayey nature of the onsite soil, the exposed surface soils are likely to become unstable rapidly in the presence of excess moisture (water) and construction traffic loading. Therefore, proper site drainage should be maintained during earthwork operations. If not, the accumulation of water could result in construction delays. Common approaches to reduce wet weather delays include grading the area so that surface water flows away from the excavation, sealing exposed soil surface with a smooth -drum roller prior to precipitation events, and forming temporary ditches, swales, berms or other surface water diversion features. We also recommend limiting construction traffic during and after wet weather. 4.1.2 Structural Fill 4.1.2.1 Selection Whether imported or borrowed from an onsite source, structural fill should satisfy the following: • No excessive deleterious material • No rocks or other inclusions greater than 3 inches in diameter • A maximum of 30% of the total material weight retained on the 3/4-inch sieve • Maximum Dry Density (MDD) of 95 pounds per cubic foot (pcf) or greater, as determined by the Standard Proctor Compaction Test (ASTM D698) Waxhaw Town Campus - Waxhaw, North Carolina Page 7 • Liquid Limit (LL) of 50 or less and a Plasticity Index (PI) of 25 or less, as determined by Atterberg Limit testing (ASTM D4318), unless otherwise noted/allowed • Organic content no greater than 3% (by weight) The SM, ML, and CL soils encountered onsite meet the LL/PI requirements above and are suitable for reuse as structural fill. If encountered, CH and MH soils will not meet the LL/PI requirements above; therefore, their use should be restricted to nonstructural areas or at a depth of 18 inchers or greater below parking areas. Although not encountered in our current borings, it is prudent to point out that CH soils were identified by two F&R borings (S-14 and S-15) in 2019 in the southwestern portion of the site. 4.1.2.2 Moisture Conditioning The water content of structural fill should be maintained within t3% of the material's optimum water content as determined by the Standard Proctor Compaction Test (ASTM D698). Please note that soils can be deemed unusable due to water content but shall not be classified as unsuitable based solely on water content. When soil water content falls outside of the requirements set herein, the contractor shall be responsible for taking appropriate measures (drying or wetting) to render the soil usable. 4.1.2.3 Compaction When using large, ride -on compactors, fill should be placed in loose lifts measuring 8 to 10-inch thick. Lift thicknesses should be thinned to 4 to 6 inches when using smaller, Rammax-type compactors and no more than 4 inches thick for sled and jumping -jack tampers. Structural fill should be compacted to the requirements below, which are based on the soil's maximum dry density as determined by ASTM D698: Within 12 inches of finished subgrade elevation ............................ 98% Below 12 inches of finished subgrade elevation ........................... 95% It is recommended that the placement and compaction of structural fill be monitored by an engineering technician from Stewart. Field compaction testing should be performed in accordance with ASTM D1556 (Sand Cone Method), ASTM D2167 (Rubber Balloon Method), ASTM D2937 (Drive Cylinder Method), or ASTM D6938/ D8167 (Nuclear Methods). 4.1.3 Difficult Excavations As discussed in previous Sections 3.3.3 and 3.3.4 of this report, multiple borings encountered shallow weathered rock and/or rock, particularly the northeast section of the property in the vicinity of the proposed Town Hall. Borings S-6, S-7, S-8, S-10, S-11, S-20 and B-06 (F&R) encountered weathered rock very close to, or just above, the proposed finished subgrade elevation. As such, difficult excavation should be expected in these areas. Typically, materials with SPT N-values of 50 blows per 3 inches to 50 blows per 6 inches of penetration are rippable using a CAT D9 dozer with a ripper teeth. Denser material such as rock or weathered rock with SPT N-values of 50 blows per 2 inches or less penetration will likely require blasting and/or hammering to facilitate removal. Please refer to the Boring Logs, Boring Snapshot, and the Boring Summary Table in Appendix B of this report for more detailed information regarding depths and elevations of the weathered rock and rock and how they may impact other site excavations such as trenching for utilities. Waxhaw Town Campus - Waxhaw, North Carolina Page 8 4.1.4 Groundwater Based on information currently on hand, groundwater is not expected to impact site grading. We cannot, however, rule out pockets of perched water that can be encountered unexpectedly above dense or low permeability layers such as weathered rock or clay. In the event that groundwater seepage occurs in open excavations, conventional sump and pump techniques from the point of seepage are expected to be adequate for most temporary conditions. 4.2 Foundations 4.2.1 Design For the Town Hall building, we anticipate maximum column loads of 200 kips and wall loads of 2 kips per linear foot (klf). For the P&R building, we anticipate maximum column and wall loads of 75 kips and 1.5 klf, respectively. Based on these structural loads, the FFEs, and the site preparation recommendations provided in this report, we recommend the use of conventional shallow spread footings to support the proposed structures. For design of the foundations, we recommend the parameters provided in Table 2. Table 2: Spread Footing Design Parameters Parameter Value Net Allowable Soil Bearing Capacity, psf Town Hall 3,500 P&R Building 2,000 Minimum Bearing Depth, in. 18 Minimum Column Footing Widths, in. Town Hall 36 P&R Building 30 Minimum Wall Footing Widths, in. Town Hall 36 P&R Building 36 Estimated Post -Construction Settlement, in. Total 1 or less Differential 1/2 or less Moist Soil Unit Weight, pcf 120 Passive Earth Pressure Coefficient' 2.77 Ultimate Friction Factor (tan b) 0.32 Notes: 1. We recommend that a safety factor of at least 1.5 be used to determine the soil's allowable passive resistance and the soil's allowable friction. 4.2.2 Construction It is preferable for spread footing excavations to be performed using a bucket with a flat cutting edge (no teeth) to reduce disturbance of the exposed bearing soil. Regardless, footing bottoms should be tamped with a jumping -jack or sled compactor prior to the foundation inspection and placement of reinforcing steel. Footings should be clean of loose material and debris and protected from disturbance. This includes protection from surface water run-off and freezing. If water is allowed to Waxhaw Town Campus - Waxhaw, North Carolina Page 9 accumulate within a footing excavation and soften the bearing soils, or if the bearing soils are allowed to freeze, the deficient soils should be removed from the excavation and rechecked by Stewart prior to concrete placement. When concrete cannot be placed immediately, we recommend placing a mud -mat to protect the bearing soil. Foundation bearing soils should be checked by Stewart during construction to verify satisfactory bearing conditions (i.e., materials and strength). This typically involves using a 1/2-inch diameter, T- handled probe rod for an overall qualitative assessment throughout the foundation excavations, followed by strategically placed hand auger borings and Dynamic Cone Penetrometer (ASTM STP-399) testing for quantitative evaluation. DCP testing should be performed in accordance with the ASTM and completed prior to stone, steel, or concrete placement. Unsuitable soil detected during this evaluation should be repaired as recommended by Stewart. If a column footing encounters rock or weathered rock in a portion of the excavation, then the rock/WR should be overexcavated by a minimum of 12 inches and replaced with compacted structural fill soil. Similarly, for strip footings, the rock/WR should be overexcavated by 12 inches from the soil/rock transition point to a distance of 15 feet beyond the beginning of the rock. 4.3 Slab -On -Grade 4.3.1 Design In designing the slab -on -grade, we recommend a minimum 4-inch base layer of washed No. 57 stone to provide uniform support and to provide a capillary break. We also recommend the installation of a vapor barrier as a measure of protection against water vapor intrusion into the building. Even when the groundwater table is not shallow, omitting the vapor barrier could lead to water vapor transmission through the slab and cause damage flooring and/or cause elevated moisture levels within the structure. We recommend considering the use of a vapor barrier meeting ASTM E1745, which should be installed per the ACI guidelines (ACI 302.2R) and ASTM E1643. The design of the concrete slab -on -grade should be based on Westergaard's modulus of subgrade reaction (k). Based on the soil conditions encountered near the surface at the site, and the stone layer recommended above, we recommend using an effective value (kef) of 120 pci for slab design. However, if the floor slab will be heavily loaded or the design is otherwise sensitive to "k", we recommend performing plate load testing in accordance with ASTM D1196 to allow site -specific refinement of the design k-value. It is important to point out that cracking of concrete is normal and should be expected. Proper jointing of slabs is paramount in the control of cracking. The American Concrete Institute (ACI) recommends a maximum panel size (in feet) equal to approximately three times the thickness of the slab (in inches) in both directions. Controlling the water -cement ratio of the concrete, particularly after batching, and including fiber reinforcement in the mix can also help reduce shrinkage cracking. 4.3.2 Construction After the pad area is prepared as described in Section 4.1.1 of this report, it should be evaluated by Stewart to check for weak or excessively unstable areas that need repair. This is typically accomplished by proofrolling with heavy, rubber -tired equipment such as a tandem -axle dump truck. In confined areas that cannot be proofrolled with a dump truck, use of smaller rubber tire equipment, probing, and/or DCP testing should be considered. Waxhaw Town Campus - Waxhaw, North Carolina Page 10 Similar to footing construction discussed herein, if a knob/pinnacle of rock or weathered rock is encountered in the slab area, it should be overexcavated by at least 12 inches and replaced with compacted structural fill soil. Cracking of concrete is normal and should be expected. Proper jointing practices are paramount in the control of cracking, particularly their location and the time at which they are installed. Concrete pavements should be jointed according to ACI 330 Section 3.7. Joint reinforcing shall be sized and detailed by the deck designer. 4.4 Seismic Design Considerations Per the 2018 NC State Building Code, the design of a structure must consider dynamic forces resulting from seismic events, regardless of their likelihood of occurrence. As part of a generalized procedure to estimate seismic forces, the code assigns a Seismic Site Classification (letter designation of Class A through F) based on the subgrade soil/rock conditions within the upper 100 feet of the ground surface at the subject site. Based on our review of the SPT N-values, we recommend designing for a Seismic Site Class "C" for the Town Hall and a Seismic Site Class "D" for the Parks & Recreation building. The following bulleted items briefly discuss our qualitative assessments of the other seismic -related issues. Detailed quantitative analyses for these items were not included in our Scope of Work and are not considered necessary at this time given the development plans and the subsurface conditions encountered. Liquefaction Hazard - Risk level is low - The soils encountered were of sufficient fines content and/or density to render them not readily liquefiable during the design earthquake. • Slope Stability - Risk level is low - Based on the grading plan, neither tall nor overly steep cut/fill slopes are planned for construction. • Surface Rupture - Risk is low - No active faults underlie the site. 4.5 Pavement 4.5.1 Flexible (Asphalt) Design For the subject site, we have assumed that typical traffic will consist of support of 1,000 passenger vehicles per day. The heavy-duty driveway pavement is assumed to support an additional six delivery trucks and two garbage trucks per week. Based on these traffic assumptions, the site soil conditions encountered in the borings, and the site preparation recommendations herein, we recommend the minimum asphalt pavement sections in Table 3. Improvements to any public roads should be designed according to the local municipality's standards. Table 3: Asphalt Pavement Sections Layer Light -Duty Thickness, in. Heavy -Duty Thickness, in. Surface (S9.5B) 2 3* Aggregate Base (ABC) 6 8 * Two lifts required Waxhaw Town Campus - Waxhaw, North Carolina Page 11 The flexible pavement design above is based on the standard 20-year design life and the NCDOT/AASHTO design methodology. All materials and workmanship used during construction should conform to the NC Department of Transportation Standard Specifications for Roads and Structures, current edition. 4.5.2 Construction The pavement recommendations herein are predicated by the assumption that the subgrade soils are suitable for pavement support and have been properly moisture conditioned and compacted to a uniform and stable condition. Experience has shown that most pavement failures are caused by localized soft spots in the subgrade or inadequate drainage. Proofrolling observed by an experienced engineer or technician from Stewart will reduce the likelihood of weak spots in the subgrade. We recommend proofrolling finished subgrades, as well as the subsequently placed stone base, with a tandem -axle dump truck weighing between 25 and 35 tons. Proofrolling should occur in the presence of Stewart so that recommendations can be provided for areas that rut, pump, or deflect excessively. Proofrolling should not be performed on frozen or excessively wet subgrades. If subgrades are exposed to precipitation or freezing temperatures prior to paving, the area should be re-proofrolled to verify its condition. Aggregate base course stone should be compacted to at least 98 percent of its maximum dry density as determined by AASHTO T-180 (modified Proctor). Asphalt shall be placed with appropriate lift thicknesses and achieve the proper compaction for the mix(es) used, as specified in the latest edition of the NCDOT QMS for Asphalt Pavements. For reference, these requirements are provided in Table 4. Table 4: NCDOT Sinqle Lift Asphalt Placement Requirements Asphalt Course Mix Type Thickness, in. Compaction, %* Surface B 1.0 - 1.5 90.0 C, D 1.5 - 2.0 92.0 Intermediate C 2.5 - 4.0 Base 4.0 - 5.5 * Percent of maximum specific gravity (Gmm) The pavement sections provided herein do not account for construction traffic (dump trucks, concrete trucks, Lulls, etc.), which is typically very heavy. If construction traffic is allowed to operate on paved surfaces, damage should be expected. Operating construction equipment on an early placement of base/intermediate course, and then placing a final surface lift at the end of construction, is not an appropriate approach unless the pavement is designed accordingly. In light of this, we recommend that paving operations be scheduled for the end of construction when heavy construction traffic will be less. Waxhaw Town Campus - Waxhaw, North Carolina Page 12 prepare All documents including computer files and drawings Project No.: F21025.00 Figure No.: prepared Stewart are instruments of professional service rIAQ SITE VICINITY MAP intended foror one-time use. They are subject to copyright and other property right laws and shall remain the property of WAXHAW TOWN CAMPUS Scale: NTS Stewart. They are not to be copied, modified, or changed in any manner whatsoever nor assigned to a third party without prior 4220 Waxhaw Marvin Road I,, w /„\ written permission of Stewart. STEWART Prepared by: DB Raleigh, N C Note: All test locations are approximate (unless otherwise p F Date: 07-21-21 reported) and intended for illustration purposes only. enz,,..�.av,��om WOW" ° STEWART T7043347s� a�a �w w�e��l'��m O©2021 O All documents including computer files and drawings prepared by Stewart are instruments of professional serAce intended for one-time use. They are 1 I I / \ 1 1 \ \\ subject to copyright and other property right laws and shall remain the property of Stewart. They are not to be copied, or modified, or a third party y m thout perwhatten per is assigned toathird party without prior written permission //\, \ \ by Stem d / —504— / I Note: All test locations are approximate unless ose reported) and intended for illustration purposes only. Project: ,0' 513 ��23' I S�f4 I a6 11 F.FF..E 8-14 / i 1/6 Igor?, ®R J. iTsq3/-V_G-2%. \. �„ X III Q In \ ` � � \\ \ �. �i /�� ,g' SOp� / / / 9 /r / /� i� .. -' � iSYt✓I I � \ / I � __-_- I V�.". III ��� WILDING ..I,SI1ks III i g O _ o - �� �s/o Title: BORING > ,0 LOCATION DIAGRAM / . / ® SOIL TEST BORING (STEWART, 2021) / / ®SOIL TEST BORING (F&R, 2019) �""'�8� �� ��_ Project number: F2102 -21 Figure: A2 Prepared by: 0721 DB scale 1X17): 1 in = 100 e NORTH I I (1 BORING SNAPSHOT STEWART 535 .................................................................. ............................................................ 535 S-18 S-20 S-19 530 ....................................................................... ... ...... 7ILI .............. .............................................................. 530 24 54 S-22 50/0.3' 14 50/0.3' 50/0. 8 525 .................................... ........ ..... 5253 5010.3...................... ............................................ 525 50/0.0 17 49 AR 50/0.2' AR 50/0.3' 1 8 520 .................................... .................... . ................. ........... S-21 . 520 5-17 T I I I 18 8 1 1, .0 S-16 13 . m515 > ..................................... S-15 .... ....................... ........... ............................... 515 39 w S-14 6 18 11 S-24 5�12 4 50/0.4' 510 S-13 .................... 4 26 ........... 21 ..... ' 22 ....................... .......................... . . ........................... . ............ 5............... 510 �O9 4 5 2 8 S- 23 508 7 15 6 23 18 S-12 50-7 1 26 jM 26 7 7 505 ... I 17 ....... 18 ...... 24 ....... ---21 .............................................................................................................. ........... 72* 1 505 I .... . = 827 20 5033 22 23 58 I 8 500 - 21 . .......................................................... ............. ........... ................................. 500 13 11 18 495 1495 The borings in ths snapshd are arranged inalphabetical orcLranddo rot represent a pwib or— sdim oftle-6—face w dffws. LITHOLOGY GRAPHICS Topsoil /Organic Lean Clay (CL) FI m. Layer Silt (ML) Silty Sand (SM) MI Weathered Crystaline EnRock (WR) WAXHAW TOWN CAMPUS IH] Elastic Silt (MH) WAXHAW,NC PROJECT NO.: F21025.00 BORING SNAPSHOT BUILDING BORINGS STEWART 550 550 S-11 545 .................................................................................................................................................................................. 545 10 8 540 ...................... .......................... .............. ............ .................... 21 540 18 S-10 50 S-7 60 535 ...................... ............. j--6 *9* .... 50/0.2 .... : . .... S-9 ...... 14 ..... 30/, 50/0.4' 535 36 50 5�34 3 50/0.2' 50/0.2' 50/0.2' 1 1 72 66 10 50/0.2' T 530 ...................... . ............. .. ........ . * ........ 50/0.4' 50/0.0' ....... ......... 5302 ........ ..... so/... ....... 50/0. 0' .................. 530 . 21 AR AR 53 50/0.2' - 50/0.3' 5�281 50/0.4' 5272 50/0.3' 23 50/0.0' .0 525 .............. .......... 50/0:0 50/0. 0' 50/0.2' AR '66�6.6- .......... ..... AR .................. 525 > a) lS--'3 M� 50/0.1- AR 52-5 w E- AR S-2 50/0.0' 035 9 AR 520 ... S-1 ... ........ ..... .......... .............................. .... .................. 520 10 12 39 3 14 9 515 ... ............. ........ ............... .......... .................... .... .................. 515 19 m 50/0.0' 9 41 AR 510 1 510 17 50/0.4' 505 .............................................................................. ............ 505 53 5001 500 The borings in ths snapshd are amrged in alphabetical orcLr and do rot rep—t a pWib or — sdim oftle-6—face w dffws. LITHOLOGY GRAPHICS Topsoil /Organic Lean Clay (CL) Layer Silt (ML) Weathered Crystaline EnRock Silty Sand (SM) M-1 (WR) WAXHAW TOWN CAMPUS WAXHAW,NC PROJECT NO.: F21025.00 STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW, NC EXPLORATION SUMMARY TABLE PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 Borehole ID Date Performed Ground Surface El. (ft) Exploration Depth (ft) Time of Drilling GW Depth El. (ft) (ft) After Drilling Depth (ft) GW El. (ft) Weathered Rock Depth El. (ft) (ft) Depth (ft) Refusal EI. (ft) S- 1 7/1 /2021 519 15 DRY DRY S- 2 6/30/2021 521.5 14.4 DRY DRY 14.5 507 S- 3 6/30/2021 523.5 10.6 DRY DRY 10.6 512.9 S- 4 6/29/2021 530 8 DRY DRY 4.5 525.5 8 522 S- 5 6/29/2021 536 11.4 DRY DRY 8.5 527.5 11.4 524.6 S- 6 6/29/2021 534 10 DRY DRY 2 532 10 524 S- 7 6/30/2021 536 5.9 DRY DRY 3.5 532.5 5.9 530.1 S- 8 6/29/2021 541 14.3 DRY DRY 6 535 14.3 526.7 S- 9 6/29/2021 534 15 DRY DRY S-10 6/30/2021 537 10.3 DRY DRY 7 530 10.3 526.7 S-11 6/30/2021 545 14.9 DRY DRY 9.5 535.5 14.9 530.1 S-12 7/1 /2021 506.5 10 DRY DRY S-13 7/1 /2021 510 10 DRY DRY S-14 7/1 /2021 512.5 10 DRY DRY S-15 7/1 /2021 514.5 10 DRY DRY S-16 7/1 /2021 515 10 DRY DRY S-17 7/1 /2021 518 10 DRY DRY S-18 6/30/2021 531.5 8.2 DRY DRY 4 527.5 8.2 523.3 S-19 6/30/2021 530 9.8 DRY DRY 9.5 520.5 S-20 6/29/2021 531 8.7 DRY DRY 4 527 8.7 522.3 S-21 6/29/2021 519 10 DRY DRY 7 512 S-22 6/29/2021 528 10 DRY DRY S-23 7/1 /2021 508.5 10 DRY DRY S-24 7/1 /2021 512 10 DRY DRY Note: Blank cells indicate not encountered or not measured/recorded. Refer to the individual boring log and report for additional details I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-1 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 07/01 /21 LOGGED BY J. NANCE GROUND SURFACE EL. 519 ft BORING DEPTH 15 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 10.9 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 10.3ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau 2 a IY < Q L U m = a a z H O w D Q 10 20 30 40� 0 80 90 o MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () w ca- m z 10 20 30 40 50 60 70 80 90 0.3 TOPSOIL 59&7 ---- -- -- ----------- ----------------------------- RESIDUAL - SOFT, LIGHT BROWN AND RED, MOIST, SANDY CLAY WITH TRACE ROOTLETS 1 CL SS 3 1 1 2 ...:............. ...:............. ...:.... 3 2.5 _3.0 — — — — — — — — — — — -- STIFF TO HARD, RED, MOIST, SANDY SILT 3.5 SS 3 4 ...:...:...:..........:...:...:...:... 2 5 9. 5 6 ...........:... ................ ...:.... SS 4 6 3 3 9 7.5 8.5 ML SS 6 ... :....:....:.......:....:....:.......:.... 4 7 10 17 10 ...:..♦:....:...:..............:...:.... 5os.7 508.1 ................ �..........:........... COLOR TRANSITION TO BROWN AND OLIVE ...:....:....:... . ...:........:... . ...:.... 13.5 L15 13 21 ...:............. ...:............. ..... 32 15.0 15 53 BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S- 2 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/30/21 LOGGED BY J. NANCE GROUND SURFACE EL. 521.5 ft BORING DEPTH 14.4 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 8.3 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 8.2ft DRILL RIG D50-T HAMMERTYPE AUTO CL [&IN MATERIAL DESCRIPTION TOPSOIL RESIDUAL - STIFF, RED AND LIGHT BROWN, MOIST, SANDY LEAN CLAY ------------------------------ STIFF TO HARD, RED AND LIGHT BROWN, MOIST, SANDY SILT COLORS TRANSITION TO LIGHT BROWN AND WHITE _ SAMPLE J CC` z O W 0-1 W m z L Q U d a Z u) HOD LU Q w o U)ED00 z 1 3 SS 4 1 6 10 2.5 3.5 4 SS 6 2 8 5 14 6 7 SS 9 3 15 24 7.5 8.5 13 SS 17 4 24 41 10 SS 1 40 WEATHERED ROCK -VERY DENSE, WHITE AND GRAY, MOIST, SILTY SAND WITH ROCK FRAGMENTS BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. A SPT N-VALUE (BPF) A 10 20 30 40 50 60 70 80 90 PL WC LL 10 20 30 40 50 60 70 80 90 ❑ FINES CONTENT (%) ❑ 1 ------------ A- ............ Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S- 3 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/30/21 LOGGED BY J. NANCE GROUND SURFACE EL. 523.5 ft BORING DEPTH 10.6 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 7.9 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 7.5ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau = a IY LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 o MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () w ca- m z 10 20 30 40 50 60 70 80 90 RESIDUAL -STIFF, LIGHT BROWN AND RED, MOIST, SANDY LEAN CLAY 1 ...:....:....:......:........:...:...:.... CL SS 3 1 4 5 ...:............. ...:............. ...:.... 9 2.5 3.0 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 520-5 — — — — STIFF TO VERY STIFF, LIGHT BROWN AND WHITE, MOIST, SANDY SILT 3.5 5 6 ...:...:...:...:...:...:...:...:...:... 2 2 6 12 5 ...:..:........ :........ :............... 6 ...:............. ...:............. ...:.... ML SS 3 3 4 5 9 n n 7.5 516 515.6 ...:...:...:...:...:...:............... 8.5 g 11 ...:....:....:...:...:....:....:...:...:.... 4 4 8 �9 10 ...:...♦........:...:.............:...:.... 10.6 512.9 SS AUGER REFUSAL NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S- 4 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/29/21 LOGGED BY J. NANCE GROUND SURFACE EL. 530 ft BORING DEPTH 8 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 5.5 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 5.4ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau _ ry LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 a MATERIAL DESCRIPTION I- D El FINES CONTENT %❑ () o Louo m OU z w ca- 10 20 30 40 50 60 70 80 90 0.3 TOPSOIL 5297 ---- -- -- ----------- RESIDUAL -VERY DENSE, WHITE AND LIGHT BROWN, MOIST, SILTY SAND WITH TRACE ROCK FRAGMENTS 1 SS 10 23 ,..... 1 30 SM .':'::: 2.5 53 3.5 4.5 SS 2 24 WEATHERED ROCK - PHYLLITE, SAMPLED AS WHITE AND LIGHT BROWN, 50/0.5 SILTY SAND 5 ... :....:............... :............... 6 ® SS 50/0.1' ...:............. : ...... . WR 6.1 3 0/0.1' 8.0 - 8 S So/o.o' 0/0.0 AUGER REFUSAL NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S- 5 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/29/21 LOGGED BY J. NANCE GROUND SURFACE EL. 536 ft BORING DEPTH 11.4 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 7.9 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 7.9ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau 2 a ry < Q L U m = a a z H O w D Q 10 20 30 40� 0 80 90 MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () o w ca- m z 10 20 30 40 50 60 70 80 90 0.3 TOPSOIL 5357 ---- -- -- ----------- RESIDUAL - HARD, WHITE AND LIGHT BROWN, MOIST, SANDY SILT 1 ...:....:....:.......:....:....:.......:.... SS 10 12 1 24 ...:............. ...:............. ...:.... 36 2.5 A: ML ROCK FRAGMENTS OBSERVED IN SAMPLE SS-2 3.5 16 18 ........ :........ ...................... 2 2 48 66 5 ...:........:.......:......A.:.......:.... 5.5 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 53Q� MEDIUM DENSE, GRAY AND WHITE, MOIST, SILTY SAND WITH ROCK FRAGMENTS 6 ...:....:....:...:...:....:....:...:...:... . SS 26 8 .... 13 21 7.5 ... 528.1 _ - 527-5 -- ----------- WEATHERED ROCK - PHYLLITE, SAMPLED AS GRAY AND WHITE, MOIST, 4 50/0.4' SILTY SAND 8.9 0/0.4 ...:............. ; . . WR - 11.4 - 11. SS So/o.o' 0/0.0 AUGER REFUSAL NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S- 6 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/29/21 LOGGED BY J. NANCE GROUND SURFACE EL. 534 ft BORING DEPTH 10 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 8.7 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 6.8ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 Q~ z O w Lau PL WC LL _ ry LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 a MATERIAL DESCRIPTION I- D El FINES CONTENT %❑ () o Louo m OU z w ca- 10 20 30 40 50 60 70 80 90 0.3 OL TOPSOIL 5337 ---- -- -- ----------- RESIDUAL - VERY DENSE, LIGHT BROWN AND WHITE, MOIST, SILTY SAND WITH ROCK FRAGMENTS 1 SM :..:.::. SS 10 43 :.... 2.0 1 50/0.2' WEATHERED ROCK - PHYLLITE, SAMPLED AS LIGHT BROWN AND WHITE, 2.2 Lj - DRY, SILTY SAND - 3.5 ® SS 50/0.4' 3.9 2 0/0.4 ...... WR 50/0.2' ...:....:....:...:....... - 62® 3S 0/0.2' 527. 8.5 ® SS 50/0.2' 525.3 8.7 4 0/0.2' 10.0 _ 594 n Ss AUGER REFUSAL NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S- 7 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/30/21 LOGGED BY J. NANCE GROUND SURFACE EL. 536 ft BORING DEPTH 5.9 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 4.1 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 3.8ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ 0 w Lau 2 a ry Q L U m = a a z H O w D Q 10 20 30 40� 0 80 90 o MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () w ca- m z 10 20 30 40 50 60 70 80 90 RESIDUAL -DENSE, LIGHT BROWN AND WHITE, MOIST, SILTY SAND SM SS 21 50 2.5 _3.5 — — — WEATHERED ROCK - PHYLLITE, SAMPLED AS WHITE AND GRAY, DRY, 532-5 3.7 � 2 50/0.2' -- 0/0.2 ----------- SILTY SAND 532.2 ...... 531.9 WR 5.9 5.9 SS 50/0.0' 0/0.0 AUGER REFUSAL NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. BORING INITIALLY ENCOUNTERED REFUSAL AT 5 FEET. OFFSET BORING WAS PERFORMED AND REFUSED AT 5.9 FEET AS NOTED ON LOG ABOVE Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S- 8 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/29/21 LOGGED BY J. NANCE GROUND SURFACE EL. 541 ft BORING DEPTH 14.3 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 10.8ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau 2 a ry < Q L U m = a a z H O w D Q 10 20 30 40� 0 80 90 o MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () w ca- m z 10 20 30 40 50 60 70 80 90 0.3 TOPSOIL 5907 ---- -- -- ----------- ----------------------------- RESIDUAL -VERY STIFF, BROWN AND GRAY, MOIST, SANDY LEAN CLAY, WITH ROCK FRAGMENTS 1 CL SS 6 8 1 10 ...:............. ...:............. ...:.... 1$ 2.5 _3.0 53U — — — — VERY DENSE, LIGHT BROWN AND GRAY, MOIST, SILTY SAND WITH ROCK FRAGMENTS 3.5 SM f; ;' : 2S 7 26 ....:. 34 5 fi0 ...:....:........:.......A...:...;...:.... 5.5 "`- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 535-5 WEATHERED ROCK - PHYLLITE, SAMPLED AS GRAY AND WHITE, DRY, - SILTY SAND 6 ® 50/0.2' 3S 2 6.0/0.2' ® 4 50/0.2' - 8.7 0/0.2' WR = n,,,,, 13.5 SS 36 14.3 1,96 7 5 14. 6S 50/0.3' 50/0.0' 0/0.3 ... ....:....:...:...:....:....:........ : AUGER REFUSAL NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S- 9 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/29/21 LOGGED BY J. NANCE GROUND SURFACE EL. 534 ft BORING DEPTH 15 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 9 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 9ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau = a IY LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () o w ca- m z 10 20 30 40 50 60 70 80 90 0.3 OL TOPSOIL 5337 ---- -- -- ----------- RESIDUAL - STIFF TO VERY STIFF, LIGHT BROWN AND WHITE, MOIST, SANDY SILT WITH TRACE ROCK FRAGMENTS 1 SS 4 4 1 6 ...:............. ...:............. ...:.... 10 2.5 3.5 g 6 ...:...:...:...:...:...:...:...:...:... 2 2 8 14 5 ...:..:....:...:...:....:....:...:...:.... ML 6 ...:....:....:...:...:....:....:...:.... SS 8 9 3 14 ........ ......... ......... ......... ......... 23 7.5 8.5 595 SS 9 10 .:.......:........:........ 4 18 2$ 10 ...:.......A...:...:.............:...:.... 12.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 522-0 DENSE, LIGHT BROWN AND WHITE, MOIST, SILTY SAND SM:':'::: 13.5 SS 21 ... ............. �...�............. �...�.... 18 1Sn C':': cenn 3Q BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-10 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/30/21 LOGGED BY J. NANCE GROUND SURFACE EL. 537 ft BORING DEPTH 10.3 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 6.1 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 5.9ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau _ a ry LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () o w ca- m z 10 20 30 40 50 60 70 80 90 0.4 TOPSOIL-------------------------- 53U RESIDUAL - STIFF, LIGHT BROWN AND WHITE, MOIST, SANDY LEAN CLAY WITH TRACE ROOTLETS 17 88.4 CL SS 5 7 23 32 7 ... :.... .{..:...........:...:....... 14 2.5 VERY DENSE, LIGHT BROWN AND WHITE, MOIST, SILTY SAND WITH ROCK FRAGMENTS 3.5 SS 5 31 ....................................... ....:. 2 41 SM „:... :... `: 5 72 ...:............. ; ........:....: A......:... . 530.s 11 SS 31 7.0 53001 3 WEATHERED ROCK - PHYLLITE, SAMPLED AS LIGHT BROWN AND WHITE, 7.3 50/0.3 MOIST, SILTY SAND WR 8.5 ® 4 50/0.3' 8.8 0/0.3' ....... :......... :...:....:......... ;...:.... 10.3 1 1,9671 10.3— SS 50/0.0' _ ._ _ ...:....:........:...:.............:...:.... AUGER REFUSAL NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. BORING INITIALLY ENCOUNTEREED REFUSAL AT 8.3 FEET. OFFSET BORING WAS PERFORMED AND REFUSED AT 10.3 FEET AS NOTED ON LOG ABOVE Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-11 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/30/21 LOGGED BY J. NANCE GROUND SURFACE EL. 545 ft BORING DEPTH 14.9 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 10.7 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 10.7ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 Q~ z O w Lau PL WC LL _ a ry LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () o w ca- m z 10 20 30 40 50 60 70 80 90 0.5 11 TOPSOIL 54 — ----------------------------- RESIDUAL - STIFF, LIGHT BROWN, MOIST, LEAN CLAY — -- -- ----------- : 14 1 BS ...:..:.........:........:.........;p.:.... 83.4 CL 1.5 1 3 4 18 30 6 ...:...��...:...:............. ...:.... 10 2.5 3.0 — — — — 5429 -- -- VERY STIFF TO HARD, LIGHT BROWN AND WHITE, MOIST, SILT 3.5 SS 9 9 ....... :... :...:...:...:............... 2 12 21 5 ...:........... :........ :........ :....... 6 ...:....:....:......:....:....:......:.... ML SS 5 13 3 37 ........ ......... ......... ......... ......... 50 7.5 ROCK FRAGMENTS OBSERVED IN SAMPLE SS-3 ....................................... 8.5 SS9 13 ... :....:............... ............... 9.5 1 5355 4 WEATHERED ROCK - PHYLLITE, SAMPLED AS LIGHT BROWN AND WHITE, 50/0.4 - MOIST, SILTY SAND 9 9 ............:...:.............:.... 534.3 WR - 5 50/0.2' - 13.7® 0/0.2' 14.9 530.1 SS AUGER REFUSAL NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-12 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 07/01 /21 LOGGED BY J. NANCE GROUND SURFACE EL. 506.5 ft BORING DEPTH 10 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 5.6 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 5.4ft DRILL RIG D50-T HAMMERTYPE AUTO CL MATERIAL DESCRIPTION -TOPSOIL RESIDUAL - MEDIUM STIFF TO VERY STIFF, BROWN, MOIST, SANDY, LEAN CLAY COLOR TRANSITION TO LIGHT BROWN AND RED _ SAMPLE J CC` z O W 0-1 W m z L Q U d a Z u) HOD LU Q w o U)ED00 z 1 3 SS 3 1 5 8 2.5 3.5 9 SS 11 2 12 5 23 6 5 SS 6 3 7 13 7.5 8.5 SS 6 4 9 9 BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. A SPT N-VALUE (BPF) A 10 20 30 40 50 60 70 80 90 PL WC LL 10 20 30 40 50 60 70 80 90 ❑ FINES CONTENT (%) ❑ 20 95. .:....:�—i 21 45: .:............. ...:.... Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-13 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 07/01 /21 LOGGED BY J. NANCE GROUND SURFACE EL. 510 ft BORING DEPTH 10 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 6.7 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 6.3ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau 2 a IY < Q L U m = a a z H O w D Q 10 20 30 40� 0 80 90 o MATERIAL DESCRIPTION Lou I- OU ❑ FINES CONTENT %❑ () w o ca- m z 10 20 30 40 50 60 70 80 90 0.4 TOPSOIL-------------------------- 50U RESIDUAL - MEDIUM STIFF, LIGHT BROWN, MOIST, SANDY LEAN CLAY WITH TRACE ROOTLETS 1 CL SS 3 3 3 ...:............. ...:............. ...:.... 6 2.5 -3.0 - - - - - 507-0 -- -- VERY STIFF, LIGHT BROWN AND RED, MOIST, SANDY SILT 3.5 5 8 ...:...:...:...:...:...:...:...:...:... 2 2 9 17 5 ...:..:....:...:...:....:....:...:...:.... 6 ...:....:....:......:....:....:......:.... ML 503.7 SS 7 503.3 3 10 12 ........ ......... ......... ......... ....:.... 22 7.5 8.5 g 9 ...:....:....:...:...:....:....:...:...:.... 4 4 12 10.0 10 21 BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-14 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 07/01 /21 LOGGED BY J. NANCE GROUND SURFACE EL. 512.5 ft BORING DEPTH 10 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 5.4 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 5.4ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 Q~ z O w Lau PL WC LL = a IY LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () o w ca- m z 10 20 30 40 50 60 70 80 90 0.5 — TOPSOIL ----------------------------- 512.0 ---- -- -- : : ----------- RESIDUAL - SOFT TO VERY STIFF, LIGHT BROWN AND RED, MOIST, SANDY SILT WITH TRACE ROOTLETS 1 SS 2 1 1 4 2.5 3.5 M L 2S g 10 ...:...:...:...:...:...:...:...: 13 23 5 ...:....:..:...:...:....:.........;...:.... 507.1 6 ...:....:....:......:....:....:......:.... SS 7 7 3 1$ 7.5 8.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 504,5 MEDIUM DENSE, RED AND BROWN, MOIST, SILTY SAND 8.5 SM SS : : ......... ......... .....inn 4 10 BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-15 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 07/01 /21 LOGGED BY J. NANCE GROUND SURFACE EL. 514.5 ft BORING DEPTH 10 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 5.8 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 5.8ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau = IY LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 a MATERIAL DESCRIPTION I- D El FINES CONTENT %❑ () o Louo m OU z w ca- 10 20 30 40 50 60 70 80 90 0.4 TOPSOIL-------------------------- 5J`� RESIDUAL - STIFF TO VERY STIFF, RED AND BROWN, SANDY SILT WITH ROCK FRAGMENTS 1 SS 4 4 1 7 ...:............. ...:............. ...:.... 11 2.5 3.5 SS 7 10 ...:...:...:...:...:...:...:...:...:... 2 11 21 ML 5 ...:.......:.......:....:....:.......:.... 5�.7 g ...:............. ...:............. ... SS 7 1115 3 . . . . 26 7.5 ♦: 8.5 4 ...........:...:...�....�....:...;...�.... 14 BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-16 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 07/01 /21 LOGGED BY J. NANCE GROUND SURFACE EL. 515 ft BORING DEPTH 10 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 5.6 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 5.6ft DRILL RIG D50-T HAMMERTYPE AUTO ML MATERIAL DESCRIPTION ,TOPSOIL RESIDUAL - MEDIUM STIFF TO VERY STIFF, BROWN, MOIST, SANDY SILT WITH TRACE ROCK FRAGMENTS COLOR TRANSITION TO RED AND LIGHT BROWN _ SAMPLE J Cam` z LU 0-1 O W W m L Q U 0- u) �0D LU Q w J 0-Z 0 i z 0 (01000 :,, Q 1 3 SS 2 1 4 6 2.5 3.5 9 SS 12 2 14 5 26 6 7 SS 9 3 9 18 7.5 8.5 SS 7 4 10 11 BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. A SPT N-VALUE (BPF) A 10 20 30 40 50 60 70 80 90 PL WC LL 10 20 30 40 50 60 70 80 90 ❑ FINES CONTENT (%) ❑ Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-17 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 07/01 /21 LOGGED BY J. NANCE GROUND SURFACE EL. 518 ft BORING DEPTH 10 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 5.6 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 5.6ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 Q~ z O w Lau PL WC LL = a IY LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () o w ca- m z 10 20 30 40 50 60 70 80 90 TOPSL 0.6 RESIDUAL - STIFF, RED AND BROWN, MOIST, SANDY LEAN CLAY WITH TRACE ROCK FRAGMENTS 1 CL SS 1 4 5 8 ...:............. ...:............. ...:.... 13 2.5 3.0 — 59 -- -- STIFF TO VERY STIFF, LIGHT BROWN AND WHITE, MOIST, SANDY SILT 3.5 7 8 ...:...:...:...:...:...:...:...:...:... 2 2 10 �$ 5 ... :..-L... ............... 512.4 6 ...:....:....:......:....:....:......:.... ML SS 8 3 10 12 ........ ......... ......... ......... ......... 22 7.5 8.5 4 ...........:...:...�....�....:...;...�.... inn 8 BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-18 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/30/21 LOGGED BY J. NANCE GROUND SURFACE EL. 531.5 ft BORING DEPTH 8.2 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 5.5 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 5.4ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau _ a ry LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () o w ca- m z 10 20 30 40 50 60 70 80 90 0.4 TOPSOIL-------------------------- 531J RESIDUAL - MEDIUM DENSE, LIGHT BROWN, MOIST, SILTY SAND WITH ROCK FRAGMENTS 1 SS 7 8 1 SM 24 2.5 3.5 4.0 SS 39 WEATHERED ROCK - PHYLLITE, SAMPLED AS WHITE AND LIGHT BROWN 4.3 5010.3 - 0/0.3' WR _ 6 ® SS 3 50/0.1, ... :............. :................ :...:.... 6.1 0/0.1' 8. 523.3 SS ................ ............... ....... AUGER REFUSAL NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-19 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/30/21 LOGGED BY J. NANCE GROUND SURFACE EL. 530 ft BORING DEPTH 9.8 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 6.7 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 6.5ft DRILL RIG D50-T HAMMERTYPE AUTO LU SAMPLE A SPT N-VALUE (BPF) A a } ~ J LU 471 CL 10 20 30 40 50 60 70 80 90 PL WC LL Q 0 LU LU LU z 2 LU ry Q LU U m = a z (/) H O LU Q 10 20 30 40 0 80 90 LU MATERIAL DESCRIPTION J J a w S D a_j0 ? El FINES CONTENT % () ❑ 0 LU �j 0 cA 10 0 Z in ?n nn nn sn Fn 7n sn an 0.4 TOPSOIL-------------------------- 52U RESIDUAL - STIFF TO HARD, LIGHT BROWN AND WHITE, MOIST, SANDY SILT WITH ROCK FRAGMENTS 1 SS 6 6 1 8 ...:............. ...:............. ...:.... 14 2.5 3.5 SS 7 15 ...:...:...:...:...:...:...:...:...:... 2 15 ML 5 30 ...:....:...i..:....... :........ :........ 6 ...:....:....:......:....:....:......:.... SS 14 27 5 3 22 ........ ......... ......... ......... ......... 49 7.5 8.5 SS 11 ...:....:.........;...:....:.........;...:.... 9.5 4 22 9.8 WR WEATHERED ROCK - PHYLLITE, SAMPLED AS GRAY AND WHITE, DRY, 90 9 19 $ 50/0.3 SILTY SAND BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-20 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/29/21 LOGGED BY J. NANCE GROUND SURFACE EL. 531 ft BORING DEPTH 8.7 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 5.7 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 5.3ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau = a IY LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 o MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () w ca- m z 10 20 30 40 50 60 70 80 90 RESIDUAL - VERY DENSE, LIGHT BROWN AND WHITE, MOIST, SILTY SAND WITH ROCK FRAGMENTS ' SS 8 23 SM 31 ...:....:....:...:...:.............:...:.... 54 2.5 :A 3.5 4.0 5270 SS 39 WEATHERED ROCK - PHYLLITE, SAMPLED AS GRAY AND WHITE, SILTY 4.3 SAND 0/0.3' 525.7 525.3 6 SS ® 50/0.3' WR 6.3 3 0/0.3' R 7 8.5 SS AUGER REFUSAL NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC DATE DRILLED 06/29/21 LOGGED BY J. NANCE DRILLING CONTRACTOR HPC DRILLING METHOD HSA AUGERSIZE 2-1/4 INCH (ID) DRILL RIG D50-T HAMMERTYPE AUTO W a Q ry LLU Q MATERIAL DESCRIPTION 0 !!-- ML SM BORING LOG: S-21 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 GROUND SURFACE EL. 519 ft BORING DEPTH 10 ft TIME OF DRILLING: WL DRY CAVE-IN 6.2 ft AFTER DRILLING: WL DRY CAVE-IN 6 ft TOPSOIL ------------------------------ RESIDUAL - MEDIUM STIFF, LIGHT BROWN, MOIST, SANDY SILT ------------------------------ DENSE, BROWN, MOIST, SILTY SAND WITH WEATHERED ROCK FRAGMENTS WEATHERED ROCK (LENS) - PHYLLITE, SAMPLED AS LIGHT BROWN AND WR WHITE, MOIST, SILTY SAND _8.0 _ ------------------------------ MEDIUM DENSE, BROWN, MOIST, SILTY SAND WITH WEATHERED ROCK FRAGMENTS SM BORING TERMINATED SAMPLE A SPT N-VALUE (BPF) A J W 471 fl- 10 20 30 40 50 60 70 80 90 p W LLy PL WC LL > Q _ m = cn I— W D 10 20 30 40 50 0 80 90 > a a z � O D j El FINES CONTENT El >J OU (%) W > 0 U) m Z 10 20 30 40 50 60 70 80 90 1 ...:....:....:.......:....:....:...:...:.... SS 3 2 1 6 ...:............. ...:............. ...:.... $ 2.5 -- 3.5 - 13 19 ...:...:...:...:...:...:...:...:...:... 2 2 20 39 5 ...:....:....... ....... :........ :........ 6 ...:............. ...:............. ...:.... 512.8 SS 13 5120 3 35 50/0.4 7.4 51L9 ---- -- -- -----===--- 8.5 _ SS 14 ...........:...:...�....�....:...;...�.... 4 14 NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-22 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 06/29/21 LOGGED BY J. NANCE GROUND SURFACE EL. 528 ft BORING DEPTH 10 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 5.8 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 5.7ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau = a IY LU < Q L U m = a a z u) H O w D Q 10 20 30 40� 0 80 90 MATERIAL DESCRIPTION Louo I- OU El FINES CONTENT %❑ () o w ca- m z 10 20 30 40 50 60 70 80 90 0.4 TOPSOIL-------------------------- 527-6 RESIDUAL - MEDIUM STIFF, LIGHT BROWN, MOIST, SANDY CLAY LEAN WITH TRACE ROOTLETS 16: 85.4 CL SS 3 3 8 36: $ 2.5 3.0 ----- -- -- VERY STIFF, LIGHT BROWN AND RED, MOIST, SANDY SILT 3.5 7 8 ...:...:...:...:...:...:...:...:...:... 2 2 9 �� 5 ...:..:....:...:...:....:....:...:...:.... COLOR TRANSITION TO LIGHT BROWN AND WHITE SL2'. g ...:............. :...:............. : ML SS 6 3 8 10 ........ ......... ......... ......... ....:.... 1$ 7.5 8.5 SS $ ...........:...:...�....�....:...;...�.... inn 4 10 BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-23 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 07/01 /21 LOGGED BY J. NANCE GROUND SURFACE EL. 508.5 ft BORING DEPTH 10 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 5.6 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 5.4ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau 2 a IY < Q L U m = a a z H O w D Q 10 20 30 40� 0 80 90 MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () o w ca- m z 10 20 30 40 50 60 70 80 90 TOPSL 0.6 RESIDUAL - MEDIUM STIFF TO VERY STIFF, BROWN, MOIST, SANDY LEAN CLAY 1 ............... ........ ...:... . SS 3 3 1 4 ...:............. ...:............. ...:.... T 2.5 A 3.5 7 9 ...:...:...:...:...:...:...:...:...:... 2 2 11 5 20 ...:......:.......:........:...:...:.... CL COLOR TRANSITION TO LIGHT BROWN AND RED SAa 1 502.9 SS 3 1 3 7 $ 7.5 8.5 3 4 ...:....:....:...:...:....:....:...:...:.... 4 4 7 10.0 10 11 BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. I STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW. NC BORING LOG: S-24 PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 DATE DRILLED 07/01 /21 LOGGED BY J. NANCE GROUND SURFACE EL. 512 ft BORING DEPTH 10 ft DRILLING CONTRACTOR HPC TIME OF DRILLING: WL DRY CAVE-IN 5 ft DRILLING METHOD HSA AUGERSIZE 2-1/41NCH(ID) AFTER DRILLING: WL DRY CAVE-IN 4.9ft DRILL RIG D50-T HAMMERTYPE AUTO w SAMPLE A SPT N-VALUE (BPF) A a } J 471 10 20 30 40 50 60 70 80 90 PL WC LL Q~ z O w Lau 2 a IY < Q L U m = a a z H O w D Q 10 20 30 40� 0 80 90 MATERIAL DESCRIPTION Louo I- D OU El FINES CONTENT %❑ () o w ca- m z 10 20 30 40 50 60 70 80 90 0.3 TOPSOIL 59L7 ---- -- -- ----------- ----------------------------- RESIDUAL - MEDIUM STIFF, LIGHT BROWN, MOIST, SANDY ELASTIC SILT MH SS 3 2 1 3 ...:....:....:......:....:....:......:.... 5 2.5 _3.0 — — — — — -- VERY STIFF, RED AND BROWN, MOIST, SANDY LEAN CLAY 3.5 CL 2S g 11 ...:...:...:...:...:...:...:...: 15 26 5 ...:....:..�.:... : ...:....:....: 5.5 ----------------------------- 5063 HARD, LIGHT BROWN, MOIST, SANDY SILT 6 .............:... .............:... ........ SS 18 28 3 44 ............:................:.......:.... 72 7.5 ML 8.5 SS 11 18 ...:....:....:...:...:....:....:.......:.... 4 40 10.0 10 58 BORING TERMINATED NOTE(S); GSE INTERPOLATED FROM PROVIDED TOPOGRAPHIC MAP AND SHOULD BE CONSIDERED APPROXIMATE. Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. fgcR FROEHLING ::: ROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 533 ± Total Depth: 10.0' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina BORING LOG Boring: B-01 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/10/19 Driller: F&R/Skoglund Elevation Depth Description of Materials * Sample Sample Depth N-Value blows/ft) Remarks (Classification) Blows feet 532.8 0.2 SURFICIAL SOIL r 5-18-24 U.0 No groundwater : 42 encountered g. boring at time of drilling. RESIDUUM: Dense, Orange Brown, Silty Fine to 531.5 1.5 Medium SAND (SM), dry — — — — — — — — — — — 1 5 5 5-6 Stiff to Very Stiff, Brown, Silty CLAY (CL) with some fine to medium sand, moist 11 3.0 3.5 8-14-15 29 5.0 526.0 7.0 Hard, Tan Gray, Silty Fat CLAY (CH), moist 22-42-50/3 6.5 PARTIALLY WEATHERED ROCK: Sampled as 100+ White and Gray, Clayey, Fine to Coarse SAND 8.0 (SC), dry-------------------- 524.5 8.5 Sampled as Brown and Gray, Fine to Medium 8.5 50/6 Sandy SILT (ML) with some clay and rock 100+ 523.0 10.0 fragments, dry to moist Boring Terminated at 10 feet Number ot blows r quired tor a 140 lb hammer dropping 30 to drive 2 O.D., 1.375 I.D. sampler a totof 18 inc es in t ree 6 increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. f$c� FROEHLINGROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 532 ± Total Depth: 8.0' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina BORING LOG Boring: B-02 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/11/19 Driller: F&R/Skoglund Elevation Depth Description of Materials (Classification) * Sample Blows Sample Depth feet N-Value blows/ft) Remarks 530.0 2.0 SURFICIAL SOIL 4-14-19 12-47-50/5 0.0 1.5 33 100+ No groundwater encountered in boring at time of drilling. RESIDUUM: Hard, Tan and Brown, Silty CLAY (CL) with some fine sand, dry PARTIALLY WEATHERED ROCK: Sampled as Tan, Silty CLAY (CL) with some fine sand, dry 3.0 528.5 3.5 ------------------------ Sampled as Tan, Fine Sandy CLAY (CL) with rock 3.5 50/6 fragments, dry 100+ 5.0 525.0 6.5 6.5 100+ RESIDUUM: Hard, Gray and Tan, Silty Fat CLAY (CH), moist 16-50/6 PARTIALLY WEATHERED ROCK: Sampled as Tan and Gray, Silty Fine to Medium SAND (SM) with 524.0 8•0 50/0 8.0 rock fragments, dry 100+ Auger Refusal at 8 feet 'Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. f$cR FROEHLWG > ROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 531 ± Total Depth: 11.0' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina BORING LOG Boring: B-03 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/10/19 Driller: F&R/Skoglund Elevation Depth Description of Materials * Sample Sample Depth N-Value Remarks (Classification) Blows feet (blows/ft) 530.6 0.4 SURFICIAL SOIL 4-9-11 No groundwater RESIDUUM: Very Stiff, Orange Brown, Fine to 20 encountered in boring at time of drilling. 529.5 1.5 Medium Sandy CLAY (CL), dry _ _ _ _ _ _ _ _ _ J 1.5 11-14-16 Very Stiff, Tan, Clayey SILT (ML), dry 30 3.0 527.5 3.5 Hard, Tan and Gray, Silty CLAY (CL), dry to moist 3.5 12 17-18 35 5.0 524.0 7.0 ___ _ __________ __ 11-11-18 6.5 Very Stiff, Light Gray and Brown, Silty CLAY (CL) 29 with trace fine sand, dry 8.0 522.5 8.5 8.5 PARTIALLY WEATHERED ROCK: Sampled as Tan 50/2 and Gray, Clayey Fine to Medium SAND (SC) with 100+ rock fragments, dry 10.0 520.0 11.0 Auger Refusal at it feet 50/0 100+ *Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. fgcR FROEHLINGROBERTSON 16 Project No: 63X-0157 Client: Dewberry Elevation: 529 ± Total Depth: 15.0' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina �I:ll1► [cII9Z0 Boring: B-04 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/11/19 Driller: F&R/Skoglund Elevation Depth Description of Materials * Sample Sample Depth N-Value blows/ft) Remarks (Classification) Blows feet SURFICIAL SOIL 4-8-7 0.0 No groundwater 15 encountered g. boring at time of drilling. RESIDUUM: Stiff, Tan and Brown, Silty CLAY (CL) 527.5 1.5 with little fine sand, dry ____________ 15 Very Stiff, Light Brown and Gray, Clayey SILT (ML)l 10-10 12 with little fine to medium sand, moist 22 3.0 3.5 6-10-13 23 5.0 522.5 6.5 6.5 PARTIALLY WEATHERED ROCK: Sampled as 20-34-50/5 Light Brown, Fine Sandy SILT (ML), dry 100+ 8.0 520.5 8.5 8.5 RESIDUUM: Very Hard, Light Brown, Fine 20-29-33 Sandy SILT (MIL), dry 62 10.0 515.5 13.5 13.5 PARTIALLY WEATHERED ROCK: No Recovery 50 2 100+ 514.0 15.0 Auger Refusal at 15 feet 50/0 100+ "Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. AIL c� FROEHLING ROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 527 ± Total Depth: 6.0' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina Boring: B-05 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/10/19 Driller: F&R/Skoglund Elevation Depth Description of Materials * Sample Sample Depth N-Value Remarks (Classification) Blows feet (blows/ft) • SURFICIAL SOIL 3-8-11 No groundwater 19 encountered in boring at time of drilling. RESIDUUM: Very Stiff, Orang Brown and Tan, 525.5 1.5 SiItyCLAY (CL) ________________ 15 Very Stiff, Orange Brown and Tan, Silty CLAY (CL) 19-10 12 with few fine to medium sand, dry 22 3.0 523.5 3.5 3.5 PARTIALLY WEATHERED ROCK: Sampled as Tan 50/3 and Light Gray, Clayey Fine to Medium SAND (SC) 100+ with some rock fragments, dry 5.0 521.0 6.0 Auger Refusal at 6 feet 50/0 100+ 'Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. Project No: 63X-0157 Client: Dewberry Elevation: 527 ± Total Depth: 3.5' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina BORING LOG Boring: B-06 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/11/19 Driller: F&R/Skoglund Elevation Depth Description of Materials * Sample Sample Depth N-Value blows/ft) Remarks (Classification) Blows feet 0.1 SURFICIAL SOIL 3 9-5u.0 No groundwater 14 encountered in boring at time of drilling. RESIDUUM: Stiff, Tan and Gray, Clayey SILT (ML), dry 1.5 17-50/4 525.0 2.0 100+ PARTIALLY WEATHERED ROCK: Sampled as Tan, Silty Fine to Medium SAND (SM) with mostly rock 523.5 3.5 fragments 3.0 Auger Refusal at 3.5 feet 50/0 3.5 100+ 'Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. Fgc� FROEHLING ROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 524 ± Total Depth: 18.0' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina BORING LOG Boring: B-07 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/10/19 Driller: F&R/Skoglund Elevation Depth Description of Materials * Sample Sample Depth N Value Remarks (Classification) Blows feet (blows/ft) 0-1 SURFICIAL SOIL 4-6-10 No groundwater 16 encountered g. boring at time of drilling. RESIDUUM: Very Stiff, Tan and Orange Brown, Silty CLAY (CL), dry 1.5 8-12-13 25 Fx 3.0 520.5 3.5 Hard, Tan and Light Gray, Silty CLAY (CL) with few 3.5 8-11-24 fine sand, moist 35 5.0 12-35-50/4 6.5 517.0 7.0 100+ PARTIALLY WEATHERED ROCK: Sampled as Tan and Light Gray, Clayey SILT (ML) with little fine to medium sand, moist 8.0 515.5 8.5 Sampled as Tan and Brown, Fine to Medium 8.5 50/5 Sandy SILT (ML) with some clay and rock 100+ fragments, dry 10.0 510.5 13.5 Sampled as Tan and Gray, Silty Fine to Medium 13.5 50/2 SAND (SM) with mostly rock fragments, dry 100+ 15.0 506.0 18.0 Auger Refusal at 18 feet 50/0 100+ ^`Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. f$cR FROEHLING ROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 523 ± Total Depth: 17.5' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina BORING LOG Boring: B-08 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/11/19 Driller: F&R/Skoglund Elevation —572'y Depth Description of Materials (Classification) * Sample Blows Sample Depth feet N-Value blows/ft) Remarks 521.5 0-1SURFICIAL 1.5 SOIL 4-4-5 1.5 9 13 No groundwater encountered in boring at time of drilling. RESIDUUM: Stiff, Tan an Light Brown, Clayey SILT (ML), dry — — — —----------------- Stiff, Tan and Light Gray, Clayey SILT (ML) with little fine to medium sand, dry 4-6-7 3.0 519.5 3.5 — — — — — — — — — — — — — — — — — — — — — — — — Very Stiff, Tan, SILT (ML), dry 3 5 8-9-9 18 5.0 516.5 6.5 — — — — — — — — — — — — — — — — — — — — — — — — Very Stiff, Light Gray, SILT (ML), dry 6 5 9-10-14 24 8.0 514.5 8.5 Very Stiff, Light Gray, Fine Sandy SILT (ML), dry 8.5 6 9 17 26 10.0 509.0 14.0 13.5 100+ 19-50 4 PARTIALLY WEATHERED ROCK: Sampled as Tan and Gray, Fine Sandy SILT (ML) 15.0 505.5 17.5 Auger Refusal at 17.5 feet 50/0 17.5 100+ *Number of blows r q ired for a 140 lb hammer dropping 30 to drive 2 O.D., 1.375 I.D. sampler a totof 18 inc es in three 6 increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. BORING LOG FROEHLING ROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 523 ± Total Depth: 10.0' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina Boring: B-09 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/10/19 Driller: F&R/Skoglund Elevation Depth Description of Materials * Sample Sample Depth N-Value blows/ft) Remarks (Classification) Blows feet 0.1 SURFICIAL SOIL 5-9 12 No groundwater 21 encountered in boring at time of drilling. RESIDUUM: Very Stiff, Tan and Light Brown, 521.5 1.5 ClaygSIIT(MI),dry ________--- ___ J 15 Very Stiff, Tan and Brown, Silty CLAY (CL), dry to 12-12-13 moist 25 3.0 3.5 9-50/5 519.0 4.0 100+ PARTIALLY WEATHERED ROCK: Sampled as Tan and Light Gray, clayey SILT (ML) with few fine sand, dry 5.0 516.5 6.5 Sampled as Tan and Light Gray, clayey SILT (ML) 6.5 22-50/2 with some fine to medium sand, dry 100+ 8.0 514.5 8.5 Sampled as Light Gray, Silty Fine to Medium 8.5 50/3 SAND (SM) with some rock fragments, dry 100+ 513.0 10.0 Auger Refusal at 10 feet *Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. �$cR FROEHLING , ROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 523 ± Total Depth: 8.5' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina BORING LOG Boring: B-10 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/11/19 Driller: F&R/Skoglund Elevation Depth Description of Materials (Classification) * Sample Blows Sample Depth feet N-Value blows/ft) Remarks 0.1 SURFICIAL SOIL 3-6-6 12 No groundwater encountered in boring at time of drilling. RESIDUUM: Stiff, Light Brown, SILT (ML), dry 521.5 1.5 Stiff, Tan and Light Brown, Clayey SILT (ML), dry 1.5 5 4-6 to moist 10 3.0 519.5 3.5 Stiff, Tan and Orange Brown, Clayey SILT (ML) 3.5 6-6-7 with trace fine to medium sand, moist 13 5.0 516.5 516.0 6.5 7.0 Very hard, Tan and Light Gray, Silty CLAY (CL), moist 6.5 100+ 30-50/6 PARTIALLY WEATHERED ROCK: Sampled as Brown and Gray, Silty Fine to Medium SAND (SM) with some rock fragments, dry 514.5 8 5 8.0 50/0 Auger Refusal at 8.5 feet 100+ Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. FgcR FROEHLING I, ROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 522 ± Total Depth: 10.0' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina BORING LOG Boring: B-11 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/10/19 Driller: F&R/Skoglund Elevation Depth Description of Materials (Classification) * Sample Blows Sample Depth feet N Val blowsue ue Remarks 0-1 SURFICIAL SOIL 3-5-7 U.0 No groundwater 520.5 1.5 M1, 1.5 12 21 encountered in boring at time of drilling. RESIDUUM: Stiff, Orange Brown and Tan, Silty CLAY (CL), dry to moist -- —— — — — — — — — — — — — — — — — Very Stiff, Tan and Brown, Silty CLAY (CL) with few fine sand, moist 6 -8-13 3.0 518,5 3.5 Very Stiff, Tan and Light Gray, Clayey SILT (ML) 3.5 10-9-11 with trace fine sand, dry to moist 20 5.0 6.5 5-8-11 19 8.0 5-7-50/6 8.5 512.5 9.5 100+ PARTIALLY WEATHERED ROCK: Sampled as Tan and Light Gray, Clayey SILT (ML) with some fine 511.0 11.0 to medium sand, dry 11.0 Auger Refusal at 11 feet `Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. FROEHLING ROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 522 ± Total Depth: 8.5' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina BORING LOG Boring: B-12 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/11/19 Driller: F&R/Skoglund Elevation Depth Description of Materials (Classification) * Sample Blows Sample Depth feet N Val blowsue ue Remarks SURFICIAL SOIL 3-4-6 U.0 No groundwater 520.5 1.5 1.5 10 18 encountered in boring at time of drilling. RESIDUUM: Stiff, Orange Brown and Tan, SILT (ML), dry------------------- Very Stiff, Tan, SILT (ML) with few fine sand, dry to moist 7-7-11 3.0 518.5 3.5 Hard, Light Gray and Brown, Fine Sandy SILT 3.5 13-12-25 (ML), dry 37 5.0 515.0 514.5 7.0 7.5 — — — — — — — — — — — — — — — — — — — — — — — — Hard, Gray and Tan, Silty Fat CLAY (CH), moist 19-17-50/2 6.5100+ PARTIALLY WEATHERED ROCK: Sampled as Tan and Gray, Clayey Fine to Medium SAND (SC) with few rock fragments, dry 513.5 8•5 8.0 50/0 Auger Refusal at 8.5 feet 100+ 'Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. F$cR FROEHLING ,: ROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 523 ± Total Depth: 11.0' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina BORING LOG Boring: B-13 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/11/19 Driller: F&R/Skoglund Elevation Depth Description of Materials * Sample Sample Depth N-Value blows/ft) Remarks (Classification) Blows feet SURFICIAL SOIL 4-4-6 No groundwater 10 encountered in boring at time of drilling. RESIDUUM: Stiff, Gray and Brown, Fine to Medium Sandy SILT (ML) with little clay, dry 521.0 2.0 Stiff, Tan, Clayey SILT (ML) with little fine sand 15 dry 3.0 3.5 9-13-13 518.5 4.5 — — — — — — — — — — — — — — — — — — — — — — — — 26 Very Stiff, Orange Brown and Tan, Clayey SILT 5.0 (MH), moist 710-50/6 6.5 100+ 515.5 7.5 PARTIALLY WEATHERED ROCK: Sampled as 8.0 514.5 8.5 Tan, Fine to Medium Sandy SILT (ML) with little 8.5 26-50/2 clay_, dry -------------------jam Sampled as Tan, Fine to Medium Sandy SILT (ML) 100+ with little clay and some rock fragments, dry 10.0 512.0 11.0 Auger Refusal at 11 feet `Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. f$cR FROEHLING =,ROBERTSON Project No: 63X-0157 Client: Dewberry Elevation: 519 ± Total Depth: 10.0' Project: Waxhaw - Public Works and Fire Station Boring Location: See Test Location Plan City/State: Waxhaw, North Carolina BORING LOG Boring: B-14 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/11/19 Driller: F&R/Skoglund Elevation Depth Description of Materials * Sample Sample Depth N Val blowsue ue Remarks (Classification) Blows feet SURFICIAL SOIL (with bark, leaves) 3-4-8 0.0 No groundwater 12 encountered in boring at time of drilling. 517.5 1.5 1.5 RESIDUUM: Stiff, Orange Brown, Silty CLAY (CH) 5-6-8 with some fine sand, moist 14 3.0 515.5 3.5 Very Stiff, Orange Brown and Tan, Clayey SILT 3.5 10 10-9 (MH), moist 19 5.0 512.5 6.5 Stiff, Tan and Light Brown, Clayey SILT (ML), 6.5 4-5-6 moist 11 8.0 510.5 8.5 Very Stiff, Gray and Brown, SILT (ML), dry 8.5 21-12-15 27 509.0 10.0 Boring Terminated at 10 feet *Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. oFROEHLING ROBERTSON Project No: 63X-0157 Client: Dewberry Project: Waxhaw - Public Works and Fire Station City/State: Waxhaw, North Carolina Elevation: 522 ± Total Depth: 10.0' Boring Location: See Test Location Plan BORING LOG Boring: B-15 (1 of 1) Drilling Method: HSA Hammer Type: Automatic Date Drilled: 10/11/19 Driller: F&R/Skoglund Elevation Depth Description of Materials * Sample Sample Depth N-Value blows/ft) Remarks (Classification) Blows feet 521.7 0.3 SURFICIAL SOIL 3-4-6 0.0 No groundwater 10 encountered g. boring at time of drilling. RESIDUUM: Stiff, Orange Brown and Tan, Silty 520.5 1.5 Fat CLAY (CH), dry ______________ 15 5-18-20 Dense to Medium Dense, Orange Brown, Clayey Fine to Medium SAND (SC) with mostly quartz 38 fragments, dry 3.0 3.5 7-13-17 30 5.0 6.5 8-6-6 12 8.0 513.5 8 5 Very Stiff, Orange Brown, Fine to Medium Sandy 8.5 10-13-16 SILT (ML) with little clay, moist 29 512.0 10.0 Boring Terminated at 10 feet *Number of blows r q ired for a 140 lb hammer dropping 30 to drive 2 1 O.D., 1.375 1 I.D. sampler a totof 18 inc es in three 6 increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N-Value. UNIFIED SOIL CLASSIFICATION (ASTM D-2487) MATERIAL CRITERIA FOR ASSIGNING SOIL GROUP NAMES TYPES GROUPI SOIL GROUP NAMES & LEGEND GRAVELS CLEAN GRAVELS Cu>4 AND 1<Cc<3 GW WELL -GRADED GRAVEL w >50% OF COARSE <5% FINES Cu>4AND 1>Cc>3 GP POORLY -GRADED GRAVEL a p z FRACTION RETAINED a Q o w ON NO 4. SIEVE GRAVELS WITH FINES FINES CLASSIFY ASMLORCL GM SILTY GRAVEL w w z Z V) >12% FINES FINES CLASSIFY AS CL OR CH GC CLAYEY GRAVEL Q � O O 0 � N SANDS Cu>6AND 1<Cc<3 SW WELL -GRADED SAND CLEAN SANDS 0 o z <5% FINES Cu>6AND 1>Cc>3 SP POORLY -GRADED SAND < A >50% OF COARSE Ov FRACTION PASSES FINES CLASSIFY ASMLORCIL SM SILTY SAND ON NO 4. SIEVE SANDS AND FINES > 12% FINES FINES CLASSIFY AS CL OR CH SC CLAYEY SAND SILTS AND CLAYS PI>7 AND PLOTS>"A" LINE CL LOW PLASTICITY (LEAN) CLA U) INORGANIC LU 0 LIQUID LIMIT<50 PI>4 AND PLOTS<"A" LINE ML LOW PLASTICITY SILT w > Lf)w w a o ORGANIC LL (oven dried)/LL (not dried)<0.75 OL ORGANIC CLAY OR SILT o SILTS AND CLAYS PI PLOTS >"A" LINE CH HIGH PLASTICITY (FAT) CLA Ln p INORGANIC z A z LIQUID LIMIT>50 PI PLOTS <"A" LINE MH HIGH ELASTICITY SILT ORGANIC LL (oven dried)/LL (not dried)<0.75 OH ORGANIC CLAY OR SILT HIGHLY ORGANIC SOILS PRIMARILY ORGANIC MATTER, DARK IN COLOR, AND ORGANIC ODOR PT PEAT 0 MATERIAL TYPES ENCOUNTERED ONSITE SAMPLE TYPES ® Fat Clay (CH) ® Lean Clay (CL) ® Split Spoon ® Elastic Silt (MH) F7 Silt (ML) Silty Sand (SM) El Topsoil / Organic Layer Weathered Crystaline ADDITIONAL ABBREVIATIONS, TERMS, & SYMBOLS Rock (WR) HSA - HOLLOW -STEM AUGER FIAD - FILLED IMMEDIATELY PLASTICITY CHART 80 70 60 x 50 z CL r 40 V 30 � g OH & MH a 2p P 10 rEEEIT�ML OL 0 0 10 20 30 40 50 60 70 80 90 100 110 120 LIQUID LIMIT (%) TEWART HA - HAND AUGER AFTER DRILLING/DIGGING SPT - STANDARD PENETRATION TEST DRY - REQUIRES WETTING TO REACH OPTIMU BPF - BLOWS PER FOOT MOIST - AT OR NEAR OPTIMUM PL - PLASTIC LIMIT WET - REQUIRES DRYING TO REACH OPTIMUM LL - LIQUID LIMIT SAT - SATURATED, NEARLY LIQUID MC - MOISTURE CONTENT TRACE- < 5% SS - SPLIT SPOON FEW - 5 - 10 % FEW - 15 - 25 % AP - AUGER PROBE LITTLE - 15 - 25% SOME - 30 - 45% WL - WATER LEVEL USCS - UNIFIED SOIL CLASSIFICATION SYSTEM V WATER LEVEL AT TIME OF DRILLING WOH - WEIGHT OF HAMMER WOR - WEIGHT OF RODS V WATER LEVEL AFTER DRILLING EOD - END OF DAY �n CAVE-IN LEVEL PENETRATION RESISTANCE (RECORDED AS BLOWS PER 6IN.) SAND & GRAVEL SILT & CLAY UNDRAINED SHEAR RELATIVE DENSITY BLOWS/FOOT- CONSISTENCY BLOWS/FOOT- STRENGTH (KSF) VERYLOOSE 0-3 VERY SOFT 0-1 0 - 0.25 LOOSE 4-9 SOFT 2 - 4 0.26 - 0.50 MEDIUM DENSE 10 - 30 MEDIUM STIFF (FIRM) 5 - 8 0.51 - 1.0 DENSE 31 - 50 STIFF 9-15 1.1 - 2.0 VERYDENSE 51+ VERY STIFF 16 - 30 2.1 - 4.0 HARD 31+ 4.0+ * NUMBER OF BLOWS OF 140 LB HAMMER FALLING 30 INCHES TO DRIVE A 2 INCH O.D. (1-3/8 INCH I.D.) SPLIT -BARREL SAMPLER THE LAST 12 INCHES OF AN 18-INCH DRIVE(ASTM-1586 STANDARD PENETRATION TEST). LEGEND TO SOIL DESCRIPTIONS STEWART PROJECT WAXHAW TOWN CAMPUS LOCATION WAXHAW, NC SUMMARY OF LABORATORY RESULTS PAGE 1 OF 1 CLIENT TOWN OF WAXHAW PROJECT NO. F21025.00 Borehole Depth Liquid Limit Plastic Limit Plasticity Index Maximum Size (mm) o 0 Sieve Sieve Class- ification Water Content N Max. Dry Density (pcf) Opt. Water Content N Void Ratio S- 1 1.5 15.7 S- 2 1.5 20.0 S- 3 1.5 21.3 S- 8 1.5 19.8 S-10 2.0 32 23 9 0.075 88.4 CL 16.8 S-11 1.5 30 18 12 0.075 83.4 CL 14.2 112.1 14.0 S-11 4.0 23.2 S-12 2.0 45 21 24 0.075 95.0 CL 19.8 S-14 1.5 17.1 S-17 1.5 20.4 S-22 2.0 36 18 18 0.075 85.4 CL 16.0 ASTM D4318 Liquid and Plastic Limits Test Report 60 Dashed line indicates the approximate SOIL DATA NATURAL SYMBOL SOURCE SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY USCS NO. CONTENT LIMIT LIMIT INDEX � S-10 21-045 16.8 22.9 31.7 8.8 CL ■ S-11 Bulk 21-047-lftto-2ft 14.2 18.3 29.9 11.6 CL � S-22 21-046 16.0 18.5 36.1 17.6 CL • S-12 21-044 19.8 21.3 44.9 23.6 CL Tested By: JE Checked By: Tested By: JE Checked By: Particle Size Distribution Report CO co C C O N M O O O 000 O O V O 3k 3k 3k 3k ZM 3k 100 I I I I I I I 0 90 I I I I I I I I I I 10 I I I I I I I I I I I I 80 I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I 70 30 m LU 60 40 n z m z z w o Of LLI 40 60 Cf) M I I I I I I I I I I I I I I 30 I I I I I I I I I I I I I I 70 I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I 80 10 I I I I I I I I I I I I I I 90 o 1100 100 10 1 0.1 0.01 0.001 0.0001 GRAIN SIZE - mm. Client: Town of Waxhaw Project: Waxhaw Town Campus S T E WA RT Project No.: F21025.00 Figure %Gravel %Sand %Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay a 0.0 0.0 0.0 0.2 5.1 6.3 88.4 0 0.0 0.0 3.8 1.9 4.8 6.1 83.4 0 0.0 0.0 0.1 0.6 5.2 8.7 85.4 0 0.0 0.0 0.2 0.2 1.6 3.0 95.0 SOIL DATA SYMBOL SOURCE SAMP NO LE DEPTH Material Description USCS o S-10 21-045 Tan/ Gray Lean Clay w/ organics CL ❑ S-11 Bulk 21-047 -lft to -2ft Tan Lean Clay with Sand w/ organics CL o S-22 21-046 Tan/ Brown Lean Clay with Sand CL o S-12 21-044 Tan/ Brown Lean Clay w/ organics CL Tested By: JE Checked By: PO Box 832 Mooresville, NC 28115 www.soilandforestryservices.com July 19, 2021 Job #21-1098 Stewart Engineering Attn: Don Brown, PE 5400 Old Poole Road Raleigh, NC 27610 Re: Seasonal -High Water Table Determination-Waxhaw Marvin Road site At your request Soil & Forestry Services of the Carolinas, PA (S&FS) has prepared a detailed soil profile description to assist project engineers in designing stormwater facilities for a parcel at the intersection of Waxhaw Marvin and Kensington Drive in Union County, NC. Specifically, our scope of work involved determining the depth of seasonal -high water table, if present in 2 proposed locations. The following is a brief report of the methods utilized in this evaluation and the results obtained. Soil Evaluation S&FS was provided soil samples taken at the 2 proposed stormwater facility locations. The samples were not continuous in nature with grab depths at four separate ranges: 1'-2.5', 3.5'- 5', 6'-7.5' and 8.5'-10'. Samples were taken by others via drill rig. Specifically, we evaluated soils taken at drill locations S-23 and S-24. The boring locations, furnished to S&FS, are shown on the attached site plan. The evaluation involved identifying and recording soil morphological conditions at the requested location in order to develop a profile description included with this report. Evaluated soil types formed from the weathering of Carolina Slate Belt rock materials. These soil types contain a high percentage of silt textures. The soil samples were taken on ridge/shoulder landscape positions. Soil conditions were moist at the time of field evaluation. Seasonal -High Water Table Evidence of seasonal -high water table (SHWT) was identified in both samples. For location 5-23 SHWT was identified in the 6.0-7.5' grab depth. In the case of location 5-24 SHWT was identified in the 3.5'-5' grab depth. The seasonal high-water table depth was determined via reduced soil mottles (2 chroma Munsell color). In the case of sample 5-24 the depth of soil was limited to 5ft. Sample 5-24 grab depths greater than 5ft were determined to be C horizon (parent materials). Profile descriptions for the samples are attached with this report. Soil & Forestry Services, PA is pleased to be of service in this matter and we look forward to assisting in the successful completion of the project. Sincerely, Wendell Overby, LSS, RF Eric: Figure 1: Boring Location Map Figure 2: Profile Descriptions 2 Figure 1. Soil Profile Descriptions S&FS Project Name: Stewart Engineering-Waxhaw Date: 7/19/21 Job Number: 21-1098 Conducted By:Wendell Overby Boring Location Test area #1 (S-23) Test area #2 (S-24) Horizon 1 Depth 1-2.5' 1-2.5' Horizon Designation B BA Matrix Color 2.5YR 5/8 10YR 7/6 Mottle Color Texture Silty Clay Silt Loam Structure Blocky Blocky moist Consistence Friable Friable Horizon 2 Depth 3.5-5' 3.5-5' Horizon Designation BC BC Matrix Color 5YR 6/8 2.5YR 5/8 Mottle Color 5Y 8/3 2.5Y 7/6 & 5Y 8/1 Texture Silty Clay Loam Silty Clay Structure Blocky Blocky moist Consistence Friable Friable Horizon 3 Depth 6-7.5' 6-7.5' Horizon Designation BC Cr Matrix Color 5YR 5/8 2.5Y 7/4 Mottle Color 2.5Y 7/8 & 5Y 8/1 Texture Silty Clay Loam Channery slate rock Structure Blocky moist Consistence Friable Horizon 4 Depth 8.5-10' 8.5-10' Horizon Designation BC Cr Matrix Color 5YR 5/8 2.5Y 7/4 Mottle Color 2.5Y 7/8 & 5Y 8/1 Texture Silty Clay Loam Channery slate rock Structure Massive moist Consistence Friable Horizon 5 Depth Horizon Designation Matrix Color Mottle Color Texture Structure moist Consistence Horizon 6 Depth Horizon Designation Matrix Color Mottle Color Texture Structure moist Consistence Horizon 7 Depth Horizon Designation Matrix Color Mottle Color Texture Structure Moist Consistence Depth to seasonal high water table 1 6.0-7.6' 1 3.6-6.0' r r i rc s I4x e ro i Photograph 3: Cleared trail near boring S-19 from previous subsurface exploration activities. Photograph 4: Miscellaneous household garbage observed scattered throughout the site. U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-02216 County: Union U.S.G.S. Quad: NC- Catawba NE NOTIFICATION OF JURISDICTIONAL DETERNIINATION Requestor: Town of Waxhaw Erskine Smith Address: 1150 N. Broome Street Waxhaw, NC 28173 Telephone Number: 704-843-2195 E-mail: esmith(&waxhaw.com Size (acres) 8_5 Nearest Town Marvin Nearest Waterway Twelvemile Creek River Basin Santee USGS HUC 03050103 Coordinates Latitude: 34.945266 Longitude:-80.774083 Location description: The review area is located on west side of Waxhaw-Marvin Road; at the intersection of Waxhaw-Marvin Road and Kensington Drive. PIN: 06192003A. Reference review area description shown in Jurisdictional Determination Request package entitled "Figure 1, Aerial Site Map" Indicate Which of the Following Apply: A. Preliminary Determination ® There appear to be waters on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 2/4/2020. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are waterson the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ We recommend you have the waters on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. SAW-2019-02216 ❑ The waters on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ❑ The waters have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below onDATE. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Bryan Roden -Reynolds at 704-510-1440 or brvan.roden-revnoldsnn ,u sace.armv.mil. C. Basis For Determination: Basis For Determination: See the preliminary jurisdictional determination form dated 2/5/2020. D. Remarks: None. E. Attention USDA Program Participants This delineation/determmation has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Phillip Shannin, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** LY: RODEN REYNOLDS.BRYAN.KENNETH.1263385574 Digitally signed by RODEN REYNOLDS.BRYAN.KENNETH.1263385574 Corps Regulatory Official: Date: 2020.02.0511:08:53-05'00' Date of JD: 2/5/2020 Expiration Date of JD: Not applicable SAW-2019-02216 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Agent: Dewberry Katherine Shumaker Address: 551 Piney Forest Road Danville, VA 24540 Telephone Number: 434-549-8510 E-mail: kshumaker(adewberrv.eom NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Town of Waxhaw, Erskine Smith File Number: SAW-2019-02216 Date: 2/5/2020 Attached is: See Section below ❑ INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A ❑ PROFFERED PERMIT Standard Permit or Letter ofpermission) B ❑ PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D M1 PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.asi) or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Admilstrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Phillip Shannin, Administrative Appeal Review Officer Attn: Bryan Roden -Reynolds CESAD-PDO Charlotte Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 1 OM15 8430 University Executive Park Drive, Suite 615 Atlanta, Georgia 30303-8801 Charlotte, North Carolina 28262 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Bryan Roden -Reynolds, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 2/5/2020 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Town of Waxhaw, Erskine Smith, 1150 N. Broome Street, Waxhaw, NC 28173 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Town of Waxhaw, SAW-2019- 02216 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The review area is located on west side of Waxhaw-Marvin Road; at the intersection of Waxhaw-Marvin Road and Kensington Drive. PIN: 06192003A. Reference review area description shown in Jurisdictional Determination Request package entitled "Figure 1, Aerial Site Map". (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: Union City: Marvin Center coordinates of site (lat/long in degree decimal format): Latitude: 34.945266 Longitude:-80.774083 Universal Transverse Mercator: Name of nearest waterbody: Twelvemile Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ® Field Determination. Date(s): 01/30/2020 TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Estimated amount of Type of aquatic q Geographic authority to Latitude (decimal Longitude (decimal aquatic resources inwhich resources (i.e., the aquatic resource "may Feature degrees) degrees) review area (acreage wetland vs. non - be" subject (i.e., and linear feet, if wetland waters) Section 404 or Section applicable 10/404) Stream SA 34.945115 -80.773309 484 linear feet Non -wetland 404 Weiland WA 34.94511 -80.773351 0.021 acre Wetland 404 Wetland WB 34.945277 -80.773333 0.0004 acre Wetland 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AID could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative orjudicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AID, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Maps: Aerial Project Area Map, Topographic Project Area Map, National Wetland Inventory, Map, NRCS Web Soil Survey, and Wetland Exhibit ❑ Data sheets prepared/submitted by or on behalf of the PJD requestor. ❑ Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: Topographic Project Area Map (1:24,000 Catawba NE, NC) ® Natural Resources Conservation Service Soil Survey. Citation: Web Soil Survey (Web Soil Survey of Union County) ® National wetlands inventory map(s). Cite name: National Wetland Inventory Map (USFWS NWI Mapper) ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ®Aerial (Name & Date): Aerial Project Area Map (Google Imagery Dated 03/30/2018) or ®Other (Name & Date): Photographs 1-2 ❑ Previous determination(s). File no. and date of response letter: ® Other information (please specify): Wetland Exhibit, Sheet 1 (Dated 02/04/2020) and NCDWQ Stream Identification Form (Version 4.11) Dated 10/24/2019 IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later Jurisdictional determinations. RODEN Digitally signed by RODEN REYNOLDS.BRYANXEN NETH. REYNOLDS.BRYAN.KE 1263385574 NNETH.1263385574 Date: 2020.02.0511:07:59 -05'00' Signature and date of Regulatory staff member completing PJD 2/5/2020 Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)1 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. S • o • o Wetland WB ;. Stream SA u Wetland u WA °s :...................... LEGEND •• ••• ••• •�� Fv] Wetland Stream Continues beyond delineation Scale 1:75 Investigation Boundary TITLE DATE REVISION SHEET NO. Dewberry' Dewberry Engineers Inc. Wetland Exhibit 11/4/2019 Revised 1 551 Piney Forest Road Danville, VA24540-3353 2/4/2020 PROJECT PROJ. NO. DRAWING NO 434.797.4497 Waxhaw Fire Station 50118752 1 Wetland / WOTUS Table: Waxhaw Fire Station Map ID Classification Square Feet Acreage Linear Feet Lat/Long Data Point WA Wetland 916.47 0.0210 34.946110/-80.773351 N/A WB Wetland 19.13 0.0004 34.945277/-80.773333 N/A SA Stream 484.30 34.945115/-80.773309 N/A