Loading...
HomeMy WebLinkAboutSW6220904_Design Calculations_20221102 (4)• " " ' " ' ' PROJECT NAME Hidden Valley Subdivision DATE 07-22-22 PROJECT NO 1860 DESIGN PHASE PRELIM CONSTR / X / REVISION LOCATION Quewiffle Township, Raeford, NC BY BPB RECORD OTHER CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE CONTINUED AREAS (INLETS) INLET AREA (AC) INLET Cc RUNOFF COEFF. INLET ISCHARG (CFS) Q (+) JPSTREAN BYPASS (CFS) Q(-) INLET BYPASS (CFS) CAPTURED INLET TOTAL ISCHARG AREAS (CFS) (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO OT-1 CI-2 OT-1 7.79 0.35 10.91 0.00 0.00 10.91 7.79 15.00 0.00 15.00 5.51 0.35 CI-2 CI-3 CI-2 0.25 0.65 0.65 0.00 0.00 0.65 8.04 5.00 0.06 15.06 5.50 0.36 CI-3 FES-4 CI-3 0.24 0.65 0.62 0.00 0.00 0.62 8.28 5.00 0.14 15.14 5.49 0.37 OT-5 CI-6 OT5 5.80 0.35 8.12 0.00 0.00 8.12 5.80 15.00 0.00 15.00 5.51 0.35 CI-6 CI-7 CI-6 1.15 0.50 2.30 0.00 0.45 1.85 6.95 5.00 0.06 15.06 5.50 0.37 CI-7 FES-8 CI-7 0.18 0.65 0.47 0.00 0.11 0.36 7.13 5.00 0.14 15.14 5.49 0.38 CI-9 CI-10 CI-9 1.00 0.55 2.65 0.45 0.63 2.02 1.00 5.00 0.00 5.00 7.29 0.55 CI-10 FES-11 CI-10 0.20 0.65 0.63 0.11 0.07 0.56 1.20 5.00 0.10 5.10 7.27 0.57 CI-12 CI-13 CI-12 1.00 0.50 2.63 0.63 0.62 2.01 1.00 5.00 0.00 5.00 7.29 0.50 CI-13 FES-14 CI-13 0.09 0.50 0.25 0.07 0.01 0.24 1.09 5.00 0.10 5.10 7.27 0.50 INLET CI-15 INLET 22.27 0.35 31.18 0.00 0.00 31.18 22.27 15.00 0.00 15.00 5.51 0.35 CI-15 CI-16 CI-15 0.67 0.50 1.96 0.62 0.00 1.96 22.94 5.00 0.01 15.01 5.51 0.35 CI-16 FES-17 CI-16 0.14 0.65 0.38 0.01 0.00 0.38 23.08 5.00 0.08 15.08 5.50 0.36 CI-18 CI-19 CI-18 1.68 0.55 3.70 0.00 1.22 2.48 1.68 5.00 0.00 5.00 7.29 0.55 CI-19 FES-20 CI-19 0.26 0.65 0.68 0.00 0.09 0.59 1.94 5.00 0.05 5.05 7.28 0.56 CI-21 CI-22 CI-21 1.06 0.55 3.55 1.22 1.28 2.27 1.06 5.00 0.00 5.00 7.29 0.55 CI-22 FES-23 CI-22 0.11 0.65 0.29 0.00 0.02 0.27 1.17 5.00 0.10 5.10 7.27 0.56 CI-24 FES-25 CI-24 0.57 0.60 2.67 1.30 0.00 2.67 0.57 5.00 0.00 5.00 7.29 0.60 1860-Storm drainage.xim 10-YEAR Date: 11/2/2022 Time: 6:40 AM Page 1 of 4 " ' ' DATE DESIGN PHASE NAME 7H,dd.n Valle Subdivision 07-22-22 PROJECT NO 1860 PRELIMCT CONSTR / X REVISIONION RECORDiffle OTHER (SPECIFY) Township, Raeford, NC BY BPB CHECKED BY CSB n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE - CONTINUED Q ISCHARG (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (IN) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) UPSTREA LOWER TOP INV. ELEV. (FT) (FT) FROM TO 6.0 22 0.06 337.20 340.00 337.05 340.82 336.78 340.82 334.20 337.00 334.05 338.01 333.80 338.01 OT-1 CI-2 15.03 0.00 0.0069 24 18.8 337.35 337.20 337.05 CI-2 CI-3 15.90 0.00 0.0057 24 17.0 5.4 27 0.08 CI-3 FES-4 16.73 0.00 0.0056 24 16.9 5.4 48 0.15 334.35 334.20 334.05 OT-5 CI-6 11.19 0.00 0.0069 24 18.8 6.0 22 0.06 CI-6 CI-7 14.34 0.00 0.0057 24 17.0 5.4 27 0.08 CI-7 FES-8 14.95 0.00 0.0052 24 16.3 5.2 48 0.15 5.6 34 0.10 324.80 330.00 323.50 329.79 321.95 326.99 321.65 326.99 CI-9 CI-10 4.01 0.00 0.0090 18 9.9 325.10 CI-10 FES-11 4.94 0.00 0.0406 18 21.2 12.0 32 0.04 324.80 CI-12 CI-13 3.65 0.00 0.0057 18 7.9 4.5 27 0.10 322.10 CI-13 FES-14 3.96 0.00 0.0056 18 7.8 4.4 54 0.20 321.95 22 27 56 324.70 324.51 324.51 INLET CI-15 42.96 0.00 0.0759 36 183.7 26.0 0.01 321.50 319.85 CI-15 CI-16 44.80 0.00 0.0057 36 50.2 7.1 0.06 319.85 319.70 CI-16 FES-17 45.23 0.00 0.0054 36 48.8 6.9 0.14 319.70 319.40 9.6 27 0.05 321.00 326.58 317.30 326.58 315.65 320.77 315.40 320.77 CI-18 CI-19 6.74 0.00 0.0264 18 17.1 321.70 321.00 CI-19 FES-20 7.96 0.00 0.0771 18 29.2 16.5 48 0.05 315.80 CI-21 CI-22 4.25 0.00 0.0057 18 7.9 4.5 27 0.10 CI-22 FES-23 4.76 0.00 0.0052 18 7.6 4.3 48 0.19 315.65 10.7 48 0.07 310.50 315.24 CI-24 FES-25 2.49 0.00 0.0417 15 13.2 312.50 1860-Storm orainage.xim 10-YEAR Date: 11/2/2022 Time: 6:40 AM Page 2 of 4 n= 0.013 g= 226 h= 26 BEND LOSE K'S 90 DEG=0.7 30 DEG=0.28 0 DEG=0.55 15 DEG=0.10 Cl COVER BOX COVER BELOW IDESTREAl BEND DEPTH SUBGRADEiUMMATIO LOSS (8") (CFS) K FROM TO OT-1 CI-2 2.65 (0.48) 0.00 0.10 CI-2 CI-3 3.62 0.50 0.00 0.10 CI-3 FES-4 3.77 0.65 0.00 0.10 OT-5 CI-6 2.65 (0.48) 0.00 0.10 CI-6 CI-7 3.81 0.68 0.00 0.10 CI-7 FES-8 3.95 0.83 0.00 0.10 CI-9 CI-10 4.90 2.27 0.00 0.10 CI-10 FES-11 4.99 2.36 0.00 0.10 CI-12 CI-13 4.89 2.26 0.00 0.10 CI-13 FES-14 5.04 2.42 0.00 0.10 INLET CI-15 3.20 (0.93) 0.00 0.10 CI-15 CI-16 4.66 0.53 0.00 0.10 CI-16 FES-17 4.81 0.68 0.00 0.10 CI-18 CI-19 4.88 2.26 0.00 0.10 CI-19 FES-20 5.58 2.95 0.00 0.10 CI-21 CI-22 4.97 2.34 0.00 0.10 CI-22 FES-23 5.12 2.50 0.00 0.10 CI-24 FES-25 2.74 0.37 0.00 0.10 1860-Storm drainage.xim 10-YEAR Date: 11/2/2022 Time: 6:40 AM Page 3 of 4 NAME NC NO BY n= 0.013 HYDRAULIC GRADE LINE - CONTINUED 9= 226 h= 26 INLET W.S. ELEV. OUTLET OUTLET INLET USE FLOW FREE- HGL FROM TO W.S. ELEV CONTOL CONTROL CONDITIO BOARD FOCROWt COMMENTS CAPACITY VS (FT) (FT) (FT) (FT) JCONTROL (FT) DISCHARGE 315.40 CI-24 FES-25 311.50 311.62 313.30 313.30 INLET 1.94 0.45 OK 10.69 310.50 DESIGN PHASE PRELIM CONSTR / X / REVISION RECORD OTHER (SPECIFY) DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY = g/(h+T), FOR 10 YR STORM (g and h were derived from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: NC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) 1860-Storm drainage.xim 10-YEAR Date: 11/2/2022 Time: 6:40 AM Page 4 of 4