Loading...
HomeMy WebLinkAboutNC0047384_Report_20170112r City of Greensboro L J North Carolina Water Resources Department January 12, 2017 Certified Mail 7003 1680 0001 0763 6495 Return Receipt Requested North Carolina Department of Environmental Quality Division of Water Resources Attn: Jordan Lake Watershed Coordinator 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RECEIVEDINCDEQIDWR JAN 17 2017 Water Quality Permitting Section RE: T. Z. Osborne NPDES Total Nitrogen Reduction Schedule Report for CY 2016 Submitted in Response to NPDES Permit NC0047384 Part I-A.(4) To Whom It May Concern: This correspondence will serve as the City of Greensboro Total Nitrogen Reduction Schedule Report for CY2016 in order to comply with Part 1-A.(4) of the T. Z. Osborne NPDES permit NC0047384. The permit includes the following requirements for the 2016 report: • Award construction contract for Package 1 of the T. Z. Osborne BNR Project • Bid construction contract for Packages 2 and 3 of the T. Z. Osborne BNR Project • By December 31, 2016 submit report to DWR on activities relating to Packages 1, 2 and 3 of the T. Z. Osborne BNR Project • Note: In September 2014, the City of Greensboro decided to continue the Haw River Arm Study for at least an additional 12 months (through September 2015) and in 2015, because of the State of North Carolina Solar Bee project in the Haw River Arm, Greensboro decided to continue the study until further notice. Jordan Lake Haw River Arm Study • The Haw River Arm Study began in October 2013 and includes 2 sampling events per month. • Two Sampling Sites: Site 055C— Below Pittsboro at the upper end of the Haw River Arm and Site 055E — Near the Jordan Lake Dam on Haw River arm • All lake sampling and laboratory analyses were conducted by Meritech, Inc., a State -certified commercial laboratory. • The following parameters were included in the study: Field Parameters Dissolved Oxygen (in mg/1) pH (in standard units) Specific Conductance (in umho/cm) Temperature (in °Celsius) Other Parameters Total Suspended Solids (TSS) — Standard Methods 2540 D (in mg/1) Turbidity — EPA Method 180.1 (in NTU) Ammonia -Nitrogen — EPA Method 350.1 (in mg/1) Total Kjeldahl Nitrogen (TKN) — EPA Method 351.1 (in mg/1) Nitrate/Nitrite Nitrogen — EPA Method 353.2 (in mg/1) Total Phosphorus — EPA Method 200.7 (in mg/1) Chlorophyll a — EPA Method 445.0 (in pg/I) PO Box 3136 , Greensboro, NC 27402-3136 www.greensboro-nc.gov s 336-373-CITY (2489) TTY # 333-6930 Letter of 1-12-2017 Page 2 —T. Z. Osborne NPDES Total Nitrogen Reduction Schedule Report for CY 2016 • The CY2016 Total Nitrogen Reduction Schedule Report contains an interim data summary for October2013 through October 3, 2016, since the study is on -going. • A final report will be submitted at the conclusion of the study. Jordan Lake Haw River Arm Study Interim Data Summary Report (October 2013-October 3, 2016) • One hundred forty-four samples (144) have been collected in the 36-month period. • Results from Site 055C: Below Pittsboro at the upper end of the Haw River Arm o 10 WQS exceedances for pH (10/72 = 13.9% exceedances) o 3 WQS exceedances for turbidity (3/72 = 4.17% exceedances) o 3 WQS exceedances for chlorophyll a (3/72 = 4.17% exceedances) • Results from Site 055E: Near the Jordan Lake Dam on Haw River arm o 1 WQS exceedance for pH (1/72 = 1.4% exceedances) o 1 WQS exceedance for turbidity (1/72 = 1.4% exceedances) o 0 WQS exceedances for chlorophyll a (0/72 = 0.0% exceedances) T. Z. Osborne BNR Project Packages • Package 1 of the T. Z. Osborne BNR Project was bid on July 10, 2014. Garney Construction was awarded the project and issued a Notice to Proceed on December 1, 2014. Construction is on -going and the package is scheduled for completion in late 2017. • Package 2 of the T. Z. Osborne BNR Project was bid on August 28, 2014 and Garney Construction was awarded the project by the Greensboro City Council on January 6, 2015. Construction is on- going and the package is scheduled for completion in late 2017. • Package 3 of the T. Z. Osborne BNR Project is being delivered using the Construction Manager at Risk (CMAR) method and was awarded to Garney Construction by the Greensboro City Council on November 15, 2015. Construction is underway and is scheduled for completion in 2017. Sincerely, Martie Groom Laboratory and Industrial Waste Section Supervisor Phone: 336-433-7229 Email: martie.groome@greensboro-nc.gov cc: Steve Drew, Water Resources Department Director (via email) Mike Borchers, Water Resources Department Deputy Director (via email) Elijah Williams, Water Reclamation Manager (via email) Bradley Flynt T. Z. Osborne ORC (via email) Alicia Goots, Laboratory Coordinator (via email) Julie Grzyb, NCDENR, WQ Permitting Section- NPDES (via email)