HomeMy WebLinkAboutNCC223590_ESC Approval Submitted_20221101ROY COOPER
d4
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
August 23, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
HCP Kannapolis Crossing Land Ventures, LLC
Attention: Mathias G. Linden, Managing Director
400 Frank West Burr Boulevard, Suite 8
Teaneck, New Jersey 07666
RE: Project Name: Kannapolis Crossing -Clearing & Grubbing
Acres Approved: 99.6
Project ID: ROWAN-2022-014
County: Rowan, City: Kannapolis
Address: Old Beatty Ford Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Carlton Burton, PE, Burton Engineering Associates
Date Received by LQS: August 8, 2022
Plan Type: Revised
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible
party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file
at the job site:
.. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115
■�' 704-663-1699
Letter of Approval with Modifications
HCP Kannapolis Crossing Land Ventures, LLC
August 23, 2022
Page 2 of 3
The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to
the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
SIKIZ, a ,V ,&a',, i
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGOI Fact Sheet
c: Inspection Department
cc: Carlton Burton, PE
Letter of Approval with Modifications
HCP Kannapolis Crossing Land Ventures, LLC
August 23, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Kannapolis Crossing -Clearing & Grubbing
Project ID: ROWAN-2022-014
County: Rowan
1. A temporary Rock Dam shall be installed below Riser Basins # 10 & # 12 and below Skimmer Basins # 1 &
#3, as discussed in Construction Sequence Note 4.1 on Sheet MG101. See construction detail on Sheet
MG401.
2. The proposed rip -rap of outlet protection and/or emergency spillways for basins shall be extended (as
necessary) to the limits of construction (e.g. Basin #12, Basin #10, Basin #4, Basin #8, Basin #1, Basin #5,
Basin #6, etc.).
3. If the Class B stone outlet protection below Basins #10 & #12 fails to adequately stabilize outlet and/or
becomes displaced, a larger diameter stone shall be provided. Class B stone shall have a minimum 18"
thickness and Class 1 stone shall have a minimum 20" thickness.
4. A rock check dam and/or straw wattle shall be installed within the existing roadway ditch line (along Old
Beatty Ford Road) on the West side of DA-15 to contain disturbed area.
5. The embankment for Basin #13 shall have a 5' minimum top crest width.
6. A rock outlet in the silt fence shall be provided in the existing swale below TD 1.16 (located SW of Basin
#1).
9
C4
A:
P+
PJ
NO)
E
E
564
A&
F
m
Q.
P4-
Co
co
Qo
VA
Tr,
(21
j,8
C/Z
04
pq
-,A
Cif
IN
Id
rA
ID
P=j
v
e4-
ID
fP-