HomeMy WebLinkAboutNCS000057_Monitoring Plan Approval_20121119Patterson, Robert
From: Patterson, Robert
Sent: Monday, November 19, 2012 8:27 AM
To: 'Dwyer, Mark'
Subject: RE: Copper and Zinc Stormwater Sampling Protocol.docx
Mark,
This looks good. I apologize for the delay in responding. This monitoring plan, along with the information and map you
submitted on August 21, 2012, is herby approved as per Part II, Section E.4. of NCS000057.
Please let me know if you have any questions. Thanks.
Robert D. Patterson, PE
Environmental Engineer
NCDENR I DWQ I Stormwater Permitting
1617 Mail Service Center, Raleigh, NC 27699-1617 Mail 1 512 N. Salisbury St, 9th Floor, Raleigh, NC 27604 Location N. Parcels
(919) 807-6375 Phone 1 (919) 807-6494 F�Lx I Robert. Pattersor a,ncdenr.gov Email I http:/ /portal.ncdenr.or /g web/wq/ws/su Website
A Before printing this email, please consider your budget and the environment.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is
exempt by statute or other regulation.
From: Dwyer, Mark [mailto:markdOchemspec.com]
Sent: Tuesday, November 13, 2012 1:41 PM
To: Patterson, Robert
Subject: Copper and Zinc Stormwater Sampling Protocol.docx
Robert,
Hope you're well. Thanks for your assistance.
Mark Dwyer
Safety, Health and Environmental Manager
Chemical Specialties, Inc.
1
W
F
August 21, 2012 C 8'
CHEMICAL SPECIALTIES. INC.
Mr. Robert Patterson
Wetlands and Stormwater Branch
North Carolina Division of Water Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
Subject: NPDES Stormwater Permit Monitoring Plan
Permit No. NCS000057
Chemical Specialties, Inc. (CSI)
Cabarrus County
Dear Mr. Patterson:
Chemical Specialties Inc., has devised a monitoring plan for sampling runoff from segregated
areas to determine if and where primary contributions of copper and zinc to stormwater occur at
the site.
During the period beginning on the effective date of the permit (May 1, 2012) and lasting until
expiration, analytical monitoring of stormwater discharges shall be performed during a
representative storm event. The required monitoring requires grab sampling of a minimum of 5
internal segregated outfalls including stormwater drains and roof discharge drains; which will be
sampled bi-annually. Additional areas may be sampled to the further delineate potentially
contributing areas.
Chemical Specialties, Inc. will evaluate the proportion of the contribution to the total mass of
copper and zinc in runoff from the entire site; measurements are to be taken concurrently at
stormwater discharge outfalls.
Sincerely,
.ice.`_
Mark Dwyer
Safety, Health and Environmental Manager
Attachment
PO Box 1330 •5910 Pharr Mill Road • Harrisburg, NC 28075 •704-455-5181
Main Fax 704-455-6507 • Purchasing and Transportation Fax 704-455-5987
Lab Fax 704-455-1123 • Accounting and PoleCare Fax 704-455-1940
Engineering Fax 704-454-5348
itlGS poop s''>
Copper and Zinc Stormwater Sampling Protocol
1. Representative Samplin¢
Samples collected and measurements taken, as required herein, shall be characteristic of the
volume and nature of the permitted discharge. Analytical sampling shall be performed during a
measurable storm event. Samples shall be taken on a day anytime that is characteristic of the
discharge. All samples should be taken before the discharge joins or is diluted by any other
waste steam, body of water, or substance. Monitoring points (minimum of 5) have been
identified by a team of qualified and experienced personnel with consideration given to material
storage and handling areas. Additional source points to be sampled may be added to, or
removed from the sampling agenda to further segregate potential point sources, or as per
defined in the current plan.
2. Recording Results
For each measurement or sample taken pursuant to the requirements of this permit, Chemical
Specialties, Inc. shall record the following information (40 CFR 122.41).
a. The date, exact place, and time of sampling or measurements;
b. The individual(s) who performed the sampling of measurements;
c. The date(s) analyses were performed;
d. The individual(s) who performed the analyses;
e. The analytical techniques or methods used; and
f. The results of such analyses, including flow volume and total event volume.
3. Records Retention
Copies of analytical monitoring results shall also be maintained on -site along with the
Stormwater Pollution Prevention Plan.
4. Sampling Analysis Results
The sampling results will be evaluated and appropriate actions will be implemented including
Best Management Practices. Corrective actions will be evaluated, via sampling program, after
implementation to determine their effectiveness.
�VE
NOV 1 3 2012
Sampling Area
#1 Tanker Parking (at gate valves)
Cu
0
Zn
0
.
0%
0%
#2 ACQ Tank Farm roof drain (NW
corner of roof)
0
0
0%
0%
#3 Storm drain behind #4 warehouse
0
0
0%
0%
#4 Main drain by-pass at QC Lab (6"
pipe)
0
0
0%
0%
#5 Run off pipe at fire water tank
0
0
0%
0%
#6 Bldg. 1 (NE Corner)
0
0
0%
0%
#7 Bldg. 1(NW Corner)
0
0
0%
0%
#8 Dock #3 (S side of bldg.. 36)
0
0
0%
0%
#9 Downspout in front of T-142 (E of
AA plant)
0
0
0%
0%
#10 Downspout in front of Bldg.23
0
0
0%
0%
#11 Downspout pipe west of T-138
(Chiller room area)
0
0
0%
0%
#12 Downspout at SW corner of
Bldg.24
0
0
0%
0%
#13 Drain at North side of Bldg.
230/231
0
0
0%
0%
#14 Downspout at W side of loading
dock roof(Bldg. 230)
0
0
0%
0%
#15 French drain (open end) SE
corner of Bldg. 231
0
0
0%
0%
#16 Curb -side drain at ACQ drive
(North/upstream drain)
#17 Curb -side drain at ACQ drive
(South/downstream drain)
#18 Outfall #1
0
0
0%
0%
419 Outfall #2
0
0
0%
0%
#20 Rocky River (upstream)
0
0
0%
0%
#21 Rocky River (downstream)
0
0
0%
0%
Analytical Monitoring
Requirements
Discharge Characteristics
Units
Measurement
Frequency
Sample
Type
Sample
location
Copper, Total Recoverable
mg/L
semi-annual
Grab
#1-#21*
Zinc, Total Recoverable
mg/L
semi-annual
Grab
#1-#21*
Monitoring Schedule
Monitoring period
Sample
Number
Start
End
Year 1- Period 1
1
1-May-12
31-Dec-12
Year 1- Period 2
2
1-Jan-13
30-Jun-12
Year 2 - Period 1
3
1-Jul-13
31-Dec-13
Year 2 - Period 2
4
1-Jan-14
30-Jun-14
Year 3 - Period 1
5
1-Jul-14
31-Dec-14
Year 3 -Period 2
6
1-Jan-15
30-Jun-15
Year 4- Period 1
7
1-Jul-15
31-Dec-15
Year 4 - Period 2
8
1-Jan-16
30-Jun-16
Year 5 - Period 1
9
1-Jul-16
31-Dec-16
Year 5 - Period 2
10
1-Jan-17
30-Apr-17
*Sample locations may be
changed/added/removed
as determined beneficial
to further identify possible
contributing areas.
_ _ I
1 2 3j 3 6
'r 1U1 14 15 16I 17� 1 191
20
2y 2
?:3
251
27
281 1 291 30
PLANT NORTH
k TRUE NORTH
d 1
• ��u Ill�l�lllu � ��Illl�lllm ®I�� �
r•, ,
y� >�ry7�1y�
----------------------------•----------------------------------------------------------- ------ m--------- ---------- -----------rim-effiru:Uli'L�Y' -� H
ill
------ --------------
DA1Y-If ►���a ,A4eQ►.� ,��1�-----------■
--__-ate.-•�.r-�.�r.--�-' •- ��� ' -- -_-, _--. .i� r 7•��� I,
FOR
10410
• ► � • - � r a• a ` 1 -
L__J Ll
I.
`dal �I �� J ���������� .®__ I �2II,,,,� _ - - ♦♦♦♦♦♦♦�
' �� . ��1 ls. ' '!` II � . - • � �=�dllfli�� I; _ h'I����I� I • _ IIII � � �:�♦♦�
■
♦c � sue•*♦�♦ � �BLDG 6
� �I� � �l® � � ♦♦♦♦
• ® iZ
F fill
I Iry
�♦♦♦♦ ,I,, ;..��.. I. ♦ ►try♦♦ ---
��♦:♦�,`` ♦�� li ,_r�,;mmr- 1'V' ♦♦♦�I►�i�'�'' ®'I �,: � „ Q, , " Q' � _ � , nml m�m� „'® ♦'�
�� ♦♦ �. ��� L= �I�.�I �'�.. �i�_LU9111����' , .-. _.� �.,G.I��I h-� ^ii „
�♦♦o`er♦♦♦� ��♦♦� ►♦♦ ♦♦♦♦♦♦♦ ♦♦♦♦♦♦ ��`♦♦♦♦��WARA ,♦���� ♦♦♦♦♦ ♦♦♦♦♦♦♦♦♦♦♦►, : , _.LANDING
Poll
N2 TANK
`�♦♦ ♦ � � ��♦♦♦♦♦♦♦�♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� �♦♦♦♦♦♦��♦♦♦♦ice♦�♦♦♦♦♦♦♦♦♦� ►♦♦1♦t �♦♦♦♦♦♦♦♦♦�1 �:�,,``'� ��y�'
INDICATES SAMPLED AREAS +�t\
BLUE UNDERGROUND STORMWATER NES) +�
+\P.tUG CGR AT Al
RED TO LINED LAGOON)+�
3
SWA L DITCH
TO RIVER IF CLEAN IF NOT BACK TO PROCESS
TO WASTE WATER TREATMENT (NWT)
TO RIVER IF CLEAN IF NOT BACK TO WWT
TO PROCESS
NZ
UNDER ROOF STORM —DR/ N TO RIVER
B0G 231
--------------------- -----------------
GRASc,
TO STi )RMWATER
GRAVEL ROAD
WOODS
5
BLDG 39
rA
A/C
UNIT
BLDG 7
_t
UNIT
A/C
�i UNIT
8 LDG COR GND
B 4
M AI IN TENA NCE•-
8 UILDI NG�/
coNc
PAD
BLDG 1DI
ENGINEERING
EXISTING BUILDING
66'x28'
TP
D-1f o
J
TWO—WAY TRAFFIC
A
C
A
I 00 000000000000000 �-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Tti
TANKER PARKING
- I
18\ 2 21 22 23 24 25_6 27 28 29 30 31 5
O, 000000000000,.
DIRE I ro A'� 0 Z / / ./ // /✓ // /✓
I! f
2 3 �4 �5 �6 �7 �8
EXISTING GRAVEL ROAD
EIAERGENCY SHUT—OFF VALE
AS DRAWN _
AS DRAWN
CONTINGENCY PLAN REVISION.
AS —BUILT PER 2006
q. REVISED SPILL KIT LOCATION
SITEPLAN 2004 UPDATE
SITEPLAN 2002 UPDATE
1 AS PER COMMENTS (D.C.)
PRELIMINARY
NO. REVISIONS
0
m
CHEMICAL SPECIALITIES, INC.
Cm%' HARRISBURG, NOR IH CAROLSO
CHOMM �,�!!
I6-0411
WLM
is
13/19/10
TBC
JS
18 14 09
TBC
JS
19/19/06
DSW
JS
CSI MASTER SITEI PLAN
ROOF DRAINAGE, WASTE WATER
UNDE=RGROUND ST RM WATER
T
16/23/05
DSW
TR
i/13/04
DSW
TR
0/237/02
DSW
HH
1 /1 / /00
DSW
H H
MRD CAD NO.
Dt�AIN2008-
SCALE
N. T. S.
DATE
1/01/95
i/9/00
DSW
PFZ
PROJECT NC.
A I T E
DRAWING NUMBER
DRAIN — 2 0 0 8 2
REV.
8
DATE
BY
CKD.