OFFSITE WATER LINE EXTENSION TO NC 98 IS
NOT PART OF THIS CONSTRUCTION DOCUMENT
SUBMITTAL. WATERLINE TO BE CONSTRUCTED
PRIOR TO THE FIRST CERTIFICATE OF
OCCUPANCY. REFERENCE SITE PLAN CASE
#D2100041 & D2100088. t
�hh _1
OFFSITE SANITARY SEWER CONNECTION TO
THE EXISTING GRAVITY SANITARY SEWER
SYSTEM IS NOT PART OF THIS CONSTRUCTION
DOCUMENT SUBMITTAL. OFFSITE SANITARY
SEWER TO BE CONSTRUCTED PRIOR TO THE
jl f
FIRST CERTIFICATE OF OCCUPANCY.
REFERENCE SITE PLAN CASE #D2100088.
r
1-�
- --- -- _ _ — --- — -- PIN: 0860-03-84-5286 ■
PID: 194192 ■
OFFSITE WATER LINE EXTENSION IN KEMP ROAD AND ■
DEVELOPMENT SUMMARY: •
VIRGIL ROAD TO TIE INTO THE EXISTING WATERLINE AT THE
�- WESUMMARY IN
FYN,
SOUTHEAST REGIONAL LIFT STATION IS NOT PART OF THIS F\c UL—DA TQREA: ],]26m6SFp]B.M2AC)
TEA FDISIURBANCE: 5. O358.000SF1123.OAC) IN
DOCUMENT SUBMITTAL WATERLINE TO OTALAR
< i 7 PH. 1-4LAND AREA: 3,M.114SF(M.157AC)
BE CONSTRUCTED PRIOR TO THE FIRST CERTIFICATE OF % PH INwZONIN : URBANCE FOR 906 SF Id0.512 AC1 ■
PK EXISTING ZONING: 2. R , 9 ■
OCCUPANCY WITHIN THE FUTURE DEVELOPMENT AREA. EX e INGUSE PRESEN- E DUES zr
PROPOSED USE SINGLE FAMILY B TOWNHOME ■
REFERENCE SITE PLAN CASE D2100088 WATERSHED: FFJHB
RIVER BASIN: NEUSE ■
CITY UW: INSIDE
NOT PART or THIS sue L�,
y , "•K- NOT PART OF THIS SUBMITTAL
1
2493'
*>
A,
�1
1
1- -
J
� YY
�f~
-
TIER:
SUBURBAN
■
II
LOT SUMMARY
■
-
MAXIMUM BUILDING HEIGHT:
35'
TOTAL UNITS:
I B6
■
2TQWNHCMFUNRS
26' TOWNHOME UNITS:
IB
18
■
HORVATH
r�
UNITS:
ISTORY SINGLE FAMILY:
ITORY SINGLE
52
52
,
2STORYSINGLE FAMILY:
57
■
A SNS CA IMKA TH ENS
PESIDNGRBMMAIY
■
NO
iA�rUwwc noKKwArze w>•Aee.K.
1
RESIDEIN LPARKING:
PARKING:
1 SPACES
■
16 CONSULTANT PLACE, SUITE 201s
_ I I
TOWN OMEPFAMILY
iOw NHOME PARKING:
I IS45PACE5
•
DURHAM, NORTH CAROL INA 27707
P 919.490.4990 F 919.490.8953
I
AMENITY CENTER PARKING:
AMENITY CENTER PARKING REQUIRED:
40SPACES
•
NORTH CAROUNA BOARD OF
1 'STANDARD
PARKING PROVIDED:
64SPACES
EXAMINERS FOR ENGINEERS AND
I I
V:
ACCECCESSIBLE HC PARKING
VAN A
3
■
SURVEYORS LICENSE NO.:'-71
C]
ADDRIONALVBIFORPARMNG:
•
www.horvalhasso<oles com
- - - n
STANDARD HC PARKING:
VANACCESSIBLEHC PARKING:
I SPACE
SPA
IACES
■
STANDARD PARKING PROVIDED I9-X 191
2 SPACES
•
TOTALPARKINGPROVIDED:
1A)SPACES
I
BIKE PARKING:
20 SPACESES
sl 11 I
IMPERVIOUS SUMMARY TALI PHASES)
l II
MAXIMUM ALLOWABLE IMPERVIOUS AREA:
3.889,508 SF (89.29 AC) 150.00%)
•
Q
Al
( + I
IXNTING IMPERVIOUS AREA:
"ILPROPOSED IMPERVIOUS AREA:
2000 SF 10.046 ACI
215I,80DSF149.53AC11D.]3SI
■
< Z
1 1
STREET
5.,UUN SF 112H6 AC1
■
J
O
I I
SIDEWALK
2T TH UNIT IIMOAVG. PER UNRI
186.000 SF 14.2] ACI
80.6003E 11.85 ACI
•
> O
C?
26' TH UNIT (2,050 AVG. PER UNTO
94.300 SF 1, 16AC)
= Z Q
I
( 1,
2B' TH UNIT (2.600 AVG. PER UNIT)
129ORY SF UNIT (4,000 AVG. PER UNIT)
1]9A00 SF 14.12 ACI
368.000 SF I&MAC)
■
V U � O
2 STORYSF UNIT (3,`DD AVG. PER UNIT)
549„5M SF 1T 2.61 AC]
■
Z
` z O
AMENITY CENTER
RECREATIONAL OPEN SPACE
50.000 SF II.IS Al;--�
50.000 SF I.IS AC)
■
=
p\ a O ~
-
- ----
RESERVE
40.000 Sf (0.92 AC)
■
Q cc 0
-
TREE COVERAGE SUMMARY
•
= W Q z
REQUIRED TOTAL TREE PRESERVATION:
PROPOSEDTOTALTREEPRESERVATION:
REQUIRED PH. 14 TREE PRESERVATION:
I.639,593 SF 13I.50 ACI(21.00%)
2,245.31]Sf 51.54AC)128.86551
806.424 SF(18.513 AC)(21.00%)
•
O d
J
\j
PROPOSED PH. 14 TREE PRESERVATION:
I.W41111.7. AC)12&U2i1
•
,^ O
V, Q
p
OPEN SPACE SUMMARY
IN
p - - -
REQUIRED TOTAL OPEN SPACE
1.541.4D$3F (1 C)1211.&
.-
_
PROPOSED TOTAL OPEN SPACE:
DAM
4.549.40E SF El OAM ACI IS&481R1
■
f- Q
REQUIRED TOTAL RECREATIONAL OPEN SPACE 3B&951SF(&93ACIFOFISIK)
PROP05ED TOTAL RECREATIONAL OPEN SPACE: 39BA68 SF 19.15 AC]
IN
PRE
ROVIRED PH. 1-4 OPEN SPACE:
PROPOSED PH. I OPEN SPACE.
]68.0235F(IT6IAC) (20.00%j
254,018 SF (58.494 AC) (66.35%)
•
I
REQUIRED PH. 14 RECREATIONAL OPEN SPACE
192,006 SF 14.408 AC] R OF 15S)
■
/
PROPOSEDPH.1-4RECREATIONAL OPEN SPACE:
210,9145F(-2ACI
■
PHASING NOTES
•
•
PHASING
`�\(\
I. CONSTRUCTION PHASE ORDER AMV NOT MATCH NUMERICAL ORDER ILLUSTRATED.
;
PLAN
2. SEE NOTES ON SHEET C002 AND TRAFFIC PHASING
IMPROVEMENT PHASING.
ANALYSIS FOR ROAD
it �ls\y0
3. ACCESS TO SCM#2 WILL BE PROVIDED ALONG THE FRONTAGE OF LOTS 102-110
■
ON ROAD E UNTIL PHASE 3 B COMPLETED.
IN
m o
■
\
PNASE
SI uNRS
•
•
PHASE2
--NITS
■
PHASF3
-UNITS
■
PHASE4
28 UNITS
■
■
■
S
■
__
-. __. _
CAR ��"'
■
?�ptiH
1
i , ,
........
�n�EI--��I,
1..1-'^. �I I:I
•
OCTOBER 22.2U21
II
I
■
I PER CRY OF DURHAM
FIRST REVIEW
I1 j
11 I
■
IANUARY 14.
_. __ ',
■
2 I PER CRY OF DURHAM I AL
SECOND REVIEW
-
■
MARCH 24. 2022
■
3 I ER CRY OF DURH- I w
THIRD REVIEW
IN
I I
IN
CITY OF DURHAM
INPUBLIC
WORKS DEPARTMENT
■
u r APPROVED
IN
--
■ 8 CALL BF RE O'J DIG
■ DRAWN NY. CNECKID BY:
Ms TJS
PHASING PLAN
C1SO SCALE,) =20
•
DATE
JULY 20, 2021
•
■
PROTECT NO.
1886
D _OD
40]
SX EET NO.
C
SAALE:'..' -.�
a D
.
C 150
/
N
■
CONSTRUCTION DOCUMENTS