Loading...
HomeMy WebLinkAboutNCC223594_Site Plan or Location Map_20221025`�/ •ram A ♦.•lam % 1 OFFSITE WATER LINE EXTENSION TO NC 98 IS NOT PART OF THIS CONSTRUCTION DOCUMENT SUBMITTAL. WATERLINE TO BE CONSTRUCTED PRIOR TO THE FIRST CERTIFICATE OF OCCUPANCY. REFERENCE SITE PLAN CASE #D2100041 & D2100088. t �hh _1 OFFSITE SANITARY SEWER CONNECTION TO THE EXISTING GRAVITY SANITARY SEWER SYSTEM IS NOT PART OF THIS CONSTRUCTION DOCUMENT SUBMITTAL. OFFSITE SANITARY SEWER TO BE CONSTRUCTED PRIOR TO THE jl f FIRST CERTIFICATE OF OCCUPANCY. REFERENCE SITE PLAN CASE #D2100088. r 1-� - --- -- _ _ — --- — -- PIN: 0860-03-84-5286 ■ PID: 194192 ■ OFFSITE WATER LINE EXTENSION IN KEMP ROAD AND ■ DEVELOPMENT SUMMARY: • VIRGIL ROAD TO TIE INTO THE EXISTING WATERLINE AT THE �- WESUMMARY IN FYN, SOUTHEAST REGIONAL LIFT STATION IS NOT PART OF THIS F\c UL—DA TQREA: ],]26m6SFp]B.M2AC) TEA FDISIURBANCE: 5. O358.000SF1123.OAC) IN DOCUMENT SUBMITTAL WATERLINE TO OTALAR < i 7 PH. 1-4LAND AREA: 3,M.114SF(M.157AC) BE CONSTRUCTED PRIOR TO THE FIRST CERTIFICATE OF % PH INwZONIN : URBANCE FOR 906 SF Id0.512 AC1 ■ PK EXISTING ZONING: 2. R , 9 ■ OCCUPANCY WITHIN THE FUTURE DEVELOPMENT AREA. EX e INGUSE PRESEN- E DUES zr PROPOSED USE SINGLE FAMILY B TOWNHOME ■ REFERENCE SITE PLAN CASE D2100088 WATERSHED: FFJHB RIVER BASIN: NEUSE ■ CITY UW: INSIDE NOT PART or THIS sue L�, y , "•K- NOT PART OF THIS SUBMITTAL 1 2493' *> A, �1 1 1- - J � YY �f~ - TIER: SUBURBAN ■ II LOT SUMMARY ■ - MAXIMUM BUILDING HEIGHT: 35' TOTAL UNITS: I B6 ■ 2TQWNHCMFUNRS 26' TOWNHOME UNITS: IB 18 ■ HORVATH r� UNITS: ISTORY SINGLE FAMILY: ITORY SINGLE 52 52 , 2STORYSINGLE FAMILY: 57 ■ A SNS CA IMKA TH ENS PESIDNGRBMMAIY ■ NO iA�rUwwc noKKwArze w>•Aee.K. 1 RESIDEIN LPARKING: PARKING: 1 SPACES ■ 16 CONSULTANT PLACE, SUITE 201s _ I I TOWN OMEPFAMILY iOw NHOME PARKING: I IS45PACE5 • DURHAM, NORTH CAROL INA 27707 P 919.490.4990 F 919.490.8953 I AMENITY CENTER PARKING: AMENITY CENTER PARKING REQUIRED: 40SPACES • NORTH CAROUNA BOARD OF 1 'STANDARD PARKING PROVIDED: 64SPACES EXAMINERS FOR ENGINEERS AND I I V: ACCECCESSIBLE HC PARKING VAN A 3 ■ SURVEYORS LICENSE NO.:'-71 C] ADDRIONALVBIFORPARMNG: • www.horvalhasso<oles com - - - n STANDARD HC PARKING: VANACCESSIBLEHC PARKING: I SPACE SPA IACES ■ STANDARD PARKING PROVIDED I9-X 191 2 SPACES • TOTALPARKINGPROVIDED: 1A)SPACES I BIKE PARKING: 20 SPACESES sl 11 I IMPERVIOUS SUMMARY TALI PHASES) l II MAXIMUM ALLOWABLE IMPERVIOUS AREA: 3.889,508 SF (89.29 AC) 150.00%) • Q Al ( + I IXNTING IMPERVIOUS AREA: "ILPROPOSED IMPERVIOUS AREA: 2000 SF 10.046 ACI 215I,80DSF149.53AC11D.]3SI ■ < Z 1 1 STREET 5.,UUN SF 112H6 AC1 ■ J O I I SIDEWALK 2T TH UNIT IIMOAVG. PER UNRI 186.000 SF 14.2] ACI 80.6003E 11.85 ACI • > O C? 26' TH UNIT (2,050 AVG. PER UNTO 94.300 SF 1, 16AC) = Z Q I ( 1, 2B' TH UNIT (2.600 AVG. PER UNIT) 129ORY SF UNIT (4,000 AVG. PER UNIT) 1]9A00 SF 14.12 ACI 368.000 SF I&MAC) ■ V U � O 2 STORYSF UNIT (3,`DD AVG. PER UNIT) 549„5M SF 1T 2.61 AC] ■ Z ` z O AMENITY CENTER RECREATIONAL OPEN SPACE 50.000 SF II.IS Al;--� 50.000 SF I.IS AC) ■ = p\ a O ~ - - ---- RESERVE 40.000 Sf (0.92 AC) ■ Q cc 0 - TREE COVERAGE SUMMARY • = W Q z REQUIRED TOTAL TREE PRESERVATION: PROPOSEDTOTALTREEPRESERVATION: REQUIRED PH. 14 TREE PRESERVATION: I.639,593 SF 13I.50 ACI(21.00%) 2,245.31]Sf 51.54AC)128.86551 806.424 SF(18.513 AC)(21.00%) • O d J \j PROPOSED PH. 14 TREE PRESERVATION: I.W41111.7. AC)12&U2i1 • ,^ O V, Q p OPEN SPACE SUMMARY IN p - - - REQUIRED TOTAL OPEN SPACE 1.541.4D$3F (1 C)1211.& .- _ PROPOSED TOTAL OPEN SPACE: DAM 4.549.40E SF El OAM ACI IS&481R1 ■ f- Q REQUIRED TOTAL RECREATIONAL OPEN SPACE 3B&951SF(&93ACIFOFISIK) PROP05ED TOTAL RECREATIONAL OPEN SPACE: 39BA68 SF 19.15 AC] IN PRE ROVIRED PH. 1-4 OPEN SPACE: PROPOSED PH. I OPEN SPACE. ]68.0235F(IT6IAC) (20.00%j 254,018 SF (58.494 AC) (66.35%) • I REQUIRED PH. 14 RECREATIONAL OPEN SPACE 192,006 SF 14.408 AC] R OF 15S) ■ / PROPOSEDPH.1-4RECREATIONAL OPEN SPACE: 210,9145F(-2ACI ■ PHASING NOTES • • PHASING `�\(\ I. CONSTRUCTION PHASE ORDER AMV NOT MATCH NUMERICAL ORDER ILLUSTRATED. ; PLAN 2. SEE NOTES ON SHEET C002 AND TRAFFIC PHASING IMPROVEMENT PHASING. ANALYSIS FOR ROAD it �ls\y0 3. ACCESS TO SCM#2 WILL BE PROVIDED ALONG THE FRONTAGE OF LOTS 102-110 ■ ON ROAD E UNTIL PHASE 3 B COMPLETED. IN m o ■ \ PNASE SI uNRS • • PHASE2 --NITS ■ PHASF3 -UNITS ■ PHASE4 28 UNITS ■ ■ ■ S ■ __ -. __. _ CAR ��"' ■ ?�ptiH 1 i , , ........ �n�EI--��I, 1..1-'^. �I I:I • OCTOBER 22.2U21 II I ■ I PER CRY OF DURHAM FIRST REVIEW I1 j 11 I ■ IANUARY 14. _. __ ', ■ 2 I PER CRY OF DURHAM I AL SECOND REVIEW - ■ MARCH 24. 2022 ■ 3 I ER CRY OF DURH- I w THIRD REVIEW IN I I IN CITY OF DURHAM INPUBLIC WORKS DEPARTMENT ■ u r APPROVED IN -- ■ 8 CALL BF RE O'J DIG ■ DRAWN NY. CNECKID BY: Ms TJS PHASING PLAN C1SO SCALE,) =20 • DATE JULY 20, 2021 • ■ PROTECT NO. 1886 D _OD 40] SX EET NO. C SAALE:'..' -.� a D . C 150 / N ■ CONSTRUCTION DOCUMENTS