HomeMy WebLinkAboutSWA000170_Plansheet C001 - Notes_20221004GENERAL NOTES 1. BENCHMARK LOCATIONS AND ELEVATIONS WILL BE VERIFIED BY THE CONTRACTOR PRIOR TO BEGINNING CONSTRUCTION. 2. ALL WORK TO BE DONE IN STRICT ACCORDANCE WITH CABARRUS COUNTY NCDEQ, AND NCDOT SPECIFICATIONS; WHEN SPECIFICATIONS ARE IN CONFLICT, THE STRICTER SPECIFICATION SHALL BE HELD. 3. EXISTING UTILITIES ARE SHOWN IN THEIR APPROXIMATE LOCATION ONLY. ANY DAMAGE DONE TO EXISTING UTILITIES (SHOWN OR NOT SHOWN NOT THIS PLAN) SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL SHOWN OR NOT SHOWN UTILITIES PRIOR TO CONSTRUCTION. TO INSURE PROPER LOCATION OF THE UTILITIES, THE CONTRACTOR SHALL CONTACT NC ONE CALL AT 1-800-632-4949, AT LEAST 48-HOURS PRIOR TO CONSTRUCTION. NON -SUBSCRIBERS SHALL BE CONTACTED DIRECTLY. 4. THE CONTRACTOR SHALL PROVIDE APPROPRIATE BARRICADES, WARNING LIGHTS, AND WARNING SIGNS TO ENSURE THE SAFETY OF THE PUBLIC AT ALL TIMES. 5. BOUNDARY AND TOPOGRAPHIC SURVEY PROVIDED BY SCOTT TIERNEY, PLS, DATED 5/3/2022. 6. THE ENGINEER HAS MADE NO EXAMINATION TO DETERMINE WHETHER ANY HAZARDOUS OR TOXIC MATERIALS ARE PRESENT OR CONTAINED IN, UNDER, OR ON THE SUBJECT PROPERTY OR ITS WATERS, OR IF ANY HAZARDOUS OR TOXIC MATERIALS HAVE CONTAMINATED THIS OR OTHER PROPERTIES OR ITS WATERS IN ANY WAY WHATSOEVER. NO SUBSURFACE EXAMINATION OF ANY TYPE HAS BEEN MADE BY THE ENGINEER 7. AND ACCORDINGLY, NO OPINION IS EXPRESSED OR INFERRED. FURTHER, NO OPINION IS RENDERED AS TO ANY VIOLATION OF AN ENVIRONMENTAL LAWS OR REGULATIONS, EITHER FEDERAL, STATE, OR LOCAL RELATED TO THE INFORMATION SHOWN ON THIS PLAN AND THE ENGINEER IS IN NO WAY LIABLE FOR ANY VIOLATION OF SUCH ENVIRONMENTAL LAWS SHOULD THEY EXIST. 8. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE CITY/COUNTY, THE OWNER'S REPRESENTATIVE AND THE ENGINEERS HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE CITY/COUNTY, THE OWNER'S REPRESENTATIVE OR THE ENGINEER. 9. CONTRACTOR SHALL VERIFY PROPERTY LINES, BUILDING DIMENSIONS, AND ALL OTHER SITE CONDITIONS PRIOR TO CONSTRUCTION. ANY SIGNIFICANT VARIATIONS SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 10. CESI, INC. HEREBY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS AND DESIGNS IN ANY FORM OR MANNER WHATSOEVER, NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING EXPRESSED WRITTEN PERMISSION FROM CESI, INC. 11. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS ON THE JOB AND CESI, INC. SHALL BE NOTIFIED IN WRITING OF ANY VARIATIONS FROM THE DIMENSIONS, CONDITIONS, AND SPECIFICATIONS SHOWN BY THESE DRAWINGS. EARTHWORK NOTES 1. GENERAL: EARTHWORK SHALL INCLUDE THE LOOSENING AND REMOVAL, TRANSPORTING, STORAGE, BACKFILLING, GRADING AND ALL HANDLING OF NATURAL SOIL, DEPOSITED SOILS, OR ROCK FOR CONSTRUCTION OF ALL WORK UNDER THIS CONTRACT. 2. STRIPPING AND STOCKPILING OF TOPSOIL: STRIP ALL TOPSOIL TO ITS ENTIRE DEPTH IN THE AREAS TO BE GRADED AND PILE IN APPROVED OR DESIGNATED AREAS BEFORE ANY GRADING OR FILLING IS BEGUN. SOIL SHALL BE FREE FROM CLAY, LARGE STONES AND DEBRIS. THIS TOPSOIL SHALL BE USED FOR FINAL FINISH GRADING. 3. EXCAVATION FOR STRUCTURES: CONFORM TO ELEVATIONS AND DIMENSIONS SHOWN WITHIN A TOLERANCE OF PLUS OR MINUS 0.10'. 4. REMOVAL OF UNSATISFACTORY SOIL MATERIALS: EXCAVATE EXISTING FILL MATERIAL AND UNSATISFACTORY NATURAL SOIL MATERIALS ENCOUNTERED THAT EXTEND BELOW REQUIRED ELEVATIONS TO DEPTH DIRECTED BY THE SOILS ENGINEER. LATERAL DIMENSIONS, DEPTH AND VOLUME SHALL BE DETERMINED BY SOILS ENGINEER. PAYMENT SHALL NOT BE MADE FOR MATERIALS REMOVED IF THE SOILS ENGINEER IS NOT PRESENT AT THE TIME OF REMOVAL. 5. ROCK EXCAVATION: WHERE EXPLOSIVES ARE USED, WORK SHALL BE DONE BY EXPERIENCED POWDERMEN USING SMALL CHARGES IN STRICT ACCORDANCE WITH ALL REGULATIONS GOVERNING THIS WORK. BLASTING WILL NOT BE PERMITTED WITHOUT SPECIAL AUTHORIZATION OF THE OWNER, THE ENGINEER, AND LOCAL AUTHORITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE OR INJURY TO ANY PERSONS, PROPERTY, OR STRUCTURES AS A RESULT OF HIS BLASTING OPERATIONS. PAYMENT WILL BE MADE FOR ROCK EXCAVATION IN AN AMOUNT PER CUBIC YARD INDICATED ON THE BID FORM. 6. PROOFROLLING: FOLLOWING THE STRIPPING AND NECESSARY UNDERCUTTING, THE EXPOSED SUBGRADE SHALL BE PROOFROLLED UNDER THE OBSERVATION OF THE SOILS ENGINEER BEFORE NEW FILL IS PLACED OR AFTER CUTS ARE MADE TO EVALUATE THE SUBGRADE STABILITY. THE PROOFROLLING EVALUATION SHALL BE PERFORMED USING A HEAVILY LOADED DUMP TRUCK OR SIMILAR PNEUMATIC -TIRED VEHICLE WITH A MINIMUM LOADED WEIGHT OF 25 TONS. THE SOILS ENGINEER WILL PROVIDE RECOMMENDATIONS FOR TREATMENT IF UNSTABLE SOILS ARE OBSERVED DURING THE PROOFROLLING OPERATIONS. 7. SUBGRADE MAINTENANCE: WATER FROM STORM RUNOFF SHALL BE CONTROLLED DURING EARTHWORK AND CONSTRUCTION ACTIVITIES BY INTERCEPTING AND DRAINING THE RUNOFF AWAY FROM THE SITE TO PREVENT WATER FROM PONDING ON OR SATURATING THE SOILS WITHIN THE EXCAVATIONS OR ON FINAL GRADES. 8. FILL MATERIAL: THE GENERAL CONTRACTOR SHALL FURNISH ALL FILL REQUIRED TO BRING THE GRADES TO LEVEL AS SHOWN ON THE DRAWINGS. FILL MATERIAL SHALL BE COMPACTED BY AN APPROVED METHOD TO THE REQUIREMENTS LISTED IN NOTE 6. IN NO CASE SHALL FILL CONTAIN TRASH, DEMOLITION DEBRIS, OVERSIZED MATERIAL (>3"), OR ORGANIC MATERIAL OF ANY KIND. IN ADDITION, HIGH PLASTICITY SILT AND CLAY (PLASTICITY INDEX>30) SHALL ONLY BE USED AS COMMON FILL. NO FILL SHALL BE PLACED UNTIL THE SOIL HAS BEEN CHECKED BY A LABORATORY AND APPROVED BY THE SOILS ENGINEER. THE MOISTURE IN THE SOIL SHALL NOT VARY MORE THAN 3% ABOVE OR 3% BELOW THE OPTIMUM WHEN IT IS BEING INSTALLED IN THE FILL. 9. INSTALLATION OF FILL: ALL FILL SHALL BE FORMED OF APPROVED MATERIAL PLACED IN SUCCESSIVE LAYERS OF NOT MORE THAN 8" IN DEPTH. EACH SUCCESSIVE LAYER SHALL BE THOROUGHLY COMPACTED WITH APPROVED MECHANICAL TAMPERS TO THE REQUIRED DENSITY AND TESTED AND APPROVED BY THE SOILS ENGINEER PRIOR TO PLACEMENT OF THE NEXT LAYER. ALL FILL SHALL BE AT OPTIMUM MOISTURE CONTENT WHEN COMPACTED AS FOLLOWS IN ACCORDANCE WITH ASTM D698: STRUCTURE TOP 12" 100% REMAINDER 95% COMMON ALL DEPTH 92% DRIVES & TOP 24" 98% PARKING REMAINDER 95% THE OWNER SHALL FURNISH AND PAY FOR ALL FILL TESTING. ROCK DEFINITION WE SUGGEST THAT "ROCK" BE DEFINED AS THE FOLLOWING: A. GENERAL EXCAVATION: ANY MATERIAL WHICH CANNOT BE EXCAVATED WITH A SINGLE -TOOTH RIPPER DRAWN BY A CRAWLER TRACTOR HAVING A DRAW BAR PULL RATED AS NOT LESS THAN 65,000 POUNDS (CATERPILLAR D8K OR EQUIVALENT) OR EXCAVATED BY A FRONT-END LOADER WITH A MINIMUM BUCKET BREAKOUT FORCE OF 30,000 POUNDS (CATERPILLAR 973 OR EQUIVALENT). B. TRENCH EXCAVATION: ANY MATERIAL WHICH CANNOT BE EXCAVATED WITH A BACKHOE HAVING A BUCKET CURLING FORCE RATED AT NOT LESS THAN 42,000 POUNDS (CATERPILLAR 325BL OR EQUIVALENT). NOTE: IF THE CONTRACTOR ELECTS TO USE EQUIPMENT WITH POWER RATINGS THAT EXCEED THE MINIMUM POWER RATINGS DESCRIBED IN THE SPECIFICATION, THEN ROCK WILL BE DEFINED BASED ON THE ACTUAL EQUIPMENT USED. SITE DEVELOPMENT AND EROSION CONTROL SEQUENCE 1. OBTAIN REQUIRED PERMITS AND SCHEDULE A PRE CONSTRUCTION MEETING WITH REQUIRED PERSONNEL. 2. STAKE CLEARING LIMITS. 3. STAKE AND INSTALL PHASE 1 SILT FENCE ALONG PERIMETER. 4. INSTALL CONSTRUCTION ENTRANCE. 5. CLEAR REMAINDER OF SITE. 6. ROUGH GRADE THE SITE. 7. INSTALL REQUIRED STORM FOR PHASE 1. 8. INSTALL INLET PROTECTIONS FOR PHASE 1. 9. INSTALL TEMPORARY DIVERSION DITCHES FOR PHASE 1. 10. INSTALL REQUIRED STORM FOR PHASE 2. 11.ROUGH GRADE ROAD AND DRIVEWAYS, 12.CONVERT TO PHASE 2 EROSION CONTROL. REMOVE ALL PHASE 1 MEASURES NOT USED IN PHASE 2 13.ENSURE ALL MEASURES ARE FUNCTIONING PROPERLY AND REPAIR ANY MEASURES THAT NEED MAINTENANCE. 14.INSTALL ROAD BASE. 15.INSTALL 1ST COURSE OF PAVEMENT. 16. FINE GRADE ENTIRE SITE. 17.INSTALL LANDSCAPING AND SEED AND/OR SOD. 18.INSTALL SURFACE COURSE OF ASPHALT. 19. SEED ALL AREAS WITH FINAL SEEDING ACCORDING TO SPECIFICATIONS. 20.UPON STABILIZATION OF AREA, SCHEDULE AN INSPECTION. 21.ONCE APPROVED, REMOVE SILT FENCE AND ANY OTHER REMAINING TEMPORARY MEASURES. 22.CALL FOR FINAL INSPECTION. GRADING NOTES 1. THE UTILITIES AND THE LOCATIONS THEREOF, SHOWN ON THE PLANS, REPRESENT THE DESIGNER'S UNDERSTANDING OF EXISTING UTILITIES IN THE CONSTRUCTION AREA. THE CONTRACTOR SHALL VERIFY THE LOCATION DEPTH AND EXISTENCE OF ALL UTILITIES ELECTRICAL MECHANICAL GAS WATER TELEPHONE, ETC.) WITHIN THE CONSTRUCTION AREA WITH THE OWNER AND/OR THE APPROPRIATE UTILITY COMPANY PRIOR TO BEGINNING ANY EXCAVATION. THE OMISSION OR THE INCLUSION OF UTILITY LOCATIONS ON THE PLANS IS NOT TO BE CONSIDERED AS THE NON-EXISTENCE OF OR A DEFINITE LOCATION OF EXISTING UNDERGROUND UTILITIES. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. CONTACT N.C. ONE -CALL CENTER ® (800-632-4949). 2. CONTRACTOR SHALL PROVIDE ALL EROSION CONTROL MEASURES AS REQUIRED BY LOCAL AND STATE REGULATIONS. ALL MEASURES SHALL BE IN PLACE PRIOR TO STARTING ANY GRADING. 3. ALL CONSTRUCTION AND CONSTRUCTION MATERIALS SHALL CONFORM TO LOCAL CITY/COUNTY LAND DEVELOPMENT STANDARDS. 4. ANY UNSUITABLE MATERIALS ARE TO BE QUALIFIED BY A GEOTECHNICAL ENGINEER PRIOR TO REMOVAL. CONTRACTOR SHALL NOTIFY OWNER OR OWNER'S REPRESENTATIVE IF UNSUITABLE MATERIAL IS UNCOVERED. 5. ANY EXCESS SOIL TO BE WASTED ON -SITE SHALL BE PLACED IN AREA DESIGNATED BY OWNER. WASTE AREAS SHALL BE STABILIZED TO ENSURE EROSION CONTROL OF SLOPED AREAS. TOPSOIL SHALL BE STRIPPED AND STOCKPILED IN AREA DESIGNATED BY OWNER. 6. CONTRACTOR SHALL COORDINATE WITH GEOTECHNICAL ENGINEER IF SUBSURFACE DRAINAGE SYSTEMS ARE INSTALLED. 7. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1 UNLESS OTHERWISE NOTED ON THE PLANS. IF DESIGN CALLS FOR SLOPE GREATER THAN 2:1 AND IS GREATER THAN TEN (10) FEET IN HEIGHT, SLOPE MUST BE MATTED OR BENCHED. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. 8. GRADING MORE THAN ONE (1) ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO FINES. 9. ANY GRADING BEYOND THE LIMITS OF DISTURBANCE SHOWN IS A VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO FINES. 10. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION SHALL BE OBTAINED FROM THE AFFECTED PROPERTY OWNER'S). 11. ANY LAND DISTURBING ACTIVITY GREATER THAN FIVE (5) ACRES REQUIRES COMPLIANCE WITH ALL CONDITIONS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (PERMIT NO. NCG010000). ANY PERMIT NON-COMPLIANCE IS A VIOLATION OF THE CLEAN WATER ACT AND MAY REQUIRE ENFORCEMENT ACTION BY THE N.C. DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES. 12. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 13. NO BURNING IS ALLOWED. 14. A GRADING PLAN SHALL BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE (1) ACRE THAT WAS NOT PREVIOUSLY APPROVED. 15. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT R/W MUST BE PRESENTED AT PRE -CONSTRUCTION MEETING. NARRATIVE: THE PROPOSED PROJECT IS LOCATED AT 6483 MOUNT PLEASANT RD. S., CONCORD, NORTH CAROLINA AND IT IS PART OF A SINGLE FAMILY HOME SUBDIVISION. PLANS CONSISTS OF GRADING OF THE ROADS AND DRIVEWAYS, STORM DRAINAGE, APPLICABLE EROSION CONTROL MEASURES, AND LANDSCAPING. SEEDING SPECIFICATION 3:1 OR FLATTER SLOPES (TEMPORARY AND PERMANENT SEEDING 1.APPLY AGRICULTURAL LIME AT A RATE OF 3 TONS PER ACRE 2.APPLY 10-10-10 COMMERCIAL FERTILIZER AT A RATE OF 20 LBS/ 1000 SQ. FT. 3.SEE IN ACCORDANCE WITH THE FOLLOWING SCHEDULE AND APPLICATION RATES: DATES TYPE PLANTING RATE AUGUST 15 - NOVEMBER TALL FESCUE 300 LBS/ACRE NOVEMBER 1 - MARCH 1 TALL FESCUE 300 LBS/ACRE ABRUZZI RYE 25 LBS/ACRE MARCH 1 - APRIL 15 TALL FESCUE 300 LBS/ACRE APRIL 15 JULY 30 MULLED COMMON BERMUDA GRASS 30 LBS/ACRE = JULY 30 AUGUST 15 TALL FESCUE 300 LBS/ACRE BROWN TOP MILLET 30 LBS/ACRE 4.MULCH WITH STRAW APPLIED AT A RATE OF 75-100 LBS/1000 SQ. FT. TACK WITH ASPHALT EMULSION AT A RATE OF 400 GALLONS PER ACRE. 5.INCREASE MULCH FROM JANUARY TO MARCH TO 100-125 LBS/ACRE. 6.OVER SEED ALL APPLICATION SEPTEMBER 1, WITH TALL FESCUE AT THE RATE OF 150 LBS/ACRE UNTIL STAND OF GRASS IS ESTABLISHED SLOPES GREATER THAN 3:1 1.APPLY AGRICULTURAL LIME AT A RATE OF 3 TONS PER ACRE 2.APPLY 10-10-10 COMMERCIAL FERTILIZER AT A RATE OF 20 LBS/ 1000 SQ. FT. 3.SEE IN ACCORDANCE WITH THE FOLLOWING SCHEDULE AND APPLICATION RATES: DATES TYPE PLANTING RATES MARCH - JUNE 1 SWITCH GRASS 150 LBS/ACRE MARCH - APRIL ADD TALL FESCUE 150 LBS/ACRE JUNE - SEPTEMBER 1 TALL FESCUE 150 LBS/ACRE BROWN TOP MILLET 30 LBS/ACRE SEPTEMBER - MARCHI SWITCH GRASS 150 LBS/ACRE TALL FESCUE 150 LBS/ACRE BROWN TOP MILLET 30 LBS/ACRE 4.MULCH WITH STRAW APPLIED AT A RATE OF 75-100 LBS/1000 SQ. FT. TACK WITH ASPHALT EMULSION AT A RATE OF 400 GALLONS PER ACRE. PROVIDE MATTING AS NOTED FOR SLOPE IN EXCESS OF 2:1 OR SLOPES NOTED AS RECEIVING MATTING. MATTING TO BE INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND DETAILS PROVIDED 5.INCREASE MULCH FROM JANUARY TO MARCH TO 100-125 LBS/ACRE. 6.OVER SEED ALL APPLICATION SEPTEMBER 1, WITH TALL FESCUE AT THE RATE OF 150 LBS/ACRE UNTIL STAND OF GRASS IS ESTABLISHED EROSION CONTROL NOTES TEMPORARY EROSION CONTROL SEEDBED PREPARATION 1. SURFACE WATER CONTROL MEASURES TO BE INSTALLED ACCORDING TO PLAN. 2. AREAS TO BE SEEDED SHALL BE RIPPED AND SPREAD WITH AVAILABLE TOPSOIL 3" DEEP TOTAL SEEDBED PREPARED DEPTH SHALL BE 4" TO 6" DEEP. 3. LOOSE ROCKS, ROOTS, AND OTHER OBSTRUCTIONS SHALL BE REMOVED FROM THE SURFACE SO THAT THEY WILL NOT INTERFERE WITH ESTABLISHMENT AND MAINTENANCE OF VEGETATION. SURFACE FOR FINAL SEEDBED PREPARATION, AT FINISH GRADES SHOWN, SHALL BE REASONABLY SMOOTH AND UNIFORM. 4. IF NO SOIL TEST IS TAKEN, FERTILIZER AND LIME TO BE ACCORDING TO SEEDING SPECIFICATIONS SHOWN. IN ADDITION, PROVIDE 15 LBS./1000 SQ.FT. OF SUPERPHOSHATE. 5. IF SOIL TEST IS TAKEN, PROVIDE LIME AND FERTILIZER ACCORDING TO SOIL TEST REPORT. 6. LIME & FERTILIZER SHALL BE APPLIED UNIFORMLY & MIXED WITH THE SOIL DURING SEEDBED PREPARATION. 7. GRADED SLOPES AND FILL: THE ANGLE FOR GRADED SLOPES AND FILL SHALL BE NO GREATER THAN THE ANGLE WHICH CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED SHALL, WITHIN 14 WORKING DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION CONTROL. 8. GROUND COVER: WHENEVER LAND -DISTURBING ACTIVITY IS UNDERTAKEN ON A TRACT COMPRISING MORE THAN ONE ACRE, IF MORE THAN ONE CONTIGUOUS ACRE IS UNCOVERED A GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE PLANTED OR OTHERWISE PROVIDED WITHIN 14 WORKING DAYS ON THAT PORTION OF THE TRACT UPON WHICH FURTHER ACTIVE CONSTRUCTION IS NOT BEING UNDERTAKEN. 9. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED DEPENDING ON FIELD CONDITIONS. 10. MULCH TO BE TACKED WITH ASPHALT EMULSION OR MECHANICALLY TIED DOWN WITHIN ONE DAY AFTER MULCH IS SPREAD. 11. CONTRACTOR SHALL ESTABLISH AND MAINTAIN A GOOD STAND OF GRASS UNTIL PROJECT IS COMPLETED. NEW STABILIZATION TIMEFRAMES SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 CAL. DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 CAL. DAYS NONE SLOPES STEEPER THAN 3:1 7 CAL. DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 CAL. DAYS 7 CAL. DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 CAL. DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES rn L w U z I p c 0 ca 0 Z Q p U �O U Z U �a I`7 �voJZQo o Jp 0 J p U C� w a I p= z 0 -11) _ m� O o-f9>� _Q � ��Zo� o N pz� o `` 11 C jZw�H S ^J a � Q U W N 0 LL C W ., _ L = = _ - U = v U t - +� - O :_ Z =_ z 0 U (N W 0 w Q 0 z O N_ z O 0 z N ry� W Y Z � D m W Y /^ V / O U Q (/1 CAI z Q W Q J J m M W H O 0° Q 0 W O W Z J vi J � W CL W �Qa Q W o N W y m 0 QJ w a I� 0 N m ^J z z I..L M 00 3 Y W .. m z m0 WLd CL z Y D U) Q W O U 0 0 ''01 � CIVIL GEOTECHNICAL SURVEYING PO BOX 268 CONCORD, NC 28026-0268 P. 704.786.5404 F. 704.786.7454 www.cesicgs.com NCBELS CORP. NO. C-0263 ©COPYRIGHT 2012 ENGINEERS ,Rp4 SS%'' q _ EAL 033470 = 0 ,A 3/20�2; 00