Loading...
HomeMy WebLinkAboutNCC223375_ESC Approval Submitted_20221012ROY COOPER - Govern" I ELIZABETH S. BISEP ., SecrVary BRIAN WRENN NORTH CAROL€NA olrecfvr &w1roamenfa1Qual1ty August 24, 2022 LETTER OF APPROVAL /0S� North Carolina State Ports Authority ATTN: Brian E Clark PO BOX 9002 Wilmington NC, 28402 RE: Project Name: Fertilizer Storage Warehouse Port of Morehead City Acres Approved: 3.25 Project ID: CARTE-2023-003 City: Morehead City County: Carteret Address: 114 Arendell Street River Basin: White Oak Stream Classification: Other Submitted By: M. Robin Austin, Catlin Engineers and Scientists Date Receive by LQS: August 05, 2022 Plan Type: Commercial Dear Mr. Clark: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached if required. This plan approval shall expire three (3) years following the date of approval. If no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413,0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRF from submitted for this project you MUST obtain the COC prior to commencement of any land disturbing activity. The eNO1 form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eN01 changes in the future. The new responsible party MUST obtain a new COC. Title I SA NCAC 4B .0118(a) and the NCGO I permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation, 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Hard, Carolina Department of EnW—m-1 Quality € DMMan of Energy, Mlnerai and Land R—ur—a Whninglon Regiotwl OM— 1 921 Cardlnat Drier C-zeension; Mraingran, North Carotins 28405 910.796.7215 Letter of Approval North Carolina State Ports Authority August 24, 2022 Page 2- of 4 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act, Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, Iocal city or county ordinances or rules may also apply to this land disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a Iand-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, 7_k� C19_oA� Mike Cook Assistant Regional Engineer Land Quality Section Enclosures: Modifications Required for Approval NPDES NCGO I Fact Sheet cc: M. Robin Austin, Catlin Engineers and Scientists