Loading...
HomeMy WebLinkAboutNCC223413_Site Plan or Location Map_20221011ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL WAKE COUNTY, TOWN OF GARNER, CITY OF RALEIGH AND / OR NCDOT STANDARDS AND SPECIFICATIONS" O E k 3 u DUKE HEALTH -- GARNERM DICALE BUILDING01 EROSION CONTROL PLAN TOWN OF GARNER AND ST. MARY'S TWP, WAKE COUNTY, NORTH CAROLINA Tmbei OF Urthed Slale51 Foslal SeLvice ® Timber Dr T-kMbPr Family Durhlal 9 Timber Pr I 1 �I Mrpona Id's SWL: Ernpsayee5' CrPdrt Union 41ex2rkdef's llelWrx byCmier Cr�IL 51 619 Ecr54iarner F Lion smk�ji TTT CarolIna Fr$hFyCo � nkeaLA - N Iltere a 0 a c Chlld"ro Network 0 z LV U,"wry LP .4Qhi&..S ,giG4iixanSL Owner: DUKE UNIVERSITY HEALTH SYSTEM, INC., A North Carolina Non -Profit Corporation 310 Blackwell Street, 4th Floor Durham, North Carolina, 27701 Site Designer: NV5 ENGINEERS + CONSULTANTS 3300 Regency Parkway Cary, NC 27518 Michael Allen, PE, Project Manager Mobile: (919) 201-5002 Email: michael.allen@NV5.com Developer: DUKE HEALTH FACILITIES PLANNING DESIGN & CONSTRUCTION PO BOX 3019 DUMC Durham, North Carolina 27710 Shawn Subasic, Associate VP Mobile: (919) 286-8331 Email: shawn.subasic@duke.edu J A 9tagr CbmPuller serwltg Tirnber Spring ApOtnenl9 -va149 ISr TFEeline Firriber Creek Apartments 9 �i VICINITY MAP (not to scale) THE ENGINEER DOES NOT GUARANTEE THAT ALL EXISTING FACILITIES SUCH AS PIPELINES, ELECTRICAL LINES, CONDUIT, TELEPHONE CABLE, SERVICE CONNECTIONS, OR OTHER FACILITIES ARE SHOWN ON THE PLANS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE ALL UTILITIES LOCATED BY THEIR RESPECTIVE OWNERS, FIELD MARK THE UTILITY LOCATIONS, AND PROTECT ALL SUCH EXISTING FACILITIES PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR IS FULLY RESPONSIBLE FOR NOTIFYING ALL UTILITY OWNERS IN ACCORDANCE WITH NC GENERAL STATUTE - CHAPTER 87, ARTICLE 8, THE UNDERGROUND DAMAGE PREVENTION ACT. GENERAL NOTES: 1. EXISTING CONDITIONS INFORMATION FROM CAD FILE PROVIDED BY NV5 ENGINEERS & CONSULTANTS. 2. ALL WORK SHALL CONFORM TO WAKE COUNTY DEPARTMENT OF ENVIRONMENTAL SERVICES / WATER QUALITY STANDARDS AND SPECIFICATIONS. 3. CONTRACTOR IS RESPONSIBLE FOR INSTALLING AND MAINTAINING MEASURES AS NECESSARY TO PREVENT SEDIMENT FROM LEAVING THE LIMITS OF CONSTRUCTION. 4. ALL BARE SOILS ARE TO BE STABILIZED UNDER CONDITIONS OUTLINED IN THE CURRENT NPDES PERMIT OR, IF IT IS IN A CRITICAL AREAS (PIPE OUTLETS/ OUTFALLS, BY THE END OF THE DAY. UTILIZE STAGED SEEDING IF NECESSARY TO COMPLY WITH STABILIZATION TIMEFRAMES. 5. DEWATERING OF SEDIMENT CONTAINMENT DEVICES FOR MAINTENANCE OR REMOVAL PURPOSES IS TO BE DONE THROUGH A SILT BAG. 6. EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSTALLED IMMEDIATELY AT ANY AREAS USED FOR CONTRACTOR EQUIPMENT STAGING, MATERIALS LAYDOWN, SPOIL OR WASTE AREAS. 7. A RAIN GAUGE SHALL BE INSTALLED ON SITE. COPIES OF APPROVED PLANS, PLAN APPROVAL LETTER WITH ANY MODIFICATIONS OR PERFORMANCE RESERVATIONS, 401 / 404 DOCUMENTATION & A MIN. OF 30 DAYS OF SELF -INSPECTION REPORTS SHALL BE MAINTAINED ON SITE UNTIL PROJECT IS CLOSED OUT BY NC DEQ RALEIGH OFFICE. 8. ALL SEDIMENT BASINS MUST BE MAINTAINED UNTIL ALL UPSTREAM DRAINAGE AREAS HAVE BEEN STABILIZED WITH THE ESTABLISHMENT OF PERMANENT VEGETATION. MAT ALL BASIN SLOPES WITH A SUITABLE RECP AFTER SEEDING AND STABILIZE ANY AREA BETWEEN BASIN/DIVERSION BERMS AND PROJECT LIMITS OF DISTURBANCE. 9. IF AN OFF -SITE SPOIL OR BORROW AREA IS UTILIZED, IT MUST BE IN COMPLIANCE WITH STATE AND LOCAL REGULATIONS. ALL SPOIL AREAS OVER 1 ACRE ARE REQUIRED TO HAVE AN APPROVED SEDIMENT CONTROL PLAN. CONTRACTOR SHALL NOTIFY WAKE COUNTY OF ANY OFF -SITE DISPOSAL OF SOIL PRIOR TO DISPOSAL. 10. DURING THE ENTIRE PERIOD OF CONSTRUCTION ACTIVITY ON THE SITE, ALL PROTECTED TREES SHALL BE SURROUNDED AND PROTECTED BY AN ORANGE TENSAR GEOGRID FENCING FABRIC OR APPROVED EQUAL FENCING. A SIGN STATING, "TREE PROTECTION AREA - DO NOT ENTER / PARA PROTECCION DE LOS ARBOLES - PROHIBIDO ENTRAR" SHALL BE INSTALLED AT EVERY LINEAR INTERVAL OF 200'. TREE PROTECTION FENCING SHALL BE INSTALLED A MINIMUM OF 10 FEET FROM THE TRUNK OF ANY PROTECTED TREE OR DRIP LINE, WHICHEVER IS GREATER FOR ANY TREE GREATER THAN 10 INCHES DBH, THIS DISTANCE SHALL BE INCREASED 1 FOOT FOR EVERY 1 INCH DBH. TREE PROTECTION FENCING SHALL BE MAINTAINED UNTIL A FINAL CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED, UNLESS EXPRESSLY EXEMPTED BY THE PLANNING DIRECTOR [SEC. 7.1(1)(5)(a)j. ONCE TREE PROTECTION FENCE HAS BEEN INSTALLED, PLEASE CONTACT ALISON JONES AT 919-773-4429 (ajones@garnernc.gov) TO SCHEDULE AN INSPECTION. A PASSING INSPECTION FROM THE TOWN OF GARNER FOR THE TREE PROTECTION FENCING IS REQUIRED PRIOR TO RECEIVING APPROVAL FROM WAKE COUNTY. 11. NO OFFSITE SOIL OR BORROW SITE IS UTILIZED DURING CONST. 12. THE NEUSE RIVER RIPARIAN AREA PROTECTION AND MAINTENANCE RULE (15 NCAC 213.0233) APPLIES TO ALL PERENNIAL AND INTERMITTENT STREAMS, LAKES, PONDS AND ESTUARIES IN THE NEUSE RIVER BASIN WITH FOREST VEGETATION ON THE ADJACENT LAND OR "RIPARIAN AREA". SKIMMER BASIN EARTHWORK CONSTRUCTION SPECIFICAITONS 1. ALL FILL MATERIALS USED FOR THE DAM EMBANKMENT SHALL BE TAKEN FROM BORROW AREAS APPROVED BY THE GEOTECHNICAL ENGINEER. FILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, WOOD AND STONES LARGER THAN 6". 2. PRIOR TO PLACEMENT OF FILL MATERIAL FOR THE BERM SECTION, ALL UNSUITABLE MATERIAL SHALL BE REMOVED AND THE SURFACE PROPERLY PREPARED FOR FILL PLACEMENT. 3. ALL EARTHEN FILLS SHALL BE CLEARED, GRUBBED AND STRIPPED OF ALL VEGETATIVE MATERIAL, TOPSOIL, AND ORGANIC MATTER PRIOR TO CONSTRUCTION. 4. PLACE BACKFILL AND FILL SOIL MATERIALS IN LIFTS NOT MORE THAN 8 INCHES IN LOOSE DEPTH. EACH LIFT SHALL BE CONTINUOUS FOR THE ENTIRE LENGTH OF THE EMBANKMENT. 5. THE SURFACE OF EACH LAYER SHALL BE SCARIFIED PRIOR TO PLACEMENT OF THE NEXT LAYER. 6. COMPACT SOIL MATERIALS TO NOT LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698) AT MOISTURE CONTENTS VARYING FROM 2 PERCENT BELOW OPTIMUM MOISTURE CONTENT TO 3 PERCENT ABOVE OPTIMUM MOISTURE WITH HAND TAMPS OR LIGHT SELF PROPELLED WALK BEHIND EQUIPMENT. STOCKPILE NOTES: 1. SOIL STOCKPILE HEIGHT SHALL NOT EXCEED 35 FEET IN HEIGHT 2. STOCKPILE SLOPES SHALL BE 2:1 OR FLATTER. STOCKPILE MAINTENANCE REQUIREMENTS: 1. SEEDING OR COVERING STOCKPILES WITH TARPS OR MULCH IS REQUIRED AND WILL REDUCE EROSION PROBLEMS. TARPS SHOULD BE KEYED IN AT THE TOP OF THE SLOPE TO KEEP WATER FROM RUNNING UNDERNEATH THE PLASTIC. 2. IF A STOCKPILE IS TO REMAIN FOR FUTURE USE AFTER THE PROJECT IS COMPLETE (BUILDERS, ETC.), THE FINANCIAL RESPONSIBLE PARTY MUST NOTIFY WAKE COUNTY OF A NEW RESPONSIBLE PARTY FOR THAT STOCKPILE. 3. THE APPROVED PLAN SHALL PROVIDE FOR THE USE OF STAGED SEEDING AND MULCHING ON A CONTINUAL BASIS WHILE THE STOCKPILE IS IN USE. 4. ESTABLISH AND MAINTAIN A VEGETATIVE BUFFER AT THE TOE OF THE SLOPE (WHERE PRACTICAL). WAKE COUNTY UDO ARTICLE 10 - EROSION AND SEDIMENT CONTROLREQUIREMENTS 1. 10-20-1 MINIMUM STANDARDS - ALL SOIL EROSION & SEDIMENTATION CONTROL PLANS AND MEASURES MUST CONFORM TO THE MINIMUM APPLICABLE STANDARDS SPECIFIED IN NORTH CAROLINA'S EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND THE WAKE COUNTY SEDIMENTATION AND EROSION CONTROL PLAN REVIEW MANUAL. EROSION CONTROL DEVICES MUST BE INSTALLED TO PREVENT ANY OFFSITE SEDIMENTATION FOR ANY CONSTRUCTION SITE REGARDLESS OF THE SIZE OF THE LAND DISTURBANCE. 2. 10-20-3 - OPERATION IN LAKES OR NATURAL WATERCOURSES - LAND DISTURBING ACTIVITY IN CONNECTION WITH CONSTRUCTION IN, ON, OVER, OR UNDER A LAKE OF NATURAL WATERCOURSE MUST MINIMIZE THE EXTENT AND DURATION OF DISRUPTION OF THE STREAM CHANNEL. WHERE RELOCATION OF A STREAM FORMS AN ESSENTIAL PART OF THE PROPOSED ACTIVITY, THE RELOCATION MUST MINIMIZE UNNECESSARY CHANGES IN THE STREAM FLOW CHARACTERISTICS. RIPARIAN BUFFER RULES 1. DUE TO THE LOCATION OF THIS PROJECT, IT SHOULD BE NOTED THAT A RULE TO PROTECT AND MAINTAIN EXISTING BUFFERS ALONG WATERCOURSES IN THE NEUSE RIVER BASIN BECAME EFFECTIVE ON JULY 22, 1997. THE NEUSE RIVER RIPARIAN AREA PROTECTION AND MAINTENANCE RULE (15A NCAC 213.0233) APPLIES TO ALL PERENNIAL AND INTERMITTENT STREAMS, LAKES, PONDS AND ESTUARIES IN THE NEUSE RIVER BASIN WITH FOREST VEGETATION ON THE ADJACENT LAND OR "RIPARIAN AREA". BASIN REMOVAL SEQUENCE 1. SCHEDULE A SITE MEETING WITH THE WAKE COUNTY ENVIRONMENTAL CONSULTANT TO DETERMINE IF THE BASIN CAN BE CONVERTED TO A PERMANENT SCM. INSTALL SILT FENCING OR OTHER TEMPORARY EROSION CONTROL MEASURES AS NEEDED PRIOR TO REMOVAL OF THE BASIN. 2. REMOVE BASIN AND ASSOCIATED TEMPORARY DIVERSION DITCHES. FINE GRADE AREA IN PREPARATION FOR SEEDING. 3. PERFORM SEEDBED PREPARATION, SEED, MULCH AND ASPHALT TACK ANY RESULTING BARE AREAS IMMEDIATELY. 4. INSTALL VELOCITY DISSIPATORS AND/OR LEVEL SPREADERS AS REQUIRED ON THE EROSION CONTROL PLAN. 5. WHEN SITE IS FULLY STABILIZED, CONTACT THE WAKE COUNTY ENVIRONMENTAL CONSULTANT FOR APPROVAL OF REMOVING REMAINING TEMPORARY EROSION CONTROL MEASURES AND ADVICE ON WHEN SITE CAN BE ISSUED A CERTIFICATE OF COMPLETION. NOTE: A MEETING SHOULD ALSO BE SCHEDULED WITH THE ENVIRONMENTAL CONSULTANT TO DETERMINE WHEN A BASIN MAY BE CONVERTED FOR STORMWATER USE. GROUND STABILIZATION: A. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: a. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. b. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. PHASE 1 CONSTRUCTION SEQUENCE 1. SCHEDULE A PRECONSTRUCTION CONFERENCE WITH THE ENVIRONMENTAL CONSULTANT, ANDREW LAKE (919-594-0895). OBTAIN A LAND -DISTURBING PERMIT. 2. INSTALL GRAVEL CONSTRUCTION PAD, TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASIN AND OTHER MEASURES AS SHOWN ON THE APPROVED PLAN. STABILIZE AREAS DOWNSTREAM OF TEMPORARY DIVERSIONS AND SEDIMENT BASINS. INSTALL SCM RISER AND OUTLET PIPE, GRADE TEMPORARY SKIMMER BASIN AS SHOWN ON PHASE I PLAN AND SCM SHEETS. FOLLOW SCM CONSTRUCTION DETAILS AND SPECIFICATIONS FOR EARTHEN DAM CONSTRUCTION. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. SEED TEMPORARY DIVERSIONS, BERMS AND BASIN IMMEDIATELY AFTER CONSTRUCTION. 3. CALL ANDREW LAKE (919-591-0895) FOR AN ONSITE INSPECTION BY THE WATERSHED MANAGER TO OBTAIN A CERTIFICATE OF COMPLIANCE. 4. BEGIN CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED. ROUGH GRADE SITE. 5. INSTALL CLEAN WATER STORMWATER BYPASS AND PROTECT INLETS WITH BLOCK AND GRAVEL INLET CONTROLS. BEGIN CONSTRUCTION, BUILDING, ETC. PRIOR TO DEWATERING BASINS, MEET WITH ENVIRONMENTAL CONSULTANT, ANDREW LAKE, TO DETERMINE IF BASIN MAY BE REMOVED AND THEN PROVIDE WRITTEN NOTIFICATION TO NCDEQ. &STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION, PAVING, DITCH LININGS, ETC. SEED AND MULCH DENUDED AREAS PER GROUND STABILIZATION TIME FRAMES. 7. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED COMPLETELY, CALL ANDREW LAKE (919-594-0895) FOR AN INSPECTION BY THE ENVIRONMENTAL CONSULTANT. 8. IF SITE IS APPROVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASIN, ETC. AND SEED OUT OR STABILIZE ANY RESULTING BARE AREAS. ALL REMAINING PERMANENT EROSION CONTROL DEVICES, SUCH AS VELOCITY DISSIPATORS, SHOULD NOW BE INSTALLED. 9. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR A FINAL SITE INSPECTION BY THE ENVIRONMENTAL CONSULTANT, ANDREW LAKE (919-594-0895). OBTAIN A CERTIFICATE OF COMPLIANCE. PHASE 2 CONSTRUCTION SEQUENCE 1. SCHEDULE A PRECONSTRUCTION CONFERENCE WITH THE ENVIRONMENTAL CONSULTANT, ANDREW LAKE (919-594-0895). OBTAIN A LAND -DISTURBING PERMIT. 2. INSTALL GRAVEL CONSTRUCTION PAD, TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASINS AND OTHER MEASURES AS SHOWN ON THE APPROVED PLAN. STABILIZE AREAS DOWNSTREAM OF TEMPORARY DIVERSIONS AND SEDIMENT BASINS. INSTALL SCM RISER AND OUTLET PIPE, GRADE TEMPORARY SKIMMER BASIN AS SHOWN ON PHASE I PLAN AND SCM SHEETS. FOLLOW SCM CONSTRUCTION DETAILS AND SPECIFICATIONS FOR EARTHEN DAM CONSTRUCTION. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. SEED TEMPORARY DIVERSIONS, BERMS AND BASINS IMMEDIATELY AFTER CONSTRUCTION. 3. CALL ANDREW LAKE (919-591-0895) FOR AN ONSITE INSPECTION BY THE WATERSHED MANAGER TO OBTAIN A CERTIFICATE OF COMPLIANCE. 4. BEGIN CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED. ROUGH GRADE SITE. 5. INSTALL STORM SEWER AND PROTECT INLETS WITH BLOCK AND GRAVEL INLET CONTROLS. BEGIN CONSTRUCTION, BUILDING, ETC. 6. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION, PAVING, DITCH LININGS, ETC. SEED AND MULCH DENUDED AREAS PER GROUND STABILIZATION TIME FRAMES. 7. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED COMPLETELY, CALL ANDREW LAKE (919-594-0895) FOR AN INSPECTION BY THE ENVIRONMENTAL CONSULTANT. 8. IF SITE IS APPROVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASIN, ETC. AND SEED OUT OR STABILIZE ANY RESULTING BARE AREAS. ALL REMAINING PERMANENT EROSION CONTROL DEVICES, SUCH AS VELOCITY DISSIPATORS, SHOULD NOW BE INSTALLED. 9. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR A FINAL SITE INSPECTION BY THE ENVIRONMENTAL CONSULTANT, ANDREW LAKE (919-594-0895). OBTAIN A CERTIFICATE OF COMPLIANCE. INDEX OF SHEETS ESC-000 COVER ESC-001 EXISTING CONDITIONS ESC-002 EXISTING TREES ESC-003 EXISTING TREE TABLE ESC-100 EROSION CONTROL PHASE 1 ESC-101 EROSION CONTROL PHASE 2 ESC-400 GRADING & DRAINAGE EXHIBIT ESC-500 EROSION CONTROL DETAILS ESC-501 EROSION CONTROL DETAILS ESC-600 NPDES STABILIZATION PLAN ESC-601 NPDES DETAIL SHEET ESC-602 NPDES DETAIL SHEET E C L E U Z E O U _ U 1-0 Z Z � cr, Q � U U J z m bn LLI ZwN �3WULO LLx xk ZfYz0 w0 I wU Z� LOO Zc'o6 � z zytli 1"116 ..IN D. ILL 2 O P-+HJN WW W I ^ T 1 O r �c°wN aW o� I -I H Q O x z � o W�Pa� Z �2 Q In Gl Z Z ❑ ❑ 01 110 1 W � W a 0_ N Z Z ❑ Z ❑ ❑ N ❑ Z In D 111 ❑ w W ❑ El ff W a W W Z Z �1 ❑ ❑ ❑ ❑ Q W 0 U W 0 W W w Y Y a 3 3 N N N N N N W ❑ N ❑ N ❑ N Q ❑ 00 r ❑ (*3 r (1) N M ❑ r ❑ r <\ ❑ ❑ Z N M 1 0 0 00 M PROJECT NO: 2020171.01 DRAWN BY: DFB DWG. CHECKED BY: MDA SCALE: SEE PLAN DATE: 2022.03.1 1 COVER ESC-000