HomeMy WebLinkAboutNCC223497_ESC Approval Submitted_20221011NORTH CAROLINA August 2, 2022 To: Rex Vick, Jr. Montecristo No. 70, LLC 3434 Kildair Farm Road, Ste. 135 Cary, NC 27518 From: Kyle F. Manning, PE — Civil Engineer III City of Wilson — Engineering Division SUBJECT: Local Sedimentation and Erosion.Control Program Approval Bright Leaf Phase II (EC-050522-01) Mr. Vick, The City of Wilson received a revised submission for an erosion control plan from Bartlett Engineering and Surveying for Bright Leaf Phase II Subdivision for the disturbance of 9.2 acres on July 18, 2022. Bartlett Engineering and Surveying has addressed all outstanding items. Thus, the plan is approved. This plan approval shall expire three years following the date of approval, if no land - disturbing activity has been undertaken, as required by 15A NCAC 4B .0129. This approval was based partially on the accuracy of the information provided in the Financial Responsibility Form. You are requested to file an amended form if there is any change in the information included on the form. The City of Wilson has been granted delegated authority from the North Carolina Division of Energy, Mineral and Land Resources to regulated land disturbing activities subject to the Sedimentation Pollution Control Act of 1973. This Act is performance oriented, requiring protection of existing natural resources and adjoining properties. If the approved sedimentation and erosion control plan is inadequate to meet the requirements of the Act, this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with all Federal, State, and City of Wilson's ordinances as applicable to this land disturbing activity. Please be aware that this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspections to insure compliance with the approved plan. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form shall be submitted prior to the commencement of any land disturbing activity on this project. The NOI form may be accessed at deq.nc.govincg01. Please direct all questions about the NOI form to NC DEQ. After you submit a complete and correct NOi Form, a COC will be emailed to you within three business days. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviations/revisions; 2. The NCG01 permit and COC; and 3. Records of all required inspections made during the previous 30 days. The General Contractor or delegated agent is required to set up an erosion control pre - construction meeting (before construction begins) with the City Staff. Please contact either Brandon Galloway (252-205-2525) or Johnnie Webb (252-205-2526) to schedule the pre - construction meeting. A minimum of 72 hours' notice is required If you have questions, please contact me at (252) 296-3416. Sincerely, Kyle F. Manning Civil Engineer, PE Cc: Brandon Galloway, City of Wilson Johnnie Webb, City of Wilson Steve Oliverio, Bartlett Engineering & Surveying enclosures