Loading...
HomeMy WebLinkAboutNCS000605_Hudson 2022 Annual Report_20220830Reporting Line Year BMP Measurable Goal Reporting Comments No. (July 1 - Ref. Metric June 30) Did Hudson submit the Annual Self -Assessment to NCDEQ prior 1 1 1 to August 31 each year? Did Hudson develop and distribute new fliers to raise 9 1 3.B.1. general stormwater awareness? YES If so, how many general stormwater awareness fliers 10 1 3.B.1. were distributed? 75 Did Hudson attend the annual Hudson Butterfly Festival to disperse stormwater outreach materials/awareness through the use of interactive educational games and Cancelled in 19 1 4.B.1. activities? NO 2021 If so, how many event attendees were engaged in stormwater outreach/received 20 1 4.B.1. stormwater information? Did Hudson provide additional outreach supplement or alternative outreach opportunities if the annual Hudson Butterfly Festival was 29 1 4.B.2. canceled? YES If so, how many attendees were engaged in stormwater 30 1 4.B.2. outreach? 100 Did Hudson have WPCOG provide instruction and stormwater educational 39 1 5.B.1. activities to youth? YES If so, how many WPCOG youth education activities/events 40 1 5.B.1. were provided? 2 If so, how many WPCOG youth event participants were 41 1 5.B.1. reached? 45 How many storm drains were 54 1 5.B.2. stenciled? 0 Did Hudson create a Being 59 1 5.B.3. presentation covering Partial developed. stormwater topics to be presented in digital classrooms and/or provided to teachers? If so, how many classroom presentations were provided by 60 1 5.B.3. teachers or staff? 0 If so, how many students were reached by classroom 61 1 5.B.3. presentations? 0 Did Hudson develop printed stormwater best practices materials for local government 74 1 6.B.1. distribution? YES Did Hudson provide one presentation about one of the six NPDES Minimum Control Measures at each annual WPCOG Water Quality 75 1 7.B.1. Conference? YES If so, how many attendees were reached during the annual WPCOG Water Quality Conference stormwater 76 1 7.B.1. presentation? 137 Did Hudson evaluate the target pollutants and audiences to Changes were identify where outreach can be not required 85 1 8.B.1. improved? YES at this time. If so, were any revisions made 86 1 8.B.1. to target pollutants? NO If so, were any revisions made 87 1 8.B.2. to target audiences? NO Did Hudson maintain and update the stormwater 100 1 10.13.1. program web page? YES Was the annual selfassessment uploaded to stormwater 101 1 10.13.2. website? YES Did any links, contact information, or documents on the stormwater web page need 102 1 10.13.2. to be updated? YES How many hits did the 103 1 10.13.3. stormwater web page receive? 93 Did Hudson provide citizen education as part of the 116 1 11.13.3. enforcement process for illicit YES discharges, illegal dumping and improper disposl of waste? Few overall IDDE reports, If so, how many educational most were citizen interactions were residential completed as part of the illicit construction discharge and illegal dumping sediment 117 1 11.13.3. enforcement process? 5 runoff Did Hudson establish a hotline for stormwater complaints and 126 1 12.13.1. information? YES Did Hudson identify specific staff who will serve as the 127 1 12.13.2. hotline contact(s)? YES Does not include planning questions received at How many stormwater hotline hotline 128 1 12.13.3. calls were received? 12 number Did Hudson stormwater hotline staff receive training in general stormwater awareness, complaint call protocols, appropriate contacts for referral, and typical stormwater 133 1 12.13.4. issues? YES Did Hudson publicize contact information on the municipal Facebook page, and the stormwater program and 138 1 12.13.5. WPCOG webpages? YES Did Hudson establish a web based complaint/ 143 1 15.B.1. reporting/input form? YES Did Hudson maintain a Facebook page for stormwater 152 1 16.13.1. messaging? YES Did Hudson utilize the Facebook page to promote public involvement in stormwater programs, events and projects 153 1 16.13.2. and provide outreach/general YES stormwater awareness messages? If so, how many posts were made on the Facebook page related to the stormwater 154 1 16.6.2. program? 2 Did Hudson participate in quarterly Water Resource 167 1 17.6.1. Committee meetings? YES If so, how many quarterly Water Resource Committee meetings did Hudson 168 1 17.13.1. participate in? 2 If so, how many attendees (total of all meetings) were at quarterly Water Resource Committee meetings that 169 1 17.B.1. Hudson participated in? 38 Did Hudson provide a survey to engage the public and gauge public interest in stormwater issues and the stormwater 182 1 18.B.1. program? YES Online survey was provided but none have been filled out If so, how many surveys were as of the time 183 1 18.13.1. completed? 0 of reporting Did Hudson provide and promote volunteer stream 192 1 19.B.1. cleanup activities? YES If so, how many stream cleanup 193 1 19.B.1. events were held? 1 If so, how many stream cleanup 194 1 19.B.1. participants were there? 13 If so, how many trash bags were filled during stream cleanup 195 1 19.B.1. events? 8 Did Hudson provide materials for volunteer stream cleanup activities hosted by Hudson and 212 1 19.13.2. WPCOG? YES Did Hudson supplement or replace stream clean-up time 217 1 19.13.4. with outdoor educational YES activities if streams do not have adequate litter available for cleanup? If so, how many supplemental or replacement outdoor educational activities were 218 1 19.13.4. held? 1 If so, how many supplemental or replacement outdoor Occurred educational activity participants same day as 219 1 19.13.4. were there? 13 clean-up. Did Hudson update the existing MS4 map to include open channels, storm drain 232 1 20.13.1. information and flow direction? YES If so, was at least 20% of the 233 1 20.13.1. MS4 area mapped? Yes Mapping is in progress, Did Hudson add newly constructed constructed infrastructure to infrastructure 242 1 20.13.2. the existing MS4 map? YES included Updates to add construction waste and additional IDDE protections in is progress, waiting for council approval. Did Hudson review the IDDE Ordinance is ordinance and update if written and 247 1 21.13.1. needed? YES submitted Did Hudson develop a written 252 1 22.13.1. IDDE Plan? YES Template for IDDE plan and O&M plan What date did Hudson submit was provided the written IDDE Plan to DEQ to JP on 253 1 22.13.1. for approval? ##### 11/3/2020 Without repeat discharges priority IDDE areas were not applicable. Currently working with WM site maps and NPDES permit locations to generate priority areas. High pollution potential Did Hudson use the MS4 map to areas (such as locate priority areas likely to industrial) are 254 1 23.13.1. have illicit discharges? YES prioritized Did Hudson establish dry weather inspection procedures 259 1 24.13.1. and a schedule? YES Did Hudson establish procedures to track and document illicit discharge 272 1 25.13.1. investigations? YES Did Hudson screen priority areas likely to have illicit 273 1 26.13.1. discharges? YES Primarily single family home construction If so, how many illicit discharges w/ erosion were identified in priority control 274 1 26.13.1. areas? 3 concerns Did Hudson evaluate and assess the IDDE plan/program and 283 1 26.13.3. revise if necessary? YES Did Hudson develop the IDDE 288 1 27.13.1. tracking sheet? YES How many verified IDDE issues 289 1 27.13.2. were identified? 6 Did Hudson enforce illicit discharge and illegal dumping 294 1 27.13.3. violations? PARTIAL Of the verified IDDE issues reported, only 2 were illegal dumping related. Both were determined to not be legitimate discharges (neighbor How many illicit discharge and dispute and illegal dumping wetland violations/enforcement actions water levels 295 1 27.13.3. were issued? 0 rising) Of the verified IDDE issues reported, only 2 were illegal dumping related. Both were determined to not be legitimate discharges (neighbor How many illicit discharge and dispute and illegal dumping wetland violations/enforcement actions water levels 296 1 27.13.3. were resolved? 0 rising) Did Hudson establish and maintain a list of chronic 309 1 27.13.4. violators? YES The tracking tool/list was created, but no chronic If so, how many chronic violators have 310 1 27.13.4. violators were identified? 0 occurred Did Hudson identify staff and contractors likely to observe and identify illicit discharges, illicit connections, illegal 327 1 28.13.1. dumping and spills? YES Did Hudson train identified staff and contractors to identify and report illicit discharges, illicit connections, illegal dumping 328 1 28.6.2. and spills? YES How many staff and contractors were trained to identify and report illicit discharges, illicit connections, illegal dumping 329 1 28.6.2. and spills? 5 Did Hudson utilize social media and the stormwater webpage(s) to publicize contact information 338 1 29.13.2. for IDDE reporting? YES Did Hudson evaluate the IDDE 343 1 32.13.2. complaint response time? YES Reports are followed up on the same day or the following day depending on time of report. Resolution time follows within the periods outlined by issued NOVs. No issued NOVS required further If so, what was the average <24 Hours enforcement response time for IDDE response, <5 to correct the 344 1 32.13.2. complaints / reports? days resolved issue Did Hudson train municipal staff on proper handling of construction site runoff 353 1 33.13.1. complaints? YES How many staff were trained on proper handling of construction 354 1 33.13.1. site runoff complaints? 5 How many construction site runoff complaints were 355 1 33.13.2. received from municipal staff? 4 Did Hudson administer a public survey to receive perspective Included with 368 1 34.13.1. on construction site runoff? YES overall survey Did Hudson publicize the ability to report concerns about construction runoff issues via the online form on the Hudson and WPCOG websites and social 369 1 34.13.4. media? YES Ordinance developed and submitted to council, Did Hudson develop an awaiting ordinance that addresses approval by 378 1 35.13.1. construction site waste? PARTIAL Town Did Hudson adopt an ordinance that addresses construction site Adoption is in 379 1 35.13.2. waste? NO progress Did Hudson train municipal staff on identifying and reporting construction site waste 384 1 35.13.3. violations? YES How many staff were trained on identifying and reporting construction site waste 385 1 35.13.3. violations? 5 Did Hudson track the number of low -density and high -density 406 1 36 plan reviews performed? YES If so, how many low density project reviews were 407 1 36 performed? 5 If so, how many high density project reviews were 408 1 36 performed? 1 If so, how many low density 409 1 36 project reviews were approved? 5 If so, how many high density 410 1 36 project reviews were approved? 1 Did Hudson maintain a current inventory of low -density projects and constructed SCMs, including SCM type or low- 431 1 36 density acreage, location, last YES inspection date and type of enforcement action (if any)? How many high density non - municipally owned SCM 436 1 36 inspections were performed? 7 How many low -density 441 1 36 inspections were performed? 2 How many post -construction enforcement actions were 446 1 36 issued? 0 Did Hudson train field and office staff in Stormwater Ordinance procedures and 451 1 38.13.1. enforcement actions? YES How many staff were trained in Stormwater Ordinance procedures and enforcement 452 1 38.13.1. actions? 3 How many post -construction notices of violation were 461 1 38.13.2. issued? 0 How many post -construction 462 1 38.B.2. Civil Citations were issued? 0 How many post -construction violations are still in process of 463 1 38.B.2. abatement? 0 Did Hudson review post - construction procedures and documents and update as 476 1 39.B.1. needed? YES No SCMs were ready for CO How many pre -CO SCM inspection at 481 1 42.13.1. inspections were completed? 0 time of report No SCMs were ready for CO How many repeat pre -CO SCM inspection at 482 1 42.13.1. inspections were completed? 0 time of report No permitted How many permitted projects SCMs were with O&M Plans received their moving 483 1 40.13.1. CO? 0 towards close out at time of report How many SCM inspections were completed by municipal 484 1 42.13.2. staff? 6 For minor/typical How many SCM inspections concerns that performed by municipal staff were 485 1 42.13.2. were failed? 2 corrected How many qualified licensed professional SCM inspections completed with documentation 486 1 42.13.3. received? 6 2 above listed issues were resolved after discussing the How many SCMs are under issues with annual inspection property 487 1 42.13.3. enforcement? 0 owners Did Hudson conduct inspections of 20% of low -density projects 488 1 42.13.4. this year? YES Did Hudson provide educational materials about low density developments during the issuance of zoning permits, distributed through mailings, posted on social media, and 521 1 43.13.3. handed out at events? YES How many low density During plan educational materials were review 522 1 43.13.3. distributed? 2 process Did Hudson provide educational materials to developers about high density development during the issuance of zoning permits, distributed through mailings, posted on social media, and handed out at 531 1 44.B.2. events? YES How many high density Distributed to educational materials were HD permitted 532 1 44.B.2. distributed? 1 projects Did Hudson establish/maintain links to all post -construction ordinances, manuals, policies, checklists, design standards, and/or other materials on the 541 1 44.B.3. website? Did Hudson maintain a Pet 546 1 45.B.1. Waste Ordinance? YES Did Hudson implement and enforce the Pet Waste 547 1 45.B.1. Ordinance? YES Did Hudson develop educational awareness materials on fecal coliform pollution associated with 556 1 45.13.2. maintenance of septic systems? YES How many educational awareness materials on fecal coliform pollution associated with maintenance of septic 557 1 45.13.2. systems were distributed? 0 How many municipal facilities 562 1 46.13.2. have O&M Plans? 2 Did Hudson verify the municipal 563 1 47.B.1. facility list is complete? YES How many municipal facilities were identified to have stormwater pollution potential 564 1 47.13.2. / spill risk? 3 How many municipal facilities were inspected to ensure good housekeeping / spill prevention and control measures are 565 1 47.13.3. implemented? 8 Not all inspections How many municipal facilities showed signs implemented corrective of pollution 570 1 47.13.4. action(s) following inspection? 2 potential risk Included as Did Hudson develop a written part of spill response procedure plan municipal for each facility that requires O&M and 575 1 48.B.1 one? YES facility O&M How many municipal facilities implemented spill response 576 1 48.13.2. procedure plans? 2 How many non -reportable spills were documented according to 585 1 48.13.5. the spill response SOP? 0 How many reportable spills were documented according to 586 1 48.13.5. the spill response SOP? 0 Did Hudson develop an MS4 O&M Plan to define required procedures, inspections, schedules, documentation, and MS4 maintenance and 595 1 49.B.1. evaluations? YES Submitted When did Hudson submit the alongside 596 1 49.13.2. MS4 O&M Plan to DEQ? ##### IDDE plan Did Hudson provide comprehensive stormwater training to municipal staff and 605 1 50.13.1. contractors? YES How many comprehensive stormwater training sessions 606 1 50.13.1. were held? 1 How many municipal and contractor staff received comprehensive stormwater 607 1 50.13.1. training? 5 Did Hudson inspect the MS4 616 1 51.13.1. infrastructure? YES How many MS4 catch basins 617 1 51.13.1. were inspected? 50 How many MS4 conveyances 618 1 51.13.1. were inspected? 50 How many MS4 issues were 619 1 51.13.1. documented? 6 How many MS4 cleanings/maintenance actions 636 1 52.13.2. were performed? 4 Did Hudson maintain an inventory of municipally -owned SCMs with information including type, year built, date of last inspection and 641 1 53.13.1. maintenance actions? YES How many municipally -owned 642 1 53.13.1. SCMs are in the inventory? 0 Did Hudson develop/maintain a 643 1 53.13.2. SCM Operation and NO N/A Maintenance Plan for each municipally -owned SCM? How many municipally -owned SCM inspections were 656 1 54.13.3. performed? 0 N/A How many municipally -owned SCMs had documented deficiencies/required 661 1 54.13.4. maintenance? 0 N/A How many municipally -owned SCM corrective actions/repairs 662 1 54.13.4. were performed? 0 N/A Did Hudson ensure that only certified landscapers/applicators are applying pesticides, herbicides 671 1 56.13.1. and fertilizers? YES How many certified landscapers/applicators are applying pesticides, herbicides 672 1 56.13.1. and fertilizers? 4 Did Hudson establish standard operating procedures for vehicle and equipment 681 1 57.13.1. washing? YES Did Hudson implement standard operating procedures for vehicle and equipment 682 1 57.13.3. washing? YES Did Hudson ensure all municipal facilities have appropriate industrial stormwater permit 687 1 58.13.1. coverage? YES How many municipal facilities have industrial stormwater 688 1 58.13.1. permit coverage? 0 Did Hudson perform annual municipal street/curb and 689 1 59.13.1. gutter sweeping? PARTIAL How many lane miles were 690 1 59.13.1. swept? 2 Did Hudson track conveyances/infrastructure that have frequent problems with pollution to prioritize their 691 1 59.13.2. maintenance? YES Did Hudson distribute educational flyers regarding 704 1 59.13.3. street runoff pollution? YES How many educational flyers regarding street runoff 705 1 59.13.3. pollution were distributed? 55 Did Hudson service public waste 714 1 60.13.1. receptacles? YES How many trash bags were 715 1 60.13.1. used/collected? 50 Did Hudson collect litter on an 724 1 60.6.2. as -needed basis? YES How much trash was collected 725 1 60.13.2. (pounds)? 3,000 Did Hudson perform leaf collections between November 734 1 61.13.1. and January? YES How many cubic yards of leaves 23 miles 735 1 61.13.1. were collected? vacuumed Did Hudson train first responders on minimizing, collecting and disposing of fluids and other vehicular pollutants following an 744 1 62.13.1. accident? PARTIAL How many first responders were trained on minimizing, collecting and disposing of fluids and other vehicular pollutants following an 745 1 62.13.1. accident? Did Hudson equip and maintain spill kits in first responder 754 1 62.13.2. vehicles? YES How many first responder spill 755 1 62.13.2. kits were maintained / refilled? 5 gallon spill kit How many public education materials about vehicle leaks / pollution potential were 764 1 62.13.3. distributed? Did Hudson enforce significant vehicle leaks from parked cars 769 1 62.13.4. under the IDDE ordinance? YES How many enforcement actions were issued for significant 770 1 62.13.4. vehicle leaks from parked cars?