Loading...
HomeMy WebLinkAboutSW6220504_Plansheet SCM-1&2 - SCM Detail_20220926/'STORMWATER MANAGEMENT NOTES: 1, THE DEVELOPER OR HIS AGENT SHALL CONTACT THE DESF ENGINEER WHEN THE BEST MANAGEMENT PRACTICE(S) ARE CONSTRUCTED AND ABOUT TO BECOME OPERATIONAL SO A FINAL INSPECTION CAN BE PERFORMED TO DETERMINE COMPLIANCE WITH THE APPROVED PLAN CAN BE PERFORM 2. ANNUAL MAINTENANCE INSPECTION AND REPORT REQUIRED THE OWNER OF A PERMITTED STRUCTURAL STORMWATER BMP/CONTROL SHALL ANNUALLY SUBMIT A MAINTENANCE INSPECTION REPORT FOR EACH BMP TO THE STORMWATER ADMINISTRATOR. ANNUAL INSPECTIONS SHALL BEGIN WITh ONE YEAR OF THE RECORDATION OF ANY DEED(S) SHOWN STORMWATER BMPs/CONTROL STRUCTURES. J. UPON COMPLETION OF THE PROJECT, AND BEFORE A CERTIFICATE OF OCCUPANCY SHALL BE GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE COMPLETI PROJECT IS IN ACCORDANCE WITH THE APPROVED STORMWATER MANAGEMENT PLANS AND DESIGNS. 4. A FINAL INSPECTION OF THE SITE AND STORMWATER MANAGEMENT BMP/CONTROLS TO BE SCHEDULED WITH AN, COMPLETED BY THE PROJECT ENGINEER, 5. NCDEQ AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORMWATER CONTROL(s) FOR INSPECTIONS OR MAINTENAI AS NECESSARY, 6. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE FINAL PLAT OR CERTIFICATE OF OCCUPANCY. THE STORMWATER CONTROL IS TO BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED A HAS FULL DESIGN VOLUME PRIOR TO ISSUANCE OF THE F CERTIFICATE OF OCCUPANCY. 11, THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING STORMWATER CONTROLS(s) ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION OF NCDEQ SEEDBED PREPARATION: 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHE CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE (SEE SEEDING MIXTURE). 5. CONTINUE TILLAGE UNTIL A WELL —PULVERIZED, FIRM, REASONA PREPARED FOUR TO SIX INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LI OR CULTIPACK AFTER SEEDING. 7, MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH, 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE MORE RE—ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER ANI 9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE AFTER PERMANENT COVER IS ESTABLISHED. LANDSCAPE NOTES: ALL LANDSCAPING SHALL BE IN COMPLIANCE WITH THE NCDEQ BMP LANDSCAPE CONTRACTOR SHALL PROVIDE A TWO—YEAR WARRANTY R SU RVIVAL/REP LACEM ENT. AT THE END OF THE FIRST YEAR AND AT THE END OF THE TWO —YE THAT DO NOT SURVIVE MUST BE REPLACED. ESTABLISHMENT PROCEDURES, SUCH AS CONTROL OF INVASIVE WEE[ MULCHING, RE —STAKING, WATERING, AND MESH OR TUBE PROTECTIOI IMPLEMENTED TO THE EXTEND NEEDED TO ENSURE PLANT SURVIVAL. ESTABLISHMENT (APPROXIMATELY 12 MONTHS), TO PREVENT GIRDLINt SOD WITHIN BMP AND SURROUNDING AREAS TO BE BERMUDA OR CI GRASS OR WILDFLOWER SEED MUST BE APPLIED AT THE RATES SPE ESTABLISHMENT CANNOT BE ACHIEVED WITH SEEDING BY THE TIME C STORMWATER FACILITY PORTION OF THE PROJECT, THEN THE CONTRI WILDFLOWER SOD, PLUGS, CONTAINER PLANTS, OR OTHER MEANS TC AND PROTECT AGAINST EROSION BEFORE WATER IS ALLOWED TO EM ALL MATERIALS SHALL BE ACQUIRED FROM AN APPROVED NCDEQ PL BE PURCHASED FROM A LOCAL SOURCE TO ENSURE SURVIVABILITY. INCLUDE: — CILL IDE NATIVE PLANT NURSERY 919-662-5566 — GROWING WILD NURSERY 910-259-6361 — NC FOREST SERVICE 919-731-7988 — PLANT DELIGHTS NURSERY 919-772-4794 — TARHEEL NATIVE TREES 919-553-5927 IMMEDIATELY AFTER THE WET DETENTION BASIN IS ESTABLISHED, THE AND PERIMETER OF THE BASIN SHOULD BE WATERED TWICE WEEKLY ESTABLISHED (COMMONLY SIX WEEKS) NO PORTION OF THE WET DETENTION POND SHOULD BE FERTILIZED THAT IS REQUIRED TO ESTABLISH THE PLANTS ON THE VEGETATED � LANDSCAPING NOTES: 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND LANDSCAPING, 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH A ALL SEEDED AREAS. 3. CONTRACTOR SHALL PROVIDE NATURAL TOPSOIL THAT IS FERTILE SUBSOIL MATERIALS, AND OBTAINED FROM A WELL DRAINED, A CONTAIN SUBSTANCES WHICH MAY BE HARMFUL TO PLANT GROV SCREENED AND FREE FROM CLAY, LUMPS, STONES, ROOTS, PLAT OR MORE IN DIAMETER, DEBRIS, OR OTHER OBJECTS WHICH MIG PLANTING OPERATIONS. TOPSOIL SHALL CONTAIN AT LEAST 4—f AND HAVE A PH RANGE OF 5,5 TO 7.0. 4, CONTRACTOR SHALL BE RESPONSIBLE FOR THE WATERING AND T LANDSCAPED AREAS UNTIL THE LATER OF; (a) THIRTY (30) DAY THE GRASS AND SHRUBS, OR (b) THE DATE THAT STORE OPEN! CONTRACTOR SHALL ALSO BE RESPONSIBILITY FOR THE SURVIVAI MATERIALS DURING THE TWO—YEAR WARRANTY PERIOD AND SHAI NOT SURVIVE AT THE END OF THE FIRST YEAR AND AT THE EN' WARRANTY PERIOD. 5. CONTRACTOR TO VERIFY QUANTITIES PRIOR TO COMMENCING WOF 6. ANY DISTURBED AREAS NOT SCHEDULED FOR HARDSCAPE, PLANT SEEDED LAWN. REFER TO SITE PLAN FOR LOCATION OF AREAS 7. NO PLANT SUBSTITUTIONS ARE PERMITTED WITHOUT WRITTEN APF REPRESENTATIVE. 8. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUI DEBRIS; REMOVE COMPACTED SOIL AND ADD 18" NEW TOPSOIL, 18" OF EXISTING SOIL TO MEET TOPSOIL/PLANTING MIX STANDAI 9. ADJUST TREE PLANTING LOCATIONS TO AVOID UNDERGROUND UTI UNDERGROUND UTILITIES (SEWER AND STORM DRAINAGE, GAS, W LINES.) STORMWATER MANAGEMENT SYSILM ULIAILS NOT TO SCALE WET POND PLAN VIEW IV ,Ln11 JIVM. 1.I M, LV.VV b1J IVV.JJ 1,r.1 J.OVo l.rJ 1 INCH = 30 FEET 0-YEAR STORM EVENT; 56.79 CFS 19m2 CFS 20,77 CFS v v � D 6" PVC 1GH RISER :TURE OPERATION & MAINTENANCE BMP element: Potentialproblem; How I will remediaie the problem The entire SCM Trash/debris is present Remove the trash/debris The perimeter of the wet pond Areas of bare soil and/or erosive gullies have formed Regrade the soil if necessary to remove the gully: plant ground cover and water until it is established. Provide lime and a one—time fertilizer application The inlet device The inlet pipe is clogged (if applicable) Unclog the pipe. Dispose of the sediment in a location where it will not cause impacts to streams or the SCM The inlet is cracked or Repair or replace the pipe otherwise damage (if applicable) pipe Erosion is occurring in the $wale (if applicable) Regrade the swale if necessary and provide erosion control devices such as reinforced turf matting or riprap to avoid future erosion problems The foreboy Sediment has accumulated to a depth greater than the on final design depth for sediment storage Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the SCM Erosion has occurred Provide additional erosion protection such as reinforced turf matting or riprap if needed io prevent future erosion problems Weeds are present Remove the weeds, preferably, by hand. If pesticide is used, wipe. It on the plants rather than spraying The vegetated shelf Best professional practices show that runing is needed to moinpain optimal plant health Prune according to best professional practices Plants are dead, diseased or dying Determine the source of the problem; soils, hydrology, disease, etc. Remedy the problem and replace plants, Provide a one—time fertilizer application to establish the ground cover if a soil test indicates it is necessary Weeds are present Remove the weeds, preferably, by hand. If pesticide is used, wipe it on the plants rather than spraying The main treatment area Sediment has accumulated to a depth greater than the original design sediment storage depth Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the SCM Algal growth covers over 50% of the area Consult a professional to remove and control the algal growth Cattails, phrogmites or other invasive plants cover 50% of the basin surface Remove the plants by wipin them with pesticide (do no sprayl The embankment Shrubs have started to grow on the embankment Remove shrubs immediately Evidence of muskrat or beaver activity is present Consult a professional to remove muskrats or beavers and repair any holes or erosion A tree has started to grow on the embankment Consult a dam safety specialist to remove the tree An annual innspection by an appro riate rofessional shows that t fie am nkment needs repair Make all needed repairs immediately The outlet device Clogging has occurred Clean out the outlet device and dispose of any sediment in a location where it will not cause impacts to dreams or the SCM The outlet device is damaged Repair or replace the outlet device The receiving water Erosion or other signs of damage have occurred at the outlet. Repair the damage and improve the flow dissipation structure Discharges from the wet pond are, cau i g erosi n or so imen a�ion in toha receiving wafter Contact the local NCDEQ Regaionl Office 8 t J r O J C O ctl a� U �O ^ CV U � d) uiCIS U) C U ? 0 Z E 00 z °' rr M m 0 a m L E '� 3 z E m° � m SEAL 5 57 ; ��C'•.GI F.�ooO�. W A OWNER/DEVELOPER: Lee Humphrey D&L Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 (Off ice) 910-206-1808 (cell) lee@doubledeng. corn L_t_0 E� 3 a 0 U z a N Drawn Checked Approved Project No; 048019 Date; January 5, 2022 Title STORMWATER CONTROL MEASURE DETAILS Sheet No. SCM-1 'STORMWATER MANAGEMENT NOTES: 1, THE DEVELOPER OR HIS AGENT SHALL CONTACT THE DESIGN ENGINEER WHEN THE BEST MANAGEMENT PRACTICE(S) ARE CONSTRUCTED AND ABOUT TO BECOME OPERATIONAL SO A FINAL INSPECTION CAN BE PERFORMED TO DETERMINE COMPLIANCE WITH THE APPROVED PLAN CAN BE PERFORMED, 2. ANNUAL MAINTENANCE INSPECTION AND REPORT REQUIRED - THE OWNER OF A PERMITTED STRUCTURAL STORMWATER BMP/CONTROL SHALL ANNUALLY SUBMIT A MAINTENANCE AND INSPECTION REPORT FOR EACH BMP TO THE STORMWATER ADMINISTRATOR. ANNUAL INSPECTIONS SHALL BEGIN WITHIN ONE YEAR OF THE RECORDATION OF ANY DEED(S) SHOWING STOR14WAFER BMPs/CONTROL STRUCTURES. J. UPON COMPLETION OF THE PROJECT, AND BEFORE A CERTIFICATE OF OCCUPANCY SHALL BE GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE COMPLETED PROJECT IS IN ACCORDANCE WITH THE APPROVED STORMWATER MANAGEMENT PLANS AND DESIGNS. 4, A FINAL INSPECTION OF THE SITE AND STORMWATER MANAGEMENT BMP/CONTROLS TO BE SCHEDULED WITH AND COMPLETED BY THE PROJECT ENGINEER. 5. NCDEQ AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORMWATER CONTROL(s) FOR INSPECTIONS OR MAINTENANCE AS NECESSARY, 6. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE FINAL PLAT OR CERTIFICATE OF OCCUPANCY. THE STORMWATER CONTROL IS TO BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND HAS FULL DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY. 11, THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING THE STORMWATER CONTROLS(s) ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION OF NCDEQ 24" RCP WITH WATER TIGHT SEAL PIPE TO BE BEDDED PER DIRECTION OF GEOTECHNICAL ENGINEER 3 1 �/ APPROXIMATE SIZE EXCAVATE AND BACKFILL WITH COMPACTED STRUCTURAL FILL AS DIRECTED BY GEQTECHNICAL ENGINEER 204'-24" RCP 0 0.54% SEEDBED PREPARATION: 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE SEEDING MIXTURE). 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP, 6, SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8, INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RE-SEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE MORE THAN 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. LANDSCAPE NOTES: ALL LANDSCAPING SHALL BE IN COMPLIANCE WITH THE NCDEQ BMP REQUIREMENTS. LANDSCAPE CONTRACTOR SHALL PROVIDE A TWO-YEAR WARRANTY FOR BMP PLANTING SURVIVAL/REPLACEM ENT. AT THE END OF THE FIRST YEAR AND AT THE END OF THE TWO-YEAR WARRANTY PERIOD, ALL PLANTS THAT DO NOT SURVIVE MUST BE REPLACED. ESTABLISHMENT PROCEDURES, SUCH AS CONTROL OF INVASIVE WEEDS, ANIMAL AND VANDAL DAMAGE, MULCHING, RE -STAKING, WATERING, AND MESH OR TUBE PROTECTION REPLACEMENT, SHALL BE IMPLEMENTED TO THE EXTEND NEEDED TO ENSURE PLANT SURVIVAL. STAKING MUST BE REMOVED AFTER ESTABLISHMENT (APPROXIMATELY 12 MONTHS), TO PREVENT GIRDLING (STRANGLING) OF ALL WOODY PLANTS. SOD WITHIN BMP AND SURROUNDING AREAS TO BE BERMUDA OR CENTIPEDE GRASS. GRASS OR WILDFLOWER SEED MUST BE APPLIED AT THE RATES SPECIFIED BY THE SUPPLIERS. IF PLANT ESTABLISHMENT CANNOT BE ACHIEVED WITH SEEDING BY THE TIME OF SUBSTANTIAL COMPLETION OF THE STORMWATER FACILITY PORTION OF THE PROJECT, THEN THE CONTRACTOR SHALL PLANT THE AREA WITH WILDFLOWER SOD, PLUGS, CONTAINER PLANTS, OR OTHER MEANS TO COMPLETE THE SPECIFIED PLANTING AND PROTECT AGAINST EROSION BEFORE WATER IS ALLOWED TO ENTER THE STORMWATER BMP FACILITY. ALL MATERIALS SHALL BE ACQUIRED FROM AN APPROVED NCDEQ PLANT VENDOR. PLANT MATERIAL SHOULD BE PURCHASED FROM A LOCAL SOURCE TO ENSURE SURVIVABILITY. LOCAL VENDORS FOR THIS SITE INCLUDE: - CILL IDE NATIVE PLANT NURSERY 919-662-5566 - GROWING WILD NURSERY 910-259-6361 - NC FOREST SERVICE 919-731-7988 - PLANT DELIGHTS NURSERY 919-772-4794 - TARHEEL NATIVE TREES 919-553-5927 IMMEDIATELY AFTER THE WET DETENTION BASIN IS ESTABLISHED, THE PLANTS ON THE VEGETATED SHELF AND PERIMETER OF THE BASIN SHOULD BE WATERED TWICE WEEKLY IF NEEDED UNTIL THE PLANTS BECOME ESTABLISHED (COMMONLY SIX WEEKS) NO PORTION OF THE WET DETENTION POND SHOULD BE FERTILIZED AFTER THE FIRST INITIAL FERTILIZATION THAT IS REQUIRED TO ESTABLISH THE PLANTS ON THE VEGETATED SHELF. LANDSCAPING NOTES: 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES REGARDING LANDSCAPING. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH A HEALTHY STAND OF GRASS ON ALL SEEDED AREAS. 3. CONTRACTOR SHALL PROVIDE NATURAL TOPSOIL THAT IS FERTILE, FRIABLE, WITHOUT MIXTURE OF SUBSOIL MATERIALS, AND OBTAINED FROM A WELL DRAINED, AVAILABLE SITE. IT SHALL NOT CONTAIN SUBSTANCES WHICH MAY BE HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED AND FREE FROM CLAY, LUMPS, STONES, ROOTS, PLANTS, OR SIMILAR SUBSTANCES I" OR MORE IN DIAMETER, DEBRIS, OR OTHER OBJECTS WHICH MIGHT BE A HINDERANCE TO PLANTING OPERATIONS, TOPSOIL SHALL CONTAIN AT LEAST 4-6% ORGANIC MATTER BY WEIGHT AND HAVE A PH RANGE OF 5.5 TO 7,0. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE WATERING AND THE MAINTENANCE OF ALL LANDSCAPED AREAS UNTIL THE LATER OF; (a) THIRTY (30) DAYS FOLLOWING THE PLANTING OF THE GRASS AND SHRUBS, OR (b) THE DATE THAT STORE OPENS FOR BUSINESS TO THE PUBLIC. CONTRACTOR SHALL ALSO BE RESPONSIBILITY FOR THE SURVIVAL OF THE BMP PLANTING MATERIALS DURING THE TWO-YEAR WARRANTY PERIOD AND SHALL REPLACE ALL PLANTS THAT DO NOT SURVIVE AT THE END OF THE FIRST YEAR AND AT THE END OF THE SECOND YEAR OF THE WARRANTY PERIOD. 5. CONTRACTOR TO VERIFY QUANTITIES PRIOR TO COMMENCING WORK. 6. ANY DISTURBED AREAS NOT SCHEDULED FOR HARDSCAPE, PLANTINGS, OR MULCH SHALL BE SEEDED LAWN. REFER TO SITE PLAN FOR LOCATION OF AREAS TO BE SODDED. 7. NO PLANT SUBSTITUTIONS ARE PERMITTED WITHOUT WRITTEN APPROVAL OF THE OWNERS REPRESENTATIVE. 8. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS; REMOVE COMPACTED SOIL AND ADD 18" NEW TOPSOIL, OR TILL AND AMEND THE TOP 18" OF EXISTING SOIL TO MEET TOPSOIL/PLANTING MIX STANDARDS FOR TREES. 9, ADJUST TREE PLANTING LOCATIONS TO AVOID UNDERGROUND UTILITIES. PLANT Is' FROM ALL UNDERGROUND UTILITIES (SEWER AND STORM DRAINAGE, GAS, WATER, PHONE, AND ELECTRICAL LINES.) STORMWATER MANAGEMENT SYSTEM DETAILS NOT TO SCALE 3' MIN 4' MIN, EMBANKMEN7 WIDTH 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION 3 TRASH RACK REFER TO DETAIL THIS SHEET STAGE STORAGE TABLE STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) (FT) AREA (SF) STORAGE (CF) STORAGE (Cr) 0.0 255,0 25040 0 0 0.5 255.5 27485 13131 13131 0.9 255.9 26745 11246 24377 1.0 256,0 29065 2891 27268 1.3 256.3 30350 8912 36180 (WQV) 2.0 257.0 32275 21919 58099 3,0 258.0 35075 33675 91774 4.0 259.0 37925 36500 126274 TOP OF EMBANKMENT ELEVATION=259.0 6" TOPSOIL ABOVE ___ - 6" CLAY LINER - ON LITTORAL SHELF ( REFER TO DETAIL FOR INCREMENTAL WEIR 100 YEAR STORM ELEVATION=258,46 _ ' EMERGENCY WEIR ELEVATION=257.0 6" CLAY SOIL 10 YEAR STORM ELEVATION =256.9 6 LINER ON INSIDE 6.0'x6,0' s FACE OF SEEPAGE COLLAR 1 EMBANKMENT SEE DETAIL �_ _ I ,_ 2 YEAR STORM ELEVATION=256.41 INTERMEDIATE WEIR ELEVATION=256,3 ---:_'I 6 (_ 6FT LITTORA.L � I- � 1 4'x4' PRECAST CONCRETE RISER C � o 1 YEAR STORM ELEVATION=256,30 _ SHELF - (INSTALL STEPS j AS NECESSARY) ` :_.__ --1 1-_ INV=255,0 1.0-INCH STORM ELEVATION=255,05 7 NORMAL POND ELEVATION=255.0 1 ELEV=253.0 - 1 4' MIN. ASTM C-923 SEAL BETWEEN KEY BARREL & RISER. RISER BASE TO BE FILLED WITH CONIC, TO INVERT OF BARREL 8"X8"X1"X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO BASE, PROVIDE 2-3/4" A307 BOLTS FROM ANGLE TO RISER AND 2-A307 "J" HOOKS 3/4" DIA. X 12" LONG FROM ANGLE TO BASE. ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER CONSTRUCTION. "J" HOOKS TO BE PLACED UNDER LOWER REINFORCING STEEL. WET POND PLAN VIEW t PVC ELBOW SEE DETAIL I 1-1 CONCRETE SHALL BE I= PLACED IN RISER "- AFTER ANGLES ARE SECURED TO BASE AND RISER. I___ 5'x5'xl,5' CONIC. BASE REINFORCE WITH 14 BARS AT 12" O.C. TOP AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE BETWEEN EDGE OF CONC. AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SCALE: N.T.S. CONSTRUCTION SEQUENCE FOR WET DETENTION POND: 1. INSTALL EROSION CONTROLS. 2. CONSTRUCT DAM BASE AND AREAS BELOW THE NORMAL POOL. CONSTRUCTION TO BE PERFORMED UNDER THE INSPECTION OF THE GEOTECHNICAL ENGINEER. SEED UPON COMPLETION, 3. INSTALL OUTLET PIPE, RIP -RAP APRON AND STONE FILTER RING, 4. CONSTRUCT OUTLET STRUCTURE. 5. REMOVE ACCUMULATED SEDIMENT AND SEED UPON COMPLETION, NOTE: PUMPS SHALL BE USED TO DRAIN THE POND WHEN NECESSARY, REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=251.0 �, (BOTTOM OF SEDIMENT STORAGE)--250,0 6" CLAY SOIL - LINER MAIN POOL EXISTING GRADE=262.Ot CMFRGeNCy wEip 25y� I NTFRMF��AT f Wflp ZSg3 2 1F TAD Ar CTOWTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T.S. 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM 6" TOPSOIL ABOVE 6" CLAY LINER 3:1 ON LITTORAL SHELF - 6FT LITTORAL 6:1 SHELF ON TES: 1, SEE DESIGN PLANS FOR SPECIFIED DIMENSIONS OF RISER, 2. TRASH RACK DIMENSION CRITERIA SPECIFIED IS APPROXIMATE AND VARIES BY MANUFACTURER. 3. INSTALLATION OF TRASH RACK SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 4. ALL COMPONENTS OF TRASH RACK SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL. S. ALL MOUNTING HARDWARE SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL, GRAPHIC SCALE i0 0 15 30 1 INCH = 30 FEET TRASH RACK CORROSIVE MATERIAL / \ 5.5" SPACING ! , \ 5.5" 5.5" NOT TRA H RACK SHALL BE INSPECTED PERIODICALLY AND ANY DEBRIS ON THE TRASH RACK IS TO BE REMOVED AND PROPERLY DISPOSED OF. TRASH RACK DETAIL SCALE: N.T.S. CONCRETE SEEPAGE COLLAR SCALE: N.T.S. 5.5" RISER #4 REBAR 0 12" OC IN FRONT & REAR FACE OF COLLAR. REBAR TO HAVE 3" MIN. CONC. COVER FROM EDGE OR FACE OF COLLAR 5' MIN. GRASS FOREBAY WEIR AT ELEV=254.0 FOREBAY TOP ELEV=256.0 WIDTH AT TOP=2.0 FT RISER STRUCTURE 4" PVC SCREW CAP FOR CLEANING ACCESS 12" MIN. EXTEN THRO STRU 4"x4" PVC TEE PERM. POND ELEV.=255.0 12" MIN. 22"DIA. HOLE DRILLED INTO BOTTOM CAP PVC DRAIN OUTLET NOTE: PUMPS SHALL BE USED TO DRAIN SEDIMENT STORAGE TOP THE FOREBAY WHEN NECESSARY. REFER TO DETAIL FOREBAY BOTTOM THIS SHEET FOR DEWATERING REQUIREMENTS. ELEV=253.0 NORMAL POND ELEVATION '41M BOTTOM OF SEDIMENT - v STORAGE/EXIT ELEV=252.5 FOREBAY ENTRANCE SHALL BE DEEPER THAN FOREBAY EXIT SHALLOW LAND ZONE HERBACEOUS PLANTS 1 6 TYPICAL LITTORAL SHELF VEGETATION DETAIL SCALE: N,T.S, SCIENTIFIC NAME COMMON NAME PLANTING ZONE QUANTITY NURSERY CONTAINER TYPE `- 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/ENTRANCE ELEV=252.0 SHALLOW WATER ZONE HERBACEOUS PLANTS POND (NORMAL POOL) SPACING PLANTING SEASON Joncus effusus Soft Rush SHALLOW WATER 149 PEAT POT 6' O.C. SPRING/SUMMER Iris vlrginica Blue Flag Iris SHALLOW WATER 149 PEAT POT 6' O.C. SPRING/SUMMER Schoenoplectus tobernaemontani Soft Stem Bulrush SHALLOW WATER 149 PEAT POT 6' O.C. SPRING/SUMMER Eupatoriodelphus maculatus Spotted Trumpetweed SHALLOW LAND 149 PEAT POT 6' O.C. SPRING/SUMMER Eupatorium purpureum Joe-Pye Weed SHALLOW LAND 149 PEAT POT 6' O.C. SPRING/SUMMER Rhynchospora colorato Starrush Whitetop SHALLOW LAND 149 PEAT POT 6' O.C. SPRING/SUMMER NOTES: 1. ALL CONCRETE TO BE 3000 PSI NON -FLY ASH. 2. APPLY I" THICK WRAP OF ASPHALTIC CEMENT AROUND DISCHARGE PIPE 6" BEYOND PLANNED SEEPAGE COLLAR ON BOTH SIDES. 3. APPLY ADDITIONAL ASPHALTIC CEMENT AT PIPE/SEEPAGE COLLAR INTERFACE ON UPSTREAM FACES, 4, TO BE FIELD INSPECTED BY GEOTECHNICAL ENGINEER, ASPHALTIC CEMENT TO MEET OR EXCEED FEDERAL SPECIFICATION 55-153 TYPE 1: ASTM-D-2822-75 TYPE 1, TYPICAL LITTORAL SHELF PLANTING SCHEDULE D 4" PVC UGH RISER CTURE OPERATION & MAINTENANCE BMP element: Potentialproblem: How I will remediate the problem The entire SCM Trash/debris is present Remove the trash/debris The perimeter of the wet pond Areas of bare soil and/or erosive gullies have formed Regrade the soil if necessary to remove the gully, plant ground cover and water until it is established, Provide time and a one-time fertilizer application The inlet device The inlet pipe is clogged (if applicable) Unclog the pipe, Dispose of the sediment in a location where it will not cause Impacts to streams or the SCM The inlet pipe is cracked or otherwise damage (if applicable) Repair or replace the pipe Erosion is occurring in the swale (if applicable) Regrade the swale if necessary and provide erosion control devices such as reinforced turf malting or riprap to avoid future erosion problems The foreboy Sediment has accumulated to a depth greater than the on final design depth for sediment storage Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the SCM Erosion has occurred Provide additional erosion protection such as reinforced turf maiting or riprap if needed io prevent future erosion problems Weeds are present Remove the weeds, preferably by hand. If pesticide is used, wipe. it on the plants rather than spraying The vegetated shelf Best professional practices show that pruning is needed to main Pain optimal plant health Prune according to best professional practices Plants are dead, diseased or dying Determine the source of the problem: soils, hydrology, disease, etc, Remedy the problem and replace plants, Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary Weeds are present Remove the weeds, preferably, by hand. If pesticide is used, wipe it on the plants rather than spraying The main treatment area Sediment has accumulated to a depth greater than the ongqfinal design sediment storage depth Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the SCM Algal growth covers over 50% of the area Consult a professional to remove and control the algal growth Cattails, phrogmites or other invasive plants cover 50% of the basin surface Remove the plants by wipin them with pesticide (do no spray}p The embankment Shrubs have started to grow on the embankment Remove shrubs immediately Evidence of muskrat or beaver activity is present Consult a professional to remove muskrats or beavers and repair any holes or erosion A tree has started to grow on the embankment Consult a dam safety specialist to remove the tree An annual innspection by on Make all needed repairs immediately appro riate professional shows that tie embankment needs repair The outlet device Clogging has occurred Clean out the outlet device and dispose of any sediment in a location where it will not cause impacts to streams or the SCM The outlet device is damaged Repair or replace the outlet device The receiving water Erosion or other signs of damage have occurred at the outlet. Repair the damage and improve the flow dissipation structure Discharges from the wet pond are, cau i g erosion or seamen a�ion In the receiving wa or Contact the local NCDEQ Regatonl Office Ic 0 J r O J o L c N 6 E 6 6 z U LO U d Z 0 _ E � Z Z c c Ens °0 E a 100 m° .•��� CARO • Z �9 i • a SEAL 0 157.1 '.�, q�••......•• 4:' OWNER/DEVELOPER: Lee Humphrey D&L Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 (Office) 910-206-1808 (cell) lee@doubledeng. corn CD Cl L�0 U V) z 0 ,jy a 0 Drawn Checked Approved Project No: 048019 Dais: January 5, 2022 Title STORMWATER CONTROL MEASURE DETAILS Sheet No, SCM o2 3 a W U z a N m N rn