Loading...
HomeMy WebLinkAboutNCC223402_ESC Approval Submitted_20220930Engineering Services Department Trevor Spencer, P.E. DIRECTOR NORTH CAROLINA°S INTERNATIONAL CITY:` August 26, 2022 Financial Responsible Party BSC Holdings, LLC PO Box 16168 High Point, NC 27261 Owner (Property) SFCW Properties, LLC PO Box 16168 High Point, NC 27261 RE: APPROVAL of EROSION and SEDIMENTATION CONTROL PLAN Project: Lakeside at James Landing Location: at/near 4820 Piedmont Parkway, High Point, NC 27262 Land Disturbing Permit: # EN 22 0222 2446 Dear Sir or Madame: The Engineering Services Department has completed the review process for the revised Soil Erosion Sedimentation Control Plan submitted to our department on August 18, 2022, for the project referenced above. Based on our review, the plan is hereby approved. This plan approval will specifically cover the Erosion and Sediment Control measures required for both the Grading Phase and the Building Phase for the proposed Disturbed Area under GP-21-0004. If a different identity (from the Grading Phase) executes the Building Phase, this approved Erosion and Sediment Control Plan (E&SCP) may be transferred as per §113A-54.1 (dl) to the firm/person executing the Building Phase. The Erosion Control Measures shown on the plan(s) are approximate. Some field adjustment may be required to make the measures work correctly. An Erosion Control Financial Guarantee (Surety) is required to be submitted prior to any Land -Disturbing activities. This refundable guarantee shall remain in force until the work is completed in accordance with the Land -Disturbance Permit and the work is approved by the Engineering Services Director. The amount of the guarantee required is $2000.00 per City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fax:336.883.4118 Phone:336.883.3194 TDD:336.883.8517 disturbed acre and can be in the form of a Check, Irrevocable Letter of Credit, Equivalent Security or Surety Bond. The Check, Irrevocable Letter of Credit or Equivalent Security can be deposited with the City or held in escrow with a Financial Institution as per Section 7.2.2 — Performance Guarantee of the City of High Point Development Ordinance. Surety bonds will be held by the city until released This letter will serve notice that: • As per NCGS 15A NCAC 04B .0120 (b) and (c), INSPECTIONS AND INVESTIGATIONS, this letter shall serve as notice that inspection of sites shall be carried out by the staff of Department of Environmental Quality or other qualified persons authorized by the Commission or Department of Environmental as necessary to carry out its duties under the Act and no person shall refuse entry or access to any representative of the Commission or any representative of a local government who requests entry for purposes of inspection. • Any amount of visual off -site sedimentation - the process by which sediment resulting from accelerated erosion has been or is being transported off the site (land area under responsible control of person or party conducting land -disturbing activities) of the land - disturbing activities, or into a lake, natural watercourse, riparian buffer or wetland, or noted violation(s) of the conditions set forth in the approved plan will necessitate a Notice of Violation (NOV) and/or a Stop Work Order being issued. If compliance is not achieved within the allotted time set forth in the NOV, fines can be assessed and a demand for payment can be imposed as per City of High Point Development Ordinance — Chapter 9. Stipulations of a Stop Work Order will be imposed as outlined in the City of High Point Development Ordinance — Chapter 9. In addition to the Notice of Violation and/or Stop Work Order, any additional enforcement remedies and/or penalties outlined in the Sedimentation Pollution Control Act of 1973 or the current City of High Point Development Ordinance — Chapter 9, may be used in obtaining compliance. • As per High Point Development Ordinance 2.5.10.G.1 and 2, the Land -Disturbing Permit will become null and void one (1) year from the date of issuance. You may request in writing, 180-day permit extension 30 days prior to the expiration date, for good cause. • The approval of the draft Erosion and Sediment Control Plan and the Land Disturbing Permit issued by the City of High Point is conditional based on the applicant's compliance with Federal and State water quality, permits, laws, regulations, and rules. • The approval of the draft Erosion and Sediment Control Plan is based in part on the accuracy of the information provided on the submitted Financial Responsibility Form. If any changes to the submitted Financial Responsibility Form (e.g., ownership, address, company name, North Carolina Agent, etc.) occur, then you are required to submit an amended form showing such changes. • The approval of the draft Erosion and Sediment Control Plan does not supersede any other permit or approval. • This Letter of Approval must be posted at the site of the land disturbing activity along with the Land -Disturbing Permit, the approved Erosion and Sediment Control Plan, DEMLR Monitoring Form (i.e., Self -Inspection Records for Land -Disturbing Activities per GS 113A-54.1 and Inspection and Monitoring Records for Activities under Stormwater General Permit NCGO 10), a copy of the NPDES/NCGO 10 Permit (Readily 2 City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fax: 336.883.4118 Phone: 336.883.3194 TDD: 336.883.8517 available electronic copy of NPDES/NCGO10 Permit is acceptable) , and a copy of the Certificate of Coverage (COC). • Per G.S. 113A-54.E(e), The landowner, the financially responsible party, or the landowner's or the financially responsible party's agent shall perform an inspection of the area covered by the plan after each phase of the plan has been completed and after establishment of temporary ground cover in accordance with G.S. 113A-57(2) - the angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion -control devices or structures. In any event, slopes left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. The record of inspection, also known as the DEMLR Monitoring Form, shall set out any significant deviation from the approved erosion control plan, identify any measures that may be required to correct the deviation, and document the completion of those measures. This record shall be maintained until permanent ground cover has been established as required by the approved erosion and sedimentation control plan. The record of inspections is required by this subsection shall be in addition to inspections required by G.S. 113A-61.1 (NOV). Please note that Records of Inspections in respect to the NCGO10000 Construction Stormwater General Permit from the Department of Enviromnental Quality (DEQ), must be kept on site for twelve (12) months. All data used to complete the e-NOI and all Inspection Records must be maintained for a period of three (3) years and available upon request (40 CFR 122.41). • Modifications to the approved Erosion and Sediment Control Plan that require changes to the Erosion and Sediment Control Plan shall be approved by the Erosion and Sediment Control Plan Authority prior to modification. Minor adjustments/deviation(s) from the approved Erosion and Sediment Control Plan to address minor deficiencies can be approved by the Erosion and Sediment Control Plan Authority. Deviations are limited to the following deficiencies: o Addition of E&SC measures (e.g., silt fence, inlet protection, check dam, rolled erosion control practices, etc.). o Relocation of E&SC Measures that improve the overall stormwater and sediment control. ® Erosion Control Measures must be maintained until site is stabilized with sufficient ground cover: o The establishment of temporary ground cover in accordance with G.S. 113A- 57(2), ... slopes left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. Stabilization by temporary ground cover is recognized as being achieved with the establishment of a uniform and evenly distributed (no large, denuded areas) ground cover with a cover density of at least 80%. Please note that the requirement of Part II Section E (1) of the NCGO10000 Construction Stormwater General Permit which refers to Ground Stabilization Timelines in Table 3 are different from G.S. 113A-57(2). As noted in 15A NCAC 04B .0107, it is the responsibility of the person conducting the land -disturbing activity to ensure compliance with the NCGOI I. o Permanent ground cover sufficient to restrain erosion after completion of construction or development shall be accomplished within 90 calendar days (I5A NCAC 04B .0107) as specified by rule of the Commission. Stabilization by permanent ground cover is recognized as being achieved with the establishment J City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fax:336.883.4118 Phone:336.883.3194 TDD:336.883.8517 of a uniform and evenly distributed (no large, denuded areas) ground cover with a cover density of at least 80%. Please note that this is also a requirement of Part 11 Section E (2) of the NCGO 10000 Construction Stormwater General Permit. o The requirements in NCGO I for temporary or permanent ground cover may differ from the ground cover, or stabilization, requirements as specified by rule of the Commission. Per 15A NCAC 04B .0 107, it is the responsibility of the person conducting the land -disturbing activity to ensure compliance with the NCGO I. • A condition of this approval is that the permittee will maintain close contact with the Erosion Control Inspector. It is the responsibility of the person conducting the land - disturbing activity to inform the Erosion Control Inspector of : o Any site -specific conditions that would lead to a site being in non-compliance or violation of the approved Erosion and Sediment Control Plan. o Any proposed temporary removal of an Erosion Control Measure in order to disturbed, install, construct, build, grade repair, etc. , an area where the measure is in conflict with proposed grading/building activities. An example of a temporary removal would be the removal of water bars, berms, etc., in a road/street under construction so that newladditional grading can be performed in the immediate area oJ'the measure being temporarily removed. Any temporarily removed measure must be re -installed prior to a rain event, completion of the activity which necessitated the temporary removal of the measure(s), or prior to the end of the workday. o Any "upset" of the Erosion and Sediment Control Measures required by the approved Erosion and Sediment Control Measures. o Any planned or accidental "Draw Down" of Sediment Basins for maintenance or close out. • The Sedimentation Pollution Control Act of 1973 (N CGS 113A-51 through 66) is performance -oriented, requiring protection of existing natural resources and adjoining properties. If following the commencement of this project, the approved E&SCP is found to be inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973, revisions to the plan may be required by the Erosion Control Inspector. • Construction site pollutants must be maintained on -site and not allowed to reach the state's waters. Any spent fluids from construction traffic must be cleaned up and disposed of properly. Any herbicide, pesticide and fertilizer must be used in accordance with the label restrictions. All wastes composed of building materials shall be disposed of in accordance with North Carolina General Statues, Chapter 130 A, Article 9 — Solid Waste Management, and rules governing the disposal of solid waste (NC Administrative Code Section 15A NCAC 13B). No dumping of paint and other liquid building material waste in storm drains. Concrete materials onsite, including excess concrete, must be controlled, and managed to avoid contact with surface waters, wetlands, or buffers. No concrete slurry shall be discharged from the site. • Erosion Control Measures to prevent construction traffic from tracking sediment onto the streets must be provided and maintained. Any debris or sediment shall be cleaned from the street surface immediately. When you are ready for the Land -Disturbing Permit to be issued, please notify my office to arrange for a pre -construction meeting. Additional Information: 4 City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fax: 336.883.4118 Phone: 336.883.3194 TDD: 336.883.8517 You will be required to obtain a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit from the Department of Environmental Quality (DEQ). Detailed information can be found on the North Carolina Environmental Quality's website at https:Hdeq.nc. gov/about/divisions/energy-mineral-land-resources/energy-mineral-land- permits/stormwater-permits/construction-sw Site Data: Project Name:: Lakeside at James Landing Project Tracking ID(CoHP): # EN 22 0222 2446 Limits of Disturbance (in acres) approved: 4.33 acre(s) Address: at/near 4820 Piedmont Parkway City: High Point State: NC Zip Code: 27265 County: Guilford Latitude (in decimal degrees): 36.044 degrees Longitude (in decimal degrees):-79.926 degrees River Basin: Cape Fear** Receiving Waterbody: Long Branch ** Stream Index: 17-2-1-(2)** Draft E&SCP submitted by: CPT Engineering and Surveying, Inc., 4400 Tyning Street, High Point, NC 27265 Date(s) draft E&SCP Received: August 18, 2022 Plan Type: E&SCP Is this site part of a project covered under a common plan of development: YES * Per FROF ** Information shown on NC Surface Water Classifications Map. Please confirm prior to any submittal. Please call me if you have any questions or comments. is*nc rely, cott E. Ford Engineering Services Department (336) 883-3197 cc: File Tim Lauer, c/o CPT Engineering and Surveying, Inc., 4400 Tyning Street, High Point, NC 27265 (via email) 5 City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fax:336.883.4118 Phone:336.883.3194 TDD:336.883.8517