Loading...
HomeMy WebLinkAboutSW5220301_Plansheet C-06 - Misc. Detail_202209073 d L !11 ITI rT rAll"� / INLt I JGKttN/l BARREL PIPE OR "ARM" ORIFICE INSIDE NOT INCLUDED WITH SKIMMER NOTE: INLET SCREEN SUPPLIED BY USER SCH 40 PIPE VARIES ON LARGER SKIMMERS SEE CALCULATIONS FOR SKIMMER SIZE SKIMMERS TO BE FAIRCLOTH SKIMMERS OR APPROVED EQUAL. SKIMMER DETAIL PIPE OUTLET TO FLAT, NON -DEFINED CHANNEL NTS NOTES 1. La IS THE LENGTH OF RIPRAP APRON 2. d=1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP ON THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TALLWATER DEPTH OR TO TOP PF THE BANK, WHICHEVER IS LESS. La 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP -RAP AND PIPE OUTLET TO WELL-DEFINED CHANNEL iii �� �i =11 I VVVVVV iV� u u �" II II�11=�' =III III hl III=u-.11� -I II II III II .I II III IIII N.T.S. OUTLET do La W d50 dMAX d 12" DIP 3' 8' 6.5' 0. 2' 0. 4' 0. 5' 15" RCP 3.75' 8' 7' 0. 2' 0. 4' 0. 5' 6" PVC 1.5' 3' 1. 7' 0. 2' 0. 4' 0. 5' METAL FENCE POSTS 1.25 LB/LF MIN REINFORCING WIRE FENCE MINIMUM 14 GAUGE WIRE MAX. MESH SPACING OF 6" SILT FENCE FABRIC-----_ ATSM 6461 OR EQUIV. WIRE OR ZIP TIES MIN. STRENGTH OF 2. 7 50 PSI q FL 0 BACKFILL TRENCH AND COMPACT THROUGHLY 18"-24" 1 I 5' 4» I24" MIN i CROSS SECTION 8' MAX W WIRE FENCE 6' MAX W/O WIRE FENCE WIRE FENCE FABRIC FENCE COMPACTED SOIL EXISTING GRADE 2' MIN. 1 3� s% "A" F`S "B" CONSTRUCTION SPECIFICATIONS REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONAL MATERIAL. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION. ENSURE DIVERSION IS STABILIZED WITHIN 7 DAYS OF CONSTRUCTION. MAINTENANCE INSPECT TEMPORARY DIVERSION ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL END APPROPRIATELY STABILIZE IT. DESCRIPTION "A" FT DEPTH "B" FT BOTTOM WIDTH LINER PERM. DIVERSION DITCH 1 1.5 2 STRAW MATTING-N.A.G. SC150 OR EQ. PERM. DIVERSION DITCH 2 1.25 2 STRAW MATTING-N.A.G. SC150 OR EQ. ROADSIDE DITCH 1.25 1 STRAW MATTING - N.A.G. SC150 OR EQ. TEMP DITCH #1 1.5 2 STRAW MATTING-N.A.G. SC150 OR EQ. TEMP DITCH 2 # 1.25 2 - STRAW MATTING N.A.G. SC150 OR EQ. TEMP DITCH #3 1.25 2 STRAW MATTING-N.A.G. SC150 OR EQ. KEY IN 8" DOWN AND 4" FORWARD WIRE OR ZIP TIES EXISTING GRADE MAINTENANCE REQUIREMENTS: - INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. - SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. - REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. - REMOVE ALL FENCING MATERIAL AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. TEMPORARY SILT FENCE NTS WIRE OR ZIP TIES METAL FENCE POSTS MIN. STRENGTH OF 1.25 LB/LF MIN 50 PSI REINFORCING WIRE FENCE MINIMUM 14 GAUGE WIRE SILT -FENCE MAX. MESH SPACING OF 6" / WIRE FENCE ' SILT FENCE ■ 1.0 FT. ■ MIN. FRONT VIEW VARIES (SEE PLAN) 4' M A X CLASS B RIP RAP SILT FENCE METAL FENCE POSTS 1.25 LB/LF MIN SILT FENCE ALL STONE TO J L NCDOT #5 OR BE PLACED AT #57 WASHED A 2:1 SLOPE WIRE OR ZIP TIES STONE MIN. STRENGTH OF 50 PSI TOP VIEW MAINTENANCE REQUIREMENTS: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. - SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. - REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. - REMOVE ALL FENCING MATERIAL AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. NOTE: - REFER TO SILT FENCE DETAIL FOR MORE INFORMATION. SILT FENCE STONE OUTLET N.T.S. DIVERSION DITCH DETAIL NTS I� 50' MIN - 50' MIN EXISTING GROUND 11=11=11=11=11=11=�I=�I► � � � � � � � � � � R=30' PLAN VIEW CONSTRUCTION SPECIFICATIONS 1. STONE - USE COARSE AGGREGATE (2-3 INCH STONE) 2. LENGTH - 50' MIN 3. THICKNESS - NOT LESS THAN SIX(6) INCHES 4. WIDTH - NOT LESS THAN FULL WIDTH OF ALL POINTS OF INGRESS OR EGRESS 5. WASHING - WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE. THROUGH USE OF SAND BAGS, GRAVEL, BOARDS OR OTHER APPROVED METHODS. 6. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR Al CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. TEMPORARY CONSTRUCTION ENTRANCE NTS PLAN VIEW STEEL POST 0 STAKE TO 4' O.C. TYP.--7SUPPORT ROPE OR WIRE TO SUPPORT WIRE, TYP. PREVENT SAGGING N. T. S. Im ,I�VAV� &VAVA� �AVAVA �VAV�� (•AVA�I,I�VAV� ��AVA� NAVAVA kVAV�� �AVA�I NVI .ITV/'.........AVAI 1i . LVAVAVA FAVAVAI kV.... V........... ►...... NAVAN MA ►. STEEL POST MIN. 24" IN _� COIR MESH OR SIMILAR, GROUND BELOW BOTTOM STAPLED OR TRENCHED OF SED. TRAP SECTION X INTO BOTTOM OR SIDE, TYP. BAFFLES MADE OF 700 G/M COIR EROSION BLANKET SIMILAR TO AND INSTALLED AS SEDIMENT FENCE. TYP OF 3 EA. BASIN, (2 IF BASIN IS 20' OR LESS IN LENGTH.) SKIMMER WITH >�>�L RETRIEVAL ROPE CROSS SECTION TEMPORARY SKIMMER BASIN N.T.S. GENERAL NOTES/MAINTENANCE REQUIREMENTS 1. AREA UNDER EMBANKMENT TO BE CLEANED, GRUBBED AND STRIPPED OF ANY VEGETATION AND ROOT MAT. 2. FILL MATERIAL FOR THE EMBANKMENT SHALL BE FREE OF ROOTS OR OTHER WOOD/VEGETATION AS WELL AS OVER -SIZED STONES, ROCKS, ORGANIC MATERIAL OR OTHER OBJECTIONABLE MATERIAL. THE EMBANKMENT SHALL BE COMPACTED IN NOT GREATER THAN 9" LIFTS BY TRAVERSING WITH EQUIPMENT. 3. SEDIMENT SHALL BE REMOVED AND TRAP RESTORED TO IT ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE BASIN. THIS DEPTH SHALL BE MARKED IN THE FIELD. 4. REMOVED SEDIMENT SHALL BE PLACED IN A DESIGNATED DISPOSAL AREA AND PROTECTED AGAINST EROSION. 5. THE WEIR MUST BE CONSTRUCTED LEVEL AND TO GRADE TO ASSURE DESIGN 6. STONES SHALL BE MACHINE PLACED AND SHOULD BE HARD, ANGULAR AND WEATHER RESISTANT. 7. EMERGENCY SPILLWAY SHALL BE DIRECTED TO NATURAL, STABLE AREAS. 8. ALL CUT AND FILL SLOPES SHALL BE 3:1 OR FLATTER. 9. ALL DISTURBED AREAS SHALL BE STABILIZED IMMEDIATELY UPON COMPLETION OF CONSTRUCTION OF THE BASIN. WITH LINER, NO GRAVEL APPROACH ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER 10'-0" MIN. .A SANDBAGS (TYP.) OR STAPLES 10 MIL 1:1 PLASTIC SANDBAGS (TYP.) SIDE SLOPE LINING OR STAPLES o (TYP.) M i o z X a CLEARLY MARKED SIGNAGE SECTION A -A CONCRETE NOTING DEVICE (18"X24" MIN.) WASHOUT NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUT DETAIL 0 vm z �2oo D0 xW m12, D z =cn, Z ofy u �DDD cn { 0 le 0 z y m �z m� C.)W a= r cn N D " O M > r� r� � o Z D L7 > aZ Cn m H Zm 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL. 4. PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH A 6" OVERLAP. USE A DOUBLE ROW OF STAGGERED STAPLES 4" APART TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED IN 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4 OVER THE CENTER BLANKET AND STAPLED 2" FOR C350 MATTING . 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT INTERVALS. USE A ROW OF STAPLES 4 APART OVER ENTIRE WIDTH OF THE CHANNEL. PLACE A SECOND ROW 4" BELOW THE FIRST ROW IN A STAGGERED PATTERN. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. DITCH LINING/MATTING INSTALLATION GUIDE TEMPORARY SEEDING SPECIFICATIONS PIEDMONT REGION Application Rates (lb/ac) Recommended Species 10-10-10 Agriculural Straw Seeding Dates Seed Fertilizer Limestone Jan. 1 - May 1 Winter Wheat Annual Lespedeza 120 50 750 2,000 4,000 (Kobe) May 1 - Aug 15 German Millet 40 750 2,000 4,000 Aug 15 - Dec 30 Ryegrain 120 1,000 2,000 4,000 NOTES USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL STONE. PROVIDE STABILIZED OUTLET TO STREAM BANK. WOOD PALLETS MAY BE USED IN LIEU OF STONE AND GEOTEXTILE AS DIRECTED. A SUFFICIENT NUMBER OF PALLETS MUST BE PROVIDED TO ELEVATE THE ENTIRE SPECIAL STILLING BASIN ABOVE NATURAL GROUND. NOT TO SCALE SPECIAL STILLING BASIN DETAIL o Z �a z m oZ N J � J � M z U) N � J =a u J W ow a w N PERMANENT SEEDING DEFINI TION Seeding disturbed areas with perennial grasses and (or) legumes to provide a permanent vegetative cover to lessen runoff and soil erosion. PURPOSE To lessen soil erosion and permanently stabilize disturbed areas created by grading of construction sites. CONDITIONS WHERE PRACTICE APPLIES All bare soil areas on construction sites which are not covered by structures or other erosion control devices. PREPARA TION Prepare seedbed by ripping, chiseling, harrowing or plowing to depth of six inches so as to produce a loose, friable surface. Remove all stones, boulders, stumps or debris from the surface which would prohibit germination or plant growth. Spread topsoil in a layer 3" - 6" depth. Incorporate into the soil 800 to 1,000 pounds of 10-10-10 fertilizer plus 500 pounds of twenty percent (209) superphosphate per acre and two tons of dolomitic lime per acre unless soil tests indicate that a lower rate of lime can be used. Mulch after seeding with 1.5 tons of grain straw per acre and either crimp straw into soil or tack with liquid asphalt at 400 gallons per acre or emulsified asphalt at 300 gallons per acre. PLANTS & MIXTURE PLAN TING RA TE/A CRE PLAN TING DATES Tall Fescue 100-150 lbs. Aug. 15 - Oct. 15 (Low Main ten an ce) Feb. 15 - May 1 Tall fescue 200-250 lbs. Aug. 15 - Oct. 15 Waterways and Feb. 15 - May 1 Lawns (High Main t.) Blend of two turf- 200-250 lbs. Aug. 15 - Oct. 15 type tall Fescues Feb. 15 - May 1 (9O) an d t wo or more improved Ken tucky bluegrass varieties (10q) (high maintenance) Tall Fescue 100 lbs. Feb. 15 - May 1 and and Aug. 15 - Oct. 15 Kobe or Korean 20-25 lbs. L esp edeza Tall Fescue 50 lbs./acre Nov. 1 - Feb. 1 (Unscarified) Tall Fescue and 60 lbs. July and August German Millet or and Sudan grass 2 30 lbs. Tall Fescue 70 lbs. No v. 1 -Jan. 30 and and Ryegrain 2 25 lbs. Common Bermuda grass 8 lbs. (hulled) April 15 - June 30 15-20 lbs. (unhulled) Feb. 1 - March 30 I For spring seedings, use Scarified Lespedeza seed. For late fall and winter seedings, use unscarified seed. 2 Annuals such as Millet, Sudangrass and Rye grain must be kept at 10-12" maxim um h eigh t. PERMANENT GROUNDCOVER Permanent groundcover is to be provided for all disturbed areas within 15 working days or 30 calender days (whichever is shorter) following completion of construction or de velopm en t. P �• �. 4 Q zLU s o U) co 0 �: v .• V , Al �J � O j) c V) o � N O Ei L E U Q s�Q-1 I Z N N N N N m z W O U ~ Imo- Imo- Imo- I�- u Z Z Z Z Cr W W W W j `"0000 ovvvv o oZ o) o, o) o) 0 0 0 0 I-zzzz cl:� CK: CK: or_ ac� W W W W W a a a a a O' O' N N N N N N 0� LA a � - - 00 0, en 01 o 0 0 0 0 Z N M mot- L1 V z J O oC V l `U V z � 3 o W '� U Feso 3 Z Z N� 0 Z X v o W �v LLI w W 0 N s O 0 z N Q m 2 � Y O cn 0 V 01 Sheet No.