HomeMy WebLinkAboutSW3220805_Stormwater Report_20220921STORMWATER MANAGEMENT REPORT PREPARED FOR: LGI HOMES NC, LLC 3037 SHERMAN DRIVE LANCASTER, SC 39720 BEPC #NCC202055 March 28, 2022 PREPARED BY: BOHLER ENGINEERING, NC, PLLC 1927 S. TYRON ST. SUITE 310 CHARLOTTE, NC 28203 (980) 272-3400 �NCARo S AL - 046878 c ° v 9 LNG NE_� 4°6 N M Goo 04/26/22 NORTH CAROLINA LICENSE #046878 R. ALLEN MCDOWELL, P.E. PROFESSIONAL CERTIFICATION: I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED REGISTERED ENGINEER UNDER THE LAWS OF THE STATE OF NORTH CAROLINA CIVIL & CONSULTING ENGINEERS• SURVEYORS -TRAFFIC CONSULTANTS www.bohlereng.com Table of Contents GeneralProject Description/Stormwater Management...................................................................... 3 Appendix............................................................................................................................................... 4 RainfallIntensity Data.................................................................................................................... SoilMap....................................................................................................................................... HydroCADOutput.......................................................................................................................... StormsewersOutput...................................................................................................................... RiprapCalculations........................................................................................................................ Erosion Control Calculations........................................................................................................... General Project Description/Stormwater Management GENERAL PROJECT OVERVIEW AND EXISTING CONDITIONS The subject site is located at 310 Limestone Terrace Rd in Granite Quarry, NC. The project site consists of approximately 8.72 acres. The proposed project will include 53 single family townhome units. There is an existing dry pond to the eastern property line. The site is majority grassland with type B/C soils, with average existing slopes of 2% to 8%. There is currently no stormwater measure provided on the site. Off -site area is planned to be bypassed and is not examined in this analysis. STORMWATER REQUIREMENTS AND DESIGN OVERVIEW This project is located in the Yadkin Pee -Dee river basin and is adjacent to Crane Creek. This project is classified as a high -density because the largest drainage area has greater than 24% built upon area. For the western portion of the site, a proposed sand filter will be used to treat for water quality and quantity before flowing to an existing wet pond in the adjacent development. The entire drainage area for the existing wet pond was analyzed to show no increase in peak flows in the required storm events. For the eastern portion of the site, the existing dry pond footprint will be expanded and the system will be converted to a wet pond to treat for water quality and quantity before discharging to the adjacent stormwater network. Stormwater will be conveyed through pipe systems and discharge to the proposed BMP's in a non -erosive manner to maintain natural drainage patterns. Stormwater quality treatment systems shall treat the runoff generated from the first inch of rainfall. All structural stormwater treatment systems used to meet these requirements shall be designed to have a minimum of 85% average annual removal for total suspended solids. General engineering design criteria shall be accordance with 15 A NCAC 2H. 1008(c) in the design manual. The peak discharge is attenuated for both the 2-year, 24-hr storm and the 25-year, 24-hr storm events. The 100-year, 24-hr storm event has been analyzed to provide 1' of freeboard to the top of berm. Areas not controlled by systems due to topographic challenges are sheet flowing to roadside inlets along Limestone Terrace Appendix 548150 35o 36'30"N 35o 36' 21" N 548150 548190 548230 548270 548310 548350 548390 Map Scale: 1:1,970 if printed on A landscape (11" x 8.5") sheet. $ Meters N 0 25 50 100 150 Feet 0 50 100 200 ?00 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: UTM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Hydrologic Soil Group —Rowan County, North Carolina (Granite Quarry Soil Map) 548190 548230 548270 548310 548350 548390 548430 548470 548510 548430 548470 548510 a 548550 35o 36' 30" N 35o 36' 21" N 548550 m a 3/23/2022 Pagel of 4 Hydrologic Soil Group —Rowan County, North Carolina (Granite Quarry Soil Map) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Rowan County, North Carolina Survey Area Data: Version 19, Jan 21, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 6, 2021—Apr 7, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 3/23/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Rowan County, North Carolina Granite Quarry Soil Map Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CeB2 Cecil sandy clay loam, 2 to 8 percent slopes, moderately eroded B 7.6 81.9% VnB2 Vance sandy clay loam, 2 to 8 percent slopes, moderately eroded C 1.7 18.1 % Totals for Area of Interest 9.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 3/23/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Rowan County, North Carolina Granite Quarry Soil Map Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 3/23/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 3/23/22, 3:01 PM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Salisbury, North Carolina, USA* �'° Latitude: 35.6067*, Longitude:-80.466° Elevation: 765.37 ft** *source: ESRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 0.388 0.458 0.535 0.588 0.647 0.686 0.721 0.750 0.782 0.802 5-min (0.357-0.420) (0.423-0.499) (0.492-0.581) (0.539-0.637) (0.591-0.700) (0.624-0.743) (0.652-0.781) (0.675-0.815) (0.696-0.850) (0.709-0.874) 0.619 0.733 0.856 0.940 1.03 1.09 1.15 1.19 1.24 1.26 10-min (0.571-0.672) (0.677-0.798) (0.788-0.930) (0.862-1.02) (0.942-1.12) (0.993-1.18) 1 (1.04-1.24) 1 (1.07-1.29) 1 (1.10-1.35) 1 (1.12-1.38) 0.774 0.921 1.08 1.19 1.31 1.38 1.45 1.50 1.56 1.59 15-min (0.714-0.839) (0.850-1.00) (0.996-1.18) (1.09-1.29) 11 (1.19-1.42) 1 (1.26-1.50) 1 (1.31-1.57) 1 (1.35-1.63) 1 (1.39-1.69) 1 (1.40-1.73) 1.06 1.27 1.54 1.72 1.94 2.08 2.22 2.34 2.48 2.57 30-min (0.978-1.15) 1 1 (1.42-1.67) 1 1 (1.77-2.10) 1 (1.89-2.26) (2.01-2.40) (2.10-2.54) (2.21-2.69) (2.27-2.80) 1.32 1.60 1.97 2.24 2.58 2.82 3.06 3.28 3.55 3.75 60-min (1.22-1.44)1 (1.47-1.74) 1 1 (2.35-2.79) 1 (2.57-3.06) (2.76-3.31) (2.95-3.56) (3.17-3.87) (3.31-4.09) 1.53 1.85 2.30 2.63 3.06 3.39 3.70 4.00 4.40 4.68 2-hr (1.40-1.67)1 (1.70-2.02) 11 (2.11-2.51) 11 (2.41-2.87) 11 (2.79-3.33) 1 (3.06-3.68) 1 (3.33-4.03) 1 (3.57-4.37) 1 (3.88-4.80) 1 (4.09-5.13) 1.63 1.96 2.45 2.82 3.31 3.69 4.06 4.43 4.92 5.29 3-hr (1.50-1.78) 11 (1.81-2.15) 11 (2.25-2.68) 11 (2.58-3.07) 11 (3.01-3.60) 1 (3.33-4.00) 1 (3.64-4.40) 1 (3.94-4.81) 1 (4.32-5.35) 1 (4.59-5.77) 1.97 2.37 2.96 3.42 4.03 4.51 4.99 5.47 6.12 6.62 6-hr (1.81-2.15) (2.18-2.59) (2.72-3.24) 11 (3.13-3.72) 11 (3.66-4.37) 1 (4.07-4.89) 1 (4.47-5.41) 1 (4.85-5.93) 1 (5.35-6.65) 1 (5.72-7.20) 2.32 2.80 3.51 4.07 4.83 5.44 6.06 6.70 7.58 8.26 12-hr (2.14-2.53) (2.58-3.06) 1 1 (3.73-4.43) 11 (4.39-5.24) 1 (4.90-5.89) 1 (5.41-6.55) 1 (5.92-7.23) 1 (6.58-8.1 7) 1 (7.07-8.91) 2.77 3.34 4.19 4.86 5.76 6.48 7.21 7.97 8.99 9.80 24-hr (2.58-2.97)1 (3.12-3.59) 11 (3.91-4.50) 11 (4.52-5.21) 11 (5.35-6.18) 1 (6.01-6.95) 1 (6.67-7.73) 1 (7.34-8.55) 1 (8.25-9.66) 1 (8.96-10.5) 3.21 3.87 4.82 5.56 6.56 7.35 8.16 8.98 10.1 11.0 2-day (3.00-3.44) (3.62-4.14) 11 (4.50-5.15) 11 (5.19-5.94) 11 (6.11-7.01) 1 (6.83-7.86) 1 (7.55-8.71) 1 (8.29-9.60) 1 (9.28-10.8) 1 (10.1-11.8) 3.42 4.11 5.09 5.86 6.90 7.73 8.57 9.43 10.6 11.5 3-day (3.20-3.65) 1 (4.76-5.43) 11 (5.47-6.25) 11 (6.43-7.37) 1 (7.18-8.25) 1 (7.94-9.15) 1 (8.72-10.1) 1 (9.76-11.3) 1 (10.6-12.3) 3.63 4.35 5.36 6.16 7.25 8.11 8.98 9.88 11.1 12.1 4-day (3.40-3.86) 11 (4.08-4.64) 11 (5.02-5.71) 11 (5.76-6.56) 11 (6.75-7.73) 1 (7.54-8.65) 1 (8.33-9.59) 1 (9.14-10.6) 1 (10.2-11.9) 1 (11.1-12.9) 4.18 4.99 6.07 6.92 8.09 9.02 9.96 10.9 12.2 13.3 7-day (3.95-4.45) 11 (4.71-5.30) 11 (5.72-6.44) (6.51-7.35) 11 (7.59-8.59) 1 (8.44-9.58) 1 (9.29-10.6) 1 (10.2-11.6) 1 (11.3-13.1) 1 (12.3-14.2) 4.77 5.67 6.81 7.70 8.90 9.84 10.8 11.7 13.0 14.0 10-day (4.52-5.05) (5.37-6.00) 11 (6.45-7.20) 1 (8.39-9.41) 1 (9.26-10.4) 1 (10.1-11.4) 1 (11.0-12.4) 1 (12.2-13.8) 1 (13.0-14.9) 6.42 7.57 8.94 10.0 11.5 12.6 13.7 14.9 16.5 17.7 20-day (6.11-6.73) 1 1 (8.49-9.38) 11 (9.51-10.5) 11 (10.9-12.0) 1 (11.9-13.2) 1 (13.0-14.4) 1 (14.0-15.7) 1 (15.4-17.4) 1 (16.5-18.7) 7.93 9.33 10.8 12.0 13.5 14.7 15.9 17.0 18.5 19.7 30-day (7.57-8.30) 11 (8.90-9.75) 11 (10.3-11.3) (11.4-12.5) (12.9-14.1) (14.0-15.4) (15.0-16.6) (16.1-17.8) (17.5-19.5) (18.5-20.7) 9.98 11.7 13.3 14.6 16.3 17.5 18.7 19.9 21.5 22.6 45-day (9.58-10.4) 1 1 (12.8-13.9) (14.0-15.2) (15.6-16.9) (16.7-18.3) (17.8-19.5) (18.9-20.8) (20.3-22.4) (21.4-23.7) 11.9 13.9 15.6 17.0 18.8 20.1 21.4 22.6 24.2 25.4 60-day (11.5-12.4) JL (13.3-14.4) JL (15.0-16.2) JL (16.4-17.7) JL (18.0-19.5) (19.3-20.9) (20.5-22.2) (21.6-23.5) (23.1-25.2) (24.1-26.5) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?Iat=35.6067&Ion=-80.4660&data=depth&units=english&series=pds 1 /4 3/23/22, 3:01 PM Precipitation Frequency Data Server 25 c t 20 a-1 a di U 15 49 10 CL a i 30 25 c s 20 a m a 15 A, 49 a 10 CL a PDS-based depth -duration -frequency {DDF) curves Latitude: 35.6057', Longitude:-80-4660' --------------------- t t Jr t L N N O r{4 N rq rq rq N rq N f1�5 lb N rV A q O O O Ln O ,1 r-I rn w � N rn v Ln Duration 5 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAAAtlas 14, Volume 2, Version 3 Created fGMTY Wed Mar 23 19:01:18 2022 Back to Top Maps & aerials Small scale terrain Average recurrence mlerva I {years} — 1 2 — 5 — 10 — 25 50 100 200 500 1000 Duration — 6-min — 2-day — 10-min — 3-day 15-min — 4-dmy — 30-min — 7-day — 6 Wain — 1 D-day — 2fir — 20-day — 3-fir — 30-day — Sfir — 45-day — 12-h r — 60-day - 24-hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds—printpage.htmI?Iat=35.6067&Ion=-80.4660&data=depth&units=engIish&series=pds 2/4 3/23/22, 3:01 PM AWORr� Precipitation Frequency Data Server r'S'. Blvd Large scale terrain t Bristol City 4 wi 11 Stoll -5 al eill Co Durham[ -.-It Mitchell Greensboro qp Raleic • AsheMle . . . NORTH IC AROL INA Charlotte Fayetteville 'Greenville M& 100km Mi 1, R 01 I N A Will-ni Large scale map B 55'1 Jenson Gfty Liem Gree sboro D4rh.. Raleig Ash M1 II North Carolina arlotte ill 1 00krp Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds—printpage.htmI?Iat=35.6067&Ion=-80.4660&data=depth&units=english&series=pds 3/4 3/23/22, 3:01 PM Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.6067&Ion=-80.4660&data=depth&units=english&series=pds 4/4 3/23/22, 3:01 PM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Salisbury, North Carolina, USA* �'° Latitude: 35.6067*, Longitude:-80.466° Elevation: 765.37 ft** *source: ESRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hourp Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 4.66 5.50 6.42 7.06 7.76 8.23 8.65 9.00 9.38 9.62 5-min (4.28-5.04) 11 (5.08-5.99) (5.90-6.97) 11 (6.47-7.64) 11 (7.09-8.40) 1 (7.49-8.92) 1 (7.82-9.37) 1 (8.10-9.78) 1 (8.35-10.2) 1 (8.51-10.5) 3.71 4.40 5.14 5.64 6.18 6.56 6.88 7.14 7.42 7.58 10-min (3.43-4.03) (4.06-4.79) 1 (5.17-6.11) 11 (5.65-6.70) 1 (5.96-7.10) 1 (6.22-7.45) 1 (6.42-7.75) 1 (6.61-8.07) 1 (6.70-8.26) 3.10 3.68 4.33 4.76 5.22 5.53 5.79 6.00 6.23 6.34 15-min (2.86-3.36) 11 (3.40-4.01) 11 (3.98-4.71) 11 (4.36-5.16) 11 (4.77-5.66) 1 (5.03-6.00) 1 (5.24-6.28) 1 (5.40-6.52) 1 (5.54-6.77) 1 (5.60-6.91) 2.12 2.55 3.08 3.45 3.87 4.17 4.44 4.67 4.95 5.13 30-min (1.96-2.30) (2.35-2.77) (2.83-3.34) 11 (3.16-3.74) 11 (3.54-4.19) 1 (3.79-4.52) 1 (4.01-4.81) 1 (4.20-5.07) 1 (4.41-5.39) 1 (4.54-5.60) 1.32 1.60 1.97 2.24 2.58 2.82 3.06 3.28 3.55 3.75 60-min (1.22-1.44) (1.47-1.74) 1 (2.35-2.79) 1 (2.57-3.06) 1 (2.76-3.31) 1 (2.95-3.56) 1 (3.17-3.87) 1 (3.31-4.09) 0.764 F 0.924 1.15 1.32 1.53 1.69 1.85 2.00 2.20 2.34 2-hr (0.702-0.832) (0.849-1.01) 1 1 (1.39-1.67) (1.53-1.84) 1 (1.66-2.01) 1 (1.79-2.18) 1 (1.94-2.40) 1 (2.05-2.56) 0.541 0.654 0.817 0.939 1.10 113 1.35 1.47 1.64 1.76 3-hr (0.498-0.591) (0.602-0.715) (0.750-0.891) (0.859-1.02) (1.00-1.20) 1 (1.11-1.33) 1 (1.21-1.47) 1 (1.31-1.60) 1 (1.44-1.78) 1 (1.53-1.92) 0.329 0.396 0.495 0.571 0.673 0.752 F 0.832 F 0.913 1.02 1.11 6-hr (0.303-0.359) (0.365-0.433) (0.454-0.540) (0.522-0.622) (0.611-0.730) (0.679-0.816) (0.746-0.903) (0.810-0.991) 1 (0.894-1.11) 1 (0.955-1.20) 0.193 0.232 0.291 0.338 0.401 0.451 0.503 0.556 0.629 0.685 12-hr (0.178-0.210) (0.214-0.254) (0.268-0.318) (0.309-0.368) (0.364-0.435) (0.407-0.489) (0.449-0.544) (0.491-0.600) (0.546-0.678) (0.587-0.740) 0.115 0.139 0.175 0.202 0.240 0.270 0.301 0.332 0.375 0.408 24-hr (0.108-0.124) (0.130-0.149) (0.163-0.187) (0.189-0.217) (0.223-0.258) (0.250-0.290) (0.278-0.322) (0.306-0.356) (0.344-0.403) (0.373-0.439) 0.067 0.081 0.100 0.116 0.137 0.153 0.170 0.187 0.210 0.228 2-day (0.063-0.072) (0.075-0.086) (0.094-0.107) (0.108-0.124) (0.127-0.146) (0.142-0.164) (0.157-0.181) (0.173-0.200) (0.193-0.225) (0.209-0.245) 0.047 0.057 0.071 0.081 0.096 0.107 0.119 0.131 0.147 0.160 3-day (0.044-0.051) (0.053-0.061) (0.066-0.075) (0.076-0.087) (0.089-0.102) (0.100-0.115) (0.110-0.127) (0.121-0.140) (0.136-0.158) (0.147-0.171) 0.038 0.045 0.056 0.064 0.075 0.084 0.094 0.103 0.116 0.126 4-day (0.035-0.040) (0.043-0.048) (0.052-0.060) (0.060-0.068) (0.070-0.080) (0.079-0.090) (0.087-0.100) (0.095-0.110) (0.107-0.124) (0.115-0.135) 0.025 0.030 0.036 0.041 0.048 0.054 0.059 0.065 0.073 0.079 7-day (0.023-0.026) (0.028-0.032) (0.034-0.038) (0.039-0.044) (0.045-0.051) (0.050-0.057) (0.055-0.063) (0.061-0.069) (0.067-0.078) (0.073-0.084) 0.020 0.024 0.028 0.032 0.037 0.041 0.045 0.049 0.054 0.058 10-day (0.019-0.021) (0.022-0.025) (0.027-0.030) (0.030-0.034) (0.035-0.039) (0.039-0.043) (0.042-0.048) (0.046-0.052) (0.051-0.058) (0.054-0.062) 0.013 0.016 0.019 0.021 0.024 0.026 0.029 0.031 0.034 0.037 20-day (0.013-0.014) (0.015-0.017) (0.018-0.020) (0.020-0.022) (0.023-0.025) (0.025-0.028) (0.027-0.030) (0.029-0.033) (0.032-0.036) (0.034-0.039) 0.011 0.013 0.015 0.017 0.019 0.020 0.022 0.024 0.026 0.027 30-day (0.011-0.012) (0.012-0.014) (0.014-0.016) (0.016-0.017) (0.018-0.020) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.029) 0.009 0.011 0.012 0.014 0.015 0.016 0.017 0.018 0.020 0.021 45-day (0.009-0.010) (0.010-0.011) (0.012-0.013) (0.013-0.014) (0.014-0.016) (0.015-0.017) (0.017-0.018) (0.018-0.019) (0.019-0.021) (0.020-0.022) 0.008 0.010 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.018 60-day (0.008-0.009) (0.009-0.010) (0.010-0.011) (0.011-0.012) (0.013-0.014) (0.013-0.015) (0.014-0.015) (0.015-0.016) (0.016-0.018) (0.017-0.018) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?Iat=35.6067&Ion=-80.4660&data=intensity&units=english&series=pds 1 /4 3/23/22, 3:01 PM i 61616IMl 1.000 41 C 3fa ON 0 001 Precipitation Frequency Data Server PD5-based intensity -duration -frequency (IDF) curves Latitude: 35.6067', Longitude:-80.4660' t t Jr t L N N r{4 N rq rq rq N rq O N Alb N rV A q r, O O O Ln O ,1 r-1 rn ro � N rn v Ln Duration 10.000 1.000 m .c 0.100 O 49 0.010 a 0 001 1 2 5 10 25 50 100 200 500 10D4 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created {GMTY Wed Mar 23 19:01:48 2022 Back to Top Maps & aerials Small scale terrain Average recurrence interval {years} — 1 2 — 5 — 10 — 25 50 100 200 500 1000 Duration — 6-min — 2-day — 10-min — 3-day 15-min — 4-dmy — 30-min — 7-day — 6 Wain — 1 o-day — 2fir — 20-day — 3-trr — 30-day — Sfir — 45-day — 12-h r — 60-day - 24-hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.6067&Ion=-80.4660&data=intensity&units=english&series=pds 2/4 3/23/22, 3:01 PM AWORr� Precipitation Frequency Data Server r'S'. Blvd Large scale terrain t Bristol City 4 wi 11 Stoll -5 al eill Co Durham[ -.-It Mitchell Greensboro qp Raleic • AsheMle . . . NORTH IC AROL INA Charlotte Fayetteville 'Greenville M& 100km Mi 1, R 01 I N A Will-ni Large scale map B 55'1 Jenson Gfty Liem Gree sboro D4rh.. Raleig Ash M1 II North Carolina arlotte ill 1 00krp Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds—printpage.htmI?Iat=35.6067&Ion=-80.4660&data=intensity&units=english&series=pds 3/4 3/23/22, 3:01 PM Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.6067&Ion=-80.4660&data=intensity&units=english&series=pds 4/4 WET POND 1 Granite Quarry DESIGN: WATER QUALITY TO MEET 90% TSS REM GIVEN: DRAINAGE AREA TO FACILITY LAND USE = Shopping Center ESTIMATED PERCENT IMPERVIOUS = - 1) SA/DA RATIO: AVERAGE POOL DEPTH = 4.40 FEET = PERCENT IMPERVIOUS = 75% SA/DA = - % = 0.0241 SA REQUIRED = 5.11 Ac. X 0.0241 = 0.12 Ac. = 5,364 SF SA PROVIDED = 10,332 SF 2) TEMPORARY WATER QUALITY POOL REQUIREMENTS PROVIDE VOLUME TO DETAIN THE 1" STORM EVENT ABOVE THE ELEVATION ALLOCATED AS A PERMANENT POOL THE \/OI 1 i^^c - Tu- -" --norm 66 NT CAN BE CALCULATED AS: V, _ (Design Rainfall)(Rv)(Drainage Area) Design Rainfall = -Inch Drainage Area = 5.11 Acres Rv = 0.05 + 0.9(1) 1 = Percent Impervious = 75% Rv = 0.73 in./in. V, = 0.309 acre-feet = 13,448 ft3 Pond Height above Orifice =_feet Orifice Invert Elevation = feet Vpp/SA MDC2 Orifice Diameter (D) _- inches = 0.13 feet Orifice Area (a) = 0.0123 square feet Gravitational Constant (g) = 32.2 fUsec2 Head (H) = 1.60 feet Driving Head (Ho) = 0.800 feet Discharge Coefficient (CD) = 0.6 Drawdown rate (Q) = 0.053 cfs Time (t) = 254,458 seconds = 2.95 days 70.6828327 Note: Theabovecalculation is based on the orifice equation where: Y = Cn ZSHo MDC1 4/26/2022 1:55 PM Page 1 of 1 Sand Filter 2 Post Development Drainage Area =J01 -acres Impervious % (I) = 75% CN=it� Routed Area = 3.01 acres Impervious Acres =,2� acres Pervious Acres= 0.76 acres Water Quality Volume A = Area Rv = Volumetric Runoff Coefficient= 0.05+0.009*I I = Percent Impervious Rv = 0.72 WQv- 1.0*Rv*A/12 WQv- 0.18 Acre -Feet WQv= 0.72 in WQv= 7897 ]Cubic Feet Filter Media Surface Area of Media Required Af- (WQv)(df)/[(k)(hf+df)(tp] WQv = 7897 cf df = 2.5 ft/day k = 3.5 ft/day hf = 1 ft/day tf= 2.125 day -> 51 Hours Drawdown time for WQv Af- T 758 Sediment Chamber Volume VOLpre= WQv*0.2 VOLpre= 1579 cf Stave-Discharee For Sand Filter A Media (85 % BUA) Q= At*k((hf+d /(df)) Required Af- sq. ft. Area of Sand Media Provided Af = sq. ft. Area of Sand Media Af (Shop Drawing) _ hf= See Chart Below Water Height Above Media df= 2.5 ft Depth of Media k = 3.5 ft/day Coefficient of Permeability of Media Stage (above Media ft) cf/day cfs 0 2800.00 0.032 0.25 3080.00 0.036 0.5 3360.00 0.039 0.75 3640.00 0.042 1 3920.00 0.045 1.25 4200.00 0.049 1.5 4480.00 1 0.052 1.75 4760.00 0.055 2 5040.00 0.058 2.25 5320.00 0.062 2.5 5600.00 0.065 2.75 5880.00 0.068 3 6160.00 0.071 3.25 6440.00 0.075 3.5 6720.00 0.078 3.75 7000.00 1 0.081 4 7280.00 0.084 4.25 7560.00 0.088 4.5 7840.00 0.091 4.75 8120.00 0.094 5 8400.00 0.097 5.25 8680.00 0.100 5.5 8960.00 0.104 6" perferrated PVC pipe with 3/8" Underdrain Desien Sand Filter A perforation spaced 3" on center along four longitudinal rows spaced 90 degrees apart Assume 50% Clogged WQv = 7897 'cf Drawdown Time = 2.125 days Min Drawdown Rate = 0.04 ' cfs Underdrain Capacity Calculations Pipe Length= 5 feet # of Pipes = 2 Cleanouts Per Pipe = 2 # of Perforations = 416 holes 50%Perforations = 208 holes Capcity One Hole = 0.0083 cfs 0 0 a o 0 aN om �Rm �z wo 0 zm. L) m J >N J W oo Wo 0 z W U) (, Z I­-� W C� ww Z 5 Z U) U WUr WVU' U> wm W C.D z o ----_-'_- Z (, Z W W U) W w W V r m W Q 2 W Z Z>zUWU)O =w LU Zcn�wz�� =ow W 0 UzpJQ0� zQLL mZ )OUMU)w> WZ U) aiZ Q oloW > ww =o /\ 0 W ow 00 J0 U) 0 0� II z. m o< N/F ;o PID 404 140 - PIN 5667-06-49-4396 ROBERT J DAMRON & EVA 1 DAMRON DB 1045-835 t,'' REVISIONS ZONED RL ' ; REV DATE COMMENT DRAWN BY CHECKED BY , BMP SOf /PRNAJf) PID 404B008 ORNNAGE£ASEMENJ _ - 0C I 1 _I [ __--- 8MP6 J % AFIM7TY710NPONDPIN 5667-06-39-8246 75HERE ROW I $ TRACT HILLIARD ---- > _ STM STM WL \ 'a 6' SIDE SETBACK / 7� 11 i DB 1359-562 61 1G— -- s ZONING PUD - .--------- - -�- ' ; A9'%FF / ,__ •. �.,e.. P , •_ � , , � - - - - - - TREEL/NE ------ --- " � r'�� ', % I�`, Ole-20—ZA— 1 J \ 1 . 30'SWOTAfYS£ifER - - - - �16 \ P� PvSNIF TM L - --- - I 761 10' "_ RM DRAIAG PID 4046007 \C'-',\01 �0� i� F / , by B 10 62 E I NAN I II I, I PIN 5667-06-39-8201 - , PROP. SAND FILTERF/ /Yn PAUL S PALMER ET AL ,n►ti' �o �Q.j - s --- _ - 0 STM « -' , . _ P£RM *N1 UTILITY , DB 1363-439 "� - - - - P j _ �a L - -. - 75 �/� i� u ZONING PUD,' 1'�� ��A / g B-20 b ` �` - '-- 56 `� ' i i I % ii IEASEMENJ 75 o WL :.� 2 STM 155 \\ D�A/NACA EASEMENT 8C,'T MANAGEMENT PRACTICE / ✓ STM 1 PID 404B006'NIF�i cQ " 14S.Y DiENT/O POND 0 $ IN 5667-06-39-7167 l ' i ,� 60/ ' / �' ' £X. PUBUC1 JEFFERY SHORT 1A' STORM DRA?NAGE & ML I I / / / TY EASMNTVEANDRA SHORT I DB 1368-906 BM 9995--18D5 ZONING PUD `� /77 / ,' I t:. L I I i 1 i 1 i I°ROP II i- — — / 20" ANOSPEBOFFFH \\/1.00 j �- —� 6_SIDE SETBACK 196E 00' _ n -____ J//RO4T/NLE7156.67' _--- 2Y1' SDE p / 'I I L - — PVT. ALLEY B I' 1 Mp i °% I III N/F 19'RCP /NV OUT 75242' `---------- -- I� % T I TM STM I I , , . Tom' STM / Q p o-- -_ ID 4046004 h == i i \` I----I--�- -_-___ ''' 22 W W W W W W 111 W W W W W 11 A 101 / i OC STM Q I i$ /� 4, , I ,-----', / o I I / ' , I 667-06-39-7056,E r ' I v I I I I I -OC OMES NC LLC e 9 B 1297-258 -J i i rn Q ' - LLJ ONING PUD; I N/F ; N/F I N/F PID 404B003 ; I ' PID 404B002 I I PID 404B001 I I, 44 ' ------ PID 404 002 ; if ; N/F ,---- PIN 5667-06-49-3631 PID 404BO12 i I ALAN K BEGBIE -------- i i i i PIN 5667-06-39-9571 i I DB 1289-319 I I i % SHANITRA JONES i ZONED RL DB 1360-439 I`- -- / I ' ZONING PUD ; I ` 20' PVT SDE 1 -- --- , 20" ANOSCAPFEA&AAAS 756 _ PID 404B011 -- T/?E£L/NE 757 — — TR£EL/NE_ _ 5 i i i PIN 5667-06-39-9464 `', / / i �'/77 758 0 COREY JAMES & Aq /R --- 59 ANDREA TONES < , 1 DB 1359-832 -------------------- 5 i ZONING PUD ---- 758-- - - I OBL C/ //M 749.75' N/F i % I BASED DNAS-BU/LTS% PID 404B009 `Ag/R����� ----------- ---- 7s5 1a PIN 5667-06-39-8381 , / ; ; \ / �d \,. MARCUS DIXON DB 1359-811 ; l k 11 /'\\ - -- A 62 ZONING PUD76 WL\ SAN/TARP IS / SEIf'£R EASEMENTNIF r PID 4046009 \\ .' " / i a b ' WL W I �' I / I I I --. - ' ----- '' PIN 5667-06-39-8381 ' MARCUS DIXON ��` / I �i I i Q` J I I' < ', J DB 1359-811 /�F STM In L I ' ZONING PUD D/ R/M 752..T9 I wL "� I \ , , % THROAT INLET 75>. 40 / XB i i J , �` J/1ROAT INLET 751.42" I I J b a r 24"RCP /NV OUT Ae799' N/F 2D' PRIVATE STORM '1 / H � \ I I - I _ OUJLLT CDrYTRDI STRUCTURE $ w I I , a0 ' i , 1 I i I i ' ' \ , _ - ih _ ,jD"RCP_/NV IS925';, y \ d .•'``'• i •. d' I - a" O_CB RIM 75S. w PIN 5667-06-39-8024 PIN 5667-06-39-8094 PIN 5667-06-39-9064 ; " I I $ a II ) , I 1 / 24"RCP AY/N 15555' (1 L¢I HOMES NC LLC i LGI HOMES NC LLC I LGI HOMES NC LLC o i I', i ' I I� ' R/P %A, / i ' ' 24°RCP AY IN 755.74' J III , ^ I •.' ! .JD'CP /NV DUJ755.56' I I DB 1297--258 I , DB 1297-258 I DB 1297-258 I , � , , , , ,' '; ; I/ , , R' ZONING PUD ; ZONING PUD ZONING PUD I I I 7 24'RCP /rV /M/SS/NG) 4696 UN/CAT/DY BD,Y �I I _ -y____________ __' ; I I `` I � 1• - 65 d• \ I // j / , 24"RCP /NV DUT7.55.74' I 5' STONE SUBD/!4S/DN ----- -- I--- ---I CAIVBOX 15' F4?' NTSET A: K 4 K — / i d. i/GN/f%TNfENC£ -e -----Df0 I - - - -- -- - - ` 15 T' FR NT SETA 762 - S/GHJTRLANLES G/IYPj I CD R/M 75999' o •. . • s >5"/NVOUJ756.74' — —� J 1" 1 ao1 1001 aoi aQi �; X..T5;J5'S.T. �PUBL/Cx T—s _ _ _ £ ABASED DNAS--DU/LTS)=s=� l S/DEX 4LK UJ/L/IYEASEMENJ - - - - - - - - - - - - - - - - _ - - s --L---j-- I I OAR/ABLE DV/OTLL PUBLIC R/6VV' � s CB R/M 76>.0T --sus s s y ` o 'Tr\\ \ CB R/M 759.02' �0'RCP /NV 753.92'I I OBL CB R/M 758.28' CB R/M 761.J2' 24"RCP /NV //V 75418" >'24'RCP /N 75410' I —I I_ B00K 9995, PAGE BB89 a PROP. SAWCUT LINE (TYP.) $ I I 15"RCP /NV /N 756.09' 15"RCP /NV /N 75408' 1 24"RCP /NV OUJ7545T „ $ 15"/NV OUJ75B2D' , C UNTY MAINTAINED /BASED DNAS BU/LTSj 3 I I 15"RCP /NV DUT 755.96 1 , — — _ �,/6'RCP /NV DUT 7544D" $ S88'1911 141.51' ° --�-------------- --- ---- ---- - ;' STM ' `, `, cBR/M 75B42' --GE -- - OBL CB R/M 759.BB' S86'1019 2pp 14' i XA76>.54' S/DE6YALK UT/LNY CB R/M 75850', �� ,\ , 1B°RCP /NV /N 7549T IN[_/-_-_-- , 7 3 _- --- ---- (ror-- -- 15"RCP /NV DUT 756.54' 24'RCP /NV OUT 7549D' \ , , I , p pRA _ SIDE#& UT/L/TY- _ _ _ _ _ _ _ _ LOD EASEMENT RC - % ; STORM r---1S"/NV/rV 756.5.T' , 16 20� ter` -------------------- _ EASEMENT LOD , EX FNYD I 15'/NV/N756.7.1' , , 1 '.F ONTSET A K \ - '' " 67. 19'XilDUT756.28' p,10', RO 15'lY97fBFtSEYENIt - ` A20 S�E -- -I ,63 2 15'FRONTSETBACK a \ \\ �)X�S �l/BL1CJal - --- N/F N/F I i I - _ _ - 0'-. 76 PID 404BO87 PID 404B086 1 - i PIN 5667-06-38-9816 I PIN 5667-06-38-9886 Y i i I 763 ` 5'STON£SUBD/V/S/�V' C8 R/M 158.50' LGI HOMES NC LLC I LGI HOMES NC LLC a I i V _ S/GN lfilH FENCE DB 1297-258 DB 1297-258 vo i i - - , --- - m ------------- \- \' % 18'RCP/NV IN7SJX0117 ' ZONING PUD ZONING PUD - o l D --BASED 0 A5= _ U '� _ -� �✓ , ' N BU/LTS) 2 'PFRMAN£NT \ i DRNNAG£EASEM£/l _- \ S' ®` ` - r -_c. _ -_ -- __ _ i i ? i i D/R/M159.58' >. , THROAT /NLE775B5J' VT. ---- TM '•i -� _ I I I 2• I r� 4' P ALL -40 67- - _ STM I , I �, I 15"RCP/NV OI/J 755,28\ 15"PR/ — — — — --- - -- - - I I VAJE STORM D r 1PA/M'GEEASEMENT I I ; - •t - ---- � S A 30 7 7 ' � 1 , ALLEY C ` S88'1911 T 15158' MUM) v - — -- ---- UTILITY PERMANENT 765 �- —765�� — _ _ _ _ i i i I EASEMENT oFES 76T96' 'trip �o• I - - - T - - - - - - - ---------------- ----- --.�T- --------------- ------ '� --- --- I _ ----- --- --- _ --- 'T... _7 — _ _� — --�- : ' �� �_� - �. 20•LANOSrAPEBOFFEF ------ ---- I 15 /NV /N 762.OD 15'PR/VATS STORMORNNAGEEASEMENJ - - - "-•- �- I •' i ,Al /RF NBT27:36'il' 9098' - - ' ' , , �&S£D ONAS--BU/LTSj ---- - - I N/F FES76426';' 777� v s _------------------ - ----- ------ % PID 404BO88 15'IAIY/N 192JO'�-------------- ----------------- - 20' REAR SETBACK ` - ~ RNER J?aK -__ PIN 5667-06-38-9724�BASEO ONAS--BU/LTS)/ � �-�--� � W � \ T- - — - - _`� -_ Z = i � � - , I 9 /RF R Q 20' REAR SET ACK ELIZABETHMCKENZIE f` ASPRALTPAI�EDACCESSROAD r- KIRK MCKENZIE — I _-_ DB 1354-134 I '�. • , ----------------199.21' --- -------------------- , ' (' I `� ; �/ I S00;982W'9V 14.2J --------------------- 1 ZONING R-10` — — �! _ _ N8B19057Y552.1 ___---- -- � 252.90' / I I I I ------------------------------ N/F �'' `r` I PID 404 04 J \ PID 4046089 I � � � I / \ PIN 5667-06-38-9628 I I PIN 5667-06-48-2665 I ; i FODAY DYER SR r, CURTIS R KESLER & AMANDA KESLER SEIDI KENNEH I i DB 1243-552 DB 1353-455 `\ ZONED RL / ZONING R-10 I I / - I I 1 I, 40 20 10 0 40 1 "= 40' Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: NCC202055 DRAWN BY: RSW CHECKED BY: RAM DATE: 04/06/22 CAD I.D.: NCC202055 - IDAM - 0 CONSTRUCTION DOCUMENTS FOR LGI HOMES, INC. VILLAGE AT GRANITE TOWNHOMES 310 LIMESTONE TERRACE ROWAN COUNTY GRANITE QUARRY, NC 28146 PARCELS 404-144, 404-145, 404-142 AND 404-143 BOHLER# BOHLER ENGINEERING NC, PLLC NCBELS P-1132 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 NC@)3ohlerEng.com \ 0,Ilii N CARC SEAL - 046878 9 � ° FNG I NEED �, �� FN000�GQO ,/OZZ SHEET TITLE: INLET DRAINAGE AREA MAP SHEET NUMBER: C-903 ORG. DATE - 03/15/2022 i N/F PID 404BO12 P01-3 PIN 5667-06-39-9571 I I I SHANITRA TONES I l DB 1360-439 / l ZONING PUD 20' PVT SDE - h N/F L PID 404 002 PIN 5667-06-49-3631 ALAN K BEGBIE DB 1289-319 ZONED RL / N/F -20 Z IVL6L-Z b' FFEa ROR Sz7aacK PID 404B011 TRE£L/NE b° TRfEL/NE my TR£EL/NE r - PIN 5667 O6-3J-9�64 - - COREY JAMES / Al ................ .... ANDREA JONES ` 5 £X SSMH R/M 749.5J' DB 1359-832 o /NV IN AV 4el ZONING PUD � / I I o , /NV /LY 14L 48' / 5 /NV 0111741. J5' 111 I I o (BASED ON AS-BU/LTS) �0' (� �/ I OBL CI AW 749.75' NIF I oY / 24"/NV /N 7(571 PID 4046009 �'�w E-' / (BASON AS-BU/LTSj �9 �RFti� ` I PIN 5667-06-39-8381 / 24" OAK / MARCUS DIXON CD �`\ \ DB 1359-811 / / MR) I ZONING PUD N/F / I a PID 404 140 I I o PIN 5667-06-49-4396 `,• � I �' ROBERT J DAMRON & DA-3 i �\ \� I EVA 1 DAMRON I I I DB 1045-835 I 5 .JO' SANITARY �� \���to ZONED RL 5 N/F PID 404B009 \� I / \ PIN 5667-06-39-8381 \\\ SSA/STUB �TRj I I' MARCUS DIXON DB 1359-811 \ 1?f I / ZONING PUD 752..J9'\ 711047INLET 751.42'/ o P 01-2 I I I I 24'RCP /NV OWAe799' I N/F D I I of N/F 2PR/VAlf STORM PID 404144 I I I BMP SOf /PR/VAlf� ? PID 404B008 DRAINAGE EASEMENT / PIN 5667-06-49-1233 I I 9MP/6 I /eEMr/ n PIN 5667-06-39-8246 \ LGI HOMES NC LLC I I �'YD£T£NT/ON POND yEXE ROW � TRACI HILLIARD / DEEDED ACRES 4.42 $ I DB 1359-562 / / DB 1297, PG 258 I I s' IDE SETBACK_ ZONING PUD / / MB 9995, PG 8889 I / o \ --- ----- ,— —\$ / ZONED PUD — — TRE£L/NE =� o — 2o'taruosraPEaofrER � N/F / / R/CHJ PID 404BI207 PIN 5667-06-39-8201 0� 6009 I I PAUL S PALMER ET AL `►tip 5�� S�"�� �� I g / PERMANENT UJ/UIY 39 DA-L% I o ZONING NG PUD � �ati � � EASEMENT / STORM DRAINAGE EISEMENT / I PO PID4NIF 046006 BEST M4N4GEM£NPRACTICE #6 DRY D IN 5667-06-39-716� 0� / I I / ETENT/POND / EX. PUBLIC JEFFERY SHORT / / I I e UJ/UIY EASEMENT VEANDRA SHORT s,� DB 1368-906 / N/F BM 9995 1805 0 ZONING PUD l°�RF • / I I I PID 404 145 PIN 5667-06-49-4162 LGI HOMES NC LLC I \ l I DEEDED ACRES 1.78 R/RW I O \------------------------ I a I DB1297,PG258 I / �' I OZh 20'�oSC411Z RFFER I h PLAT PAGE 7805 r; o p I I I ZONED PUD / I I 'N.^ I �� 6_SID�Q E SETBACK I � � NB.Jo5191Y,� 4�61 �t2LlD' l4//O//' pp' I I I 757.70'(Q P01-1 / o l THROAT INLL775S97' 2O' SDE I I I I Q O I N/F 19'RCP /NV OUT 75242' (p — — — ID 404B004 667-06-39-7056 I a I I I I I I $ I OMES NC LLC I m B 1297-258 Q I I I I OUTLET CONTROL STRUCTURE ONING PUD l o I o / � � � � I � _ _ _ jig"RCP_/NV 158.25' N/F N/F N/F h o I I PID 404B003 PID 404B002 I I PID 404B001 I I I I I CB AW 756.54 PIN 5667-06-39-8024 PIN 5667-06-39-8094 PIN 5667-06-39-9064 I I R/P 24'RCP AY/N75555' LGI HOMES NC LLC LGI HOMES NC LLC I I LGI HOMES NC LLC do I / I I DA-1 I I I N Ft' IN 24°RCP AW755.74' DB 1297-258 DB 1297-258 DB 1297-258 / JD I ZONING PUD ZONING PUD I ZONING PUD "RCP /NV OU1755.56' I RCP /N /M/SS/NCB I Cgf/MUN/CAl/ON BDX WATER METER (TBR) I I 4.39 ACRES I 24">QCP /NV DUJ 75574' ___ I I AND LATERAL (TBA) CANBDX METER (TBR) _ _ I I / / 5' STONE BDMS/DN L / 15' FRONT SETBACK WM WATER 16 FRONT SETBAC / S/�iN Wf / C00 C/.0 L/G//T POLE (TLv) I I I -7 7-1 I F / .J5X.J5'ANO 14X*\ _ _ S/OHT TRIANGLES op) —— -142.30'57.86' WM �s CB R/M 759.89' �o / 1911 iY 164.90' o EX..J5; J5' ST (PUBLIC) I s s 15,/NV0UJ156.14 3139W &19' �� —— _ _ ao� ao� ao� - - ao�- ao� - - ao� ;T ao� - a - - Go] - - o s — (BASED ONAS-BU/LTSj_s-�,1I DEWAL T/L/IYEASEM£NT EX SSMH R/ GJ —30' I�VA R I EX SSNR SEUBA 162.98'/TBAj , CURB (IBRj fX SS,11// R/M AV SY' `° 1 s— B'A /NV /N 152R, EgS�M (TBA) CURB (/BRj /BASED ON AS BU/LTS CB R/M 759.02' JO'RCP /NV 753.92' OBL R/M 756.28' \ I VAR/ABLE W/OJH PUBLLC R/W CB R/M /6L0/' --s— B /NV /N /55.0/'_s I EX SSMH R/M 76J JB'11 CB R/M 761. J2' 24'AV /NV /N 754IS' I I 24" P /N 75410' I /NV /N 749.79' BOOK 9995, PACE BB89 15'INVOUT75B.20' PROP. SAWCUT LINE (TYP.) a'ss I I 15"RCP/NV/N756.09' \ /NV OU1749.44' I I B DROP /NV /N 751.89' o $ \ . COUNTY MAINTAINED BASED ONAS BU/LTS A /NV /N 75489' 15"RCP /NV /N 75408' 24' P /NV OU175457' /BASED ONAS-BU/LZS� - - _ - ( % B"/NV OUJ75>.B6 VX lVR STUB B TBAj BE Cf I I 15"RCP /NV 0UJ755m, B GW IN 75492' J6'RCP /NV OUT 7544D' ON AS-B TSB R/M I 1 _ �j = _ _ _ _ B"/NV OU175455' WATER LATERAL (TBA� ` / LOD EN E lMJN i ITR 388'1911 " 141.5r — _ -- z o_ $E / — — — — — — — - - _ _ _ =� N%083 D U/(ff£D ONAS-BU/LTS% I I CB R/M 761.54' CB /M /m.V o CB R/M 15850' j M OBL CB R/M 759. BB' - - ses 10 �9 /4- �r� � B I S/DE6YALK UJ/LNY 24"RCP /NV OUT 7549D' 1B P /NV IN 75497' \ / I /SIOM14 /, UJILIIY I s> T % LOD 15"RCP /NV OUT 756.54'buzI IN 20, STORM % 15'/NV /N 756.5J' / 1s'�ALTv uLxr L — �- s�5s' LOD-saa7911 T �5os' EASEMENT WIM EX. F//YO I I I �z 15"/NV IN756.7J' �! 15'FRONTSETBACK �RL% 1B"/NV OUT 756.28' I — �_ — _ = '- > : •' ...:.. ... .....• .......:... .. ..:., :.APPkDX.Lagl/aV��OlERIN/N_ . WATER METER (TBR� I — — J — — — — — _ _ \ Q (BASED oNAS-911VS)l I I AND LATERAL (TBA� S/DEIYAL mf) —_ — 15 sLTRT�s — 1rjEX. J5 rJ5' S.T. (PUBL/Cj \ / 15' FRONT SETBACK - Ilk UR8 (f-O EX SSf STUB B 763.70' (W WM \ N/F / / N/F I I fASEME (T AJ WER (BASED �V AS=BU/LTSj /CV o PID 404BO87 / PID 404BO86 WATER METER (TBR I -0 I PIN 5667-06-38-9816 i / PIN 5667-06-38-9886 Y I I AND LATERAL (TBA) 5'STON£SUB1fflyeV \ C8 R/M 158.50' \ m h i LGI HOMES NC LLC �/ LGI HOMES NC LLC m S/CN lfJlHF£NCE p� 15°RCP /NV /N 75J70' DB 1297-258 / DB 1297-258 o F- v w I 18"RCP /NV 011175350 p ZONING PUD / ZONING PUD LLJ (BASED ONAS-BU/LTS)_ N/F PID 2D' PERMANENT / PID 404143 I NINf EASEMENT PIN 5667-06-48- 0 / I � PIN 5667-06-48-1832 � I LGI HOMES NC LLC LGI HOMES NC LLC 71 R/M 15ZZ7 \ P 01-4 ' DEEDED ACRES 1.15 I THRDAT INLET 75B5J' e DEEDED ACRES 1.41 e _ — 6 I 14' DB 1297, PG 258 DB 1297, PG 258 15'RCP /NV DUJ 155.29 I _ 1 'PRIVATE PLAT PAGE 7805 EEASEMf ��I PLAT PAGE 7805 0 i ZONED PUD ZONED PUD \ PERMANENT UJIUIY = S88'1911 � 151.58' (rOTA[J \ I � EASSEMENl \ DA-4 ti I— — — — — — — I 15"/NV /N 162.0' 'V,0MMGEEASEMENT 20' XY- 4 Ee�F�A — — — — I �¢'RF / NBT27 367v 9036' (MS£D ONAS-BU/LTSj ° 0.67 ACRES NIF 001( 00 _ CURB (TBR� PID 4046088 15"/NV /N 162.30' c� _ 20' REAR SETBACK / PIN 5667-06-38-9724(BASED ON AS BU/LTSj o Q 20' REAR SETBACK I ` n' ' r / ELIZABETHMCKENZIE / 1giRF ASPRALTPAIIEDACCESSROAD VV C / KIRK MCKENZIE — DB 1354-134 I 299.21' / ZONING R-10 SOD38247V 14.23 CURB (lBRj � L= N887905V 552.11' (707W) 252.90' C 20' STORM DRAINAGE EASEMENT o Q N/F TO BE REMOVED FROM BUFFER. Z NIFa �N PID 404B089 I I PIN PID 04004 665 S PIN 5667-06-38-9628 I I1%6 CURTIS R KESLER & \ / FODAY DYER SR AMANDA KESLER / SEIDI KENNEH DB 12 DB 1353-455 I ZONEDD RL RL � ZONING R-10 I 40 20 10 0 40 / I / I 1 40' L) J J W L) Z V miZ R W Z 3 W W J moo (D Z_ W W W U) z �� W C� z 5 z W 2 W 0 2 0� Ozwww5w z�O11--WEW W Q 2 0 W z > z U W W 0 (� QQzQ 0zaQQ~O zJOU)D�U) Q z 0- z > J U W U) o 0 aN o �zm ow 0 m. >N <o o. o ow o zzw �w ow Qom �.0 0 o m aoo o Sa REVISIONS REV DATE COMMENT DRAWN BY ra+ Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: NCC202055 DRAWN BY: RSW CHECKED BY: RAM DATE: 04/06/22 CAD I.D.: NCC202055 - IDAM - 0 PROJECT: CONSTRUCTION DOCUMENTS FOR LGI HOMES, INC. VILLAGE AT GRANITE TOWNHOMES 310 LIMESTONE TERRACE ROWAN COUNTY GRANITE QUARRY, NC 28146 PARCELS 404-144, 404-145, 404-142 AND 404-143 BOHLER# BOHLER ENGINEERING NC, PLLC NCBELS P-1132 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 NC@)3ohlerEng.com 0\ N CARC SEAL - 046878 FN000GQO SHEET TITLE: PRE-DEV. DRAINAGE AREA MAP SHEET NUMBER: C-902 ORG. DATE - 03/15/2022 0 m N Ur 0 N o Q U ' ; ------ N/F ------ PID 404 002 ♦I N/F `--- PIN 5667-06-49-3631 P►D 404BO12 i I ALAN K BEGB►E ---------- i i i i PIN 5667-06-39-9571 i I DB 1289-319 I I i % SHAN►TRA JONES i ZONED RL DB 1360-439 I`— -- I ' ZONING PUD BYP 71 _----- -- / p/RF / 20'LANOSCAP`BUFFEA&/r'EA//SETBACK I 0.36 ACRES 757 TREEL/N P►D 404B011 7REE_ EL/NE ` PIN 5667-06-39-9464 -- o ------ I / / � / � "' ACCESS CESS 758 CANDREA JONES OREY JAMES & A� /R --- EASEMEN —T 5g � / ' h ` 7 I-- I ; I ^ \ r DB 1359-832 i 39 -------------------- / \ i ZONING PUD I / i / 5a \ I o -- ---- -- o , -758 1 1 , `` ` P►D 404B009 �9 /Rh NIF PIN 5667-06-39-8381 , MARCUS DIXON -- DB 1359-811 _ _ _ ; I / \\' ZONING PUD ; l� / ; /; —760 \ - ,s 1 i N/F ,-761. `� 1 •':.s. i • '4 i I I of i PID 404 140 ROBERT J DAMRON & EVA 1 DAMRONPIN 5667-06-49-4396 DB 1045-835 ,��'SAN/TiIRY \ �// ` �` �` 1 ^ ` QS� �I I I� i i ZONED RLNIF S£lf'£R £ASEM£NT P►D 404B009 PIN 5667-06-39-8381 ---- MARCUS DIXON 4 / \\ , J Q I I ✓' r ,' ,' ,.' DB 1359-811 ZONING PUD3. ij I ,- i�T / N/F P►D 404B008 `\ `\\ / / i Cl ' 'a _ I /B PIN 5667-06-39-8246 ",' 756 : ' LU a " 6 : ` J l HERE JPOIY �.. TRAC► H►LL►ARD •' _ o rn ------ - ' ----; ; _ / $ EMI DB 1359-562 i e 761 `\ / / I ZONING PUD A_ �' - — — — — 7REEL/NE-------- D/ A ___r v —-------_EO�LANW4PZ IfE ' — 30'..WY/T/VIY S£O£/I _ 6 ,1 N/F / I / =--- ---- / ' / / 1� - 758 OF if j61 -' -10' STORM DRAI — / I P►D 404B007 ACRES 62 GE $ , 3.0 C S NA --- ' F ' h MAINTE _- PIN 5667-06-39-8201 � , / / 0`�/ , � NANCE EA$EM PAUL S PALMER ET AL PROP. SA b. ' ENT'' DB 1363-439 ; .' '' / ''vP�/ --__/ ��"' ' / � t 8 �" I. �.�_ • 751 ZONING PUD,' �9�F i / % 759 ,, e I DA- gNIF P►D 404BCCs % l ' '' / ', -`v I 5.11 ACRES IN 5667-06-39-7167 10 JEFFERY SHORT VEANDRA SHORT / /,' / 1A' STORM DRAINAGE & MAINTENANG"E EASEMENT DB 1368-906 ZONING PUD rROP 0 12 20 LANOS�PEBUFFFH I AAA --------------- ----- 763 `_„_- ti 16o I „ . ALLEY � � la _-----___- ---- - =--= _ — — — — PVT. ALLEY B ; �l � N/F - ��I I' T e9 -- ►D 404B004 == I �- '--�--- - ''' I i $ I 667-06-39-7056;; i i i i I I I I I I ' �� i i I i i/ I $ i j i i OMES NC LLCr ----- / B 1297-258 ,`_J i i i i i i i Q '� I - -- - \ `•r � I � I I � 1 -� � 1 1 ON►NG PUD/ivl i i I I 11 N/F i N/F N/F P►D 404B003 ; I ' P►D 404B002 I I P►D 404B001 It ,1 /; I I I I I C/O- I I G/IN8(%i L i - _ __ - � \. ,pro `�4 762 .pro � `I I /� j / i �•l � _ ,/ II a 71 i IL/MESTONE TERRAC' I --- `\ I I VAR/,4BLE GY/0TH PUBL/C R/GY BYP r -� I , ` II , BOOK 9995, PAGE BB89 NTY MA/NTA/NED — 3 S\`I ` $ ; \ .19 0 55 ACRES ----- --------------- . �------------ '� • I I i r 16------- , I I O I I I I - - \` W •1 i , 764 -- - __ __ - _ P. 10' I `- _ _- ` � \ I , � _ _'_ - /-, \ , /,' , I � I ' ( / � Q . • _____ --- - - _ ___ ,__ a ♦ \ ' 'III / /' NIF 4\ i i P►D 404BO87 P►D 404BO86 T PIN 5667-06-38-9816 I PIN 5667-06-38-9886 ; ,' O; 76 LG►HOMES NCLLC I LG►HOMES NCLLC �� J 7�- - _ -- -- `\ `, I /� --`= -' DB 1297rf -258 DB 1297-258 - - , --- --- m' 44 45 46 47 48 4g 50 51 ---- �_ ZONING PUD ZONING PUD o ,; ':.:,.; .:,. -:.. < --- R 767 - 52 53--------- -- J'---- \ __ 1 ' PVT ALL _,-ji 767 --- ------------- -- - i i i �, I i a. I I I , , , �\ ---- \ 1 / ` ... . -------------- :o I I / G ' i/ i ```�'� _ / 1` I � - ' \��— � • a�'�.� 765' �- —765�� — _ — _—_— I I h i � I •� ' �yI vr.. `�64_-------- --- V. --.j ----- I ----------------- ---------------------------- - --- "--- ---- _ I 764---------------------- ---- _ saw r ------ --- - ----- - --------------- -- — — I S T / T ______ ____ _____y . 4 - -76.E-_ :• I L _ BYP 1 20 • LANOSrAPE BOFFEF / - - -- , / r � I /-------------------- '' \I J01- L — PID 4046088 �\ ��``NIF — —-------_------------------------------ — I ' PIN 5667-06-38-9724 - - - -__ _ 0.43 ACRES , EL►ZABETHMcKENZ►E f`` \ ASPh'ALTPA V7EDACCESSROAO r _ K►RK McKENZ►E ----- _— Jf DB 1354-134 i _ --- _ ---_-, — -------- - - --------------- ZONING------------------------ i : -"-- i --�i V R-10 f — __-------- - ' '// ' '�_---------------------------------------- _ V , I ---------------- I ,,• II `\ N/F i,'' �. I P►D 404 004 PID 4046089 I •� / \ I PIN 5667-06-38-9628 I I PIN TIS R 6-4 LER I ; i FODAY DYER SR r, CURTIS R KESLER & AMANDA KESLER SEIDI KENNEH I i DB 1243-552 DB 1353-455 ZONED RL ZONING R-10 ; I 40 20 10 0 40 I / I -- 1 "= 40' 1 LU yh'� � .'\', i •. a. .., . � i � � ✓✓� o_ � i i I ,`,'i i i \ I � / i ir, ��<.ff�T.� PIN 5667-06-39-8024 PIN 5667-06-39-8094 PIN 5667-06-39-9064 (1 L91 HOMES NC LLC i i LG► HOMES NC LLC I LG► HOMES NC LLC DB 1297-258 ; DB 1297-258 I DB 1297-258 -- ZONING PUD ZONING PUD I ZONING PUD 31 32 33 34 35 36 37 , `--- N/CA7/ON MIr I ----------------- COYhV1 -765d I M I \I J J a Wz V mi it W W /Z V W OLU J moo (D Z W W (n Z W 0� W 0 z 5 z W 2 W 0 2 0- 0� U' zWww5w Z_ i 0 ~ W a� W W Q = 0 W Z > Z U W W 0 (n� e QQZQ � Q ILL LL J (_9 U) Q �zcn�z > J 0 W U) o 0 aN .-o�Rm -z wo 0 R > I N �o o wI ow o= zz< �w ow Qom �N= $ m 0 00 > a mm Sa om o o zz N wa o� o. o REVISIONS REV DATE COMMENT DRAWN BY 1 Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS , CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: NCC202055 DRAWN BY: RSW CHECKED BY: RAM DATE: 04/06/22 CAD I.D.: NCC202055 - IDAM - 0 PROJECT: CONSTRUCTION DOCUMENTS FOR LGI HOMES, INC. VILLAGE AT GRANITE TOWNHOMES 310 LIMESTONE TERRACE ROWAN COUNTY GRANITE QUARRY, NC 28146 PARCELS 404-144, 404-145, 404-142 AND 404-143 BOHLER# BOHLER ENGINEERING NC, PLLC NCBELS P-1132 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 NC@)BohlerEng.com N CARC =o Es o SEAL - 046878 _ 9 � ° 4G I NEED FN000MCI SHEET TITLE: POST-DEV DRAINAGE AREA MAP SHEET NUMBER: C-903 ORG. DATE - 03/15/2022 S (jS (jS 40S Pre -De POI-1 Pre-Dev POI-2 Pre-Dev POI-3 Pre-Dev POI-4 10 PH1 BMP - Ex Dry Pc nd 41 13L Pre-Dev POI-1 5S 6S 7S 8S 9S Post-D v POI-1 Post-D v POI-2 Post-Dev P 1-2 Bypass Post-Dev POI-3 Post-Dev POI-4 11 12 Prop Modi ied BMP 1 Prop. BMP 2 (Sa d (WetPond) Filter) 14L 15L Post-Dev POI-1 Post-Dev POI-2 Subcat Reach on Link Routing Diagram for Granite Quarry Prepared by {enter your company name here}, Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: Pre-Dev P0I-1 Runoff = 8.37 cfs @ 11.96 hrs, Volume= 0.393 af, Depth= 1.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description 4.390 73 On Site Pre Area 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Pre-Dev P0I-1 Hydrograph 9 ■Runoff 8.37 cfs - -- -- -- --II -- -- -- -- -- --II -- -- -- TYp It 2 r 7 -- Runbff A're�ll=4.390 ac 6 RLInpff''IVQILjm'Ie='10.$9$ CIf ^ --r- --I--r--r--r--r--I---I--r--r--t--r--r--r--I--r--r--r--r--r--I---I-- 5 Rulnoff IDepth=0.077 a 4 TGTJ.iV 111M --'-- --'----1--L--1--------J--1--1--L----1---1--J--1--r--L- - 3 I I I I I --'-- --'----1--L--1---1---1--J--1--1_-1--L--1---1--J--1--L----------'-- 2 -I ------------------------------------------------------------ 1 I I I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2S: Pre-Dev P0I-2 Runoff = 3.08 cfs @ 11.97 hrs, Volume= 0.152 af, Depth= 0.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description 2.000 61 >75% Grass cover, Good, HSG B 0.400 98 Paved roads w/curbs & sewers, HSG B 2.400 67 Weighted Average 2.000 83.33% Pervious Area 0.400 16.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Pre-Dev P0I-2 Hydrograph � � �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I ■Runoff 3.08 cfs 3 T ------i--r--r--r--r--i---i--r--r--t--r--r--r--i--r--r Yp� r--r— I1 2—r-4 —i-- - 2-YR Rainfall-3.34" Runbff Area=2.400 ac - - - - - -' - - - - - - Rt n-pffV Its me=0. 15 -elf - N 2- Runoff DepthT0.76P' TcT5.0 Mid 1 I I I I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 3S: Pre-Dev POI-3 Runoff = 1.50 cfs @ 11.98 hrs, Volume= 0.084 af, Depth= 0.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description 2.000 61 >75% Grass cover, Good, HSG B 2.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pre-Dev POI-3 Hydrograph I I II II II II II II II II II II II II II II II II II II II II II ❑Runoff 1.50 cfs lTYpe I( 24-h'r �2-YR Rainfall-3.34" Rwnbff A'rei�=2.000 ac -- -- -- -- - -- -- --T --f� n-�ff'Ii� C r�-a='I-0.i8-4-clf- 1 'I 'I 'I 'I 'I 'I 'I 'I 'I 'I 'I 'I 'I k6noff IDepthT0.501' 3 I I I I I I I I I I I I I I I I I I I Tc" 0 tnih LL I I I I I I I I I I I I I I I I I I I CAN=61 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 4S: Pre-Dev P0I-4 Runoff = 0.50 cfs @ 11.98 hrs, Volume= 0.028 af, Depth= 0.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description 0.670 61 >75% Grass cover, Good, HSG B 0.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Pre-Dev P0I-4 Hydrograph 0.55 0.50 cfs_________________________�__�__�___�___�__�__�__�__�__ 0.5 -- -- Y�/Ip� II'124-h'r 0.45 2-YR' Rainfai11�3.34'' --'I-- — -- -- --' ---- -- -- --'— --- — ——--4--+-----I---I--�--+--+--I-- 0.4 RUnbffl Aeei�=0.670 ac 0.35 Rpnpff V41gmY=0•02$ cif ^ --r- -r--r--r--r--r-r--r--r--r--r--i--r-- Runoffr--r--r--r--i--r--r--r--r- 0.3 �Depfh=�0.501' 3 --'---J--L--L--L--1--J--L--L--L--'---'--�--L--L--'---'---'--L--L--L--'-- T'cy5.10 rrih a 0.25 T w' ----- r--r--r--r----r--r--r--r--r--r-r--r--r--r--r----r-ON 6'il 0.2 — —'— — — L — — L — — L — — L — —'— — L — — — — L — — L — —'— — —'— — — — L — — L — —'— — —'— — —'— — — — L — — L — —'— — 0.15 0.1 --�-- J--L--L--L--1--J--L--L--L--L--�--�--L--L--�---�---�--L--L--L--i-- 0.05 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ■ Runoff Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 5S: Post-Dev P0I-1 Runoff = 17.13 cfs @ 11.96 hrs, Volume= 0.800 af, Depth= 1.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description 5.110 85 1/8 acre lots, 65% imp, HSG B 1.788 35.00% Pervious Area 3.322 65.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: Post-Dev P0I-1 Hydrograph 19------------+--+-----------+--'--'--+---------------+----�-- ■Runoff 18 -- 17.13cfs —__ __1__1--L-- __L--__ __1--1--1__L__L--1---1---I--L--L--L--L-- --1�y1pe-N12-4-fir - 17 1_ 1_ �_ L_ L_ L_ 1_ 1_ 1_ L_ L_ L_ L_ L_ �_ 1_ 1 _ 16 ---- -----L--L--L--L-------J--L--L--+--L-- - - -----L--+--L--L -- 2-YRF�1'ainfa�lL�3 34''-- 14 --'-- -1----1--1--L--11---1---1--L1--1--L-lftnb#f-A'rett=5.410-ad - 13 --'---'---'---'--'---'------------------'p----L-------- --------------L--- 12 --'-- -'----1--1--L-----'---'--J--1--1R-qnp fiLV-p1Lt 'ie=A-$00-cj - ,1 1 1 1 1 1 1 1 1 1 1 1 1 LL $ — — — —I — — — — — — i I --I--__I__I__I___I___I___I__I__I__I__I __I___I___I___I__I__I__I 7 — ———---------------------------------------—I��i- 6 --------------------------------------------------- 5 4 -- -- 1-- 1 -- 1 -------------------------------- ------------------- 3 ---- --- -- -- --------------- -- -- --------------- -- -- -- -- 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 6S: Post-Dev P0I-2 Runoff = 10.09 cfs @ 11.96 hrs, Volume= 0.471 af, Depth= 1.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description 3.010 85 1/8 acre lots, 65% imp, HSG B 1.053 35.00% Pervious Area 1.957 65.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 6S: Post-Dev P0I-2 Hydrograph --I---�---�--,--�--r--r--I---I---�--,--�--�--T--r--r--I---�---�--,--r--r--r-- 11 I I I I I I I I I I I I I I I I I I I I I I I ■Runoff 110.09 cfs -----L--L--L--1--1---1--J--1--1--1--L--L--1---1---1--L--1--L--L-- 10 � 'Type 1(24-hr 9 2-YR R'ainfa►1IT3.34" Runoff A'rei�=3.010 ac 7 Runpffl Vplum'Ie=10.471 elf 6 I I I I I I I I I I I I I Runoff'IDepthT1.881' LL 5 -- -- -- -- --II -- -- -- -- -- -- --II--cT5.'0 rni --r--I--r--r--r--r--r--r--I--r--r--r--r--r--r--I---I---I--r-- r--r-- 4 N=85 --I-- ---I -- --T -- I - - --------I -- I -- I -- T -- I -- I - - --------I -- I -- I -- I - - 2 --'---'--�--1--1--L--1---1---1--J--1--1--1--L--L--1---1---1--L--1--L--L-- 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 7S: Post-Dev P0I-2 Bypass Runoff = 1.84 cfs @ 11.96 hrs, Volume= 0.086 af, Depth= 1.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description 0.550 85 1/8 acre lots, 65% imp, HSG B 0.193 35.00% Pervious Area 0.358 65.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, N 3 0 LL Subcatchment 7S: Post-Dev P0I-2 Bypass Hydrograph 1.84 cfs ,Type If 24-hr 2-YR RainfaillT3.34" Rwnbff Area=0.550 ac ROnOff'VQ1L;me=0.080 elf --- ----,--7--!------------- --! --!----RUnoffbep#h=1.88" TcT5.0 Mid PN=85 41, Time (hours) e Runoff Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 8S: Post-Dev POI-3 Runoff = 0.27 cfs @ 11.98 hrs, Volume= 0.015 af, Depth= 0.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description 0.360 61 >75% Grass cover, Good, HSG B 0.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: Post-Dev POI-3 Hydrograph ■ Runoff 0.28 0.27 cfs 0.26 1 y�lpe 11 2 -h C -- -- 0.24 2-YR�_RaiftMII�3.34" ' 1 I I I I I I I I I I I I 0.22 ---7--r--r--I----,--7--r-------RI0InbI #I -ptIe&I 9I .JI 6GI aG1 - 0.2 1 1 1 1 1 1 1 - -- - - -- ---I�gngff1fc�Igr�jEs—0.0fi$-Cl# 0.18 y __I__ ___+-----------------------+--4__1___1-----------I-- w Runoff1Depth�0.501' 0.16 1 1_ 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0.14 - I C711- .0 IM ih- LL i t I I I I I I I I I I I I I I I I I I I I I I 0.12 CN=-61- 0.1 --I--------------------------------I--I --I---I---I--I--I--I --I-- 0.08 --r- r--r--r--r--1--r--r--r--r--r--1--r--r--r--r--1---1--r--t--r--r- 0.06 __1-- 0.04 --i-- +--+--+--+----+--+--+--+-------+--+--+----------+--+--+--i-- 0.02 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 9S: Post-Dev POI-4 Runoff = 0.32 cfs @ 11.98 hrs, Volume= 0.018 af, Depth= 0.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description 0.430 61 >75% Grass cover, Good, HSG B 0.430 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: Post-Dev POI-4 Hydrograph --r----r--r--r--r--r-r--r--r--r--r----r--r--r----------r--r--r--r- 0.36 ------+--+--+--+----+--+--+--+-------+--+--+----------+--+--+---- 0.34 �oszcfs ----------------0.3 --------------------------�-- �pQfl 24-1 028 YR-RalnfaCl#3:34"'- - ---------------------------------- 0.26 - - - -R-0 rrbff Atea=9.43G ac- 0.24 I I I I I I I 0.22 --II - ---+--+--+----+----+--r-----�n(ff VQlrnje_ 0.(1_3-�_f_ -I I I I I I I I I I I tNi 0.2 --'---J--1--L--L----J----1--L----- '-- _- " Ru�Inoff IDepth-0.50" 3 0.18 --'--'-''--------------------'- - - - -------------'-- i—°--------------- ° 0.16 --II-- --II-------------------------------------'I- T'c?5.b -- --- ------ 0.14 CN�1- --i - - -- --r-- --I-- -- --T-- --i --I-- -- --r--i-----I-- - 0.12 I I I I I I I I I I I I I I I I I I I I I I 0.1 --I-- +--+--r--+----+--+--+--+-------+--+--+----------+--+--+--I-- 0.08------------------------------------------�-- 0.06 --'-- J--1--L--+--'------i----'-------1--1--L--1-------1--L--1-- 0.04 nm �I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ■ Runoff Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 11 Summary for Pond 10P: PH1 BMP6 - Ex Dry Pond Inflow Area = 4.390 ac, 0.00% Impervious, Inflow Depth = 1.07" for 2-YR event Inflow = 8.37 cfs @ 11.96 hrs, Volume= 0.393 of Outflow = 3.24 cfs @ 12.08 hrs, Volume= 0.392 af, Atten= 61 %, Lag= 6.6 min Primary = 3.24 cfs @ 12.08 hrs, Volume= 0.392 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 753.84' @ 12.08 hrs Surf.Area= 8,341 sf Storage= 4,643 cf Plug -Flow detention time= 49.1 min calculated for 0.392 of (100% of inflow) Center -of -Mass det. time= 50.4 min ( 908.8 - 858.3 ) Volume Invert #1 753.00' UM11.1ire Description 65,286 cf Ex Volume - Design (Pyramidal)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 753.00 3,100 0 0 3,100 754.00 9,600 6,052 6,052 9,607 756.00 12,700 22,228 28,280 12,820 758.00 16,100 28,733 57,012 16,352 758.50 17,000 8,274 65,286 17,288 Device Routing Invert Outlet Devices #1 Primary 753.00' 24.0" Round RCP -Round 24" L= 53.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 753.00' / 752.71' S= 0.0055'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Primary 754.00' 1.8" Vert. Orifice/Grate C= 0.600 #3 Primary 755.20' 13.3' long Sharp -Crested Rectangular Weir End Contraction(s) Primary OutFlow Max=3.21 cfs @ 12.08 hrs HW=753.84' TW=0.00' (Dynamic Tailwater) 1=RCP_Round 24" (Barrel Controls 3.21 cfs @ 3.79 fps) 2=Orifice/Grate ( Controls 0.00 cfs) 3=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 12 Pond 10P: PH1 BMP6 - Ex Dry Pond Hyd rog raph -- 1 --L --I-- J-- 1 -- L --I-- J -- 1 -- L --I-- J-- 1 -- L --I-- J — —1 --L-----I-- 1 -- ❑ Inflow 9 8.37 cfs ❑ Primary -�-- -- 1-- fnf[6 LAir60-04.`390-Ilia - 8---IL------------------11--� -I-- Poa;k-F-16V=751. 4'-- �11 IIIIIIIIIIII 7---IL--------------------�-- IL - , , -- $#brage: 441,643 cf 6 --11-- ---IL--II-- -- -- --II-- -- -- --II-- -- -- --II-- ----IL-----II-- -- y I I I I I I I I I I I I I I I I I I I I I I V 5 , ____ _1--L --I--J--1--L--I--J--1--L--I--J--1--L--I--J--1--L--I---I--1-- 3 I I I I I I I I I I I I I I I I I I I I I I p I I I I I I I I I I I I I I I I I I I I I I LL 4 , 3.24 cfs I I I I I I 3 -- -+--+----+--+--+----+--+--+----+--+--+----+--+--+------+-- 2 I I I I I I I I I I I I I I I I I I I I I - -+--+----+--+--+----+--+--+----+--+--+----+--+--+-------+-- 1 I I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 13 Summary for Pond 11 P: Prop Modified BMP 1 (Wet Pond) Inflow Area = 5.110 ac, 65.00% Impervious, Inflow Depth = 1.88" for 2-YR event Inflow = 17.13 cfs @ 11.96 hrs, Volume= 0.800 of Outflow = 0.81 cfs @ 13.18 hrs, Volume= 0.766 af, Atten= 95%, Lag= 73.3 min Primary = 0.81 cfs @ 13.18 hrs, Volume= 0.766 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 755.86' @ 13.18 hrs Surf.Area= 12,861 sf Storage= 20,804 cf Plug -Flow detention time= 1,577.4 min calculated for 0.766 of (96% of inflow) Center -of -Mass det. time= 1,554.9 min (2,375.0 - 820.2 ) Volume Invert Avail.Storaae Storaae Description #1 754.00' 68,712 cf Volume (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 754.00 8,870 0 0 8,870 755.00 11,632 10,220 10,220 11,661 759.00 17,834 58,492 68,712 18,157 Device Routing Invert Outlet Devices #1 Primary 749.38' 24.0" Round RCP -Round 24" L= 38.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 749.38' / 749.00' S= 0.0100'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 754.00' 1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 755.60' 20.0" W x 27.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 757.85' 16.0' long Sharp -Crested Rectangular Weir End Contraction(s) #5 Primary 758.50' 20.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.81 cfs @ 13.18 hrs HW=755.86' TW=0.00' (Dynamic Tailwater) 1=RCP_Round 24" (Passes 0.81 cfs of 42.98 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.08 cfs @ 6.46 fps) 3=Orifice/Grate (Orifice Controls 0.73 cfs @ 1.65 fps) 4=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) = Broad -Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 14 Pond 11 P: Prop Modified BMP 1 (Wet Pond) Hyd rog raph 19 ,1 1 _---+--+--+-------+--+-------+--+--+----+--+--+-------+--+--+---- 17.13 cfs rt--r--1---1--�--r--r--1--y--t--r--I--y--t--r--1---1--rt--r--r-- Clnflow ❑ Primary ry 18 --1---rt--r--li---li----r--Ir--li-----r-�,nfloowtAreaal5: 40,aCi 17 16 --I-- —T--r---------r-----I--1--T--r--I--r--T--r--1-----T--r--r--I-- --1-- ---r--1---1-- --r----1--;--T--r--'1PPO Et - 15 14 755-0-6' --I--—7--T---------T--II ----1--T--Ir----r--T--r--+q(-----T--r--r--1-- ---- - --------- --------- -- ----- Stora— ,SU' Cf 13 12 V 10 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 9 i LL � I i I --I-- — I -- I--I---I-- I -- I--I---I-- I -- I--I---I---I-- I 7- 6 -1--L--1---'----L-----'-- -- --L----J--1--L--1-----1--L--L--'-- 5 -- - --------- --------- -- -- ---- -- --------- -- -- ---- 4 - --------- --------- -- -- ---- --+--------- -- -- ---- 3 ---- --+-------+--+-------+--+--+----+--+--+-------+--+--+---- 2 0.81 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 15 Summary for Pond 12P: Prop. BMP 2 (Sand Filter) Inflow Area = 3.010 ac, 65.00% Impervious, Inflow Depth = 1.88" for 2-YR event Inflow = 10.09 cfs @ 11.96 hrs, Volume= 0.471 of Outflow = 0.35 cfs @ 13.79 hrs, Volume= 0.471 af, Atten= 96%, Lag= 110.1 min Primary = 0.35 cfs @ 13.79 hrs, Volume= 0.471 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 754.42' @ 13.79 hrs Surf.Area= 6,232 sf Storage= 12,556 cf Plug -Flow detention time= 1,334.3 min calculated for 0.471 of (100% of inflow) Center -of -Mass det. time= 1,335.4 min (2,155.6 - 820.2 ) ►1[.7 ..�� ��iGnFTI�•�i•7 Description #1 752.00' 40,395 cf Custom Stage Data (Prismatic)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 752.00 4,162 0 0 758.00 9,303 40,395 40,395 Device Routing Invert Outlet Devices #1 Primary 749.50' 18.0" Round RCP -Round 18" L= 25.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 749.50' / 749.00' S= 0.0200'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 752.00' Exfiltration Head (feet) 0.00 0.01 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.032 0.045 0.058 0.071 0.084 0.097 #3 Device 1 754.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 0.33 0.33 #4 Device 1 756.00' 16.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #5 Primary 756.50' 20.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.35 cfs @ 13.79 hrs HW=754.42' TW=0.00' (Dynamic Tailwater) 1=RCP_Round 18" (Passes 0.35 cfs of 21.71 cfs potential flow) 2=Exfiltration (Custom Controls 0.06 cfs) 3=Custom Weir/Orifice (Weir Controls 0.29 cfs @ 2.11 fps) 4=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) = Broad -Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 16 Pond 12P: Prop. BMP 2 (Sand Filter) Hyd rog raph ----r-- T--r-------r--r--I ----r--T--r----r--r--r-------r--r--r-r-- �I ❑ Inflow 11 - 1o.osots �--r--�---�--�--r--�---�--�--�--�--�--�--+--�--�---�--�--r--�--�-- ❑ Prima rY I'nflo'w'A' e' = '�0 0'�a_r- 10 - - - - - - - ---- -I - �� I I I I I I I I I I I I I I I IROI I I I I � 9 - -I- - I I I I I I I I I I I I 8 --I-- ---r-------;--r-------;--t--T--Stora0e=12Y,556-d 7 ---- - --------- --------- -- -- ---- -- --------- -- -- ---- y I I I I I I I I I I I I I I I I I I I I I I 3 I I I I I I I I I I I I I I I I I I I I I I LL 5 --I-- -r--r--r----r--r-------r--r--__r-r--r--r-------r--r--r--I-- 4- 3- 2 I- rr--rI- rr--T I- rrrIrrr--I-I- rr--TI-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 17 Summary for Link 13L: Pre-Dev P0I-1 Inflow Area = 4.390 ac, 0.00% Impervious, Inflow Depth = 1.07" for 2-YR event Inflow = 3.24 cfs @ 12.08 hrs, Volume= 0.392 of Primary = 3.24 cfs @ 12.08 hrs, Volume= 0.392 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 13L: Pre-Dev P0I-1 Hyd rog raph C Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 18 Summary for Link 14L: Post-Dev P0I-1 Inflow Area = 5.110 ac, 65.00% Impervious, Inflow Depth > 1.80" for 2-YR event Inflow = 0.81 cfs @ 13.18 hrs, Volume= 0.766 of Primary = 0.81 cfs @ 13.18 hrs, Volume= 0.766 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 14L: Post-Dev P0I-1 Hyd rog raph U.y 0.85 --I 0.81 cfs+__1-_+__+__1- cfs -1__+__1-_+__+--+--I--+--+--+--I--+--+--+_-1__ I� f [Q 1 All-ei I5 I 1 � ar 0.81 I - - 0.8 I 1 - - L - � - -I - -- 1 YY I V I 0.75 + L J--1--L-- J + L J--1-- ----J--L--L--I-- ------J-- 0.7 0.65 0.6 ,I I I I I I I I I I I I I I I I I I I I I I I I 0.55 ,I I _ w 0.5 0.45 - a 04 I -- -- 1-T--T--F--Ir-T--T--F-T--T--T--Ir-T--T--F----T--T--Ir- -1-- 0.3 �I T-- 1--I-- 1-- T-- 1-1-- T-- 1--I-- 1-- T-- 1--I-- 1-- 1--I-- 1-- 0.25 7--Y__r--I__7--t--r-7--Y_-r--I--7--t--r--I--�--r--I--7-- 0.2 --+--r----y--+--r-y--t--r----y--t--r-------r----y-- 0.15 I I I I I I I I I I I I I I I I 0.1 0.05 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) C Inflow ❑ Primary Granite Quarry Type/1 24-hr 2-YR Rainfall=3.34" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 19 Summary for Link 15L: Post-Dev P0I-2 Inflow Area = 3.560 ac, 65.00% Impervious, Inflow Depth = 1.88" for 2-YR event Inflow = 1.89 cfs @ 11.96 hrs, Volume= 0.557 of Primary = 1.89 cfs @ 11.96 hrs, Volume= 0.557 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 15L: Post-Dev P0I-2 Hyd rog raph C Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 1S: Pre-Dev P0I-1 Runoff = 22.82 cfs @ 11.96 hrs, Volume= 1.057 af, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 4.390 73 On Site Pre Area 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Pre-Dev P0I-1 Hydrograph 25 --'---'---'--+--+--+--+--'---'---'--+--+--+--+--+--+----------+--+--+--+-- ■Runoff 24 23 22 --� -�,-- -- 22.82 cfs ----+--+--+--+--+-----+----+--+--+--+--+--+-1I -- - -- r-- -- r--r --- - ---- -r-- r- ------ - -, -- ------ r- -- - r-- ------------------ ---------- `�-(,I--p+ + + - r--+--r--r - - - -- Y- + I 21 20 _ --'-----�--T-- --,-_-I--r--r--r--r --r--'---'---'--�--------+--r--�T--I-'--------'- � � � r--r--r--r- -'-+--rn-c-r-- 2- -I�-R Rciflnfalf�,7-67 - 19 18 --'---'--L--L--L--L--'---'-----J--L--L--+--L--L--'------'-- -- ---- T- - T- - T - -T -- -------T- - T- --+--L--L-- - T - -TRun ff-Arett=4.390 ad - 17 --'-- -'--L--L--L--L--'---'---'--J--L--L--+--L--L--'--------L--+--L--L-- u15 14 ---- -- --r----y--rt--+--r--r-------y--rt--rt--+==RM!! ©rr� f *1Tfie} ¢A ID}VEL_ 3o 12 a11 --r- -i----T--T--T--T--li---li-- -------------------------------------------------- --T--T--T--T--T--Ir--li- f► �r,,� SST �i�_illJ��-- 10 --i-----T--T--T--T--------i-- -- -- --+--T--+----------+-- + -- -74 8 7 ,i --+- +--+--+--+--+--+--+-+--+--+--+--+--+--+--+-+--+--+--+--+--+-- --F- I -- I -- --I--I------------- -- -- --------------- -- -- -- -- 6- 5 --I-- ------------- -I---I-----------I_-- -----------------I-- --I---1----I-- -- I --I---I---I---I--I--I--I--I --I--- I---I---I--I--I-- -- -- 2 --'---'--+--+--+--+--'---'---'--+--+--+--+--+--+-- -------- +--+--+--+-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 2S: Pre-Dev P0I-2 Runoff = 10.16 cfs @ 11.96 hrs, Volume= 0.470 af, Depth= 2.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 2.000 61 >75% Grass cover, Good, HSG B 0.400 98 Paved roads w/curbs & sewers, HSG B 2.400 67 Weighted Average 2.000 83.33% Pervious Area 0.400 16.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Pre-Dev P0I-2 Hydrograph 11 I I I I I I I I I I I I I I I I I I I I I I I ■Runoff 10.16 cfs 10 'Type 1( 24-1l'r --r- -I--r--r--r--r--r--I---I--r--r--r--+--r--r--r--I---I--r--r--r--r-- 91 25-YR Rainfall:;5.761' --�---�--�--1--1--L--1---�---�--J--1--1--1--L--L--1---1---1--1--1--L--�-- Run off A're�ll=2.400 ac 7 RunOffl Vpl�m'1e=10.1 7 af 6 Runoff DepthT2.351' 3 _ LL 5 1 -I-- -- ------- -I-- -- -- -------cT5:;0 rni 4 "r 1 :6- 3V --I-- ---I -- I -- T -- I - - --------I -- I -- I -- T -- I -- I ----------I -- I -- I -- I - - 2 1 I I I I I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 3S: Pre-Dev POI-3 Runoff = 6.56 cfs @ 11.96 hrs, Volume= 0.308 af, Depth= 1.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 2.000 61 >75% Grass cover, Good, HSG B 2.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pre-Dev POI-3 Hydrograph - ■Runoff 6.56 cfs 6 25-YR RainfaillT5.761, -- -- -- -- ----.--.----Run1fAreA=2.0i0-a1�- 5 Rgnpff''IVQILjm'le='10.$0$ elf -- - -- -- -- -- -- -- ---------- ----------------------- 4 Runoff Depth=0.'Lm8-51, LL --I----T--T-Tc�5.10-,�„II 3 CAN=61 --I-- --I----+----------------+-------------+------I------I-- 2 1 I I I I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 4S: Pre-Dev POI-4 Runoff = 2.20 cfs @ 11.96 hrs, Volume= 0.103 af, Depth= 1.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 0.670 61 >75% Grass cover, Good, HSG B 0.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Pre-Dev POI-4 Hydrograph � � �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I ❑Runoff 2.20 cfs -- -- --+-- -- -- --+-- --' -- -,--+TypP, If 24-hr_ 2 25-YR RainfaillT5.761' Rwnbff Area=0.670 ac RL;npff'IVQIL;me='10.'10$ elf R6noff Depth=0.851' LL --I—--T--T— Tcz .&. -111M 1 II II II II II II II II II II II II II II II II II II II CAN=61 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 5S: Post-Dev P0I-1 Runoff = 35.91 cfs @ 11.95 hrs, Volume= 1.736 af, Depth= 4.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 5.110 85 1/8 acre lots, 65% imp, HSG B 1.788 35.00% Pervious Area 3.322 65.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: Post-Dev P0I-1 Hydrograph 40 --�r-------+--+--+--r--r---------+--+--+--r--r--+----ti----+--r--r-- ■Runoff 38 36 35.91cfs --- --I-- ---,-- --r--r- +__r--r-------7--rt--rt--t__t__r_-1---I---I— --------- -- -- 7__r__r__ --T--r--r-----IType-f1l24-Tr- I 34 30 28 ---- --- -- -- -- --- --- - - - - -I I -- I -- I I I I -RunWAIC@ CL 1Q ad- - - 26 '' ---- --- -- -- -- -----------'-- -- Q f' ¢1 a �.I ^ 24 u 22 �I - - -''----1--1--L----------J--1--i i I I --'-- -'----1--1--L--1--------J--L-L-L--Rtnofi� I I I I I I I I I I pI I I I^ I I Iw In I ptli= �F.N811-- 20 a18 ---- -----1--1--L--1--------J--1--1--+--+-- ---- --- -- --+-- ---------- --'--'--+--+--L-------�iiT-7.0—MIH-- ---------/►-1-CC-+--+-- -- 16 ---- --- -- --+-- --- - - - - - -- -- -- --+--+------------ -_�� 14 ,I --+-+--+--+--+--+--+--+-+--+--+--+--+--+--+--+-+-----+-- +--+-- 12 ,I --I-----+--+--+--r--------I-- -- -- -- +——r--+--------I----+--+--+-- 10 'I - -I- - -I 7 - - + - - + - - Y - - - - - - - - - - 7 - - - - - I - - + - - Y - - r - - - - - - - - - - I - - Y - - + - - r - - 8 ' I --r— —I-- +— — + — —-— r--r-- 6 ' I --F---T-- T-- r --r -- -------T--T--T--T--r--F--I--------T--T--r--r-- 4 � --I ----T-- T- - r - -r - - I -------T--T- -T--T--r--Ir--------I--T--T--r--r-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 6S: Post-Dev P0I-2 Runoff = 21.16 cfs @ 11.95 hrs, Volume= 1.023 af, Depth= 4.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 3.010 85 1/8 acre lots, 65% imp, HSG B 1.053 35.00% Pervious Area 1.957 65.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 6S: Post-Dev P0I-2 Hydrograph 23 --r--I---I--r--r--r--r--r--I---I--r--r--r--t--r--r--r--I---I--r--r--r--r-- __I___I _I---- -- --I -- ■Runoff 22 21 -- 21.16 cfs ,---r+--- r--- L-1 r---------'-- L--L--1----L——L—— rrrI_ppf� ,24 hr- TZ- 20 19 ,I - - -- --I-- -I -- -- -- - ---25"-- 18_- 1 7 ' ' - -- ---11-----IRg1f- A--reA=3.-01Oa 16 15 ;I --7I -- rI --rI --- --+--+--+--+--+-- ----+A--+}-A-+-+-- f�lrI� ��YL ' �aTII ^ v 13 rI ----I ------iI ---- - oYI I OI W D"a�I ©I tIh1 0 11 LL 10 i I --'-- -'----1--1--L--1---1---1--J--1--1--1--L-- --r----r--r--r--r--r--r----r--r--r--r--r--r--------I- I -----'- TL— ��. r--r--r�-pr-- 9 - ----?-------------------?----- - - -- - --------------- 8 ---- --- -- -- -- ---------- -- -- --+-- ------------ -- -- -- -- 7 r- I--r--r--r--r--r--r--I--r--r--r--r--r--r--I---I---I--r-- r--r--r-- 6 --'------'---' I I I I -----------------'---' I I I I I I I ---' -----------------'---' ---' -----'--- I I I I I I I I I I I 5 4 ,I --I-- —I----+--+-- -- - -r- ----------+--+--+--+--+-- -r--i -----I-- -- -- --------I----+--+-- -- -- T - -r----------I--I --T--r--r-- 3 2 �I --'-----!--! I I I --I-- —I----+--+--+----------+--+--+--+--+-- I -- ! -- I !--- I I ------ - -'- I I I -! --! I --! --!--------- - -'- -! --! --! --! -- I I I I I I I I I I I --------I----+--+-- -- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 7S: Post-Dev P0I-2 Bypass Runoff = 3.87 cfs @ 11.95 hrs, Volume= 0.187 af, Depth= 4.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 0.550 85 1/8 acre lots, 65% imp, HSG B 0.193 35.00% Pervious Area 0.358 65.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: Post-Dev P0I-2 Bypass Hydrograph I I I ■Runoff 4 3.87 cfs ITy; pe If 24-h'r 25-YR RainfaillT5.761' -----1 T--r--T--r--I`RWnbffMee=0:v550 ae 3 Rtl nOff'IVQItjme='10.81 i4f w I I I I I I I I I I I I I --- -- -- -- -- -- -- -- Runo-f- ID = 8'1-1eth�4p1 0 2 - cT5.';0 rnih PN=85 -- ----;--;--------------I--;--;----------------;-----I----------- 1 I I I I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 8S: Post-Dev POI-3 Runoff = 1.18 cfs @ 11.96 hrs, Volume= 0.055 af, Depth= 1.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 0.360 61 >75% Grass cover, Good, HSG B 0.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: Post-Dev POI-3 Hydrograph � � �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I ❑Runoff 1.18 cfs Ty; pQ I( 24-h'r 1--L-- J--1--1--L- 2 -YR-Rainfafl=5-767- 1 I I I I I I I I I I I I I Rwnbff Area=0.360 ac RL;npff',VQIL;me=',0.05$ elf R6noff Depth=0.857 TcT5.0 Mih CAN=61 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 9S: Post-Dev POI-4 Runoff = 1.41 cfs @ 11.96 hrs, Volume= 0.066 af, Depth= 1.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 0.430 61 >75% Grass cover, Good, HSG B 0.430 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: Post-Dev POI-4 Hydrograph � � �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I ❑Runoff 1.41 cfs Ty; pQ I( 24-h'r 25-YR RainfaillT5.761' Rwnbff A're�=0.430 ac 1 RL;npff',VQIL;m'e=0.060 elf Runoff Depth=0.851' TcT5.0 tnih CAN=61 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 29 Summary for Pond 10P: PH1 BMP6 - Ex Dry Pond Inflow Area = 4.390 ac, 0.00% Impervious, Inflow Depth = 2.89" for 25-YR event Inflow = 22.82 cfs @ 11.96 hrs, Volume= 1.057 of Outflow = 10.53 cfs @ 12.06 hrs, Volume= 1.057 af, Atten= 54%, Lag= 6.2 min Primary = 10.53 cfs @ 12.06 hrs, Volume= 1.057 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 754.66' @ 12.06 hrs Surf.Area= 10,578 sf Storage= 12,729 cf Plug -Flow detention time= 33.4 min calculated for 1.057 of (100% of inflow) Center -of -Mass det. time= 34.4 min ( 863.4 - 829.0 ) Volume Invert #1 753.00' UM11.1ire Description 65,286 cf Ex Volume - Design (Pyramidal)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 753.00 3,100 0 0 3,100 754.00 9,600 6,052 6,052 9,607 756.00 12,700 22,228 28,280 12,820 758.00 16,100 28,733 57,012 16,352 758.50 17,000 8,274 65,286 17,288 Device Routing Invert Outlet Devices #1 Primary 753.00' 24.0" Round RCP -Round 24" L= 53.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 753.00' / 752.71' S= 0.0055'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Primary 754.00' 1.8" Vert. Orifice/Grate C= 0.600 #3 Primary 755.20' 13.3' long Sharp -Crested Rectangular Weir End Contraction(s) Primary OutFlow Max=10.42 cfs @ 12.06 hrs HW=754.65' TW=0.00' (Dynamic Tailwater) 1=RCP_Round 24" (Barrel Controls 10.35 cfs @ 5.07 fps) 2=Orifice/Grate (Orifice Controls 0.06 cfs @ 3.65 fps) 3=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type // 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 30 Pond 10P: PH1 BMP6 - Ex Dry Pond Hyd rog raph --+--+--+-------+--+-------+--+--+----+--+--+-------+--+--+--�-- ❑Inflow zz.az ots ❑ Primary 24 --I---r--r--I---I--r--r--r--I--r--r r -r--r r--I---I- r r - -I- - -lln Iolw� re,a� lar, 22 --,I --rI --rI -I -- ,I --rI --rI --'--,--,--r-----,--r--r-- eV 20 --IPkEl=54I1-- - I 18 - ,II IIIIIIIIIIIIIIIIIIIII 16 �I --i-- - -------i-- -- --i --i-- -- --i-----i-- --i-----i-- -- --i --i-- y I_ �i 14 3 12 _I-- 0 10.53 cfs LL I I I I I I I I I I I I I I I I I I I I I 10 - 8 -- —L--L--1---1----L--'---'----L--L----J--L--L--1---1--L--L--L--'-- 6 -- - --------- --------- -- -- ---- -- --------- -- -- ---- q ---+--+-------+--+-------+--+--+----+--+--+-------+--+--+--i-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 31 Summary for Pond 11 P: Prop Modified BMP 1 (Wet Pond) Inflow Area = 5.110 ac, 65.00% Impervious, Inflow Depth = 4.08" for 25-YR event Inflow = 35.91 cfs @ 11.95 hrs, Volume= 1.736 of Outflow = 9.46 cfs @ 12.10 hrs, Volume= 1.701 af, Atten= 74%, Lag= 8.9 min Primary = 9.46 cfs @ 12.10 hrs, Volume= 1.701 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 757.05' @ 12.10 hrs Surf.Area= 14,648 sf Storage= 37,116 cf Plug -Flow detention time= 752.3 min calculated for 1.700 of (98% of inflow) Center -of -Mass det. time= 741.9 min ( 1,540.0 - 798.1 ) Volume Invert Avail.Storaae Storaae Description #1 754.00' 68,712 cf Volume (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 754.00 8,870 0 0 8,870 755.00 11,632 10,220 10,220 11,661 759.00 17,834 58,492 68,712 18,157 Device Routing Invert Outlet Devices #1 Primary 749.38' 24.0" Round RCP -Round 24" L= 38.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 749.38' / 749.00' S= 0.0100'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 754.00' 1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 755.60' 20.0" W x 27.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 757.85' 16.0' long Sharp -Crested Rectangular Weir End Contraction(s) #5 Primary 758.50' 20.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=9.45 cfs @ 12.10 hrs HW=757.05' TW=0.00' (Dynamic Tailwater) 1=RCP_Round 24" (Passes 9.45 cfs of 47.94 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.10 cfs @ 8.32 fps) 3=Orifice/Grate (Orifice Controls 9.35 cfs @ 3.87 fps) 4=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) = Broad -Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type // 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 32 Pond 11 P: Prop Modified BMP 1 (Wet Pond) Hyd rog raph ----+--+--r-------+--r-------+--+--+----+--+--+-------+--r--+--I-- ----T--T--T-------T--T-------T--T--Ir----T--T--Ir-------T--T--Ir--II-- C Inflow 40 ,' - - --- IIIIIIiIi_-------- I I IIIII-__---11+-35. -_�---- -L-+-_--_--- -_----- ---_----__--- -_-_--- IIIIIIiF--------- -_----- -_---- ❑ Primary 38 ,II I -- ------------- -_-------- -_-------- -_-------- -_--------IIIIIIIiIi -_---------_-------- -_-------- -----_---- - nwIC_ 536 �IIr-__-- ,,' ----_---- ----_---- - -__--- 34 IIIIIII--------- - 32 -00-E1i"7-`57- 30 28 {ttgq1r� +L+I__------ ---r-- r--r- -I ---�--r -r - - 26 - - - - - - - - 22 L-++ --------- --------- --------- L-T+T_---------_--------IIr_------- _-------- _-------- _-------- L-+----_---- L-T+T-----_---- L-T+-----_---- IIIi_------ L-++----_---- _-------- _-------IIIrI J-+III _-_--- _-_--- _-_--- __--- _----- 20 - a 18 - 16 T - 14 Tri --Ii-- --T--Ir-------T--T--Ir 12 10 I ' I ----- 9.46 cfs I I - - -I- I I - - I -I-------I- - I I - I I I -I-------I- - - I I I - - I I I I I I - - - - - - -I- ------- -I- ------- -I- -I-- I I I I I I I I I I I - - - - - 8- 6 -- -----I-- -- -----I-- -- -- --I-- -- -- -----I-- -- -- --I-- 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 33 Summary for Pond 12P: Prop. BMP 2 (Sand Filter) Inflow Area = 3.010 ac, 65.00% Impervious, Inflow Depth = 4.08" for 25-YR event Inflow = 21.16 cfs @ 11.95 hrs, Volume= 1.023 of Outflow = 2.36 cfs @ 12.30 hrs, Volume= 1.023 af, Atten= 89%, Lag= 20.9 min Primary = 2.36 cfs @ 12.30 hrs, Volume= 1.023 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 756.03' @ 12.30 hrs Surf.Area= 7,615 sf Storage= 23,734 cf Plug -Flow detention time= 694.5 min calculated for 1.022 of (100% of inflow) Center -of -Mass det. time= 695.9 min ( 1,494.0 - 798.1 ) ►1[.7 ..�� ��iGnFTI�•�i•7 Description #1 752.00' 40,395 cf Custom Stage Data (Prismatic)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 752.00 4,162 0 0 758.00 9,303 40,395 40,395 Device Routing Invert Outlet Devices #1 Primary 749.50' 18.0" Round RCP -Round 18" L= 25.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 749.50' / 749.00' S= 0.0200'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 752.00' Exfiltration Head (feet) 0.00 0.01 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.032 0.045 0.058 0.071 0.084 0.097 #3 Device 1 754.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 0.33 0.33 #4 Device 1 756.00' 16.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #5 Primary 756.50' 20.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.36 cfs @ 12.30 hrs HW=756.03' TW=0.00' (Dynamic Tailwater) 1=RCP_Round 18" (Passes 2.36 cfs of 25.57 cfs potential flow) 2=Exfiltration (Custom Controls 0.08 cfs) 3=Custom Weir/Orifice (Orifice Controls 2.00 cfs @ 6.05 fps) 4=Sharp-Crested Rectangular Weir(Weir Controls 0.28 cfs @ 0.57 fps) = Broad -Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type // 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 34 Pond 12P: Prop. BMP 2 (Sand Filter) Hyd rog raph --I -- r ---- -'---' -- Y -- --'---'----------------------------'---' r-- -- —I-- r -- r-- — --I-- r -- r --r -- I -- r —— Y -- r--I — — —I-- Y -- r --r --I-- --------'- - -'--------'-- D Inflow 23 — 6c fs ----il------l---- ----- yr-----+Tr+------Ir++-------lIiI ❑Primary T22- �y 1 n1hm00- 21 20 'i 7`56-Q-319 - Rp4k-f -------- 18 -- r- - r - -#o/yd -- ra ---- +--+--+- ---- 15 -- ---- 14 -- - y u 13 12 I ----I-2-1--.1 -- +rt------ rr -- rr--rI---l-----lIlI - - rrIr------�--------`----llI +rt7------ rrr------ - - - -- - - - - --- -- - --- L--1-----1-+--'-- 11 'L 109 ----lo i---- --rt-----r-----li------li---- -----r-----Ir-----li---- -----r-----Ir-----li---- -----T-----Ir-----li------li----rt-----r-----Ir-----li--- - --I-- -+--r-----I-- --r-------1--+--+--I-- --+--+-------+--r--+--I-- 8 ---- ---- -------- --- -------- --- --- ------------------------------ 7 ---- - -- ------- -- ------- -- -- ---- --+--------- -- -- ---- 6 ---- -T--T------- --T-- ---- --T-- ---- --T--------- T- -T -- ---- 5 II 4 3 --II-- 2.36 cfs —T--T— ! -- —— — -----'-- — -- --T-------,--T--Ir----1--T--Ir-------T--T--Ir--II-- -- -----'---- --------'----------'-- -------'-- 2 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 35 Summary for Link 13L: Pre-Dev P0I-1 Inflow Area = 4.390 ac, 0.00% Impervious, Inflow Depth = 2.89" for 25-YR event Inflow = 10.53 cfs @ 12.06 hrs, Volume= 1.057 of Primary = 10.53 cfs @ 12.06 hrs, Volume= 1.057 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 13L: Pre-Dev P0I-1 Hyd rog raph --'----L--L--' — — —'---- L--' — — —'----1--L--1--J--1--L--1-----L--L--L--'-- C Inflow 10.53 cfs I���A, ��q( ❑ Primary 11 0.53 cfs — l------- --li --li --i-- j— 1 I��� 5 Inflow =4�13 10 - -----I-- --I-- -----I-------I-- --I-- 9 I ---T--r------- I I I I T - I I -r- I - ------r--L---- I I I I --T--L-------T--r--Ir---- I I I I I I I I I I I 8 , I I I --I-rt--r-----I-- I I I I --r--r----y-- I I I I I + I I I I I I I I I I I --r--I--y--+--r-------rt--r--r--I-- 7 y -- - -- I ------- I I -- I I ------- I -- I I I I -- ---- --+--------- -- -- ---- I I I I I I I I I I I U i i I I I I I I I I I I I I I I I I I I I I I 6 -- -- -----'-- -- -----'-- -- -- --'-- -- -------'-- -- -- --'-- 3 I I I I I I I I I I I I I I I I I I I I I o I I I I I I I I I I I I I I I I I I I I I LL 5-------L -----I__ 4 i I i ,�� I I --�I--------�I-- I I I I --------�I-- I I I I I -----------�I-- I I I I I I I I I I I --------�I----------�I-- 3 ----T----- -- T - -T - - ---- --T-- ----T--T--------- --T-- ---- 2 7--r-----I-- I --r--r--I-- I I I r--r----7--7--r-------7--r--r--I-- I I I I I I I I I I I I I I I 1 --------------- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 36 Summary for Link 14L: Post-Dev P0I-1 Inflow Area = 5.110 ac, 65.00% Impervious, Inflow Depth > 3.99" for 25-YR event Inflow = 9.46 cfs @ 12.10 hrs, Volume= 1.701 of Primary = 9.46 cfs @ 12.10 hrs, Volume= 1.701 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 14L: Post-Dev P0I-1 Hyd rog raph ,� --�r---7--r--�r------r---------r--�r--�r-7--7--�r--�r----7--r--�r--�i-- C Inflow 9.46 ofs ❑ Primary 10 ,' 9.46 ofs � - - - - 'I- - -'I- - -'I - - - - - 'I- - -'I- - -'I - - -'1 - - - 1'�I-n 1;1 o'I� '�I A're � � 5 :�I 11 G ''I ac _ 9 --li -rt--r--li---li----r--Ir--li----r--Ir--li-- --7--Ir--li---li--rt--r--Ir--li-- 8 I I --' I I I I I I I I I I I I I I I I I I I I I 11 1---'-- -------'-- ----------'----------'-- --�-----'-- 7 -- rt--r-----I-- --r--r----y--+--r----y--+--r-------rt--r--r--I-- w 6- I I I I I I I I I I I I I I I I I I I I I 5 0 LL ----------- — ——-——————--+--------+---------------i-- I I I I I I I I I I I I I I I I I I I I I 4 i --' -'--'---'----------------------------'---'--------'---'--------'-- 3 -- -r-----I----r-------1--+--r--I-- --+--r-------+--r--r--I-- 2 --' I I I I I I I I I I I I I I I I I I I I --'----- - -' --'-------'--'--------------------'--'-----'-- 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 25-YR Rainfall=5.76" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 37 Summary for Link 15L: Post-Dev P0I-2 Inflow Area = 3.560 ac, 65.00% Impervious, Inflow Depth = 4.08" for 25-YR event Inflow = 5.25 cfs @ 11.97 hrs, Volume= 1.209 of Primary = 5.25 cfs @ 11.97 hrs, Volume= 1.209 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 15L: Post-Dev P0I-2 Hyd rog raph C Inflow 525 cfs I I I ❑ Primary 5cfs — -- — — -- -- — — -- -- 1'Intow-Ae'Iva=foO-lay - —+-- ---I— —+ —— --I T——r--I-- T----I — —+— +-- 60 65 70 75 :0 85 90 95 100 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 1S: Pre-Dev P0I-1 Runoff = 32.21 cfs @ 11.96 hrs, Volume= 1.506 af, Depth= 4.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description 4.390 73 On Site Pre Area 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Pre-Dev P0I-1 Hydrograph 36 ---------+--+--+--+----------+--+--+--+--+--+----------+--+--+--+-- ----------------- -------------- ■Runoff 34 32s_ -- 3221cfs -- - - - - - - - -- -- - - s_ L_ L_ �_ �_ - - - - - -- `i- - -- 30 28 / , I --- -- -- --; --; ---------- -- 1i 1 I --"f00-YR Rai aIfTT.2V 26 - T R n6f# Arett=4.-390 at - 24 22 -I --I-- --- --rt-- --'-- -'-- -- -- --r---------- -- --------'-- --rt--rtR -- ---, I I I I I I I I nOff�Vpl I II 1.$0$-CO _ u20 / ,I ' ' 1 L Runoff fIDepttr 4. 2 �-- T 3 18 LL 16 --'I-- ----- -----------------I-- -- '--- -- -- --------I------'---' ------' ---- -I T5.0rn----ih Tc - 14 --li - -li----T-- T - —r - -r ---------7--T--T--r-- ---------- -I yN=70 - 12 —I-- T -- T -- T -- r--------I-- r-- T -- �j T -- T -- I --------I-- T -- T -- T -- r -- 8 ---- --- -- -- -- ---------- --'--'--+-- ------------ --+-- -- -- 6 --'-- -'----1--1--L--1---'---'--J--1--1--1--L--+--1---1---1--1--1--L--L-- 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 2S: Pre-Dev P0I-2 Runoff = 15.02 cfs @ 11.96 hrs, Volume= 0.695 af, Depth= 3.48" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description 2.000 61 >75% Grass cover, Good, HSG B 0.400 98 Paved roads w/curbs & sewers, HSG B 2.400 67 Weighted Average 2.000 83.33% Pervious Area 0.400 16.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Pre-Dev P0I-2 Hydrograph 1 1 16 1 ■Runoff 15.02 cfs_1--+--+--+--+--1---1---1--+--+--+--+__+__+--1---1---1--+__+__+__+__ / 1 _ _ � _1 _L _L 1 1 1 _J _1 _1 _1 _L _1L _1 15 _ 1- T" „e-11-1 11117 - 14 1 1 1 1 1 -- T-- T--T --T --T -- -- -- T-- T--"1011 --YR Ralli all#T.21�r- 13 --r- -1--+--+--+--r---------- +--+--+--+--r--rw--r--1-----+--+--+--r-- 12 ' 1 -1----1--1--L--1---1---1--J---,---,--,Runc)ff A1KeA=2AOOac-- 11 --11---11---- 1--11---11---11---11---11---11--1-- I1Of �Q#f111_Vp1�0�-- 10 w --r- -1--r--r--r--r--r--1---1--r--r--r--+--r--r--r--1---1--r--r--r--r-- 1 1 _Runoff 1lDepth;3 481'-- 1 1 1 8 ---1--_1--_1 _1--+ _1 __1___1 _1_ _ iL --I —---7--7--T__7__I-------7--7--7--T__T--7P ----------7--N=T-- 67 6 1 --I---11--�--�--�--�--11---11---11--�--�--�--+--�--1�--11---11---11--�-- �--,-- s 4 ---- --- 3 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 3S: Pre-Dev P0I-3 Runoff = 10.28 cfs @ 11.96 hrs, Volume= 0.476 af, Depth= 2.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description 2.000 61 >75% Grass cover, Good, HSG B 2.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pre-Dev P0I-3 Hydrograph 11 I I I I I I I I I I I I I I I I I I I I I I I-- � Runoff 10.28 cfs ----—I--r--r--r--r--r--I---I--r--r--r--r--r--r--r--I---I--r--r-- r-- 10 Type II'12 -1�r 9 100-YR Rainfall:;7.211' 8 Rwnbff A'Ire�ll=2.000 ac -- - -- --+-- -- ----'R+n' fV'-1 m'e=0.47 f- 7 'I tA Q Q � w--'I-- -'I-- -- ---------------'I-- -- -- --- �- —� 6 -- Run-©f�IDepth--T2.8511 - -I--T-- T- -T - -I----'I-- ----T--r-- ---'I- T --I--—I--I--4--+--I----- I --- 1---4--4--+--+---1--- 1---I--�— +— " i'- - 4 1Y= 3 --r- -I--r--r--r--r--r--I---I--r--r--r--t--r--r--r--I---I--r--t--r--r-- 2 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 4S: Pre-Dev POI-4 Runoff = 3.44 cfs @ 11.96 hrs, Volume= 0.159 af, Depth= 2.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description 0.670 61 >75% Grass cover, Good, HSG B 0.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Pre-Dev POI-4 Hydrograph I I II II II II II II II II II II II II II II II II II II II II II ❑Runoff 3.44 cfs ITy; pQ I( 24-h'r 3 100-YR-Rainfc &I-.217- �Rwnbff Area=0.670 ad RLjnpff'IVQILIme='10.'150 elf wI I I I I I I I I I I I I I I I 2 -I-- -- --------------I-- ---------Ri-4— DepfhT2-857- 3 I I I I I I I I I I I I I I I I I I I Tc"5.0 to i h LL I I I I I I I I I I I I I I I I I I I CAN=61 1 I I I I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 5S: Post-Dev P0I-1 Runoff = 47.21 cfs @ 11.95 hrs, Volume= 2.322 af, Depth= 5.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description 5.110 85 1/8 acre lots, 65% imp, HSG B 1.788 35.00% Pervious Area 3.322 65.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: Post-Dev P0I-1 Hydrograph 52 --r-----+--+--+--+ I -+--li --li--+--+--+--+--+--+ -Ir--li --II-- --+--+--+-- ■Runoff 50 48 ,i — — — —'---'--L--L--L--L--'---'---'--J--L--L--L--L--L--1---1---1--L--L--L--L-- 47.21 cfs -- -----L--L--L--'---'---'--J--L--L--L--L--L-----'��MY-[ 1 1 1 24-lr-- 44� 42 �i ---- -----L--L--L--L-------J--L--L--D0=YfZ r--r--r--r--�---�--r--r--r--T--r--r--I---I---�--r--r--r--r-- Raift11.2V'-- 40 38 --� --�--r--r--r--r--r--�---�--r--r--r--T--r--r ---- --- -- -- --L---------- -- -- I 1 � r--r--r --r -- --L R�nVll Area= .410 at 34 32 ---- --- -- - -I-- -- -- ---------- --'-- --------I-- ���- - "�nQ- w 30 V Zg --I-------+--+------------+--+----+--r--------------+--+--�-- -----'-- -- --' r --' r -----------'-- -- --' --Runs #��Depth��;451'-- 3 26 0 24�22 i --I-----+--+--+--+--li---li---II-- -- --'i --'i --'i -- --------'I-- -- __ --+--r--+---------�-/►-�+--+--.�+-,-yyr.-- __ --'i --'i-----'I-- IiriTJ.� lillill 20 ----+--+--r--r-------+--+--+--+--r--r--r-----i- --r- -i-- --'-- -'-- -- --r- -i----+--+--+--+--li---li-- -- -- -----------'-- --+--+--+--+--+--Ir--li---li-- -- +--+--r--r-- -- -------------'-- - - 18 'i 14 ,i 'i --r- -i--r- -r-- r- -r--r--i---i--r--r--r--r--r--r--r--i---i--r--r--r--r-- 12 ,i --'-- -'--!--!--!--L--'---'---'---'---'---'--!--L-------------!--!--L--'--- i r- - r- -r- -i --i i--r- -r- - r-- T-- r-- r--r --i-- i- r--r--r--r-- 8 --I--JLLI--I--L--1---1---'--J--L--L--L--L--L--1---1---1--L--L--L--L-- 6 4 --I-- — — 1— L — r--r--I- — L — — L — — L — — — — — — — L — — L — --r --, r — L — — L — — L — — L — — — — — — — — — — L — — L 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 6S: Post-Dev P0I-2 Runoff = 27.81 cfs @ 11.95 hrs, Volume= 1.368 af, Depth= 5.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description 3.010 85 1/8 acre lots, 65% imp, HSG B 1.053 35.00% Pervious Area 1.957 65.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 6S: Post-Dev P0I-2 Hydrograph 30 ■Runoff 27.81 cfs z8 - - - - - - - - - - - - - - Ty, p� [it-[ r 26 1 I I I I 24 -,----;--,,--,, --,,-----,---, 40 -YR Ra_in all.;T.21TMr- 22 Runoff A''rei�=3.010 ac 20 -'-- -- -- ----------'-- -- -- R-"npff, V-p1 vne =1 •$60 Af - - 18 w - - - - - Run©ff DepthT5.451r- 16 a 14 Tc�5.�0 Min 12 i5 10 8 --'-- -'-- -- -- ----------'-- -- -- --+-- ----------'----+-------- 6 ---- --- -- -- --------------- -- -- --------------- -- --r--F 4 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment 7S: Post-Dev P0I-2 Bypass Runoff = 5.08 cfs @ 11.95 hrs, Volume= 0.250 af, Depth= 5.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description 0.550 85 1/8 acre lots, 65% imp, HSG B 0.193 35.00% Pervious Area 0.358 65.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: Post-Dev P0I-2 Bypass Hydrograph I I II II II II II II II II II II II II II II II II II II II II II ■Runoff --�---�---�---�-- ___________________________ 5 'Type k 24-h r 100-YR RainfaillT7.21 --�----�--�--1--L--I---1---1--J--1--1--L--L--I---I--J--1--L--L--�---�---�-- 4 Runbff A'Irei�=0.550 ac ROOOVQIt06=1'10.�50 Of y --I-----__+----------------+--___------�--+------I---I --- I-- 3 Rulnoff DepthT5.;451' LL TcT5.';0 tnid 2 ---- -- ------------ -- -- -- --------- -- -- ------------ 1 I I I I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 45 Summary for Subcatchment 8S: Post-Dev POI-3 Runoff = 1.85 cfs @ 11.96 hrs, Volume= 0.086 af, Depth= 2.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description 0.360 61 >75% Grass cover, Good, HSG B 0.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: Post-Dev POI-3 Hydrograph 2 ❑Runoff 1.85 cfs ,Type I( 24-h'r 100-YR RainfaillT7.�21 Rwnbff Area=0.860 ad ROnOff',VQIL;me=0.080 elf w I I I I I I I I I I I I I I I � '�� ----,--7--r----------------T--r----Rurto7Dffep#hT2.85-- 0 1 LL TcT5.0 tnih CAN=61 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment 9S: Post-Dev POI-4 Runoff = 2.21 cfs @ 11.96 hrs, Volume= 0.102 af, Depth= 2.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description 0.430 61 >75% Grass cover, Good, HSG B 0.430 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: Post-Dev POI-4 Hydrograph � � �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I �I ❑Runoff 2.21 cfs -- -- --' -- -- -- --' -- -,--,TypP, If 24-hr_ 2 100-YR RainfaillT7.�21 Rwnbff Area=0.430 ac RL;npff'IVQIL;me='10. O1 elf R6noff DepthT2.851' LL----7--Y--Y--_-------7-----t--Y--r--I_----7--Y- c�S•10- J* 1 N=61 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 47 Summary for Pond 10P: PH1 BMP6 - Ex Dry Pond Inflow Area = 4.390 ac, 0.00% Impervious, Inflow Depth = 4.12" for 100-YR event Inflow = 32.21 cfs @ 11.96 hrs, Volume= 1.506 of Outflow = 15.10 cfs @ 12.06 hrs, Volume= 1.506 af, Atten= 53%, Lag= 6.1 min Primary = 15.10 cfs @ 12.06 hrs, Volume= 1.506 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 755.13' @ 12.06 hrs Surf.Area= 11,304 sf Storage= 17,886 cf Plug -Flow detention time= 30.1 min calculated for 1.505 of (100% of inflow) Center -of -Mass det. time= 31.0 min ( 849.9 - 818.9 ) Volume Invert #1 753.00' UM11.1ire Description 65,286 cf Ex Volume - Design (Pyramidal)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 753.00 3,100 0 0 3,100 754.00 9,600 6,052 6,052 9,607 756.00 12,700 22,228 28,280 12,820 758.00 16,100 28,733 57,012 16,352 758.50 17,000 8,274 65,286 17,288 Device Routing Invert Outlet Devices #1 Primary 753.00' 24.0" Round RCP -Round 24" L= 53.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 753.00' / 752.71' S= 0.0055'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Primary 754.00' 1.8" Vert. Orifice/Grate C= 0.600 #3 Primary 755.20' 13.3' long Sharp -Crested Rectangular Weir End Contraction(s) Primary OutFlow Max=14.99 cfs @ 12.06 hrs HW=755.12' TW=0.00' (Dynamic Tailwater) 1=RCP_Round 24" (Barrel Controls 14.90 cfs @ 5.56 fps) 2=Orifice/Grate (Orifice Controls 0.09 cfs @ 4.93 fps) 3=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 48 Pond 10P: PH1 BMP6 - Ex Dry Pond Hyd rog raph ----r--r--r--r----r--r-------r--r--r--r-r--r--r-------r--r--r--I-- 36 ------rt--r--li---li----r--Ir--li----r--Ir--li----7--Ir--li---li--rt--r--Ir--li C Inflow ," 32.21cfs rt--r------- --r--�r----y--+--Ir---- --+--/-�r-pp------rt--r--�r--�i--- ❑Primary In 32 ' 30 ,'I POO_IEt _765.1-3' - 28 .I 24 H 20 o 16 15.10 cfs T 12 10 8 �I -- -r--r--r--I--r--r--r--I--r--r--r-7-r--r--r--I---I--r--r--r-7- -- -r--r-------r--r--r----r--t--r----r--r--r-------r--r--r--I-- 6 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 49 Summary for Pond 11 P: Prop Modified BMP 1 (Wet Pond) Inflow Area = 5.110 ac, 65.00% Impervious, Inflow Depth = 5.45" for 100-YR event Inflow = 47.21 cfs @ 11.95 hrs, Volume= 2.322 of Outflow = 16.64 cfs @ 12.07 hrs, Volume= 2.287 af, Atten= 65%, Lag= 7.3 min Primary = 16.64 cfs @ 12.07 hrs, Volume= 2.287 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 757.72' @ 12.07 hrs Surf.Area= 15,708 sf Storage= 47,282 cf Plug -Flow detention time= 576.3 min calculated for 2.286 of (98% of inflow) Center -of -Mass det. time= 568.8 min ( 1,358.7 - 789.9 ) Volume Invert Avail.Storaae Storaae Description #1 754.00' 68,712 cf Volume (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 754.00 8,870 0 0 8,870 755.00 11,632 10,220 10,220 11,661 759.00 17,834 58,492 68,712 18,157 Device Routing Invert Outlet Devices #1 Primary 749.38' 24.0" Round RCP -Round 24" L= 38.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 749.38' / 749.00' S= 0.0100'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 754.00' 1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 755.60' 20.0" W x 27.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 757.85' 16.0' long Sharp -Crested Rectangular Weir End Contraction(s) #5 Primary 758.50' 20.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=16.38 cfs @ 12.07 hrs HW=757.70' TW=0.00' (Dynamic Tailwater) 1=RCP_Round 24" (Passes 16.38 cfs of 50.44 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.11 cfs @ 9.18 fps) 3=Orifice/Grate (Orifice Controls 16.26 cfs @ 4.65 fps) 4=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) = Broad -Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 50 Pond 11 P: Prop Modified BMP 1 (Wet Pond) Hyd rog raph I--�--�--r--r--I--�--r--I---I--�--r--r--r-�--7--r--I---I--�--r--r--I-- ❑ Inflow a�. I cfs ❑ Primary 50 ,�i --�-- ------------------------Jnft*'A're;05:140�ac 45 --�i---7--1--�r----I--r--�r------r--�r--�i 7-7 ----- - f- ROO �'Ellev�=7'5',7 -n 40 --,-- -;--,I --,---,-- --,I --,I --,-- --,I --,I--�ISfoe=aae=--47282� cf- 35 ---- - --------- --------- -- -- ---- -- --------- -- -- ---- I � r I I � r I I � r r I � 7 r I I � I I I I I I I I I I I I I I I I I I I I I I I w 30 --'-- -'--'-------'--'-------'--'--------------------'--'-----'-- � I I I I I I I I I I I I I I I I I I I I I I 3 ' p 25 --I-- -+--r--I---I--+--r--r--I--+--r--r--I--+--+--r--I---I--+--r--r--I-- LL 20 - --------- --------- ---------------------- --------- 16.64 cfs i i 15 --I -+--r-------+--r--r----+--+--r----+--+--r-------+--r--r--I-- ,' I I I I I I I I I I I I I I I I I I I I I I I 10 -- - --------- --------- ---------------------- --------- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 51 Summary for Pond 12P: Prop. BMP 2 (Sand Filter) Inflow Area = 3.010 ac, 65.00% Impervious, Inflow Depth = 5.45" for 100-YR event Inflow = 27.81 cfs @ 11.95 hrs, Volume= 1.368 of Outflow = 17.28 cfs @ 12.04 hrs, Volume= 1.368 af, Atten= 38%, Lag= 5.3 min Primary = 17.28 cfs @ 12.04 hrs, Volume= 1.368 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 756.43' @ 12.04 hrs Surf.Area= 7,961 sf Storage= 26,877 cf Plug -Flow detention time= 539.5 min calculated for 1.367 of (100% of inflow) Center -of -Mass det. time= 540.9 min ( 1,330.9 - 789.9 ) ►1[.7 ..�� ��iGnFTI�•�i•7 Description #1 752.00' 40,395 cf Custom Stage Data (Prismatic)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 752.00 4,162 0 0 758.00 9,303 40,395 40,395 Device Routing Invert Outlet Devices #1 Primary 749.50' 18.0" Round RCP -Round 18" L= 25.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 749.50' / 749.00' S= 0.0200'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 752.00' Exfiltration Head (feet) 0.00 0.01 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.032 0.045 0.058 0.071 0.084 0.097 #3 Device 1 754.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 0.33 0.33 #4 Device 1 756.00' 16.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #5 Primary 756.50' 20.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=16.66 cfs @ 12.04 hrs HW=756.42' TW=0.00' (Dynamic Tailwater) 1=RCP_Round 18" (Passes 16.66 cfs of 26.42 cfs potential flow) 2=Exfiltration (Custom Controls 0.09 cfs) 3=Custom Weir/Orifice (Orifice Controls 2.24 cfs @ 6.79 fps) 4=Sharp-Crested Rectangular Weir(Weir Controls 14.32 cfs @ 2.12 fps) = Broad -Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 52 Pond 12P: Prop. BMP 2 (Sand Filter) Hyd rog raph C Inflow 30 2-7-.-1---- L'----1------��---- L---- _LI----i�1-----�1---- �---- _1I----��L----��1-----J�---- �1----�L----1------�1---- 1---L--��L--�-- ❑ Primary --rt--r-- =28 ,],nI Wrea1e40,ac- y 26 , I fs --I P----pI - --I ---El-I -t-lI e--v-I =--7-I -5--1I -F-4II ---3-I Cfs 1 22 -StOraq��2&,8T7Cf 20 172I8c18 - -- r--r-----r--r r----r--t r --r--r--r-------r--r--r--I-- 16 LL 12 'I , , 10 I I I I I I I I I I I I I I I I I I I I I I I $ -- -r--r--r----r--r--r----r--r--r--r- r --r--r-------r--r--r--I- - --1---1----1-- 6 I I I I 4I / "in ---r---------i -- i------i --r---------r---------r --r --i-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 53 Summary for Link 13L: Pre-Dev P0I-1 Inflow Area = 4.390 ac, 0.00% Impervious, Inflow Depth = 4.12" for 100-YR event Inflow = 15.10 cfs @ 12.06 hrs, Volume= 1.506 of Primary = 15.10 cfs @ 12.06 hrs, Volume= 1.506 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 13L: Pre-Dev P0I-1 Hyd rog raph --1----T--T--Ir--li-- --T--T--li-- --T--T--Ir-T--T--T--Ir--li--T--T--T--li-- C Inflow - 15.10 cfs+--r--1---1--+--+--1---i--+--+--+--�///I���+�+��-�-/+{w�-+-Q-i�-�-i--+--r/F-�4-+--i-- ❑ Prima Primary 16 - -- -- -]i 14F 15 ,1ViYY /lrG til 1 ar 13 T- T 12 �� --- 1 -T-----i- ---T- -T----T- -T-- - ---T- -T---------T- --- --i-- -- -4--I---------+-------F--+------F--+--F-------F--I----I-- 1 L '-1 L 1 1 1-- 1 L1 L 10 - -- --' - - -- -- -----'-- -- --L --'-- -- -----'-- -- --L --'-- 0 8--r--r--T--r--T --1---1-- T --T--1---1-- T --T --T LL 7 T--r----r--r--r-------r--r--r--I-- 6 ,1 1 1--L-----'-- -- --L-----'-- --1--L--1--J--1--L-------1--L--L--'-- 3 ---T--r--T--r--T --1---1------r--T 2 1 1 1 1 1 1 1 1 1 1 1 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 54 Summary for Link 14L: Post-Dev P0I-1 Inflow Area = 5.110 ac, 65.00% Impervious, Inflow Depth > 5.37" for 100-YR event Inflow = 16.64 cfs @ 12.07 hrs, Volume= 2.287 of Primary = 16.64 cfs @ 12.07 hrs, Volume= 2.287 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 14L: Post-Dev P0I-1 Hyd rog raph �4----+--+--+--+-+--+--+--+-+--+--+--+--+-+--+--+----+--+--+--+--I-- C Inflow 18 16.64 cfs ❑ Primary 17 16.64 cfs —+--+--+----+--+--+----+--+ l+�^+--+ +--i-- + +--i-- 110 16 15 I I I I I I I I I I I I I I I I I I I I I I I 14 I I I I I I I I I I I I I I I I I I I I I I I 13 + — — + — — + — + — — + — — + — —I— — —I— — + — — + — — + — —I— — 12 I I I I I I I I I I I I I I I I I I I I I I I +--+--+-+--+--+--+-+--+--+--+----+--+--+----+--+--+--+--I-- .... 10 I ' I I +----+------+--I---I--+--+--+--I--+--+---------+------I-- I I I I I I I I I I I I I I I I I I I I 3 9 o -- +--+--+-+--+--+--+-+--+--+--+--+-+--+--+----+--+--+--+--I-- LL 8 4--I—_I---I--+--+--I---I--+--+--+--I--+--+__+--I---I--+__I--+--I-- 7 6 I I — — I + — I I — + — — + — I I —I— — + — I — + — I I I — + — —I— — + — I — + I I I I I I I I I I I — — + — — + — + — — + — — + — —I— — —I— — + — — + — —5- 4 I 3 + I I I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by {enter your company name here} Printed 4/26/2022 HydroCAD® 10.00-24 s/n 03478 © 2018 HydroCAD Software Solutions LLC Page 55 Summary for Link 15L: Post-Dev P0I-2 Inflow Area = 3.560 ac, 65.00% Impervious, Inflow Depth = 5.45" for 100-YR event Inflow = 20.10 cfs @ 12.03 hrs, Volume= 1.618 of Primary = 20.10 cfs @ 12.03 hrs, Volume= 1.618 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 15L: Post-Dev P0I-2 Hyd rog raph --'----L--L-----'-- --L-----'-- -- --L----J--L--L-------L--L-- L - -'-- C Inflow 22 - 20.10Cfs +--r------- --r------- --+--r---- --+--+-------+--r--+---- ❑Primary 21 20.10 cfs -?--------,-- --------I-- ----1nf](MlAm' 13.1-OOL 20 ---L--L-------L--L-------L--L--L -'- J--L-- -'--L- -L _ 19 --li-rt--r--li---li-- --r--Ir--li--1--r--Ir--II-- --+--Ir——li---li--I--r--Ir--li-- 18 - -- - - - I -- 17 -- -+-- -----'-- --+-----'-- --+-- --'-- --+---------+-- -- --'-- 16 --li-rt--r--li---li-- --r--Ir--li-- --r--Ir--li-- --+--Ir--li---li--rt--r--Ir--li-- 15 -- - 14 13 -- -1--L--1---1--L--L--'---'--L--L--L----L--+--L-------+--L--L--'-- N 12 -- —T--T---------T-------,--T--Ir----1--+--Ir-------T--T--Ir--II-- -- ----- -- ---------------------- ------------------------------ 10 -- - --r------- --r-------,--r--r---- --+--r---------r--r---- �—°° 9 - - - - - - - - - - - - - 8- 7- -- — T -- T—----II— — T -- T --II -- -- T -- T --Ir- -1-- T -- IF ------- T -- T --Ir --II-- 6 - - - - - - - - - - - - - 5 -- +--+--+-+--+--+--+-+--+--+--+--+-+--+--+----+--+--+--+-+-- 4 -- T--r------- --r-- ----T--T --L----T--T--L-------T--r--Ir--- - 3 2 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan 0 Project File: 220328_Granite Quarry.stm 4 10 3 Number of lines: 10 Outfall r. 1 Date: 3/28/2022 7 Outfall Storm Sewers v2020.00 Inlet Report Page 1 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 A-20 0.34 0.00 0.34 0.00 DrGrt 0.0 0.00 3.66 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.05 7.04 0.05 7.04 0.0 Off 2 A-30 1.84 0.00 1.84 0.00 DrGrt 0.0 0.00 3.66 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.16 17.52 0.16 17.52 0.0 Off 3 A-40 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 4 A-50 1.05 0.00 1.05 0.00 DrGrt 0.0 0.00 3.66 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.11 12.72 0.11 12.72 0.0 Off 5 B-21 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 6 B-22 0.80 0.00 0.52 0.28 DrGrt 0.0 0.00 0.00 3.00 2.00 1010 2.00 0.020 0.020 0.013 0.09 11.10 0.09 11.10 0.0 Off 7 A-11 1.16 0.00 0.67 0.49 DrGrt 0.0 0.00 0.00 3.00 2.00 1010 2.00 0.020 0.020 0.013 0.10 12.10 0.10 12.10 0.0 Off 8 B-11 1.47 0.00 0.80 0.67 DrGrt 0.0 0.00 0.00 3.00 2.00 0.010 2.00 0.020 0.020 0.013 0.11 13.10 0.11 13.10 0.0 Off 9 B-12 1.67 0.00 1.67 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.050 0.020 0.000 0.23 8.74 0.23 8.74 0.0 Off 10 B-13 1.67 0.00 1.67 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.050 0.020 0.000 0.23 8.74 0.23 8.74 0.0 Off Project File: 220328_Granite Quarry.stm TNumber of lines: 10 Run Date: 3/28/2022 NOTES: Inlet N-Values = 0.016; Intensity = 4.04 / (Inlet time + 5.50) ^ 0.00; Return period = 1 Yrs. ; ' Indicates Known Q added. All curb inlets are throat. Storm Sewers v2020.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 31.816 0.10 0.95 0.85 0.09 0.81 5.0 6.6 6.6 5.30 9.17 6.32 15 1.19 757.00 757.38 757.72 758.31 761.54 763.07 SD -Al 2 1 78.000 0.54 0.85 0.85 0.46 0.72 5.0 6.4 6.6 4.79 6.52 5.33 15 0.60 757.48 757.95 758.31 758.84 763.07 763.08 SD-A2 3 2 166.327 0.00 0.31 0.00 0.00 0.26 0.0 5.4 6.9 1.82 6.50 2.93 15 0.60 758.05 759.05 758.84 759.59 763.08 764.67 SD-A4 4 3 106.428 0.31 0.31 0.85 0.26 0.26 5.0 5.0 7.1 1.86 6.51 4.11 15 0.60 759.14 759.78 759.60 760.32 764.67 763.66 SD-A5 5 End 22.570 0.00 0.25 0.00 0.00 0.20 0.0 5.3 6.9 1.39 8.13 3.31 18 0.60 751.00 751.14 751.42 751.58 752.63 758.75 SD - (140) 6 5 102.810 0.25 0.25 0.80 0.20 0.20 5.0 5.0 7.1 1.41 21.22 5.01 18 4.09 753.00 757.20 753.26 757.64 758.75 762.00 SD - (140) (1) 7 End 50.651 0.34 0.34 0.85 0.29 0.29 5.0 5.0 7.1 2.04 8.08 3.69 18 0.59 753.00 753.30 753.51 753.84 759.83 761.01 SD-DFES 8 End 57.461 0.46 1.44 0.80 0.37 1.20 5.0 5.7 6.8 8.21 8.20 5.51 18 0.61 751.00 751.35 752.11 752.61 753.25 759.68 SD-C1 9 8 128.176 0.49 0.98 0.85 0.42 0.83 5.0 5.1 7.0 5.84 10.58 3.83 18 0.60 751.35 752.12 753.03 753.18 759.68 759.92 SD - (120) 10 9 24.000 0.49 0.49 0.85 0.42 0.42 5.0 5.0 7.1 2.94 10.43 2.96 18 0.58 752.12 752.26 753.33 752.91 759.92 759.92 SD - (130) Project File: 220328_Granite Quarry.stm Number of lines: 10 Run Date: 3/28/2022 NOTES:Intensity = 72.63 / (Inlet time + 12.70) ^ 0.81; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v2020.00 Phase I - Sediment Basin A 4.400 Disturbed Area (Acres) 10.6921 Peak Flow from 10-year Storm (cfs) 7920 Required Volume ft3 4651 Required Surface Area ft2 48.2 Suggested Width ft 96.4 Suggested Length ft 42300 Actual Volume ft3I I Okay 14610 Actual Surface Area ft2I Okay 30 Trial Weir Length ft 1 Trial Depth of Flow ft 90.0 Spillway Capacity cfs Okay 2 Skimmer Size (inches) 0.167 Head on Skimmer (feet) 1.25 Orifice Size (1/4 inch increments) 2.68 Dewatering Time (days) Suggest about 3 days ! aq SbwaQe Virne Tabb Cora= Bay.-. CoMoLw mm - Yrsemetd Lk0 h W MEW 4,273.53 WA 7%.000 953010 4w 7%.L19D U77.40 TWO -PA.DOD 10,557.N am 757.M 11,$4.$1 1. 75E.000 13.174.37 1.000 75930D 10,614.53 LUDO An. End Arse itime wIJ Val. {Qu. nj WA M 520.6b DAD 11207.0 M1915 13M.45 Avg. End Am 0m dWw W. $w-it) &OD A04 5M.65 5MIS 1&493.(6 29447 71 4M.15 Cux heemerial 1h1. �eu.fll Cons Ohre 1+01. I��h WJA 0.00 0.00 0.00 4475.45 4675.45 OM f87S.45 11241.31 15576 77 Im n 2638155 13M26 412M7.81 Phase I - Sediment Basin B 2.400 Disturbed Area (Acres) 5.8321 Peak Flow from 10-year Storm (cfs) 4320 Required Volume ft3 2537 Required Surface Area ft2 35.6 Suggested Width ft 71.2 Suggested Length ft 38609 Actual Volume ft3I I Okay 7580 Actual Surface Area ft2I Okay 30 Trial Weir Length ft 1 Trial Depth of Flow ft 90.0 Spillway Capacity cfs Okay 2 Skimmer Size (inches) 0.167 Head on Skimmer (feet) 1 Orifice Size (1/4 inch increments) 2.29 Dewatering Time (days) Suggest about 3 days mega MuarrvMwM lame CanarDiv CwL"rrm... Y�naead bepm Oil 751 bw 3Z7.52 WA 752A00 k149.71 1bx 75 bw 5,a5 M 1 bm 7%bw 6,=75 1 M 7%bw 7A+ IM 1 bm 75+5A00 8,111M Ibw 757bw 13m721 I bm 757)W 3,252.95 Cbm Avg. W Area Fu7ftDfttS VM. ice,. fll WA 3723A 4U 2.59 563 AO fi531.19 nm.3D 18730.10 O.M Avg. W Area Cum ahrrt 1W . fau. to 4.-M 3723.11 83MA9 1 MU.19 2aMA7 27975.77 99759.97 39755.97 WA 3714.93 AM5.10 5531.59 652432 7571% IMM90 D.08 M 371499 8310 w 138 41.67 2M.19 27W.10 vM.48 vM.60 Phase I - Sediment Basin C 2.000 Disturbed Area (Acres) 4.8601 Peak Flow from 10-year Storm (cfs) 3600 Required Volume ft3 2114 Required Surface Area ft2 32.5 Suggested Width ft 65.0 Suggested Length ft 4667 Actual Volume ft3I I Okay 2413 Actual Surface Area ft2I Okay 20 Trial Weir Length ft 1 Trial Depth of Flow ft 60.0 Spillway Capacity cfs Okay 2 Skimmer Size (inches) 0.167 Head on Skimmer (feet) 1 Orifice Size (1/4 inch increments) 1.91 Dewatering Time (days) Suggest about 3 days image Storage Volume Table CarRour Bev... Contour Area... hcremelal Depth ffly Avg. End Area Incremental Val _ (cu. ft) Avg. End Area C mulative V& (cu. ft) Corr- hcrmwtal Vol- (cu.ft) Cory- CrmuLa ive Vol. (cu. ft) 754.500 825.00 N/A NIA 0.00 NIA 0.00 755.000 1 A44.00 0.500 467.25 467.25 466.18 466.19 756.000 1.532.57 1.000 1283-28 1755.53 1280.49 1746.67 757.000 2.079-54 1.000 1805.55 3561.09 1798.63 3545.30 757.500 2.413.03 0.500 1122.89 4683.98 1121.85 4667.16 757.500 4.748.16 0.000 0.00 4683.99 0.00 4667.16