Loading...
HomeMy WebLinkAboutSW8061005_Historical File_20070219Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality February 19, 2007 Steve Shuttleworth, Member/Manager Cypress Grove Land, LLC 7741 Market Street, Unit H Wilmington, NC 28411 Subject: Stormwater Permit No. SW8 061005 Correction Tarin Woods High Density Subdivision Project New Hanover County Dear Mr. Shuttleworth: The Wilmington Regional Office issued Stormwater Management Permit No. SW8 061005 dated February 6, 2007, for development at Tarin Woods. The built upon area on page three was omitted in item I. (7) (b) for each basin. Please replace Page 3 of the permit with the attached, corrected page. The corrections listed above do not impact the approved plans or permitted stormwater control system. 7215. If you have any questions, please do not hesitate to call Mary Jean Naugle or me at (910) 796- Sincerely —� Edward Beck Regional Supervisor Surface Water Protection Section ENBlmjn: S:1WQSISTORMWATERtPERMIT1061005 feb07 cc: Howard Resnik, P.E., Coastal Site Design, PC New Hanover County Inspections Beth E. Wetherill, New Hanover County Engineering M. J. Naugle 1i11ikr-ington Regirenel Office Central Files A'Al Carolina ta; , North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.nemm=uality.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunely/Afflrmative Action Employer — 50% Recycled/10% Post consumer Paper State Stormwater Management Systems Permit No. SW8 061005 7. The following design elements have been permitted for this infiltration basin stormwater facility, and must be provided in the system at all times. Units Basin 1 Basin 2 Basin 3 Basin 4 a. Drainage Area Onsite Offsite Acres ft2 ft2 4.55 198,207 0 8.4 366,083 0 11.49 500,519 0 13.5 588,192 0 b. Total Impervious Surfaces OS BUA per lot OS Buildings/driveways OS Streets OS Parking OS Sidewalks Offsite ft2 78,742 4000 52,000 24,155 0 2,587 0 181,734 4000 123,000 52,099 0 6,635 0 224,726 4000 160,000 56,971 0 ' 7,755 0 290,495 4000 185,000 96,044 0 9,451 0 c. Design Storm inches 3 3 3 3 d. Infiltration Basin Depth feet 1.6 1.8 1.8 3.3 e. Bottom Elevation FMSL 19 18 22 24 f. Surface Area @ Bottom ft2 11,772 23,486 32,966 16,292 g. Storage/bypass Elevation FMSL 20.6 19.8 23.8 27.3 h. Storage Volume W 20,195 45,466 56,820 72,714 i. Top of Soil Murville/ Seagate Murville/ Leon Murville\ Leon Lynn Haven j. Storage/Bypass .Elevation FMSL . 18.2 19.8 23.8 24 k. Expected Infiltration Rate In/hr 2 2 2 10 I. Time to drawdown hours 11 12 12 9. m. Receiving Stream Everett Creek same same Same n. River Basin Cape Fear " " It o. Stream Index Number 18-87-29 p. Classification of Water Body SA;HWQ II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 061005 7. The following design elements have been permitted for this infiltration basin stormwater facility, and must be provided in the system at all times. Units Basin 1 Basin 2 asin 3 asin 4 a. Drainage Area Onsite Offsite Acres ft2 ft2 4.55 1983207 0 8.4 366,083 0 11.49 500,519 0 13.5 588,192 0 b. Total Impervious Surfaces OS BUA per lot OS Buildings/driveways OS Streets OS Parking OS Sidewalks Offsite ft2 178,742 4000 52,000 24,155 0 2,587 0 181,734 4000 123,000 52,099 0 6,635 0 224,726 4000 160,000 56,971 0 7,755 0 290,495 14000 185,000 96,044 0 9,451 0 c. Design Storm inches 3 3 3 3 d. Infiltration Basin Depth feet 1.6 1.8 1.8 3.3 e. Bottom Elevation FMSL 19 18 22 24 f. Surface Area @ Bottom ft2 11,772 23,486 32,966 16,292 g. Storage/bypass Elevation FMSL 20.6 19.8 23.8 27.3 h. Storage Volume W 20,195 45,466 56,820 72,714 i. Top of Soil Murville/ Seagate Murville/ Leon Murvillel Leon Lynn Haven j. Storage/Bypass Elevation FMSL 18.2 19.8 23.8 24 k. Expected Infiltration Rate In/hr 2 2 2 10 1. Time to drawdown hours 11 12 12 9 m. Receiving Stream Everett Creek same same Same n. River Basin Cape Fear It o. Stream Index Number 18-87-29 It p. Classification of Water Body SA;HWQ II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Paae3of8 of W A rF r > y O NC February 6, 2007 Steve Shuttleworth, Member/Manager Cypress Grove Land, LLC 7741 Market Street, Unit H Wilmington, NC 28411 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Subject: Stormwater Permit No. SW8 061005, Tarin Woods High Density Subdivision Project, New Hanover County Dear Mr. Shuttleworth: Alan W. Klimek, P.E. Director Division of Water Quality The Wilmington Regional Office received a Stormwater Management Permit Application for Tarin Woods on October 10, 2006. Additional information was submitted on November 28, 2006, January 10, 23, and 31, 2007 to complete the application. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000. We are forwarding Permit No. SW8 061005 dated February 6, for the construction of the project, Tarin Woods. This permit shall be effective from the date of issuance until February 6, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements of this permit. Monitoring wells are required on each infiltration basins with recordkeeping and maintenance. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Mary Jean Naugle, or me at (910) 796-7215. Sincer , Edward Beck Regional Supervisor Surface Water Protection Section ENB/mjn: S:1WQSISTORMWATIPERMIT1061005 feb07 cc: Howard Resnik, P.E., Coastal Site Design, PC New Hanover County Inspections Beth E. Wetherill, New Hanover County Engineering M. J. Naugle Wilmington Regional Office None Caro; a Central Files �a kna, AA� North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwaterquality.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer —50% Recycled/10% Post Consumer Paper State Stormwater Management Systems permit No. SW8 061005 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STOR I 'ER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT accordance with the provisions of Article 21 of Chapter 143, and General Statutes of In applicable Laws, North Carolina as amended, and other app PERMISSION IS HEREBY GRANTED TO Steve Shuttleworth, Member/Manager and Cypress Grove Land, LLC Tarin Woods 1200 Lt. Congleton Road, New Hanover County FOR THE construction, operation and maintenance of an infiltration basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to asthe ,st r otheraer rulesupponagnd the approved stormwater management plans and specifics data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This lermit shall be effective from the date of issuance until February E, 2017 and shall be suyect to the following specified conditions and limitations: ►. DESGN STANDARDS This permit is effective only with respect to the nature an d volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1(7) on page 3 of this permit. The subdivision is permitted for 130 lots; each allowed 4000 per lot square feet of built -upon area. \ ��pproved plans and specifications for this project are incorporated by reference Id are enforceable parts of the permit. stormwater collection, treatment, and discharge systems must be located in sr dedicated common areas or recorded easements . The final plats for the ict will be recorded showing all such required easements, in accordance with oproved plans. off from built -upon areas on the lot must drain into the permitted system. 'ng wells shall be provided around each infiltrati on basin of o this trice and maintained as described in Section II (9) ( ) Page 2 of 8 State Stormwater Management Systems Permit No. SW8 061005 7. The following design elements have been permitted for this infiltration basin stormwater facility, and must be provided in the system at all times. Unfts Basin 1 BaMn 2 Basin 3 Bit 4 a. Drainage Area Offsite Offsite Acres ft2 ft2 4.55 198,207 0 8.4 366,083 0 11.49 500;519 0 13.5 588,192 0 b. Total Impervious Surfaces Lots @ BUA per lot OS Buildings/driveways OS Streets OS Parking Sidewalks Offsite i ft2 78,742 tbd 52,000 24,155 0 2,587 0 181,734 tbd 123,000 52,099 0 6,635 0 224,726 tbd 160,000 56,971 0 7,755 0 290,495 tbd 185,000 96,044 0 9,451 0 c. Design Storm inches 3 3 3 3 d. Infiltration Basin Depth feet 1.6 1.8 1.8 3.3 e. Bottom Elevation FMSL 19 18 22 24 f. Surface Area @ Bottom ft2 11,772 23,486 32,966 16,292 g. Storage/bypass Elevation FMSL 20.6 19.8 23.8 27.3 h. Storage Volume W 20,195 45,466 56,820 72,714 i. Top of Soil Murville/ Seagate Murville/ Leon Murvillel Leon Lynn Haven j. Storage/Bypass Elevation FMSL 18.2 19.8 23.8 24 k. Expected Infiltration Rate In/hr 2 2 2 10 I. Time to drawdown hours 11 12 12 9 m. Receiving Stream Everett Creek same same Same n. River Basin Cape Fear o. Stream Index Number 18-87-29 p. Classification of Water Body SA;HWQ " II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 061005 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 7. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Infiltration systems should not be used as erosion control devices, due to the potential clogging. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 9. The permittee shall at all times provide the Operation and Maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. h. The water level in the .monitoring wells will be recorded after a 1-inch rainfall event and at least once a month. Chronic high water table elevations (within 1 foot of the bottom of the system for a period of three months) shall be reported to DWQ immediately. Monitoring well observations, made by a certified soil scientist, shall be retorted to DWQ regional office supervisor semi-annually. 10. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 061005 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 12. Prior transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 13. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 061005, as issued by the Division of Water Quality under NCAC 2H.1000 for Tarin Woods. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is 4000 per lot square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g- The approved Operation and Maintenance Plan must be followed in its entirety, maintenance, and reporting must occur at the scheduled intervals. h. All runoff on the lot must drain into the permitted system. This may be accomplishers through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. i. Built -upon area in excess of the permitted amount will require a permit modification. 14. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 15. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 061005 16. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. Ili. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the sixth day of February 2007. NORTH ROLINA E O"NTAL MANAGEMENT COMMISSION Aian VV. KlimeK, F'.t., uirector Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 061005 Tarin Woods Stormwater Permit No. SW8 061005 New Hanover County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best.of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 061005 Page 2 of 2 Certification Requirements: The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. 16. Monitoring wells are installed around each infiltration basin to ensure proper drawdown. 17. An Operation and Maintenance Plan has been established with a recordkeeping and reporting system in place as required in the Permit and Infiltration Supplements. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections Page 8 of 8 OFFICE USE ONLY Date Received Fee Paid Permit Number LO to Div 6l5 $ O 1605 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): 3. Mailing Address for person listed in item 2 above: 7 741 City: State: /(%G Zip: Telephone Number: 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, [.y letters, operation and maintenance agreements, etc.): —7':r n noa r 5. Location of Project (street address): City: 6j; I'M f,41n County: ty /�ewner¢� 6. Directions to project (from nearest major intersection): 4&m rAferxado.+• of US,17( .c,' AG /3Z 1, "Art A. taiesc V4. ( Pt �►�► /'�9,.r�(e G�at� W. (sP,�,_ l,¢�), Tgge- Of A, 44�1 Ao(. 7. Latitude: ,34 D% AC fill Longitude:__ 77 .f ,3 Zc 14 of project 8. Contact person who can answer questions about the project: Name: zt" P Telephone Number: (9/0 IL PERMIT INFORMATION: 1. Specify whether project is (check one) New Form S % U-101 Version 3.99 Page 1 of 4 Renewal Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number 411A and its issue date (if known) ,� 3. Specify the type of project (check one): Low Density C High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major K Sedimentation/Erosion Control _404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. "XIMMIi✓iy�i 2. Stormwater runoff from this project drains to the G.PQ— River basin. 3. Total Project Area: �671 4� acres 5. How many drainage areas does the project have? 4. Project Built Upon Area: 3W, !f— % 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area I Drainage Area 2 Receiving Stream Name Receiving Stream Class Drainage Area Existing Impervious* Area Proposed Impervious*Area % Impervious* Area (total) Impervious` Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings On -site Streets On -site Parking On -site Sidewalks Other on -site Off -site Total: Total: * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ic OCT 1 0 2006 Form SWU-101 Version 3.99 Page 2 of 4 rX: k « CO e � Cl) a � c § � _ § « c I ■ � k « m k � k& § k ca g § \'k k«� 0 �7% »kG Gt I� co Go LO g _ ; 2 $.f LO f«0 o �2% � LucLo �\ �J�$« LO k k e m §.f a) L) 0 CY § f " \ � u�7 Cl) 0) §§ §\0 Co <, JO �§m (a ca �§�tE% « m q C £ G 2E©E�� >7m 0 BBk%A 2 6 w C @ co § g e @ m m N qg q § 4w'de & a e c kk k k coo) „ g CN § § § Q e m ; � f .�..co n— CDLo o b o 0 k- � � $/.w,.� � g § § q,�..� .4 6 0 0 0 0 ■% U �m LO lw �o Cl) \ NLO " § § ED § g ; @ « S mS,S..Go wd ci — o b o 0 ti� % % kƒ k CN co § N I,- � §/ E 2% E wca £� �aom— mkCLL� aia$2$ f f f f© T 1�Cca= 00000§ 0 k e G [7 1 O 2006 BYD���... w 7. How was the off -site impervious area listed above derived? AA IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. Z. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will nin with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement ,177 CCIT 1 0 200E BX: Form SWU-101 Version 3.99 Page 3 of 4 ""` ` VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form Ar • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of (payable to NCDENR) • Detailed narrative description of stormwater treatment/management A if, • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): CD�tSI+�� See De iar, . f G NDwa /CP.sn�� i7 Mailing Address: P,0 , B"'e City: �tJ. ' A(CG Zip: Z ,404" w �nti,�d� State: Phone: ( 910 ) '791 A01 Fax: ( 9to 1 79 / / S-0 ( VIII. APPLICANT'S CERTIFICATION I, (print or type name of person :fisted in General Information, item 2) 516Eye 5—Ace Afte s4wryA certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in ormance with the approved plans, that the required deed restrictions and protective covena wi be r d, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. /�_1 Date: 10 - (g - O Le Ci,T 1 0 20106 Form SWU-101 Version 3.99 Page 4 of 4 Permit No. SW 806 (00 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : Contact Person: Ns6✓otry( P05 Phone Number: ( 9(0) 79/ •FW / This worksheet applies to: Basin No. Z in Drainage Area gr (as identified on plans) (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (finsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation l"%r-140 LIWIt Z. 0 r cf/hr/sf (circle appropriate units) Id"O fmSl (Seasonal High Water Table elevation) 1. f— inch (1. S inch event for SA waters,1 inch event for others) ZZ,-733 c.f. 7r /. S inc�/ �f ��G a� - 3 iko� 0 - days '#= Z SO ft. x to ft. = Z3, o08C sq. ft. (bottom dimensions) 4,C /lo c.f. /910 finsl 19, ® finsl G1"T 1 a 2006 Zo,O finsl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials IM a. System is located 50 feet from class SA waters and 30 feet from other surface waters. b. System is located at least 100 feet from water supply wells. c. Bottom of system is at least 2 feet above the seasonal high water table. d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. e. System is not sited on or in fill material or DWQ approval has been obtained. f. System is located in a recorded drainage easement for the purposes of operation and (20 8C ROW) maintenance and has recorded access easements to the nearest public right-of-way. g. Drainage area for the device is less than 5 acres. 1Pt2e��'4'L MEAT sE ItL tcatl t'otvD -toN►- i,2�t�C, V4e-LL P2o�1tDt-p, h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. C�3'1) #Ae. j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. rIQ. m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum P w;&() length is 50 feet for SA waters, 30 feet for other waters). A j! . o. Flow distribution mechanism within the basin is provided. p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). 114 r. System is designed to draw down the design storage volume to the proposed bottom elevation ender seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. GGZ I Form SWU-103 Rev 3.99 Page 2 of 3 Lm —. IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads _ 9. feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. (o • 'M O N ITn R � N C, v4E L.LS AFTeZ 1 l mr>_1 1Rr"1N F&u_ A m> oNc E A I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Address: Date:— 10 - la — 0 (a Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a 1 resident of the subdivision has been named the president. I, CEAQ� ?. M LAAf CLJ—k%,ti , a Notary Public for the State of AjcK-+t,-, CAAQt l County of &&--) 8a,J Ov-ey , do hereby certify that �- � � �...� Olr personally appeared before me this Lo day of 0C_+o a tiV , f and acknowledge the due execution of forgoing infiltration basin maintenance requirements. Witness my hand and official seal, oo��,l►uless����� � SEAL @kU. .xP ��y�i�i My commission expiresea LU otis�y : v Form SWU-103 R Sr 34k. pJ�,Z ` V Z Page 3 of 3 9"gal110�,� Permit No. S W U 0(4 (00 s (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name Contact Person: 9warr'( l7t Phone Number: ( 910 ) 791- W This worksheet applies to: Basin No. 3 in Drainage Area (as identified on plans) (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (finsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Me r 2.0 in/hr or cf/hr/sf (circle appropriate units) Zo. 0 fmsl (Seasonal High Water Table elevation) <7 inch ZS{�f0 c.f. 0.5- days ft. x bra l3 Z C. ZZ.o finsl Z 1 8 finsl Z 4,e fiml (3.0 iAr,4 prdOdd) (1.5 inch event for SA waters, I inch event for others) -Aar 1. s A,,4 , 5-G, 8to ep ar 3.0 ;+� �• -'"/- Z� ft. = 3 4 9&'C sq. ft. (bottom dimensions) Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials &,iP, a. System is located 50 feet from class SA waters and 30 feet from other surface waters. #rt. b. System is located at least 100 feet from water supply wells. Afif, c. Bottom of system is at least 2 feet above the seasonal high water table. 4,lt. d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. 11,4 e. System is not sited on or in fill material or DWQ approval has been obtained. AA f. System is located in a recorded drainage easement for the purposes of operation and 3E mora) maintenance and has recorded access easements to the nearest public right-of-way. PRC—T�Z_EzZT "L=t-IT S e-WL-1 WL-1 PziV4O i g. Drainage area for the device is less than 5 acres.<i LO ti_c,R W, WEI.� P2ca�liliL=D. /i 1 h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. (?w) �.�?. j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). lyli�, 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. n. Vegetated filter is provided. for overflow and detail is shown on plans (Required minimum C3,.l- rA.+: pw-4-0 length is 50 feet for SA waters, 30 feet for other waters). o. Flow distribution mechanism within the basin is provided. V"f, p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. AC, q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. lyd. s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. - G�T Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads i', S� feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. Co, WeLL�p R.GcoROCD AFCUIZ k1NC." RA10M%_L AND p13Ce pt n\Ot'r�• I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Address: Ili Date: t o .1 to 10 (0 Note: The legally responsible party should not be a homeowners association unless more than SO% of the lots have been sold and a resident of the subdivision has been named the president. I, r0 t L<gj 1 k ). Mum- a Notary Public for the State of I 0 ('VA% rA rb11 rP_County of Ne,".) do hereby certify that SSJ ,y SkLAk kA personally appeared before me this day of OC�O1Q_ V and acknowledge due execution of the forgoing infiltration basin maintenance requirements. Witness my hand a(A6�F1f; seal, ``es�ve-7-.1 T SEAL �<fif �o'vm o 'G�+ ��i I l J . My commission expires ,ri:'� rotary = 00 U a %Pub��6 `p r70. 2 0 Form SWU-l'tlg®"IWikir", ��Page 3 of 3 Permit No. '!!5 W Z Np 1 db 5 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : 7at r A �✓®®�s Contact Person: Ay&/Aa pesln/�� ypr Phone Number: (910) 79(--vWJ This worksheet applies to: Basin No. 4 in Drainage Area (as identified on plans) (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (finsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation r /0' U �r cf/hr/sf (circle appropriate units) 740 fmS1 (Seasonal High Water Table elevation) <3.0 'U'k Pad.0-1a0. �. inch (1.5 inch event for SA waters, I inch event for others) 3G. 3 5"7 c.f. 4f- S- , aoti 7z71W 3 v ,t..4 O. s-' days f,4- f ft. X 4 - 8, ft. _ g, sq. ft. (bottom dimensions) r 7Zo3 c.f. Zsl'. o frnsl z7. 3 fmsl 3i.D finsl Form 5WU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials 1 Z. a. System is located 50 feet from class SA waters and 30 feet from other surface waters. kr2, b. System is located at least 100 feet from water supply wells. M. c. Bottom of system is at least 2 feet above the seasonal high water table. d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. e. System is not sited on or in fill material or DWQ approval has been obtained. it, f. System is located in a recorded drainage easement for the purposes of operation and anvo) maintenance and has recorded access easements to the nearest public right-of-way. g. Drainage area for the device is less than 5 acres.<pRE�E� '► r Se—r t- 6 PC,ND ��LoN�Y'oR1NC, vJCU.: P1zo�llDFb, h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. (50 ) j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. /&!. k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). �.2. 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. Af, , m.. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. Af n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). if. o. Flow distribution mechanism within the basin is provided. I if. p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. Orie, q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). r. System is designed to draw down the design storage volume to the proposed bottom elevation tinder seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. F-1�'10'k-iT 1 rJ ZUL, Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads _%Z�C feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. Mc*(7XtZ1r4ea w/ELLS coP—Det7 1 X"O'\ AIAp 0WC-U- hi KWD - I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: Date: 1 O' (o — D Co Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of tJor'4 -.. CA*-61*1 �county of iJ-e ILA0 u-e>r , do hereby cer i that 5+QJu'C S,t� Q t,,�1pY}^�� personally appeared before me this day of �t p1t,.e� aO6 1,,, and acknowledge due exe tion of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, `eaaaaoaa�eaoao��MkCAIq ' SEAL ���,� oMM pqG 0 My commission expires rotary Form SWUf 0;"-- Zev 3.99�' �?�� Page 3 of 3 Permit No. 6 J004 6 l 0 Q 5 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DM Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system,. design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name: 1a&A LcJOdr,T Contact Person: IY32rrWd P&I" %. PE Phone Number: (90 ) ' 9/ W44�-1 This worksheet applies to: Basin No. I in Drainage Area (as identified on plans) (from orm SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (finsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation ,rr.)1'k ak & 0.0 in/hr r cf/hr/sf (circle appropriate units) V fmSI (Seasonal High Water Table elevation) (3.0 :"4 Prova-0 inch (1.5 inch event for SA waters, 1 inch event for others) D 9 7 c.f. 4-- �l f-.S�ti r Tyr l gf- �..� days t o ft. x //{ 770._ .___sq. $. (bottom dimensions) Z11095 c.f. /9, v finsl Zo. G finsl Zr o fmsl 7777:: ` , 4 i ce. :T 1 ® 2006 Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials a. System is located 50 feet from class SA waters and 30 feet from other surface waters. b. System is located at least 100 feet from water supply wells. R. c. Bottom of system is at least 2 feet above the seasonal high water table. d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. At R. e. System is not sited on or in fill material or DWQ approval has been obtained. ,1?. f. System is located in a recorded drainage easement for the purposes of operation and (70 10 R*fffO) maintenance and has recorded access easements to the nearest public right-of-way. P�ET'�Esa�N�T S€�"U►NL, Phis � g. Drainage area for the device is less than 5 acres( t►4Or111_r">.,e14G WELL P?-ovtoty, h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. (16 4) ��. j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. k,P. k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. i m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. A MA n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum C3 ;-A rd(r a p to&4 O length is 50 feet for SA waters, 30 feet for other waters). o. Flow distribution mechanism within the basin is provided. I�rQ. p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. 114 s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads ___& feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. �, 1��1t�Nt-�(z►rt(°, WF-L-Ls eEFCOepE-p PtF1EQ. IiNCA RAINFAU— AMo once (A motel. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Date: 16 - La _ 0 (o Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, C0tl•?..2.r a Notary Public for the State of�p1( C�LX611Irn�.County of ") fiN , wire* , do hereby certi. that Sw,, $ xkViL',' personaL'y appeared bcforc me this day of Cx D , �o 6, and acknowledge the xecutioil of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, 7 SEALQ�;tv�, EXR h..y ,ai�� My commissiolexpires 6 a 'oo �t�l • to � - ��� • LU o _ �p e�\ Cc,T 1 2'? Form SWU-103 �ReyQk99��,., `� Page 3 of 3 N0 EXHIBIT B DEED RESTRICTIONS AND PROTECTIVE COVENANTS In accordance with Title 15NCAC 2H.1000, the Coastal Stormwater Management Regulations, deed restrictions and protective covenants are required to ensure that the development maintains a "built -upon" surface area consistent with the applicable regulation limiting built -upon areas. The following deed restrictions and covenants will be recorded prior to issuing the Stormwater Management Permit: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SjgE OCo `o05 , as issued by the Division of Water Quality under NCAC 2H.1000. 2. The state of North Carolina is beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants run with the land and are binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area is _4,000 square feet per lot. This allotted amount includes any built -upon area constructed within the property boundaries, and that portion of the right-of-way between the front property line and the edge of the pavement. Built -upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas. 7. All runoff from the built -upon areas on the lot must drain into the permitted system. This will be accomplished through providing roof gutters and drains, grading the property to drain or grading perimeter swales to collect surface runoff and directing them into the stormwater system. Site areas that will naturally drain into the system arc not required to provide these additional measures. 8. Placement of dredged or fill material, disturbance or development within waters of the US and/ or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act. This activity also requires notification to the Division of Water Quality Stormwater and 401 Wetlands Sections." JAN 3 12007 Owner's signature: Printed name and title: �{� A, ��i ,� i-� 1 a�r Late: 61 1 Z - I, Cr l L"An P. - t w �-(A, &a Notary Public for the State of NOY-PA CA,VQ JI- V� County of &)-e,W aka "U -PX , do Hereby certify that �Sj-e� Personally appeared before me the this day of Ou yLa � , Z 007 and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, �aceo®��/�� OM�c�•,•R,T�Q� s� �Gv0'VI I oVe ; SEAL My Commission expires OFR— Z 1 —10 JAN 3 12007 WP-) ncoto --(-\t I r4 -,Icr- >PS RSV U L i 1 0 2006 BY: 5WWO 1005 THIS DOCUMENT REGULATES OR PROHIBITS THE DISPLAY OF THE FLAG OF THE UNITED STATES OF AMERICA OR STATE OF NORTH CAROLINA. THIS DOCUMENT REGULATES OR PROHIBITS THE DISPLAY OF POLITICAL SIGNS. PREPARED BY: J.M. Baker, Attorney at Law RETURN TO: 720 North Third Street, Suite 202 Wilmington, NC 28401 STATE OF NORTH CAROLINA HANOVER COUNTY OF NEW DECLARATION OF COVENANTS CONDITIONS AND RESTRICTIONS T A R I N W O O D S THIS DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS, made the day of 2006 by Cypress Grove Land, LLC hereinafter referred to as "Declarant". W I T N E S S E T H: Whereas, Declarant is the owner of certain real property in New Hanover County, North Carolina, know as "Tarin Woods" which is described in that deed recorded in the Office of the Register of Deeds of New Hanover County, North Carolina in Book at Page , and described on that plat recorded in Map Book at Page to which reference is made for a more particular description; and Whereas Declarant desires to place certain Covenants and Restrictions upon the lands described shove: Now, THEREFORE, Declarant declares that the Property described above shall be held, sold and conveyed subject to the following easements, restrictions, covenants, and conditions, which are for the purpose of protecting the value and desirability of, and which shall ran with the land and be binding on and shall inure to the benefit of all parties having any right, title or interest in the Property or any part thereof, their heirs, successors and assigns. PCB'1 Q zoos BY. ARTICLE I. DEFINITIONS SECTION 1. Association shall mean and refer to Tarin Woods Homeowners Association, Inc., a North Carolina non-profit corporation, its successors and assigns, the owners association organized for the purposes set forth herein. SECTION 2. Common Area shall refer to all of that area labeled as Common Area, Open Space, Active Area, Passive Area or the like upon plat of Tarin Woods and shall be subject to all local, state and federal rules and ordinances. SECTION 3. Community Wide Standard. Declarant shall establish initially a standard for the conduct, construction, maintenance, replacement or other activity generally prevailing at Tarin Woods pursuant to Architectural Guidelines, Restrictions and Rules. Declarant may unilaterally amend said standards as the development progresses. SECTION 4. Declarant shall refer to Cypress Grove Land, LLC, a North Carolina Limited Liability Corporation, its successors and/or assigns (which designations shall include singular, plural, masculine and neuter as required by the context). SECTION 5. Declaration shall mean this instrument as it may be from time to time amended or supplemented. SECTION 6. Development Period means the period commencing on the date on which this Declaration is recorded in the New Hanover County Register of Deeds and terminating on the earlier to occur of (i) when Declarant no longer owns a Lot in the Subdivision; (h) the date that Declarant relinquishes in writing Declaranes right to appoint Directors; or (iii) the occurrence of the date ten (10) years from the date of recording the Declaration, renewable for an additional ten (10) year period with the consent of a majority of Lot Owners other than the Declarant. SECTION 7. Lots shall mean and refer to any subdivided lot within the confines of the land described above together with any dwelling situated thereon. SECTION 8. Members shall mean and refer to every person or entity that has a Membership in the Association. SECTION 9. MembershW shall mean and refer to the rights, privileges, benefits, duties, and obligations, which shall be inure to the benefit of and burden each Member of the Association. SECTION 10. Owner shall mean and refer to the record owner, whether one or more persons or entities, of a fee simple title to any Lot, including contract sellers, but excluding those having such interest merely as security for the performance of an obligation. SECTION 11. Pier shall mean all of that area labeled as pier, dock, piling, pier walkway or the like upon a plat to be recorded in the New Hanover County Registry other than any area dedicated to the sole possession of a unit or lot owner. SECTION 12. PrMerty shall mean the Property as defined in the preamble to this Declaration. _ -- L1 0 ZOOf� ARTICLE II. PROPERTY RIGHTS AND EASEMENTS SECTION 1. Owners' Property Rights and Easement of Enjoyment in the Common Area. Every Owner shall have and is hereby granted a right and easement of enjoyment in existing and any future Common Areas, if any, which shall be appurtenant to and shall pass with the title to every Lot, subject to the following: (a) The Declarant and Association may make and amend reasonable rules and regulations governing the use of any future Common Areas;; (b) The Association may levy fines in accordance with the North Carolina Planned Community Act (Chapter 47F of the North Carolina General Statues). SECTION 2. Easements in Favor of Declarant and the Association. The following easements are reserved to Declarant and the Association, their successors and assigns: (a) Any as shown upon that map of the property recorded in Map Book at Page of the New Hanover County Registry. SECTION 3. Other Easements. The following easements are granted by Declarant to others; (a) an easement is hereby granted to all police, fire protection, ambulance and all similar persons, companies or agencies performing emergency services, to enter upon all Lots in the performance of their duties; (b) in case of any emergency originating in or threatening any Lot or Common Areas, regardless of whether any Lot Owner is present at the time of such emergency, the Association or any other person authorized by it, shall bane. the right to enter any Lot for the purpose of remedying or abating the causes of such emergency and making any other necessary repairs not performed by the Lot Owners, and such right of entry shall be immediate; (c) the Association is granted an easement over each Lot for the purpose of providing Remedial Lot maintenance. (d) the Declarant reserves the right to subject the real property of this subdivision to a contract with any and all utility companies as necessary including, but not limited to, installation of street lighting which may require a continuing installment payment to the utility provider by each residential customer. SECTION 4. Nature of Easements. All easements and rights described herein are perpetual easements appurtenant, running with the land, and shall inure to the benefit of the binding on the Declarant and the Association, thcir successors and assigns, and any Owner, purchaser, mortgagee and other person having an interest in the Property or any Additional Property, or any part or portion thereof, regardless of whether or not reference is made in the respective deeds of conveyance, or in any mortgage or trust deed or other evidence of obligation, to the easements and rights described in this Declaration. ARTICLE III. AMENDMENTS SECTION 1. Amendment of Declaration by the Declarant. This Declaration may be amended without member approval by the Declarant, or the Board of the Association, as the case may be, as follows: (a) in any respect, prior to the sale of the first Lot; (b) to the extent this Declaration applies to Additional Property (c) to correct any obvious error or inconsistency in drafting, typing or reproduction; (d) to qualify the Association or the Property and Additional Property, or any portion thereof, for tax-exempt status; (e) to include any platting change as permitted herein; (f) to conform this Declaration to the requirements of any law or governmental agency having legal jurisdiction over the Property or any Additional Property or to qualify the Property or any Additional Property or any Lots and improvements thereon for mortgage or improvement loans made, insured or guaranteed by a governmental agency or to comply with the requirements of law or regulations of any corporation or agency belonging to, sponsored by, or under the substantial control of the United States Government of the State of North Carolina, regarding purchase or sale of such loss and improvements, or mortgage interests therein, as well as any other law or regulation relating to the control of property, including, without limitation, ecological control, construction standards, aesthetics, and matters affecting the public health, safety and general welfare. A letter from an official of any such corporation or agency, including, without limitation, the Veterans Administration, U.S. Department of Housing and Urban Project, the Federal Home Loan Mortgage Corporation, Government National Mortgage Corporation, of the Federal National Mortgage Association, requesting or suggesting an amendment necessary to comply with the requirements of such corporation or agency shall be sufficient evidence of the approval of such corporation or agency, provided that the changes made substantially conform to such request or suggestion. Notwithstanding anything else herein to the contrary, only the Declarant, during the Developer Control Period, shall be entitled to amend this Declaration pursuant to this Section. SECTION 2. Amendment of Declaration. Except as provided above, the covenants and restrictions of this Declaration may be amended only by an instrument duly recorded in the Office of the Register of Deeds of New Hanover County, executed by the duly authorized officers of the Association upon the vote of not less than two-thirds (2/3) of the Lot Owners; provided that no amendment shall alter any obligation to pay ad valorem taxes or assessments for public improvements, as herein provided, or affect any lien for the payment thereof established herein. ARTICLE IV. © Zoos HOMEOWNER'S ASSOCIATION BY- ` SECTION 1. Formation of Association. The Association is a nonprofit corporation organized pursuant to the Nonprofit Corporation Act of the State of North Carolina for the purpose of establishing an association for the Owners of Lots to (i) own, operate and maintain the Common Areas, (ii) to maintain the 4 Designated Common Area, (iii) to maintain the Limited Common Areas, and (iv) serve as a member of Sea Breeze Sound, all in accordance with this Declaration, the Association's Charter and Bylaws. SECTION 2. Membership. Every Lot Owner shall be a Member of the Association. Membership shall be appurtenant to and may not be separated from Lot ownership. SECTION 3. Voting Bights. The Association shall have two classes of voting Membership: (a) Class A. Class A members shall be all Owners with the exception of Declarant, and shall be entitled to one vote for each lot owned. When more than one person holds an interest in any lot, all such persons shall be members. The vote for such lot shall be exercised as they determine, but in no event shall more than one vote be cast with respect to any lot. (b) Class B. Class B members shall be the Declarant and shall be entitled to three (3) votes for each lot owned. The Class B membership shall cease and be converted to Class A on the happening or either of the following events, whichever occurs earlier: i. Sale of last lot owned by Declarant ii. December 31, 2016. SECTION 4. Government Permits. All duties, obligations, rights and privileges of the Declarant under any water, sewer, storm water, and utility agreements, easements, and permits for the Project with municipal or governmental agencies or public or private utility, companies are at all times the responsibility of the Association. ARTICLE V. INSURANCE AND BONDS If it is economically advantageous to obtain group insurance over individual insurance, the following shall apply: SECTION 1. Insurance. It shall be the duty of the Association to maintain in effect casualty and liability insurance as follows: (a) Amount and Scope of Insurance. All insurance policies upon the Common Areas shall be secured by the Board of Directors, or its designee on behalf of the Association which shall obtain such insurance against loss or damage by fire or other hazards normally insured against and such other risks, including public liability insurance, as from time to time shall be customarily required by private institutional mortgage investors for projects similar in construction, location and use as the Project and the improvements thereon for at least $1,000,000.00 for bodily injury, including deaths of persons and property damage arising out of a single occurrence. Coverage under this policy shall include, without limitation, legal liability of the insureds for property damage, bodily injuries, and deaths of persons in connection with the operation; (b) Insurance Provisions. The board of directors shall make diligent efforts to insure that said insurance policies provide for the following: (1) a waiver of subrogation by the insurer as to any claims against the AssociUion,_ any officer, director, agent or employee of the Association, the Lot Owners and ;their 2., 3 employees, agents, tenants and invitees; OCT 1 0 2006 5 y: cash; (2) a waiver by the insurer of its right to repair and reconstruct instead of paying (3) coverage may not be canceled or substantially modified (including cancellation for nonpayment of premium) without at least thirty days prior written notice to be named insured and all mortgagees; (4) coverage will not be prejudiced by act or neglect of the Lot Owners when said act or negligent is not within the control of the Association or by any failure of the Association to comply with any warrant or condition regarding any portion of the Project over which the Association has no control. (5) the master policy on the Common Areas cannot be canceled, invalidated or suspended on account of the conduct of any one or more individual Lot Owners; (6) the master policy on the Common Areas cannot be canceled, invalidated or suspended on account of the conduct of any officer or employee of the Board of Directors without prior demand in writing that the Board of Directors cure the defect and the allowance of a reasonable time thereafter within which the defect may be cured. (c) Premiums. All premiums on such insurance policies and any deductibles payable by the Association upon loss shall be a common expense as described in Article VI, Section 4 herein: (d) Proceeds. All insurance policies purchased pursuant to these provisions shall provide that all proceeds thereof shall be payable to the Board as insurance trustee or to such attorney -at -law or institution with trust powers as may be approved by the Board of Directors; (e) Policies. All insurance policies purchased by the board of Directors shall be with a company or companies permitted to do business in the State of North Carolina. All insurance policies shall be written for the benefit of the Board of Directors and the Lot Owners and any mortgagees as their respective interests may appear, and shall provide that all proceeds thereof shall be payable to the Board of Directors and duplicates of said policies and endorsements and all renewals thereof, or certificates thereof, together with proof of payment of premium, shall be delivered to the Owners at least ten (10) days prior to the expiration date with respect to the then current policies. Duplicates shall also be obtained and issued by the Association to each mortgagee, if any, upon request of such mortgagee; (f) Individual Policies. The insurance coverage for the individual lots and the structure(s) thereon shall be purchased as individual policies under such terms and conditions as the Association may prescribe by the individual lot owners. Each lot shall be insured for its full replacement value; Lot owners shall also be liable for payment of any claim made against the Association caused solely by the negligent or willful act or behavior of said owner or their guests. (g) Distribution of Insurance Proceeds. Proceeds of insurance policy for the Common Areas shall be distributed to or for the befit of the beneficial owners in the following manner: (1) all reasonable expenses of the insurance trustee shall be paid or provision made thereof; (2) the remaining proceeds shall be used to defray the cost of repairs for the damage or reconstruction for which the proceeds are paid. Any proceads-feiffaining:afte defraying such cost shall be distributed to the beneficial owners, including lienholders of GCT 1 0 2006 ; 6 ` record, or retained by the Association for such common expenses or purposes as the Board shall determine. SECTION 2. Fidelity Bond. The association shall maintain blanket fidelity bonds for all officers, directors, employees, and all other persons handling or responsible for funds of the Association (provided, however, that if the Association shall delegate some or all of the responsibility for the handling of its funds to a management agent, such fidelity bonds shall be maintained by such management agent for its officers, employees and agents handling or responsible for funds of or administered on behalf of the Association). ARTICLE VI. COVENANTS FOR ASSESSMENTS SECTION 1. Creation of the Lien and Personal Obligation of Assessments. Each owner of any Lot, by acceptance of a deed for the Owner's Lot, whether or not it shall be so expressed in such deed, covenants and agrees to pay to the Association the following assessments (collectively the "Assessments': The Assessments, together with interest, costs and reasonable attorney's fees, shall be a charge on the land and shall be a continuing lien upon the respective Lot against which the Assessments are made. Each such Assessment, together with interest costs and reasonable attorney's fees, shall also be the personal obligation of the person who was the Owner of such Lot at the time when the Assessment fell due. The personal obligation for delinquent Assessments shall not pass to the Owner's successors in title unless expressly assumed by them. SECTION 2. Annual Assessments. The board of directors shall adopt a proposed annual budget at least 90 days before the beginning of each fiscal year. Within 30 days after adoption of the proposed budget for the Project, the Board of Directors shall provide all of the Lot Owners a summary of the budget and notice of a meeting to consider its ratification including a statement that the budget may be ratified without a quorum. The budget is ratified unless, at the meeting, a majority of all the Lot Owners in the Association rejects the budget. In the event the proposed budget is rejected, the periodic budget last ratified by the Lot Owners shall be continued until such time as the Lot Owners ratify a subsequent budget proposed by the Board of Directors. The annual assessment for each Lot shall be established based on the annual budget thus adopted; provided, however, that the first Annual Assessment shall be set by the Declarant prior to the conveyance of the first Lot to an Owner. The due date for payment shall be established by the Board of Directors. The board of Directors shall have the authority to require the assessments to be paid in periodic installments. The Association shall, upon demand, and for a reasonable charge furnish a certificate signed by an officer of the Association setting forth whether the assessments on a specified Lot have been paid. SECTION 3. Special Assessments for Capital Improvements. In addition to the Annual Assessments authorized above, the Association may levy, in any assessment year, a Special Assessment applicable to the year only for the purpose of defraying, in whole or in part, the cost of any construction, reconstruction, repair, or replacement of a capital improvement upon any current or future Common Areas, including fixtures and personal property related thereto, provided that any such assessment shall have the assent of a majority of the members of each class who are voting in person or by proxy at a meeting duly called for this purpose. SECTION 4. Insurance Assessments. All premiums on insurance policies purchased by the Board of Directors or its designee and any deductibles payable by the Association upon r#ss-hl be. —a--, ciori; ' expense, and the Association may in any assessment year levy against the OwnLs-�equallyan ,"Insurance `� 1 0 2006 Assessment", in addition to the Annual Assessments, which shall be in an amount sufficient to pay the annual cost of all such deductibles and insurance premiums not included as a component of the Annual Assessment, SECTION 5. Rate of Assessment. The Association may differentiate in the amount of Assessments charged when a reasonable basis for distinction exists, such as between vacant Lots of record with completed dwellings for which certificates of occupancy have been issued by the appropriate governmental authority, or when any other substantial difference as a ground of distinction exists between Lots. However, Assessments must be fixed at a uniform rate for all Lots similarly situated. SECTION G. Working Capital. The Association is authorized to establish an amount to be collected from each purchaser of a Lot(s) to be set aside in reserve. SECTION 7. Commencement of Assessments. Assessments for each Lot shall commence upon the date of acceptance by an Owner of a deed from Declarant. SECTION 8. Declarant Obligation for Assessments. Declarant shall be responsible to cover any budget shortfall; specifically the difference between the actual expenses charged the association less lot owner contributions. SECTION 9. Effect of Nonpayment of Assessments and Remedies of the Association. Any assessment or installment thereof not paid within (30) days after the due date shall bear interest from the due date at the highest rate allowable by law. The association may bring an action at law against the Owner personally obligated to pay the same, or foreclose the lien against the Owner's Lot. No Owner may waive or otherwise escape liability of the Assessments provided for herein by non-use of the Common Area or abandonment of his Lot. All unpaid installment payments of Assessments shall become immediately due and payable if an Owner fails to pay any installment within the time permitted. The Association may also establish and collect late fees for delinquent installments. SECTION 10. Lien for Assessments. The Association may file a lien against a Lot when any Assessment levied against said Lot remains unpaid for a period of 30 days or longer. (a) The lien shall constitute a lien against the Lot when and after the claim of lien is filed of record in the office of the Clerk of Superior Court of the county in which the Lot is located. The Association may foreclose the claim of lien in like manner as a mortgage on real estate under power of sale under Article 2A of Chapter 45 of the General Statutes. Fees, charges, late charges, fines, interest, and other charges imposed pursuant to Sections 47-E-3-102, 47F-3-107A and 47F-3-115 of the Act are enforceable as Assessments. (b) The lien under this section shall be prior to all liens and encumbrances on a Lot except (i) liens and encumbrances (specifically including, but not limited to, a mortgage or deed of trust on the Lot) recorded before the docking of the claim of lien in the office of Clerk of Superior Court, and (ii) liens for real estate taxes and other governmental assessments and charges against the Lot. (c) The lien for unpaid assessments is extinguished unless proceedings to enforce the tax lien are instituted within three years after the docketing of the claim of lien by the office of the Clerk of Superior Court. (d) Any judgment, decree, or order in any action brought under this section shall include costs and reasonable attorney's fees for the prevailing party. (e) Where the holder of a first mortgage or deed of trust of record, or oth r, purhaspx of a'Lot '-' obtains title to the Lot as a result of foreclosure of a first mortgage or st deed of trust, such purchaser and its heirs, successors and assigns shall not be liable for the A sessments against the 8 BY: __ Lot which became due prior to the acquisition of title to the Lot by such purchaser. The unpaid Assessments shall be deemed to be common Expenses collectible from all the Lot Owners including such purchaser, its heirs, successors and assigns. (f) A claim of lien shall set forth the name and address of the association, the name of the record Owner of the Lot at the time the claim of lien is filed, a description of the Lot, and the amount of the lien claimed. SECTION 1 L. Common Surplus. If the Annual Assessments collected in any given year is in excess of the actual Common Expenses for that year, the Association may, at its sole discretion credit each Owner's share of the Common Surplus to each Owner's payment as for the Annual Assessment for the following year. ARTICLE VII. ARCHITECTURAL CONTROL SECTION 1. Committee Established. The Association shall at all times have as a standing committee an architectural control committee, consisting of one or more persons. Each Committee member is appointed by, and serves at the pleasure of, the Board, unless the Board from time to time constitutes itself as the Committee. The Board from time to time may designate alternate members, to serve in the absence of any regular member. Absent Board action to the contrary, the Board is deemed to have constituted itself as the Committee. Committee members need not be Directors but must be a lot owner. No Committee member is entitled to compensation for services performed; but the Board may employ independent professional advisors to the Committed and allow reasonable compensation to such advisors from Association funds. Any Committee action may be taken by a simple majority of its members, with or without a formal meeting or joint deliberation, so long as each member is informed in advance of the action proposed. SECTION 2. Developer's Rights. All duties and responsibilities conferred upon the .Architectural Review Committee by this Declaration or the By -Laws of the Association shall be exercised and performed by the Declarant or its Designee, so long as the Declarant shall own any lot in Tarin Woods or any additions annexed thereto by Supplemental Declaration or Amendment. SECTION 3. Committee Authority. The Committee has full authority to regulate the exterior appearance of the Lots to: (i) assure harmony of external design and location in relation to surrounding buildings and topography; and (ii) to protect and conserve the value and desirability of the Properties as a residential community. The power to regulate includes the power to prohibit those exterior uses, structures, conditions, or activities inconsistent with the provisions of this Declaration or otherwise contrary to the best interests of all Homeowners in maintaining the value and desirability of the Properties as a residential community. SECTION 4. Committee Approval. No building, improvement, structure, addition, landscaping, attachment, condition, excavation, alteration, or change (including any color change) may be made, installed, maintained, restored, or permitted to remain on or to the exterior of any Lot, unless made, installed, maintained, or restored, as the case may be, substantially in compliance with plans and specifications reviewed and approved by the Committee in advance. Notwithstanding the foregoing, the Committee's approval is not required for (i) interior areas of a building, (ii) restoration of any previously approved building, structure, or other item that is substanLLally identical in all respects to the original work, as approved, or (iii) for any item that is concealed from view by improvements, structures, fencing, vegetation, or other items previously approved or installed. SECTION 5. Obj_ective Standards. In addition to any other express standard that may be provided by this Declaration, all actions by the Committee must: (i) assure harmony of external design, materials, and 6-3 =-- location in relation to surrounding buildings and topography within the Properties; and (ii) protect and conserve the value and desirability of the Properties as a residential community; and (iii) not conflict with the express provisions of the Legal Documents; and (iv) otherwise be in the best interests of all Homeowners in maintaining the value and desirability of the Properties as a residential community. SECTION 6. Rules and Regulations. The Committee from time to time may adopt and amend reasonable, uniform rules and regulations as to all matters within the scope of its authority, including procedural matters, so long as such rules and regulations are (i) consistent with the provisions of the Legal Documents; and (ii) if the Board has not constituted itself as the Committee, approved by the Board before taking effect. Rules and regulations adopted pursuant to this Section have the same force and effect as the Association's other rules and regulations and are enforced by the Board in the name of the Association. SECTION 7. Subjective Judgment. In addition to complying with the objective standards of this Declaration, Developer specifically intends the Committee members to exercise an informed, subjective aesthetic judgment as to any matters within the Committee's authority that is conclusive and binding upon any person affected, absent bad faith, mistake, or deliberate intentional discrimination that cannot be justified on any rational basis. Without limitation, and in recognition of the fact that each Lot is unique, no Committee action with respect to any particular Lot necessarily is of any precedential value with respect to any other Lot. Specifically, the fact that the Committee may have approved or denied a particular installation, condition, activity, or item with respect to any particular Lot does not, by itself, constitute grounds for requiring such approval or denial with respect to any other Lot. Each application for Committee action must be evaluated on its own merits, with the Committee exercising the broadest discretionary judgment that is consistent with the requirements of this Declaration. SECTION 8. Review. The Board from time to time may appoint one or more persons to make preliminary review of any applications to the Committee and report such applications with such person's advisory recommendations for Committee action. If the Board has not constituted itself as the Committee, provision must be made for review by the Board of Committee decisions at the request of the applicant, subject to such reasonable limitations and procedures as the Board considers appropriate. The Association's procedures for review and enforcement of the provisions of this Article in all events and at all times must provide any affected person with reasonable advance notice and a reasonable opportunity to be heard in person and through appropriate representatives of such person's choosing in a reasonably impartial manner. SECTION 9. Applications. Any applications for Committee approval must be accompanied by three sets of plans and specifications, together with such renderings, samples, models, and other information as the Committee reasonably may require. Any application submitted other than by a Homeowner must attach the Homeowner's written consent to the approval requested. Any application for installation of any building or other permanent structure must include a landscaping plan and detailed plot plan of any permanent improvements and structures. If requested, the Committee may require the preliminary staking of such improvements and structures according to such plan for Committee inspection. Any application for the initial installation of any residential dwelling also must include a grading and drainage plan and tree survey. Any costs of filing and processing an application pursuant to this Article are at the expense of the applicant; and the Association also may impose a reasonable, uniform application fee to defray its costs. SECTION 10. Procedure. Within 60 days after receiving an application, the Committee either must approve the application as submitted or notify the applicant of (i) the Committee's intent to deny the application, or (ii) any additional plans, specifications, drawings, or other items that the Committee will require to act upon the application, or (iii) both of the foregoing. Tlie Committees failure to so notify the applicant is an approval of the application submitted. Upon receiving the foregoing notice, the applicant may request a hearing before the Committee, at which the applicant, personally and through representatives of the applicant's choosing, is entitled to a reasonable opportunity to be heard in a reasonably impartial manner, after reasonable advance notice. No particular formality is required for any of the Committee's proceedings; -- including any hearing, nor is any record required other than a written statement faiky summarizing the lit, 1 1 V 20106 10 DY: { material features of any Committee action. Unless the applicant agrees otherwise, the Committee must approve or disapprove any application within 75 days after receipt. SECTION 11. Approval. The Committee's approval is deemed given under any of the following circumstances: (i) the Committee fails to deny any application within 75 days after receipt, unless the applicant agrees to a longer period of time; or (ii) the Committee fails to notify the applicant of its intent to deny an application, or that further information is required, within 60 days after receipt of an application; as provided in the preceding Section; or (in) no suit, action, or other proceeding is instituted by the Association within one year after substantial completion with respect to any use, activity, structure, installation, condition, or other item installed, maintained, or restored without application to the Committee. In all other events, the Committee's approval must be in writing and endorsed upon two sets of the plans and specifications, one of which must be returned to the applicant and one retained in the Association's permanent records for a period of at least five years. Upon completion of the approved work, the applicant and any architect, engineer, contractor, or other responsible professional must certify to the Association in writing that the work has been completed substantially according to the approved plans and specifications; and no Statute of Limitations begins to run in favor of any Homeowner or other applicant with respect to any substantial non -conformity to the approved plans and specifications until such certificate is filed. SECTION 12. Chang s. Any material change to any plans and specifications approved by the Committee also must be approved by the Committee as provided in this Article, except that the Committee will expedite, to the extent practical, any such application that is made while construction is in progress. The Committee in no event is required to act upon any such application in less than 15 days, however. SECTION 13. Notice of Action. No suit, proceeding, or other action to enforce the provisions of this Article may be commenced or continued, nor may any of the provisions of this Article be enforced, against any person who acquires any interest in a Lot without actual knowledge that a building or other structure (including walls and fencing) was installed, maintained, or restored, as the case may be, in violation of the requirements of this Article unless such suit, action, or other proceeding is commenced within one year after such building or other structure was substantially complete and a lis pendens or other notice of the pendency of such action is recorded within such time period. No such action may be commenced, continued, or otherwise enforced against any purchaser or creditor who acquires an interest in, or a lien upon, any Lot for value, other than pre-existing indebtedness, and without actual knowledge of any such violation, if such purchaser or creditor obtained a statement under penalty of perjury from the applicable Homeowner that no violation existed on such Lot at the time value was given or paid. Upon payment of any reasonable uniform charge that the Association, from time to time may impose to defray its costs, the Association within ten days after request will issue an appropriate certificate of compliance or noncompliance, as the case may be, with the provisions of this Article that is binding and conclusive as to the information its sets forth upon both the Association and any person without actual knowledge to the contrary. SECTION 14. Developer Action. Notwithstanding any provision of this Article, no Committee approval is required for any residential dwelling or any of its appurtenances constructed or authorized by Declarant on any Lot, so long as it otherwise conforms to the applicable requirements of this Declaration. The foregoing exemption is for the exclusive benefit of a Declarant and may not be extended by Declarant to any Builder or any Homeowner other than Declarant. SECTION 15. Hold Harmless. The Declarant, Association, and Architectural Review Committee do not warrant and make no representations regarding the quality of any building, improvement, structure, addition, landscaping, attachment, condition, excavation, alteration, or change located upon any lot. All owners hereby hold harmless the Declarant, Association, or Architectural Review Committee from any and all damages that may result from the installation, construction, maintenance or the like with regards to any improvements or additions. 11 ARTICLE VIII. USE RESTRICTIONS AND MAINTENANCE SECTION 1. Use Restrictions. (a) Commencement of Construction. Purchaser(s) of lot(s) must obtain a permit to construct a residence upon said lot(s) and commence construction within one year of the recordation of deed of conveyance for said lot(s) from Declarant. If purchaser does not commence construction, Declarant retains the right of first refusal to purchase any lot(s) from the original Grantee prior to such lots being offered for sale to the general public. U Land Use and Building Type. No Lot shall be used for any purpose except for residential purposes. All numbered Lots are restricted for construction of one single-family dwelling. (c) Nuisances. No noxious or offensive activity shall be carried on upon any Lot nor shall anything be done thereon which may be or may become an annoyance or nuisance to the neighborhood. There shall not be maintained any plants or animals, nor device or thing of any sort whose normal activities or existence are in any way noxious, dangerous, unsightly, unpleasant or other nature as may diminish or destroy the enjoyment of other Lots by the Owner thereof. It shall be the responsibility of each Owner to prevent any unclean, unsightly or unkempt condition of buildings or grounds on the Owner's Lot which would tend to decrease the beauty of the neighborhood as a whole or the specific area. (d) Temporary Structures. No structure of a temporary character, trailer, basement, tent, garage, barn, or other outbuilding shall be used on any Lot any time as a residence either temporarily or permanently without the written consent of the Association or its designee; provided, however, that this shall not prevent the Declarant, its designees or assigns from maintaining a construction trailer or office on any part of the Project until the construction of dwellings on all Lots and improvements are completed. (e) Vehicles/Boats/Etc. No camper, trailer, motor or mobile homes, tractor/trailer, or similar type vehicle, bicycles, scooters, toys or other personal articles shall be permitted to remain on any Lot, or on any street at any time. No inoperable vehicle or vehicle without current registration and insurance will be permitted on any Lot or street. The Association shall have the right to have all such vehicles towed away at the owner's expense. No repairs to any vehicle may be made on the streets or in driveways, but only in garages or other areas not visible from the street. No vehicle belonging to an owner or to a member of the family or guest, tenant, or employee of an owner shall be parked in such a manner as to impede or prevent ready access to another owner's lot. The owners, their employees, servants, agents, visitors, licensees and the owner's family will obey the parking regulation posted on the private streets and drives and any other traffic regulations promulgated in the future for the safety, comfort and convenience of the owners. (f) Animals. No animals, livestock, poultry of any kind shall be kept or maintained on any Lot or in any dwelling except that dogs, cats, or other household pets may be kept or maintained provided that they are not kept or maintained for commercial purposes and provided further that they are not allowed to run free, are at all times kept properly leashed or under the control of their owner and do not become a nuisance to the neighborhood. Pet owners shall be responsible to immediately and properly dispose of any pet waste on common areas or roadways. (g) Nuisances. No owner shall make or permit any noises that will disturb or annoy the occupants of any of the lots in the development or do or permit anything to be done which will interfere with the rights, comfort or convenience of other owners. (h) Statuary, TV Satellite Dishes and Outside Antennas. No yard statu ~yard art, or TV satellite signal receiving dishes are permitted on any lot and no outside radio or televisic n antennas shall ber4 12 I� � i erected on any Lot or dwelling unless and until permission for the same has been granted by the Board of Directors of the Association or its architectural control committee; provided, however, satellite dishes not over eighteen (18) inches in diameter which cannot be seen from the street are permitted. (i) Construction in Any Future Common Area. No person shall undertake, cause or allow alteration or construction in or upon any portion of future Common Areas except at the direction .or with the express written consent of the Association or as permitted by this Declaration. 0) Subdividing. Subject to any rights reserved to the Declarant herein, no Lot shall be subdivided, or its boundary lines changed except with the prior written consent of the Declarant during the period of Declarant control of the Association and thereafter by the Board of Directors of the Association. (k) Trash. Each owner shall keep such owner's lot in a good state of preservation and cleanliness and shall not sweep or throw or permit anything to be swept or thrown therefrom, or from the doors or windows thereof, any dirt or other substance. All garbage and refuse from the lots shall be deposited with care in garbage containers intended for such purpose only at such times and in such manner as the Board of Managers/Directors may direct. All trash cans must be kept from view from the street except on trash pickup days. Trash cans must be removed from the street within 24 hours of trash pickup. (1) Christmas Decorations. Christmas decorations may only be exhibited between November 20 and January 7 of the following year. (m) Flags. No flags shall be flown upon any lot or common area in the subdivision with the exception of the flag of the State of North Carolina and the flag of the United States of America. No flags of any kind may be displayed upon vertical flag poles. No flag may be displayed larger that 4'x6'. (n) Political Signs. No political signs may be displayed upon any common areas or individual lots within the subdivision. (o) Damage Liability. Any damage to buildings, recreational facilities, or other common areas or equipment caused by owners, their children or their guests shall be repaired at the expense of the owner. (p) Amendment and Revocation. Any consent or approval given under these Community rules by the Board of Managers shall be revocable at any time. These Community Rules may be added to or repealed at any time by the Board of Managers/Directors, SECTION 2. Maintenance. To the extent the association is not obligated to provide maintenance pursuant to this Declaration, each Lot Owner shall keep his Lot free from weeds, underbrush or refuse piles, or unsightly growth or objects. In the event the Owner fails to do so, then after thirty days notice from the Architectural Control committee, the Association or its designee may enter upon the Lot and remove the same at the expense of the Owner, and such entry shall not be deemed a trespass, and in such event alien shall arise and be created in favor of the full amount of the cost thereof chargeable to the Owner's Lot, including collection costs and such amounts shall be due and payable within thirty (30) days after the Owner is billed therefore. Such lien shall be enforceable by Court proceedings as provided by law for enforcement of liens. In the event that any maintenance activities are necessitated to any future Common areas by the willful act or active or passive negligence of any Owner, his family, guests, invitees or tenants and the cost of such maintenance, repair or other activity is not fully covered by insurance, then, at the sole discretion of the board of directors of the association, the cost of the same shall be the personal obligation of the owner and, if not paid to the association upon demand, may be added to the annual assessment levied against said Owner's Lot and shall become a lien against the Lot.;. V ` OCT 1 0 2006 i 13 -� --. _� _ _._ _ -- l ARTICLE IX. GENERAL PROVISIONS SECTION 1. Restrictions on jurisdictional Wetlands. The areas denoted as Wetland Preservation Area shown on the recorded plat entitled "Wetland Preservation Plan for Tarin Woods dated ", for Colorado Coastal Developers, LLC, attached hereto as Exhibit "A", and recorded in Book , Page in the New Hanover County Register of Deeds as Wetland Preservation Area shall be maintained in perpetuity in a natural and managed condition. This covenant is intended to ensure continued compliance with the mitigation condition of a Clean Water Act authorization issued by the United States of America, U.S. Army Corps of Engineers, Wilmington District, Action ID 200400941, and, therefore, may be enforced by the United States of America. This covenant is to run with the land and shall be binding on the Owner and all parties claiming through or under it, including, but not limited to any adjacent homeowner's or any homeowners' association to whom the owner may. assign or convey its rights. Modification of this particular Section 13 of Article VI will require written consent of the United States Army Corps of Engineers. The wetland map referred to in paragraph one of this Section designates Wetland Preservation Areas. Notwithstanding the provisions of this Section, the following activities will be permitted in Wetland Preservation without further consent of the United States Army Corps of Engineers: establish and maintain pervious surface, nature trails; remove noxious or poisonous plants such as poison ivy, poison oak; repair or remove storm damage and/or dying or diseased vegetation and trees; erect, build and maintain pile supported structures not requiring permits pursuant to 33 CFR 323.3. SECTION 2. Stormwater Management. The following covenants ongoing compliance with State Stormwater Management Permit Number. by the Division of Water Quality under NCAC 2H.1000. are indented to ensure as issued The maximum allowable built -upon area per lot is 4,000 square feet. This allotted amount includes any built - upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina, but does not include raised, open wood decking, or the water surface of swimming pools. The covenants pertaining to storm water regulations may not be changed or deleted without concurrence of the Division of Water Quality. Filling in, piping or altering any vegetative conveyances (ditches, swales, etc.) associated with the development except for average driveway crossings, is strictly prohibited by any persons. Lots within CAMA's Area of Environmental Concern may have the permitted built upon area reduced due to CAMA jurisdiction within the AEC. Each designat swale shown on the approved plan mus ' :e tnaint«inert at; 2 t ?u a UE—1 of 100' long with 5:1 (F�; or L1atter, laa,,c" a ,o gi tudin7i l Slope no stecpzx than 3 %, carry the flow from a 10-yeqrgt(li !Y! i.� r;C f-2.rG51'V e manr;e.-, and maintain a uense veaetateci cover. • urtl4er, ft37ir;.ri -r..piping or ala!r41g any designated 5:1 curb outlet swale ?,s�ocmted with the detrF:lop.rrw.iit is prohibited by any persons. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater management permit. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. These Covenants are to run with the land and shall be binding on all persons and parties claiming under them. The Covenants pertaining to storm water may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Environmental Management. No lot owner is allowed to pipe or fill in any swale or ditch used to meet the storm water regulations, except for driveway culverts. Each lot will maintain a 30' wide vegetated buffer between all impervious areas and surface waters. All roof drains shall terminate at least 30' from the mean high water mark of surface waters. y _ 1'Y'� wP .� f . 1 •..5.�, 14 U x i 0 2006 n-Y I All owners shall be responsible to ensure continued compliance with the rules and regulations with regard to their individually owned property. Lot owners shall not pipe or fill-in any swale or ditch that is a requirement under the storm water regulations, except for driveway culverts. These Covenants are to run with the land and shall be binding on all persons and parties claiming under them. The Covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Environmental Management. Respot.isibiiitV to i1.11. zcre continued complirnce with the above .referenced permit shall transfer to the Association once Declarant hay conveyed fifty percent (50%) of the lots initially owned by Declarant. SECTION 3. Rights of Institutional Note Holders. Any institutional holder of a first lien on a Lot will, upon request, be entitled to (a) inspect the books and records of the Association during normal business hours, (b) receive an annual audited financial statement of the Association within ninety (90) days following the end of its fiscal year, (c) receive written notice of all meetings of the Association and right to designate a representative to attend all such meetings, (d) receive written notice of any condemnation or casualty loss that affects either a material portion of the Project or the Property securing its loan, (e) receive written notice of any sixty-day (60) delinquency in the payment of assessments or changes owed by any Owner of any property which is security for the loan, (f) receive written notice of a lapse, cancellation, or material modification of any insurance policy or fidelity bond maintained by the Association, (g) receive written notice of any proposed action that requires the consent of a specified percentage of mortgage holders, and (h) be furnished with a copy of any master insurance policy. SECTION 4. Utility Service. Declarant reserves the right to subject the Property to contracts for the installation of utilities, cable TV and street lighting, which may require an initial payment and/or a continuing monthly payment by the Owner of each Lot. Each Lot Owner will be required to pay for any water connections, sewer connections, impact fees or other utility service to the Lots. In the alternative, the Developer may collect such connection, impact and other fees, charges directly from the Lot Owners. All Lot Owners shall be required, for the household purposed, to use water and sewer supplied by the companies/governmental units servicing the Project. Separate water systems for outside irrigation and other outdoor uses shall not be permitted without the consent of the Declarant or the Association. SECTION 5. Severabilivv. Invalidation of any one of these covenant or restrictions by judgment or court order shall in no way affect any other provisions which shall remain in full force and effect. SECTION 6. Lots Subject to Declaration/Enforcement. All present and future Owners, tenants and occupants of Lots and their guests or invitees, shall be subject to, and shall comply with the provisions of the Declaration, and as the Declaration may be amended from time to time. The acceptance of a deed of conveyance or the entering into of a lease or the entering into occupancy of any Lot shall constitute an agreement that the provisions of the Declaration are accepted and ratified by such Owner, tenant or occupant. The covenants and restrictions of this declaration shall inure to the benefit of and be enforceable (by proceedings at law or in equity) by the Association, or the Owner of any _Lot, their respective legal representatives, heirs, successors and assigns, and shall run with and bind the land and shall bind any person having any Lot, as though such provisions were made a part of each and every deed of conveyance or lease, for a term of twenty (20) years from the date this Declaration is recorded, after which time they shall be automatically extended for successive periods of (10) years, unless terminated by the Lot Owners. Failure by the association or by an Owner to enforce any covenant or restriction herein contained shall in fio event be deemed a waiver of the right to do so thereafter. SECTION 7. Liability of Declarant. The affirmative vote of no less than two-thirds (2/3) of all votes entitled to be cast by the Association Members shall be required in order for the Association to (1) file a complaint, on account of an act or omission of the Declarant, with any governmental a en c -`--" , regulatory or judicial authority over the Project or any part thereof; or (2) assert a claim or su �t1;e Declarant: OCT 1 0 2006 I 15 , SECTION 8. Right of First Refusal. Declarant retains the right of first refusal to purchase any vacant lot to be sold within twelve (12) months of initial transfer for an amount equal to the purchase price of the initial sale. SECTION 9. Sale of Property. No owner shall employ as listing agent Coldwell Banker Seacoast Realty as representative for the sale of any and all property encompassed in this Declaration. Nor shall any owner allow signage, advertisements, banners or flyers for Coldwell Banker Seacoast Realty, their brokers, agents, subsidiaries, successors and/or assigns to be placed on any property, lot or common area described in this Declaration. ARTICLE X. PIER AREA SECTION 1. The Association shall responsible for the cost of maintenance, repair and replacement the pier and pier area as delineated upon plat of the same if constructed. Any obligation for the construction and replacement of any pier shall be subject to approval from CAMA. On or before completion of construction of any pier a plat shall be recorded in the New Hanover County Registry depicting such pier. Replacement of any pier area shall be at the discretion of the Association as determined by vote of a majority of the lot owners. Any owner of an individual boat slip, unit or area shall be liable to pay for his or her pro-rata share, as determined by the Association, of any maintenance, repair or replacement or said slip, unit or area and shall be billed accordingly by the Association. Any owner granted permission to individually and unilaterally construct any pier, dock or slip shall be solely responsible and liable for the cost of construction, maintenance, repair and replacement of said structure. In the event that a owner of a unilaterally constructed pier, dock or slip allows said area to fall into disrepair the Association is hereby granted a right of access to repair or demolish said area and assess a lien for the cost of said repair or demolition upon said owner. ARTICLE XI. FUTURE DEVELOPMENT SECTION 1. Developer may, from time to time, without the assent of any other entity, annex to and make part of the Subdivision any other real property which Developer now owns or later acquired (the "Additional Property'D, upon such terms and conditions and subject to covenants and restrictions, as the Developer, in its sole discretion, shall deem reasonable and appropriate. SECTION 2. Each such annexation of Additional Property shall become effective upon the recording of an amendment to this Declaration, duly executed by the Developer, specifically describing the Additional Property annexed to the subdivision, and setting forth the terms and conditions upon which such Additional Property is annexed to the Subdivision and the covenants and restrictions to which such Additional Property shall be subject. c l 1 0 2006 BY: 16 IN WITNESS WHEREOF, the undersigned has caused this Declaration to be executed the day and year first above written. M County, North Carolina Cypress Grove Land, LLC Steven Shuttleworth, Member/Manager I certify that the following person(s) personally appeared before me this day, each acknowledging to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated: Steven Shuttleworth, member/manager. Date: Printed Name: My commission expires: Notary Public 17 [FQ: $W8 061005 Tarin Woods] Subject: [Fwd: SW8 061005 Tarin Woods] From: Mary Jean Naugle <Mary.Naugle@ncmail.net> Date: Tue, 06 Feb 2007 08:06:03 -0500 To: Linda Lewis <Linda.Lewis@ncmail.net>, Ed Beck <Ed.Beck@ncmail.net> Is this ok ? MJ Subject: SW8 061005 Tarin Woods From: Mary Jean Naugle <Mary.Naugle@ncmail.net> Date: Thu, 25 Jan 2007 14:33:05 -0500 To: Linda Lewis <Linda.Lewis@ncmail.net>, mary.naugle@ncmail.net 1 of 4 2/6/2007 8:06 AM COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 January 31, 2007 Mary Jean Naugle Express Review Permitting N.C. Department of Environment And Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Request for Additional Information I ! i ,, w Project # SW8 061005 1 Tarin Woods New Hanover County CSD Project No. 05-0043 Dear Mary Jean: JAN s 1 ?007 Thank you for your comments on the Tarin Woods submittal. I've noted below our response or actions regarding your comments for the referenced project. Enclosed please find the following items. - two (2) copies of sheets EC-1 through EC-7 , the "Sedimentation & Erosion Control and Storm Water Management Plan" - original notarized restrictive covenants Items: 1. add flow distribution pipes to infiltration basins and flow distribution detail to sheet ec7 Ve truly yours, Ylt Rodney W ht Encl.: As noted above cc: Cypress Grove Land, LLC SW8 061005, Tarin Woods Subject: SW8 061005 Tarin Woods From: Mary Jean Naugle <Mary.Naugle@ncmail.net> Date: Thu, 25 Jan 2007 14:33:05 -0500 To: Linda Lewis <Linda.Lewis@ncmail.net>, mary.naugle@ncmail.net Linda; Please find attached the engineer justification for large drainage areas to infiltration basin. The project proposes: DA infil rate shwt 8 acres 2 in/hr 2 ft separation 11 ac 2 in/hr 2 13 l0in/hr 2 6 2 2 [not at issue] Since the DA to infiltration basins are outside of the 5 acre guidelines in the supplement and the April 1999 BMP, the following items are provided to minimize the potential for erosion and blinding off the infiltration areas as mentioned in BUT as concerns: • storage ponds will act as pretreatment to remove a majority of sediment before the infiltration basins • pumps on discharge of storage ponds are raised above the 25% clean out level so oil or contaminants that float will not make it to he infiltration basin to blind it off. Most of the sediment shouldn't be pumped either [2 ft clean out level at bottom of pump well] • inlet to infiltration basin provides a distribution mechanism to reduce erosion [channel through center with fabric and rock] • pumps discharge into a 3" pipe that is much less than storm runoff erosion for inlet to infiltration basin • monitoring well • O&M will include clean out • will require a semi-annual soil scientist or engr to verify performance in addition to routine O&M should require either additional clean out with replacement of 4" minimum of soil at native infiltration rates [minimum 10in/hr] ... or dense vegetation. Which is more likely to be successful? Probably since this is HOA - i would guess the dense vegetation = is that correct ? One other issue to address is to be sure that they only pump the state SW runoff of 3 inches to the infil basins... but since the bypass is at state storage level, then we should be bypassing water above the 3 inches... right? The Land Management document argues for soil type and SHWT, but i think the biggest concern is blinding off. Have we provided everything in the list above that we can reasonably suggest. Howard indicates the owner is willing to take the additional measures. 1 of 3 2/2/2007 9:07 AM SW8 061005 Tarin Woods it may be alright... but i think he should just use up more land for another basin on future projects: appreciate your review Mary Jean Subject: Tarin Woods From: "Howard Resnik" <howard@coastalsitedesign.com> Date: Wed, 24 Jan 2007 17:46:35 -0500 To: "Mary Jean Naugle" <Mary.Naugle@ncmail.net> Mary Jean, I've enclosed pdf's of the letters I presented to you earlier today. Howard Resnik, PE Coastal Site Design, PC 3805 Cherry Avenue Wilmington, NC 28403 910 791 4441 office 910 791 1501 fax www.coastalsitedesign.com Mary Jean Naugle NC DENR Express WiRO <Mary.Naugle@ncmail.net> Express DWQ NC DENR ............ ............................... _.__..... ............ _............................ _.... _............ ....... ._......_............ _._............ ...................... ... 1 Content -Type: message/rfc822 ;Tarim Woods" Content -Encoding: 7bit ...........:_-::_____:: _:..........................................::......:_:_:............................................ Content -Type: application/pdf I TarinWoodsRFalternDesl.pdf 1 Content -Encoding: base64 1 Content -Type: application/pdf WoodsRFalternDes2.pdf Content -Encoding: base64 WoodsRFalternl;es3.pdfContent-Type: application/pdf i Content -Encoding: base64 2 of 3 2/2/2007 9:07 AM SW8 961095 Tarin Woods ............... -- ........... . . . ........ ........ ... ..................................... .................... ... .. ..................... ...... .................... .. ...... Content -Type: application/pff: TarinWoodsRFalternDes4.pdf Content -Encoding: base64 .......... .. ...... ............. .. .. ................... ................ ........... ..................................................... ......... . ..... ......... .................... ............ ...................................... 3 of 3 2/2/2007 9:07 AM Q TRANSMITTAL To: Mary Jean Naugle Company: NCDENR/DWQ Re: Tarin Woods COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 From: Howard Resnik, PE Date: January 24, 2007 CC: - ❑ Urgent x For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle eComments: Mary Jean Enclosed please find one copy of the letter you requested with a copy of the supporting letter from John Williams. Please call with any questions. Sincerely, Howard LMG LAND MANAGEMENT GROUP INC. Environmental Consultants January 24, 2007 Howard Resnick Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28406 Reference: Tarin Woods, New Hanover County Project #SW8-061005 Dear Mr. Resnick: I am writing to you in response to your recent query regarding approval of an alternative design to the stormwater system serving this project. It is my understanding that NCDENR/DWQ is concerned about the total infiltrative area being greater than 5 acres in size. Although NCDENR/DWQ's comments may have merit in some limited circumstances, I do not perceive this to be a problem on this site from a soils perspective. Specifically, I offer the following guidance. The stormwater system is already overdesigned in my opinion relative to compliance with the seasonal high water table. As you recall, the physical water was not correlated with the seasonal high water table determination during my site visit with Vincent Lewis. Rather, the seasonal high water table was uniformly shallower than the observed water table during all site visits during all seasons of the year due to drainage systems that have been in place for many years on this site. The site was evaluated and the infiltration areas were designed according to redoximorphic features that are indicative of past elevations of seasonal high water table (Richardson and Vepraskas, 2000) and are identified in the field in accordance with Field Indicators of Hydric Soils in the United States, 1998 and Field Guide for Describing and Sampling Soils, 1998. Under undrained conditions these color patterns represent the seasonal high water table which is itself a short term event within a normal hydrologic cycle. Specifically, the Soil Survey of New Hanover County, NC specifically states on page 23 that a high water table is "the highest level of a saturated zone more than 6 inches thick in soils for a continuous period of more than 2 weeks during most years." The Tarin woods project has been designed to morphologic indicators of seasonal high water table. However, it must be noted that this area has historic drainage that has converted the hydrology of thousands of acres in this part of New Hanover County. During a soil investigation, the effects of drainage are not always apparent. In fact, in sandy soils that are iron poor such as the Tarin Woods project, the soil color patterns will remain as false indicators of seasonal high water tables even though the actual water table has been modified by historic www.imgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402 drainage projects. This concept of "relict features of reduction" is well documented By Richardson and Vepraskas in Wetland Soils: Their Genesis, Morphology, Landscapes, and Class cation, 2000. In other words, the site is drained and has a much deeper depth to the seasonal high water table than the actual design depth to the seasonal high water table as approved by Vincent Lewis and as such the infiltration devices have an even higher degree of certainty of performance. Therefore, I must conclude that with respect to the seasonal high water table the project as designed by your office exceeds the required depth to the drainage modified seasonal high water table. This design parameter would support a cumulative infiltration basin that exceeds 5 acres in size. With all due respect to the applicable regulations, I must contend that this site is uniquely qualified to receive an alternative design due to the historic drainage in this area and the conservative design that was utilized in formulating the infiltration basin system. Sincerely, r 9io;:-P'�Williams NC Licensed Soil Scientist 41113 SC Professional Soil Classifier 458 CC: Colorado Coastal Development Company COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 916 791-1501 January 24, 2007 Mary Jean Naugle Express Review Permitting N.C. Department of Environment And Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Request for Approval of Alternative Design Project # SW8 061005 Tarin Woods New Hanover County CSD Project No. 05-0043 Dear Mary Jean: Thank you for your assistance in the review of this project and your direction of how to proceed with latest issue. Per your recommendation, we respectfully request approval of the following alternative design for infiltration basins within the Tarin Woods project: - Installation of infiltration basins with drainage areas larger than 5 acres in size, but otherwise meeting all guidelines and acceptable practices of the NCDENR/DWQ In support of our request, T.R. Schueler in Controlling Urban Runoff, 1992, states that conventional infiltration basins can have drainage areas up to 10 acres in size. He further states that if the drainage area is greater than the maximum allowable drainage area for a practice, then leeway is permitted or more than one practice can be installed in series. The Maryland DNR design manual also states that infiltration basins with drainage areas larger than 10 acres are acceptable. However, neither reference mentions any reasons for limiting the size of drainage areas draining to infiltration basins. It is most likely that scour from high flow rates and increased sedimentation are the main reasons for the drainage area size limitations. The NCDENR BMP manual states that infiltration basins fail mostly due to sediment clogging the basin and preventing infiltration. For all infiltration basins proposed in the Tarin Woods development, sediment/settling basins (storage basins) are used as a primary pretreatment measure, along with sumps in catch basins, junction boxes, and at the offline bypass structures. Stormwater is then pumped to infiltration basins. With this process, a great amount of TSS removal should be achieved prior to storinwater entering the infiltration basin. This treatment system should eliminate the typical causes for infiltration basin failure. The Tarin Woods project is located on property which was ditched some fifty years ago. It is assumed that before the ditching, the property was either extremely wet and/or had a very shallow water table. During the Infiltration Site Visit with DWQ, very few soil conditions were found indicating a deep water table (the locations showing an acceptable SHWT depth were utilized for the infiltration basins shown on the plan). However, groundwater was only encountered in the excavation of the test pits at depths far deeper than what the soil indicated. This is probably due to the excessive dewatering which has taken place since the ditching. The enclosed letter from John Williams with Land Management Group, Inc. supports this soil condition. The proposed infiltration basins are designed to store and infiltrate the first 3" of runoff (instead of first 1"). The `larger drainage area' infiltration basins should help charge the groundwater table at a higher rate within an area previously dewatered by historic ditching. With the presence of ditches and streams on the project, the site will benefit from the increased recharge and the larger basins will promote dry weather flow in the streams on site. Finally, there are other measures which could be installed to mitigate the concerns associated with the larger drainage areas and minimise the chances of failure: - installation of flow distribution mechanisms could more evenly spread runoff within the basins - onsite monitoring could be required to track the proper function and efficiency of the basins, - installation and regular cleanout of a 4" layer of clean sand could minimize clogging/or dense vegetation could me encouraged - increased operation and maintenance requirements could further reduce the possibility of sedimentation and eventual failure.. With the overall proposed impervious at 47%, this project is not extremely high in density, despite the `high density' state stormwater designation. The storage basins should function adequately as sediment basins during the construction process, and begin pumping to the infiltration basins once the site is stable. With proper installation and maintenance of the infiltration basins, this project could serve as a model for other similar projects in Coastal Carolina, and help to minimize the degradation of water quality. We hope that you consider Tarin Woods as an acceptable project for approval of this alternative stormwater design. 'hanks again for your assistance in this matter. Tarin Woods - SW8 061005 Subject: Tarin Woods - SW8 061005 From: Mary Jean Naugle <Mary.Naugle@ncmail.net> Date: Mon, 22 Jan 2007 16:03:51 -0500 To: Howard Resnik <howard@coastalsitedesign.com>, mary.naugle@ncmail.net Howard; Please note that the infiltration supplement states in section III ".... Attach justification if a requirement has not been met." Infiltration supplement item III (g), second paragraph, third sentence, requires drainage area less than 5 acres for an infiltration device, as well as the BMP April 1999 and proposed new BMP. The supplement states you should justify when a requirement is not met. Provide a request for alternative design and the engineering justification for not meeting the 5 acre drainage area on -infiltration basins with the Tarin Woods project. I will forward the request for alternative design to appropriate persons for approval. Mary Jean Naugle NC DENR Express Permitting - WiRO Mary Jean Naugle NC DENR Express WiRO <Man Naugle@ncmail.net> Express DWQ NC DENR SWU103_Infiltration_Basin_Supplement.pdf Content -Type: application/pdf Content -Encoding: base64 1 of 1 1/22/2007 4:46 PM SW8 061005 Tarin Woods Subject: SW8 061005 Tarin Woods From: Mary Jean Naugle <Mary.Naugle@ncmail.net> Date: Fri, 19 Jan 2007 19:27:51 -0500 To: RODNEY WRIGHT <rodney@coastalsitedesign.com>, Howard Resnik <howard@coastalsitedesign.com>, mary.naugle@ncmail.net O \�� Rodney � Please send me another copy of the exhibit B for the deed restrictions that is notarized. A copy by fax is fine, with the original in the normal paper mail is fine. Your submittal on 11/28/06 ad info corrected the deed restriction language to just reference exhibit B... and I received a blank exhibit B with the submittal. I have to get approval from Raleigh for the drainage areas to the infiltration basins for # 2, 3, and 4 because they are significantly larger than the guidelines of 5 acres and the infiltration rate for # 2 and 3 are only 2 in/hr with the SHWT separation, from the infil bottom, only about 2 ft. The infiltration supplement section III (g) requires drainage areas for the device to be less than 5 acres. Please call me Monday to go over the pipe I.E. from the pond to the JB. I just need to understand that the pipe coming out of the pond is above the 25% clean out `level. a ,..The pond detail shows the pipe IE the same as the pond bottom. ' ,k.?,,Please review these items with me for each pond when you have a chance to pull out In -the plans Y thank you t r Mary Jean Mary Jean Naugle NC DENR Express WiRO <Mary.Naugle@ncmail.net> Express DWQ NC DENR 1 of 1 1/22/2007 11:23 AM COASTAL SITE DESIGN, PC PO Box 4041 Wiimington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 January 10, 2007 Mary Jean Naugle Express Review Permitting N.C. Department of Environment And Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Request for Additional Information Project # SW8 061005 Tarin Woods New Hanover County CSD Project No. 05-0043 Dear Mary Jean: Thank you for your comments on the Tarin Woods submittal. I've noted below our response or actions regarding your comments for the referenced project. Enclosed please find the following items. - one (1) copy of the Stormwater Management Calculations - two (2) copies of sheets EC-1 through EC-7 , the "Sedimentation & Erosion Control and Storm Water Management Plan" - one (1) copy of the revised infiltration map Items: 1. enclosed a revised infiltration map that has both the NCDENR and Land Management test pits. 2. N/A 3. a) all pumps have been set an elevation that is greater than the cleanout level b) calculations have been provided in Stormwater packet showing the 25% volume left in the basin c) calculations have been provided in Stormwater packet showing the amount of storage available above the cleanout level. d) calculations have been provided in Stormwater packet showing volumes from b + c above is greater than or equal to the design storm e) all basin are located at least 2 ft above SHWT. Synthetic liner called out on plans will meet or exceed requirements for hydrologic conductivity f) floating fountains have been called for on storage basins. V truly yours, RECEIVED Rodney Wri t Encl.: As noted above JAN 10 2007 cc: Cypress Grove Land, LLC - STORMWATER MANAGEMENT CALCULATIONS For Tarin Woods Subdivision New Hanover County, NC PREPARED FOR Cypress Grove Land, LLC 7741 Market Street, Unit H Wilmington, NC 28411 Prepared by: COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28408 Phone 910 791-4441 Fax: 910 791-150191-1501 JAN 10 2007 ,+pry 0 EV go oN 4owar s 5 P.E. 74 VI .la 0� 06 ?ev, TABLE OF CONTENTS Section Contents I Stormwater Narrative II Project Data III Soils IV 3" Volume Determination, Stage Storage/Discharge Tables, draw down calculations V Pump Curves VI Stormwater Management/Routing Summary VII Hydraulic Modeling VIII Stormwater Collection System Calculations IX NC DOT Calculations X Swale Calculations XI Soils Evaluation Report XII Supporting Documentaion Coastal Site Design, PC P.O. Box 4041 Wilmmingian, NC 28406 Section I 4kCoastal Site Design, PC P.O. Box 4041 V{lilminooN NC 28408 COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 FOR STORMWATER EXPRESS REVIEW October 10, 2006 PROJECT NAME: Tarin Woods PROJECT DESCRIPTION: Tarin Woods is a proposed 130 lot single-family residential subdivision located in New Hanover County. The project is located within %z mile of SA;HWQ waters, and is proposing a total of 34.5% impervious surface throughout the site. Open infiltration basins were chosen as the BMP's. Due to the typically shallow groundwater table, storage basins will be used to store stormwater which will then be pumped to the infiltration basins. There are a total of four storage basins and four infiltration basins handling stormwater for this project. This project is designed to meet or exceed the minimum stormwater management requirements for both the NCDENR/DWQ and New Hanover County's Stormwater Management Ordinance. Stormwater management will be provided for impervious areas only. Backyard water will drain directly offsite. This project is located very close to the ICWW and must be designed to meet NCDENR/DWQ requirements for projects located within Y, milc of SA waters. Stormwater from the impervious areas will be collected via catch basins and conveyed to storage basins, and then pumped to infiltration basins. The infiltration basins have been sized to store the first 3 inches of runoff and infiltrate this volume in under 5 days time. Offline bypass structures have been provided, which includes weir structures set at the 3 inch storage volume elevation. Stormwater volumes larger than the design storm will pass over the weir and out the existing stormwater system. Vegetative filters have not been included since the basin is storing twice the minimum design storm (1- 1/2 inch volume). Additionally, emergency spillways have been provided for both storage basins and infiltration basins with the crest elevations set at least 0.3 feet below the basin's top of berm. In meeting New Hanover County's requirements, the basins have been designed to store and/or infiltrate the increased runoff from the 2-year, 10-year, and 25-year storms. The calculations show that the basins will manage the discharge for the previously mentioned storms. However, bypass and emergency weirs have been provided in the event of a device failure or a storm event much greater than any design storm. PROJECT BMP: High density within %2 mile of SA;HQ waters / open infiltration basins. STORMWATER ENGINEER/CONSULTANT: Coastal Site Design, PC PO Box 4041 Wilmington, NC 28406 Howard Resnik, PE howard@coastalsitedesign.com 910.791 4441 office 910 791 1501 fax coastal Site Nalon, PC PO. BOX 4041 Wumington, NC2840g Section II PROJECT DATA: Existing Site Data (pre -development condition): Areas Draining to Basin 1: existing impervious surface 0 sf (0.00 acres) existing unimproved area 198,207 sf (4.55 acres) Total area to Basin 1 198,207 sf (4..55 acres) Areas Draining to Basin 2: existing impervious surface 0 sf (0.00 acres) existing unimproved area 366,083 sf (8.40 acres) Total area to Basin 2 366,083 sf (8.40 acres) Areas Draining to Basin 3: existing impervious surface 0 sf (0.00 acres) existing unimproved area 500,519 sf (11.49 acres) Total area to Basin 3 500,519 sf (11.49 acres) Areas Draining to Basin 4: existing impervious surface 0 sf (0.00 acres) existing unimproved area 588,192 sf (13.50 acres) Total area to Basin 4 588,192 sf (13.50 acres) Areas Draining offsite: existing impervious surface 0 sf (3.44 acres) existing unimproved area 594,895 sf (13.66 acres) Total area 594,895 sf (13.66 acres) Cw*I Site Design, AC P.O. Box 4041 Wilmington, NC 2NO TOTAL EXISTING TRACT AREAS: total existing impervious surface total existing unimproved area total existing wetlands area Total Tract Area Proposed Site Data (post development condition) Areas Draining to Basin 1: proposed impervious surface proposed grassed areas Total area to Basin 1 Areas Draining to Basin 2: proposed impervious surface proposed grassed areas Total area to Basin 2 Areas Draining to Basin 3: proposed impervious surface proposed grassed areas Total area to Basin 3 Areas Draining to Basin 4: proposed impervious surface proposed grassed areas Total area to Basin 4 Areas Draining offsite: existing wetlands area (to remain undisturbed) proposed grassed area Total area 0 sf (0.00 acres) 2,247,896 sf (51.60 acres) 0 sf (0 acres) 2,247,896 sf (51.60 acres) 78,742 sf (1.81 acres) 119,465 sf (2.74 acres) 198,207 sf (4.55 acres) 181,734 sf (4.17 acres) 184,349 sf (4.23 acres) 366,083 sf (8.40 acres) 224,726 sf (5.16 acres) 275,793 sf (6.33 acres) 500,519 sf (11.49 acres) 290,495 sf (6.67 acres) 297,697 sf (6.83 acres) 588,192 sf (13.50 acres) 0 sf (0.00 acres) 594,895 sf (13.66 acres) 594,89 DWj % DeSigni PC a P.0.8ox4p¢T frrdVoa NC PAW TOTAL PROPOSED TRACT AREAS: total proposed impervious surface total proposed grassed areas Total Tract Area 775,697 sf (17.80 acres) 1,472,199 sf (33.80 acres) 2,247,896 sf (51.60 acres) Coastal Site Design, PC ., PO. Box 4041 Wilmington, NC 28406 Section III �t Coastal site Design, PC P,O. Box 4041 Wilmington, NO 2840 Soil Types: Abbreviation Type and Description Hydrologic Group Area Pm Pamlico D 17.18 ac Mu Murville A/D 18.92 ac Ly Lynn Haven B/D 10.70 ac Le Leon B/D 4.03 ac Kr Kureb A 0.24 ac Se Seagate A/D 0.53 ac (See attached page 15 of Table 8.01d, "Soil Characteristics for Common Soils in North Carolina". Also see attached Table 14, "Physical and Chemical Properties of Soils.") (See attached soils map and page 26 & 63 from New Hanover County Soils Survey) Coastal Site Design, PC M. sox 4041 Wilmington, NC 28406 Section IV Coastal site Design, PC P.O. Box 4041 Wiimin0ion, NO 28408 INFILTRATION BASIN 1 1-1/2" VOLUME DETERMINATION: DETERMINE IMPERVIOUS PERCENTAGE TO INFILTRATION BASIN area to basin = 198,207 sf - 4.55 acres buildings/driveways = 52,000 sf paved area = 24,155 sf sidewalks = 2,587 sf total imp. surface = 78,742 sf percent imp. = 39.7 % DETERMINE RUNOFF COEFFICIENT (Rv) I = 39.7 percent impervious Rv = ? (runoff coefficient, inches per inch) Rv = 0.05 + 0.009 (1) Rv = 0.41 in/in DETERMINE VOLUME design stone - 1.5 inch Rv = 0.41 inAn drainage area = 4.55 acres volume = ? volume = (design storm)(Rv)(drainage area) volume = 0.2 acre-ft 1-10 volume = 10,097 cf of required storage volume vd veg. Filter 3" volume = 20,195 cf of required storage volume w/o veg. Filter STORAGE BASIN STAGE - STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (ft) (sf) (cf) M 13 5083 - - pump on elev 13.9 6503 5,214 5,214 14 6,666 658 5,872 14.6 7,661 4,298 10,170 15 8,344 3,201 13,371 15.6 9,753 7;239 20,610 16 10,111 1,966 22,596 17 11,940 11,026 33,622 weir cut 17.1 12,126 1,203 34,825 18 13,824 11,678 46,503 19 15,765 14,795 61,297 20 17,763 16,764 78,061 Storage provided between pump and overflow = 29,612 cf 3" storage volume provided = 20,610 cf 25% of 3" volume = 5,048 cf 5,048 + 29,612 = 34,660 cf < 20,195 cf COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 STORAGE BASIN STAGE - DISCHARGE TABLE: pump flow rate (cfs) = 0.23 elevation of pump = 13.9 crest length of weir cut (ft) = 2.0 elevation of weir cut = 17.1 crest length of spillway (ft) = 40.0 elevation of spillway = 18.0 ELEVATION PUMP WEIR SPILLWAY TOTAL (ft) (d5) (ifs) WS) (S) 13 - - - - 14 - - - - 15 0.23 - 0.23 16 0.23 - - 0.23 17 0.23 - - 0.23 18 0.23 5.64 - 5.87 19 0.23 17.29 120.00 137.52 20 0.23 32.59 339.41 372.24 INFILTRATION BASIN STAGE - STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (ft) (sf) (co (if) 19 11,772 - - 20 13,527 12,650 12,650 20.6 14,625 8,446 21,095 21 15,376 3,075 24,170 3" storage volume provided = 21,095 cf !� STAGE - DISCHARGE TABLE: infiltration rate (cfs) = 0.55 crest length of spillway (ft) = 20.0 elevation of spillway 20.6 ELEVATION INFILTRATION SPILLWAY TOTAL (ft) (cfs) (cfs) (cfs) 19 - - - 20 0.55 - 0.55 21 0.55 15.18 15.72 DRAWDOWN TIME: linear infiltration rate = 2 in/hr = 0.000046 ft/sec basin bottom area = 11,772 sf 3-d Infiltration rate = 0.55 cf/sec drawdown time = 645.1 minutes t 10.8 hours or 0.4 days COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 INFILTRATION BASIN 2 1-1/21' VOLUME DETERMINATION: DETERMINE IMPERVIOUS PERCENTAGE TO INFILTRATION BASIN area to basin = 366,083 sf 8.40 acres buildings/driveways = 123,000 sf paved area = 52,099 sf sidewalks = 6,635 sf total imp. surface = 181,734 sf percent imp. = 49.6 % DETERMINE RUNOFF COEFFICIENT (Rv) I = 49.6 percent impervious Rv = ? (runoff coefficient, inches per inch) Rv = 0.05 + 0.009 (1) Rv = 0.50 inAn DETERMINE VOLUME design storm = 1.5 inch Rv = 0.50 in/in drainage area = 8.40 acres volume = ? volume = (design storm)(Rv)(drainage area) volume = 0.5 acre-ft 1-1/2" volume = 22,733 cf of required storage volume w/veg. Filter 3" volume = 45,466 cf of required storage volume w/o veg. Filter STORAGE BASIN STAGE - STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (ft) (sf) (co (C0 8 8,446 - - 9 9,645 9,046 9,046 pump elev 9.3 10,021 2,950 11,995 10 10,924 7,199 19,195 10.4 11,458 4,476 23,671 11 12,283 7,122 30,793 12 13,720 13,002 43,795 weir cut 12.2 14,106 2,783 46,577 13 15,236 7,336 53,913 14 16,831 16,034 69,946 15 18,505 17,668 87,614 Storage provided between pump and overflow = 34,582 cf 3" storage volume provided 46,577 cf.- - 25% of 3" volume = 11,367 cf 11,367 + 34,582 = 45,949 cf < 45,466 cf COASTAL SITE DESIGN, PC PO BOX 4041 W ILMINGTON, NC 28406 STAGE - DISCHARGE TABLE: pump flow rate (cfs) = 0.20 crest length of weir cut (ft) = 2.0 crest length of spillway (ft) = 20.0 ELEVATION PUMP (ft) (cfs) 8 4,961 - 9 5,897 - 10 6,921 0.20 11 8,034 0.20 12 9,235 0.20 13 10,511 0.20 14 11,858 0.20 15 13,278 0.20 INFILTRATION BASIN STAGE - STORAGE TABLE: INCREMENTAL elevation of pump = 9.3 elevation of weir cut = 12.2 elevation of spillway = 14.5 WEiR SPILLWAY TOTAL (cfs) (cfs) (cfs) - 0.20 - 0.20 - - 0.20 4.72 - 4.92 15.94 - 16.14 30.92 21.21 52.34 ELEVATION AREA VOLUME STORAGE (ft) (sf) (cf) (Cf) 18 23,486 - - 19 25,841 24,664 24,664 19.8 27,776 21,447 46,110 20 28,267 5,604 51,715 3" storage volume provided = 46,110 cf STAGE - DISCHARGE TABLE: infiltration rate (cfs) = 1.09 crest length of spillway (ft) = 20.0 elevation of spillway = 19.8 ELEVATION INFILTRATION SPILLWAY TOTAL (ft) (cfs) (Cfs) (cfs) 18 - _ _ 19 1.09 - 1.09 20 1.09 5.37 6.45 DRAWDOWN TIME: linear infiltration. rate = basin bottom area = 3-d infiltration rate = drawdown time = 2 in/hr 0.000046 ft/sec 23,486 sf 1.09 cF/sec 706.8 minutes or 11.8 hours or 0.5 days COASTAL SITE DESIGN, PC PO BOX 4041 W ILMINGTON, NC 28406 INFILTRATION BASIN 3 1-1/2" VOLUME DETERMINATION: DETERMINE IMPERVIOUS PERCENTAGE TO INFILTRATION BASIN area to basin = 500,519 sf = 11.49 acres buildings/driveways = 160,000 sf paved area = 56,971 sf sidewalks = 7,755 sf total imp. surface = 224,726 sf percent imp. = 44.9 % DETERMINE RUNOFF COEFFICIENT (Rv) I = 44.9 percent impervious Rv = ? (runoff coefficient, inches per inch) Rv = 0.05 + 0.009 (1) Rv = 0.45 in/in DETERMINE VOLUME design storm = 1.5 inch Rv = 0.45 in/in drainage area = 11.49 acres volume = ? volume (design stormxRv)(drainage area) volume 0.7 acre-ft 1-1/2" volume 28,410 cf of required storage volume wl veg. Filter 3" volume 56,820 cf of required storage volume w/o veg. Filter STORAGE BASIN STAGE - STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (ft) (sf) ' (cf) (d 15 24,672 - - pump elev 15.6 25,928 15,180 15,180 16 26,787 10,543 25,723 16.1 27,004 2,690 28,413 17 28,982 25,194 53,606 weir cut 17.2 29,427 5,841 59,447 18 31,233 24,264 83,711 19 33,542 32,388 116,099 20 35,907 34,725 150,823 21 38,328 37,118 187,941 22 40,807 39,568 227,508 23 43,341 42,074 269,582 Storage provided between pump and overflow = 44,267 cf. 3" storage volume provided = 59,447 cf 25% of 3" volume = 14,205 cf 14,205 + 44,267 = 58,472 cf < 56,820 cf 0 COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 STAGE - DISCHARGE TABLE: pump rate (cfs) = 0.21 elevation of pump = 15.6 crest length of weir cut (ft) = 2.0 elevation of weir cut = 17.2 crest length of spillway (ft) = 50.0 elevation of spillway = 21.0 ELEVATION PUMP WEIR SPILLWAY TOTAL (ft) (cft) (cfs) (cfs) (cfs) 15 24,672 0.00 - - 16 26,787 0.21 - 0.21 17 28,982 0.21 - 0.21 18 31,233 0.21 4.72 - 4.93 19 33,542 0.21 15.94 - 16.15 20 35,907 0.21 30.92 - 31.13 21 38,328 0.21 48.89 - 49.10 22 40,807 0.24 69.41 150.00 219.65 23 43,341 0.24 92.19 424.26 516.69 INFILTRATION BASIN STAGE - STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (ft) (sf) (cf) (Cf) 22 32,966 - - 23 35,912 34,439 34,439 23.8 38,320 29,693 64,132 24 38,929 7,725 71,857 1-1/2" storage volume provided = 34,439 cf 3" storage volume provided = 64,132 cf STAGE - DISCHARGE TABLE: infiltration rate (cfs) = 1.53 crest length of spillway (ft) = 20.0 elevation of spillway = 23.8 ELEVATION INFILTRATION SPILLWAY TOTAL (ft) (d7S) (cls) (cfs) 22 - - - 23 1.53 - 1.53 24 1.53 5.37 6.89 DRAWDOWN TIME: linear infitration rate = basin bottom area = 3-d infiltration rate = drawdown time = 2 In/hr 0.000046 ft/sec 32,966 sf 1.53 cf/sec 700.3 minutes or 11.7 hours or 0.5 days COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 a INFILTRATION BASIN 4 1-1/2" VOLUME DETERMINATION: DETERMINE IMPERVIOUS PERCENTAGE TO INFILTRATION BASIN area to basin = 588,192 sf = 13.50 acres buildings/driveways = 185,000 sf paved area = 96,044 sf sidewalks = 9,451 sf total imp. surface = 290,495 sf percent imp. = 49.4 % DETERMINE RUNOFF COEFFICIENT (Rv) I = 49.4 percent impervious Rv = ? (runoff coefficient, Inches per inch) Rv = 0.05 + 0.009 (1) Rv = 0.49 in/in DETERMINE VOLUME design storm = 1.5 inch Rv = 0.49 infin drainage area = 13.50 acres volume = ? volume = (design stonn)(Rv)(drainage area) volume= 0.8 acre-ft 1-1/2' vD.lume = 36.357 cf of required storage volume w/ veg. Filter 3' volume = 72,714 cf of required storage volume w/o veg. Filter STORAGE BASIN STAGE - STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (ft) (SO (co (cf) 16 16,227 - - 17 18,223 17,225 17,225 25%of volume 17.1 18,425 1,832 19,057 18 20,276 19,250 38,307 19 22,386 21,331 59,638 19.7 23,897 16,199 75,837 .20 24,553 7,268 83,104 21 26,776 25,665 108,769 22 29,057 27,917 136,685 23 31,393 30,225 166,910 Storage provided between pump and overflow = 56,780 of 3" storage volume provided = 75,837 cf 25% or 3' volume = 18,179 cf 18,179 + 56,780 74,959 of < 72,714 cf COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC28406 STAGE - DISCHARGE TABLE: pump rate (cfs) = 0.21 crest length of weir cut (ft) = 2.0 crest length of spillway (ft) = 40.0 ELEVATION PUMP (fQ (cft) 16 13,099 0.00 17 14,807 0.00 18 16,573 0.21 19 18,395 0.21 20 20,274 0.21 21 22,209 0.21 22 24,201 0.21 23 26,249 0.23 INFILTRATION BASIN STAGE - STORAGE TABLE: elevation of pump = 17.1 elevation of weir cut= 19.7 elevation ofspillway= 20.2 WEIR SPILLWAY TOTAL (cft) (cfs) Wis) 0.21 0.21 1.08 1.29 9.78 85.87 95.86 23.02 -289.79 313.03 39.57 562.24 602.03 INCREMENTAL ELEVATION AREA VOLUME STORAGE (ft) (Sfl (co (co 24 16,292 - - 25 17,852 17,072 17,072 26 19,480 18,666 35,738 26.1 19,646 1,956 37,694 27 21,175 27,824 65,518 27.3 21,697 9,685 75,203 28 22,938 15,622 90,825 29 24,770 23,854 114,679 30 26,670 25,720 140,399 31 28,638 27,654 168,053 3' storage volume provided 75,203 cf STAGE DISCHARGE TABLE: Infiltration rate (cfs) = 2.29 crest length of spillway (ft) = 20.0 elevation of spillway = 30.0 ELEVATION INFILTRATION SPILLWAY TOTAL (ft) (cfs) (cfs) (cfs) 24 16,292 - - 25 17,852 2.29 - 2.29 26 19,480 2.29 2.29 27 21,175 2.29 2.29 28 22,938 2.29 - 2.29 29 24,770 2.29 2.29 t 30 26,670 31 28,638 2.29 2.29 - 2.29 44�p�11� 60.00 62.29 DRAWDOWN TIME: linear infiltration rate = 10 in/hr = 0.000231 ft/sec basin bottom area = 9,884 sf 3-d infiltration rate = 2.29 cf/sec drawdown time = 547.8 minutes or - /9.1 hours �_,Or- _ - 0.4 days COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 Section V TARIN WOODS STORMWATER PUMP STATION / FORCE MAIN CALCULATIONS STORAGE BASIN 1 PUMP CONDITIONS: 19.0 = APPROXIMATE DISCHARGE ELEVATION 13.9 = ELEVATION OF PUMP 17.5 = INVERT OF HIGHEST POINT IN PROPOSED FORCE MAIN 410 LF OF PROPOSED 3' FORCE MAIN 20195 CF VOLUME TO BE DRAWN DOWN IN UNDER 5 DAYS 21.0 GPM MIN. FLOWRATE REQUIRED TO DRAWDOWN IN 5 DAYS HEAD LOSS: USING HAZEN-WILLIAMS: Q = 21 GPM min. required for drawdown D= 3" hf = 10.44 x 410 x 21 A1.85 = 0.6 FT L = 410 FT 140A1.85 x 3 A4.87 C = 140 he = 17.5 - 13.9 = 3.6 FT hm = 522 x 3.7 x QA2 = 0.071 FT Ke = 5 DA4 TOTAL DYNAMIC HEAD = 4.3 FT USE 21.0 GPM @ 4.3 FT TDH FOR DESIGN Select Tsurumi NK2-15 Semi -Vortex Dewatering Pump: 3" discharge 2 HP, 110 Volt, 1 Phase, 3440 RPM Motors 102 GPM ACTUAL FLOWRATE ACCORDING TO PUMP CURVE 0.23 CFS ACTUAL FLOWRATE ACCORDING TO PUMP CURVE 1.03 DAYS ACTUAL DRAWDOWN TIME Page 1 TSURUMI Pump NK-SEMErs PERFOUMCE §B94ORM-MWATEM PUNS I RANGE I m R 30- 100 so 251 So m 20 6D 5D 40 10 30 o GROUP PERFORMANCE IU%NrzE MM me —MM US GPM 0 20 40 60 OD 7:. 1o01-1&* --12D 140 m3lafin 0.0 02 0.3 CA 0.6 CAPACITY Bfi-swl, ti 'd 88ti8 'ON NL AlddnS. SIHOnH TARIN WOODS STORMWATER PUMP STATION / FORCE MAIN CALCULATIONS STORAGE BASIN 2 PUMP CONDITIONS: 18.0 = APPROXIMATE DISCHARGE ELEVATION 9.3 = ELEVATION OF PUMP 17.5 = INVERT OF HIGHEST POINT IN PROPOSED FORCE MAIN 846 LF OF PROPOSED 3" FORCE MAIN 46713 CIF VOLUME TO BE DRAWN DOWN IN UNDER 5 DAYS 48.5 GPM MIN. FLOWRATE REQUIRED TO DRAWDOWN IN 5 DAYS HEAD LOSS: USING HAZEN-W ILLIAMS: Q = D= hf = 10.44 x 846 x 48.5 A1.85 = 5.9 FT L = 140A1.85 x 3 A4.87 C = he = 17.5 - 9.3 = 8.2 FT hm = 522 x 3.7 x QA2 = 0.376 FT Ke = DA4 TOTAL DYNAMIC HEAD = 14.5 FT USE 48.6 GPM @ 14.5 FT TDH FOR DESIGN Select Tsurumi NK2-15 Semi -Vortex Dewatering Pump: 3" discharge 2 HP, 110 Volt, 1 Phase, 3440 RPM Motors 90 GPM ACTUAL FLOWRATE ACCORDING TO PUMP CURVE 0.20 CFS ACTUAL FLOWRATE ACCORDING TO PUMP CURVE 2.70 DAYS ACTUAL DRAWDOWN TIME 48.5 GPM min. required for drawdown 3" 846 FT 140 5 Page 1 '17 TsuRumi PUMP I NK - SONFA womma I PRUSE I M Ft 30- 100 so 25 80 m 2D I 6D 5 so 40 Qu Xj 10 GROUP PERFORMANCE RANGE 4 6o loo 14C us GPM a 20 4o 4 ao 12D A mNrwln 0.0 02 as 0.4 0.6 CAPACITY Coastal Slt6 0881in, PC jkpo%xol Milmingon, NC 28406 ti 'd RD8 'ON NL Alddns SMAH W014. MT bt aq.q TARIN WOODS STORMWATER PUMP STATION / FORCE MAIN CALCULATIONS STORAGE BASIN 3 PUMP CONDITIONS: 22.0 = APPROXIMATE DISCHARGE ELEVATION 15.6 = ELEVATION OF PUMP 22.0 = INVERT OF HIGHEST POINT IN PROPOSED -FORCE MAIN 576 LF OF PROPOSED 3" FORCE MAIN 59447 CF VOLUME TO BE DRAWN DOWN IN UNDER 5 DAYS 61.8 GPM MIN. FLOWRATE REQUIRED TO DRAWDOWN IN 5 DAYS HEAD LOSS: USING HAZEN-WILLIAMS: Q= 61.8 GPM min. required for drawdown D= 3" hf = 10.44 x 576 x 61.8 A1.85 = 6.3 FT L = 576 FT 140A1.85 x 3 A4.87 C = 140 he = 22.0 - 15.6 = 6.4 FT hm = 522 x 3.7 x QA2 = 0.733 FT Ke = 6 DA4 TOTAL DYNAMIC HEAD = 13.4 FT USE 61.8 GPM @ 13A FT TDH FOR DESIGN Select Tsurumi NK2-15 Semi -Vortex Dewatering Pump: 3" discharge 2 HP,110 Volt 1 Phase, 3440 RPM Motors 95 GPM ACTUAL FLOWRATE ACCORDING TO PUMP CURVE 0.21 CFS ACTUAL FLOWRATE ACCORDING TO PUMP CURVE 3.25 DAYS ACTUAL DRAWDOWN TIME Coastal Site Design, PC s a,. P.O, Box 4041 Wilmington, NC 28406 Page 1 NK—SERES PERFDMMCE I jSURU gav TM Pump I fflwvm=.MWATERRM PLMM I RANGE I m R 251 1UU so 1 11 201 70 3: 151 so 40- ;pa 201. t�o 10 a 1 0 GROUP PERFORMANCE RANGE , qh ILL I US GPM 0 20 40 SD 8D �"%00 120 14' liffrWin 04 01 OA OS CAPACITY B��� Coastal site Deslop . PC PO, BOX 4041 1111minp, N'C 2a4LI6 ODD 'ON NL AlddnS 23HonH &OL.:P 080� -�j -d3S TARIN WOODS STORMWATER PUMP STATION / FORCE MAIN CALCULATIONS STORAGE BASIN 4 PUMP CONDITIONS: 27.0 = APPROXIMATE DISCHARGE ELEVATION 17.1 = ELEVATION OF PUMP 27.0 = INVERT OF HIGHEST POINT IN PROPOSED FORCE MAIN 368 LF OF PROPOSED 3' FORCE MAIN 72714 CF VOLUME TO BE DRAWN DOWN IN UNDER 5 DAYS 75.5 GPM MIN. FLOWRATE REQUIRED TO DRAWDOWN IN 5 DAYS HEAD LOSS: USING HAZEN-WILLIAMS: Q= D= hf = 10.44 x 368 x 75.5 A1.85 = 5.8 FT L = 140A1.85 x 3 A4.87 C = he = 27.0 - 17.1 9.9 FT hm = 522 x 3.7 x QA2 = 0.912 FT Ke = DA4 TOTAL DYNAMIC HEAD = 16.6 FT USE 75.5 GPM Q 16.6 FT TDH FOR DESIGN Select Tsurumi NK2-15 Semi -Vortex Dewatering Pump: 3" discharge 2 HP, 110 Volt, 1 Phase, 3440 RPM Motors 96 GPM ACTUAL FLOWRATE ACCORDING TO PUMP CURVE 0.21 CFS ACTUAL FLOWRATE ACCORDING TO PUMP CURVE 3.93 DAYS ACTUAL DRAWDOWN TIME 75.5 GPM min. required for drawdown 3" 368 FT 140 Castel Site Design, PC Pd. BOX 4041 MI mington, NC 28406 Page 1 ti 'd BM 'ON NC Al.W.n.q qqlp.DoH jAld A I : E 9AA7 -4,1. -.no Section VI Coastal Site Design, PC JRk-m-0i, P0. Box 4041 Wilminoon, NC 28406 STORMWATER MANAGEMENT FOR NEW HANOVER COUNTY: PRE -DEVELOPED CONDITIONS (see hydrograph summary): - Pre-dev. — Basin 1 CN Pre Developed = 53 (SCS) composite value determined as follows: +/- 146,214 sf of soils are A, woods — thin stand (CN = 45) +/- 22,336 sf of soils are B, woods — thin stand (CN = 66) - +/- 29,658 sf of soils are D, woods — thin stand (CN = 83) (146,214 x 45 + 22,336 x 66 + 29,658 x 83) / 198,207 = 53.1... Used CN = 53 Area = 198,207 sf or 4.55 acres Hydraulic length = 498 ft Basin slope = 1.8% Qmax for pre-dev 2-yr storm = 0.91 cfs Qmax for pre-dev 10-yr storm = 3.65 cfs Qmax for pre-dev 25-yr storm = 5.11 cfs Qmax for pre-dev 100-yr storm = 8.10 cfs - Pre-dev. — Basin 2 CN Pre Developed = 56 (SCS) composite value determined as follows: +/-172,000 sf of soils are A, woods — thin stand (CN = 45) +/-194,083 sf of soils are B, woods —thin stand (CN = 66) (172,000 x 45 + 194,083 x 66) / 366,083 = 56.1... Used CN = 56 Area = 366,083 sf or 8.40 acres Hydraulic length = 720 ft Basin slope = 6.1 % Qmax for pre-dev 2-yr storm =1.92 cfs Qmax for pre-dev 10-yr storm = 6.59 cfs Qmax for pre-dev 25-yr storm = 8.95 cfs Qmax for pre-dev 100-yr.storm = 13.78 cfs - pre-dev. — Basin 3 CN Pre Developed = 58 (SCS) composite value determined as follows: +/- 265,973 sf of soils are A, woods — thin stand (CN = 45) - +/-142,973 sf of soils are B, woods —thin stand (CN = 66) +/- 91,573 sf of soils are D, woods — thin stand (CN = 83) (265,973 x 45 + 142,973 x 66 + 91,573 x 83) / 500,519 = 57.9... Used CN = 58 Area = 500,519 sf or 11.49 acres Hydraulic length = 702 ft Basin slope = 1.0% A Coastal Site Design, PC P.O. Box 4041 0mington,, NC 28406 Qmax for pre-dev 2-yr storm = 2.72 cfs Qmax for pre-dev 10-yr storm = 8.59 cfs Qmax for pre-dev 25-yr storm =11.54 cfs Qmax for pre-dev 100-yr storm = 17.42 cfs - Pre-dev. — Basin 4 CN Pre Developed = 74 (SCS) composite value determined as follows: +/- 87,220 sf of soils are A, woods — thin stand (CN = 45) +/- 106,243 sf of soils are B, woods — thin stand (CN = 66) +/- 394,729 sf of soils are D, woods — thin stand (CN = 83) (87,220 x 45 + 106,243 x 66 + 394,729 x 83) / 588,192 = 74.2... Used CN = 74 Area = 588,192 sf or 13.50 acres Hydraulic length = 527 ft Basin slope = 0.7% Qmax for pre-dev 2-yr storm = 12.13 cfs Qmax for pre-dev 10-yr storm = 25.28 cfs Qmax for pre-dev 25-yr storm = 31.06 cfs Qmax for pre-dev 100-yr storm = 41.99 cfs POST -DEVELOPED. CONDMONS (see hydrograph summary): - Post-dev. - Basin 1 CN Post Developed = 74 (SCS) composite value determined as follows: +/- 71,409 sf of soils are A, woods — thin stand (CN = 45) - +/- 21,398 sf of soils are B, woods — thin stand (CN = 66) +/- 26,658 sf of soils are D, woods — thin stand (CN = 83) +/- 78,742 sf of impervious surface (CN = 98) (71,409 x 45 + 21,398 x 66 + 26,658 x 83 + 78,742 x 98) / 198,207 = 73.4... Used CN = 74 Area = 198,207 sf or 4.55 acres Hydraulic length = 489 ft Basin slope = 0.4% Qmax for post-dev 2-yr storm = 3.38 cfs Qmax for post-dev 10-yr storm = 7.09 cfs Qmax for post-dev 25-yr storm = 8.73 cfs Qmax for post-dev 100-yr storm = 11.82 cfs - Post-dev. - Basin 2 CN Post Developed = 78 (SCS) composite value determined as follows: +/- 81,133 sf of soils are A, woods — thin stand (CN = 45) Xp"'O' 103,213 sf of soils are B, woods — thin stand (CN = 66)0, gox4041181,734 sf of impervious surface (CN = 98) j��p'roon, NO 28406 (81,133 x 45 + 103,213 x 66 + 181,734 x 98) / 366,083 = 77.2... Used CN = 78 Area = 366,083 sf or 8.40 acres Hydraulic length = 1,250 ft Basin slope = 0.4% Qmax for post-dev 2-yr storm = 5.01 cfs Qmax for post-dev 10-yr storm = 9.94 cfs Qmax for post-dev 25-yr storm = 12.10 cfs Qmax for post-dev 100-yr storm = 16.14 cfs - Post-dev. - Basin 3 CN Post Developed = 75 (SCS) composite value determined as follows: +/- 97,428 sf of soils are A, woods — thin stand (CN = 45) - +/-109,264 sf of soils are B, woods — thin stand (CN = 66) - +/- 69,101 sf of soils are D, woods —thin stand (CN = 83) +/- 224,726 sf of impervious surface (CN = 98) (97,428 x 45 + 109,264 x 66 + 69,101 x 83 + 224,726 x 98) / 500,519 — 78.6..Used CN = 79 Area = 500,519 sf or 11.49 acres Hydraulic length = 1,210 ft Basin slope = 0.4% Qmax for post-dev 2-yr storm = 7.13 cfs Qmax for post-dev 10-yr storm = 13.94 cfs Qmax for post-dev 25-yr storm = 16.90 cfs Qmax for post-dev 100-yr storm = 22.44 cfs Post-dev. - Basin 4 CN Post Developed = 84 (SCS) composite value determined as follows: +/- 72,695 sf of soils are A, woods — thin stand (CN = 45) +/- 77,194 sf of soils are B, woods —thin stand (CN­ 66) +/-147,808 sf of soils are D, woods — thin stand (CN = 83) +/- 290,495 sf of impervious surface (CN = 98) (72,695 x 45 + 77,194 x 66 + 147,808 x 83 + 290,495 x 98) / 588,192 = 83.5..Used CN = 84 Area = 588,192 sf or 13.50 acres Hydraulic length =1,332 ft Basin slope = 0.4% Qmax for post-dev 2-yr storm = 11.23 cfs Qmax for post-dev 10-yr storm = 20.44 cfs Qmax for post-dev 25-yr storm = 24.34 cfs Qmax for post-dev 100-yr storm = 31.57 cfs Coagtai site Deign, PC A!" PO. Box 4041 ,,A-. Wilmington, NC 28406 - Routed -site -areas draining to pond routed through pond (see hydrographs) Basin 1: Qmax for post -route 2-yr storm = 0.23 cfs Qmax for post -route 10-yr storm = 1.l l cfs Qmax for post -route 25-yr storm = 2.58 cfs Qmax for post -route 100-yr storm = 5.77 cfs Basin 2: Qmax for post -route 2-yr storm = 1.03 cfs Qmax for post -route 10-yr storm = 6.43 cfs Qmax for post -route 25-yr storm = 8.92 cfs Qmax for post -route 100-yr storm = 13.28 cfs Basin 3: Qmax for post -route 2-yr storm = 0.55 cfs Qmax for post -route 10-yr storm = 5.48 cfs Qmax for post -route 25-yr storm = 8.79 cfs Qmax for post -route 100-yr storm = 14.28 cfs Basin 4: Qmax for post -route 2-yr storm = 2.21 cfs Qmax for post -route 10-yr storm = 17.70 cfs Qmax for post -route 25-yr storm = 22.78 cfs Qmax for post -route 100-yr storm = 31.21 cfs SUMMARY: Total Pre Development Flows: Qmax for pre-dev 2-yr storm = 0.91 + 1.92 + 2.72 + 12.13 =17.68 cfs Qmax for pre-dev 10-yr storm = 3.65 + 6.59 + 8.59 + 25.28 = 44.11 cfs Qmax for pre-dev 25-yr storm = 5.11 + 8.95 + 11.54 + 31.06 = 56.66 cfs Qmax for pre-dev 100-yr storm = 8.10 + 13.78 + 17.42 + 41.99 = 81.29 cfs Total Post Development Flows: Qmax for post-dev 2-yr storm = 3.38 + 5.01 + 7.13 + 11.23 = 26.75 cfs Qmax for post-dev 10-yr storm = 7.09 + 9.94 + 13.94 + 20.44 = 51.41 cfs Qmax for post -dev 25-yr storm = 8.73 + 12.10 + 16.90 + 24.34 = 62.07 cfs Qmax for post -dev 100-yr storm = 11.82 + 16.14 + 22.44 + 31.57 = 81.97 cfs Total Post -Routed Development Flows: Qmax for post routed-dev 2-yr storm = 0.23 + 1.03 + 0.55 + 2.12 = 4.02 cfs Qmax for post -routed -dev 10-yr storm =1.11 + 6.43 + 5.48 + 17.70 = 30.72 cfs Qmax for post -routed -dev 25-yr storm- 2.58 + 8.92 + 8.79 + 22.78 = 43.07 cfs Qmax for post-routed-dev 100-yr storm = 5.77 + 13.28 + 14.28 + 31.21 = 64.54 cfs Qmax for post-dev. 25-yr storm = 43.07 cfs > 56.66 cfs... OK "SYSTEM PASSES 100 YEAR STORM Coasts! Site Design, PC P.O, Box 4041, Wilmington, NC 28406 Section VII SIB DnIgn PC P6 BOX 4041 WIRRIngton, NC 28406 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation 00 Maximum storage (cuft) Hydrograph description 1 SCS Runoff 12.91 6 798 237,061 — -- Total Site Pre-dev 2 SCS Runoff 0.914 6 762 10,572 — ---- Basin 1 Pre-dev 3 SCS Runoff 1.918 6 768 23,860 — Basin 2 Pre-dev 4 SCS Runoff 2.719 6 780 38,202 — ------ Basin 3 Pre-dev 5 SCS Runoff 12.13 6 750 96,654 — ------ — Basin 4 Pre-dev 6 SCS Runoff 3.376 6 756 32,067 — — Basin 1 Post-dev 7 SCS Runoff 5.006 6 780 69,289 — — Basin 2 Post-dev 8 SCS Runoff 7.126 6 780 98,234 — — Basin 3 Post-dev 9 SCS Runoff 11.23 6 768 138,027 — — --- Basin 4 Post-dev 10 SCS Runoff 0.143 6 1188 5,482 — Offsite Post-dev 11 SCS Runoff 2.348 6 846 50,250 — — — Offsite Pre-dev 12 Reservoir 0.230 6 972 31,970 6 15.00 23,423 Basin 1 Routed 13 Reservoir 1.032 6 1002 69,184 7 12.18 48,103 Basin 2 Routed 14 Reservoir 0.549 6 1290 96,118 8 17.07 82,765 Basin 3 Routed 15 Reservoir 2.212 6 954 103,485 9 20.01 98,750 Basin 4 Routed Coastal Site Design, PC: P.O. Box 4041 wilmingtA NC 2" All—basins.gpw Return Period: 2 Year Monday, Jan 8 2007, 4:45 PM u d---Mmv Hydro�zmnhs ! yv l^tellsolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cts) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 34.00 6 786 562,177 -- --- — Total Site Pre-dev 2 SCS Runoff 3.655 6 756 32,009 — Basin 1 Pre-dev 3 SCS Runoff 6.588 6 762 66,578 — — Basin 2 Pre-dev 4 SCS Runoff 8.594 6 768 101,741 — Basin 3 Pre-dev 5 SCS Runoff 25.28 6 750 198,081 — ------ Basin 4 Pre-dev 6 SCS -Runoff 7.090 6 756 65,717 — Basin 1 Post-dev 7 SCS Runoff 9.941 6 774 135,228 — — — Basin 2 Post-dev 8 SCS Runoff 13.94 6 774 189,501 — -- Basin 3 Post-dev 9 SCS Runoff 20.44 6 768 251,882 — — — Basin 4 Post-dev 10 SCS Runoff 1.101 6 1014 37,944 — ------ Offsite Post-dev 11 SCS Runoff 6.706 6 816 128,294 — — Offs!te Pre-dev 12 Reservoir 1.109 6 924 65,620 6 17.16 44,530 Basin 1 Routed 13 Reservoir 6.431 6 870 135,124 7 13.13 62,188 Basin 2 Routed 14 Reservoir 5.482 6 918 187,353 8 18.05 112,301 Basin 3 Routed 15 Reservoir 17.70 6 804 217,338 9 20.17 102,953 Basin 4 Routed i Caas�►ti Site Des19►►rpC ,� '`� P.O. Box 4041 Ail—basins.gpw Return Period: 10 Year Monday, Jan 8 2007, 4:45 PM !-lvdref1mv .4 Almaraohs by !rv�!!so!v Hydrograph Summary Report Hyd. No. 1 Hydrograph type (origin) SCS Runoff Peak flow (cfs) 44.18 Time interval (min) 6 Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 780 715,733 -- — -- ------ Total Site Pre-dev 2 SCS Runoff 5.113 6 750 42,962 — -- -- Basin 1 Pre-dev 3 SCS Runoff 8.953 6 762 87,879 -- -- ------ Basin 2 Pre-dev 4 SCS Runoff 11.54 6 768 132,954 — ------ ------ Basin 3 Pre-dev 5 SCS Runoff 31.06 6 750 243,575 — ------ Basin 4 Pre-dev 6 SCS Runoff 8.727 6 756 80,811 — ------ Basin 1 Post-dev 7 SCS Runoff 12.10 6 774 164,313 — — - Basin 2 Post-dev 8 SCS Runoff 16.90 6 774 229,602 — — - -- Basin 3 Post-dev 9 SCS Runoff 24.34 6 768 301,050 — Basin 4 Post-dev 10 SCS Runoff 1.752 6 990 58,366 — -- Offsite Post-dev 11 SCS Runoff 8.886 6 810 166,103 — Offsite Pre-dev 12 Reservoir 2.576 6 840 80,714 6 17.42 47,881 Basin 1 Routed 13 Reservoir 8.920 6 852 164,208 7 13.36 65,745 Basin 2 Routed 14 Reservoir 8.794 6 888 227,443 8 18.34 121,860 Basin 3 Routed 15 Reservoir 22.78 6 792 266,506 9 20.23 104,332 Basin 4 Routed Coastal Site Design, PC >. P.O. Box 4041 Wilmington, NC 284DB Aii_basins.gpw Return Period: 25 Year Monday, Jan 8 2007, 4:45 PM Hvdmflm. Hvd a nhs by !rts;isalv� Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) 64.29 rime. interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 6 780 1,017,475 -- ----- - Total Site Pre-dev 2 SCS Runoff 8.096 6 750 65,386 — - — Basin 1 Pre-dev 3 SCS Runoff 13.78 6 756 130,933 — — --- — Basin 2 Pre-dev 4 SCS Runoff 17.42 6 768 195,551 — ------ -- Basin 3 Pre-dev 5 SCS Runoff 41.99 6 744 330,657 — -_-- — Basin 4 Pre-dev 6 SCS Runoff 11.82 6 756 109,702 — -- Basin 1 Post-dev 7 SCS Runoff 16.14 6 774 219,530 — --- Basin 2.Post-dev 8 SCS Runoff 22.44 6 774 305,592 — Basin 3 Post dev 9 SCS Runoff 31.57 6 768 393,467 — Basin 4 Post-dev 10 SCS Runoff 3.267 6 960 104,008 — Offsite Post-dev 11 SCS Runoff 13.27 6 804 241,379 -- — Offsite Pre-dev 12 Reservoir 5.768 6 816 109,604 6 17.90 55,172 Basin 1 Routed 13 Reservoir 13.28 6 828 219,426 7 13.75 71,981 Basin 2 Routed 14 Reservoir 14.28 6 864 303,419 8 18.83 137,696 Basin 3 Routed 15 Reservoir 31.21 6 774 358,923 9 20.32 106,621 Basin 4 Routed Coastal Site Design, PC P0, Box 4041 WhIn&n, NC 28408 All—basins.gpw Return Period: 100 Year Monday, Jan 8 2007, 4:45 PM Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 1 - Storage Basin 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 13.90 6,503 0 0 3.00 15.00 8,344 22,271 22,271 4.00 16.00 10,111 9,228 31,498 5.00 17.00 11,940 11,026 42,524 6.00 18.00 13,824 12,882 55,406 7.00 19.00 15,765 14,795 70,200 8.00 20.00 11,763 13,764 83,964 Culvert / Orifice Structures Weir Structures Monday, Jan 8 2007, 4:45 PM [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. 2.60 3.33 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = -- - - --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No EAItration = 2.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage (ft) 8.00 6.00 4.00 2.00 0.00 Stage / Discharge Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 8.00 6.00 4.00 '2.00 0.00 120.00 160.00 200.00 240.00 280.00 320.00 360.00 400.00 Discharge (cfs) 0.00 40.00 80.00 Total 0 Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 2 - Storage Basin 2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 9.30 10,021 0 0 2.00 10.00 10,924 20,945 20,945 3.00 11.00 12,283 11,604 32,549 4.00 12.00 13,720 13,002 45,550 5.00 13.00 15,236 14,478 60,028 6.00 14.00 16,831 16,034 76,062 7.00 15.00 18,505 17,668 93,730 Culvert / Orifice Structures Weir Structures Monday, Jan 8 2007, 4:45 PM [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 2.60 3.33 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = - - - - Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .013 :000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No EAItration = 2.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 8.00 6.00 4.00 2.00 Stage / Discharge Site Dab, PC Stage (ft) 8.00 6.00 4.00 2.00 0.00 1 0.00 5.00 Total Q 10.00 0.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00 Discharge (ofs) Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 3 - Storage Basin 3 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 15.60 25,928 0 0 2.00 16.00 26,787 52,715 52,715 3.00 17.00 28,982 27,885 80,600 4.00 18.00 31,233 30,108 110,707 5.00 19.00 33,542 32,388 143,095 6.00 20.00 35,907 34,725 177,819 7.00 21.00 38,328 37,118 214,937 8.00 22.00 40,807 39,568 254,504 9.00 23.00 43,341 42,074 296,578 Culvert / Orifice Structures [A) [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi-Staae = n/a No No No Stage (ft) 10.00 8.00 6.00 4.00 2.00 0.00 0.00 Weir Structures [A] Crest Len (ft) = 0.00 Crest El. (ft) = 0.00 Weir Coeff. = 2.60 Weir Type = - Multi -Stage No Monday, Jan 8 2007, 4:45 PM [B] [C] [D] 0.00 0.00 0.00 0.00 0.00 0.00 3.33 0.00 0.00 No No No Exfiltration = 2.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage / Discharge PO. Boj 4041 Wllm4on, NC Stage (ft) 10.00 8.00 6.00 4.00 2.00 I I I I I 1 I 1 I I 1 0.00 50.00 100.00 150.00 200.00 250.00 300.00 350.00 400.00 450.00 500.00 550.00 Total 0 Discharge (cfs) Pond Report Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Pond No. 4 - Storage Basin 4 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuft) 0.00 16.00 16,227 0 0 2.00 17.00 18,223 34,450 34,450 3.00 18.00 20,276 19,250 53,700 4.00 19.00 22,386 21,331 75,031 5.00 20.00 24,553 23,470 98,500 6.00 21.00 26,776 25,665 124,165 7.00 22.00 29,057 27,917 152,081 8.00 23.00 31,393 30,225 182,306 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (%) =. 0.00 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) 8.00 6.00 4.00 2.00 Weir Structures [A] Crest Len (ft) = 0.00 Crest El. (ft) = 0.00 Weir Coeff. = 2.60 Weir Type - Multi -Stage No [B] [C] [D] 0.00 0.00 0.00 0.00 0.00 0.00 3.33 0.00 0.00 No No No EAltration = 10.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under Inlet and outlet control. Stage / Discharge Stage (ft) 8.00 6.00 4.00 _._._............ _... _........... _.......... _. Coastal Ste Desig ; PC 2.00 Wilminato , NC 28406 0.00 -1- 0.00 I .. 0.00 60.00 120.00 180.00 240.00 300.00 360.00 420.00 480.00 540.00 600.00 660.00 Total Q Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 1 Total Site Pre-dev Hydrograph type = SCS Runoff Peak discharge = 12.91 cfs Storm frequency = 2 yrs Time interval = 6 min Drainage area = 51.600 ac Curve number = 64 Basin Slope = 1.0 % Hydraulic length = 2100 ft Tc method = LAG Time of conc. (Tc) = 90.10 min Total precip. = 4.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 242 Q (cfs) 14.00 12.00 ..... .... ...... ................ ........ __..._._ . 10:00 8.00 6.00 4.00 ........................................................ ............... ....... . 2.00 0.00 0 3 6 --- Hyd 'No. 1 Total Site Pre-dev Hyd. No. 1 — 2 Yr Hydrograph Volume = 237,061 cuft Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 _.. .... _ 2.00 .._................ _........ .....____...___._._.__.._-.--..---..- ..... __ -..--_... ___"............... ............................. . _........... .___-. _..---.._..— ....... __ 0.00 9 12 15 18 21 24 27 30 Time (hrs) Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 1 Total Site Pre-dev Hydrograph type = SCS Runoff Peak discharge = 34.00 cfs Storm frequency = 10 yrs Time interval = 6 min Drainage area = 51.600 ac Curve number = 64 Basin Slope = 1.0 % Hydraulic length = 2100 ft Tc method = LAG Time of conc. (Tc) = 90.10 min Total precip. = 7.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 562,177 cuft Total Site Pre-dev Q (CIS) Hyd. No. 1 -- 10 Yr Q (ds) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ... . ... ........ . ........... . .... ..... ..... .......... ............ .............. ... ............. . .... ... 4 ....... . ..... . ............ - - - ----------------- --- - ... ...... ............ .......... ............ . .... . . . . . . ...... ......... . ... . ....... ..... ... ............. ........... . ..... .... .. .. .. .... .. .... .. . . .... ... .. .. . .. ... ....... . ......... . . . .............. .......... . . ...... . ....... . ..... . .. .... ........ . . ...... ........ .. ..... -- - ..... . . . ..... . . ......... - ------ - --------------------- ...... . .......... ................. ...... .. .. ........ - ............... . ...... . . ..... . . . ........ .... . ............ . ..... . ...... . . .... . -- - -------------- . ....... .. ........... .............. . .... ......... ... ... .. . ............... ........... ..... . ... ..... .... ............ .......... . ...... .... . ....... .......... . .......... .. ...... ........... . . ............................. .. .. .... ..... .................... ........... ............... . .. .. .. ............ .... .. . . ........... ..... . . .... ........................ .... ------ . ..... ... . ---) . . . . . . .... . .. .. . ... . ....... ................ . .. ............... .. .. ... . ....... . . .............. . . ........ . ... ... ...... .... I . ... ............... . . I . . ................. ... .... ... ...................... ........... ....... ...... . . ........... ...... .... . .. .. ..... ...... ... ..... ......... . .......... .. ...... .. ............. ........... .. .. ........ ........... .......... ..... . ................. ... ........ . ....... ..... .............. . ..... ... . . .... . ............ . .... - ... . ............... ... ..... . .... ....... ...... .. ... ........... . ------------ - --- -' - . ... . .. . ............ .... . ................... .. ..... . .. .. .. ....... - - ----- - ------------ . . ... ....... .... . .................. I . . .. ........... -.1... .... ....... .. . . ........... . .. ................ .. . . ............ ...... - -------- .............. ......... .... .. ...... .. ...... . . . I .... ..... ...... . . ........... . ..... ... .. . . . . ..................... . ..... . .... -1- ........ ... ....... . . ... .... ................ - . . .............. ........... . .. .. ............. ....................... . .......... ........ . . . . ...... . ............. ..... ..... ...... .. ....... . ........... . ........ .. .. ...... . . . ..................... . ............ .... .. . .......... . ..... . ...... . .. . . . ....... . ................... .. .... .. ............. ... ........... -- . . ............ . . ........ ............. ........ ............... . .. .............. . ....... . ............ .. ... ....... .... . . --.- ..... . ................... . ......... . ...... .. I ... ... . .. .... - . ...... .. ... . ..................... . ........ . ......... . . .......... . . .......... I ... ........ .. . ........ . ............... ... .......... ... I ... ........ . --k . ..... .... ..... . . .......... . ...... . . . .. .. . . .. ..... . .... ............. . ....... .... ... - . -- . . ............. ...... . ........ . . .... .............. .... ..................................... ........ .... . ........ . . . . . ............... ...... . ...... ...... ..... .. . .......... ........ ...... . ......... I . ....... ... I .. . . . .......... ........... . ............... I ... ...... ..... .. . -- ......... . ... ..... . .I .... ..... .. ..... ....... - - -------- . .... .......... .... .......... . .... . . .. . ........ . ......... . ............. . ......... . ...... ...................... .... . ...... i 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 3 6 9 12 15 18 21 24 27. 30 ---A°y Hyd No. 1 Time (hrs) C102*1 Site Design, PC PO. Box 401 " W111* 011, NC 2W8 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 1 Total Site Pre-dev Hydrograph type = SCS Runoff Peak discharge = 44.18 cfs Storm frequency = 25 yrs Time interval = 6 min Drainage area = 51.600 ac Curve number = 64 Basin Slope = 1.0 % Hydraulic length = 2100 ft Tc method = LAG Time of conc. (Tc) = 90.10 min Total precip. = 8.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 242 Total Site Pre-dev Q (Cfs) Hyd. No. 1 -- 25 Yr 50.00 40.00 30.00 20.00 10.00 0.00 0 3 6 ---- Hyd No. 1 Hydrograph Volume = 715,733 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 9 12 15 18 21 24 27 30 Time (hrs) .- Coastal Site Design, PC .®' P.O. Box 4041 Wiiminoon, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 1 Total Site Pre-dev Hydrograph type = SCS Runoff Peak discharge = 64.29 cfs Storm frequency = 100 yrs Time interval = 6 min Drainage area = 51.600 ac Curve number = 64 Basin Slope = 1.0 % Hydraulic length = 2100 ft Tc method = LAG Time of conc. (Tc) = 90.10 min Total precip. = 10.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 1,017,475 tuft Total Site Pre-dev Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 11 Offsite Pre-dev Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 13.660 ac Basin Slope = 0.8 % Tc method = LAG Total precip. = 4.50 in Storm duration = 24 hrs Q (cfs) 3.00 2.00 1.00 0.00 0 3 — Hyd No. 11 Offsite Pre-dev Hyd. No. 11 — 2 Yr 6 9 12 15 18 Monday, Jan 8 2007, 4:45 PM Peak discharge = 2:348 cfs Time interval = 6 min Curve number = 60 Hydraulic length = 1800 ft Time of conc. (Tc) = 98.63 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 50,250 cuff 21 24 27 Coastal Site Des19% PC g P0. Box 4041 Wilminoon, NO 28406 1PA1111 1.00 ---a- 0.00 30 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 11 Offsite Pre-dev Hydrograph type = SCS Runoff Peak discharge = 6.706 cfs Storm frequency = 10 yrs Time interval = 6 min Drainage area = 13.660 ac Curve number = 60 Basin Slope = 0.8 % Hydraulic length = 1800 ft Tc method = LAG Time of conc. (Tc) = 98.63 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 128,294 cuft Offs1te Pre-dev Q WS) Hyd. No. 11 --10 Yr Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0 3 6 9 12 15 18 21 24 27 30 Hyd No. 11 Time (hrs) Coastal Slte Design, PC P.O. Box 4041 Wilmington, NC W6 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 11 Offsite Pre-dev Hydrograph type = SCS Runoff Peak discharge = 8.886 cfs Storm frequency = 25 yrs Time interval = 6 min Drainage area = 13.660 ac Curve number = 60 Basin Slope = 0.8 % Hydraulic length = 1800 ft Tc method = LAG Time of conc. (Tc) = 98.63 min Total precip. = 8.05 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Offsite Pre-dev Q (cfs) • Hyd. No. 11 -- 25 Yr 10.00 8.00 6.00 4.00 2.00 Hydrograph Volume = 166,103 cult 0 3 6 9 12 15 18 21 24 27 30 Hyd No. 11 Time (hrs) �� Coaxial Site Design, PC ^±s P.O. Box 4041 V11* 0n, NC 28408 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 11 Offsite Pre-dev Hydrograph type = SCS Runoff Peak discharge = 13.27 cfs Storm frequency = 100 yrs Time interval = 6 min Drainage area = 13.660 ac Curve number = 60 Basin Slope = 0.8 % Hydraulic length = 1800 ft Tc method = LAG Time of conc. (Tc) = 98.63 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 0 Hydrograph Volume = 241,379 cult Offsite Pre-dev 3 6 9 12 15 18 21 24 27 30 Hyd No. 11 Time (hrs) Coastal Site Design, PC P0. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 10 Offsite Post-dev Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 13.660 ac Basin Slope = 0.7 % Tc method = LAG Total. precip. = 4.50 in Storm duration = 24 hrs Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 000 0 3 6 ------ Hyd No. 10 Monday, Jan 8 2007, 4:45 PM Peak discharge = 0.143 cfs Time interval = 6 min Curve number = 39 Hydraulic length = 1700 ft Time of conc. (Tc) = 173.28 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 5,482 cult Offsite Post-dev Hyd. No. 10 -- 2 Yr Q (ds) 9 12 15 18 21 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 4.` 0.10 0,05 0.00 24 27 30 33 Time (hrs) Coastal Site Design, PC P.O. Box 4041 WilmingtoN NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 10 Offsite Post-dev Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 13.660 ac Basin Slope = 0.7 % Tc method = LAG Total precip. = 7.00 in Storm duration = 24 hrs 1.00 Monday, Jan 8 2007, 4:45 PM Peak discharge = 1.101 cfs Time interval = 6 min Curve number = 39 Hydraulic length = 1700 ft Time of conc. (Tc) = 173.28 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 37,944 cuft Offsite Post-dev Hyd. No. 10 —10 Yr ..... . .......... ............ .............. . . .... ........... . ......... . ........ .. .... .......... . .......... . ............. . ... . .. . ... . .............. ... .......... ... . .... ....................... ......... ... .... .. ..... .. . ................ ............... ............. ........ .. ..... - . ..... . . .............. .... . ....... .............. ................... ......... ...... . ............. ........ . .......... ......... ...... . ............. .. .... . ...... ......................... ........... . .... . ............. ........... ..... . ..... .......... ..... ..... . .... ..................... . ................ ... ........................ . . . . . .................. .. . .............. . ....... . ... ..... .......... ............ . ......... ........... ....... ........... . ......... . . .. . . ...... . ................. . ... .. ........ .... . . ..... ..... ... ... ....... .. ...... . ...... 0 3 Hyd No. 10 6 9 12 15 18 21 Q (cfs) 2.00 1.00 0.00 24 27 30 33 Time (hrs) Coastal Re Design, PC P.O, Box 4041 Wilmington, NC 28408 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 10 Offsite Post-dev Hydrograph type = SCS Runoff Storm frequency = 25 yrs Drainage area = 13.660 ac Basin Slope = 0.7 % Tc method = LAG Total precip. = 8.05 in Storm duration = 24 hrs Offsite Post-dev Q (Cfs) Hyd. No. 10 — 25 Yr 2.00 W1I1l 0.00 0 3 Hyd No. 10 6 9 12 15 18 21 Monday, Jan 8 2007, 4:45 PM Peak discharge = 1.752 cfs Time interval = 6 min Curve number = 39 Hydraulic length = 1700 ft Time of conc. (Tc) = 173.28 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 58,366 cult Q (cfs) 2.00 1.00 0.00 24 27 30 33 Time (hrs) R Coastal Site Design, PC PO. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 10 Offsite Post-dev Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 13.660 ac Basin Slope = 0.7 % Tc method = LAG Total precip. = 10.00 in Stone duration = 24 hrs Q (cfs) 4.00 MIA 2.00 1.00 Offsite Post-dev Hyd. No. 10 —100 Yr Monday, Jan 8 2007, 4:45 PM Peak discharge = 3.267 cfs Time interval = 6 min Curve number = 39 Hydraulic length = 1700 ft Time of conc. (Tc) = 173.28 min Distribution = Type III Shape factor = 242 Hydrograph Volume=104,008 cult Q (cfs) 4.00 IIGNIX, 2.00 1.00 0.00 0 3 6 9 12 15 18 21 24 27 30 33 Time. fts) Hyd No. 10 Mr,. Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 2 Basin 1 Pre-dev Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 4.550 ac Basin Slope = 1.8 % Tc method = LAG Total precip. = 4.50 in Storm duration = 24 hrs Monday, Jan 8 2007, 4:45 PM Peak discharge = 0.914 cfs Time interval = 6 min Curve number = 53 Hydraulic length = 498 ft Time of conc. (Tc) = 28.07 min Distribution = Type III Shape factor = 242 Hydrograph Volume=10,572 cuft Basin 1 Pre-dev Q (cfs) Hyd. No. 2 -- 2 Yr Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 -0.30 0.20 0.10 000 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 HTime (hrs) Hyd No. 2 4ACoastal Site Des4gn, PC P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:46 PM Hyd. No. 6 Basin 1 Post-dev .Hydrograph type = SCS Runoff Peak discharge = 3.376 cfs Storm frequency = 2 yrs Time interval = 6 min Drainage area = 4.550 ac Curve number = 74 Basin Slope = 0.4 % Hydraulic length = 489 ft Tc method = LAG Time of conc. (Tc) = 33.94 min Total precip. = 4.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Q (cfs) 4.00 3.00 2.00 1.00 Basin 1 Post-dev Hyd. No. 6 -- 2 Yr Hydrograph Volume = 32,067 cuft Q (cfs) 4.00 3.00 11PA11747 1.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 6 Time (hrs) Coastal Sh Deslgn; PC P0. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 12 Basin 1 Routed Hydrograph type = Reservoir Peak discharge = 0.230 cfs Storm frequency = 2 yrs Time interval = 6 min Inflow hyd. No. = 6 Max. Elevation = 15.00 ft Reservoir name = Storage Basin 1 Max. Storage = 23,423 cuft Storage Indication method used. Q (cfs) 4.00 3.00 2.00 1.00 MM Basin 1 Routed Hyd. No. 12 — 2 Yr Hydrograph Volume = 31,970 cuft Q (cfs) 4.00 3.00 2.00 1.00 0.00 0 15 30 45 60 75 90 105 120 135 150 Time (hrs) -- - Hyd No. 12 Hyd No. 6 C088tal Site Design, PC . , �, P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 2 Basin 1 Pre-dev Hydrograph type = SCS Runoff Peak discharge = 3.655 cfs Storm frequency = 10 yrs Time interval = 6 min Drainage area = 4.550 ac Curve number = 53 Basin Slope = 1.8 % Hydraulic length = 498 ft Tc method = LAG Time of conc. (Tc) = 28.07 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Basin 1 Pre-dev Q (Cfs) Hyd. No. 2 --10 Yr 4.00 Om 1.00 Hydrograph Volume = 32,009 cuft Q (cfs) 4.00 3.00 2.00 igeIf, 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 6 Basin 1 Post-dev Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 4.550 ac Basin Slope = 0.4 % Tc method = LAG Total precip. = 7.00 in Storm duration = 24 hrs Q (cfs) 8.00 .M r.11I111 2.00 0.00.E 0 2 4 - . Hyd No. 6 Basin 1 Post-dev Hyd. No. 6 —10 Yr 6 8 10 12 14 16 Monday, Jan 8 2007, 4:45 PM Peak discharge = 7.090 cfs Time interval = 6 min Curve number = 74 Hydraulic length = 489 ft Time of conc. (Tc) = 33.94 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 65,717 cuft Q (cfs) 8.00 4.00 2.00 0.00 18 20 22 24 26 Time (hrs) Coastal Site Design, PC c P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 12 Basin 1 Routed Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 6 Reservoir name = Storage Basin 1 Storage Indication method used. 4.00 2.00 0.00 0 13 26 —-- Hyd No. 12 Monday, Jan 8 2007, 4:45 PM Peak discharge = 1.109 cfs Time interval = 6 min Max. Elevation = 17.16 ft Max. Storage = 44,530 cuft Hydrograph Volume = 65,620 cuft Basin 1 Routed Hyd. No. 12 —10 Yr 39 52 65 78 91 104 117 130 Hyd No. 6 Q (cfs) 8.00 . ie 2.00 0.00 143 Time (hrs) ILACoastal Site Daatgn, PC �' " A PO. BOX 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 2 Basin 1 Pre-dev Hydrograph type = SCS Runoff Peak discharge = 5.113 cfs Storm frequency = 25 yrs Time interval = 6 min Drainage area = 4.550 ac Curve number = 53 Basin Slope = 1.8 % Hydraulic length = 498 ft Tc method = LAG Time of conc. (Tc) = 28.07 min Total precip. = 8.05 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Basin 1 Pre-dev Q (cfs) Hyd. No. 2 -- 25 Yr 6.00 5.00 4.00 3.00 2.00 1.00 Hydrograph Volume = 42,962 cuft Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 " I I I I I I I 1 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 - Hyd No. 2 Time (hrs) Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 2WO Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 6 Basin 1 Post-dev Hydrograph type = SCS Runoff Peak discharge = 8.727 cfs Storm frequency = 25 yrs Time interval = 6 min Drainage area = 4.550 ac Curve number = 74 Basin Slope = 0.4 % Hydraulic length = 489 ft Tc method = LAG Time of conc. (Tc) = 33.94 min Total precip. = 8.05 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Q (cfs) 10.00 E:111I1l AM MIA 2.00 Basin 1 Post-dev Hyd. No. 6 -- 25 Yr Hydrograph Volume = 80,811 cuft Q (cfs) 10.00 8.00 4.00 2.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 6 Time (hrs) ;. Coastal Site Design, PC A: P.O. Box 4041. W1I*00n, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 12 Basin 1 Routed Hydrograph type = Reservoir Peak discharge = 2.576 cfs Storm frequency = 25 yrs Time interval = 6 min Inflow hyd. No. = 6 Max. Elevation = 17.42 ft Reservoir name = Storage Basin 1 Max. Storage = 47,881 cuft Storage Indication method used. Basin 1 Routed Hydrograph Volume = 80,714 cult Q (CFs) Hyd. No. 12 -- 25 Yr Q (cfs) 10.00 10.00 8.00 8.00 _..... .......... ................ ..... .-..... - ------- .. _. 6.00 6.00 ............ ... ........ ......... ...... ..... ........ ...._ .... ...... ......... ........ _...... ... ........ ....... ......-.._..... .... ..... _ ... ... ...... .................... ............... _ _......... .... 4.00 4.00 2.00 2.00 ... ....................... .... -. .......... -.-.................... .._-...... .................. --... ....... ........ _.... .................. -..... ...................... ..... _........... -.... ....... .... ..-..._._-............ ........ ---............ -------- - ..._..... _ 0 11 22 33 44 55 66 77 88 99 110 •�----� Hyd No. 12 Hyd No. 6 Time (hrs) Coastal Site design, RC P.O. Box 4041 Wilmington, NC PPAnP Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 2 Basin 1 Pre-dev Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 4.550 ac Basin Slope = 1.8 % Tc method = LAG Total precip. = 10.00 in Storm duration = 24 hrs W1111l . II 2.00 rsW� Basin 1 Pre-dev Hyd. No. 2 --100 Yr Monday, Jan 8 2007, 4:45 PM Peak discharge = 8.096 cfs Time interval = 6 min Curve number = 53 Hydraulic length = 498 ft Time of conc. (Tc) = 28.07 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 65,386 cuft Q (cfs) 10.00 OR 6.00 4.00 2.00 WIYITO 0 2 4 6 8 10 12 14 16 18 20 22 24 26 •-- Hyd No. 2 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 6 Basin 1 Post-dev Hydrograph type = SCS Runoff Peak discharge = 11.82 cfs Storm frequency = 100 yrs Time interval = 6 min Drainage area = 4.550 ac Curve number = 74 Basin Slope = 0.4 % Hydraulic length = 489 ft Tc method = LAG Time of conc. (Tc) = 33.94 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Q (Cfs) 12.00 10.00 M AM 4.00 ON M Basin 1 Post-dev Hyd. No. 6 --100 Yr Hydrograph Volume=109,702 tuft Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 6 Time (hrs) Coastal Site Design, PC P.Q, Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 12 Basin 1 Routed Hydrograph type = Reservoir Peak discharge = 5.768 cfs Storm frequency = 100 yrs Time interval = 6 min Inflow hyd. No. = 6 Max. Elevation = 17.98 ft Reservoir name = Storage Basin 1 Max. Storage = 55,172 cuft Storage Indication method used. Basin 1 Routed Hydrograph Volume = 109,604 cuft Q (Cfs) Hyd. No. 12 --100 Yr Q (Cfs) 12.00 12.00 10.00 10.00 ......... 8.00 _ ....... ......... ... ..... ... ....... ..... ............. .._..... _..-. . ..................... . . 8.00 6.00 6.00 4.00 4.00 .................. . ...._._ ................ ....... ......... ............... ... ... ... _ _ 2.00 ..... ......... .............._. _........._. ......... ............... ...._ .... .................... _..... _._.... ._... ..... ....... .......... _.... ..... ..... _._......................... ....... ................ _................. _...... ..._._ .......... -- --- 2.00 0.00 _........ ... ..........._...j...._....._._.. .._.... _................... ...._ ...... _........... _...... _._ ....._._..--- _..._._ __._.._._.........-_ -.._... --- -._._....._.__._. n nn 0 9 18 27 36 45 54 63 72 81 90 Time (hrs) Hyd No. 12 Hyd No. 6 4Caasfal Site Deelgn, PC P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Basin 2 Pre-dev Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 8.400 ac Basin Slope = 1.6 % Tc method = LAG Total precip. = 4.50 in Storm duration = 24 hrs Q (ds) 2.00 1.00 0.00 0 2 4 — Hyd No. 3 Basin 2 Pre-dev Hyd. No. 3 -- 2 Yr 6 8 10 12 14 Monday, Jan 8 2007, 4:45 PM Peak discharge = 1.918 cfs Time interval = 6 min Curve number = 56 Hydraulic length = 720 ft Time of conc. (Tc) = 37.07 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 23,860 cult Q (ds) 2.00 1.00 0.00 16 18 20 22 24 26 Time (hrs) Coastal Site Design, PC ® PO. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 7 Basin 2 Post-dev Hydrograph type = SCS Runoff Peak discharge = 5.006 cfs Storm frequency = 2 yrs Time interval = 6 min Drainage area = 8.400 ac Curve number = 78 Basin Slope = 0.4 % Hydraulic length = 1250 ft Tc method = LAG Time of conc. (Tc) = 63.99 min Total precip. = 4.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 69,289 cult Basin 2 Post-dev Q (efs) Hyd. No. 7 -- 2 Yr Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 7 Coastal Site Design, PC ,� P0. Box 4041 Wllmhigton, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 13 Basin 2 Routed Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 7 Reservoir name = Storage Basin 2 Storage Indication method used. Basin 2 Routed Monday, Jan 8 2007, 4:45 PM Peak discharge = 1.032 cfs Time interval = 6 min Max. Elevation = 12.18 ft Max. Storage = 48,103 cuft Hydrograph Volume = 69,184 cuft Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 3 Basin 2 Pre-dev Hydrograph type = SCS Runoff Peak discharge = 6.588 cfs Storm frequency = 10 yrs Time interval = 6 min Drainage area = 8.400 ac Curve number = 56 Basin Slope = 1.6 % Hydraulic length = 720 ft Tc method = LAG Time of conc. (Tc) = 37.07 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 66,578 cuft Basin 2 Pre-dev Q (cfs) Hyd. No. 3 --10 Yr Q (Cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 -_•..— Hyd No. 3 Time (hrs) Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 7 Basin 2 Post-dev Hydrograph type = SCS Runoff Peak discharge = 9.941 cfs Storm frequency = 10 yrs Time interval = 6 min Drainage area = 8.400 ac Curve number = 78 Basin Slope = 0.4 % Hydraulic length = 1250 ft Tc method = LAG Time of conc. (Tc) = 63.99 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Q (cfs) 10.00 4.00 2.00 Is 1 1 Basin 2 Post-dev Hyd. No. 7 — 10 Yr Hydrograph Volume=135,228 cuft Q (cfs) 10.00 8.00 6.00 4.00 2.00 `—. 0.00 0 3 6 9 12 15 18 21 24 27 — Hyd No. 7 Time (hrs) Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28408 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 13 Basin 2 Routed Hydrograph type = Reservoir Peak discharge = 6.431 cfs Storm frequency = 10 yrs Time interval = 6 min Inflow hyd. No. = 7 Max. Elevation = 13.13 ft Reservoir name = Storage Basin 2 Max. Storage = 62,188 cuft Storage Indication method used. Hydrograph Volume = 135,124 cuft Q (cfs) 10.00 AM 4.00 2.00 Basin 2 Routed Hyd. No. 13 — 10 Yr Q (ds) 10.00 8.00 � 4.00 2.00 0.00 - I v I r- _ - -......__r. ... _ . _.... a . _.... .I._ J 0.00 0 9 18 27 36 45 54 63 72 81 90 99 - — Hyd No. 13 Hyd No. 7 Coastal site Design, PC Time (hrs) s P.O. Box 4041 Wilmington, NG 28408 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 3 Basin 2 Pre-dev Hydrograph type = SCS Runoff Storm frequency = 25 yrs Drainage area = 8.400 ac Basin Slope = 1.6 % Tc method = LAG Total precip. = 8.05 in Storm duration = 24 hrs Q (cfs) 10.00 . M m r "I Basin 2 Pre-dev Hyd. No. 3 — 25 Yr Monday, Jan 8 2007, 4:45 PM Peak discharge = 8.953 cfs Time interval = 6 min Curve number = 56 Hydraulic length = 720 ft Time of conc. (Tc) = 37.07 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 87,879 cult Q (cfs) 10.00 8.00 M 4.00 2.00 0.00 1—__ 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 ��- Hyd No. 3 Time (hrs) ACoastal SRO 0eslgn, PC PO, Box 4041Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 7 Basin 2 Post-dev Hydrograph type = SCS Runoff Peak discharge = 12.10 cfs Storm frequency = 25 yrs Time interval = 6 min Drainage area = 8.400 ac Curve number = 78 Basin Slope = 0.4 % Hydraulic length = 1250 ft Tc method = LAG Time of conc. (Tc) = 63.99 min Total precip. = 8.05 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 164,313 cuft Basin 2 Post-dev Q (Grs) Hyd. No. 7 — 25 Yr Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 - 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 ... _._.......... .... --..... -... .... -...................................... ......_._._._._.-. 0.00 _ ,.._..�_.. _,.,,. ""` nnn 0 3 - Hyd No. 7 6 9 12 15 18 21 24 27 Time (hrs) Coastal Slte Design, PC PO. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 13 Basin 2 Routed Hydrograph type = Reservoir Peak discharge = 8.920 cfs Storm frequency = 25 yrs Time interval = 6 min Inflow hyd. No. = 7 Max. Elevation = 13.36 ft Reservoir name = Storage Basin 2 Max. Storage = 65,745 cuft Storage Indication method used. Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 Basin 2 Routed Hyd. No. 13 -- 25 Yr I.._ ._ .......... .....I.... _......t...11 it I", ...... .......1__. ... ..... 1 ....., ........., ... .I .. ... ...._...I..... ....._....._. L... - Hydrograph Volume = 164,208 cuft Q (cfs) 14.00 12.00 10.00 8.00 6.00 I M1111 2.00 0.00 0 8 16 24 32 40 48 56 64 72 80 88 Hyd No. 13 Hyd No. 7 Time (hrs) 3 Coastal Site Design, PC PO. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 3 Basin 2 Pre-dev Hydrograph type = SCS Runoff Peak discharge = 13.78 cfs Storm frequency = 100 yrs Time interval = 6 min Drainage area = 8.400 ac Curve number = 56 Basin Slope = 1.6 % Hydraulic length = 720 ft Tc method = LAG Time of conc. (Tc) = 37.07 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 130,933 cult Basin 2 Pre-dev Q (Cfs) Hyd. No. 3 --100 Yr Q WS) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 7 Basin 2 Post-dev Hydrograph type = SCS Runoff Peak discharge = 16.14 cfs Storm frequency = 100 yrs Time interval = 6 min Drainage area = 8.400 ac Curve number = 78 Basin Slope = 0.4 % Hydraulic length = 1250 ft Tc method = LAG Time of conc. (Tc) = 63.99 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 219,530 cuft Basin 2 Post-dev 3 6 9 12 15 18 21 24 27 vv Hyd No. 7 Time (hrs) Coastal Site D6819n, PC P.O. Box 4041 Wilmington, NC 28a Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 13 Basin 2 Routed Hydrograph type = Reservoir Peak discharge = 13.28 cfs Storm frequency = 100 yrs Time interval = 6 min Inflow hyd. No. = 7 Max. Elevation = 13.75 ft Reservoir name = Storage Basin 2 Max. Storage = 71,981 cuft Storage Indication method used. Basin 2 Routed Hydrograph Volume = 219,426 cult Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 4 Basin 3 Pre-dev Hydrograph type = SCS Runoff Peak discharge = 2.719 cfs Storm frequency = 2 yrs Time interval = 6 min Drainage area = 11.490 ac Curve number = 58 Basin Slope = 1.0 % Hydraulic length = 702 ft Tc method = LAG Time of conc. (Tc) = 43.69 min Total precip. = 4.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Basin 3 Pre-dev Q (cfs) Hyd. No. 4 — 2 Yr 3.00 2.00 1.00 11 1 Hydrograph Volume = 38,202 cuft ..... . .... . ......... ............ ..... . ...................... .. .................. ... ......... ... ................ ....... ............ ..... ..... . ........ .. . . .......... .. ..... ------ ................ . ....... . ..... . ................ . ....... ........ ........................ .............. .................... . ............ .... ... . .................. . ... ... . . ... .................. . ........ . ........ .. .............. .............. . .......................... . .. . . ..................... . ....... ....... . . ......... . ... . . . . ............... . .......... ........ .......... . ....... - ................. . . . . . . . . ............................. .......... ..... .... . ............. ........ ... . . . ................... ..... ...... 11 . .... . .......... . ......... . .......... --- ........ . ....... ... ...... ... ....... ------ ----- . . . ..... ................. . ... . ..... . ........................ - -- . . .. . .................................... - ...... ......... ..... . ..... . ... ....... . .... ....... . .. . ........... . ........ ........... . ....... . ........... ........ -- ------- - ---- - ---- - ------ . .......... .. . ............ ..... ....... ...... .................. . .... . . ............ ............................................ .. .... . . . .............. . ..... ........... . ....... ......... .... . ......... ... ................ . .. ....... ....... .............. ...... . . .. ...... ....... ............. . ...... -.- ........ ..... ... ......... ........... ........ ................... . ........ -' ......... . . .. . ..... ....... ... . . . .... . . . .. .. ...... ...... .. ........ . . ............. .. - .... . .. . ......... . ........ . ........ 0 3 -- Hyd No. 4 6 9 12 15 Q (cfs) 3.00 W41111 1.00 O.00 18 21 24 27 Time (hrs) Coastal Site Design, PC P0, Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve , Hyd. No. 8 Basin 3 Post-dev Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 11.490 ac Basin Slope = 0.4 % Tc method = LAG Total precip. = 4.50 in Storm duration = 24 hrs Q (cfs) 8.00 4.00 2.00 0.00 �_ .:......_..� 0 3 — -- Hyd No. 8 Monday, Jan 8 2007, 4:45 PM Peak discharge = 7.126 cfs Time interval = 6 min Curve number = 79 Hydraulic length = 1210 ft Time of conc. (Tc) = 60.48 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 98,234 cuft Basin 3 Post-dev Hyd. No. 8 — 2 Yr 6 9 12 15 18 21 24 Coasts! Site Design, pC P.O. Box 4041 Imington, NC 28406 Q (cfs) 8.00 � 4.00 2.00 - 0.00 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 14 Basin 3 Routed Hydrograph type = Reservoir Peak discharge = 0.549 cfs Storm frequency = 2 yrs Time interval = 6 min Inflow hyd. No. = 8 Max. Elevation = 17.07 ft Reservoir name = Storage Basin 3 Max. Storage = 82,765 cuft Storage Indication method used. Basin 3 Routed Hydrograph Volume = 96,118 cult Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 4 Basin 3 Pre-dev Hydrograph type = SCS Runoff Peak discharge = 8.594 cfs Storm frequency = 10 yrs Time interval = 6 min Drainage area = 11.490 ac Curve number = 58 Basin Slope = 1.0 % Hydraulic length = 702 ft Tc method = LAG Time of conc. (Tc) = 43.69 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Basin 3 Pre-dev Q (Cfs) Hyd. No. 4 —10 Yr 10.00 8.00 1^-JU11611 4.00 2.00 WAY Hydrograph Volume = 101,741 cuft Q (cfs) 10.00 M M 4.00 2.00 0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) — Hyd No. 4 Coasts! Site Design, PC jk PO. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 8 Basin 3 Post-dev Hydrograph type = SCS Runoff Peak discharge = 13.94 cfs Storm frequency = 10 yrs Time interval = 6 min Drainage area = 11.490 ac Curve number = 79 Basin Slope = 0.4 % Hydraulic length = 1210 ft Tc method = LAG Time of conc. (Tc) = 60.48 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 189,501 cuft Basin 3 Post-dev Q (Cfs) Hyd. No. 8 --10 Yr Q (Cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 3 Hyd No. 8 6 9 12 15 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 18 21 24 27 Time (hrs) Coastal Site Design, PC P0. Box 4041 Wilmington, NO 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 14 Basin 3 Routed Hydrograph type = Reservoir Peak discharge = 5.482 cfs Storm frequency = 10 yrs Time interval = 6 min Inflow hyd. No. = 8 Max. Elevation = 18.05 ft Reservoir name = Storage Basin 3 Max. Storage = 112,301 cuft Storage Indication method used. Hydrograph Volume = 187,353 cuft Basin 3 Routed Q (CfS) Hyd. No. 14 --10 Yr Q (CfS) 14.00 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 4 Basin 3 Pre-dev Hydrograph type = SCS Runoff Peak discharge = 11.54 cfs Storm frequency = 25 yrs Time interval = 6 min Drainage area = 11.490 ac Curve number = 58 Basin Slope = 1.0 % Hydraulic length = 702 ft Tc method = LAG Time of cons. (Tc) = 43.69 min Total precip. = 8.05 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Basin 3 Pre-dev Q (cfs) Hyd. No. 4 -- 25 Yr 12.00 ROX111I :-11n G 11 Om f!><!T!7 Hydrograph Volume = 132,954 cult Q (cfs) 12.00 10.00 M 4.00 WA11I11 0.00 0 3 6 9 12 15 18 21 24 27 ---- Hyd No. 4 CO29tal Site DesIgn, PC Time (hrs) PO. Box 4041 44 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Basin 3 Post-dev Hydrograph type = SCS Runoff Storm frequency = 25 yrs Drainage area = 11.490 ac Basin Slope = 0.4 % Tc method = LAG Total precip. = 8.05 in Storm duration = 24 hrs Basin 3 Post-dev Monday, Jan 8 2007, 4:45 PM Peak discharge = 16.90 cfs Time interval = 6 min Curve number = 79 Hydraulic length = 1210 ft Time of conc. (Tc) = 60.48 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 229,602 tuft Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 14 Basin 3 Routed Hydrograph type = Reservoir Peak discharge = 8.794 cfs Storm frequency = 25 yrs Time interval = 6 min Inflow hyd. No. = 8 Max. Elevation = 18.34 ft Reservoir name = Storage Basin 3 Max. Storage = 121,860 cult Storage Indication method used. Basin 3 Routed Hydrograph Volume = 227,443 cuft Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 4 Basin 3 Pre-dev Hydrograph type = SCS Runoff Peak discharge = 17.42 cfs Storm frequency = 100 yrs Time interval = 6 min Drainage area = 11.490 ac Curve number = 58 Basin Slope = 1.0 % Hydraulic length = 702 ft Tc method = LAG Time of conc. (Tc) = 43.69 min Total precip. = 10.00 in Distribution = Type ill Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 195,551 tuft Basin 3 Pre-dev Q (ds) Hyd. No. 4 --100 Yr Q (ds) 18.00 15.00 12.00 9.00 6.00 3.00 0 00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 3 6 9 12 15 18 21 24 27 --w Hyd No. 4 Time (hrs) Coastal Site Design, PG A P.O. Box 4041 W1)minOn, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 8 Rasin 3 Post-dev Hydrograph type = SCS Runoff Peak discharge = 22.44 cfs Storm frequency = 100 yrs Time interval = 6 min Drainage area = 11.490 ac Curve number = 79 Basin Slope = 0.4 % Hydraulic length = 1210 ft Tc method = LAG Time of conc. (Tc) = 60.48 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 305,592 cult Basin 3 Post-dev Q (Cfs) Hyd. No. 8 -- 100 Yr Q (Cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0 00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0 3 6 9 12 15 18 21 24 27 Hyd No. 8 Time (hrs) Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 14 Basin 3 Routed Hydrograph type = Reservoir Peak discharge = 14.28 cfs Storm frequency = 100 yrs Time interval = 6 min Inflow hyd. No. = 8 Max. Elevation = 18.83 ft Reservoir name = Storage Basin 3 Max. Storage = 137,696 cuft Storage Indication method used. Hydrograph Volume = 303,419 cuft 20.00 iiI-8A1 12.00 L: I i 4.00 Basin 3 Routed Hyd. No. 14 -- 100 Yr 9 18 27 36 45 54 63 72 81 Hyd No. 14 Hyd No. 8 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 90 99 Time (hrs) Coastal Site 0e819n, PC PO, Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Basin 4 Pre-dev Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 13.500 ac Basin Slope = 0.7 % Tc method = LAG Total precip. = 4.50 in Storm duration = 24 hrs Basin 4 Pre-dev Monday, Jan 8 2007, 4:45 PM Peak discharge = 12.13 cfs Time interval = 6 min Curve number = 74 Hydraulic length = 527 ft Time of conc. (Tc) = 27.24 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 96,654 cuft Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 9 Basin 4 Post-dev Hydrograph type = SCS Runoff Peak discharge = 11.23 cfs Storm frequency = 2 yrs Time interval = 6 min Drainage area = 13.500 ac Curve number = 84 Basin Slope = 0.4 % Hydraulic length = 1332 ft Tc method = LAG Time of conc. (Tc) = 55.57 min Total precip. = 4.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 0 Hydrograph Volume = 138,027 cuft Basin 4 Post-dev 3 6 9 12 15 18 21 24 27 Hyd No. 9 Time (hrs) Coastal Slte Daslgn, PC 0 P.O, Box 404i Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 15 Basin 4 Routed Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 9 Reservoir name = Storage Basin 4 Storage Indication method used. Basin 4 Routed Monday, Jan 8 2007, 4:45 PM Peak discharge = 2.212 cfs Time interval. = 6 min Max. Elevation = .20.01 ft Max. Storage = 98,750 cuft Hydrograph Volume = 103,485 cult Q (ds) Hyd. No. 15 -- 2 Yr Q (Cfs) 12.00 12.00 10.00 10.00 ... ... ..... ...... . . ........ _ . _.. ---........._..._._._._..._ . 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 it 0.00 0.00 0 12 24 36 48 60 72 84 96 108 120 ----- Hyd No. 15 .Hyd No. 9 Time (hrs) Coastal Site Design, PC r P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Basin 4 Pre-dev Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 13.500 ac Basin Slope = 0.7 % Tc method = LAG Total precip. = 7.00 in Storm duration = 24 hrs Monday, Jan 8 2007, 4:45 PM Peak discharge = 25.28 cfs Time interval = 6 min Curve number = 74 Hydraulic length = 527 ft Time of conc. (Tc) = 27.24 min Distribution = Type III Shape factor = 242 Hydrograph Volume = 198,081 cuft Basin 4 Pre-dev Q (cfs) Hyd. No. 5 —10 Yr Q (Cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 ------ Hyd No. 5 Time (hrs) Coastal Site Design, PC ® P0. Box 4041 Y< Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 9 Basin 4 Post-dev Hydrograph type = SCS Runoff Peak discharge = 20.44 cfs Storm frequency = 10 yrs Time interval = 6 min Drainage area = 13.500 ac Curve number = 84 Basin Slope = 0.4 % Hydraulic length = 1332 ft Tc method = LAG Time of conc. (Tc) = 55.57 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 3 ------ Hyd No. 9 Basin 4 Post-dev Hyd. No. 9 —10 Yr 6 9 12 15 Hydrograph Volume = 251,882 cuft Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 �r�ry 0.00 18 21 24 27 Time (hrs) Coastal Slte Design, PC e P0. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 15 Basin 4 Routed Hydrograph type = Reservoir Peak discharge = 17.70 cfs Storm frequency = 10 yrs Time interval = 6 min Inflow hyd. No. = 9 Max. Elevation = 20.17 ft Reservoir name = Storage Basin 4 Max. Storage = 102,953 cuft Storage Indication method used. Hydrograph Volume = 217,338 cult Basin 4 Routed Q (ds) Hyd. No. 15 --10 Yr Q (Cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 7 14 21 28 35 42 49 .56 63 70 --- Hyd No. 15 Hyd No. 9 Time (hrs) 44�Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4A5 PM Hyd. No. 5 Basin 4 Pre-dev Hydrograph type = SCS Runoff Peak discharge = 31.06 cfs Storm frequency = 25 yrs Time interval = 6 min Drainage area = 13.500 ac Curve number = 74 Basin Slope = 0.7 % Hydraulic length = 527 ft Tc method = LAG Time of conc. (Tc) = 27.24 min Total precip. = 8.05 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Hydrograph Volume = 243,575 cuft Basin 4 Pre-dev Q (Cfs) Hyd. No. 5 -- 25 Yr Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 - Hyd No. 5 Time (hrs) Coastal Site Design, PC ¢ RO. Box W Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 9 Basin 4 Post-dev Hydrograph type = SCS Runoff Peak discharge = 24.34 cfs Storm frequency = 25 yrs Time interval = 6 min Drainage area = 13.500 ac Curve number = 84 Basin Slope = 0.4 % Hydraulic length = 1332 ft Tc method = LAG Time of conc. (Tc) = 55.57 min Total precip. = 8.05 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 Hydrograph Volume = 301,050 cult 0 3 6 9 12 15 18 21 24 27 �v Time (hrs) Hyd No. 9 Coastal Site Design, PC PO. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 15 Basin 4 Routed Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 9 Reservoir name = Storage Basin 4 Storage Indication method used. Monday, Jan 8 2007, 4:45 PM Peak discharge = 22.78 cfs Time interval = 6 min Max. Elevation = 20.23 ft Max. Storage = 104,332 cuft Hydrograph Volume = 266,506 cult Basin 4 Routed Q (Gfs) Hyd. No. 15 — 25 Yr Q (cfs) 28.00 24.00 20.00 — ._........ _...... _....... -.......... ..._._._..._._._........ _....... .-_............ ...... ....._._.... —i _..-.......... ................ _......... ---.... .._.-................. ........ -...._...._ -_._ ........._._.._..... ..... ..............___._....._......._...._._._..._.................. ......... __.._................... . -... _._......-..... ........... ..:_ 16.00 ......... .. ... _.__. .. ... _. _. ... ... _..... ..... .........f_. ._ .................... 12.00 ....... _.- ....................... _........ ....................... _........ ............... __......- --._.. _.. _._....-_._... _........... R .. ........................................ ... ................__._._._.......... _....... .._._.......__...-'-'-.-.--._..........._..._....._...... ............................................... .......... ... .... ........ __._._...._._...___...._...._...._._._._._.--...................... _..... _..... . 8.00 ..................... .... ........ ..... ............ .... ........... ......... ..... ..... ............ ....._ ....... ......... .....` _....._.. ........ ... ............ ........ ... ......... ....... ....... ...... ..... ....................._.....__.._..........�......_._._......._..._ _..... 4.00 '-'-.... ........ --- ........... .----- _.........-.......... _......... . _...- ' ' ............ ..._._.................... ---------- ---- ...- .._._.......... ._......_._........... ..... _........ ............... ..... ......._..__.........._._._.__..._._. ------- .__..-.. 0.00 0 4 8 12 16 — Hyd No. 15 Hyd No. 9 28.00 24.00 20.00 16.00 12.00 8.00 4.00 -' -'--._...._.. _....-'--._.........._._.. -'- ._........... ... -.......... �..�, 20 24 28 32 36 Time (hrs) Coastal Site Design, PC P0. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 5 Basin 4 Pre-dev Hydrograph type = SCS Runoff Peak discharge = 41.99 cfs Storm frequency = 100 yrs Time interval = 6 min Drainage area = 13.500 ac Curve number = 74 Basin Slope = 0.7 % Hydraulic length = 527 ft Tc method = LAG Time of conc. (Tc) = 27.24 min Total precip. = .10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = .242 Q (cfs) 50.00 - 40.00 30.00 20.00 10.00 Hydrograph Volume = 330,657 cuft Basin 4 Pre-dev Hyd. No. 5 —100 Yr iiI'IIIIII .. ... ... . ........ I ... ... .. ... I ......... .................... . . ............... — Q (cfs) 50.00 40.00 30.00 20.00 10.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 5 Coastal Site Design, PC Time (hrs) P0. Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 9 Basin 4 Post-dev Hydrograph type = SCS Runoff Peak discharge = 31.57 cfs Storm frequency = 100 yrs Time interval = 6 min Drainage area = 13.500 ac Curve number = 84 Basin Slope = 0.4 % Hydraulic length = 1332 ft Tc method = LAG Time of conc. (Tc) = 55.57 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 242 Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 - - nyu 1VV. A Hydrograph Volume = 393,467 cuft Coastal Site Deslgn, RC P0, Box 4041 Wilmington, NC 28406 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 8 2007, 4:45 PM Hyd. No. 15 Basin 4 Routed Hydrograph type = Reservoir Peak discharge = 31.21 cfs Storm frequency = 100 yrs Time interval = 6 min Inflow hyd. No. = 9 Max. Elevation = 20.32 ft Reservoir name = Storage Basin 4 Max. Storage = 106,621 cuft Storage Indication method used. Basin 4 Routed Hydrograph Volume = 358,923 cuft Q (ds) Hyd. No. 15 --100 Yr Q (cFs) 35.00 35.00 30.00 ... _ ......... ....- _ ..... .. ..... . _ ._ __..._.._. . _.. ... ...... ..... .... ........ .... ............. _....... .--........ -- -. .. . . . .............. ....... . ... ................. 30.00 ..... ._............. ......... ... .... ..._ . ............... ..._ .... .... ... . ..... .. ....... .. ....... ..... ........... 25.00 ... _ ....... _ ....... ... ._... ... _..... _ ...................... .......... ...... ._ .. _ ...... _...... ........ ... ...... ...... .... _..._... ...... .......... _ 25-00 ............ . 20.00 ._._. _._._... _._._.... ....- ......... ............_.. .._.... ..--.--.--.._._............ _...- _ .... ............ . . 20.00 ....... .. _ ......... ...... ........_......_ . ............ ._............... ......... .....-....... .... ... .......... _........... ---............... ....... ......... _....... _........... .................... ..... .......................... _-..._._.__. ._......... _.................. ............... .. 15.00 _....... --_.... ..... ................... - 15.00 ... .. .. _...... ._ - 10.00 ...... ................ ....... .... .... ......... ........... _........ __... ................ ....... ........ . ............... ................... ..... . ..... - -- . ................... ......... 10.00 -............._ ...._......._- ........................_ ......................... ....................... ....... ........ ---- ... ..................................................:...................................... -...... ....... .--)....... -- .._. - - - _ ........._..... _. 5.00 5.00 0.00 1 ._.... _...__._._. .._......._._._...._... _._........._._... _....-----......_. - -.. ..........-_...._._._._._._._. -.-.__._._._... -.._ ...._._._.__ ......._._..._..._... _...----...............-- --.._... . ; , -4-,-, -- -- ---- - - - - - ---------- 0 3 6 9 12 15 18 21 24 27 30 33 36 Hyd No. 15 Hyd No. 9 Time (hrs) Coastal Site Design, PC P.Q. Box 4041 Wilmington, NC 28406 Section VIII Cq;pot�! .-Ito Deelgn, PC Pq. tx491 q DesIgN PC fax WSW O d CD m a wL W ww�+ 'W c/ E L '� Q O G J m U W LL _ m C J Q O O r O O O r O O Q m m O W o C7 h O r r r C. N .N W C G O o O o O ro O ro O o O r O o O q OD Oi E N N N r N r o � W C O' = O COO OR O O O r q q C O N m W O N m 0 r co r co r � N 0 Lo co L j cm Iq QO COD Uh ti m � � W r r r r r r r J c� U� Lq C~D COO. r*.: ti h r h r h h r h r h r h h r ro _O . 7 ONO tm N C {L co � 'T It le in le Lo w O d C ' COI pp d' COO N M COO CD m 7 r r r v r m LO M r T Z m Q e "MY. � q Nt COM Q N m C7 O O O O 0 C7 a d N CA S CM 0 co 0 N rro N 0 @ O 01 C COO CLO m O M 0 O Cl 0) � Q N N 6 N N W CCD N O W C N W CD tLq N O �1 co N CC N �1 5 0 LO N Lo N CD G � — O p OOi v Z r_ V CO r CD r r r r y h h OD h ro ro ro ro � +� C N E W 0 co Sri r- ui ui LO ui v o m C E o 0 0 0 0 o O o a - c 0 ui 0 0 m 0 G E V 0 0 O m m m >< G N N N r r O r O O C O W ro d r� O O O O O c9 N N LD M O M < — 0 Cl 0 0 0 O 0 O C N Lf) LO Lo LO C6 N E :7 1p v v M It M 0 r h h v r co V: M CD O ro m M co O N O r O I C O - co co r- m O W V w r Ld I Z CO r m J O O O O R Oro' O N O D _ m II �' M N t- N N Y Rsite Design, N C r '0 c C P.O. Box 4041 N O F J W r N N It O v h ' neAAs V w o c o O r N M O CD h OD I Z .(D a 3 0 L A 4kCoastal Site Design, PC P.O. Box 4041 Wilmington, NC 28406 ca N C J O Z T c O ■� }i LM 4) 3: cn E L -W cn q N G J m U ❑ W LL U 2 _ ' Z O Ci U H C JQ CV N CV N N N N N ' N N J N N N N N N lV N N J O O O O O O O O O O O 0 0 0 O O O 0 O Q m m ❑ W W C7 C9 — Y — J J Z O Z a ❑ U n 0 N N N N N N N N N N N N N N N N N N N O N CD O O O O O O O O O O O O O O O O O O O O 0o G L1J ❑ r M N N CO O O T T T Ln r N ID N M O M 0 co co w w co O w O O to O CD CD O 0 0 0 co co C $' O M O N O N O CO O O 0 O O O O O 0 C,O O O O O O 0 O C = T T T LO LO � � N lO N M M M M co co co 1p co co co co O O 06 LL V T T T T r r r N T T T N. r r r T T C ' 0 Cl) LO CD O M M 0 v N T M r O N Ih V i M CO I-- > C M N R M O N M CO � N q O CD M CO O qO W W m m d' Ln Ln Ln cD O 0 CD n n co ti h I; O ti w 0 Ln WT T r T r T T T T T r T T T J _ O LO LO h v O 01 1�- O N O N O O O O O O n = v O N N O LD N O W N c9 M O Iq O O q O W W m T Lo Ln Ln c0 co CD 0 O N n I, � n m w I- O 0 Ln T T T r r r T T r T r r r r T T O N 00 O O N O N O O O O O O O O O O O O O O O O N ❑ r CD T T cD CO N CD N CO CD O N O CO CO cq C W W M r CM T CM T M r - r v r - r v r In T — T — r — T — r c0 ,F — r — r — r r — T — T O m c Q o N 0 m 0 CO 0 r 0 N 0 c0 0 ti 0 N 0 CO 0 f-- 0 cD 0 I` 0 O 0 LO pp tD 0 CD 0 h o O E . 0 M M C9 v v v v N 6 N 6 6 CD O CO cD CO co M 07 M O Z T T T T T T T T T T T r 0 C CO T M O M M M N CO M CO. CM LO M M CO M M M CL O N e O 6 r G C Cl) O O it C7 M O v C M G m O IT O M C v C M O M O O M O It G Nr O � O y L N a W 5 ... co O m co 0 co 0 0 0 O o v w v CD OD ao 0 0 co M M T M M r M r M r T N r N ———- C -a 60 co LD r- O v N CD M CD LO N M Cl) CA O co ll7 O r M LO CO 0 CO • co T O I-- CD O cD M M v Lf) N C7 CD O 4 N T CM M r.- N r r0+ O M N N N COO N O N CAD N O N CD N N N E Ci w V W O tD 6 q vi O ri N W pi W C+i O R N 01 CA W l0 CC M N CG N CG N CC CC CO T CC CD CO Cn CG CC O O O W W 3 O 4 0 M m N (0 coo co CD 01 M N m v N O Ch LO CA N N W 0 N CD N O N vi N N OD r Ln N C T C;M r In Cq In N O C C N N r M r LO CD Lc) r tll ti DO ti ri c0 OD cG 00 ti OD ZA a0 CD oD I,- W } ID y = N T O LOO O M CD N T O O M O W O Cl) N CD O T O p r r ICJ O W 6 OD Ln h Ln Ln CC Cn cC In Ln LCJ Ifj Cp In V H .0 w m = O O O O O O O O O O O O O O O O O o O 0 O- C O Lri Lri O LCi Lri N ui C Lri Lo Ln LL•i O Ln ui Ln Iri Iri Lri ` V C ti LO M N- CO N M a� r T T O O N M N M N CD N N O CO N r O I'^ C) m O Cq N 0 N O T O O T C O O C7 O O O 6i O �- V. O Cl) O O CV CD co O O 0) -ItT M O M M M CID W C�'! C O O r O M N T N O O N T N O N V M N O O O C7 O O C C C O O C O O O C C O O O O O N co O O O O O C O O O 6 O C; O O C O C O O O C; O E CE w V 01 m M O M LO CD LO M m O N N LO 0 I• M 0 O y CU O LO O O N A LO t9 r M A tq N Ln C R "t 0A q CO N O C a F � � O CD cD O Ln O d' O O cri O N T C T C O C CD E j Cf @ O O I-- O CO N O O N F- LO CD O v O O M in v N O O N M O 0 y N O ❑ C C O O O C O O O O O N O O N O LO C O O l0 C W C n O t0 C N O O 0 Z� yj co C m O O G O 'cf C N p O O p CO O N O O O O O O cal O 01 o O O U m II _I CO v N M N Cl) LO C`7 CO r M T c7 T LO M c0 m CC m •y N T N T T N T N r r N r N_ 'Cf N C rO. O O C ~ J C W T N N N N h 1` 01 O 07 N N v /�'ll M r c((y� Design, ilte Design, RC LL T T r i/oatal oat w Z r N M v LO 0 I, wD, T T drain oTf NC�d406 t- O O N 00 O O M C ai Z v � m � � ry 1l.1 C�7 l� y Q � Ih m Q I � I M Z� Coastal Site Design, PC m p0. Box 4041 ai Wilmington, NO 26406 ;L w U O d a c O G L. Y / E L -W cn a M Ja M M M M cyi M M M M C O O O O O O 00 O O O O O 0 J a m U m w LL (7 = C7 Y w 2 h O CM C7 CM M M M M M CM M M M M N d OD 9 O O O O O O O CD O O O O O CD O M O O O O O v O r O O O CD r0 W v O M NN N N O to C W O C N Cu N N � R C = v O O O O O cD O O O O O CO O q O q O q O v O r O r CD CD q cq N r N O O O O C O O r N N N N N r N N N N N N N O v M c17 M r v CF q N O N h h O O N h v W h O r q M CD m 0 CO -CD CD CD w w O W O O m O O CD Wr r r r r r r N r N r r J = p, O M r v CO lly CA N O N O M CD W O v O h O h O lt7 h 'fit CD aD oD oD W CD 0 W M O CD Di O CD Ce r r r r N r N r r d O O O N O q O It: O O O O CD m O q O Up O O O q O v O O O M r N N C M LOP CD LO CO CO m I- CO 1- � LO CD ,, W r r _ r O d 0 c a o 0 ov o 0 oao 0 0 o 0 0 0 0 � E q O O q O M v ID M Iri rri co co cc cD cD r` rn r; r; CD cD Z r r r r r r r r. r r r N O. CO O M LO M N M M M r M O . p e N M M N ch th M M O- M v Q. O O O O r C O C O C C O G O y IL Nt6a C G cli N O N w CD CD co O O w r N c0+9 r r r r r r r r N C � r � h h aD h o � O W r M � o CD t0 M LO� h LO o Q N N 6 r 6 6 6 r N N O N � � O• — CO O N COD COD N O N v C. N 0 N E w ' r 6 q q 6 N W O W r M O q CD q y 3 O O CD r r CD m CD CD CD LO 0 ;0 3 0 m m r h O CD Lq W h v r r h O M tg 0 N N co C. I-N M M M m In In h O CO V r N O H .V. N N ICi r 0 v v H C � Cm CD r r CD h h _ r ' r-� 6 CD r� r-: r; cd CD r� 6 CD CD CD } LO .. CD N M O r r O M O O m O M O N !! CO W CD O O co h h IC) O CD O O O ID p O tl I_ _ •c d � •E o 0 0 0 0 0 0 0 0 0 0 0 0 0 a — o rri ui rri Ici rri Iri 16 Iri O 6 6 Iri wi E V � N N m O r M O r v O- O W CD CD R H CD M CD M CD O tt O O N Lq r r r ' O N O CD O cD O O O CD O N C CR C O O O O O O O O O O O O O O N O m � LO LO It LO M LOtD O co cm + C p C� O v v v d V O O O O O O O O O O C O O O E p b Cj O CD O M in O O h O r v 0 O N O M In M N M !V r N v N CO LO y C CD W r r I[7 M N O O r r O r O rA V tl O O M O N O W M O N r O O CD O © C V O q O .O O) O v M O O O N O ID O O O r O O C O O O r O O O Z O r o o O a M o O 0 N 0 0 0 0 o O O o N o N m u J co M M Di (fl Oi c'M y M N N cD N N N r N r N m C C O C C Coastal Site Deslgn, LL .O+ H J W r N M N CD CO h O h O r O v .p W R d H 9 °' r Wilmington, NC 28406 °z j r N M v 0 0 1-CD 0) �- r i Coastal Site Design, PC P.O. Box 4041 Wilmington, NG 26406 c O ■� m m M W ww�+ 'W E L '*0 c9 d M p m U ❑ W u. J M < M < < LL O O O O O J H ¢ m U m w n O m Ca0 M M Cal O N Dil W 0o O E N N N n N N C Q' O O [M q OOo OOo C ei N N N N N N C CM li Oco o O ti 0 m co Go co 07 CO 0) J NOOItM 0 OC! OD W 6 W 6 r r r r r r O C _ O O O O r N C W r r r r r r 0 r m cCL C0 0 0 LON a) .n E � ui �ci cc cc cc 0 ' Z r r r O � N C07 cOri M coo M O 0 0 0 0 0 0 a N ' a fn O M C N O r O r O r Go r V N C w +mo O N Cl) N co n ND C C Go O •.�+ v C6 �4 Cq CV N CL A LO O CD M n h ti N . E lC) In ID LL") D O f 0 r r Cl) M .. h - h CC! 6 CC CD } O O Co O N O LO N E 11 H co a<i vi ui ui o o y c C E o 0 0 0 0 o N Q _ CD Sri LO LO LO E V +10+ N N COtl COo � 3 CD % Ip F O O O O D7 O d C C9 O O N C O O O O C C N (j O O OD + C O O C C O E A p � CR M CN W O E 6 w W 8 v u O O Lo M OOo O Q MI O O W C C C C O r zI r C O O O O O O Q 11 J - It cm m CC4 LO N N to C 0 O C c P.O. Box 4041 LL N c O :j W r N M N Oul w o- H O i i V � v coastal site Design, PC P.O. Box 4041 Wilmington, NC 28406 r" 0 c N cc O O c .0 m ''3 V/ E i. CIO) O c Q v v v v v v v v v v v v v v LL- F O O O O O O O O O O p p O O O O O O O O ¢ m U o o tL C9 O _ _ Y w Y z u. IL a if m m O v v v v v v v v v v v v v v v v v v v v o N dco C O O O O CD O OR O oonnn It o M o O n O O O O CDW r 0 O M M M cM M M N N N N CM N M N n m M N M N m N r N 7 N O _E N N N N N N N R! N N N N C\ N N N N N N N CY M m a o O 0 O 0 CD 0 O 0 O 0 n 0 h 0 n 0 0 '�t 0 O 0 M 0 M 0 n 0 n 0 0 0 0 0 O M M M M M CO N N N N m N N N N M N M N 07 N N r N N CV 7 Q' N N N N N N N N N N N N N N N N N N N N N C M N w N W N -t M LOW n O LOv OR N O r It n CD O n W LO O CD W V O N W r r V O 0 N r UO - N CO (y� 0 O N O N O N O N O N O N O N N r N r N r N r N N N N N N N N N et N J x C w N CD N N Crl W O O n n n o r O N N cD n n O W N O O O M O It O V O' N O W c'o O N 0 N 0 N 0 N O N 0 N r NNN r r N N N N N N N C? N m N n N M N C O O Cl r O N O M O r O r O O O r O r O W O W O n O O O M O n O O O O O O O O O N lL G fD r co Co co � r r- w o 0 o W 0 Co 0 1+ o w M w n o n o C N r r r r O Ol C Q. O r O N O CM O Cl O O O O O O O O O O O O O O O O 07 0 r N m r N W O M O r n OO O r M n CO M 0 o CD ti t: n o o Co O� O) C O o W o CD CD o o z r r r r N N r r r r r 0 C G O e N q M CD W N O M W N co M w M W N N M W N n M co M W m W O co lq' O v M O a o 0 0 0 0 0 0 0 0 0 0 C. N 0 q 0 N O M 0 0 q 0 M 0 O o M 0 O m as N CA c .... N N N N m CD O (O CD W W CO DD CD 0 co CD CD a C�pp O d' tt r M M r N r r r r r r N N r r N N ±� O O It O v N N OD It r W r N N N O M w 1- v 0 m v w LOO w n r VO O W m W M O M M C v M M M M o M 6 r CM r N r O r O N r N N o O N .2 co U�V n O O co r N M r N w h m v v C. N q q qCM �IEJ LOI LO LOL6 v N N —' Sri 0 Co IA Co Co N Co — : - LO - v CO ti w cm9. O CD n M W v co n W W O n O H M m cn o N (D v O O O m CO O O m O CN N Ch N r N r CA F- •� v ti C W W 6 W 6 r r N M r O r n W r O r O r CD oo r O CD t` W h r-: CD t,: CO t�: n CD CD o n CO I�: h 6 Oo C r r cn O O O N O W O N E N N r O O O N O O n O O O O m O n 11 N r r 0 r M LO 11 Cn I: CO o LO ' LO o Lo ti CD Co to -O F o o O a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a O O O O O O O O O O O O O O m O O O O O E 7 p O O O co r M W N N m O M m r co N W O 'et M N N co O 01 x �o 6 c ri r o r o c o 0 0 r 0 N 0 - r r r r o m o CD rm, a C O O m O N N M O r O O O Iq n N N M W M O O W r M rO ice- W r r r M N O O pp M CD r G O o < o 0 0 o O o O O O O o O o O C o O o C o o C n, p d O LO m m O O m It to O O O O O O N � C d v t O t t 0 0 0 O o 0 0 0 o 0 0 0 0 0 o 0 0 0 0 0 o m w ® Cf .v IT O v O N W v I-r m N M O O m 0)M O O (D W n N CD n CD N n to N v M N r O ao aD N m l r Q W O CD O h v o N O r C O O O CM C N N C N i r C to tT' O N CD co M O w W O m 0 N CD O N d' r O m O _E to O O N O O O n q O et N r N O O CD ' O LO 0 o 0 0 00 0 0 o 0 0 0 0 0 0 0 . 0 zl w y o 0 0 oC6 oio W o o o r o d0 0 0 o o m u 3 J M Co d' M co N IT M O CD � M d' N � M _ O r CC) n Vv M V C�7 `. r M e N r r r C O d Cpst%wh:Sits!De n, PC N h W W N a_z J r N M v O co n' 0 0 O -- - - r� Mingft, %2840 a c 0 � � � � � LM � 4) c E 0 -W cn § > # - - 0 0 _ > § w E § K CD k E a m a cv o § E 2 2 § CM a CD 0 E q q w Q § . CL E § k & § g 0 k § § ru - o � CL E 7 CD d z 0 q 2 B R E r S e � co c � / 2 > ¢ § § / a CL g g E \ �o f' & � w » �» Go CID @ \ LO CO2 0 _ k 2 \ . E { LO c •� 2 0 \ � m / c d d A .% % co O © to� 't - of d + .■ o 2 J 2 $ a , N � ) 2 kc m co G § - d d z CD .E Cl) § � in \ . ? ' ¥ k ' M c � § ' q / % P BOX #41 ' I 6 a IL § , u- . j q § z 2 k ! k / FL 3 0 L O O N coO O iA C J t 4 i 51 i 5 �4 i 0 t Q v r-. N Qi �I Z Q Coastal Site Desl ry, ��'� m b P0. Box 4041 16 Wiimi,1910n, NC ao, (D 'o a d p m U ❑ W w U = LL O O O O O O O W ? Q m U ❑ w ❑ 0 O v d 00 N M G N O M M : OD fo OD C' E M N N C\I M N M N O CAI N tq N co N N � � l0 Q C Q' O Ch C07 V' o OD a00 (00 COO C C9 N N Cl) LO N N N N N C N N C07 V• O OR q O CD m O N O N O N O N O N — N O N O N J 2 O N m v 000 m cm'l CD to O N O N O N O N � N 1 N CM N O N 00 m O O O O O O -: O CO O Cp N C co CD CD co r- CD r- r- p C = N G00 N N COO C00 7 cD CD CD t` CO W n t` Z CL e CDQ cl c`l N cmo ch cc! N N O O O O O O O O IL N_ spa�p H v M M N co OD OD co co U Gl ' � C j N N n C0O cl r eF N N N m N o o cc —_ V ^y v CO Coo M N N N CO CO CA N O N O O h —E-N N N — O O w O Ull D p 0 C) 0 v C0O r cq O u t~ H e- M Cn CV C C � s `� o m m o a- } .� r� rr r; t� eo ao � c6 C O Cl to cn O co O co O Lo N II H e- of of c6 Cri L6 6 6 p H m C C 07 � E o o 0 Cl 0 o 0 0 0 0 0- Sri ui ui ui Sri Sri V G C M O 0O C C CNM O d O t> O N M O N cN'> CD O t C C C G O O O O O N C (� O � VV' O � � V Cb t c tl O O 0 o O O O O 0) E OI0 0 0 INNOCcicON . � H N N N O O O E GOl OI Q C>' C v O Co O O Q V'I CO O O O O O O O O O ZI CD m O 0. O CO CO O O O � m II N Cq N N c"0 ,i N C 0) �pO - C ~ ;j c w N m r CO h e I� Q f� i�& .• 'Q fn w P0, BOX 4041 a J N M. V' CO co r• co a .0 *0 _cc � � � � � � � cn E shm 0 -W co C J § j c E § \ E n ° R C § § � R 2 = E @ w k . CL k ■ c E § ) w @ \ CL E \ E z $ Cl)\ 0 :a- a q 2 U) � 2 a $ § j \ v) c k co S, k F- 3 w e )a $ C-4 / . � » \. # § t f R C 7 _ k / / % _ E § k0 q § v 0 J a - & k M j o - ® 2 Go j E 7 > G i U ® Nadal PC I P B xo «41 LL 2 20 .i. fj LU , o . 0 _ z � a r. .0 � � � � � � � � � � ca E sm 0 -ba co $ c v § w � E % \ ) � ^ . 2 \CL j ■ k Go @ CN § � CL E $ m ■ o E C3, § w R \ t k � F & E CN z B _0 k � ■ / § k G a $ § 7 £ J) C \ 0 CO � �} # @ » 4 - 3 a ._ � £ ) � 8 # § k s F RCL k a e u 7 § 2 � $ ■■ @8 v CD 9 q + ■� o f § J a - « Ctm / I k c ® § CDCN E ) 7 to & ° � � �|$ � ) j 2 m ` w PO. om� . a. Q �. � - W . KC 2 . z w IL c 0 � � 75 m � � � � � � ca E 0 %W cn V v co q � v E \ E N 0 kCL % 2 C 2 o k k w ' L F za 2 k ■ � � % � \ w > ] CL / k \ E a J / A G / a E d 2 E % ® 0 C a S � $ k 0 v) « G $cc 4- E / m 0 / S � 7 % � E . •. Go k o c; ` k 7 u N co v ® * u 04 + o ) . ■ 2 $ a $ — k ) - « E k © co § ok - co C 2 00 \ r- Coastal Site Design, P £ i 7 ® 2 Box�1 ƒ �. � ^� A«ni@ �2 _k w @ a.§ - z � a c 0 � cc � � � � � � co E LM O -W co � $ o v § � E § \ E . k e / CL \ 2 c E 8 3 k CL p k - w a 0 t . ƒ CL A k U � E o & IL • c 2 k 2 a k 5 0 J b / \ )2 ta � � o � a # R \ 04 $ £ Q � 7 �8 � .� 04 + o E \ / . ) « �Im / e o k k § LA- § CD/ R F $Uan e § � b . -§ �'� ' \ c a a .0 � � 75 � � � LM � � � � E LM 0 -W ca § § \ d § C� j � E % co \ k k CL n E k C o � ¢ E G k w L E q Q _Q ■ c E $ 46 2 a 46 t k CL E o E M $ 2 CL G £ % LD aCD / / m #� 2 ` \ n / _ ° ] CL_ J 2 $ 2 d C4- \ \ . j - e c � � ) •- f _ 2 0 . m # \ d \ " F I f 9 m r_ U 7 § � } x � g 2 \ dco E q CV + u E cc 3 g q . - « � . . R tm 2 / co LO ~ § 2 \ E $ ® Coatal Slte DesIgn,P 2 B § • & . o © �§ 2 P BOX1 u U.f Ayn,2N24 ƒ w 2 : - � IL a .0 � � � � � � Lm � � � co E � 0 AMA ca g CD o N 3 o E % § E 4 ® � � k k CLE % ; N £ § w cm x C F C . § � ■ o £ K u e Mu » 0 E q E z k k e 2 _a IL CL Cl) } \ w a / ) n $ kk co — ON F- r_ a 7 ® f 2 2 .' 0 7 $ U k _ CN E _ / \ x 7 Go k Q ci .E d 7 %% Lo q & �_ + S o D 2 J k -§ s cm k k § k \ o ^ s § R E 2 ) LD ® 0 �f ] $ , pe P BOX41 I ■ fa WilmInoon,NC 28406 • ƒ d _ § t a c 0 � � � � � � � � � .� co E I= 0 *0 co g § \ d § » _ / Mu 0 — q § R § � F $ � Q k ■ . # w CL 2 § ■ CD w % > — a E § E Q 2 to CL - E ■ — d ¥ k E . / c 2 7 / � \ d ) CL_ k S \ § q e CID m F o m # k k If \ F U ) k m / aco . ] x k § /OR / k m � k co/ %■ q � ` k E 0 k § � < c k k 2 / LO o § 2 § c E 2 G ; » § _ _ r ' ) iTL Bo 1 \ k '%m e / $ @ 2 c 0 � � � � � � � � � � � E 0 *a CIO . � 7 v co o � 3 o £ $ \ § 04 k CL E al f CDR b w C E p >TT— k � » § k k CLA § 2CL Q / IL \ a § k 2 % k A� 2 CL k J) $ } ) � �2 k $ © $ �z-_ S ® # £ $ -0 01, 7 7 \ 0. — n e u 2 § ci 3 q k $ J m &S % E to 0 § \ u � § k / o c a o f d c E % � S � CD f o@ 2 i7L I gLUn PC E n ■ P BOX 491 \ \! ® « ' . m rn a O ._ 4a cc W ca E � co 0 a+ c � •c J � � U CO � O N i d W c 0 O Ui 01 O O E CIx 0 C O coMEco J _ CL C6 G O Of G y: L O - v tl) C 04 C G O ci 7 v Z W C co O CCL C e .... M 061 a 3 S 0) C O a_ "• E • J 3 (7 O v N H c i Q W c O Lo N N M 11 O � a C £ ce) ` r � 06 � 12 a .� o < C6 lQ O) 0i V O V �? 00 N + V O V 07 e V O :v N O E c v ea C _ Ci C N a... co E � CD O Ui L[j V oD c J CD 0 "Tr 'y r � DeaPC LU w c a LLI p J Z 0 ca ca L 'W c/ E -W M 0 d c � � J � U N W = O 0 E N a' m a O c > _ o w J = C o of V� O � tl1 W c m c a M E z 3 o co 0 O e Cal N a y o 'IL 0 c > v O o CD Ae U v e� 0 y� cc H N c `c ,6 >- 0 c O LO 11 O d c O a C Lfi M ` P co 0 Go CR 0 C) Im + c O V O CD 0 co N E O E t t7 v c m c 6 O OI O O � � N m � J r- _ N Coastal Site D gn, PC o W 4041 N Wilmington, NC 28406 a o J � Z c 0 M� � � � � LM � � � � E Im 0 vw co . � 7 � � § 2 o E § m § § ! R m k = E q c § c ■ c £ o - 8 � w E I a ■ r- E § / w a \ a CL E § � k z B CL § 0 (0 0 a ca ƒ - � 9 > - 0 k z ) CL k § \ 0 N: 0 J j o m u \ $ k . f I k - $ � 4) CL 7 2 / x U m c� 3 S 7 %■ � LO m + £§ o � ---- . o E 0 k \ « � m £ G o CA c 04 / \ 2 ¢ © a § I �a es,, 3 �) o § 2 . z 7 e � . W A%N S 2 � - . � a c 0 � � � � � � � � � co E L. 0 ,&a co m g § o E � 4 § § f � � a k CL ■ � � � w d E � � . a 0 CD w e 0 S - a) ? F § % ƒ m s c k p a . � � a ¢ 7 CL .� w § \ ® 3 0 ■ ) © 0 J2 2 C » CO _ E ° # \ $ . 0 � ' & \ ■ § 8 x ® 2 § C a 3 o § ` G 7 ■% Gi c � � + ■u o f § � \ « ® � to £ � � k U , � 2 a § } \ E co7 © § C �§ 2 E 2LU 2 w .ui a e PC ff . , z .RM41 Rn,Am� 2M CD CL c 0 � � � � LM � � (D co E L 0 *a cn � \ \ / lu 0 E § 9 G § - � � k k � � \ � � � w � CL � 2 � $ � . ■ o § Q f w ■ CL £ f 7 & z E ° £ 0 o 2 IL k L .e $ 5 E 0 2 > k CL J) . § k ■ k � to £ 0 �� � \ con 0 S Q t m % a � o 2 � / f � v . 2 C*4 c0 ) �� K. ■ k § � . © a 2 C a � % CDco7 o _ 3 � { $ r E 2 Coasd Site Design, P v / e \ P.O. BOX 4041 U- i §LU Adn|no N 264 k ■ . 0- b z _ I if c 0 9-" � � � � � � � � U) � LM 0 -W U) ■ § \ ) k ' 2 / E � � a C CL E § � § $ } § w . � CL & a Or- E § k w . Q \ > ` CL § 2 z $ C U 2 , ° § f . 2 a k , - a c \ � TO J) k § E § 5§ 2 �■ a . / 8 7 � _ 7 ƒ d k E 8 I x ° k e I kcli 7 c \ ■� . o + § \ co 6 / » k § f § � n w / § 2 Ln �s�|eQ$ ) # co a �2 u .W#niAGNO2#@ 7 § Co. § CL b . 2 z 2 IL a 0 � � 75 � � � LM � � � � E LM O -w cn � � / c ) � w_ � E k \ & ~ M E CL E k \ R w R k ■ � E k ( w 0 > t / :3 / f 3 z d o 0 / e CL / � � a n \ c k ] M_ \ k v2 k 0 \ �2 $ co. - ®LO » / § I \ q 3 § x Go � $ I w $ 0 L m co 7 �u � o + . ) § � \ q ° k § E L6 § E 2 . ) / � o . § § Tap, COG-jo-tualk .. , � © BOXg&1 ) $ \ k , Wilmington, / § 5 — z § � a c 0 � � � � � LM � � � co E lim 0 *0 co 2 / (D 8 k o E k § . � § 6 E § J � R E k w B CL E G k ■ o Ek k w > \ I M.F f v 2 2 .2 q a 'A D IL . M $ k m 2 © 0 CL Jj \ c6 � / § / �■ LO � £ � 7 F R. L C'4 § 3 & § u m ° k } k 7 %% ® cm �o v ■u o + f � ] � \ « # P ) k e « 2 Q 2 M CM E % k G c § o § LU NO SlteDesIgn,P CD j ) c ,■ ,. a ƒ § 2 mdngtonNC 2W§ . z (a 0. .� .� � � � � � LM � � � co _ E LM 4w co CD 0) � I 3 � § 3 2 E 7 § & � � ■ 9 § � . CL E G a k � ■ ar £ (F':': w \ > c a � £ § � � �§ z g g § $ 2 E 2 E , 2 k ) A G . g CL_ £ J2 a § 0 e k k ) § 2 � coLO \ . § V 7 7 q . ) R a / u _ q } a x 12 2 _ ■ to � < c / �S ® � o m + § J �� m A? k ■ k . a / G k \ E ] 7 ) L $ 12 c 2 UO2stal Site Design, PC _ 9 BOX �1 d ■ m«rQtmN2 @ . b : - z d co m CL O ■� AMP AL+ W w�w+ U)//W� .E co 0 d c rn � J � U n O o N m W c O 4 r �• o C a o m 0 r > m c C rn LO 111 r' J c� _ Q. N f0 d W C � ^O r yy C 0 a) d c CL c — E D. r o. co o . N .Cr W � W r• � S r y � CL w L %f E c o - c _ may ui o � 0 � o M u 0 c • ul c C o - LO C� a 7 7 N U x M J co ` N O O < Ci c M O W C C (j to tt N t d E � N V c IA C V t1 ems- N lLO N C > II LO ° o ~ _ oasts a Design, w U- r_ J I?0. Box 4041 m w y Wilmington, NC 28408 a o r z LO 8 N 0 c W � IL a 0 � cc � � � � � � � co E � 0 -W M Cl § \ / 2 � r CD £ § § � k M > w � � / m d a ■ o w \ 2 I CL i (A o 7 $ a � �CL 10 a \ � 0 � 2 CL \ k k �J j 'L4- } F o m # k k � • a $ \ CL 2 • / d i \ J o ) / k ¢ Cli %% « co m o JS � 0 E k \ E- c k CN o o $ § $ E\CN �§ C |�@ £ w ± @ ^ .. \ 2 ■ ƒ § = AKnI&N■ . 2 § k k k 2 � c 0 Z� � � � cc � Lm � � � co E L- AW co g \ \ d § w E � _ § \ � 2 k CL E % \ 0 C14 > R k w _§CL _ § c*4 Ar « ■ o ECD d \ w 2 \ ( ] £ k ■ I z $ CL o £ & 2 %ciZ IL § f CL / CO' 8 a \ 2 G � g (0 � E k � /k � �/ @ � � 7 # C-1) � i � 2 � 7 $ n E k 04 - k Q 7 _ § 0)�04 \ ) E k j ° « E - k 'k )' - 2 - _ / % \ j . » § ] �e�■�S%�\ $ \ ° (L § - in On N 28406 . . g IL c 0 � � � � � � � 4) � 4) co E Sm 0 -W ca v S q w k 0 } § E R § CL F § ) c � § 2 ¢ 0 E R w b § F ¥ � � o E § . ■ w Q 0 $ � & _ CL £ k E Q z • 0 7 (0 0 E ■ E 8 _ - c com - a \ $ $ / � 2 G k \ d 0 �■ 3 \ / 7i2 E © / f o m £ k $ " ] I \ m 3 k CR k m \. LO k + k OF ._ $ \ . � f c - B k m ; } G q o $ { § E � § / G Ad Coastal Site Design, PC ©� 0 uj k® 4041 a - 4ad�mN �■ . 7 a. w b z � a c 0 R� � � � � � LM 4) � � co E 0 *a co g \ _ { § j E $ § e C CL E m & ■ k Ci w # § F 7 . § � ■ o E § B w Q 2 V k CL E k E 2 z g CD CL E § 6 \ — . mcli a G � / m K / $ \ . � 0) § k CN e •- / co I F o k k k i 0 a 2 f 0 C U k GoX @ CD k � � �k � CN ) L / k � co k k c o § k , . LO LO \ cCD EGO I B i § © § . a w �ada|$%D��,P ) k « a ) § - A¥nl & N 2 @ . 2 Section IX lkCoastal Site Design, PC PO, Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 11/30/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* T Width of Spread (ft) WGR Grate Width (ft) L Grate Length (ft) d_ave Depth of Flow (ft) d curb Depth at Curb (ft) Qi Intercepted Flow (cfs) L�J G = d' 4 Cif Parallel Bar P-1-7/8 1.94 1.98 2.98 0.122 0.245 0.890 Coastal Slte Design, PC P0, Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 11/30/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) -0.15 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.000 d curb Depth at Curb (ft) 0.000 Qi Intercepted Flow (cfs) 0.460 � n�e.T CQ 1► C. OPT= 0►M c 014 (:�2 CSN O. = a.9- Coastal Site Design, PC P.O. Box 4041 v Wilmington, NC 28408 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 11/30/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/ T Width of Spread (ft) 4.61 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.178 d curb Depth at Curb (ft) 0.301 Qi Intercepted Flow (cfs) 1.560 Coastal Site Design, PC VA k-il P.O. Box4041 Wilmin9ft, NC 28a FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 2.96 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.143 d curb Depth at Curb (ft) 0.267 Qi Intercepted Flow (cfs) 1.130 () .L1 l L-j lwlhr C - C), (4 t coastal Site Design, PC ® P0, Box 4041 Wilmington, NC 28408 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* T Width of Spread (ft) WGR Grate Width (ft) L Grate Length (ft) d_ave Depth of Flaw (ft) d curb Depth at Curb (ft) Qi Intercepted Flow (cfs) Cv� 1,G � ; p "l 9 C 0, 6,= CIN c� = I I %S Parallel Bar P-1-7/8 5.64 1.98 2.98 0.199 0.322 1.850 NO Site Design, PC P0. Box 4041 Wilmington, NC 28408 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by. :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 6.35 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d ave Depth of Flow (ft) 0.214 d curb Depth at Curb (ft) 0.337 Qi Intercepted Flow (cfs) 2.060 l� R Li LNItid C = 0 •� CZ� A_ Coastal Site Design, PC e s P.C. Box 4041 �` Wilmington, NC 28406 FHWA Urban Drainage Design Program, Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data HY-22 Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* T Width of Spread (ft) WGR Grate Width (ft) L Grate Length (ft) dave Depth of Flow (ft) d_curb Depth at Curb (ft) Qi Intercepted Flow (cfs) Ccl a,% C = O'V Parallel Bar P-1-7/8 -2.22 1.98 2.98 0.000 0.000 0.140 4NO Site Design, PC 6 P0. Box 4041 WilminOon, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 0.17 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.085 d curb Depth at Curb (ft) 0.209 Qi Intercepted Flow (cfs) 0.520 CQ at 0' al C — O.0 (�= CIN _ © .5`1 Coastal Site Design, PC P.O, Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 5.22 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.190 d curb Depth at Curb (ft) 0.314 Qi Intercepted Flow (cfs) 1.730 CkI a%E 0 :: Ca Coastal Sh Design, PC P.O, Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1- T Width of Spread (ft) 4.61 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.178 d curb Depth at Curb (fL) 0.301 Qi Intercepted Flow (cfs) 1.560 Ci� ate Coa& Site Design, PC P0. Box 4041 `` Wilmington, CSC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 2.16 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.127 d curb Depth at Curb (ft) 0.250 Qi Intercepted Flow (cfs) 0.940 Glil KeG O+rs 1 C = C.S 'N Q 11 4 A1 Coastal Site Design, PC PO, Box 4041 Wilminoon, NC &06 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 2.67 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d ave Depth of Flow (ft) 0.137 d—curb Depth at Curb (ft) 0.261 Qi Intercepted Flow (cfs) 1.060 Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28408 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-�0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) -0.15 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.000 d curb Depth at Curb (ft) 0.000 Qi Intercepted Flow (cfs) 0.460 ck� L)�� Coastal Site Design, PC ,. P0. Box 4041 Wilmington, NO 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 3.44 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.153 d curb Depth at Curb (ft) 0.277 Qi Intercepted Flow (cfs) 1.250 cc, a,k L, Av% C : 0,U Q i Ci N 0,- lta5 Ceaatal Site Design, PC P.O. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 0.48 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.092 d curb Depth at Curb (ft) 0.215 Qi Intercepted Flow (cfs) 0.580 CV� Q,L Coastal Site Design, PC PO. Box 4041 Wilminoon, NC 290s FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning`s Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 3.32 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.151 d curb Depth at Curb (ft) 0.274 Qi Intercepted Flow (cfs) 1.220 C1� Q.�\ N Coastal Site Qeslgn, PC PO. Box 4041 4. Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 3.16 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.147 d curb Depth at Curb (ft) 0.271 Qi Intercepted Flow (cfs) 1.180 CVS �, 0 _ O •�"` 1 L) ihlhr C=0U a CT Pt Coastal Site Design, PC P,O, Box 4041 'h'ilMI On, INC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 7.07 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.229 d curb Depth at Curb (ft) 0.352 Qi Intercepted Flow (cfs) 2.280 � � ^ 1h LI I hd c = 0, G CI N Coastal Site Design, PC PO. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 5.39 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.194 d curb Depth at Curb (ft) 0.317 Qi Intercepted Flow (cfs) 1.780 Li 0, = C, Coastal Site Design, PC PO. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/ T Width of Spread (ft) 4.42 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.174 d curb Depth at Curb (ft) 0.297 Qi Intercepted Flow (cfs) 1.510 c 6 A = O.l�'3 > COai Site resign, RC P.O. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) -0.15 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.000 d curb Depth at Curb (ft) 0.000 Qi Intercepted Flow (cfs) 0.460 C t Q.S L) t = 0, (, Q, = C-IN = a .LiL* Coastal Site Design, PC Pa Box 4041 m Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) -2.39 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.000 d curb Depth at Curb (ft) 0.000 Qi Intercepted Flow (cfs) 0.120 Coastal Site Des[gn, PC PO. BOX 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 6.84 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d ave Depth of Flow (ft) 0.224 d-curb Depth at Curb (ft) 0.347 Qi Intercepted Flow (cfs) 2.210 ACoastal Site Deslgn, PC P.O, Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Protect No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 7.45 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.237 d curb Depth at Curb (ft) 0.360 Qi Intercepted Flow (cfs) 2.400 o 111r c= Coastal Vte aeslgn, PC PO, Box 4041 Wilmington, NO 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/ T Width of Spread (ft) 6.21 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.211 d curb Depth at Curb (ft) 0.334 Qi Intercepted Flow (cfs) 2.020 C11 3.c {� d -S9 LI i nl >nr Cr O�l� Q z CIN ng Coastal Site Design, PC Q P0. Box 941 Wilmington, NC 28Q6 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 2.25 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.128 d curb Depth at Curb (ft) 0.252 Qi Intercepted Flow (cfs) 0.960 Coastal Sate Design, PC P.O. Box 4041 V11*00n, NC 28408 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 2.03 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.124 d curb Depth at Curb (ft) 0.247 Qi Intercepted Flow (cfs) 0.910 ci� el•T� Coastal Site Design, PC d PO. Box 4041 Wilmington, NC 2W6 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 3.51 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.155 d curb Depth at Curb (ft) 0.278 Qi Intercepted Flow (cfs) 1.270 C i3 4.SI 1 L1 hr 1Z A Coastal Site Design, PC PO, Box 4041 Wilmington, IBC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar 2-1-7/8 T Width of Spread (ft) 7.51 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.238 d curb Depth at Curb (ft) 0.361 Qi Intercepted Flow (cfs) 2.420 C= 0.4 CK,� Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-004.3 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 0.07 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.083 d curb Depth at Curb (ft) 0.206 Qi Intercepted Flow (cfs) 0.500 C Q= 6.so Coastal Site Design, PC PO. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project. No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter -Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 4.61 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.178 d curb Depth at Curb (ft) 0.301 Qi Intercepted Flow (cfs) 1.560 G Vs Coastal Site Design, PC m P.O. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project. No: :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/ T Width of Spread (ft) 3.98 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.164 d curb Depth at Curb (ft) 0.288 Qi Intercepted Flow (cfs) 1.390 C=0.0 Coastal Site Design, PC P.O. Box 4041. Wilmington, NG 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 3.63 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2_98 d_ave Depth of Flow (ft) 0.157 d curb Depth at Curb (ft) 0.281 Qi Intercepted Flow (cfs) 1.300 Q- CIi�v- coastal Site Design, PC a P.O. Box 4041 Wilmington, NO 28408 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 1.17 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.106 d curb Depth at Curb (ft) 0.229 Qi Intercepted Flow (cfs) 0.720 1�= 0.J0 LI L�IA,r COW21 Site Design, PC PO, Box 4041 Wilmington, NC 28QB FHWA Urban Drainage Design Program, Drainage of Highway Pavements Inlets on Sag Date: '12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data HY-22 Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 6.61 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.219 d curb Depth at Curb (ft) 0.343 Qi Intercepted Flow (cfs) 2.140 A Coastal Site Design, RC a0, Box 4041 Wilmington, NO 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 7.67 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.241 d curb Depth at Curb (ft) 0.365 Qi Intercepted Flow (cfs) 2.470 G�3 3N,� LI Lr%) ,,r Q c-� Q a. � Coastal Site Design, PC rv' PO. Box 4041 Wilmington, NG 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) -1.15 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.000 d curb Depth at Curb (ft) 0.000 Qi Intercepted Flow (cfs) 0.290 c - 0, � Q- (ZN Q : 0. Qi,� Coastal Site Deslgn, PC P.O. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0013 `� Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 3.04 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 dave Depth of Flow (ft) 0.145 d_curb Depth at Curb (ft) 0.268 Qi Intercepted Flow (cfs) 1.150 C1�s LiIC L� c = C), Coastal Site Deslgn, PC P0. Box 4041 °- Wilmington, NO 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 4.86 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.183 d curb Depth at Curb (ft) 0.306 Qi Intercepted Flow (cfs) 1.630 Coastai Site Design, PC P0. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No.. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 0.33 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.089 d curb Depth at Curb (ft) 0.212 Qi Intercepted Flow (cfs) 0.550 Gt3 LJOr c = 0. (C Q = CIN Q= O,SS Coastal Site Design, PC PO. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No:. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/ T Width of Spread (ft) 6.51 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.217 d curb Depth at Curb (ft) 0.341 Qi Intercepted Flow (cfs) 2.110 S." � L� 1►r Coastal Site Design, PC P0, Box 4041 WilminMon, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date.: 12/01/2006 Prc-ect No. :03-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 3.98 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.164 d curb Depth at Curb (ft) 0.288 Qi Intercepted Flow (cfs) 1.390 Q & It3°I A Coastal Site Design, FC PO. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 P.r_olect. No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data HY-22 Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* T Width of Spread (ft) WGR Grate Width (ft) L Grate Length (ft) dave Depth of Flow (ft) d_curb Depth at Curb (ft) Qi Intercepted Flow (cfs) Cd � CJ:N �= 1,CO Parallel Bar P-1-7/8 4.97 1.98 2.98 0.185 0.308 1.660 Coastal Site Design, PC $ P.O. Box 4041 Wilmington, IBC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 6.28 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.212 d curb Depth at Curb (ft) 0.336 Qi Intercepted Flow (cfs) 2.040 CJ) �t�S C= 0.4 OL cl N OL _ D. 64 Coastal Slte Design, PC Ra Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 2.33 WG'R Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.130 d curb Depth at Curb (ft) 0.254 Qi Intercepted Flow (cfs) 0.980 c� 0.(.f Q= CIN o.= o.000Y Coastal Site Des ^p, PC P0. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sack: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *.Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 0.93 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.101 d curb Depth at Curb (ft) 0.224 Qi Intercepted Flow (cfs) 0.670 C = 0,�# Q= C N Q= 0 ,(.ail Coastal Site Design, PC �. P,O. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No_ -0.5-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) -0.72 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.000 d curb Depth at Curb (ft) 0.000 Qi Intercepted Flow (cfs) 0.360 c= 0,U C� = CiN a-;- a.IG Coastal Site Design, PC �., PO, Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Protect No. :05-0043 J Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 2.46 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.133 d curb Depth at Curb (ft) 0.256 Qi Intercepted Flow (cfs) 1.010 C(� LI, O C= 0.(� Q= (v= 1.0; Coastal Site Design, PC .� P.O. Box 4041 :t Wilmington, NG 28406 FHWA Urban Drainage Design Program, HY-22 Drainage. of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope -(ft/ft). 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 0.48 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.092 d curb Depth at Curb (ft) 0.215 Qi Intercepted Flow (cfs) 0.580 c = O At1 0 cIN (), = 0 M Coastal Site Design, PC " e P.O. Box 4041 W111minoon, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 3.32 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.151 d curb Depth at Curb (ft) 0.274 Qi Intercepted Flow (cfs) 1.220 �= o,5\ �= r 0' J CIN �- 22- Coeste! Site Design, RC b. P.O. Box 4041 ,,. Vdiiminjon, NG 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 6.28 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.212 d curb Depth at Curb (ft) 0.336 Qi Intercepted Flow (cfs) 2.040 G fis , 03 til CIN Coastal Site Design, PC PO. Box 4041 Wilmington, NC 2W6 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No- :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 2.33 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.130 d curb Depth at Curb (ft) 0.254 Qi Intercepted Flow (cfs) 0.980 C �J I T G= 0� Q- CSINt cove Coastal Site Design, PC PO. Box 4041 Whill&n, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-004.8 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 4.16 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.168 d curb Depth at Curb (ft) 0.292 Qi Intercepted Flow (cfs) 1.440 cz o.c� Ck- C%N a = W-N CQaft Site Design, PC e ; P,O. Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No- :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 4.24 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.170 d curb Depth at Curb (ft) 0.293 Qi Intercepted Flow (cfs) 1.460 C� L1,W o (.t\ L - i 0.4 Q = C SA �"ALe At Coastal Site Deslg PC RO, Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 SW Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 4.42 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.174 d curb Depth at Curb (ft) 0.297 Qi Intercepted Flow (cfs) 1.510 kCoastal Site Design, PC P.O. Box 404i WilmiVon, N%28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 6.11 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.209 d curb Depth at Curb (ft) 0.332 Qi Intercepted Flow (cfs) 1.990 C% Ll t\• C- o. LJ C- OJJ ('� = CJ� Coastal site Qeslgn, PC PO, Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 3.16 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.147 d curb Depth at Curb (ft) 0.271 Qi Intercepted Flow (cfs) 1.180 c� H R. t 0 -`A r c - 0, Q Q- Vi G1= 1,1� Coastal Site Design, PC ® P.O. BOX 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) 5.11 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d ave Depth of Flow (ft) 0.188 d—curb Depth at Curb (ft) 0.311 Qi Intercepted Flow (cfs) 1.700 C L'I N,�- l ; t,1 i" ►,r Coastal Site Csslgn, PC `t P0, Box 4041 Wilmington, NC 28406 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) -1.02 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.000 d curb Depth at Curb (ft) 0.000 Qi Intercepted Flow (cfs) 0.310 = 0.4 Q_cz 0,= 0 Coastal Site Design, Pc PO. BOX 4041 Wilmington, NC 28406 7 FHWA Urban Drainage Design Program, HY-22 Drainage of Highway Pavements Inlets on Sag Date: 12/01/2006 Project No. :05-0043 Project Name.:Tarin Woods Computed by :Coastal Site Design, PC Inlets on Sag: Grate Inlet Roadway and Discharge Data Cross Slope Composite/Dep Sx Pavement Cross Slope (ft/ft) 0.0208 Sw Gutter Cross Slope (ft/ft) 0.0400 n Manning's Coefficient 0.016 W Gutter Width (ft) 2.00 a Gutter Depression (inch) 2.00 Inlet Interception Inlet Type *Sag* Parallel Bar P-1-7/8 T Width of Spread (ft) -0.72 WGR Grate Width (ft) 1.98 L Grate Length (ft) 2.98 d_ave Depth of Flow (ft) 0.000 d curb Depth at Curb (ft) 0.000 Qi Intercepted Flow (cfs) 0.360 C.-:. 0, 4 Q=czh- c = 03(e Coastal Site Design, PC P,O, Box 4041 Wilmington, NC 28406 Section X coastal Site Design, PC P0, Box 4041 '� �hinoon, NC 28406 25 YEAR STORM ANALYSIS FOR STORMWATER SWALES/DITCHES: DRAINAGE SWALE 1 - (20 FT EASEMENT BACK OF LOTS 51-65) A = 0.73 acres Q = CIA I = 3.13 "/nr, (25-yr, Tc=5 min.) = (0.30)(8.15)(0.73) C = 0.3 = 1.78 cfs n = 0.022 REARRANGING MANNING'S GIVES YOU: s = 0.001 M = 3 (3:1) ARA2/3 = Qn / (1.49s^1/2) B = 0 or y = ? Zav = Zreq Zreq = Qn / (1.49s"1/2) = 0.83 A = By + My^2 P = B + 2y (1 + MA2)^1/2 R = A / P Zav = ARA2/3 B= 0 y = 0.74 A = 1.66 P = 4.7 R = 0.35 Zav = 0.83 y = 0.7 feet V = Q / A = Q / (by + My"2) = 1.08 ft/s Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) DRAINAGE SWALE 2 - (20 FT EASEMENT BACK OF LOTS 43-45) A = 0.2 acres Q = CIA I = 8.15 "/hr (25-yr, Tc=5 min.) = (0.30)(8.15)(0.20) C = 0.3 = 0.49 cfs n = 0.022 REARRANGING MANNING'S GIVES YOU: s = 0.001 M = 3 (3:1) ARA2/3 = Qn / (1.49s^1/2) B = 0 or y = ? Zav = Zreq Zreq = Qn / (1.49s^1/2) = 0.23 A = By + My^2 P = B + 2y (1 + M"2)"1/2 R=A/P Zav =AR"2/3 B= 0 y= OAS A = 0.83 P = 2.9 R = 0.22 Zav = 0.23 y = 0.5 feet V = Q / A = Q / (by + My42) = 0.78 ft/s Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 DRAINAGE SWALE 3 - (20 FT EASEMENT BACK OF LOTS 105-113, 122-130) A = 0.72 acres Q = CIA I = 8.15 "1hr (25-yr, Tc=S min.) _ (0.30)(8.15)(0.72) C. = 0.3 = 1.76 cfs n = 0.022 REARRANGING MANNING'S GIVES YOU: s = 0.001 M = 3 (3:1) ARA2/3 = On / (1.49s"1/2) B = 0 or Y = ? Zav = Zreq Zreq = Qn / (1.49s^1/2) = 0.82 A = By + My^2 P = B + 2y (1 + MA2)^1/2 R = A / P Zav = AR^2/3 B= 0 y = 0.74 A = 1.64 P = 4.7 R = 0.35 Zav = 0.82 Y = 0.7 feet V = Q / A = Q / (by + My^2) = 1.07 ft/s Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) DRAINAGE SWALE 4 - (20 FT EASEMENT BACK OF LOTS 114-121) A = 0.44 acres Q = CIA I = 8.15 "1hr (25-yr, Tc=5 min.) _ (0.30)(8.15)(0.44) C = 0.3 = 1.08 cfs n = 0.022 REARRANGING MANNING'S GIVES YOU: s = 0.001 M = 3 (3:1) ARA2/3 = On / (1.49s^1/2) B = 0 or Y = ? Zav = Zreq Zreq = On / (1.49s"1/2) = 0.50 A = By + My"2 P = B + 2y (1 + MA2)^1/2 R = A / P Zav = AR^2/3 B= 0 y = 0.62 A= 1.14 P = 3.9 R = 0.29 Zav = 0.50 y = 0.6 feet V= Q/A= Q/(by +My^2)= 0.95ft/s Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 DRAINAGE SWALE 5 - (20 FT EASEMENT BACK OF LOTS 105-113, 122-130) A = 0.29 acres Q = CIA I = 8.15 "/hr (25-yr, Tc=5 min.) _ (0.30)(8.15)(0.29) C = 0.3 = 0.71 wa -- n = 0.022 REARRANGING MANINING'S GIVES YOU: s = 0.001 M = 3 (3:1) AR^2/3 = Qn / (1.4901/2) B = 0 or y = ? Zav = Zreq Zreq = Qn / (1.49s"1/2) = 0.33 A = By + My^2 P = B + 2y (1 + MA2)^1 /2 R = A / P Zav = ARA2/3 B= 0 y = 0.53 A = 0.83 P = 3.3 R = 0.25 Zav = 0.33 y = 0.5 feet V = Q / A = Q / (by + My^2) = 0.86 ft/s Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) DRAINAGE SWALE 6 - (20 FT EASEMENT BACK OF LOTS 114-121) A = 0.18 acres Q = CIA I = 8.15 'Ihr (25-yr, Tc=5 min.) _ (0.30)(8.15)(0.18) C = 0.3 = 0.44 ofs n = 0.022 REARRANGING MANNING'S GIVES YOU: s = 0.001 M = 3 (3:1) AR"2/3 = Qn / (1.49s^1/2) B = 0 or y = ? Zav = Zreq Zreq = Qn I (1.49s^1/2) = 0.21 A = By + My^2 P = B + 2y (1 + MA2)^1/2 R = A / P Zav = ARA2/3 B= 0 y = 0.45 A = 0.59 P = 2.8 R = 0.21 Zav = 0.21 y = OA feet V - Q / A = Q / (by + My^2) = 0.74 ft/s Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 100 YEAR STORM ANALYSIS FOR STORMWATER SWALES/DITCHES: DRAINAGE SWALE 1 - (20 FT EASEMENT BACK OF LOTS 51-65) A = 0.73 acres Q = CIA I = 9.6 "/hr (100-yr, Tc=5 min.) - (0.30)(0.6)(0.73) C = 0.3 = 2.1 cfs n = 0.022 REARRANGING MANNING'S GIVES YOU: s = 0.001 M = 3 (3:1) ARA2/3 = Qn / (1.49sA1/2) B = 0 or y = ? Zav Zreq Zreq = Qn / (1.49sA1/2) = 0.98 A = By + MyA2 P = B + 2y (1 + MA2)Ai/2 R = A / P Zav = ARA2/3 B= 0 y = 0.79 A= 1.89 P = 5.0 R = 0.38 Zav = 0.98 y = 0.8 feet V = Q / A = Q / (by + MyA2) 1.11 ft/s Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) DRAINAGE SWALE 2 - (20 FT EASEMENT BACK OF LOTS 43-45) A = 0.2 acres Q = CIA I = 9.6 "/hr (100-yr, Tc=S min.) = (0.30)(9.6)(0.20) C = 0.3 = 0.58 cfs n = 0.022 REARRANGING MANNING'S GIVES YOU: s = 0.001 M = 3 (3:1) ARA2/3 = Qn / (1.49sA1/2) B = 0 or y = ? Zav = Zreq Zreq = Qn / (1.49sA1/2) = 0.27 A = By + MyA2 P = B + 2y (1 + MA2)A1/2 R = A / P Zav = ARA2/3 B= 0 y = 0.49 A = 0.72 P = 3.1 R = 0.23 Zav = 0.27 y = 0.5 feet V= Q/A= Q/(by +MyA2)= 0.8 ft/s Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 DRAINAGE SWALE 3 - (20 FT EASEMENT BACK OF LOTS 105-113, 122-130) A = 0.72 acres Q = CIA I = 9.6 "/hr (100-yr, Tc=5 min.) = (0.30)(9.6)(0.72) C = 0.3 = 2.07 s n = 0.022 REARRANGING MANNING'S GIVES YOU: s = 0.001 M = 3 (3:1) AR^2/3 = Qn / (1.49s"1/2) B = 0 or y = ? Zav = Zreq Zreq = Qn / (1.49s^i/2) = 0.97 A = By + My^2 P = B + 2y (1 + M^2)"1 /2 R = A / P Zav = ARA2/3 B= 0 y = 0.79 A = 1.87 P = 5.0 R = 0.37 Zav = 0.97 y = 0.8 feet V = QIA = Q / (by + My^2) = 1.11 ft/s Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) DRAINAGE SWALE 4 - (20 FT EASEMENT BACK OF LOTS 114-121) A = 0.44 acres Q = CIA I = 9.6 "fir (100-yr, Tc=5 min.) = (0.30)(9.6)(0.44) C = 0.3 1.27 cis n = 0.022 REARRANGING MANNING'S GIVES YOU: s = 0.001 M = 3 (3:1) ARA2/3 = Qn / (1.49s^1/2) B = 0 or y = ? Zav = Zreq Zreq = Qn / (1.49s"1/2) = 0.59 A = By + Myn2 P = B + 2y (1 + M^2)"1 /2 R = A / P Zav = ARA2/3 B= 0 y = 0.66 A = 1.29 P = 4.1 R = 0.31 Zav = 0.59 y = 0.7 feet V= QIA= Q/(by +My^2)— 0.98 f/S Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, PVC 28406 DRAINAGE SWALE 5 - (20 FT EASEMENT BACK OF LOTS 105-113, 122-130) A = 0.29 acres Q = CIA I = 9.6 "/hr (100-yr, Tc=5 min.) = (0.30)(9.6)(0.29) r = 0.3 = 0.V cfs n = 0.022 REARRANGING MANNING'S GIVES YOU: s = 0.001 M = 3 (3:1) AR"2/3 = On / (1.49s^1/2) B = 0 or y = ? Zav = Zreq Zreq = On / (1.49s^1/2) = 0.39 A = By + My^2 P = B + 2y (1 + MA2)^1 /2 R = A / P Zav = AIR A2/3 B= 0 y.= 0.56 A = 0.94 P = 3.5 R = 0.27 Zav = 0.39 y = 0.6 feet V= Q/A= Q/(by +My"2)= 0.89ft/s Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) DRAINAGE SWALE 6 - (20 FT EASEMENT BACK OF LOTS 114-121) A = 0.18 acres Q = CIA I = 9.6 "/hr (100-yr, Tc=5 min.) = (0.30)(9.6)(0.18) C = 0.3 = 0.52 cfs n = 0.022 REARRANGING MANNING'S GIVES YOU: s = 0.001 M = 3 (3:1) AR^2/3 = On / (1.49s^1/2) B = 0 or y = ? Zav = Zreq Zreq = On / (1.49s"1/2) = 0.24 A=By+My"2 P=B+2y(1+M"2)A1/2 R = A / P Zav = ARA2/3 B= 0 y = 0.47 A = 0.66 P = 3.0 R = 0.22 Zav = 0.24 y = 0.5 feet V = Q / A = Q / (by + My^2) = 0.78 ft/s Acceptable for grass lined channels (see chart 8.05a, Erosion and Sedimentation Control Planning and Design Manual) COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 Section XI A Coastal Site Design, PC P.O, Box 4041 Wilmington, NC 28406 ��LLfi%"Gf,G ei i�GfXi W UMA" J'W. &4M4�s?iY1"AW C990n 7z��j� JIasI (Y/,cry AU .2522 U% f rn�rr rt., J41,4 'eaxtoliy ,a 28/0.2 •fry(1.9 ItIL�Jb�Y'JrIN.��7rP.JJJ.JPJrJ.f�P/•! -.IV28467 Howard Resnick Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28405 February 23, 2006 Reference: Stormwater study for the Cypress Grove development near Wilmington, NC Dear Mr. Resnick: i0/rnnP: olo-/u2-(ool rrrJnrr , /9rr/ t nt�.. JJPf Land Management Group, Inc. has recently had the pleasure of evaluating the aforementioned stormwater infiltration sites. The purpose of the evaluation was to describe a typical soil profile, quantify the depth to the seasonal high water table, to estimate infiltration rates and to inform the project engineer of any potential limitations of this project. I offer the following comments. The soils at this site are most closely associated with Baymeade and a drained Murville soil series. All profiles had at least some indication of a drainage effect due to the historic local and regional drainage in this area. The contemporary seasonal high water table is evident by observation of redoximorphic features suggesting past conditions of saturation and reduction in conjunction with landscape position. I specifically concentrated on 5 areas across the site. They are designated as Area 1 (Lots 45, 46, and 47), Area 2 (Lots 54, 55, and 56), Area 3 (Lots 11, 12, 13), Area 4 (Lots 21, 22, and 23) and Area 5 (Across from Lots 92-97, above the 25 foot contour). Each area will be discussed separately. Area I The seasonal high water table was determined to be between 32" and 42" across the site with an average depth of 34". The estimated infiltration rate for stonnwater would be approximately 2" / hr. A typical soil profile description form this area is shown in the attachment. Area 2 The seasonal high water table was determined to be between 24" and 36" across the site with an average depth of 28". The estimated infiltration rate for stormwater would be approximately 2" / hr. A typical soil profile description form this area is shown in the attachment. Area 3 The seasonal high water table was determined to be between 24" and 34" across the site with an average depth of 26". The estimated infiltration rate for stormwater would be approximately 1" / hr. A typical soil profile description form this area is shown in the attachment. Only %2 of the f area originally propose_ d is useable as shown on the attached sketch. t F !" �- r:I corstai Site G igan, PC f :: P,O. Box 4041 Wilmington, NC 28406 Area 4 Zone 1 (above the 19 foot contour) The seasonal high water table was determined to be between 34" and 44" across the site with an average depth of 38". The estimated infiltration rate for stormwater would be approximately 2" / hr. A typical soil profile description form this area is shown in the attachment. Zone 2 (below the 19 foot contour) The seasonal high water table was determined to be between 24" and 34" across the site with an average depth of 26". The estimated infiltration rate for stormwater would be approximately 2" / hr, A typical soil profile description form this area is shown in the attachment. Area 5 The seasonal high water table was determined to be between 24" and 72" across the site with an average depth of 60". The estimated infiltration rate for stormwater would be approximately 10" / hr. A typical soil profile description form this area is shown in the attachment. In summary, the site can be proposed for stormwater infiltration in accordance with the above referenced design criteria. I did not observe any other factors that would limit the ability of this site to serve as a stormwater infiltration area. Please do not hesitate to contact me if you have any questions with this report. I may be reached at 910-452-0001, 910-471-0777 or at Sincerely, ohn P Williams NC Licensed Soil Scientist, #1113 SC Professional Soil Classifier, #58 CC: Colorado Coastal Development Coastal Site Design, PC { P0. BOX 4041 WIIMIrgton, NC 28406 Typical Profile Descriptions Area 1, Linear side slope, 0-2% slope. A 0-4" Loamy Sand, granular, fr, ns, np, 2.5Y2.5/1 Salt and Pepper E1 4-15" Loamy Sand, granular, fr, ns, np, 2.5Y3/1 Clean E2 15-24" Loamy Sand, single grain, vfr, ns, np, 2.5Y3/2 Clean Bw 24-42" Loamy Sand, weak subangular blocky, fr, ns, np, 2.5Y3/3, 2.5Y5/3 Cg 42-56" Sand, structureless, fr, ns, np, 2.5Y5/2, 2.5Y3/2, 10YR5/8 RMF Estimated seasonal high water table: 42" Observed water table on February 20, 2006: 53" Estimated infiltration rate: 2 inches per hour Area 2, Linear side slope, 0-2% slope. A 0-4" Loamy Sand, granular, fr, ns, np, 2.5Y2.5/1 Salt and Pepper E1 4-15" Loamy Sand, granular, fr, ns, np, 2.5Y3/1 Clean E2 15-20" Loamy Sand, single grain, vfr, ns, np, 2.5Y3/2 Clean Bw 20-32" Loamy Sand, weak subangular blocky, fr, ns, np, 2.5Y3/3, 2.5Y5/3 Cg 32-56" Sand, stzuctureless, fr, ns, np, 2.5Y5/2, 2.5Y3/2, 10YR5/8 RMF Estimated seasonal high water table: 32" Observed water table on February 20, 2006: 48" Estimated infiltration rate: 2 inches per hour Area 3, Linear side slope, 0-2% slope. A 04" Loamy Sand, granular, fr,.ns, np, 2.5Y2.5/1 E1 4-15" Loamy Sand, granular, fr, ns, np, 2.5Y3/1 E2 15-24" Loamy Sand, single grain, vfr, ns, np, 2.5Y3/2 Bwg 24-42" Sandy Loam, weak subangular blocky, fr, ns, np, 2.5Y3/2, 2.5Y5/2 Cg 42-56" Sand, structureless, fr, ns, np, 2.5Y5/2,.2.5Y3/2, 10YR5/8 RMF Estimated seasonal high water table: 24" Observed water table on February 20, 2006: 32" Estimated infiltration rate: 1 inches per hour % coastal Site Dea(rt�, RC a PO. Box 4041 Wilmington, NC 2806 Area 4, Zone 1 (above 19 foot contour), Linear side slope, 0-2% slope. A 04" Loamy Sand, granular, fr, ns, np, 2.5Y4/2 E1 4-12" Loamy Sand, granular, fr, ns, np, 2.5Y5/2 E2 12-20" Loamy Sand, granular, fr, ns, np, 2.5Y5/3 Bwl 20-34" Loamy Sand, weak subangular blocky, fr, ns, np, 2.5Y6/4 Bw2 34-44" Loamy Sand, weak subangular blocky, fr, ns, np, 2.5Y5/4 C 44-60" Sand, structureless, fr, ns, np, 2.5Y5/1, 2.5Y6/2 RMF Estimated seasonal high water table: 44" Observed water table on February 20, 2006: None Estimated infiltration rate: 2 inches per hour Area 4, Zone 1 (below 19 foot contour), Linear side slope, 0-2% slope. A 04" Loamy Sand, granular, fr, ns, np, 2.5Y2.5/1 El 4-15" Loamy Sand, granular, fr, ns, np, 2.5Y3/1 E2 15-24" Loamy Sand, single grain, vfr, ns, np, 2.5Y3/2 Bwg 24-42" Loamy Sand, weak subangular blocky, fr, ns, np, 2.5Y3/2, 2.5Y5/2 Cg 42-60" Sand, structureless, fr, ns, np, 2.5Y5/2, 2.5Y3/2, 10YR5/8 RMF Estimated seasonal high water table: 24" Observed water table on February 20, 2006: 36" Estimated infiltration rate: 2 inches per hour Area 5, Micro -ridge, 24% slope. A 04" Sand, single grain, vfr, ns, np, 10YR4/1 E1 4-15" Sand, single grain, vfr, ns, np, 10YR5/1 E2 15-22" Sand, single grain, vfr, ns, np, 2.5Y7/1 Bwl 22-56" Sand, single grain, vfr, ns, np, 2.5Y6/8 Bw2 56-60" Sand, single grain, vfr, ns, np, 2.5Y6/4 Estimated seasonal high water table: exceeds 60" Observed water table on January 31, 2006: None Estimated infiltration rate: 10 inches per hour Coastal She resign, PC R R0, Box 4041 Wilmington, NC 23406 Section XII PROPOSED NEWHANOYER COUN7YS70RMWATER DESIGNMANUAL SECTION 40 - R UNOFF DETERMINA77ON PROCEDURES TABLE 40-3 NEW HANOVER COUNTY . DEPTH - DURATION - FREQUENCY TABLE TABLE 40-3A Duration Return Period 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr (time) (in) (in) . (in) (in) (in) (in) 5 min 0.49. 0.55 0.60 0.68 0.74 0.80 10 min 0.88 0.99 1.07 1.20 1.31 1.41 15 min 1.15 1.29 1.40 1.57 1.70 1.84 30 min 1.62 1.92 2.14 2.47 2.73 2.99 60 min 2.10 2.58 2.92 3.41 3.80 4.18 2 hr 2.50 3.30 3.60 4.20 4.70 5.20 3 hr 2.80 3.50 4.05 4.70 5.20 5.80 6 hr 3.30 4.20 4.82 5.71 6.40 7.00 12 hr 3.90 5.00 5.80 6.90 7.70 8.60 24 hr 4.50 5.80 7.00 8.05 9.00 10.00 TABLE 40-3B Duration Return Period 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr (time) (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) (in/hr 5 min 5.88 6.63 7.23 8.15 8.87 9.60 10 min 5.28 5.91 6.43 7.22 7.85 8.48 15 min 4.60 5.15 5.59 6.27 6.82 7.36 30 min 3.23 3.84 4.28 4.94 5.46 5.97 60 min 2.10 2.58 2.92 3.41 3.80 4.18 2 hr 1.25 1.65 1.80 2.10 2.35 2.60 3 hr 0.93 1.17 1.35 1.57 1.73 1.93 6 hr 0.5.5 0.70 0.80 0.95 1.07 1.17 12 hr 0.33 0.42 0.48 0.58 0.64 0.72 24 hr 0.19 0.24 0.29 0.34 1 0.38 0.42 ifulal s Mfg PC Source: Latest Versions of NWS TP-40 and NWS Hydro-35 P0, Box 4041 7 Mjrnk - N 8an� JUNE 14, 2000 PAGE 40-5 El 'fable 8.03a Value of Runoff Coefficient (C) for Rational Formula Land Use C Land Use C Business: Lawns: Downtown areas 0.70-0.95 Sandv soil, flat, 2% 0.05-0.10 Neighborhood areas 0.50-0.70 Sandy soil, ave., 2-7% 0.10-0.15 Residential: Sandy soil, steep, 7% Heavy soil, flat, 2% 0.15-0.20 Single-family areas 0.30-0.50 Heavy soil, ave., 2-7% 0.13-0.17 0.18-0.22 Multi units, detached 0.40-0.60 Heavy soil, steep, 7% 0.25-0.35 Mufti units, attached 0.60-0.75 Suburban 0.25=0.40 Agricultural land: Bare packed soil Industrial: Light areas 0.50-0.80 Smooth Rough 0.30-0.60 Heavy areas 0.60-0.90 Cultivated rows 0.20-0.50 Parks, cemeteries 0.10-0.25 Heavy soil no crop Heavy soil with crop 0.30-0.60 0.20-0.50 Playgrounds 0.20-0.35 Sandsoil no crop Sandy oil with crop 0.20-0-40 0.10--0.25 Railroad yard areas 0.20-0.40 Pasture Heavy soil 0.15-0.45 Unimproved areas 0.10-0.30 Sandy soil Woodlands 0.05-0.25 0.05-0.25 Streets: Asphalt 0.70-0.95 Concrete 0.80-0.95 Brick 0.70-0.85 Drives and walks 0.75-0.85 Roofs 0.75-0.85 NOTE: The designer must use judgment to select the appropriate Cvalue within the range for the appropriate land use. Generally, larger areas with permeable soils, flat slopes, and dense vegetation should have lowest C values. Smaller areas with slowly permeable soils, steep slopes, and sparse vegetation should be assigned highest C values. Source: American Society of Civil Engineers The overland flow portion of flow time may be determined from Figure 8.03a. The flow time (in minutes) in the channel can be estimated by calculating the average velocity in feet per minute and dividing the length (in feet) by the average velocity. Step 4. Determine the rainfall intensity, frequency, and duration Tigures 8.03b through 8.03g—source: North Carolina State Highway Commission; Jan. 1973). Select the chart for the locality closest to your location. Enter the "duration" axis of the chart with the calculated time of concentration, To. Move vertically until you intersect the curve of the appropriate design storm, then move horizontally to read the rainfall intensity factor, f, in inches per hour. Step 5. Determine peak discharge, 0 00/sec), by multiplying the previously determined factors using the rational formula (Sample Problem 8.03a). Coastal Site Design, PC P.O, Box 4041 8 03.2 ' Wilmington, NC 28406 0 Table 8.03b Runoff Curve Numbers (CN) Hydrologic Soil Group A 13 C D Land Use/Cover Cultivated land without conservation 72 81 88 91 with conservation 62 71 78 81 Pasture land poor condition 68 79 86 89 fair condition 49 69 79 84 good condition 39 61 74 80 Meadow good condition 30 58 71 78 Wood or forest land Thin stand - poor cover, no mulch 45 66 77 83 Good stand - good cover 25 55 70 77 Open spaces, lawns, parks, golf courses, cemeteries, etc, good condition: grass cover on 750/6 or more of the area 39 61 74 80 fair condition: grass cover on 50 to 750/6 of the area 49 69 79 84 Commercial and business areas (85%impervious) 89 92 94 95 Industrial districts (72% impervious) 81 88 91 93 Residential:' Development completed and vegetation established Average lot size Average % Impervious 1/8 acre or less 65 77 85 90 92 1/4 acre 38 61 75 83 87 1 /3 acre 30 57 72 81 86 1 /2 acre 25 54 70 80 85 1 acre 20 51 68 79 84 2 acre 15 47 66 77 81 Paved parking lots, roofs, driveways, etc. 98 98 98 98 Streets and roads paved with curbs and storm sewers 98 98 98 98 gravel 76 85 89 91 dirt 72 82 87 89 Newly graded area 81 89 93 95 Residential: Development underway and no vegetation Lot sizes of 1 /4 acre 88 93 95 97 Lot sizes of 112 acre 85 91 94 96 Lot sizes of 1 acre 82 90 93 95 Lot sizes of 2 acres 81 89 92 94 'Curve numbers are computed assuming the runoff fromthe house and driveway is directed toward the street. source: USDA-SCS _lr_ n...._L_. 8.03.10 PO, BOX 4041 a ., - w Wilmington, NC 2W6 Rex 12M [Fwd: Tarin Woods] Subject: [Fwd: Tarin Woods] From: Mary Jean Naugle <Mary.Naugle@ncmail.net> Date: Tue, 19 Dec 2006 17:04:09 -0500 To: cameron.weaver@ncmail.net, Howard Resnik <howard@coastalsitedesign.com>, RODNEY WRIGHT <rdney@coastalsitedesign.com>, mary.naugle@ncmail.net ad info time extension approved to Jan 10, 2007 Merry Christmas Subject: Tarin Woods From: "RODNEY WRIGHT" <rodney@coastalsitedesign.com> Date: Tue, 19 Dec 2006 16:10:36 -0500 To: "Mary Naugle" <Mary.Naugle@ncmail.net> CC: "Howard Resnik" <howard@coastalsitedesign.com> Mary Jean, With the Holiday season upon us most of our office will be taking vacation time over the next couple of weeks and having time to complete the comments would be hard to accomplish in the time frame on the Request for Additional Information. I would like to request an extension on the submittal for Tarin Woods from January 4 to January 10. Also we need some clarification on comment 2. Are you looking for the trash rack to be placed over the weir cut? I will be out of the office till Jan 2 after tomorrow so please direct any correspondence about the extension to Howard's attention. Thanks, Rodney Wright Engineering Tech Coastal Site Design, PC rod nevCcD-coastals ited es ig n. com Ph. 910-791-4441 ***ANY DIGITAL INFORMATION IS PROVIDED FOR YOUR CONVENIENCE. NO CLAIM FOR ACCURACY IS MADE BY COASTAL SITE DESIGN, PC EXCEPT FOR SIGNED AND STAMPED DOCUMENTS. USER SHALL ASSUME ALL LIABILITY FOR USE AND/OR ALTERATION OF THIS DIGITAL PRODUCT.*** Fax 910-791-1601 Mary Jean Naugle NC DENR Express WiRO <Mary.Naugle(ancmail.net> Express D WQ NC DENR .._......... .... .................... ................... ................... _......... ............ ...._......... _._._............................................... ............_..........._.........._._._._._._._._._......... ..._._......... .......... ......................... _._._._._._.............. _......_._._._._._._......._.......:....._._._...................._._._..._..._._..........._._._...:.i 061005 dec06 tarin woods mj.doc Content -Type: application/msword 1 of 2 12/20/2006 8:51 AM Tarin Woods Subject: Tarin Woods From: "RODNEY WRIGHT" <rodney@coastalsitedesign.com> Date: Mon, 18 Dec 2006 11:56:23 -0500 To: "Mary Naugle" <Mary.Naugle@ncmail.net> Mary Jean, Test pit 4 on the infiltration basin map is the same test pit as test area 5 on Land Management's report. Rodney Wright Engineering Tech Coastal Site Design, PC rodney(a)-coastalsitedesign.com Ph. 910-791-4441 ***ANY DIGITAL INFORMATION IS PROVIDED FOR YOUR CONVENIENCE. NO CLAIM FOR ACCURACY IS MADE BY COASTAL SITE DESIGN, PC EXCEPT FOR SIGNED AND STAMPED DOCUMENTS. USER SHALL ASSUME ALL LIABILITY FOR USE AND/OR ALTERATION OF THIS DIGITAL PRODUCT.*** Fax 910-791-1501 I of 1 12/ 18/2006 1.23 PM I I December 19, 2006 Mr. Steve Shuttleworth, Member/Manager Cypress Grove Land, LLC 7741 Market Street, Unit H Wilmington, NC 28411 Subject: Request for Additional Information Stormwater Project No. SW8 061005 Tarin Woods, New Hanover County Dear Mr. Shuttleworth: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality The Wilmington Regional Office received a Stormwater Management Permit Application for Tarin Woods on October 10, 2006 with additional information submitted on November 28, 2006. Further review of that information has determined that the following information is needed to continue the stormwater application review: 1. Please verify infiltration rates for each of the four infiltration basins. The map indicates 10-in/hr infiltration rate for infiltration basin # 4, whereas the report from Land Management indicates a 2- in/hr infiltration rate for Area 4. Please reconcile discrepancies between the report and the map 12J('d10LP RDVOeq Te'ST t% 0,3 1 N t- I MA P '° c.►0% e iS 'fi 2. Provide bypass structure detail showing a trash rack with no more than 4-inch square openings. 3. Please provide/demonstrate the following in regard to pumped infiltration systems: a. Set the pump inlet piping at or above sediment cleanout level of the storage pond to avoid plugging the system between storage pond and infiltration basin. b. Provide calculations of the amount of volume pumped to the infiltration basin during the storm event. In no case shall this volume exceed 25% of the design storm runoff volume. Imcief `,' —'z' wl�C NlK C. Provide calculations of the available storage volume in the storage pond between thefjc sediment cleanout level and the overflow elevation. In no case shall this volume be less - 0 than 75% of the total design storm runoff volume. d. The sum of the two (2) volumes from (b) and (c) above must equal or exceed the total volume associated with the design storm. e. The bottom of the storage pond(s) must be located at least two (2) feet above the SHWT or a liner must be provided. The liner must either be of natural material at least one foot in thickness and having a hydraulic conductivity of no greater than 1 x 10-6 centimeters per second when compacted, or a synthetic liner of sufficient thickness to exhibit structural ') integrity and an effective hydraulic conductivity no greater than that of the natural material liner. r- r. The tradeoff for allowing the minimum basin volume to be reduced by that amount being infiltrated during the storm will be the creation of STANDING WATER IN THE STORAGE BASIN. Please consider specifying a means to reduce the nuisance potential for mosquitoes and algae, such as floating fountains. `rat) ','' r; T, 14" I, 1Vne �C�rCazo dvatur,a North Carolina Division of Water Quality 127 Cardinal Drive Extension. Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwateryuality.ore Fax (910) 350-2004 1-877-623.6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/100� Post Consumer Paper Mr. Steve Shuttleworth December 19, 2006 Stormwater Application No. SW8 061005 Page 2 of 2 The Division has developed new tentative guidance regarding the design of pumped infiltration systems. It is the intent of the Division to give some credit for a reasonable amount of runoff volume that can infiltrate during the design storm event, so that the storage requirement in the basin can be reduced. Credit for the volume of runoff that is pumped to the infiltration area and is infiltrated during the storm event will ONLY apply to infiltration systems where a pump is being utilized to pump the runoff to a separate infiltration area, and will not apply to normal infiltration trenches and basins where storage and infiltration are permitted to occur in the same system. The pumped infiltration system will be considered on a case -by -case basis, and will take into consideration the basin location, soils, water table and other site -specific factors and requires prior approval of the Division. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to January 4, 2007, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. if you have any questions concerning this matter please feel free to call me at (910) 796-7303. Sincerely, Mary Jet�=ugle EN/mjn: S:IWQSISTORMWATERIADDINF0120061061005 dec06 CC: Howard Resnik, Coastal Site Design, 910-791-4441 [fax1501] P. 1 COMMUNICATION RESULT REPORT ( DEC.19.2006 4:21PM ) TTI NCDENR WIRO FILE MODE OPTION ADDRESS (GROUP) RESULT PAGE ---------------------------------------------------------------------------------------------------- 152 MEMORY TX 97911501 1 P. 3/3 REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER E-2) BUSY E-4) NO FACSIMILE CONNECTION eoVaSEeWcpo � 5 ZL-W (ow) u01suR"NG i lPo La f11I A �BM;o 01At3 j 0J N ueer AjeyN 'n0A Mueyl oziwlulw of joltno puod 04; BUTA10nui U0l;0 Uojui leuos;appe ao; isenbai a pe '6uiBGnid te}te purl e9eefcl :�iuse� °aW e 129MM SId M AIdkmV ammItl gus u so ewgd Msl&" aopl X :W*r+f10 IcIOUM +GuPold :00 900 Wo 8MS -8pQQM upal %cif Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E. Director =1 Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality Phone: 910-796-7303 To: Mr. Howard Resnik, Coastal Site Design From: M. J. Naugle Fax: 910-791-1501 Pages: 1 of 2 Phone: 910-791-4441 Date: 12/18/2006 Re: Tarin Woods— SW8 061005 CC: Rodney Wright ❑ Urgent X For Review Please Comment Please Reply ❑ Please Recycle e Mr. Resnik; Please find attached a request for additional information involving the pond outlet to minimize plugging. Thank you, Mary Jean XA N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 796-7215 Customer Service A; Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1-877-623-6748 !vOL1k(vt COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone:910 791-4441 Fax: 910 791-1501 November 28, 2006 Mary Jean Naugle Express Review Permitting N.C. Department of Environment And Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Request for Additional Information Project # SW8 061005 Tarin Woods New Hanover County CSD Project No. 05-0043 Dear Mary Jean: Thank you for your comments on the Tarin Woods submittal. I've noted below our response or actions regarding your comments for the referenced project. Enclosed please find the following items. - one (1) copy of the Stormwater Management Calculations two (2) copies of sheets EC-1 through EC-7 , the "Sedimentation & Erosion Control and Storm Water Management Plan" revised pages 14-16 of the restrictive covenants exhibit "B" two (2) copies of Exhibit Map "C" Items: 1. Vincent performed soil test and basins 1 and 3 have been approved. 2. added note on each basin stating `Basin to be lined with Centipede sod". 3. location of impervious areas will be delineated with exhibit map "C". 4. overflow bypass pipes and emergency spillways are being discharged into bodies of water that are classified as streams and unnamed tributaries by the state. Other basins are discharging into 10 ft drainage easements that have been labeled on the plans. 5. basin/swales will be recorded in drainage easements. Notes have been added to sheets EC1-EC5 stating the basins will be placed in recorded drainage easements. 6. enclosed are pages 14-16 with the corrected deed language and exhibit `B" Ve ly yours, Rodney fight Encl.: As noted above 'e p% NOV 18 a` cc: Cypress Grove Land, LLC P ARTICLE IX. GENERAL PROVISIONS SECTION 1. Restrictions on -JurisdictionalWetlands. The areas denoted as Wetland Preservation Area shown on the recorded plat entitled "Wetland Preservation Plan for Tarin Woods dated ", for Colorado Coastal Developers, LLC, attached hereto as Exhibit "A', and recorded in Book Page in the New Hanover County Register of Deeds as Wetland Preservation Area shall be maintained in perpetuity in a natural and managed condition. This covenant is intended to ensure continued compliance with the mitigation condition of a Clean Water Act authorization issued by the United States of America, U.S. Army Corps of Engineers, Wilmington District, Action ID 200400941, and, therefore, may be enforced by the United States of America. This covenant is to run with the land and shall be binding on the Owner and all parties claiming through or under it, including, but not limited to any adjacent homeowner's or any homeowners' association to whom the owner may assign or convey its rights. Modification of this particular Section 13 of Article VI will require written consent of the United States Army Corps of Engineers. The wetland map referred to in paragraph one of this Section designates Wetland Preservation Areas. Notwithstanding the provisions of this Section, the following activities will be permitted in Wetland Preservation without further consent of the United States Army Corps of Engineers: establish and maintain pervious surface, nature trails; remove noxious or poisonous plants such as poison ivy, poison oak; repair or remove storm damage and/or dying or diseased vegetation and trees; erect, build and maintain pile supported structures not requiring permits pursuant to 33 CFR 323.3. SECTION 2. Stormwater Mana. emerit. SEE EXHIBIT G°B" SECTION 3. Rights of Institutional Note Holders. Any institutional holder of a first lien on a Lot will, upon request, be entitled to (a) inspect the books and records of the Association during normal business hours, (b) receive an annual audited financial statement of the Association within ninety (90) days following the end of its fiscal year, (c) receive written notice of all meetings of the Association and right to designate a representative to attend all such meetings, (d) receive written notice of any condemnation or casualty loss that affects either a material portion of the Project or the Property securing its loan, (e) receive written notice of any sixty-day (60) delinquency in the payment of assessments or changes owed by any Owner of any property which is security for the loan, (f receive written notice of a lapse, cancellation, or material modification of any insurance policy or fidelity bond maintained by the Association, (9) receive written notice of any proposed action that requires the consent of a specified percentage of mortgage holders, and (h) be furnished with a copy of any master insurance policy. SECTION 4. Utility Service. Declarant reserves the right to subject the Property to contracts for the installation of utilities, cable TV and street lighting, which may require an initial payment and/or a continuing monthly payment by the Owner of each Lot. Each Lot Owner will be required to pay for any water connections, sewer connections, impact fees or other utility service to the Lots. In the alternative, the Developer may collect such connection, impact and other fees, charges directly from the Lot Owners. All Lot Owners shall be required, for the household purposed, to use water and sewer supplied by the companies/governmental units servicing the Project. Separate water systems for outside irrigation and other outdoor uses shall not be permitted without the consent of the Declarant or the Association. SECTION 5. Severability. Invalidation of any one of these covenant or restrictions by judgment or court order shall in no way affect any other provisions which shall remain in full force and effect. SECTION 6. Lots Subject to Declaration/Enforcement. All present and future occupants of Lots and their guests or invitees, shall be subject to, and shall comply with 14 NOV 2 8 zoos Declaration, and as the Declaration may be amended from time to time. The acceptance of a deed of conveyance or the entering into of a lease or the entering into occupancy of any Lot shall constitute an agreement that the provisions of the Declaration are accepted and ratified by such Owner, tenant or occupant. The covenants and restrictions of this declaration shall inure to the benefit of and be enforceable (by proceedings at law or in equity) by the Association, or the Owner of any Lot, their respective legal representatives, heirs, successors and assigns, and shall run with and bind the land and shall bind any person having any Lot, as though such provisions were made a part of each and every deed of conveyance or lease, for a term of twenty (20) years from the date this Declaration is recorded, after which time they shall be automatically extended for successive periods of (10) years, unless terminated by the Lot Owners. Failure by the association or by an Owner to enforce any covenant or restriction herein contained shall in no event be deemed a waiver of the right to do so thereafter. SECTION 7. Liability of Declarant. The affirmative vote of no less than two-thirds (2/3) of all votes entitled to be cast by the Association Members shall be required in order for the Association to (1) file a complaint, on account of an act or omission of the Declarant, with any governmental agency which has regulatory or judicial authority over the Project or any part thereof; or (2) assert a claim or sue the Declarant. SECTION 8. Right of First Refusal. Declarant retains the right of first refusal to purchase any vacant lot to be sold within twelve (12) months of initial transfer for an amount equal to the purchase price of the initial sale. SECTION 9. Sale of Proper No owner shall employ as listing agent Coldwell Banker Seacoast Realty as representative for the sale of any and all property encompassed in this Declaration. Nor shall any owner allow signage, advertisements, banners or flyers for Coldwell Banker Seacoast Realty, their brokers, agents, subsidiaries, successors and/or assigns to be placed on any property, lot or common area described in this Declaration. ARTICLE X. PIER AREA SECTION 1. The Association shall responsible for the cost of maintenance, repair and replacement the pier and pier area as delineated upon plat of the same if constructed. Any obligation for the construction and replacement of any pier shall be subject to approval from CAMA. On or before completion of construction of any pier a plat shall be recorded in the New Hanover County Registry depicting such pier. Replacement of any pier area shall be at the discretion of the Association as determined by vote of a majority of the lot owners. Any owner of an individual boat slip, unit or area shall be liable to pay for his or her pro-rata share, as determined by the Association, of any maintenance, repair or replacement or said slip, unit or area and shall be billed accordingly by the Association. Any owner granted permission to individually and unilaterally construct any pier, dock or slip shall be solely responsible and liable for the cost of construction, maintenance, repair and replacement of said structure. In the event that a owner of a unilaterally constructed pier, dock or slip allows said area to fall into disrepair the Association is hereby granted a right of access to repair or demolish said area and assess alien for the cost of said repair or demolition upon said owner. NOV 15 BY -� ARTICLE XI. FUTURE DEVELOPMENT SECTION 1. Developer may, from time to time, without the assent of any other entity, annex to and make part of the Subdivision any other real prop" which Developer now owns or later acquired (the "Additional Property', upon such terms and conditions and subject to covenants and restrictions, as the Developer, in its sole discretion, shall deem reasonable and appropriate. SECTION 2. Each such annexation of Additional Property shall become effective upon the recording of an amendment to this Declaration, duly executed by the Developer, specifically describing the Additional Property annexed to the subdivision, and setting forth the terms and conditions upon which such Additional Property is annexed to the Subdivision and the covenants and restrictions to which such Additional Property shall be subject. IN WITNESS WHEREOF, the undersigned has caused this Declaration to be executed the day and year first above written. Cypress Grove Land, LLC Steven Shuttleworth, Member/Manager County, North Carolina I certify that the following person(s) personally appeared before me this day, each acknowledging to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated: Steven Shuttleworth, member/manager. Date: Printed Name: My commission expires: Notary Public RECEIVE NOV 8 2006 16 BY: ::DEXHIBIT B NiE In accordance with Title 15 NCAC 21-1.1000, the Coastal Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the applicable regulation governing the density level. I, acknowledge and affirm by my signature below, following deed restrictions and protective covenants to be recorded for prior to the sale of any lot: that I will cause the 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number , as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, and coquina, but does not include raised, open wood decking, or the water surface of swimming pools. 7. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swa/es to collect the runoff and directing them into a component of the stonnwater collection system. Lots that will naturally drain into the system are not required to provide thes additional measures 8. See Exhibit Map" C" for limits of Built Upon Area allowed for each lot. Signature: Date: a Notary Public in the State of , County of do hereby certify that personally appeared before me this the day of , 20 , and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, SEAL Signature My Commission expires NOV 9 8 7006 Y: iY 11/03/2006 08:56 9104520060 LANrjHHiVF1UGMt=iv i \I L:e� c--->1� INK IIyFIL7R,4TICIN SITE VISIT REQUEST Name of the Project Location (attach a clear vicinity map): street ode-ress. sR number, community, etc. Directions from the nearest major intersection- owner/Applicant Consultant Name: 4As- Consultant Contact Information: Phone, tax, ema(I. etc. ��,s�1•"+SQ�e... Existing ground elev. @basin/trench= SHWT elev.= SHWT plus 2' (max. bottom elev.)- DatefTime of Soils Investigation : Summary/Comments: \/ I N celvj l.lz-�,vJa<29 Ni, N A Je GLUA� T� it #1 #2 #3 #4 #5 #6 #7 #$ ®(.o 6 � Qii -- EVE tr �Cz-•E/�c `'' ting, active u•i;illty lines located within the proposed basin/trench Ali proposed infiltration areas and exis must be m-arked and flagged. If these ae+eo erl��fii # at o 9 system w�ll be locattediqlresan a eta ofrex sting decline to do the investigation, If the p p pavement and there is no open ilsr area nearby. ti f at on dcIs not takeattiine place ofta soils 'through prepared by la er must.be provided. The so ci verify the air, Y appropriate professional. The Soils oil Mgt on tlstto the swill luitabi� tv of #helsite tottmeet the infiltration ed to the Soils Report. and .-nake a d design requirements under NCAC 2H.-1000, and assumes no liability should the system fail. P. 1 FILE MODE -------------- 246 MEMORY TX * * * COMMUNICATION RESULT REPORT ( NOV. 3.2006 OPTION REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER ADDRESS (GROUP) 9-9107914441--- 2:35PM ) TTI RESULT OK NCDENR WIRO PAGE E-2) BUSY E-4) NO FACSIMILE CONNECTION Mlchael F. zoway, Governor William G. Rces Jr., Secretary North Carolina Department of Environment and Natural Resources 9 Alan W. Kiln*, P. E. Director Water []lvlslon of Quality Colson H. Sullins, Deputy Director Dlvlslon or water Quality Phone; 910-796 7303 To: Mr. Howard Rsnik, Coast�i Site Deign From M. J. Naugle Fam 910-791-1501 113spoo 1 of 6 Phone: 910-7914441 onto 11 /3/2006 Re: Tarin Woods- SW8 061005 cc: 0 Urgent For Review Plesao Comment x Please RepW n plasm" Recycle Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E. Director Division of Water Quality Colleen H. Sullins, Deputy Director Division of Water Quality Phone: 910-796-7303 E7 ootp Al To: Mr. Howard Rsnik, Coastal Site Design From: M. J. Naugle Fax: 910-791-1501 Pages: 1 of 6 Phone: 910-7914441 Date: 11/3/2006 Re: Tarin Woods- SW8 061005 CC: ❑ Urgent For Review Please Comment x Please Reply ❑ Please Recycle • Mr. Resnik; Please. find attached a request for additional information. Thank you, Mary Jean N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 796-7215 Customer Service Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1-877-623-6748 0-b- ®R 0'� AT �qQ� r r October 31, 2006 Mr. Steve Shuttleworth, Member/Manager Cypress Grove Land, LLC 7741 Market Street, Unit H Wilmington, NC 28411 Subject: Request for Additional Information Stormwater Project No. SW8 061005 Tarin Woods, New Hanover County Dear Shuttleworth: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality The Wilmington Regional Office received a Stormwater Management Permit Application for Tarin Woods on October 10, 2006. A preliminary review of that information has determined that the! application is not complete. The following information is needed to continue the stormwater review: Please provide a soil test at the to tion of infiltration basins numbered 1 and 3. The previous evaluation did not test these sites and the SHWT varies significantly on this property. Contact- Vincent Lewis to schedule a site visit for these basin locations. _ 2. Please specify on the p ans the vege a Ion species or asln slopes not being hardened. 3. Take the drainage areas to the rear setback lines of each lot, at a minimum. Runoff from the built - upon areas on all lots must go to stormwater collection systems. Include these areas in on -site drainage calculations. 4. Do you have appropriate easements where emergency discharges from ponds and infiltration basins discharge off the property? Is there something to drain to such as an easement, wetlands, existing body of water, etc... to prevent flooding adjacent properties? (Re: pond-1, infiltration basin- 1, pond-2, basin-3, and basin-4). 5. Please locate the infiltration basins / ponds / swales in recorded access/drainage easements shown on the plans. 6. Please include high -density format for the language in the deed restrictions and covenants according to the attached template. The permit cannot be transferred to HOA until the permittee submits the required documentation to DWQ and DWQ approves the transfer. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to November 29, 2006, or the application will be returned as incomplete.. The return of a project .will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter and to the attention of Mr. Cameron Weaver. The extension request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7303. ncerely, P r � ary Jt a4i auaIe / North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Wilmington Regional Office Internet: www.ncwaternualitv.ora Fax (910) 350-2004 ` NCaro ina oNaturally Customer Service 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper SW8 061005 Tarrin Woods Stormwater Application Re: Soil Visit t... Subject: SW8 061005 Tarrin Woods Stormwater Application Re: Soil Visit to Cyperss Grove From: Mary Jean Naugle <Mary.Naugle@ncmail.net> Date: Tue, 24 Oct 2006 11:50:58 -0400 To: Howard Resnik <howard@coastalsitedesign.com>, vincent.lewis@ncmail.net, cameron.weaver@ncmail.net Howard; Please submit the attached the request for soil site visit to Vincent Lewis and copy me. I did speak with Vincent this morning about this project. We do not have this form for this project. Vincent said there will need to be another site visit requested since the original locations did not cover infiltration basin # 1 and 3; especially since the SHWT varies significantly on this project area. Call Vincent for a site visit date. Mary Jean Naugle NC DENR Express Permitting Howard Resnik wrote: Mary Jean, I have never received anything from Vincent of that nature, on any project. Vincent trusts us to report exactly what he found out in the field, which is what that report shows. In many cases, Vincent is more liberal than the private soils scientist, and we ignore Vincent's call and design by the more conservative call on the SHWT. Howard Resnik, PE Coastal Site Design, PC 3805 Cherry Avenue Wilmington, NC 28403 910 791 4441 office 910 791 1501 fax www.coastalsitedesign.com Howard Resnik, PE Coastal Site Design, PC 3805 Cherry Avenue Wilmington, NC 28403 910 791 4441 office 910 791 1501 fax www.coastalsitedesign.com -----Original Message ----- From: Mary Jean Naugle [mailto:Mary.Naugle@ncmail.net] Sent: Tuesday, October 24, 2006 8:01 AM To: Howard Resnik Subject: Re: Soil Visit to Cyperss Grove Vincent is out for several days. I understood that the consultant submitted the report to Vincent for review. Did you receive approval from Vincent of the report? 1 of 2 10/24/2006 12:06 PM COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 7914441 Fax: 910-791-1501 October 10, 2006 Cameron Weaver Express Review Coordinator N.C. Department of Environment And Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Express Stormwater Management Permit Submittal Tarin Woods Subdivision New Hanover County CSD Project No. 05-0043 Dear Mr. Weaver: Enclosed please find the following items for the referenced project: RECEIVED OCT 1 0 7006 BY: 5W 8 Olo(065 - one (1) copy of the Express Review Narrative - original and one (1) copy of the completed Stormwater Management Permit Application and Infiltration Basin Supplements - $4,000.00 application fee - two (2) copies of sheets EC 1 through EC7, of the "Sedimentation & Erosion Control, Water Quality, and Stormwater Management Plan" - two (2) copies of the Stormwater Management Calculations - two (2) copies of sheet 1 of 1, the "Delineation for Infiltration Basins" map - two (2) copies of sheet 1 of 1, the "Infiltration Testing" map - two (2) copies of the draft restrictive covenants - one (1) copy of the corporate resolution We request NCDENR certification of compliance of this project with stormwater regulations. Thank you for your consideration of this request. Please call if you require any additional information Ve truly yours, Rodney Wri t Encl.: As noted above cc: Cypress Grove Land, LLC V f� G M a � m m LO w M CO I r 1 j O O N 0 L I c O 0 N O to a) U U (6 a3 Nt ' CO r (ri 1 r I j o D ' ( N N 0) O ' N CD( O y N W iI N m m to co � r I CCY y N c ' co co 03 O a7 v H � ar V o m E O 2 d D N OS R M 4 65 O_ E 15 E�. m a 0 - 2 a) aa) E=owCL. co L a w_A O N N CO 4 N C CO Z� 3 O O O N O W O y co O O Go (� ' ' ' O O O) r N N N N co N �--- M `- e7 r O 16 O O O O 6rl N N y CD in CJ IN O O n co n N to U') r N 13 N N m N N O to I` 1 N V_•+ O N i r N r O > V O O O O N y N fV'•A Co Cl) O (MO M N ' CO LO co r _ C - 0 w co w WE N N N U IB (6 (6 (6 0)co � O COS: `O o` 1y o LO co v O l0 rl N N 00 to 03 7 � O � c a _Q U cd Y y! L a) coa.U)'L 0 0 o O N c c c 00000 CERTIFICATE OF LIMITED LIABILITY COMPANY RESOLUTION OF CYPRESS GROVE LAND, LLC a North Carolina limited liability company WHEREAS, the provisions of the North Carolina Limited Liability Company Act, as amended (the "LLC Act") provide that any action which is required to be taken or which may be taken at a meeting of a company=s members may be taken without a meeting if a consent in writing setting forth the action so taken is signed by all of the Members entitled to vote with respect to the subject matter thereof. NOW, THEREFORE, pursuant to the provisions of the LLC Act, the undersigned Members of Cypress Grove Land, LLC (the ACompany@), who constitute all the Members of the Company, hereby consents to, votes in favor of and adopts each of the following resolutions by the unanimous written consent of said Members as if such action had been taken at a special meeting of said Members duly called with proper notice. RESOLVED, that the Company be, and is hereby authorized, directed and empowered to purchase that certain real property consisting of approximately 52 acres located in New Hanover County, North Carolina, described as All of Tract BC, as shown upon that map recorded in the New Hanover County Registry in Map Book 33 at Page 227, said map being entitled "Boundary Survey for Marvin H. Congleton and wife, CaroW, as adjusted by Boundary Line Agreement by W.K. Dickson, Inc. (the AProperty@) on the terms and conditions set forth in that certain Agreement for Purchase and Sale of Real Property dazed December 1, 2004. RESOLVED, that Steve Shuttleworth (the AAuthorized Manager@), in his capacity as Manager of the Company, be, and is hereby authorized, directed and empowered for and in the name of the Company to execute and deliver any all documents associated with the Company=s acquisition of the Property, including but not limited to the promissory note and deed of trust relating to the loan from Brown Financial, LLC to the Company, the proceeds of which shall be utilized to acquire the Property. RESOLVED, that the Authorized Manager is hereby authorized to take any and all actions and to execute or deliver any and all documents necessary to effectuate the above Resolutions. oc' I o `',1006 g ►, jq� 06t oo5 MOCUNU M'S AND SETTINGMEW21MENLWa $ET71MWEMFORARYWrERM FUMOIXIBMESOLUMN PUROWEMM —1— RESOLVED, that all actions of the Members of the Company since the last meeting of the Members be and they hereby are ratified= confirmed and approved; and FURTHER RESOLVED, that the undersigned Members hereby waive any and all notice to which they would be otherwise entitled with regard to the adoption of the aforesaid resolutions. Steve Shuttleworth Rene Morfdeiar, III H. Lowell Moore OCT 1 Q zoub By C;IDOMGMS AND SUMNOSVIMIUQ0ILOCAL SSITitQCMTDMX4kY AI78RNU FILESIOLKIBMWOLLMON MHUMP.MoOC —2— 07/06/2005 02:32 9107911501 COASTAL SITE DESIGN PAGE 01/04 COASTAL SITE DESIGN, PC PG Fox 4U41 Wilmington, NC 26406 Phone: 910 791-4"1 Fax 910 791-1501 FAX TRANSMITTAL To: Cameron Weaver From: Rodney Wright � Fax: 350-2004 Date: July 6, 2006 Phone: Pages: 4 Re: Express Review Congleton CC.- 0 Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle •Comments: Arc fccc 'lar522 �(nrr�l+e 9h7ler1 1'/,ice Ald-7 tNn i �l rr��✓1 rfr/ln .''ire. mme February 23, 2006 Howard Resnick Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28405 Reference: Stormwater study for the Cypress Grove development near Wilmington, NC Dear Mr. Resnick: Airn��e: WO-1 i2-(inn/ iararn. /n,qo n �r,. ai of Land Management Group, Inc. has recently had the pleasure of evaluating the aforementioned stormwater infiltration sites. The purpose of the evaluation was to describe a typical soil profile, quantify the depth to the seasonal high water table, to estimate infiltration rates and to inform the project engineer of any potential limitations of this project. I offer the following comments. The soils at this site are most closely associated with Baymeade and a drained Murville soil series. All profiles had at least some indication of a drainage effect due to the historic local and regional drainage in this area. The contemporary seasonal high water table is evident by observation of redoximorphic features suggesting past conditions of saturation and reduction in conjunction with landscape position. I specifically concentrated on 5 areas across the site. They are designated as Area 1 (Lots 45, 46, and 47), Area 2 (Lots 54, 55, and 56), Area 3 (Lots 1 1, 12, 13), Area 4 (Lots 21, 22, and 23) and Area 5 (Across from Lots 92-97, above the 25 foot contour). Each area will be discussed separately. Area l The seasonal high water table was determined to be between 32" and 42" across the site with an average depth of 34". The estimated infiltration rate for stormwater would be approximately 2" / hr. A typical soil profile description form this area is shown in the attachment. Area 2 The seasonal high water table was determined to be between 24" and 36" across the site with an average depth of 28". The estimated infiltration rate for stormwater would be approximately 2" / hr. A typical soil profile description form this area is shown in the attachment. Area 3 The seasonal high water table was determined to be between 24" and 34" across the site with an average depth of 26". The estimated infiltration rate for stormwater would be approximately 1" 1 hr. A typical soil profile description form this area is shown in the attachment. Only'/z of the area originally proposed is useable as shown on the attached sketch. 2006 BY: Area 4 Zone 1 (above the 19 foot contour) The seasonal high water table was determined to be between 34" and 44" across the site with an average depth of 38". The estimated infiltration rate for stormwater would be approximately 2" / hr. A typical soil profile description form this area is shown in the attachment. Zone 2 (below the 19 foot contour) The seasonal high water table was determined to be between 24" and 34" across the site with an average depth of 26". The estimated infiltration rate for stormwater would be approximately 2" / hr. A typical soil profile description form this area is shown in the attachment_ Area 5 The seasonal high water table was determined to be between 24" and 72" across the site with an average depth of 60". The estimated infiltration rate for stormwater would be approximately 10" / hr. A typical soil profile description form this area is shown in the attachment. In summary, the site can be proposed for stormwater infiltration in accordance with the above referenced design criteria. I did not observe any other factors that would limit the ability of this site to serve as a stormwater infiltration area. Please do not hesitate to contact me if you have any questions with this report I may be reached at 910-452-0001, 910-471-0777 or at Sincerely, ohn P Williams NC Licensed Soil Scientist, #1113 SC Professional Soil Classifier, #58 CC: Colorado Coastal Development BY: Typical Profile Descriptions Area 1, Linear side slope, 0-2% slope. A 04" Loamy Sand, granular, fr, ns, np, 2.5Y2.5/1 Salt and Pepper El 4-15" Loamy Sand, granular, fr, ns, np, 2.5Y3/1 Clean E2 15-24" Loamy Sand, single grain, vfr, ns, np, 2.5Y3/2 Clean Bw 24-42" Loamy Sand, weak subangular blocky, fr, ns, np, 2.5Y3/3, 2.5Y5/3 Cg 42-56" Sand, structureless, fr, ns, np, 2.5Y5/2, 2.5Y3/2, 10YR5/8 RMF Estimated seasonal high water table: 42" Observed water table on February 20, 2006: 53" Estimated infiltration rate: 2 inches per hour Area 2, Linear side slope, 0-2% slope. A 04" Loamy Sand, granular, fr, ns, np, 2.5Y2.5/1 Salt and Pepper El 4-15" Loamy Sand, granular, fr, ns, np, 2.5Y3/1 Clean E2 15-20" Loamy Sand, single grain, vfr, ns, np, 2.5Y3/2 Clean Bw 20-32" Loamy Sand, weak subangular blocky, fr, ns, np, 2.5Y3/3, 2.5Y5/3 Cg 32-56" Sand, structureless, fr, ns, np, 2.5Y5/2, 2.5Y3/2, 10YR5/8 RMF Estimated seasonal high water table: 32" Observed water table on February 20, 2006: 48" Estimated infiltration rate: 2 inches per hour Area 3, Linear side slope, 0-2% slope. A 0-4" Loamy Sand, granular, fr, ns, np, 2.5Y2.5/1 El 4-15" Loamy Sand, granular, fr, ns, np, 2.5Y3/1 E2 15-24" Loamy Sand, single grain, vfr, ns, np, 2.5Y3/2 Bwg 24-42" Sandy Loam, weak subangular blocky, fr, ns, np, 2.5Y3/2, 2.5Y5/2 Cg 42-56" Sand, structureless, fr, ns, np, 2.5Y5/2, 2.5Y3/2, 10YR5/8 RMF Estimated seasonal high water table: 24" Observed water table on February- 20, 2006: 32" Estimated infiltration rate: 1 inches per hour Area 4, Zone 1 (above 19 foot contour), Linear side slope, 0-2% slope. A 0-4" Loamy Sand, granular, fr, ns, np, 2.5Y4/2 E1 4-12" Loamy Sand, granular, fr, ns, np, 2.5Y5/2 E2 12-20" Loamy Sand, granular, fr, ns, np, 2.5Y5/3 Bwl 20-34" Loamy Sand, weak subangular blocky, fr, ns, np, 2.5Y6/4 Bw2 34-44" Loamy Sand, weak subangular blocky, fr, ns, np, 2.5Y5/4 C 44-60" Sand, structureless, fr, ns, np, 2.5Y5/1, 2.5Y6/2 RMF Estimated seasonal high water table: 44" Observed water table on February 20, 2006: None Estimated infiltration rate: 2 inches per hour Area 4, Zone 1 (below 19 foot contour), Linear side slope, 0-2% slope. A 0-4" Loamy Sand, granular, fr, ns, np, 2.5Y2.5/1 E1 4-15" Loamy Sand, granular, fr, ns, np, 2.5Y3/1 E2 15-24" Loamy Sand, single grain, vfr, ns, np, 2.5Y3/2 Bwg 24-42" Loamy Sand, weak subangular blocky, fr, ns, np, 2.5Y3/2, 2.5Y5/2 Cg 42-60" Sand, structureless, fr, ns, np, 2.5Y5/2, 2.5Y3/2, 10YR5/8 RMF Estimated seasonal high water table: 24" Observed water table on February 20, 2006: 36" Estimated infiltration rate: 2 inches per hour Area 5, Micro -ridge, 24% slope. A 04" Sand, single grain, vfr, ns, np, 10YR4/1 E1 4-15" Sand, single grain, vfr, ns, np, 10YR5/1 E2 15-22" Sand, single grain, vfr, ns, np, 2.5Y7/1 Bwl 22-56" Sand, single grain, vfr, ns, np, 2.5Y6/8 Bw2 56-60" Sand, single grain, vfr, ns, np, 2.5Y6/4 Estimated seasonal high water table: exceeds 60" Observed water table on January 31, 2006: None Estimated infiltration rate: 10 inches per hour 07/06/2005 02:32 9107911501 COASTAL SITE DESIGN PAGE 03/04 �r1i1C- ID -ALI - A IWFAA NCDENR North Carolina Department of Environment and Natural Resources 127 Cardinal Drive, Wilmington NC 28405 (910) 798-7307 FAX (910) 350-2004 q 113 M-ril aK pp,-r-Pf P Request for Express Permit Review U) nt c � - FILL-IN all information below and CHECK required Pe►miks). 14 P 101; 1 FAX or small to Cameron. Weaver0mcmail.net along with it narrative and vicinity map of the project location. Projects must be submitted by 9:00 A.M. of the review date, unless prior arrangements are made. APPLICANT Name ? Company Catwg Address111I` Mtkgk Sk. Lk.\* 44 Ci /Statekvi W% Nc- Zip RL I — County My I, oVG Phone 110-6SVIAIR4 Fax °lib-G gG-,Q733 — _Email PROJECT Name C_ o,\440 PROJECT SYSTEM(S) TRIBUTARY TO ycreec Creak (STREAM NAME) Cage Frei RIVER BASIN ENGINEER/CONSULTANT %wor'l Qe'sn"k_ P'E Company C ., Address FO dog[ 111)4 City/State %L Zip %406County ew wuvc,r Phone alb- 791- N 44 L Fax 7°l4-150I Email t6jaA m 1_na eLI eL o-. ,_- State or National Environmental Policy Act (SEPA, NEPA) - EA or EIS Required ❑ Yes ❑ No��^�M ❑ STREAM ORIGIN Determination; # of stream calls; Stream Name ��----� ❑ STORMWATER ❑ Low Density ❑ High Density -Detention Pond ❑ High Density -Other Wetlands MUST be addressed below ❑ Low Density -Curb & Gutter Eff High Density -Infiltration ❑ Off Site ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ LAND QUALITY ❑ Erosion and Sedimentation Control Plan with acres to be disturbed. WETLANDS (401) Wetlands on Property ❑ Yes NrNo Isolated Wetlands on Property ❑ yes ❑ No Check all that ap/ Wetlands Will Be Impacted ❑ Yes ❑ No Wetland Impacts: Acre(a) Wetlands Delineation has been completed ❑ Yes ❑ No ❑ Buffers Impacted: Acre(s) USACOE Approval of Delineation completed ❑ Yes ❑ No 404 Application in process w/USACOE ❑Yes ❑No / Permit received from USAGE ❑Yes [:]No 401 Application required ❑Yes ❑ No If Yes, ❑ Regular ❑ Express Additional fees, not to exceed 50% of the original Express Review permit application fee, may be charged for ^ subsequent reviews due to the insufficiency of the permit applications. For DENR use only SUBMITTAL DATES: Fee Split for multiple permits: SW $ CAMA $ LQS 401 $ Total Fee Amount $ 07/06/2005 02:32 9107911501 COASTAL SITE DESIGN PAGE 02/04 COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 FOR STORMWATER EXPRESS REVIEW July 6, 2006 PROJECT NAME: Congleton Tract PROJECT DESCRIPTION. Congleton Tract is a proposed 130 lot Hi gh.Densityesubdivision off Myrtle Grove Road in New Hanover County. The tract is 51.60 acres in size. The project is located within % mile of SA waters, and is proposing using infiltration basins to treat the storm water. PROJECT BMP: infiltration basins STORMWATER ENGINEER/CONSULTANT: Coastal Site Design, PC PO Box 4041 Wilmington, NC 28406 Rodney Wright, Engineering Technician roodn2y@coastalsitedesistn.com 910 7914441 office 910 791 1501 fax 07/06/2005 02:32 9107911501 COASTAL SITE DESIGN PAGE 04/04 LOCATION MAP NOT TO SCALE �s z T R 1521 V. rn Ln N FROM 1NTERSECRON OF US 421 AND NC 132 IRA N! EAST ON SR 1521 (PINER ROAD). TURN RIGHT ONTO SR 1492 (MYRTLE GROVE) TURN LEFT ON LT. CONGLETON ROAD. VIE IS LOCATED AT END OF ROAD.