Loading...
HomeMy WebLinkAboutSW8061005_Approved Plans_20130716"S TORA GE BA SIN 1 SUMMARY: NCDENR/DWQ PERMIT # SW8-061005 DATA: DATA AS -BUILT 1. IMPERVIOUS AREA PERMITTED AS -BUILT 78,739 SF (1.81 ACRES) 2 NORMAL POOL SURFACE AREA N/A J. NORMAL POOL ELEVATION N/A 4. POND DEPTH (DEEPEST POINT) 7 5. POND BOTTOM ELEVATION (DEEPEST POINT) 12 6. ORIFICE INVERT ELEVATION N/A 7. OUTLET BOX CREST ELEVATION N/A 8. STATE STORAGE VOLUME 34,413 9. 10:1 FT VEGETATED SHELF N/A 10. 10 FT ACCESS PRESENT ll. FOREBAY N/A 12. PRIMARY SPILLWAY ELEVATION 18.4 13. EMERGENCY SPILLWAY ELEVATION 1&4 14. ORIFICE SIZE N/A 15. WEIR CUT CREST LENGTH 2 FT 16. WEIR CUT ELEVATION IZ6 I Z SIDESLOPES (TYPICAL) 3.1 18. INV. OF PIPES FROM OUTLET STRUCTURE N/A STATE WATER QUAUTY POND CONSIDERATIONS - 3.0' STORAGE VOLUME REQUIRED = 19,900 CF 30' STORAGE VOLUME PROVIDED = 34,413 CF 'INFIL TRA TI ON BASIN 1 SUMMARY: NCDENR/DWQ PERMIT # SW8-061005 AS -BUILT DATA: 1. IMPERVIOUS AREA PERMITTED AS -BUILT DATA 78,739 SF (1.81 ACRES) 2 NORMAL POOL SURFACE AREA N/A J. NORMAL POOL ELEVATION N/A 4. POND DEPTH (DEEPEST POINT) 3 5. POND BOTTOM ELEVATION (DEEPEST POINT) 19 6. ORIFICE INVERT ELEVATION N/A Z OUTLET BOX CREST ELEVATION N/A 8. STATE STORAGE VOLUME 20,396 9. 10:1 FT VEGETATED SHELF N/A la 10 FT ACCESS PRESENT 11. FOREBAY N/A 12. PRIMARY SPILLWAY ELEVATION 20.6 13. EMERGENCY SPILLWAY ELEVATION 20.6 14. ORIFICE SIZE N/A 15. WEIR CUT CREST LENGTH N/A 16. WEIR CUT ELEVATION N/A I Z SIDESLOPES (TYPICAL) 3.1 18 INV. OF PIPES FROM OUTLET STRUCTURE N/A STATE WATER QUAUTY POND CONSIDERA11ONS - 3.0' STORAGE VOLUME REQUIRED = 19,900 CF 3.0' STORAGE VOLUME PROVIDED = 20,396 CF 23 FT TOP OF EMBANKMENT ELEVATION = 19.0 STORAGE BASIN 1 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE 21.2 FT TOP OF EMBANKMENT 20 FT ELEVATION = 21,0 ELEV. = 20.6 INFIL TRA TION BASIN 1 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE OO / O / / / \ / T Po / / Y .. -� BYPASS STRUCTURE TOP = 19.7 FT .. WEIR = IZ6 FT INV OUT = 16.9 FT \\\�VIN= 13.3FT f_ INFILTRATION BASIN 1 I BASIN BOTTOM = 19 FT OUT = 16.7 FT VARIABLE WIDTH DRAINAGE EASEMENT I `3' STORAGE ELEVATION = 17.6 FT J % SURFACE AREA 0 ELEV. 17.6 FT = 7,890 SF STORAGE 0 ELEV. 17.6 FT = 34,413 OF i EMERGENCY SPILLWAY ELEV = 18.4 FT I 2' TUCKL 7 CF 4" CLEAN SIFTED IVH VIRAL vn UUIYU STORAGE BASIN 1 EMBANKMENT SECTION NOT TO SCALE 12.4 FT 10 FT i TOP OF EMBANKMENT ELEVATION = 21.0 EMERGENCY SPILLWAY ELEVATION = 20.6 3" STATE STORAGE ELEVATION = 20.6 E7 3" STATE STORAGE VOLUME PROVIDED = 20,396 CF �\ 3' STATE STORAGE VOLUME REQ'D = 19,900 CF \.. BASIN BOTTOM ELEV. = 19.0 'NATURAL GROUND ' INFIL TRA TION BASIN 1 EMBANKMENT SECTION NOT TO SCALE I\ 36i' IrL'� ELEV. = 13.0 TOP OF EMBANKMENT ELEVATION = 19.0 RUFCO LINER - RUFCO 1000 SERIES, PRODUCT 4000E 1. RECOMMENDED LINER 2. OVER EXCAVATE BOTTOM OF POND 4" AND FILL WITH CLEAN SIFTED SAND. 3. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE ONCE EXCAVATION OF BASIN IS COMPLETE. 4. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE WHEN FABRIC IS BEING PLACED. 5. CLEAN SCREENED MATERIAL TO BE USED FOR BACKFILL. STORAGE BASIN 1 CROSS SECTION NOT TO SCALE 24" RCP TO BASIN ACD� INV = 13.3 ACCESS COIfR \ I I � I \ \ I \ 3' STORAGE ELEVATION = 20.6 FT \ SURFACE AREA 0 ELEV. 20.6 FT = 13,772 SF STORAGE 0 ELEV. IZ6 FT = 20,396 CF `\ COVER/ACCESS TOP COVER/ACCESS TOP ELEV. = 19.7 ELEV. = 19.7 2.0 FT WEIR 4 FT 24" RCP ELEV. = 17.6 TO DITCH 24 RCP INV= 16.9 TO BASIN RCP IE = 13.3 1 12' CON . 1 j 12' CONC. INV = 13.3 2 FT SUMP 2 FT SUMP FOR CLEANOU + FOR CLEANOUT =BASE SEE DETAIL THISI SECTION VIEW SHEET FOR STORMWATER P.S. (2) - 4 FT x 4 FT PRECAST CONCRETE BOX DETAIL LOCATED NC PRODUCTS 4848 OR EQUIVALENT IN THIS BOX Q' PLAN VIEW JUNCTION BOX/ 1. A a= � (2) - 4 FT x 4 FT PRECAST CONCRETE BOX �~ II NC PRODUCTS 4848 OR EQUIVALENT BYPASS STRUCTURE N Z NOT TO SCALE EMERGENCY SPILLWAY ELEV = 20.6 FT DEVIA TIONS FROM DESIGN DRA WINGS: STORAGE BASIN 1 DESIGN ASBUILT STATE MIN. WEIR ELEV IZ5 17.6 VOLUME (CF) 20,912 34,413 EMERGENCY SPILLWAY 18.5 18.4 DEVIA TIONS FROM DESIGN DRA WINGS: INFILTRATION BASIN 1 DESIGN ASBUILT STATE MIN. STORAGE ELEV. 20.8 20.6 VOLUME (CF) 21,571 20,396 EMERGENCY SPILLWAY 20.8 20.6 NOTES 1. AS -BUILT LOCATIONS PERFORMED AND PROVIDED BY LINWOOD JONES, PLS SIGNED AND SEALED BY LINWOOD JONES L-1381 2. NA VD 29 LICENSE # C-2710 " COASTAL SITE DESIGNPC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791- 4441 Q z O Q C)- U ct �O � O z O Q � W o :D p � c c,_ ao �z> cis Z p cL_ Z LLJ j O aia ca �3 ffi E w n$ � zs.y A o yew° CIA goo �L�t i i i r�P7/7f CA Ile :° -^ S A 0254� c' ` J ?f Zirk5 i Q p m cn Y Q W 0 Z w DA TE: 09-21- 75 HORZ. SCALE: 1 " = 20' VERT. SCALE: N/A DRA WN B Y.• RL W CHECKED B Y.• HSR PROJECT NO.: 05-004J Sheet No. Of 4 23 FT TOP OF EMBANKMENT ELEVATION = 1&0 20 FT , ,� r 1 . STORAGE BASIN 2 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE 21.2 FT TOP OF EMBANKMENT ELEVATION 20.0 20 FT ELEV. = 19.7 All INFILTRATION BASIN 2 EMERGENCY SPI LL WA Y FRONT VIEW NOT TO SCALE 194 PLAN VIEW (2) - 5 FT x 5 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT 1' MIN TOP OF EMBANKMENT ELEVATION = 18.0 2 TUCK / 36IS'/ ELEV. = 70y RUFCO LINER 4' CLEAN SIFTED SAND `, 1. RECOMMENDED LINER - RUFCO 1000 SERIES, PRODUCT 4000E 2. OVER EXCAVATE BOTTOM OF POND 4" AND FILL WITH CLEAN SIFTED SAND. 3. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE ONCE EXCAVA110N OF BASIN IS COMPLETE. 4. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE WHEN FABRIC IS BEING PLACED. 5. CLEAN SCREENED MATERIAL TO BE USED FOR BACKFILL. STORAGE BASIN 2 CROSS SEC TION NOT TO SCALE COVER/ACCESS TOP COVER/ACCESS TOP ELEV. = 18.5 ELEV. = 18.5 2.0 FT WEIR 5 FT ELEV. = 16.1 36" 36' RCP RCP IE = 12.9 IE = 14.0 12" CONC. 12" CONC. 2 FT SUMP 2 FT SUMP FOR CLEANOUT FOR CLEANOO SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT JUNCTION BOX/ 2. A BYPASS STRUCTURE NOT TO SCALE =BASE 13.0 FT 10 FT TOP OF EMBANKMENT ELEVATION = 18.0 EMERGENCY SPILLWAY ELEVATION = 17.5 3" STATE STORAGE ELEVATION = 16.1 3" STATE STORAGE VOLUME = 79,422 CF BASIN BOTTOM ELEV. = 7.0 NATURAL GROUND STORAGE BASIN 2 EMBANKMENT SECTION NOT TO SCALE 11.2 FT 10 FT TOP OF EMBANKMENT ELEVATION = 20.0 EMERGENCY SPILLWAY ELEVATION = 19.7 \ 3" STATE STORAGE ELEVATION = 19.7 n 3" STATE STORAGE VOLUME = 45,168 CF= BASIN BOTTOM ELEV. = 1 & 0 'NATURAL GROUND I - \ ,; . V /," ,`"/'' INFILTRATION BASIN 2 EMBANKMENT SECTION NOT TO SCALE 1 041 v \ T INFILTRATION BASIN 2 \ \ BASIN BOTTOM = 18 FT / 42 / / / / / / S TORA GE BA SIN 2 SUMMARY: NCDENR/DWQ PERMIT # SW8-061005 AS -BUILT DATA: 1. IMPERVIOUS AREA PERMITTED AS -BUILT DATA 180,648 SF (4.15 ACRES) 2 NORMAL POOL SURFACE AREA N/A J. NORMAL POOL ELEVATION N/A 4. POND DEPTH (DEEPEST POINT) 11 5. POND BOTTOM ELEVATION (DEEPEST POINT) 7 6. ORIFICE INVERT ELEVATION N/A Z OUTLET BOX CREST ELEVATON N/A 8. STATE STORAGE VOLUME 79,422 9. 10.1 FT VEGETATED SHELF N/A 10. 10 FT ACCESS PRESENT 11. FOREBAY N/A 12 PRIMARY SPILLWAY ELEVATION 16.1 13 EMERGENCY SPILLWAY ELEVATION 1 Z5 14. ORIFICE SIZE N/A 15. WEIR CUT CREST LENGTH 2 FT 16. WEIR CUT ELEVATION 16.1 17. SIDESLOPES (TYPICAL) J. 1 18. INV. OF PIPES FROM OUTLET STRUCTURE N/A STATE WATER QUAUTY POND CONSIDERATIONS 3.0' STORAGE VOLUME REQUIRED = 45,242 CF 3.0' STORAGE VOLUME PROVIDED = 79,422 CF INFILTRATION BASIN 2 SUMMARY: NCDENR/DWQ PERMIT # SW8-061005 AS -BUILT DATA: 1. IMPERVIOUS AREA PERMITTED AS -BUILT DATA 180,648 SF (4.15 ACRES) 2. NORMAL POOL SURFACE AREA N/A 3. NORMAL POOL ELEVATION N/A 4. POND DEPTH (DEEPEST POINT) 3 5. POND BOTTOM ELEVATION (DEEPEST POINT) 18 6. ORIFICE INVERT ELEVATION N/A Z OUTLET BOX CREST ELEVATION N/A 8. STATE STORAGE VOLUME 45,168 9. 10.1 FT VEGETATED SHELF N/A 10. 10 FT ACCESS PRESENT 11. FOREBAY N/A 12 PRIMARY SPILLWAY ELEVATION 19.7 13. EMERGENCY SPILLWAY ELEVATION 19.7 14. ORIFICE SIZE NIA 15. WEIR CUT CREST LENGTH N/A 16. WEIR CUT ELEVATION N/A 1 Z SIDESLOPES (TYPICAL) 3.• 1 18. INV. OF PIPES FROM OUTLET STRUCTURE N/A STATE WATER QUAUTY POND CONSIDERATIONS 3 0' STORAGE VOLUME REQUIRED = 45,242 CF 3 0' STORAGE VOLUME PROVIDED = 45,168 CF I \ r \ i \ l+F I \ EMERGENCY SPILLWAY ELEV = 19.7 FT J JlMAK ULVAHM = I.Y./ 1'1 SURFACE AREA 0 ELEV. 19.7 FT = 28,884 SF STORAGE 0 ELEV. 19.7 FT = 45,168 CF ' A ,r ' fr r f/r DEVIA TIONS FROM DESIGN DRA WINGS: STORAGE BASIN 2 DESIGN ASBUILT STATE MIN. DEAR ELEV. 15.5 16.1 aUME (CF) 45,959 79,422 DEVIA TIONS FROM DESIGN DRA WINGS: INRLIRA71ON BASIN 2 DESIGN ASBUILT STATE MIN. STORAGE ELEV. 19.8 19.7 Kl UME (CF) 46,110 45,168 aC?QXY SPILLWAY 20.7 20.7 MOTES: 1. AS -BUILT LOCATIONS PERFORMED AND PROVIDED BY LINWOOD JONES, PLS SIGNED AND SEALED BY LINWOOD JONES L-1381 2. NAVD 29 20 0 i 40 .0 I E LICENSE j C-2710 " COASTAL SITE DESIGN, PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (970) 791- 4441 41-1 N 0 d- co N QpO � m pU� o 2 cl W 3 �o CA SEAEp-7 a. 025483 - 1 Llj Q 0 m co Y Q w O Z W DA TE.• 09-21-15 HORZ. SCALE.- 1" = 20' VERT. SCALE. • N/A DRAWN BK RLW CHECKED B Y.• HSR PROJECT NO.: 05-0043 Sheet No. 2Of TOP OF EMBANKMENT ELEVATION = 21.0 ELEV. = 199 STORAGE BASIN 3 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE TOP OF EMBANKMENT ELEVATION 24.0 20 FT ELEV. = 23 8 \\\f �.!' INFIL TRA TION BASIN 3 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE 10 FT TOP OF EMBANKMENT ELEVATION = 21.0 EMERGENCY SPILLWAY ELEVATION = 19.9 3" STATE STORAGE ELEVATION = 17.2 p 3" STATE STORAGE VOLUME = 57,060 CF ��\ r\\�;���\•4\, BASIN BOTTOM ELEV. = 15.0 NATURAL GROUND STORAGE BASIN 3 EMBANKMENT SECTION 2' 4' CLEAN SIFTED NOT TO SCALE TOP OF EMBANKMENT ELEVATION = 21.0 UFCO LINER 1. RECOMMENDED LINER - RUFCO 1000 SERIES, PRODUCT 4000E 2. OVER EXCAVATE BOTTOM OF POND 4' AND FILL WIN CLEAN SIFTED SAND. J. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE ONCE EXCAVATION OF BASIN IS COMPLETE. 4. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE WHEN FABRIC IS BEING PLACED. 5. CLEAN SCREENED MATERIAL TO BE USED FOR BACKFILL. STORAGE BASIN 3 CROSS SECTION NOT TO SCALE STORAGE BASIN 3 SUMMARY: NCDENR/DWQ PERMIT # SW8-061005 AS -BUILT DATA: 1. IMPERVIOUS AREA PERMITTED AS -BUILT DATA 224,726 SF (5.16 ACRES) 2 NORMAL POOL SURFACE AREA N/A 3. NORMAL POOL ELEVATION N/A 4. POND DEPTH (DEEPEST POINT) 8 5. POND BOTTOM ELEVATION (DEEPEST POINT) 15 6. ORIFICE INVERT ELEVATION N/A 7. OUTLET BOX CREST ELEVATION N/A 8. STATE STORAGE VOLUME 57,060 9. 10.1 FT VEGETA TED SHELF N/A 10. 10 FT ACCESS PRESENT 11. FOREBAY N/A 12. PRIMARY SPILLWAY ELEVATION 17.2 13. EMERGENCY SPILLWAY ELEVATION 19.9 14. ORIFICE SIZE N/A 15. PER CUT CREST LENGTH 2 FT 16. WEIR CUT ELEVATION 1 Z2 & I Z4 I Z SIDESLOPES (TYPICAL) 3.1 18. INV. OF PIPES FROM OUTLET STRUCTURE N/A STATE WATER QUAUTY POND CONSIDERA11ONS 3.0' STORAGE VOLUME REQUIRED = 56,820 CF 3.0' STORAGE VOLUME PROVDED = 57,060 CF iyG �Bgs�NF �S PGV�o�� n V Poo�o�� G PLAN VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT FtINFILTRATION BASIN 3 MARY: NCDENR/DWQ PERMIT # SW8-061005 AS -BUILT DATA: 1. IMPERVIOUS AREA PERMITTED AS -BUILT DATA 224,726 SF (5.16 ACRES) 2. NORMAL POOL SURFACE AREA N/A J. NORMAL POOL ELEVATION N/A 4. POND DEPTH (DEEPEST POINT) 3 5. POND BOTTOM ELEVATION (DEEPEST POINT) 22 6. ORIFICE INVERT ELEVATION N/A 7. OUTLET BOX CREST ELEVATION N/A 8. STATE STORAGE VOLUME 62,599 9. 10.-1 FT VEGETATED SHELF N/A 10. 10 FT ACCESS PRESENT 11. FOREBAY N/A 12 PRIMARY SPILLWAY ELEVATION 23.8 13. EMERGENCY SPILLWAY ELEVATION 23.8 14. ORIFICE SIZE N/A 15. WEIR CUT CREST LENGTH N/A 16. WEIR CUT ELEVATION N/A I Z SIDESLOPES (TYPICAL) 3.1 18. INV. OF PIPES FROM OUTLET STRUCTURE N/A STATE WATER QUAUTY POND CONSIDERATIONS 3.0' STORAGE VOLUME REQUIRED = 56,820 CF 3.0' STORAGE VOLUME PROVIDED = 62,599 CF COVER/ACCESS TOP COVER/ACCESS TOP ELEV. = 23.3 ELEV. = 23.3 4 FT 36' HDPE TO CREEK 2.0 FT WEIR IE = 17.2 ELEV. = 17.2 HDPE 15.1 1 1 12" CONC. + 12" CONC. 2 FT SUMP 2 FT SUMP FOR CLEANOUT + FOR CLEANOUT =BASE SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT JUNCTION BOX/ 3. A BYPASS STRUCTURE NOT TO SCALE a ACCESS COVER ACCESS COVER z PLAN VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT 0 COVER/ACCESS TOP COVER/ACCESS TOP ELEV. = 23.2 ELEV. = 23.2 2.0 FT WEIR 4 FT ELEV. = 17.4 30" 24" RCP HDPE IE = 15.1 IE = 16.0 12" CONC. 12' CONC. j FOR CLEANOUT 2 FT SUMP FOR CLEANOUT SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT JUNCTION BOX/ 3A. A BYPASS STRUCTURE NOT TO SCALE i 6 "BASE DEVIA TIONS FROM DESIGN DRA WINGS: STORAGE BASIN 3 DESIGN ASBUILT STATE MIN. fCCR ELEV. (,8 3.A-A) 17.2 IZ2 VOLUME (CF) 64,132 57,060 56,820 EMERG&CY SPILLWAY 21.0 19.9 DEVIA TONS FROM DESIGN DRA WINGS: INFILTRATION BASIN 3 DESIGN ASBUILT STATE MIN. VOLUME (CF) 64,132 62,599 56,820 NOTES 1. AS -BUILT LOCATIONS PERFORMED AND PROVIDED BY LINWOOD JONES, PLS SIGNED AND SEALED BY LINWOOD JONES L-1381 2. NA VD 29 LICENSE # C-2710 COASTAL SITE DESIGN,PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791- 4441 Q z J O Q CL_ U co O Z U z Q� oQ�o � Dew v,3zz 0 oQow CL �JZ �a 6a:� �8j "y5 tg ao$ Fit �t W W o UL �oo.s J N O <t- 00 N > U O DMZ C-) �mz � o � i _�� w 0 S S� ' fr SEAL - 025483 _ ri'`fjyr'�• • DATE: 9-27-75 HORZ. SCALE: 1" = 30' VERT. SCALE. • N/A DRAWN BY- RL W CHECKED B Y.• HSR PROJECT NO.: 05-004J Sheet No. Of 4 / ' )PASS STRUCTURE to _ w 85 EMERGENCY SPILLWAY ELEV = 20.0 FT I BYPASS STRUCTURE 4A.4 ' I TOP = 23.1 - WEIR = 18.4 s ' I (A) PLAN VIEW (2)NC PRODUCTS 6061 COVER/ACCESS TOP COVER/ACCESS TOP ELEV. = 24.5 ELEV. = 24.5 2.0 FT WEIR 5 FT 42" HDPE ELEV= 18.7 TO CREEK RCP 12' CONC. 12' CONC. 2 FT SUMP 2 FT SUMP FOR CLEANOUT FOR CLEANOU ............ 'BASE SEC77ON VIEW (2) - 5 FT x 5 FT PRECAST CONCRETE BOX NC PRODUCTS 6060 OR EQUIVALENT JUNCTION BOX/ 4. A BYPASS STRUCTURE BOX NOT TO SCALE COVER/ACCESS TOP COVER/ACCESS TOP ELEV. = 23.1 ELEV. = 23.1 �Q o� Qo mo 2.0 FT WEIR 4 FT ELEV. = 18.4 �m 30 2 HDPE HDPE AC ESS CO R AC ESS CO R 12" CONC.FOR CAA I" CO FOR CLEA 0J T Q 4SEC710N VIEW o(2)NC PRODUCCTS F4848 FOR SEQUIVALENT BOX 4 PLAN VIEWR JUNCTION BOX/ 4A. A (2)NC PRO JCS 848E()RSETQ�IV�LENIE BOX BYPASS STRUCTURE NOT TO SCALE STORAGE BASIN 4 SUMMARY: NCDENR/DWQ PERMIT # SW8-061005 DATA AS -BUILT DATA: 1. IMPERVIOUS AREA PERMITTED AS -BUILT 290,495 SF (6.67 ACRES) 2. NORMAL POOL SURFACE AREA N/A 3. NORMAL POOL ELEVATION N/A 4. POND DEPTH (DEEPEST POINT) N/A 5. POND BOTTOM ELEVATION (DEEPEST POINT) 14 6. ORIFICE INVERT ELEVATION N/A 7. OUTLET BOX CREST ELEVATION N/A 8. STATE STORAGE VOLUME 69,622 9. 10:1 FT VFGETAIED SHELF N/A 10. 10 FT ACCESS PRESENT 11. FOREBAY N/A 12. PRIMARY SPILLWAY ELEVATION 1&4 13. EMERGENCY SPILLWAY ELEV471ON 20.0 14. ORIFICE SIZE N/A 15. WEIR CUT CREST LENGTH N/A 16. WEIR CUT ELEVATION 187 & 18.4 17. 9DESLOPES (TYPICAL) J..1 18. INV. OF PIPES FROM OUTLET STRUCTURE N/A STATE WATER QUALITY POND CONSIDERATIONS 30' STORAGE VOLUME REQUIRED = 72,714 CF 3.0' STORAGE VOLUME PROVIDED = 69,622 CF 10 FT I -I TOP OF EMBANKMENT ELEVATION = 31.0 EMERGENCY SPILLWAY ELEVATION = 30.0 3" STALE STORAGE ELEVATION = 28.2 ' 3" STATE STORAGE VOLUME = 77,609 CF \♦ \ ,, BASIN BOTTOM ELEV. = 24.0 NATURAL GROUND ' - "" ` ""11 A, INFILTRATION BASIN 4 EMBANKMENT SECTION NOT TO SCALE 7INFILTRATION BASIN 4 SUMMARY.• NCDENR/DWQ PERMIT # SW8-061005 AS -BUILT DATA: 1. IMPERVIOUS AREA PERMITTED AS -BUILT DATA 290,495 SF (6.67 ACRES) 2 NORMAL POOL SURFACE AREA N/A J. NORMAL POOL ELEVATION N/A 4. POND DEPTH (DEEPEST POINT) N/A 5. POND BOTTOM ELEVATION (DEEPEST POINT) 24 6. ORIFICE INVERT ELEVA TTON N/A 7. OUTLET BOX CREST ELEVATION N/A 8. STATE STORAGE VOLUME 77,609 9. 10:1 FT VEGETATED SHELF N/A 10. 10 FT ACCESS PRESENT 11. FOREBAY N/A 12. PRIMARY SPILLWAY ELEVATION N/A 13. EMERGENCY SPILLWAY ELEVATION 30.0 14. ORIFICE SIZE N/A 15. WEIR CUT CREST LENGTH N/A 16. WEIR CUT ELEVATION N/A 17. SIDESLOPES (TYPICAL) 3:1 18. INV. OF PIPES FROM OUTLET STRUCTURE N/A STATE WATER QUALITY POND CONSIDERATDNS 3.0' STORAGE VOLUME REQUIRED = 72,714 CF 30' STORAGE VOLUME PROVIDED = 77,609 CF 3 EMERGENCY SPILLWAY 2g. ; . ELEV = 20.0 FT __ ___ . _ -- DEVIATIONS FROM DESIGN DRA WINGS: STORAGE BASIN 4 DESIGN ASBUILT STATE MIN. WEIR ELEV. (JR 4.A) 18.5 18.7 PER ELEV. (,B 4A.A) 18.5 18.4 VOLUME (CF) 75,834 69,622 72,714 EMERGENCY SPILLWAY 19.5 20.0 DEVIA TONS FROM DESIGN DRA WINGS: INFILTRATION BASIN 4 DESIGN ASBUILT STALE MIN. VOLUME (CF) 75,834 77,609 56.8 FT TOP OF EMBANKMENT 40 FT ELEVATION = 23.0 i9m \\\ ELEV. = STORAGE BASIN 4 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE 26 FT TOP OF EMBANKMENT ELEVATION = 31.0 20 FT 30 / INFILTRATION BASIN 4 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE TOP OF EMBANKMENT ELEVATION = 23.0 2' TUCK f "� ELEV. = 14.0 RUFCO LINER 4' CLEAN SIFTED SAND I. RECOMMENDED LINER - RUFCO 1000 SERIES, PRODUCT 4000E 2 OVER EXCAVATE' BOTTOM OF POND 4" AND FILL WITH CLEAN SIFTED SAND. J CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE ONCE EXCAVATION OF BASIN IS COMPLETE. 4. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE WHEN FABRIC IS BEING PLACED. 5 CLEAN SCREENED MATERIAL TO BE USED FOR BACKFILL. STORAGE BASIN 4 CROSS SECTION NOT TO SCALE NOTES: 1 AS -BUILT LOCATIONS PERFORMED AND PROVIDED BY LINWOOD JONES, PLS SIGNED AND SEALED BY LINWOOD JONES L-1381 2 NAVD 29 30 15 i 30 6 •� LICENSE # C-2710 " COASTAL SITE DESIGN,PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791- 4441 FrcSSIO•`/ ?: O SEAL 9 2 ,v a 025483 may•, s®!�� �G I N r DATE.9-21-15 HORZ. SCALE: 1" = JO' VERT. SCALE. • N/A DRA WN B Y.• RL W CHECKED B Y. HSR PROJECT NO.: 05- 0043 Sheet No. Of LOCATION MAP NU I I U JC,HLt IE = 18.0 10 CY CL 11 RIPRAP IE = 17.8-7 f0 CY CL 11 RIPRAP �= DEED BOOK 2561, PAGE 63 NOTE WELL 1. ANY AREAS ON SITE WITHOUT ACTIVITY WITHIN 21 CALANDER DAYS SHALL BE TEMPORARILY STABILIZED AS PER PER THE SPECIFICATIONS FOLLOWING ANY PHASE OF GRADING. 2. THIS PLAN TO BE UTILIZED AND REVIEWED ONLY IN CONJINCTiON NTH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THiS EROSION AND SEDIMENT CONTROL PLAN. J. ALL SLOPES SHALL BE 3:1 OR FLATTER. 4. RUNOFF FROM ALL IMPERVIOUS SURFACES MUST BE DIRECTED/DRAINED TO STORMWATER COLLECTION SYSTEM. ONLY NON -IMPERVIOUS SURFACES ARE ALLOWED TO DRAIN DIRECTLY TO DRAINAGE SWALES AND DITCHES. 5. NO WETLANDS EXIST ON SITE. 6. BOUNDARY AND TOPOGRAPHY SURVEY PERFORMED BY GEOINNOVATiONS SURVEY SOLUTIONS, PLLC. 7. ALL STORAGE AND INFILTRATION BASINS TO BE RECORDED IN DRAINAGE EASEMENTS. 8. SITE ADDRESS: 1200 LT CONGLETON ROAD 9. ALL EXISTING PERIMETER DITCHES, STORM WATER FORCE MAINS AND WATERS OF THE US MLL BE PLACED IN RECORDED DRAINAGE EASEMENTS. 10. STORM WATER FORCE MAIN WILL BE LOCATED WITHIN THE 10 FT. PUE. 11. WHERE CULVERT REMOVAL IS PREFORMED SIDE SLOPES SHOULD MATCH EXISTING DITCH SLOPES AND LINED WITH EXCELSIOR MATTING AND SEEDED. 12. HOME BUILDING CONTRACTOR WILL BE RESPONSIBLE FOR INSTALLING SILT FENCING DOWN THE INDIVIDUAL LOTS LINES FOR LOTS THEY HAVE OBTAINED BUILDING PERMITS. 13. IF CONSECUTIVE LOTS ARE BEING BUILT ON THEN THE INTERIOR RUN OF SILT FENCE BETWEEN THE LOTS CAN BE OMITTED BUT THE PERIMETER OF THE CONSECUTIVE LOTS MUST BE MAINTAINED AS SHOWN 14. SEDIMENT TRAPS CAN BE REMOVED AS AREAS SERVED BY TRAP ARE VEGETATIVELY STABILIZED. 15. ALL NEW AND MODIFIED SWALES TO BE LINED WITH EXCELSIOR MATTING AND SEEDED. 16. USACE REGULATED DITCH BANKS TO BE GRADED AT 2.1 SLOPE DOWN T MEAN HIGH WATER LINE. MODIFIED BANKS MUST BE STABLIZED WITH EXCELSIOR MATTING WITHIN 24 HRS OF DISTURBANCE 17. ALL INTERIOR DITCHES NOT REGULATED BY USACE THAT ARE LOCATED WITHIN ROW AND BUILDABLE AREA OF LOTS TO BE FILLED WITH SUITABLE MATERIAL LEGEND DRAINAGE PIPE AND RIP RAP LOT LINE CENTERLINE OF RIGHT OF WAY CONTOUR LINE & ELEVATION I I -� �- 30' DRAINAGE EASEMENT 1-15 1 1 CULVERT 3 (2)-64 LF 36' CL 111 RCP'S IE = 15.4 CY CL II RIPRAP (OPTIONAL) IE = 15.0' 15 CY CL II RIPRAP (OPTIONAL) EXISTING CULVERT TO BE REMOVED CLARK AND SONS LLC DEED BOOK 9907, PAGE 996 �M A � Row) !vim _'39 Q _ 100 50 0 100 200 300 O E SCALE IN FEET. 1"-- 100' PROPERTY OWNER CERTIFICATION: "I HEREBY CERTIFY THAT I AM THE CURRENT OWNER OF THE PROPERTY AND THAT UPON RECEIPT OF "AU THORIZATION-TO- CONSTRUCT"ANY CLEARING, GRADING, CONSTRUCTION OR DEVELOPMENT, WILL BE PERFORMED IN ACCORDANCE WITH THIS PLAN AND THAT THE APPLICABLE ORDINANCES AND RULES OF NEW HANOVER COUNTY, THE STATE OF NORTH CAROLINA AND THE FEDERAL GOVERNMENT AND ITS AGENCIES WHICH ARE HEREBY MADE PART OF THIS PLAN. AS THE OWNER, I ACCEPT FULL RESPONSIBILITY FOR THE CONSTRUCTION AND OPERATION AND TRANSFER THIS RESPONSINTENANCE IBILITY WITHOUT iE PVJRR TEE 10 Z IO WILL NEW HANOVER COUNTY. SIGNATURE: PRINTED NAME AND TITLE: DATE: = 52.61 A CRES NO WETLANDS EXIST ON SITE DESIGNER'S PLAN CERTIFICATION: "I HEREBY CERTIFY THAT THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH THE LATEST NEW HANOVER COUNTY ORDINANCES AND STORM TER DESIGN MANUAL." SIGNATURE: PRINTED NAME AND TITLE:4.�rt 1Lrd�'Y DATE: �3 REGISTRATION NUMBER: EXISTING CULVERT TO BE REMOVED PLANNED EROSION AND SEDIMENT CONTROL PRACTICES - CE 1. �MPOReARGYOG6RAVEL CONSTRUCTION ENTRANCE Shall be installed at the entrances to the project from an existing roadway. Drainage should be away from the road and erosion will be controlled with downstream practices. During wet weather it may be necessary to wash truck tires at these locations. 2. LAND GRADING Practice 6.02 Grading should be limited to areas as shown on the Plans. Cut and fill slopes shall be 3:1 or flatter except where specifically indicated. Care shall be taken during land grading activities not to damage existing trees that are identified as "to be preserved". $F 3. SEDIMENT FENCE Practice 6.62 Sediment fencing should be installed as shown on the Plan, to delineate and protect wetlands and specified areas, and around any temporary stockpile areas as necessary to prevent any graded interior areas from eroding onto adjacent lands or roadway, or into inlets, or as directed by Engineer or New Hanover County Erosion Control personnel. GC) 4. GRASS -LINED CHANNELS Practice 6.30 All overflow swales to be roded to design configuration seeded, and stabi ized if necessary with temporary sfrow-net liners to collect and convey site water as shown on Plan. After final project stabilization, swales to be re -graded and cleaned of siltation as needed to establish original design contours for stormwater conveyance. DP5. OUTLET STABILIZATION Practice 6.41 Riprap aprons will be located at the downstream end of all discharge pipes to prevent scour. 6. CONSTRUCTION ROAD STABILIZATION Practice 6.80 Upon reaching final grade and after utilities have been installed, roadway areas are to be stabilized by placing sub -base course of approved 4" marl stone or 6" ABC, as shown in the typical street cross-section detail on the Plan, to reduce erosion and dust during the remainder of building construction. O 7. TEMPORARY SEDIMENT TRAP Practice 6.60 Sediment traps are to be installed as indicated on plan at the downstream end of swales as shown. S8 8. SEDIMENT BASIN Practice 6.61 The Sediment Ba in is to be constructed first (see Construction Schedule) and is the primary Practice to prevent sediment from leaving the site. Detailed design and spillway configurations are specified in the detail sheet. �P 9. INLET PROTECTION Practice 6.51 A temporary measure of wire -mesh hardware cloth around steel posts supporting washed stone placed around the opening of a drop inlet. O10. TEMPORARY PLUG TP Reference Temporary Plug detail on sheet ECZ K 1 WILSON DEED BOOK 1902, PAGE 294 CONSTRUCTION SCHEDULE - 1. Obtain approval of Plan and any necessary permits, and hold a pre -construction conference prior to commencing any work. 2. Flog work limits and stake -out roads and storm drainage structures for preliminary grading. 3. Install Gravel Construction Entrances. 4. Install sediment basins and silt fenching as shown on plan prior to clearing and grubbing site. 5. Immediately fill ditches that will be affected by lots and roads prior to any rain event. 6. Consturct grosss lined channels, sediment traps and any other sediment control practices shown, prior to rough grading roadways, site and stockpiling topsoil as necessary. 7. Install utilities in roadway, establish final road grades and stabilize road with stone base course. 8. Final grade, install non -municipal utilities as needed, and vegetatively stabilize areas where building construction is not imminent. 9. All erosion and sediment control Practices are to be inspected weekly and after any rainfall, and repaired as necessary. 10. Upon completion of construction, the roadway is to be paved, curb & gutter installed, and ail areas permanently vegetatively stabilized. After site stabilization, temporary measures are to be removed. VEGETATIVE PLAN - 1. Permanent vegetation to be established in accordance with "North Carolina Erosion and Sediment Control Planning and Design Manual", Section 6.11, latest version. See Sheet EC6. PROM NOMIOAROMOMOWNk OMSON OF ATM QKM ) i,�, 1,/ )_073 MAINTENANCE PLAN - 1. All measures to be inspected weekly and after any rainfall event and needed repairs made Immediately. 2. Sediment Bgsin to be cleaned out when the level of sediment reaches 1.5 below oriface opening. Riser structure to be cleaned if excess water above design surface no longer drains properly. 3. Sediment to be removed from swales when they are approximately 50% filled or sediment level is with 1' of top of ditch bank. 4. Sediment to be removed from behind any Silt Fence and inlet protection devices when it becomes 0.5' deep. Fencing and inlet protection to be repaired as needed to maintain a barrier. 5. All seeded areas shall be fertilized, mulched, and re -seeded as necessary, according to specifications provided, to maintain a suitable vegetative cover. 6. Construction entrance to be maintained in such a manner as to prevent mud or sediment from leaving the construction site. Periodic topdressing with 2-inch stone may be required. Inspect after each rainfall and immediately remove all obJ'ectionable materials spilled, washed, or tracked onto public roadways. 7. Bypass Junction boxes to be inspected twice a year by owner or HOA. Owner/HOA to remove sediment from basin bottom when sediment level reaches 507' of design depth. 8. Inspect temporary sediment traps after each period of significant rainfall. Remove sediment and restore the trap to its original dimensions when the sediment has accumulated to 1/2 the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage from erosion or piping. Periodicrally check the depth of the spillway to ensure it is a minimum 0,7f 1.5 ft below the low point of the embankment. Immediately fill bny settlement of the embankment to slightly above design grade. /Any riprop displaced from the spillway must be replaced immediately. After all sediment producing areas have been permanentlly stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly: M At LICENSE # C-2710 - COASTAL SITE DESIGN, PC ENGINEERING LAND PLANNING COMMERCW / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 o V E \\\\\11IIflit �� \ H C A !tp'%� ���2``pFESS/0•l'Z SEAL ;yam 025483 .F N 1;. P_ l r0 N N N 'NoO - 00 � \ `L o= Z W F- 0 0 0 Z J vfi o X o U Z V : x J Z o o E W H >_ Cn 0 Q � om LLj O wwZ U U UQW z U ww LLJw W O z w z v� O V) J X W °- W W 0 c Q U 0 W ¢ 0 a. 0 cn 0 a. 0 0 Z L Z OW NV) C5 N (n U U Q o 00 I� cD N N _ N O N rn z w w DA TE: 10-10- 06 HORZ. SCALE: 1"= 100" VERT. SCALE: N/A DRA WN B Y RL W CHECKED B Y/: HSR PROJECT NO.: 05-0043 EC1 � EC 7 Sheet No. Of i 113.9 FT RAD. = 20 FT = 20 FT /LENGTH = 319 = 31.4 FT f SM7 ATER SMRAGE BASIN IE = 13.2 PROVIDED 3' STORAGE ELEVATION = 17. ���� ` : � � SURFACE AREA = 6,892 SF \;. eo,,�&� rroM ELE�AnoN= 1.0 5 CY CL ll RIPRAP STORAGE = 20,919 CF 20 FT EMERGENCY OVERFLOW SPILLWAY EL= 18.5 30 CY CL 11 RIP RAP PLACE FILTER FABRIC UNDER RIP RAP RAD. = 20 FT LENGTH = 31.4 FT NOTES: 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSTEM. 2. PORTABLE PUMP TO BE USED TO DRAIN SYSTEM IN CASE OF EMERGENCY. J. BASIN TO BE HYDROSEEDED. 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. 5. INSTALL FLOATING FOUNTAIN IN STORAGE BASIN 113.9 FT 30 LF - 24" CL Ill RCP W/ FES �O STORAGE BASIN 1 DETAIL SCALE: 1 "= 30' 23 FT TOP OF EMBANKMENT ELEVATION = 19.0 S TORA GE BA SIN 1 EMERGENC Y SPILL WA Y FRONT VIEW NOT TO SCALE 21.2 FT TOP OF EMBANKMENT ELEVATION = 21.0 INFILTRATION BASIN 1 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE 24" RCP TO BASIN INV = 13.3 ACCESS COMER ACOESS COWER 20 _ ---- -� `29 L 24' CL Ill RCP F RA LE G1H =` 4 �w ,BYPASS STRUCTURE PRE-TREATMENT DEVICE / W/ SMART W1ER (SEE DETAIL THIS SHEET) (2) - 4' x 4' BOXES W/ ACCESS COVER COVER = 19.5 IE 36" PIPE. = 13.3 IE 36' PIPE = 13.3 IE 24 BYPASS PIPE = 16.6 IE OF BOX = ` 11.3 LF�,4\ III RCP W/-E.S O�pp� w w .i. •Y w .I. O W 41 w .� 41 W 41 W W y 100 FT GRASSED RLTER STRIP VEGETA TI VE FIL TER DETAIL WT 10 WALE 1' MIN TOP OF EMBANKMENT ELEVATION = 19.0 2' TUCK / \ 43,/ ELEV. = 13.0 RUFCO LINER 4' CLEAN SIF7E0 SAND 1. RECOMMENDED LINER - RUFCO 1000 SERIES, PRODUCT 40008 2. OVER EXCAVATE BOTTOM OF POND 4' AND FILL WIIH CLEAN SIFTED SAND. 3. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE ONCE EXCAVATION OF BASIN IS COMPLETE. 4. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE WHEN FABRIC IS BEING PLACED. 5. CLEAN SCREENED MATERIAL TO BE USED FOR BACKFTLL. STORAGE BASIN 1 CROSS SECTION NOT TO SCALE COVE_ ACCESS TOP CO WACCESS TOP TOP OF COVER = 19.5 E = 19.5 FI = 195 TOP nc cznv - ,a 9 24' RCP TO BASIN lNV = 13.3 BOX IE= 11.3 BOTTOM OF BOX = 9.8 SEE DETAIL THIS SHEET FOR STORMWATER P.S. DETAIL LOCATED IN THIS BOX 2.0 FT WEIR ELEV. = 17.5 4 FT 12" CONC. 2 FT SUMP + FOR CLEANOU71 24' RCP IE = 13.3 12' CONC. 2 FT SUMP FOR CLEANOU 24" RCP TO DI TCH /N� =ASE 1 SECTION VIEW (2) PRECAST NC PRODUCTS 4848OR EQUIVALBOX ENT PLAN VIEW JUNCTION BOX, 1 A (2) - 4 FT x 4 FT PRECAST ASTCONCREI> BOX NC PRODUCTS 4848 OR EQUIVALENT( BYPASS STRUCTURE �c II N 1 ? I I NOT TO SCALE I 71 ,rT CpR 07%VW DRIVE 5050 r 3" STORMWATER_ FM .. 1 X\ \7� .......... . 152.5 FT TggT, (; 1 FT `• ``. FLOW DISTRIBUTION PIPE", 1 �, SEE DETAILtz SHEET EC7 3' STORAGE ELEVATION = 20.8 1' _ _ SURFACE AREA = 13,552 SF S7MMWAM? INRL1RAfl BASIN;, STORA = {-� _--"�pTTOM ELEVAT N= 19.0 V � J V -- t 125.6 FT - - - - - r --_-. - _ S OF - THE US 51.9 �T i I ' LENGTH = 27 FT \ 20 FT EMERGENCY OVERFLOW SPILLWAY EL= 20.8 20 CY CL 11 RIP RAP PLACE FILTER FABRIC UNDER RIP RAP NOTES: 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSTEM. 2. PORTABLE PUMP TO BE USED TO DRAIN SYSTEM 1N CASE OF EMERGENCY. J. BASIN TO BE HYDROSEEDED. 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. MAL INFILTRATION BASIN 1 DETAIL SCALE: 1"= 30' �- TOP OF EMBANKMENT ELEVATION = 19.0 3' STATE STORAGE ELEVATION = 17.5 n 3' STATE STORAGE VOLUME PROVIDED = 20,919 CF 3' STATE STORAGE VOLUME REQ'D = 19,900 CF BASIN BOTTOM ELEV. = 13.0 NAIUKAL U'KUUNU ` S TORA GE BA SIN 1 EMBANKMENT SECTION NOT TO SCALE 12.4 FT TOP OF EMBANKMENT ELEVATION = 11.0 3' STATE STORAGE ELEVATION = 20.3 p 3' STATE STORAGE VOLUME PROVIDED = 21,571 CF 3' STATE STORAGE VOLUME REO'D = 19,900 CF BASIN BOTTOM EU7.. = 19.0 I NFI L TRA TI ON BASIN I EMBANKMENT SECTION NOT TO Sf7 LE TARN MIS INFILTRATION BASIN I CAL CULA71ON SUMMARY FOR DWO, WATER QUALITY CONSIDERAPONS - TOTAL AREA DRAINING TO BASIN = 174,694 Sr (4.01 ACRES) IMPERVIOUS AREA BRI=AKDOVh: PROPOSED BUILDING = 48,570 SF (1.12 ACRES) PROPOSED ASHPALT = 26,768 SF (0.61 ACRES) PROPOSED S1DEWALyS = J. 401 7 (0 08 A CRf, ) TOTAL IMPERVOUS = 78;739 SF (1.81 ACRES) PERCENT 1MPERVIOLIS RUNOFF COEFFICIENT DE7EIiMINA 77ON: Rv = 0.05 + (0.009 x 45.1) = 0.46 IN/IN 3' VOLUME DETERMINATiLA: VOLUME = (DESIGN STORJ4X,Rv)(DRAINAGE AREA) = 1.5 IN x 0.46 INIIN x 4.01 ACRES / 12 = 0,2 ACRE -FT 1. 5' VOLUME = 9,950, �F OF RECOJ RED STORAGE W/ 4£G. FILLER 3' VOLUME = 19,900 Cc OF REOGRED STORAGE STATE WATER Qi1ALJTY CONSIDERATIONS - 3' STORAGE VOL'LilE PEXf'R = 19,900 CF 3' STORAGE rrO JQE PROVIDED = 21,571 CF STORAGE VOLUME D-AW xoh, 7,ME = 0.5 DAYS PUMP MODEL: TSURUMI NK2-SERIES SEMI -VORTEX DEWATERING PUMP SEE SPECIFICATIONS FOR ADDITIONAL DETAIL EL.= 19.5 FT DEPTH OF WELL 8.2 FT DISCHARGE ELEVATION _-EL.= 16.0 FT TO INFILTRATION BASIN LOCKING HATCH COVER n o.` r STEPS NOTE: 2" PVC ELECTRICAL PIPE GOING FROM CONTROL PANEL TO 'OVET WELL. GROUND MUST SEAL BOTH ENDS OF EL.= 19.0 PIPE WITH ELECTRICAL PUTTY. o = •' III -III- 2"CONDUIT REQUIRED ELECTRIC POWER CABLE NOTE:1/4" CHAIN v , WITH 1/4" SHACKELS d' LJFTOUT CHAIN 1/4' (STAINLESS STEEL) , 4 C.I. FLANGE SWING CHECK PUMP ON EL.= 15.1 7- VALVE IN LINE \ PUMP OFF EL.= 14.6 F- 4' X 4' BOX i O BASE ELEVATION EL.= 11.3 FT 0 fANCHOR BOLT (2- PROJECTION) 4 FT X 4 FT PRECAST BOX WITH STEPS SECTION V/ E W N TS PUMP M : M 1 1/8" O 00 1 1/4" O f A rn f L 3/4" LA SIDE ELEVATION 12' 1/2" GRADE 60 PLAN VIEW ® STEEL REINFORCEMENT COPOLYMER �I 1 POLYPROPYLENE ELEVATION SECTION A -A MANHOLE STEP DETAIL N TS OZICENSE f C-2710 COASTAL SITE DESIGN, PC ENGINEERING LAND PLANNING COMMERC/AL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 Q Z ZU ~ Z z Q W O Oj O u E+J (3_� Z O Z Z 3 (D 2 tk CAR 0_ SEAL _ -.7 7=_ 025483 r- �0Xj_ •�G I N N TS Sheet N EC2 of EC 86 LF 36" CL 111 RCP �' SWFM / BYPASS STRUCTURE 2.A -- PRE-TREATMENT DEVICE -� W/ SMART WIER (SEE DETAIL THIS SHEET) (2) - 4' x 4' BOXES W/ ACCESS COVER COVER = 18.5 IE 36" PIPE = 12.9 IE 36" -PIPE-..=....12:9 ..__..._.._.........,', IE 36" BYPASS PIPE = 14.0 IE OF BOX = 7.8 RAD. = 33 FT LENGTH.. =-43.4 FT .__ _ ....._ - t h 3" STORAGE ELEVATION = 15.5 SURFACE AREA = 10,124 SF / �h STORAGE = 45,959 CF 0� / �A,) ATER STORAGE O� 0 BOTTOM ELEVATION= 8.0 �O 0 aro-45.5F7 MMC E17, NO S• , PLACE FILTER FABRI DER RIP RAP 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSTEM. 2. PORTABLE PUMP TO BE USED TO DRAIN \� SYSTEM IN CASE OF EMERGENCY. J. BASIN TO BE HYDROSEEDED. 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. S TORA GE BA SIN 2 DE TA IL 5. INSTALL FLOATING FOUNTAIN IN STORAGE BASIN SCALE: 1 "= 30' 23 FT TOP OF EMBANKMENT ELEVATION = 18.0 STORA GE BASIN 2 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE 21.2 FT TOP OF EMBANKMENT ELEVATION = 20.0 N11\\�,\iELEV � 19.8 INFILTRATION BASIN 2 EMERGENC Y SPILL WA Y FRONT VIEW NOT TO SCALE Tp�s� C \�s PLAN VIEW (2) - 5 FT x 5 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT KC'P TO DITCH 0 5 F� FT I 91 LF 36" CL UI RCP WITH F.E.S . LE = 130 5 CY CL Y RIPRAP 1:5,FT DEEP 49 LF 36' CL Ill RCP WITH F.E.S V?AD. 33 FT ENGTH = 51.3 FT r - 8"0�:. CY CLUI RIPRAP FT DEEP `34 LF 36" CL N RCP WITH FE.S lr 1 I ' '(rr 0M it r I� II!r 1' MIN TOP OF EMBANKMENT ELEVATION = 18.0 2' TUCKEt, ` \ \\ ELEV. 8.0 RUFCO LINER 4' CLEAN SIFTED SAND I. RECOMMENDED LINER - RUFCO 1000 SERIES, PRODUCT 4000E 2. OVER EXCAVATE BOTTOM OF POND 4' AND FILL WITH CLEAN SIFTED SAND. 3. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE ONCE EXCAVATION OF BASIN IS COMPLETE. 4. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE WHEN FABRIC IS BEING PLACED. 5. CLEAN SCREENED MATERIAL TO BE USED FOR BACKFILL. STORAGE BASIN 2 CROSS SECTION NOT TO SCALE COOVACCESS TOP COVE_ ACCESS TOP TOP OF GRATE = 18.5 ELEV = 18.5 ELEV = 18.5 TOP OF Rnx = 1R 4; SEE DETAIL THIS SHEET FOR STORMWATER P.S. DETAIL LOCATED IN THIS BOX BOX IE= 7.8 BOTTOM OF BOX = 6.3 2.0 FT WEIR ELEV. = 15.5 36' RCP IE= 12.9 12" CONC. 2 FT SUMP FOR CLEANOUT 5 FT 36' RCP IE= 14.0 12' CONC. 2 FT SUMP + FOR CLEANOU I SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT JUNCTION BOX/ 2. A BYPASS STRUCTURE NOT TO SCALE =ASE 1 T n FT NOTES: 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSTEM. 2. PORTABLE PUMP TO BE USED TO DRAIN SYSTEM IN CASE OF EMERGENCY. 3. BASIN TO BE HYDROSEEDED. 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. TOP OF EMBANKMENT ELEVATION = 1 & 0 EMERGENCY SPILLWAY ELEVATION = 17.5 3" STATE STORAGE ELEVATION = 15.5 -\7 3' STATE STORAGE VOLUME = 45,959 CF BASIN BOTTOM ELEV. = 8.0 IVA I UKAL URUUNU 11 1 " ` v STORAGE BASIN 2 EMBANKMENT SECTION NOT TO SCALE TOP OF EMBANKMENT ELEVATION = 20.0 EMERGENCY SPILLWAY ELEVATION = 19.8 J ') IA It S7UKAUE VOLUME = 46,110 CF BASIN BOTTOM ELEV. = 1&0 I NFI L TRA TI ON BASIN 2 EMBA NKMEN T SEC TI ON NOT TO SCALE TARIN W=S INFURATION BASIN 2 CALCULATION SUMMARY FOR DWO. WATER QUALITY CONSIDERATIONS - TOTAL AREA DRAINING TO BASIN = 367,733 SF (8.44 ACRES) IMPERWOUS AREA BREAKDOWN: PROPOSED BUILDING = 130,000 SF (2.98 ACRES) PROPOSED ASHPALT = 43,306 SF (1.00 ACRES) PROPOSED MEW/KS = 7.342 SF (17 A/` ) TOTAL IMPERVIOUS = 180,648 SF (4.15 ACRES) PERCENT IMPERVIOUS = 49.IX RUNOFF COEFFICIENT DETERMINATION: Rv = 0.05 + (0.009 x 49.6) = 0.50 IN11M 1. 5' VOLUME DE7ERMINA110N: VOLUME = (DESIGN STORM)(Rv)(DRAINAGE AREA) = 1.5 IN x 0.50 IN/1N x 8.44 ACRES / 12 = 0.5 ACRE -FT 1.5' VOLUME = 2Z621 CF OF REQUIRED STORAGE W/ VEG. FILTER 3' VOLUME = 45,242 CF OF REQUIRED STORAGE W/0 VEG. FILTER STALE WATER QUAUTY CONSIDERATJONS - 3' STORAGE VOLUME REQUIRED = 45,242 CF 3' STORAGE VOLUME PROVIDED = 46,110 CF STORAGE VOLUME DRAW DOWN 77ME = 0.5 DAYS PUMP MODEL: TSURUMI NK2-SERIES SEMI -VORTEX DEWATERING PUMP SEE SPECIFICATIONS FOR ADDITIONAL DETAIL LOCKING EL.= 18.5 FT HATCH COVER II -III -III-I STEPS DEPTH OF WELL 16" 12.0 FT `r DISCHARGE ELEVATION D EL. = 15.5 FT `•" TO INFILTRATION BASIN T, SCALE: 1"= 30' GROUND ® / EL.= 18.5 NOTE: 2' PVC ELECTRICAL PIPE GOING FROM CONTROL PANEL TO WET WELL. MUST SEAL BOTH ENDS OF III -I PIPE WITH ELECTRICAL PUTTY. 2"CONDUIT REQUIRED ELECTRIC POWER CABLE 1 1 /4" NOTE:1/4' CHAIN WITH 1/4" SHACKELS d' 10 3 4" A SIDE ELEVATION UFTOUT CHAIN 1/4" (STAINLESS STEEL) 1/2" GRADE 60 VIEW a PLAN STEEL REINFORCEMENT WPLASTIC COPOLYMER POLYPROPYLENEC.I. FLANGE SWNG d CHECK VALVE PUMP ON EL.= 11.4 FT ELEVATION SECTION A -A I IN LINE PUMP OFF EL.= 10.9 FT s MANHOLE STEP DETAIL BY: - PREFABRICATED REINFORCED CONCRETE PIPE OR NTS MH BASE ELEVATION EL.= 7.8 FT e-ANCHOR BOLT (2" PROJECTION) 4 FT X 4 FT PRECAST BOX WITH STEPS SECTION VIEW NTS N TS rZ LICENSE C-2710 COASTAL SITE DESIGN, PC ENGINEERING LANO PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 CV 0 J co Q V0 � o oo,Z� Z�Q) CA RO ��•F�SS7p'��y SEAL p :a 025483 0. IN E S 0 \ 0 0 od o 0 0 00 vi w cn S w U 0 Of w ? _ 0 w J Q p m O IL O co 0 o cn z Elf �Z N I- of N V) � (n0Ld Mm0MLi z Q z Q o F0° Q z Z Q o JLi z 0 z w wW U' (n ( F- !Y co H J O M f w F_ w U o p o o 0 1 �. w p p p LLJ p i N N N O CCD 0 U CCD w Z z z z LLJ W Ld a M w DA TE: 10-10- 06 HORZ. SCALE: AS SHOWN VERT. SCALE: N/A DRA WN B Y.- JDH CHECKED BY: HSR PROJECT NO.: 05--004.3 Sheet N EC3 0f EC i i RAD. = 20 FT LENGTH = 13.3 FT 1,1I �- RA` - 20 FT LENGTH '', 27.7 FT \ RAD. = 20 FT LENGTH = 20.3 FT LE = 15.0 5 CY CL 11 RIPRAP 1.5 FT DEEP 44 LF 30" HDPE WITH F.ES - 1s0 j NN MED �1BU NOTES: ` \ f 20 RAD. = FT 20 FT = LENGTH . 30.4 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSTEM. _ _ 2 LF 24" A 2. PORTABLE PUMP TO BE USED TO DRAIN EMEM SYSTEM IN CASE EMERGENCY. STORAGE BASIN 3 ®1 - - --- DETAIL 3. BASIN TO BE HYDR OSEEDED. SCALE: 1 "= 30' 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. 5. INSTALL FLOATING FOUNTAIN IN STORAGE BASIN 62 FT TOP OF EMBANKMENT ELEVATION = 23.0 50 FT IN / ' \l / ELEV. - 21.0 \ \ S TORA GE BA SIN 3 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE PLAN VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT Accm DOYEN AGYESS DOTER cn n Z V N o I PLAN VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT i 31 LF 42" HQPE WITH FE.S RAD. = 20 FT ,-----,LENGTH = 35.8 FT _-J 7FT RAD. = 20 FT 222 LENGTH = 19.3 FT 3" STORMWATER FM ASS STRUCTURE 3.A ' ,, PRE-TREATMENT DEVICE W/ SMART MER (SEE DETAIL THIS SWEET) RAD. = 20 FT, (2) - 4' x 4' BOXES W/ ACCESS COVER LENGTH = 17.0 FT COVER = 23.0 - - - ' IE 42' PIPE = 15.1 / IE J6* SS t172 IE OF BOX 31PE = 55 LF 36" HDPE WITH F.E.S BYPASS STRUCTURE 3A.A PRE-TREATMENT DEVICE W/ SMART WIER (SEE DETAIL THIS SHEET) / (2) - 4' x 4' BOXES W/ ACCESS COVER COVER = 23.0 IE 30" PIPE = 15.1 / IE 24" BYPASS PIPE = 16.0 IE OF BOX = 131 ALE 15.8 5 CY CL ll RIPRAP 1.5 FT DEEP 21.2 FT TOP OF EMBANKMENT ELEVATION = 24.0 20 FT / 1 \\ \!\%�\!�\//i�/ice I NFI L TRA TI ON BASIN 3 EMER GEN C Y SPI L L WA Y FRON T VIEW NOT TO SCALE COVE�ACCESS TOP COVE�ACCESS TOP TOP OF GRA TE = 23.0 ELSE VV = 23.0 ELSE VV = 23.0 Tnp nF Rn x = 9 4 n 36" HDPE TO CREEK IE = 17.2 BOX IE= 13.1 BOTTOM OF BOX = 11.6 2.0 FT WEIR ELEV. = 17.2 4FT 42' HDPE 15.1 12" CONC. 2 FT SUMP + FOR CLEANOUT 12" CONC. 2 FT SUMP FOR CLEANOUT SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT JUNCTION BOX/ J. A B YPA SS S TRUC TURF NOT TO SCALE /SEE DETAIL THIS SHEET FOR STORMWATER P.S. DETAIL LOCATED IN THIS BOX =ASE CO' O WACCESS TOP COVE. RIACCESS TOP TOP OF GRATE = 23.0 ELtEVV = 23.0 ELEV = 23.0 TOP nF Rnx = 9--1n BOX IE= 13.1 BOTTOM OF BOX = 11.6 2.0 FT WEIR ELEV. = 17.2 30" RCP IE=15.1 12' CONC. 2 FT SUMP FOR CLEANOUT 4FT 24" HDPE IE=15.0 12" CONC. 2 FT SUMP FOR CLEANOUT SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT JUNCTION BOX/ 3A. A BYPASS STRUCTURE NOT TO SCALE =ASE 3' STORMWAIE FM �K -_ Y y ..�.1 �' 'rid '-t-' `Y-' 71� z NOTES: / 1 5 CY CL II RIPRAP 1. ALL BUIL)ING ROOF DRAINS MUST BE DIRECTED I I 1.5 FT DEEP I -- ----------- INTO 7M STORM DRAINAGE COLLECTION S15TEI/. I 2. PORTABLC PUMP TO BE USED TO DRAIN I I I \ rf SYSTEM N CASE OF EMERGENCY. J. BASIN TC BE HYDROSEEDED. I I \ \J , 4. BASIN TC BE PLACED IN A RECORDED DRAINAGE EASEMENT. I 1 I / I / ` I 104.1F7- I I ` STORMWATER /NRORA710N BASyN \ BOTTOM ELEVA77ON- 22.0 \ 19 I 1 FLOW DISTRIBUTION PIPE \ SEE DETAIL SHEET EC7 I 20 FT EMERGENCY OVERFLOW \ 3" STORAGE ELEVATION = 23.8 \ SPILLWAY EL= 23.8 SURFACE AREA = 38,320 SF 31 CY CL 1I RIP RAP STORAGE = 64,132 CF PLACE FILTER FABRIC UNDER RIP RAP 299.7 FT I _. __ _........... L1� 10......_�E._- -- - .....4-- . - .-..-._ ........ - .. >-- _ ... . .r-- - _ L- _ - - - INFILTRATION BASIN 3 DETAIL TARIN w"s INRURA77ON BASIN 3 CALCULATION SUMMARY FOR DWO, WATER QUALITY CONSIDERATIONS - TOTAL AREA DRAINING TO BASIN = 478,571 SF (10.99 ACRES) IMPERVIOUS AREA BREAKDOWN: PROPOSED BUILDING = 160,000 SF (3.67 ACRES) PROPOSED ASHPALT - 56,971 SF (1.31 ACRES) PROPOSED SIDEWALKS = 7.755 SF (0.18 ACRES) TOTAL IMPERVIOUS = 224,726 SF (5.16 ACRES) PERCENT IMPERVIOUS = 47.OX RUNOFF COEFFICIENT DETERMINATION: Rv = 0.05 + (0.009 x 44.9) = 0.45 IN,4N 1.5' VOLUME DETERMINATION. VOLUME = (DESIGN STORM)(RvXDRAINAGE AREA) = 1.5 IN x 0.45 IN/IN x 10.99 ACRES / 12 - 0.7 ACRE -FT 1.5' VOLUME = 28,273 CF OF REQUIRED STORAGE W/ VEG. FILTER 3' VOLUME = 56,545 CF OF REQUIRED STORAGE W/0 VEG. FILTER STATE WADER QUALITY CONSIDERARONS - 3" STORAGE VOLUME REQUIRED = 56,545 CF 3" STORAGE VOLUME PROVIDED = 64,132 CF STORAGE VOLUME DRAW DOWN TIME = 0.5 DAYS 11.2 FT 10 FT{ TOP OF EMBANKMENT ELEVATION = 24.0 EMERGENCY SPILLWAY ELEVATION = 23.8 \\/\\ 3" STATE STORAGE ELEVATION = 23.8 �7 3" STATE STORAGE VOLUME = 64,132 CF BASIN BOTTOM ELEV. = 22.0 'NATURAL GROUND I NFI L TRA TI ON BASIN 3 EMBANKMENT SECTION NOT TO SCALE SCALE. 1 "= 30' 1' MIN TOP OF EMBANKMENT ELEVATION = 23.0 2' TUCK ELEV = 15.0 RUFCO LINER 4' CLEAN SIFTED SAND 1. RECOMMENDED LINER - RUFCO 1000 SERIES, PRODUCT 4000E Z OVER EXCAVATE BOTTOM OF POND 4' AND FILL WITH CLEAN SIFTED SAND. J. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE ONCE EXCAVATION OF BASIN IS COMPLETE 4. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE WHEN FABRIC IS BEING PLACED. 5. CLEAN SCREENED MATERIAL TO BE USED FOR BACKFILL STORAGE BASIN 3 CROSS SECTION NOT TO SCALE 99 n cT TOP OF EMBANKMENT ELEVATION = 23.0 3" STATE STORAGE ELEVATION = 17.2 �\7 3' STATE STORAGE VOLUME = 59,447 CF BASIN BOTTOM ELEV. = 15.0 NA 1 UKAL (iKUUNU STORAGE BASIN 3 EMBANKMENT SECTION NOT TO SCALE PUMP MODEL: TSURUMI NK2-SERIES SEMI -VORTEX DEWATERING PUMP SEE SPECIFICATIONS FOR ADDITIONAL DETAIL NOTE: 2" PVC ELECTRICAL PIPE GOING FROM CONTROL PANEL TO WET WELL. MUST SEAL BOTH ENDS OF PIPE WITH ELECTRICAL PUTTY. LOCKING GROUND EL.= 23.0 FT HATCH COVER /EL.= 23.0 -) I I n o.� , '•'••• III -I - I -I STEPSI- DEPT 10.. . . DISCHARGE ELEVATION EL.= 20.0 FT TO INFILTRATION BASIN . rr 16" 2"CONDUIT REQUIRED ELECTRIC POWER CABLE FEE i, NOTE-1/4- CHAIN MATH 1/4' SHACKELS d LIFTOUT CHAIN 1/4' ' y (STAINLESS STEEL) C.I. FLANGE SWING CHECK PUMP ON EL. = 16.1 d VALVE ' , IN LINE \ PUMP OFF EL. = 15.6 i BASE ELEVATION C� = 13.1 FT a" ANCHOR BOLT (2" PROJECTION) 4 FT X 4 FT PRECAST BOX WITH STEPS SECTION VIEW N TS STORM WA TER PUMP STATION OFFLINE BYPASS DETAIL 3.A N TS LICENSE % C-2710 COASTAL SITE DESIGN, PC ENGIT,L L k ;NG LAND PLANNII ✓G COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28-T06 (910) 791-4441 `caac Co 1. O F- ag 3 0 3 _� o� O j~"g J ~ oaac. Z nEi !4 O. FESSIeiy o y Q. Y:,;L S 25483 r F Q. Z°5yq.?'GI NEB.����: 00 M N_ N_ 03 C)F- � LO �_ 0 0 0 0- 0 o 0 F I w w w 0 0 w Z 0 Li 0 Ld w m o N O cn Y 0 > Q U 0 Z < w W LLLJ m G✓ O m CDQ z Om �V2 Q Z Z W JLd a O U Z � F w O Z Q Q N U< w f O U) (w� 0 OW 0 0 OLil OW 0 cD 0 Q Q 5 Q 5 5 c Q wLi U tY L�j U U O Z w DA TE: 10- 7 0- 06 HORZ SCALE., AS SHOWN VERT SCALE: N/A DRA WN B Y: RL W CHECKED B Y.- HSR PROJECT NO.: 05-0043 Snuet No. .__ _ Of __ LE = 18.2 5 CY CL II RIPRAP 1.5 FT DEEP 20 LF 3' STORMWATER FM/ ................................. RAD. = 20 Fr' LENGTH = 33,6 FT RAD. = 20 FT LENGTH = 29.8 FT BYPASS STRUCTURE 4A.A PRE-TREATMENT DEVICE W/ SMART IMER (SEE DETAIL THIS SHEET) (2) - 4' x 4' BOXES W/ ACCESS COVER COVER = 23.0 IE 30" PIPE = 16.1 IE 30" PIPE = 14.1 IE 24" BYPASS PIPE = 18.4 IE OF BOX = 12.1=_:::_.__::_-::.::_::_-; LE = 17.9 UNNAMED TRIBUTARY �_ 12 LF 42' HDPE PIPE _;;-WITH FES 2423FT RAD. = 20 FT _--------- --- __ - k-1- �` ` ,\ LENGTH = 19.2 FT LE = 14.0 5 CY CL 11 RIPRAP 1.5 FT DEEP ........... _----.__._-_.-..-..-..._.._..._- 40 FT EMERGENCY OVERFLOW { ;t SPILLWAY EL= 19.5 42 CY CL 11 RIP RAP PLACE FILTER FABRIC UNDER RIP RAP,' STORMWA-TER 'STURAGE BOTTOM_fLEVATION= 14.0 3" STORAGE ELEVATION = 18.5 i. SURFACE AREA = 21,325 SF I --STORAGE = 75,521 CF 14 15 16 17 NOTES 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSTEM. 2. PORTABLE PUMP TO BE USED TO DRAIN SYSTEM IN CASE OF EMERGENCY. 3. BASIN TO BE HYDROSEEDED. 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. 5. INSTALL FLOATING FOUNTAIN IN STORAGE BASIN STORA GE BA SIN 4 DETAIL 1' MIN TOP OF EMBANKMENT ELEVATION = 23.0 � r-l- 2' TUCK\ V. ELE= 14.0 RUFCO LINER 4' CLEAN SIFTED SAND 1. RECOMMENDED LINER - RUFCO 1000 SERIES, PRODUCT 4000E 2. OVER EXCAVATE BOTTOM OF POND 4' AND FILL WITH CLEAN SIFTED SAND. 3. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE ONCE EXCAVATION OF BASIN IS COMPLETE. 4. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE WHEN FABRIC IS BEING PLACED. 5. CLEAN SCREENED MATERIAL TO BE USED FOR BACKFILL. STORA GE BASIN 4 CROSS SECTION NOT TO SCALE 10 BP,.. � q.1 /GP q.2 SIN 108P ,tip TOP OF GRATE = 23.5 BOX IE= 12.1 BOTTOM OF BOX = 10.6 5' x 5' BOX W/ ACCESS COVER COVER = 23.5 IE = 1&0 LF 42' HDPE PIPE -- ` 5' x 5' BOX W/ ACCESS CO VER COVER = 23.5 \ / IE = 18.2 , \ �l ___% 65 LF 42' HDPE PIPE ``, 19 BYPASS STRUCTURE 4.A PRE-TREATMENT DEVICE W/ SMART WER (SEE DETAIL THIS SHEET) (2) - 5' x 5' BOXES W/ ACCESS COVER COVER = 23.8 IE 42' PIPE = 14.1 IE 42' BYPASS PIPE = 18.4 IE OF BOX = 12.1 COVERIACCESS TOP COVERIACCESS TOP EL = 7.3.5 FI = 93 S 2.0 FT WEIR ELEV. = 18.5 42' RCP IE = 14.1 12' CONC. 1 2 FT SUMP 1 FOR CLEANOUT 5 FT 12' CONC. 2 FT SUMP FOR CLEANOU SECTION VIEW (2) - 5 FT x 5 FT PRECAST CONCRETE BOX 6) NC PRODUCTS 6060 OR EQUIVALENT JUNCTION BOX/ 4. A (2) - 5 FT x 5FTPRECAI STCONCRETE BOX BYPASS STRUCTURE NC PRODUCTS 6060 OR EQUIVALENT NOT TO SCALE PLAN VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT TOP OF GRATE = 23.0 SEE DETAIL THIS SHEET FOR \ STORMWATER P.S DETAIL LOCATED IN THIS BOX BOX IE= 12.1 BOTTOM OF BOX = 10.6 42' HDPE TO CREEK IE = 18.4 =ASE COVEI�ACCESS TOP COVERIACCESS TOP FL = 2.3.n 97 - 93n Tnn 2.0 FT WEIR 4 FT ELEV. = 18.5 30' HDPE IE= 14.1 24' HDPE IE= 18.4 12' CONC 12' CONC. 1 2 FT SUM 2 FT SUMP 1 FOR CLEANOUT i FOR CLEANOU SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT JUNCTION BOX/ 4A. A BYPASS STRUCTURE NOT TO SCALE =ASE 20 FT 43.1 FT NOTES.• 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSTEM. 2. PORTABLE PUMP TO BE USED TO DRAIN SYSTEM IN CASE OF EMERGENCY. 3. BASIN TO BE HYDROSEEDED. 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. TAMN WOODS INRLTRATION BASIN 4 CALCULATION SUMMARY FOR DWQ. WATER QUALITY CONSIDERATIONS - TOTAL AREA DRAINING TO BASIN = 675,480 SF (15.51 ACRES) IMPERVIOUS AREA BREAKDOWN: PROPOSED BUILDING = 133,000 SF (3.05 ACRES) PROPOSED ASHPALT = 96,044 SF 2.20 ACRES PROPOSED SIDEWALKS = 9,451 SF (0.22 ACRES PROPOSED AMENITIES = 19,390 SF (0.44 ACRES) FUR)RE ALLOCATION = 32610 SE (076 ACRES) TOTAL IMPERVIOUS = 290,495 SF (6.67 ACRES) PERCENT IMPERVIOUS = 43.0% RUNOFF COEMCIENT DETERMINATION: Rv = 0.05 + (0.009 x 49.4) = 0.49 IN/1N 1.5' VOLUME DETERMINATION: VOLUME = (DESIGN STARM)(RVXDRAINAGE AREA) = 1.5 IN x 0.49 IN/1N x 15.51 ACRES / 12 = 0.8 ACRE47 1.5' VOLUME = 36,902 CF OF REQUIRED STORAGE W/ VEG. FILED? 3' VOLUME = 73,805 CF OF REQUIRED STORAGE W/O VEG. RLTER STATE WATER QUALITY CONSIDERAAONS - 3" STORAGE VOLUME REQUIRED = 73,805 CF 3" STORAGE VOLUME PROVIDED = 75,834 CF STORAGE VOLUME DRAW DOWN TIME = 0.2 DAYS 1.3 FT TOP OF EMBANKMENT ELEVA77ON = 31.0 EMERGENCY SPILLWAY ELEVATION = 30.0 0 Z)/AIt SIUCAGt ELEVATION = 27.9 �7 3' STATE STORAGE VOLUME = 75,834 CF i \� BASIN BOTTOM ELEV. = 24.0 nn rvnnL Vnuvrvu - , • • • •- INFIL TRA TION BASIN 4 EMBANKMENT SECDON NOT TO SCALE SCALE. • I"-- 30' 56.8 FT TOP OF EMBANKMENT ELEVATION = 23.0 ELEV. = 19.5 STORAGE BASIN 4 EMERGENCY SPILL WAY FRONT VIEW NOT TO SCALE 26 FT TOP OF EMBANKMENT 20 FT ELEVATION = 31.0 ELEV. = 30 x/x\�r/\/�% INF IL TRA TION BASIN 4 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE TOP OF EMBANKMENT ELEVATION = 23.0 3" STATE STORAGE VOLUME = 75,521 CF = BASIN BOTTOM ELEV. = 14.0 NAIUt(AL UKOUND S TORA GE BASIN 4 EMBANKMENT SECTION NOT TO SCALE ER FM PUMP MODEL: TSURUMI NK2-SERIES SEMI -VORTEX DEWATERING PUMP SEE SPECIFICATIONS FOR ADDITIONAL DETAIL NOTE: 2" PVC ELECTRICAL PIPE GOING FROM CONTROL PANEL TO WET WELL. MUST SEAL BOTH ENDS OF PIPE WITH ELECTRICAL PUTTY. LOCKING GROUND EL.= 23.0 FT HATCH COVER IEL.= 23.0 r STEPS DEPTH OF WELL 1 I16" 2"CONDUIT REQUIRED 9.1 FT DISCHARGE ELEVATION _EL.= 20.0 FT TO INFILTRATION BASIN ELECTRIC POWER CABLE NOTE:1/4' CHAIN v WITH 1/4' SHACKELS d LJFTOUT CHAIN 1/4' (STAINLESS STEEL) 4 C.I. FLANGE SWING CHECK PUMP ON EL. = 15.9 G VALVE IN LINE PUMP OFF EL. = 15.4 it � C7 0 BASE ELEVATION 12.1 FT s• ANCHOR BOLT (2" PROJECTION) 4 FT X 4 FT PRECAST BOX WITH STEPS SECTION VIEW 4 JUL. 0 5 ` NTS STORM WA TER PUMP S TA TION e)� OFFLINE BYPASS DETAIL 4A. A N TS LICENSE C-2710 COASTAL SITE DESIGN, PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 �V 0 � co O J N O I- C-) CL cr) 6 WCL�EC W 0 \���111111//7V7 p,• FrcSS�'••�iti� a o SEAL�- 025483 - DATE' 10-70-06 HORZ. SCALE: AS SHOWN VERT. SCALE: N/A DRA WN B Y.- RL W CHECKED BY: HSR PROJECT NO.. 05-0041 Sheet NO C5 of EC Construction Road Stabilization Specification 1 6.80 - Construction Specifications 1. pear roadbed and parking areas of all vegetation, roots and other objectionable material. 2. Ensure that road construction follows the natural contours of the terrain if it is possible 3. Locate parking areas on naturally flat areas if they are available. Keep grades sufficient for drainage but generally not more than 2 to 31. 4. Provide surface drainage, and divert excess runoff to stable crow by using water bars or turnouts (References: Runoff Control Measures). 5. Keep cuts and fills at 2.1 or flatter for safety and stability and to facilitate establishment of vegetation and maintenance. 6. Spread a 6-Inch course of 'ABC' crushed stone evenly over the full width of the road and smooth to avoid depressions 7. mare seepage areas or seasonally wet areas must be crossed, install subsurface drains or geotextile fabric cloth before placing the crushed stone (Practice 6.81, Subsurface Draki). & Vegetate all roadside ditches, cuts fills and other disturbed areas or otherwise appropriately stabilize as soon as gracing is complete (References: Surface Stabilization). 9. Provide appropriate sediment control measures to prevent off -site sedimentation. Maintenance Inspect construction roods and parking areas periodlcd/y for condition of surface. Topdraw with new gravel as needed. Check road ditches and other seeded areas for erosion and sedimentation after runoff-produekig robs Maintain dl vegetation in a healthy, vigorous condition. Sediment -producing areas should be treated immediately. C Temporary Gravel Constr<rction Entrance/ fit Specification / 6.06 - Construction Specifications i. pea the entrance and exit area of all vegetation, roots and other objectionable material and properly grade it. 2. Place the gravel to the specific grade and dimensions shown on the plans and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable outlet 4. Use geotextle fabrics because they improve stability of the foundation In locations subject to seepage or high water table. Maintenance Maintain the gravel pad In a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2-kith stone After each rainfall, inspect any structure used to trap sediment and dean it out as necessary. Immediately remove all objectionable matands sp11e4 washed, or tracked onto public roadways. Temporary Seeding Specification 1 6.10 - Specifications Complete grading before preparing seedbeds and Install all necessary erosion control practices, such as dices, waterways and basins Minimize steep slopes because they make seedbed preparation difficult and increase the erosion hazard. If sots become compacted during grading, loosen thern to a depth of 6-8 inches using a ripper, harrow, or chisel plow. Seedbed Preparation Good seedbed preparation is assentid to successful plant establishment A good seedbed is well -pulverized, loose and uniform. Mere hydroseedhg methods are used, the surface may be left with a more Irregular surface of large clods and stones. Liming - Apply lime according to sol test recommendations If the pH (acidity) of the sod is not known, an application of ground agricultural limestone at the rate of 1 to 1 1/2 tons/sae on coo -se -textured soils and 2-3 tons/acres on fine -textured sots is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 Inches of sa. Soils with a pH of 6 or higher need not be limed. Fertilizer- Base application rates on soi tests Men these am not possible, apply a 10-10-10 grade fetilizer at 700-1,000 Ib./aae Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hyoiaulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening- If recent tillage operations have resulted in a loose surf -A additional roughening may not be required except to break up large cods If rahfdl arouses the surface to became sealed or crusted, loosen it Jest prior to seeding by disking, raking, harrowing, or other suitable methods Groove or furrow slopes steeper than 3:1 on the contour before seeding (Practice 6:03, Surface Roughening). Plant Selection Select on appropriate species or species mixture from Table 6.10a, for seeding in late winter and early spring, Table 6.106 for summer, and Table 6.10c for fall. Seeding Evenly apply seed using a cyclone seeder (broadcast), dill, cultipacker seeder, or hydroseeder. Use seeding rates given In Table 6.10a-6.10a Broadcast seeding and hyraseeding ore appropriate for steep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty In achieving a uniform distribution. Small grains should be planted no more than 1 inch deep, and grasses and legumes no more than 1/2 inch. Broadcast seed must be covered by raking or chain droggng, and then lightly famed with a roller or ccdtooc ker. Hydroseeded mixtures should include a wood hoer (cellulose) mulch. y e� The of appropriate mulch will help ensure establishment under normal conditions and is essential to seeding success under harsh site condition (Practice 6.14, Mulching). Harsh site conditions Include.- -seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use), -slopes steeper than 3:1, -excessively hot or dry weather, -adverse sois(shallow, rocky, or high in day or sand), and -areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as In channels, anchor mulch with netting (Practce 6.14, Mulching). Land Grading Specification / 6.02 - Construction Specifications 1.Construct and maintain all erosion and sedimentation control practices and measures In accordance with the approved sedimentation control plan and construction schodde 2.Remom good topsoil from areas to be graded and filled, and pr- it far use in finishing the grading of all critical areas ascorify areas to be topsoped to a mhknum depth of 2 inches before placing topsoil (Practice 6.04, Topsoing). 4.C1aa and grub areas to be filed to remove trees vegetation, rootA or other objectionable material that would affect the planned stability of the fill. 5.Ensure that fill material is free of brush, rubbish, rocks, IogA stumps building debris, and other materials Inappropriate for constructing stable fl11s. 6.Place all fill in layas not to exceed 9 Inches In thkknw4 and compact the layers as required to reduce erosion, slippage, settlement or other related problems 7.Do not incorporate frozen materiel or soft, mucky, or highly compressible materials into iII/ slopes. 8.Do not place fit on a frozen foundation, due to possible subsidence and slippage 9.Keep diversions and other water conveyance measures free of sediment during dl phases of development. 10.Hande seeps or springs encountered during construction In accordance with approved methods (Practice 6.81, Subsurface Drain). i1.Permanentiy stabilize dl graded areas immediately after Rod grading Is completed on each area In the grading plan. Apply temporary stabilization measures on all graded areas when work is to be Interrupted or delayed for 30 working days or longer. 12.Ensure that topsd stodkplsA borrow aea4 and spoil areas are adequately protected from erosion with temporary and find stabilization measuras4 hdudhg sediment fencing and temporary seeding as necessary. Maintenance Periodically check all graded areas and the supporting erosion and sedimentation control practices, especially after heavy rainfalls. Promptly remove all sediment from diversions and other water-dlsposol practices. If washouts or breaks occur, repair then immediately. Prompt maintenance of smdl eroded areas before they become significant gullies is an essential pat of an effective erasion and sedimentation control plan. Permanent Seeding Spechloatlons 1 6.11 - SWficatlons Seedbed Requirements Establishment of vegetation should not be attempted on sites that am unsuitable due to Inappropriate sol texture (Table 6.11a), poor drainage, concentrated overland flow, or steepness of slope until measures have been taken to correct these problems To maintain a good stand of vegetation, the sod must meet certain minimum requirements as a growth medium. The existing sal should haw these crtteia: - Enough fine -gained (sit and day) material to maintain adequate moisture and nutrient supply (avaloble water capacity of at least .05 inches water to I inch of sal) - SufRdent pore space to permit root penetration. - Sufficent depth of sal to provide an adequate root zone The depth to rock or impermeable layers such as hardpans should be 12 Inches or more, except on slopes steeper than 21 where the oddtion of sal is not feasble. - A fawrable pH range for plant growth, usually 6.0-6.5. - Freedom from large roots, branches, stones, large clods of earth, or trash of any kind pods and stones may be left on slopes steeper than 3:1 If they are to be hydroseeded. If any of the above attain am not met -Le, if the existing sol is too coarse, dense, shallow or addle to foster vegetation -special amendments are required The sal conditioners described below may be bane" or, preferably, topsail may be applied In accordance with Practice 6.04, Topsoing. Sol Conditioners In order to Improve the structure or drainage charactaistks of a spa the following material may be added These amendments should only be necessary where sas have limitations that make them poor for plant growth or far fine turf establishment (see Chapter 3, Vegetathe ConsMaratlons). Peat -Appropriate types are sphagnum moss peat, hypnum moss peat reedsedge peat or peat humus, all from fresh -water sources Peat should be shredded and conditioned In storage pies for at least 6 months after excavation. Sand -dean and free of toxic materials Vermiculite-hovrticulturd grade and free of toxic substances. Rotted manure -stable or cattle manure not containing undue amounts of straw or other bedding matertds Thoroughly rotted sawdust- free of stones and debris. Add 6 1b. Of nitrogen to each cubic }ad Sludge -Treated sewage and Industrial sludges are available in various forms: these should be used only In accordance with local, State and Federd regulatkns Spades Selection Use the key to Permanent Seeding Mixtures (Table 6.11b) to select the most appropriate seeding mixture based on the general site and maintenance factors. A listing of spades, Including sdentif c names and cl arocterisstks, is given In Appendix II02 Seedbed Preparation Install necessary machankwl erosion and sedimentation control practices before seeding, and complete grading according to the approved plon. Line and fertilizer needs should be determined by sol tests Sol testing Is performed free of charge by the North Carolina Department of Agriculture sal testing laboratory. Directions, sample cwton4 and Information sheets are available through county agricultural extension offices or from NCDA. Because the NCDA sal testing lab requires 1-6 weeks for sample tum-oroun4 sampling must be planned well in advance of find grading. Testing Is also done by commercid laboratories. Men soil test ore not awlable, follow rates suggested on the Individual specification sheet for the seeding mix chosen (Tables 6.11c through 6.11v). Applkaations rates usually fall into the following ranges: - (round agricultural limestone Llght-textured sandy sas; 1-1 1/2 tons/acre Heavy textured clayey sas 2-3 tons/acre - Fertilizer. grasses 800-1200 Ib/acre of 10-10-10 (or the aquivenant) Grass -legume mixtures: 800-1200lb/ocre of 5-10-10 (or the awhdent) Apply line and fertlkar evenly and Incorporate Into the top 4-6 inches of sal by disking or other suitable means Operate machinery on the contour. Milan using a by roseeder, apply Ilene and fertfaer to a rough, loose surface. Roughen surfaces according to Practice 6.03, Surface Roughening Complete seedbed preparation by breaking up large cods and raking Into a smooth, uniform surface (slope less #:+an 3 1) FN In or level depressions than can collect water. Broadcast seed Into a freshly loosened seedbed that has not been seeed by rahfail. Table 6.10o - Temporary Seedng Recommendation for Late Minter and Easy *hg Seeding mixture Species- R*grah), Annual lespedazo (Kobe In Piedmont and Coastal Plain Rate (ib/sae)- 120 Omft annual lespedeza when duration of temporary cover is not to extend beyond Jinn Seeding dates -Coastal Plop - Dec. 1 - Apr. 15. Soi amendments- Fellow recommendations of sod tests or apply ZOOO b/acre ground o7kulturd limestone and 750 Ib/acre 10-10-10 fertilizer. Mulch -Apply 4,0001b/acre straw. Anchor straw by tacking with asphdt netting or a mulch anchoring tool. A desk with blades set ready straight can be used as a mulch anchoring toot Ma tance - Refertiae if growth is not fuly adequate. Reseed, rofartfize and mulch Immediately foflowhg erosion or other damage. Table 6. lob - Temporary Seeding Recommendations for Summer Seeding mixture Species -German millet Rate(Ib/acre)- 40 Seeding dates -Coastal Ptah- Apr. 15-Aug. 15 Sol amendments -Follow recommendations of soi tests or apply ZOOO b/acre ground agriculture' limestone and 750 Ib/acre 10-10-10 fertilizer. Mulch -Apply 4,000 lb/acre straw. Anchor straw by tacking with asphdt, netting or a mulch anchoring tool. A disk with blades set nearly stroight can be used as a mulch anchoring tool. Maintenance-Refertiae if growth is not fully odaWate. Reseed refertlae and mulch inmedfatdy following erosion or other damage. Table 6.10c - Temporary Seeding Recommendation for Fall Seeding mixture Species-Rye(grain) Rate(Ib/aae) - 120 Seeding dotes - Coastd Plain and Piedmont -Aug 15 - Dec. 30 Soi amendments - Fellow soil tests or apply ZOOO lb./sae grand agricultural limestone and 1,000 Ib/acre 10-10-10 farther. Mulch- Apply 4,000 b/acre straw. Anchor straw by tacking with asiI netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tod. Maintenance- Repair and refertlize damaged areas knmedi a(y. Tapdress with 50 lb/sae of nitrogen In Mach, If It is necessary to extend temporary aver beyond ,.tone 15, overseed with 50 Ib/aae Kobe (Piedmont and Coastal Ptah) P Outlet Stabilization Structure Specification / 6.41 - Construction Specifications 1. Ensure that the subgrode for the titer and rorap follows the required lines and grades shown in the plan. Compact any 1I1 required In the subg►ade to the density of the surrounding undisturbed material. Low areas In the subgrads on undisturbed sol may also be flied by Inaea+hg the nprop thickness. 2 The rorap and grovel liter must conform to the specified grading limits shown on the plans J. Filter cloth, when used, must meet design requirements and be property protected from punching or tearing during Installation. Repair any damage by removing the nprao and placing another piece of After cloth over the damaged area All connecting joints should overlap a minimum of I ft If the damage is extensive, replace the entire fitter cloth. 4. Rioray may be placed by equipment but take are to avoid damaging the titer. 5. The mhkmum thickness of the rJorop should be 1.5 times the maximum stone diameter. 6. Riprap may be field stone or rough quarry stone It should be had, angular; highly weather -resistant and well graded 6. Construct the apron an zero grade with no overfdl at the end Make the top of the riprao at the downstream and level with the receiving area or slightly below it 8. Ensure that the apron is propafy aligned with the receiving stream and preferably straight throughout its length. If a curve is needed to fit site condition4 place it in the upper section of the apron. 9. Immediately after construction, stabilize ell disturbed areas with vegetation (Practice 6.10, Temporary Seeding, and 6.11, Permanent Seeding). Maintenance Inspect riorap outlet structures after hem rams to see if any erosion wound or below the ryra, has taken place or if stones haw been dislodged Immediately make all needed repairs to prevent further damage. Sf Sediment Fence (2t Fence) Sperdflcattion 6.62 -Construction Specifications MAIMALS 1.11m a synthetle Star fabric ar a pervious sheet of polypropylene, nyon, polyester, or pd)eth)lene An, which is certified by the manufacturer or supplier as conforming to the requirements shown in Table 6.62b. Synthetic liter fabric should contain uitroviolet ray h0fim and stabilizers to provide a mhhum of 6 months of expected usable construction life at a temperature range of 0 to 120 F. 2Ensure that posts for sediment fences are either 4-Inch diameter pile, 2-hail dimeter oak or 1.33 b/llhew ft steel with a minimum length of 4 ft Make sum that steel posts haw projections to faditate fastening the fabric. 3For rabbi rcanent of standard strength After fabric, use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches. Table 6.62b 4edftc rtlorhs For Sediment Fence Fabric Phyekd Property RaWkwnwts Fitering Efficiency - 85X (mm) Tensile Strength at Standard Strength- 30 ►b/1n In (mir) Extra Strength- 50 1b/1ki in (mm) Slurry now Rate - 0.3 gd/sq ft/min (min) CONSTRUCRON 1.Construct the sediment barter of standard strength or extra strength synthetic filter filbr(cs 2&mn that the height of the sediment fence does not exceed 18 Inches above the grand surface. (Higher fences may Impound voiumas of water sufficient to cruse failure of the structure.) 3.Construct the filter fabric from a continuous roll cut to the length of the border to avoid Jokits Men Joints are necessary, securely fasten the liter cloth any at a support post with overlap to the next post 4.Support standard strength liter fabric: by wire mesh fastened securely to the up slope side of the posts using heavy duty wire staples at least 1 inch long, or tie wires, Extend the wire mesh support to the bottom of the trench. 5-Man a wire mesh support fence is used space posts a maximum of 8 ft apart Support posts should be driven securely Into the ground to a minimum of 18 hchas 6.Extra strength Star fabric with Eft post spacing does not require we mesh support lance. Staple or wire the liter fabric directly to posts 7.Exavvte a bench approximately 4 how wile aid 8 inches deep dung the proposed the of posts and upshpe from the ba rw (figure 6.62a). 8.8adkfll the trench with compacted sol or gravel placed over the liter fabri. ADO not attach liter fabric to existing iron Maintenance inspect sediment fences at least once a week and after each rainfall. Make any required rgoairs Imedately. Should the fabric of a sediment fence collapse, tear, decompose or became heffectivm4 replace it promptly. Replace burlap every 60 days. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence Take care to avoid undermining the fence during deanout Remove of fencing materiels and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized Ternp2cga Sediment Trap - continued Protection from plphg - Place liter cloth on the foundation below the rprkp to prevent piping. An alternative would be to excavate a keyway trench caps the nprap foundation and up the Was to the height of the dam. Weir length and depth - Ka* the spillway weir at least 4 ft long and sized to pass the peak discharge of the 10-yr storm. A madma flow depth of 1 ft. a mhkum freeboard of 0.5 ft and ma dma aide slopes of 21 are recommended Nbir length may be selected from Table 6.60a shown for most site locations h North Carolina Table 6.60a Design of Spilh►ays Drahop Area Nair Langth(1) (acres) (ft) 1 4.0 2 6.0 3 8.0 4 fao 5 12.0 (1) Dimensions shown are minimum Construction Specifications I. pea; grub, and a# the area under the embankment of of vegetation and root mat Remove ell art" sol eontahhg high amounts of organic matter and stociple or depose of R property. Had ell objectionable material to the di ig ated depoed area. 2 Ensure that f1 material for the enbanlkhent is troe of roots, woody vegetation, organic matter, and other objectionable motand Place the 81 In lifts not to exceed 9 Inches and machine compact it Over ill the embankment 6 Inches to allow for settlement 3. Construct the outlet section In the enmban mant Protect the connection between the nary and the sol from p4ohg by using liter fobric or a keyway cutoff trans h between the no -op structure and the sal. (Place the fitter fabric between the rjoryo and sol. Extend the fabric capes the spillway /ondatlon and sibs to the top of the darn; or (Excavate a keyway trench ding the oentarihe of the spilway foundation extending up the s(des to the height of the darn. The trench should be at least 2 ft deep and 2 R web with 1: I side Slopes 4. pear the pond aroo below the elevation of the crest of the spillway to facilitate aedinent deanout 5. AN cut and N alopes should be 21 or flatter. 6. Enere that the stone (drainage) section of the anbaiarant has a minhlum bottom width of 3 R and maxhurn aide slopes of 1:1 that extend to the bottom of the WNNY swum 7. Construct the minimum thished stone soil bottom width, as shown an the plans, with 2:1 aide stapes extending to the top of the over tiled embankment Keep the thborim of the sloes of the spill outet structure at a mhMum of Z inai' . The weir moat be level and constructed to grade to assure design Capacity. 8. Material used In the stone section should be a roll -graded m&bure of stone with a d50 she of 9 Inches (class 8 erosion control stone is recmrnanded) and a maximum stare she of 14 Inches. The stone may be machine placed and the snarler stones walked Into the voids of the loge stones The stone should be had angular; and higMy reotha-reeletant 9 Ensure that the stare spillway outlet section extends downstream past the toe of the emban anent and stable conditions are reached and outlet velocity is acceptable for the receiving strew. Keep the edges of the stone outlet section flush with the surrounding grand and shape the center to confine the outflow stream (Refannces: Outlet Protection) to Direct emergency b)pasa to naturd, stable areas locate b)peea outlets so that Now of not damage the anbanknent It. Stabilize the anbanknent and al disturbed areas dove the sediment pod and downstream from the bap Imedotely after con4truction (References SLrfuce Stablizawon 12 Show the distance from the tap of the spillway to the sadimarit deanout level (one -hail the design depth) on the pins aid mark ft in the fldd ilahtanance Inspect temporary sediment traps after each period of sfgniticmt rainfall Remove sediment and restore the trap to its arighd dimensions when the sediment has accumulated to one-half the design depth of the tray. Place the sediment that Is removed h the designated disposal area and replace the contaminated pat of the gro►d facing Check the structure far damage from aroakrh Or pyhg Periodically check the depth of the spillway to ensure It Is a mhhum of 1.5 R below the low point of the embankment Immediately IN any settlement of the ambanbrhant to slightly above do* grads. Any riprW doaced from the spuway must be replaced immediately. After d sediment -producing aeon hero been permanently stabiaed remove the structure and di unstable sediment Smooth the area to Nand wrth the odJoknhg areas and srtabl&e popery (References SLrlbce Stdbilzatkn). rr9r_--t1-1. Grass -Lined C,inrnnels SpedficaUon 16 30 - construction Spedikations 1. Remove ell trees brush, stumps, and other ob*b'oma`ie me rid from the foundation area and dispose of properly. 2 Excavate the chmnel and shape it to neat lines and dimensions shown an the plans plus o 0.2 R overeat arround the channel per m to to allow for &*Ing during seedbed reparations and sod buildup. 3 Remove and aaany dkyose, of all excess sod so that surface water may enter the channel tredy. 4. The procedure wed to establish grass in the cnand wil depend upon the severity of the onditims and selection of species Protact the chanei with mulch or a temporary liner sufficient to withstand anticipated velocities drhgthe establishment period (Appendix 8.05). Maintenance Axing the estda'dment period check Wass -lead channels after every rainfall. After grass is established periodically cheek file chard; theca it after every heavy rainfaf event Immediately make reps. ft is parbalafy knprtant to check the channel outlet and ail rood crossings for bank stability and evidence of pyng or scour holes Remove all significant sediment accrxnufations to rraintain the designed carrying capacity Keep the grass in a health, vigorous anaUtion at all tiles, since it is the primary erosion protection for the channel (Proctice 6.11, Permanent Seeding). Table &Ila - Seeding No. 4CP for. Nil-Dmhed Sandy bans to Dry Sands, Coastal PMh; Low to Medlurm-Care Lowns Seeding mixture Species - Centipedegross - Rate - 10-20 b/acre (seed) or 33 tw/ocre (sprigs) Seeding dates - Ma. - Jane, (Sprigghg can be done through ,,Uy wham rate b available for Irrigation.) Sol amendments - Apply lime and fe tilizar according to sal test, or apply 300 h/aare 10-10-10. ,**Ing - Plant sprigs h furrows with a tractor -drown transplanter, or broadcast by hand Furrows Should be 4-6 idles deep and 2ft apart Place sprigs about 2 ft ai:�at In the row with one and at or above ground level (Figure 6.1ld). Broadcost at rates shown above, and press *d9a Into the top 1 1/2 inches of sol,with a disk set straight w that sprigs am not brought bock toward the Mulch - Do not mulch Mohtahance - Fardtze very sparingly- 20 tb/aae nitrogen In sprnq with no phosphorus Centaed%rass cannot tolerate high pH or excess fertiaer. Maintenance Table 6.11t - Seeding No, 50P for: Wall -Drained Sandy Looms to Dry Surds; Low Seeding m&bxe Species Rate (b/sae) Pensacola ftlograss 50 Sekea kspedezo 30 Common Bermudogross 10 German millet 10 Seeding notes 1. Mere a neat appearance is desired omit soidow 2 Use common Bemnudograsa only an isolated apes There rt cannot become a pest Bemudogross may be replaced with 5 In/ocre cenGpedgrass. Seeding dates - Apr. 1 - Ady 15 Sol amencamts - Apply The and ferdizar accordhg to will testa or apply 3,000 b/sae grand agricultural limestone and 500 1b/acre 10-10-10 fertiaer, Adrh Apply 4,000 eb/acre grain straw or oWhdent cover of another suitable mulch. Mow by tacking with asphalt roving and netting or by ainpng with a mulch ancharhg tool. A dtelk with bides set nearly stroot can be used as a mulch anchoring too. Maintenance - Refer Ize the folowhg Apr. with 50 b/aaa nitrogen. Repeat as growth requires May be moved any ante a year. Mare a neat appearance is desired am# widow and now as often as needed Table 6.11 v - Seeding 14;,. 7CP for Grass -lined panel; Coasid Plain SpeSeething Mixture dw - Cannon Bamudograss - Rate - 40-80 (1/2 ib/1,000 ft ) Seeding dates - Coastd Ptah; Apr - Ady Sol anen6nents - Apply lime and fertilizer according to sal tests, or apply 3000 b/sae ground agri,%iturd limestone aid 500 Ib/sae 10-10-10 ferdizar. Mulch - Use jute, excelsior matting, or other effective channel lining matend to cover the bottom of dwrnsis and al The Ikhg should extend above the highest xwlmlated depth of slow. On cannel side slopes dhow this height and In ddnagn not requiring tamporary linings, apply 4,000 lb/aae groin straw and wow straw by stalling netting over the tap. MUcn and motioning materials must be allowed to wash doiwn slopes where they can dog drainage devices. Maintenance -A minimum of 3 weeks is required for establishment Inspect and repair mulch frequently. Re*Utze the following Apr. with 50 blame Refs to Appendix 8.02 for botankd names I ) I HARDWARE CLOTH & ORA a N1LET PR07ECTKil1 5lmedfication 16.51 - Cautruction 5paci icattana 1. Uniformly grade a shc4ow depression approaching the Not 2 Drive 5 FT steel past 2 FT Into the grand summing the filet. Spore post evenly around the perimeter of the Wet a maimm of 4 FT apart 3. Sixrond the posts wrt wire mesh hardware cloth. Secure the wire most to sted posts at the top: mfdde, and bottom. Pacing a 2 FT flop of the wire mesh. under the gravel for mchorhg Is recommended 4. Place dean gravel (NC DOT its or 157 atone) an a 21 sipper with a height of 16 bow wound the wn and smooth to an am grode. 5 Orm the cantrbutkg drainage area has been stabilized , remove accknu{ated sediment and wtabiish And grading devotions. 6. Compact tiro area prapnrly and stabilized R with grand cover. Maintenance Inspect filets at least reaky and after each sofficant (a5 n or greater) rahfal event pea the mesh wire of any debris or other obpcts to provide adoWde flow for subsequent robs Take are not to damage or undercut the wire mesh &OV semen t removd. Replace stone as needed COMPACTED FILL OR GRAVEL, EXTENSION OF FABRIC AND MIRE INTO THE TRENCH 6 F NOTE.• 1111� SEE NARRATIVE FOR MORE DETAIL ISOMETRIC VIEW FILTER ON OF AND WIRE BACKFILL MINIMUM 8" E TRENCH THICK LAVE OF GRAVEL COMPACTED FILL S'MINIMUM 8 "MINIMUM FILTER FABRIC 4'MINIMUM SECT sF SEDIMENT FENCE C SILT FENCE Practice 6.62 NTS Sediment Basin S0edRcotions 16.61 - Construction 510edflcations 1.Site preparations -pear, grub and step topsof from areas under the ambonli ment to remove trees, vegetation, roots and other objectionable material. Delay clearing the pod area untl the dam is complete and than remove brush, trees and other objectionable materials to facilitate sedhvent deanout StocA* all tepeol or sot containing organic matter for use on the outer shelf of the enbakmmat to faolitate vegetative establishment Place temporary sedirnent control measures below the bash as needed 2Cut-off traodn-Excavate a cut-off trench along the centerline of the earth fill ambonlawt. Cut the trench to stable sal materiel, but In no case make If Ins than 2 ft deep. The cut-off trench must extend Into both abutments to at Mat the elevation of the riser crest Make the minkhwn bottom wklth wide enough to p"lt operation of excavation and compaction equjoment but In no case leas than 2 fir Make aide slopes of the trench no steeper than 1: 1. Compaction raW ements are the same as those for the embankment Keep the trench dry during bockilhg and oanpoctkn operations 3.Embarnknemt-Toke All material from the approved auras shown on the plans It should be dean minerd sal, free of roots, woody vegetation, rocks and other objectionable materiel. Scarily areas on wfikh All is be placed before placing fil, The IN material must contain sufficient moisture so it can be famed by bond into a ball without crmblhg If water can be squeezed at of the bad, it is too wet for proper oanpoctlon. Place All material in 6 to 8-hch continuous layers over the entire length of the 81 area and than compact it Canpoctkn may be obtained by routing the construction haling equipment over the ill so that the entire surface of each layer is travemed by at least one wheel or broad bode of the heavy equipment or a compactor may be used Construct the embankment to on elevation 10% higher than the design hoot to allow for settling. 4.Condult spillways -Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure at connections between barrel sections by approved watertight assemblies Place the barrel and riser on a firm, smooth foundation of impavkus soil. Do not use pervious motarid such as send, grovel, or gushed stone as badffi around the pioe or anti -seep collars. Place the 1i material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the same density as the adjacent enmbakaent Care must be taken not to raise the pipe tram Aim contact with its foundation when compacting under the pipe hauncros Place a minimum depth of 2ft. of hand -compacted baddil over the pipe spillway before crosubg It with construction equipment Minor the now In place by concrete or other satisfactory moms to prevent flotation. In no nose should the pipe conaluf be Installed by cutting a trench through the dam after the embankment is complete. 5.Emergency cup *y-hand the emergency spillway In undisturbed sol The achie►ernant of pinned elevations; grade, design width, and entrance and exit channel elapse are aftkd to the successful operation of emergency spillway 6.1rJeta-Discharge water Into the bash in a manna to prevent arodon. Use dlersAw with outlet protection to dhwt sediment -laden water to the upper end of the pod area to Improve bash bap efficiency (References: Runoff Control Measures and Outlet Protection). 7.Eroelon conbd-Conshuct the structure so that the disturbed area is minimized Dhert a wkw water away from bare amps Complete the embankment before the area is cleared Stabilize the emergency spillway, embankment and al other dahrbod areas above the crest of the principal spillway immediately after construction (Refemneew Surface Stabilization). &Safety-Sedinamt basins may attract chid -an and can be dangerous Avvld steep sick slope4 and fence and mark basks with warning signs if trespassing Is likely. Fdow all state and local requirements Maintenance Cheda sediment basins after periods of significant runoff. Ramove sedinent and restore the bash to Its original dimensions when sediment accumulates to one- half the design depth. Chadic the embankment sp#wo)% and outlet for erosion damage, and Inspect the embankment for piping and settlement Make aN necessary repairs amedatdy. Remove ell trash and other debris from the riser and pod area. OVERFILL 6" _37, FOR SETTLEMENT �i11 4'MINIMUM i EMERGENCY \� a���� BYPASS 6" BELOW X�2:1 SIDE, SETTLED TOP OF DAM /�/, ¢/SLOPE MAX. NATURAL GROUND SECTION VIEW I-w- SMINIMUM WASHSTONE 1' NOTE: THICK ON FACE SEE NARRATIVE FOR FROM TOE OF DAM 5'MINIMUM MORE DETAIL. TO WEIR. 1,800 CF / ACRE M I2:1 SIDE SLOPE MAX. I M= 3 VARIES n= 0.03 9 GRASS LINED WITH CENTIPEDE BERMUDA OR EQUILVALENT 3: 1 GRASSED CHANNEL N.T.S PUBLIC ROAD CE ENTRANCE/EVE DETAIL Practice 6.06 N TS >C 2:1 SIDE Ln SLOPE MAX. CROSS SECTION Q TEMPORARY SEDIMENT TRAP Practice 6.60 NOT TO SCALE 19 guage hardware 4 FT Max (1/4 mesh openings; Steel "T" Post with projections. - - - - - - - - - - - - - - - - - - - - - - - - - - - - (1.25 Ib/linear FT steel minimum length 5 FT) NCDOT #5 or #57 Washed stone 2- 11 16" l �r I �� �����/�)j��j��j��j��j��j� �� Drive Posts minimum 2 F- irto the ground. HARDWARE CLOTH & GRAVEL INLET PROTECTION PRACTICE 6.51 NOT TO SCALE AN�ER �IORTEX EL=15.8 #57 WASHED o 4 0 ONE 0 0�o 0 WITH 0 0�0SPACING 0 0C� L1,1/2"HOLES 2 EL=/13.0 ,A , j�\�l \\\\�� - ��j��j��j��j��/��" 18" HDPE TEE � 18'HDPE OUTLET PIPE p . CONCRETE ANTI- FLOTATION BLOCK ark a .. TEMPORARY OUTLET STORAGE STRUCTURE DETAIL BASIN 1 NOT TO SCALE ,, �E iVOR TEX EL=12.2 #57 WASHED STONE O OW0 0 0�0 O 0 1/2"HOLES WITH A� 0 0Wo 0 0� 3" SPACING iz EL = 8.0 CID 18" HDPE TEE � 18"HDPE OUTLET PIPE El 11 ..,-CONCRETE ANTi- c. ° FLOTATION BLOCK t� . a a .. TEMPORARY OUTLET STORAGE STRUCTURE DETAIL BASIN 2 NOT TO SCALE rl_ MAY 0 A 2013 BY_' 4' �0 0o 0 o cm o 0 o REFERENCE EROSION CONT7?C 000(00 CALCULA7ONS FOR SPECIFIC mamooUok DIMENSIONS. . SET PIPE DIAMETER (Do) d50 = REFERENCE EROSION CONTROL CALCULATIONS dMAX = REFERENCE EROSION CONTROL CALCULATIONS Lo = REFERENCE EROSION CONTROL CALCULATIONS MIN. APRON THICKNESS = 4.5' NOTE: FILTER FABRIC IS TO BE PLACED UNDER ALL STONE OUTLET PRZTECTION. OUTLET PROTECTION DETAIL NOT TO SCALE LI(,LIVJt 13Y L-Z11U C OASTA. L t- ,r -r- r- -- __1 Z ---_� - arz xoavOC , o,Sw -4;(v O Z (1-1Q :' `y vo-� W Q� moo _ Z __J2 l E � Z; J O � a 0 `�- Q ZOZ '�, - "y.g" O. Q J Z tL `U N 1. � oars LW �O Q Z -t s oa-q J '< O �� Ny b � .o 0 : �j` b;Eo c LL. ` L f� ,:5 oo FO- UO - V) ,. I�oEs -J 0 Z Q Z J U Q_� 2 o ZU N O O� c J � to O U J N O N v- '0ZZ v � U'� h_ Zi � � O QZ - - - , Q� z��,: E- O : Z cc 5 .:, Q� r zo Z �uCL�ci_ ct oQ Z O�WQ1j O W oo �- JZI O -- _) � - - --- �\,k1i1111/f/ 2: \\\\ N• CAofO/,, W? SEAL 7 ',� I >- 254 r „ , -, l �,*� GNx: /, E,\ - I ,/Z ._____� - -1; -- .._ _.._.l N sir N � rn � r- r- n i' h r 0, D � r\ __ O 71 4 O O 1-1C) E 11 J I Q w ! � Q 5 an o Z < w I LJ m a a>: W M w o F O (r m al a z Z Z Q N O a : Z v N W a- W 3 o W N O H K 1- T T Li Q W kn cn o a a¢ a a S S 5 ZZ (a t` tp u7 N I- ( - DATE: 70-70`06 HORZ. SCALE., N/A I VERT SCALE: N/A LA WN B Y.-RL W CHECKED BY: HSR PROJEC 7 NO.. 05- 0043 >EC6' 7 Sheet No. Of _ Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff coeff Area x C Tc Rain (1) Total flow Cap full Vel Pipe Invert Elev HGL Elev GrndIRImElev Line iO Llne To Incr Total Incr Total Inlet Syst SIYe Slope On Up On Up On Up Line (ft) (ac) (ac) (C) (min) (min) (In/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) 00 1 End 31 0,00 2.96 0.00 0.00 ' 1.63 0.0 8.0 7.5 13.27 25.23 2.70 30 0,32 13.20 13.30 18.18 18.21 16.50 19ZO Outfall to JB1A 2 1 29 0.84 2.96 0.55 0,46 1.63 5.0 7.9 7`.6 13.27 32.17 4,22 24 1.72 13.30 13.80 18.21 18.29 19.50 18.30 1.A TO 13 3 2 91 0.00 2.12 0.00 0.00 1.17 0.0 7.4 T7 9.50 28.14 3.02 24 1.32 13.80 15.00 18.43 18.56 18.30 19.00 1.B TO 1.0 4 3 157 0.00 2.12 0,00 0.00 1.17 0.0 6.5 7.8 9.50 15.15 .3.02 24 0.38 15.00 15.60 18,56 18.80 19,00 20.90 1.0 TO 1.1) 5 4 51 0.24 0.39 0.55 0.13 0,21 5.0 5.6 8.0 1.75 15.93 0.99 18 1.96 15.60 16.60 18,93 18,94 20.90 20.50 1.1) TO 1..E 6 5 21 0.15 0.15 0,55 0.08 0,08 5.0 5.0 8.1 0.67 4.83 0.55 15 0.48 16.60 16.70 18.95 18.95 20.50 20.50 1 E TO 1 F 7 4 158 0.98 1.73 0.55 0.54 0.95 5.0 5.1 8.1 T75 6.40 4.39 18 0.32 15,60 16.10 18.80 19.54 20.90 20.10 1 D TO i G 8 7 21 0.75 0.75 0.55 0.41 0.41 5.0 5.0 8.1 3.36 4.83 2.74 15 0.48 16.10 16.20 19.72 19.77 20.10 20.10 1 G TO 1 H Project File: basin_1.stm Number of lines: 8 Run Date: 05-03-2013 NOTES: Intensity = 185.06 / (Inlet time + 28.20) ^ 0.89; Return period = 25 Yrs. ; Total flows limited to inlet captured flows. ; c = cir e = ellip b = box Hydrallow Storm Sewers 2008 vizw Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff coeff Area x C Tc Rain (1) Total flow Cap full Vol Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID Line To Incr Total Incr TotaF Inlet Syst Size Slope On Up On Up On Up Line (ft) (ac) (ac) (C) (min) (min) (In/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (tt) (tt) (ft) 00 1 End 49 0.00 6.72 0.00 0.00 3.41 0.0 9.6 7.3 27.80 228.5 3.93 36 10.00 8,00 12.90 16.92 16.99 12.00 18.50 OUTFALL TO 2A 2 1 86 1.55 6.72 0.70 1.09 3.41 5.0 9.2 7.3 27.80 69.69 3.93 36 0.93 12.90 13.70 16.99 17.12 18Z0 17.50 2A TO 28 3 2 238 0.45 5.17 0.45 0.20 2.33 5.0 8.2 7.5 18.96 25.92 3.86 30 0.34 13.70 14.51 17.13 17.56 17.50 19.00 2E TO 2G 4 3 23 0.40 0.40 0,45 0.18 0.18 5.0 5.0 8A 1.47 6.36 1.20 15 0.83 14.51 14,70 17.77 17.78 19.00 19.00 2G TO 2H 5 3 216 0.00 4.32 0.00 0.00 1.94 0.0 7.1 7.7 15,84 25.11 323 30 0.32 14.51 15.20 17.63 17.91 19.00 20.30 2G TO 21 6 5 82 0.53 0.73 0.45 0.24 0.33 5.0 5.6 8.0 2.68 7.95 1.51 18 0.49 15.20 15.60 18.03 18.08 20.30 19.60 21 TO 21 7 6 23 0.20 0.20 0.45 0.09 0.09 5.0 5.0 8.1 0.73 4.61 0.60 15 0.43 15.60 15.70 18.11 18.11 19:60 19.60 2J TO 2K 8 5 132 0.52 3.59 0.45 0.23 1.62 5.0 6.5 7.8 13.16 13.49 4.19 24 0.30 15.20 15.60 17.91 18.29 20.30 19.50 21 TO 2M 9 8 23 0.24 0.24 0.45 0.11 0.11 5.0 5.0 8.1 0.88 4.61 0.72 15 0.43 15.60 15.70 18.55 18.56 19.50 19.50 2M TO 2L 10 8 143 0.00 2.83 0.00 0.00 1.27 0.0 5.8 ' 8.0 10.38 12.96 3.30 24 0.28 15.60 16.00 18.39 18.65 19.50 20.40 2L TO 2N 11 10 80 0.96 1.46 0.45 0.43 0.66 5.0 5.3 8.1 5.35 6.97 3.03 18 0.37 16.00 16.30 18.67 18.85 20.40 19.90 2N TO 20 12 11 23 0.50 0.50 0.45 0,23 0.23 5.0 5.0 8.1 1.83 4.61 1.49 15 0.43 16.30 16.40 18.96 18.98 19.90 19.90 20 TO 2P 13 10 108 0:63 1.37 0.45 0.28 0.62 5.0 5.2 8.1 5.02 6.92 2.84 1.8 0.37 16.00 16.40 18.69 18.90 20.40 19.80 2N TO 20 14 13 23 1 0.74 0.74 1 0.45 0.33 0.33 1 5.0 5.0 8.1 2.71 4.61 2.21 15 0.43 16.40 16.50 i 18.95 � 18.99 11 19.80 19.80 2Q TO 2R BASIN-2 Number of lines: 14 Run Date: 05 03.2013 NOTES: Intensity = 185.06 / (inlet time+ 28.20) ^ 0.89; Return period = 25 Yrs. ; Total flows limited to inlet captured flows. ; c = cir e = ellip b = box Hydraflow Storm Sewers 2008 v12.01 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C To Rain Total Cap Val Pipe Invert Elev HGL Elev Grnd / Rim Eiev Line ID coeff (I) flow full Line To Incr Total Incr Total inlet Syst Size Slope On Up On Up On Up i Line (ft) (ac) (ac) (C) (min) (min) (In/hr) (cfs) (cfs) (ft/9) (in) (%) 00 (ft) 00 (ft) (ft) (ft) 1 End 31 0.00 8.20 0.00 0.00 3.69 0.0 9.3 7.3 26.99 41.04 3.82 36 0.32 15.00 15A 0 18.49 18.53 20.00 23.00 OUTFALL TO 3.A 2 1 185 0.95 8.20 0.45 0.43 3.69 5.0 8.5 7,5 27.50 44.44 3.92 36 0.38 15.20 15.90 18.53 18.78 23.00 22.00 3,A TO 3.8 3 2 137 1.00 1,92 0.45 0.45 0.86 5.0 5.1 8.1 7.01 6.87 3,97 18 0.36 17.00 17.50 18.78 19.30 22.00 21.60 3.6 TO 3.0 4 3 23 0,92 0.92 0.46 0.41 0.41 5.0 5.0 8A 3.37 4.61 2.75 15 0.43 17.50 17.60 19.43 19.48 21.60 21.60 3.0 TO 3.D 5 2 1.1 0.92 5.33 0.45 0.41 2.40 5.0 8.5 7.5 17.89 42.37 3.65 30 0.91 15.90 16.00 18.81 18.83 22.00 22.00 3.6 TO 3.E 6 5 287 0.85 3,17 0.45 0.38 1.43 5.0 7.1 7.7 11.00 12.94 3.50 24 0.28 16.00 16.80 18.85 19.43 22.00 19.90 3.E TO 31 7 6 23 0.41 0.41 0.45 0.18 0.18 5.0 5.0 8.1 1.50 4.61 1.23 15 0.43 16.80 16.90 19.59 19.60 19.90 19.90 3.F TO 3.G 8 6 190 0.53 0.92 0.45 0.24 0.41 5.0 5.3 8.1 3.34 6.91 1,89 18 0.37 16.80 17.50 19.56 19.72 19.90 21.00 3.F TO 3.1­1 9 8 23 0.39 0.39 0.45 0.18 0.18 5.0 5.0 8A 1.4.3 4.61 1.17 15 0.43 17.50 17.60 19.76 1977 21.00 21.00 3.1­1 TO 3.1 10 6 124 0.00 0.99 0.00 0.00 0.45 0.0 6.1 7.9 3,53 7.22 2.00 18 0.40 16.80 17.30 19.55 19.67 19.90 20.30 3.G TO 3.J 11 10 59 0.81 0.99 0.45 0.36 0.45 5.0 5.6 8.0 3.57 6.62 Z02 18 0.34 17.30 17.50 19.67 19.73 20.30 20.00 3.JTO3.K 12 11 20 0.18 0.18 0,45 0.08 OM 5.0 5.0 8.1 0.66 4.95 0,54 15 0.50 17.50 17.60 19.79 19.79 20.00 20.00 3.K TO 31 13 5 100 0.58 1.24 0.45 0.26 0.56 5.0 5.2 8.1 4,52 6.23 3.13 18 0.30 17.60 17.90 18,83 18.97 22.00 21.40 3.E TO 3.M 14 13 23 0.66 0:66 0,45 0.30 0:30 5.0 5.0 8.1 2.42 4.61 2,09 15 0.43 17.90 18.00 19,07 19.08 21.40 21.40 3.M TO 3.N Project File: Basin_3.stm Number of lines: 14 Run Date: 05-03-2013 NOTES: Intensity = 185.06 / (Inlet time + 28.20) A 0.89; Return period = 25 Yrs. ; c = cir e = ellip b = box TEMPORARY SEDIMENT TRAP SUMMARY: MIN. TRAP VOL - Z700 CF/ACRE DISTURBED AREA (25 YEAR STORM) (SEDIMENT MUST BE REMOVED TWICE A YEAR) 10 YR SEDIMENT DISTURBED MINIMUM TRAP WEIR DEPTH FLOW MIN. SURFACE LENGTH WIDTH IBAE AREA_(ACRE% YOLUME (Go LENGTH (En = L= AREA(M im �m 1 0.73 1,971 4 5 1.78 775 39 20 2 0.20 540 4 5 0.49 213 11 20 3 0.72 1,944 4 5 1.76 787 39 20 4 0.44 1,188 4 5 1.08 470 24 20 5 0.29 783 4 5 0.71 309 16 20 TEMPORARY SEDIMENT BASIN SUMMARY: MIN. TRAP VOL - 2,700 CF/ACRE DISTURBED AREA (25 YEAR STORM) CFS - (0.3)(9.7)(AREA) (SEDIMENT MUST BE REMOVED TWICE A YEAR) 10 YR SEDIMENT DISTURBED MINIMUM BASIN VOLUME FLOW MIN. SURFACE SURFACE AREA BAN AREA CR'ESi VOLUME (W PROVIDED (CFy L= AREA (50 PROVIDED (S 1 3.46 9,342 20,919 10.06 4,382 6,892 2 7.32 19,764 45,959 21.30 9.278 10,124 3 10.15 27,405 59,454 29.54 12,868 29,427 4 13.92 37,584 74,005 40.51 17,648 23,897 Hydfafiow Storm Sewers 2006 v12.01 Storm Sewer Tabulation Page 1 Statlon Len Drng Area Rnoff coeff Area x C To Rain (1) Total flow Cap full Vol Pipe Invert Elev HGL Elev Grnd /Rim Elev Line ID Line To Line Incr Total Incr Total inlet Syst Size Slope On Up On Up On Up (tt) (ac) (ac) (C) (min) (min) (In/hr) (cfs (cfs) (ft/9) (1n) (%) (ft) (ft) (ft) (tt) (tt) (ft) 1 End 44 0.00 2.63 0.00 0.00 1.14 0,0 7.0 7.7 8,83 21.18 1.80 30 0.23 15.00 15.10 18.49 18.51 20.00 23.00 OUTFALL TO 3A. 2 1 197 0.00 2.63 0.00 0.00 1,14 0.0 6.4 7.9 8.98 10.87 5.08 18 0.91 15.10 16.90 18.51 19.73 23.00 22.00 3A.A TO 3A.B 3 2 119 0.30 0.85 0.45 0.14 0.38 5.0 5.2 8.1 3.10 6.60 1.75 18 0.34 16.90 17.30 20.09 20.18 22.00 21.40 3A.6 TO 3A.0 4 3 23 0.55 0.55 0.45 0.25 0.25 5.0 5.0 8.1 2.02 4.61 1:64 15 0.43 17.30 17.40 20,18 20.20 21.40 21.40 3A.0 TO 3A.D 5 2 150 0.95 1.78 0.45 0.43 0.76 5.0 5.2 8.1 6,16 6.57 3.49 18 0.33 16.90 17,40 19.95 20.39 22.00 20.90 3A.8 TO 3A.E 6 5 23 0.83 0,83 0.40 0.33 0.33 5.0 5,0 8.1 2.71 4.61 2.20 15 0.43 17.40 17.50 20.50 20.53 20.90 20.90 3A,E TO 3A.F Basln_3A Number of lines: 6 Run Date: 05-03-2013 NOTES: Intensity = 185.06 1 (inlet time + 28.20) ^ 0.89; Return period = 25 Yrs. ; C = cir e = ellip b = box Storm Sewer Tabulation Hydraflow Storm Sewers 200802.01 Page 1 Station Len Dmg Area Rnoff coeff Area x C Tc Rain (1) Total flow Cap full Vol Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID Line To 7ncra)l Incr Total Inlet Syst Size Slope On Up On Up On Up (tt) (C) (min) (min) (In/hr) (cfs) (cfs) I End 31 0.00 12.00 0.00 0.00 5.33 0.0 12.3 6.8 36.32 57.15 3.78 42 0,32 14.00 14.10 19.96 20.00 20,00 23.80 OUTFALL TO 4.A 2 1 16 0.12 12.00 0.45 0.05 5.33 5.0 12.3 6.8 36.38 79.53 3.78 42 0.62 16.10 16.20 20.00 20.02 23.80. 24.20 4.A TO 4.8 3 2 34 0.26 0.26 0.45 0.12 0.12 5.0 5.0 8.1 0.95 4.95 0.78 15 0.59 16,20 16.40 20.23 20.24 24.20 24.20 4.6 TO 4.0 4 2 73 0.00 11.62 0.00 0.00 5.15 0.0 11.9 6.9 35.46 49.96 3.69 42 0,25 16.20 16.38 20.03 20,12 24.20 24.00 4.0 TO 4.13 5 4 200 0.23 9.12 0.45 0A0 4.10 5.0 10,9 7.0 28.92 60.37 3.06 42, 0.36 16.38 17.10 20A9 20.34 24.00 23.20 4.0 TO 4.D(2) 6 5 34 0.68 0.68 0.45 0.31 0.31 5.0 5.0 8.1 2,49 17,51 2.47 15 7,35 17.10 19.60 20.42 20.43 23.20 23.20 4.D TO 4,E 7 5 83 0.00 8.21 0.00 0.00 3.69 0.0 10.5 7.1 26.25 40.10 3.71 36 0.36 17A 0 17.40 20.34 20.47 23,20 23.70 4. D TO 4.17 8 7 114 0.51 3.25 0.45 0.23 1.46 5.0 7.8 7.6 11.08 12.57 3.53 24 0.26 17.60 17.90 20.49 20.72 23.70 22.40 4. F.1 TO 4. P 9 8 23 0.24 0.24 0.45 0.11 0.11 5.0 5.0 8.1 0.88 4.61 0.72 15 0.43 17.90 18.00 20.91 20.91 22.40 22.40 4.1? TO 4.0 10 8 121 0.00 2.50 0.00 0.00 1.13 0.0 7.1 7.7 8.68 14.09 2.76 24 0.33 17.90 18.30 20.80 20.95 22.40 23.50 4.P TO 4.R 11 10 138 0.43 2.50 0.45 0.19 1.13 5.0 6.3 7.9 8.86 11 :42 2.82 24 0.22 18.50 18.80 20.95 21.13 23.50 22.10 4.R.1 TO 4.S 12 11 19 0.85 0,85 0.45 0.38 0.38 5.0 5.0 8.1 3.12 5.08 2.54 15 0.53 18.80 18.90 21.15 21.19 22.10 22A0 4.STO4,T 13 11 178 0.00 1.22 0.00 0.00 0,55 0.0 5.5 8.0 4.42 4.06 3.60 15 0.34 18.80 19.40 21 A3 21.84 22.10 23.20 4.S TO 4.0 14 13 64 0.62 1.22 0.45 0,28 0.55 5.0 5.2 8.1 4,45 3.93 3.63 15 0.31 19.60 19.80 21.84 22.10 23.20 22.90 4. U.2 TO 4. V 15 14 19 0.60 0.60 0.45 0.27 0.27 5.0 5.0 8.1 2.20 5.08 1.79 15 0.53 19.80 19.90 22.25 22.27 22.90 22.90 4. V TO 4. W 16 7 192 0.50 4.96 0.45 0.23 2.23 5.0 9.6 7.3 16.21 22.67 4.12 30 0.26 18.50 19.00 20.51 20.75 23.70 22,80 4.R3 TO 4.G 17 16 34 0.88 0.88 0.45 0.40 0.40 5.0 5.0 8.1 3.23 5.37 2.63 15 0.59 19.00 19.20 20.95 21.02 22.80 22.80 4.G TO 4.1­1 18 16 95 0.70 3.58 0.45 0.32 1.61 5.0 9.2 7.3 11.81 17.78 4.38 24 0.53 19.00 19,50 20.83 20.95 22.80 23.40 4.G TO 4.G1 19 18 81 0.85 2.88 0.45 0.38 1.30 5.0 8.8 7.4 9.60 14.91 3.66 24 0.37 19.50 19.80 21.18 21.26 2140 22.90 4.G TO 4J 20 19 34 0.70 0.70 0.45 0.32 0.32 5.0 5.0 8.1 2.57 5.37 2.09 15 0.59 19.80 20.00 21.43 21.47 22.90 22.90 4.1 TO 4.J 21 19 199 0.00 1.33 0.00 0.00 0.60 0.0 7.5 7.6 4.57 6.25 2.71 18 0.30 1980. 20.40 21.39 21.68 22.90 24,70 4.1 TO 4,K 22 21 67 0.31 0.76 0.45 0.14 "0.34 5.0 5.4 8.1 2.76 10.77 2.36 18 0.90 20.40 21.00 2177 21.76 24.70 23.80 4.K TO 41 5.0 5.0 8.1 1.65 5.37 2.61 15 0.59 21.00 21.20 21.76 21.76 23.80 23.80 4.LTO4.M 23 22 34 0.45 0.45 0.45 0.20 0.20 24 21 90 0.42 0.57 0.45 0.19 0.26 5.0 6.3 7.9 2.02 6.57 1.34 18 0.33 20.40 20.70 21.76 21,78 24.70 23.80 4.K TO 4.N 25 24 34 0.15 0.15 :. 0.45 0.07 0.07 5,0 5.0 8.1 0.55 5.37 0.53 15 0.59 20.70 20.90 21.80 21.80 23.80 23.80 4.N TO 4.0 26 4 50 2.50 2.50 0.42 1,05 1.05 5.0 5.0 8.1 8.56 11.08 2.72 24 0.24 16.38 16.50 20.22 20.29 24.00 24.00 Pipe26 Project File: Basin_4:stm Number of lines: 26 Run Date: 05-03-2013 NOTES: Intensity = 185.06 / (Inlet time + 28.20) ^ 0.89; Return period = 25 Yrs. c = cir e = ellip b = box Storm Sewer Tabulation Hydraflow Storm. Sewers 2009 v12.01 Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vol Pipe Invert Elev HGL Elev Grnd / Rim Elev coo" (1) flow full Line ID Line To Incr Total Incr Total Inlet Syst Size Slope On Up On Up On Up Line 00 (ac) (ac) (C) (min) (min) (In/hr) (cfs) (cfs) (f /s) (In) (%) 00 (ft) ft () (ft) (ft) (ft) 1 End 33 0.00 3.13 0.00 0.00 1.41 0.0 8.7 7.4 10,45 22.58 2.13 30 0.30 14.00 14.10 19.96 19.98 0.00 23.00 OUTFALL to 4A. 2 1 176 0.00 3.13 0.00 0.00 1,41 0.0 7.4 7.7 10.79 40.33 2.25 30 0.97 16.10 17.80 19.98 20.09 23.00 23.50 4A.A to 4A.D-2 3 2 116 0.00 1,93 0,00 0.00 0.87 0.0 6.9 7.8 6.74 12.71 4,63 18 1.47 18.30 20.00 20.09 20.99 23.50 25.50 4A.D-2 to 4A.D-1 4 3 152 0.63 1.46 0.45 0.28 0.66 5.0 5.2 8.1 5.32 6.02 3.01 18 0.33 20,00 20.50 21.69 22.08 25.50 24.00 4A.D to 4A.B 5 4 34 0.83 0.83 0.45 0.37 0.37 5.0 5.0 8.1 3.04 4.93 2.48 15 0,58 20.50 20.70 22.13 22.20 24.00 24.00 4A.8 to 4A.0 6 3 61 0.24 0.47 0.45 0.11 0,21 5.0 5.8 8.0 1.69 11.25 3.94 18 1.15 22.60 23.30 22.99 23.80 25.50 27.00 4A.G-1 to 4A.G 7 6 34 0.23 0.23 0.45 0.10 0.10 5.0 5.0 8.1 0.84 4.95 1.54 15 0.59 23.30 23.50 23.99 23.99 27.00 27.00 4A.G to 4A.H 8 2 112 0.71 1.20 0.45 0.32 0.54 5.0 5.3 8.1 4.37 628 2.47 18 0.36 17.80 18.20 20.09 20.28 23.50 21.90 4A.D-2 to 4A.E 9 8 23 0.49 0.49 0.45 0.22 0.22 5.0 5.0 8.1 1.80 4.26 1.46 15 0.43 18,20 18.30 20.35 20.36 21.90 21.90 4A.E to 4A.F Basin_4A Number of lines: 9 Run Date: 05-03-2013 NOTES: Intensity = 185.06 / (Inlet time + 28.20) ^ 0.89; Return period = 25 Yrs. c = cir e = ellip b = box Hydra lm Storm Sewers 2008 v12.01 STORM DRAIN DESIGN COMPUTA77ONS LOCA77ON RUNOFF PIPE DESIGN FROM POINT TO POINT PIPE LENGTH (ft) D.A. INCR (ACRES) D.A. TOTAL (ACRES) RNOFF COEFF (C) 'mCA INCR mCA TOTAL TC RAIN (in/hr) DISCH. Q (fps) CAP. (cfs) VEL. (fps) DIA. (in) LOPE %) IN UP (ft,) IN DOWN (ft) HGL. UP (ft) HGL. DOWN (ft) GRND/RIM ELEV LIP (ft) GRND RIM ELEV DOWN (ft) INLET TIME DESIGN(I) TIME CULVERT 2 79 186.96 186.96 .35 65.44 65.44 40 40 4.3 - 280.64 9.40 54 0.51 15.4 15.0 19.18 19.00 25.1 25.1 CULVERT 3 64 53.97 53.97 .40 21.59 21.59 40 40 4.3 - 92.59 7.09 36 0,39 18.0 17.8 20.66 20.41 25.60 25.60 CULVERT 4 62 215.05 215.05 .35 75.27 75.27 50 50 3.8 - 285.73 8.08 60 0.32 13.2 13.0 17.34 17.22 22.2 22.2 CULVERT 5 72 216.47 216.47 .35 75.76 75.76 50 50 3.8 - 287.62 8.13 60 0.37 12.3 12.0 16.31 16.22 20.1 20.1 CULVERT 7 58 147.39 14739 .30 44.22 44.22 35.0 35.0 4.6 - 202. 95 7.19 54 0.38 13.5 13.2 16.93 16.93 20.3 20.3 NOTES: 1. ALL STORM DRAINAGE PIPE TO BE CLASS 111 OR IV RCP UNLESS OTHERWISE SPEC'-r=G. 2. CULVERTS 2-6 SIZED FOR DOUBLE CULVERTS. BOLT BOXES TOGETHER AND CUT OUT OPENING BETWEEN THE TWO BOXES A A 6' a 6" 1 SECTION VEW A - TO BE SIZED PER INLET PIPE COMING INTO BOX BOXES TO MEET NCDOT STD 840.02 REQUIREMENTS. TO BE USED AT INLET 1.B, 2.8 AND 4.G DOUBLE INLET NOT TO SCALE 6" PERFORATED PLASTIC PIPE CULT IN HALF ANCHORED TO BASIN BOTTOM STEEL ANCHORS/TIES FLOW DISTRIBUTION MECHANISM MECHANISM DETAIL NOT TO SCALE SILT FENCE W/ WIRE BACKING (STAKE SPACING 3 FT ON CENTER) 2 FEET MIN TOP AREA TEMP EARTHEN BERM �-10 Z SETTLEMENT 2 FT ABOVE FLOW T,O.B .. • �q T.O.B EXIST DITCH TO t ^�•.�.....................................•..•.•.•.•.•.•..... BE FILLED IMMEDIATELY 1 _ 20 FT MIN WIDTH GENERAL NOTES FOR TEMP. PLUG DETAIL 1. BUILD RIDGE HIGHER THAN DESIGN AND COMPACT WITH WHEELS OF CONSTRUCTION EQUIPMENT. COMPACTED RIDGE MUST BE AT OR ABOVE DESIGN GRADE AT ALL POINTS. 2. LEAVE SUFFICIENT AREA TO PERMIT CLEAN OUT AND REGRADING. 3. CONSTRUCT SILT FENCE ON DOWNSTREAM SIDE OF BERM. 4. MIN. PLUG LENGTH OF 25' TO PREVENT BLOWOUT. 5. IMMEDIATELY DIVERT WATER AWAY FROM PLUGS TO APPROPRIATE DEVICES TO PREVENT PLUG BLOWOUT. 6. PLUGS NEED TO BE INSTALLED PRIOR TO ANY RAIN EVENT. TP TEMPORARY PLUG DETAIL NTS OUTFALL RIP RAP DIMENSIONS L X W X D CLASS QUANITY CULVERT 2 20' X 14' X 1.5' 11 15 CY CULVERT 3 14' X 9' X 1.5' 11 10 CY CULVERT 4 22' X 15' X 1.5' 11 20 CY CULVERT 5 22' X 15' X 1.5' ll 20 CY CULVERT 7 20' X 14' X 1.5' II 15 CY FM BASIN 1 7' X 4' X 4.5' II 5 CY FIN BASIN 2 7' X 4' X 4.5' I! 5 CY FM BASIN 3 7' X 4' X 4.5' 11 5 CY BASIN 4 7' X 4' X 4.5' 11 5 CY EL=17.2 ANIkTF#OR TEX #57 WASHED ONE O OHO O 0 0�0 0"HOLES WITH 0 0UJ0SPACING k3" 0 0Q EL=15.OA ro 18" HDPE TEE �I I 18 hIDPE OUTLET PIPE CONCRETE ANTI - FLOTATION BLOCK A TEMPORARY OUTLET STRUCTURE DETAIL STORAGE BASIN 3 NOT TO SCALE INF# �IORTEX EL=18.4 #57 WASHED �1 1, STN , x %i %%ii112"HOLES WITH + 41 %i �•iiii 020 18'HDPE OUTLET PIPE 18" HDPE TEE -CONCRETE ANTI- ( ° FLOTATION BLOCK A" TEMPORARY OUTLET STRUCTURE DETAIL STORAGE BASIN 4 NOT TO SCALE It ' LICENSE # C-2710 " COASTAL SITE DESIGN, .PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 N U O� J cc C) J N O F U O�Z� U O 1- 02 Z o� W Q O CIARO��% .. ��0�•FF'8S�•'•��y- ?�O SEAL 7► '� 025483 ' F�'at NEE♦ •.`�\ 00 O CV N � 00 OJ NLIJ - 0 0 to to 0 00 CN O 00 \ t0 O � n O O W O Q Z a Y Q a Cif Q 12 z .Z z L� :2 w CO N wof I- w t Q 0 Q o;n Q Z Z 0 U a X w � w _ 0 w X 7Q O 0 U) 0 0 IY 0 (� (n (n m V)) U`)nn(nn (` Z Z Z Z 0_ � af 0 0 0 U 00 In d r7 cV � O O Z j w DA TE: 10-10- 06 HORZ. SCALE: N/A VERT. SCALE: N/A DRAWN BY.• RL W r CHECKED B Y. HSR PROJECT NO.: 05-0043 EC7 EC Sheet No. Of 10 FT D.E. DEED BOOR; 2561, PAC/ 63 CLARK AND SONS LLC DEED BOOK 9907, PAGE 996 LEGEND DRAINAGE PIPE AND RIP RAP LOT LINE CENTERLINE OF RIGHT OF WAY 21CONTOUR LINE & ELEVATION II -I I- 30' DRAINAGE EASEMENT II I- 15' I I CLARK AND SONS LLC DEED BOOK 9907, PAGE 996 INLET I ACREAGE LB 0.84 1.E 0.24 11 0.15 1.G 0.98 1.H 0.74 2.B 1.55 2.G 0.45 2.H 0.4 2.J 0.53 2.K 0.2 21 0.24 2.M 0.52 2.0 0.96 2.P 0.50 2.Q 0.74 2.R 0.63 3.0 1.0 3D 0.92 31 0.85 3.G 0.41 3.11 0.53 3.1 0.39 3.K 0.81 31 0.18 3.M 0.58 3.N 0.66 INFILTRATION BASIN 1 (SEE SHEET EC 2) 6. C! o K I WILSON DEED BOOK 1902. PAGE 294 J ` 1 1 STORAGE BASIN 1 Q (SEE SHEET EC 2) � r 2D / 20 / 1 S-- G, 'in 1 • / \ `� \ �t9 \ ` \ V SCALE IN FEET: 1"= // INLET ACREAGE 3A.0 0.3 3A.D 0.55 3A.E 0.95 3A.F 0.83 4.8 0.12 4.0 0.26 4.D 0.68 4.E 0.23 4.G 0.59 4.H 0.88 4.1 0.85 4.J 0.7 41 0.31 4.M 0.45 4.N 0.42 4.0 0.15 4.P 0.51 4.0 0.24 4.S 0.43 4. T 0.85 4. V 0.6 4. W 0.62 41 1. 76 4A.B 0.63 4A.0 0.83 4A.E 0.72 4A.F 0.49 4A.G 0.24 4A.H 0.23 S =5:4 �Jr r qq • LICENSE ,� C-2710 COASTAL SITE DESIGN PC ENC/NEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 Z Q U� Q 30 'z v J z LQ U � W o� p C- C� ti T Z Z -_j DATE: 10-10- 06 HORZ SCALE: 1"= 100' VERT. SCALE. N/A DRA WN E JSM CHECKED E� Y: HSH PROJECT NO.: 05-0043 Sheet No. Is BASIN ACREAGE 1 4.55 2 8.40 3 10.99 ��4 15.51 EXHIBIT MAP "C" NOTES: I. TFIE BUILT UPON AREA (BUA) FOR EACH LOT MUST BE LOCATED IN THE AREAS DELINEATED FOR EACH LOT. 00 50 0 100 200 300 /I LICENSE j C-2710 COASTAL SITE DESIGN P-C ENGINES RING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 krrJpgy oii, NC 28406 (910) 791-4441 p A U O Q.. Zi C �. W M w Q ' z c� N w 0 N ' 'W F Z w I � a Q z m iw o � w Q 'w a z LLJ 5 W 0 z W DA TE. 11-27-06 HORZ SCALE: 1 100' DER r SCALE: NIA DRA WN B Y.• RL W CHECKED B Y.• HSR PROJECT NO.: 05— 004J Sheet No Of 7 J� LOCATION MAP 0) �t- N � NOT TO SCALE IE = 18.0- 10 CY CL 1I RIPRAP CULVERT 3-- (2)-58 LF 36" CL III RCP S IE= 17.8--'_'_ 10 CY CL 11 RIPRAP , h� 1 •1. .v 1, ` � �✓'i 75 t% .•„ P, DEED BOOK 2561, PAGE 63 IE = 15.4- 15 CY CL II RIPRAP CULVERT 2 (2)-78 LF 72" CL Ill RCP'S BURIED 20% IE = 15.0' 15 CY CL II RIPRAP LEGEND DRAINAGE PIPE AND RIP RAP LOT LINE CENTERLINE OF RIGHT OF WAY 21 CONTOUR LINE & ELEVATION I I -� �- 30' DRAINAGE EASEMENT I- 15' I I NOTE WELL: 1. ANY AREAS ON SIZE WITHOUT AC77WTY WITHIN 21 CALANDER DAYS SHALL BE TEMPORARILY STABILIZED AS PER PER THE SPECIRCA71ONS FOLLOWING ANY PHASE OF GRADING 2. THIS PLAN TO BE UTILIZED AND REVIEWED ONLY IN CONJUNCTION WiTH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. J. ALL SLOPES SHALL BE 3:1 OR FLATTER. 4. ALL ROOF DRAINS TO BE DIRECTED TO STORM DRAINAGE SYSTEM. 5. NO WETLANDS EXIST ON SiTE 6. BOUNDARY AND TOPOGRAPHY SURVEY PERFORMED BY GEOINNOVATiONS SURVEY SOLUTIONS, PLLC. 7. ALL STORAGE AND 1i1,17LTRATiON BASINS TO BE RECORDED IN DRAINAGE EASEMENTS 8. SITE ADDRESS: 1200 LT CONGLETON ROAD 66 IP I TARN MS 00 III INnLT F- ULA I ,'ASIN I BASIN CAL1- D Wa TION SUMMARY FOR 1 • WA TV? I I SrERA 1' ER QUALI TY CONSIDERA1 TOTALDRAINING TO BASIN 198,207 AREA DRAINING TO f IMPERVIOUS r 1144PERVOUS AREA BREAKDOYW: PROPOSED BUILDING = 52,000 + PROPOSED BUILDING ffPROPOSEDPROPOSED r ACRES)•-I•Iv1 SF l: PROPOSED I TOTAL IMPERVIOUS 78,742 'PERCENT IMPERVIOUS J9.7X �ACRES) RUNOFF COEFFICIENT i 1 E..- / Ill• x 39.7) RUNW COUnCIENT DETERMNATION.1 ,. I f ,: f (DESIGN/' r•. F • rear 1• tAREA) r '41 55 ACRES I I ' ACRES 0.2 ACRE -FT 0.5 ACRE -FT 10,097 CF OF REQUIRED STORAGE• / 733 CF OF REQUIREI• t 20,195 CF OF REQUIRED STORAGE W10 WG. FL 7t MLLW 45,46 5 CF OF REQUIRETORAGE I STAX E• QUALITY 1, 1 X' 1STME WMER QUAUTY CONSDO71ONS STORAGE• REQUIRED 1,195 CF 3' STORAGE VOLUME- • r .. STORAGE CF • PROVIDED I• •_.VOLUME ..• r r STORAGE CF • r- • rr r r STORAGE • r- • r• 0.5 r AYS N �O �° A • ' -�%a �S re >s,a �'o?'v,: gaa;;a ►�' i�S°�°s�°,'o°rrB�F"B'$� � - FF'• J "`• Or' recto °° ® psno®n / 504 o F r F ere AW off;�,, Z r _ `` �/ IP f FT\Y evJe �` °.mil 09 /�/ / V • ':+�° rho+°�'o°s�9� �e r' TARIN WOODS INFILTRATION BASIN 3 CALCULATION SUMMARY FOR DWQ: WATER QUALITY CONSIDERATIONS - TOTAL AREA DRAINING TO BASIN = 500,519 SF (11.49 ACRES) IMPERIOUS AREA BREAKDOWN: PROPOSED BUILDING = 160,000 SF (3.67 ACRES) PROPOSED ASHPALT = 56,971 SF (1.31 ACRES) PROPOSED SIDEWALKS = 7,755 SF (0.18 AM) TOTAL IMPERVIOUS = 224,726 SF (5.16 ACRES) PERCENT IMPERVIOUS = 44.9% ; 4INDFr COEFFICIENT DETERMINATION: R v = 0.05 + (0.009 x 44.9) = 0.45 IN/IN ✓OLUME DETERMINATION: VOLUME = (DESIGN STORM)(Rv)(DRAINAGE AREA) = 1.5 IN x 0.45 IN14N x 11.49 ACRES / 12 = 0.7 ACRE -FT 5' VOLUME = 28,410 CF OF REQUIRED STORAGE W/ VEG. FILTER 3' VOLUME = 56,820 CF OF REQUIRED STORAGE W/0 VEG. FILTER STATE WATER QUALITY CONSIDERA TTONS - 3" STORAGE VOLUME REQUIRED = 56,820 CF 3" STORAGE VOLUME PROVIDED = 60,314 CF STORAGE VOLUME DRAW DOWN TiME - 0.5 DAYS CULVERT 6N (2)-68 LF 84- CL NI RCP S BURIED 20% IE = 10.3 20 CY CL 11 RIPRAP •.� T�Bg •1,6 'Wa F jSO a4�°ti°,a 4' Sri r I1 -,'.\,' i�+_��I � � ' I ?fie°$�a �r o®�B�S� J/a• e / � 3Q ,SFe�i% I�® \ 60 ° ® l '.: i1 I ° >`a�•`s'�'eQ '�'F ®'s�' . 4'1 ' • / � ® • , w®�'>'°�'e•°s`.,'.��� :®1 ®�ay '� [N:� l:I "�I �Py Ra � '•"<r�OJP°°°�4:a� � r� � � � • �1�Oitie� e/ � /i•e1 � 7 �Se��4e ���' � ri�'j i o��d�ii:�'o /i � I /". ®.�oore \O°+y'o� iiiiYl c •/ a�>� oL°ice ./ / �_�- act.s�s�<.te:?�'•a�A����>.i•°����ov=�asas�,°'4...�♦®'.��':®�`�:��".-gFoao-..� R ¢:� a ;iF• ss,: 4 sr •r a'�<a v''<;a®d•�,y o- ^v v- o,�.®��<-� `�; ' �[!�{►� ,..:F�\ � !•' ��°®��,y�a� b rJ "ad .. �`�<..�t A't�bfbrf���✓P.�e:�..o +I:ds '�i�:�i''.a��.. ' �.@a�r: � f ! .>,- fs � � o, '� ,!i �°�f; 1 � \°®®?a®. d�°a°ems. fa . f' � � OA��oo`�¢r. ,�y r���°�®��•�® i.: ® t.x® dead 4a`? s. a. • 1 ear V ✓ "le> �i ��•'} �� < i1V II 0 UF "I"', 03 .yv •'a\ \�ir ras`P4�Pa r. Od s b, T� 1p - ANY �8°®JeoFo� �8o:8Qd'�9,. Flal. �• � t :o o: i �. `';':F4 °l�o o-�.g-.pn °`Owi'�_ ��.ys F�►s?r„-.sdS3.� \TOP � e <0 'T `61®V.4. w0 � �y �y '�i'.T!'-'• P�. �1.• ��1011�\\\� � e. AO °ai��i°°�°:$ �z :+� e� txYiN-�.s- � 4i • �//S� INFILTRATION BASIN 4! (SEE SHEET EC 5) -" (DRAINAGE EASEMENT) IE = 27.7 5 CY CL II RIPRAP CULVERT 1 55 LF 18" CL ill RCP IE = 273 5 CY CL Il RIPRAP TARIN WOODS INFILTRATION BASIN 4 CALCULATION SUMMARY FOR DW'Q: WATER QUALITY CONSIDERATIONS - TOTAL AREA DRAINING TO BASIN = 588,192 SF (1350 ACRES) IMPERVIOUS AREA BREAKDOWN: PROPOSED BUILDING = 185,000 SF (4.25 ACRES) PROPOSED ASHPALT = 96,044 SF (2.20 ACRES) PROPOSED SIDEWALKS = 9,451 SF (0,22 ACRES) TOTAL IMPERVIOUS = 290,495 SF (6.67 ACRES) PERCENT IMPERVIOUS = 49.4% RUNOFF COEFFICIENT DETERMINATION: Rv = 0.05 + (0.009 x 49.4) = 0.49 IN/IN 1.5' VOLUME DETERMINATION: VOLUME = (DESIGN STORM)(Rv)(DRAINAGE AREA) = 1.5 IN x 0.49 INAN x 13.50 ACRES / 12 = 0.8 ACRE -FT 1.5' VOLUME = 36,357 CF OF REQUIRED STORAGE W/ VEG FILTER 3' VOLUME = 72,714 CF OF REQUIRED STORAGE W/O VEG• FILTER STATE WA TER QUALITY CONSIDERATIONS - 3" STORAGE VOLUME REQUIRED = 72,714 F 3" STORAGE VOLUME PROVIDED = 75,203 CF STORAGE VOLUME DRAW DOWN TiME = 0.4 DAY!3 r % 15 CY a 11 RIPRAP INFILTRATION BASiN 1 (SEE SHEET EC -2h PLANNED EROSION AND SEDIMENT CONTROL PRACTICES - O 1• TEMPORARY Practice R6 GRAVEL CONSTRUCTION ENTRANCE Shall be installed at the entrances to the project from an existing roadway. Drainage should be away from the road and erosion will be controlled with downstream practices. During wet weather it may be necessary to wash truck tires at these locations. 2. LAND GRADING Practice 6.02 Grading should be limited to areas as shown on the Plans. Cut and fill slopes shall be 3.1 or flatter except where specifically indicated. Care shall be taken during land grading activities not to damage existing trees that are identified as 'to be preserved". O 3. SEDIMENT FENCE Practice 6.62 Sediment fencing should be installed as shown on the Plan, to delineate and protect wetlands and specified areas, and around any temporary stockpile areas as necessary to prevent any graded interior areas from eroding onto adjacent lands or roadway, or into inlets, or as directed by Engineer or New Hanover County Erosion Control personnel. O 4. GRASS -LINED CHANNELS Practice 6.30 All overflow swales to be graded to design configuration seeded, and stabilized if necessary with temporary s{raw-netliners to collect and convey site water as shown on Plan. After final project stabilization, swales to be re -graded and cleaned of siltation as needed to establish original design contours for stormwater conveyance. OP 5• OUTLETSTABILIZATION .41 Rpprop aprons will be located at the downstream end of all discharge pipes to prevent scour. 6. CONSTRUCTION ROAD STABILIZATION Practice 6.80 Upon reaching final grade and after utilities have been installed, roadway areas are to be stabilized by placing sub -base course of approved 4" marl stone or 6" ABC, as shown in the typical street cross-section detail on the Plan, to reduce erosion and dust during the remainder of building construction. O 7. TEMPORARY SEDIMENT TRAP Practice 6.60 Sediment traps are to be installed as indicated on plan at the downstream end of swales as shown. SB 8• SEDIMENT BASIN Practice 6.61 The Sediment Ba ' is to be constructed first (see Construction Schedule) and is the primary Practice to prevent sediment from leaving the site. Detailed design and spillway configurations are specified in the detail sheet. �P 9. INLET PROTECTION Practice 6.52 Storm sewer inlet barriers of silt fencing or block and gravel ,Inlet protection are to be constructed to help prevent sediment from entering the storm sewer system. O 10. TEMPORARY PLUG Reference Temporary Plug detail on sheet EC7. Vl ,l (DRAINAGE EASEMENT) 5'���6'• ��� �\ i 6� q� CONSTRUCTION SCHEDULE - °F®Q®•e Fmg �eeFi °y,!Z`«•,�0�>��� 00 � CJ 20 O e l \+ � '°�®°OOA, •<<ro •°OS'° sAW>'F®.°A®a'.®��A<<.®°°° ®��7'e?°°.:�' � ° 0° ey.'�•� - d�ay<0 ®e`0r°e� ®i-�' ®,e•.F< Q.4:<o 3A� ® � �r0� \ Oo`0a®sovpo�o ?,��• � ' - i �h rsro Q0t rr:,. ®< ,r ® o•b ® gFeP °O >o <�sesror • • o w . �p•�4`®,e Q °P���a�t®v®epo°' .�S "� i� � 4FsO�p "�,$' �:.:,� .F Vj� ��,a•F • .�� �,,•' �Q � awe � °mor an/�,-F�po OP OJY �G: •ems P° <?O�°FO°� � „ry<. A.a°R..�9®°OS=a.®raa°°s�+'b•da�'�'.a^a'r�•'s0 ae°,.�yor®e�.,.,e�.. ' t�±e°i•��r oK Son�sr yF<ti r�'FB.r�O r. / 1Ngg. CLARK AND SONS LLC LIMITS 9F DISTURBANCE = 49.154 ACRES r PROPERTY OWNER CERTIFICATION: "I HEREBY CERTIFY THAT I AM THE CURRENT OWNER OF THE PROPERTY AND THAT UPON RECEIPT OF "AUTHORIZATION-TO-CONSTRUCT"ANY CLEARING, GRADING, CONSTRUCTION OR DEVELOPMENT, WILL BE PERFORMED IN ACCORDANCE WITH THIS PLAN AND THAT THE APPLICABLE ORDINANCES AND RULES OF NEW HANOVER COUNTY, THE STATE OF NORTH CAROLINA AND THE FEDERAL GOVERNMENT AND ITS AGENCIES WHICH ARE HEREBY MADE PART OF THIS PLAN. AS THE OWNER, I ACCEPT FU SPONSIBILITY FOR THE CONSTRUCTION AND OPERATION AND MAINTENANCE OF THE PROP ED F)ACILIIES. I WILL NOT ATTEMPT TO TRANSFER THIS RESPONSIBILITY WI N UTH IZATiON OF NEW HANOVER COUNTY. SIGNATUIR . r PRINTED NAME AND TITLE: fx�� SV v��ov' M_e_V- % DATE: t ©- L - 0 (o V^ Vy 1. Obtain approval of Plan and any necessary permits, and hold QP K I WiLSON a pre -construction conference prior to commencing any work. DEED BOOK 1902, PAGE 2P2. Flag work limits and stake -out roads and storm drainage preliminary grading. P Y9 . 9 B1.G structures for 19 3. Install Gravel Construction Entrances. VF 4. Install sediment basins and silt fenching as shown on plan prior to clearing and grubbing site. � In •� 5. immediately fill ditches that will be affected by lots and roads C 0 111 ..y prior to any rain event. J 6. Consturct grasss lined channels, sediment traps � and cny other sediment control practices shown, prior to rough grading roadways, site and stockpiling topsoil as necessary. O 17 , 7. Install utilities in roadway, establish final road grades Z and stabilize road with stone base course. 1 rn -1 8. Final grade, install non -municipal utilities as needed, and - vegetatively stabilize areas where building construction Is I not imminent. JB1.D 16 SF 9. All erosion and sediment control Practices are to be inspected weekly and after any rainfall, and repaired as necessary. �- • ;�, 10. Upon completion of construction, the roadway is to be paved, CB1.B - .r' curb & gutter installed, and all areas permanently 15 vegetatively stabilized. After site stabilization, temporary IP measures are to be removed r� f MAINTENANCE PLAN - 1. All measures to be inspected weekly and after any rainfall \ STORAGE BASIN 1, event and needed repairs made immediately. (SEE SHEET EC 2),\ 2. Sediment Bqsin to be cleaned out when the level of sediment (DRAINAGE EASEMENT) k" reaches 1.5 below oriface opening. Riser structure to be cleaned If excess water above design surface no longer SB �01 drains properly. 3. Sediment to be removed from swales when they are approximately �JZ�FZS 10 F ` 509 filled or sediment level is with 1 of top of ditch bank. 4. Sediment to be removed from behind any Silt Fence and QP " - \ inlet protection devices when it becomes 0.5' deep. Fencing and inlet protection to be repaired as needed to maintain a barrier. \ 5. All seeded areas shall be fertilized mulched, and re -seeded as necessary, according to specifications provided, to maintain a suitable vegetative cover. 6. Construction entrance to be maintained in such a manner as to prevent mud or sediment from leaving the construction site. Periodic topdressing with 2-inch stone may be required. NO WETLANDS EXIST ON SITE Inspect after each rainfall and immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. 7. Bypass Junction boxes to be inspected twice a year. Sediment to be cleaned out from basin bottom when sediment level reaches V- 507. of design depth. 0 I DESIGNER'S PLAN CERTIFICATION: "I HEREBY CERTIFY THAT THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH THE LATEST NEW HANOVER COUNTY ORDINANCES AND STORMWATER DESIGN MANUAL." SIGNATURE: PRINTED NAME AND TITLE: 44ou"o-- oe5, ; l DATE: REGISTRATION NUMBER: Z5 8. Inspect temporary sediment traps after each period of significant rainfall. Remove sediment and restore the trap to its original dimensions when the sediment has accumulated to 112 the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage from erosion or piping. Periodically check the depth of the spillway to ensure It is a minimum of 1.5 ft below the low point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any riprap displaced from the spillway must be replaced immediately. After all sediment producing areas have been permanently stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas .and stabilize properly. CFTV �D I VEGETATIVE PLAN - JAN 3 1 7007 1. Permanent vegetation to be established in accordance with "North Carolina Erosion and Sediment Control Planning and Design Manual", Section 6.11, latest version. See Sheet EC6. 00 100 50 0 100 200 300 SCALE /N FEET• 1 "- 100' COASTAL SITE DESIGN, PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDEN77AL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 Z O � � o aZ E. QQOQZ �oZ?o Z Q ^ oZ Q SEAL �+C _ AL 025483 - y/ GIT4 S, i'i' l (a-7 ^o O O `a N CO O ^ Q H W c� w of a 3 0 w a- (n z (n 3 m < O H PP W Q L` Z LU w r Fes- W Z en LU w U LLJ d z U) W a z � o o w _LLJo in W 0 W Q: Q tr CO Z M N w DATE.• 10-10-06 HORZ. SCALE. 1'= 100' VERT. SCALE. N/A DRAWN BY- RL W CHECKED B Y.• HSR PROJECT NO.: 05-0043 Sheet No. EC 1 Of EC7 10FTD.E RAD. 15 FT LENGTH 24,1 FT 40 FT EMERGENCY OVERFLOW SPILLWAY EL= 18.0 REQUIRED 3" STORAGE ELEVATION = 15.8 SURFACE AREA = 9,753 SF I STORMIMATER SIVRAGE BASIN STORAGE = 20;61 CF I BOTTOM ELEVATION= 13.0 ~' i PROVID€D 3' STORAGE ELEVATION = 170 ` I SURFACE AREA - 12,126 SF STORAGE = 34,825 CF \ RAD. = 15 FT = 9.9 FT NOTES: 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLEC7ION SYSTEM. 2. PORTABLE PUMP TO BE USED TO DRAIN SYSTEM IN CASE OF EMERGENCY. 3. BASIN TO BE LINED WITH CEN7IPEDE SOD. 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. 5. INSTALL FLOA7ING FOUNTAIN 1N STORAGE BASIN RAD. = 14 FT LENGTH = 34.2 FT RAD. = 14 FT LENGTH = 22 FT 85.0 FT Y CL H RIPRAP 1.5 FT DEEP RAD. = 1 FT = 26 FT LE = 13.0 LENGTH 22 = 4a8 FT 42 LF 30' CL 111 RCP \, WITH FE.S ......_.. 3' STORMWATER FM STORAGE BASIN 1 DETAIL SCALE: III_ 64 FT TOP OF EMBANKMENT ELEVATION = 22.0 STORAGE BASIN 1 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE 22.4 FT TOP OF EMBANKMENT ELEVATION = 21.0 INFIL TRA TION BASIN 1 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE LE = 16.8 5 CY CL It RIPRAP 1.5 FT DEEP ' LINER MUST HIVE A HYDRAULIC CONDUC77WTY LESS THAN 1 X 10-4CM/SEC TOP OF EMBANKMENT ELEVATION = 22.0 r\ I I TOP OF GRATE = 20.0 �= II N O ti 30' RCP TO BASIN ACCM COWR INV = 13. 7 BOX IE= 11.7 BOTTOM OF BOX = 70.2 TRIES 7 ocvz, IN me nL; MEMBRANE OR. EQUIVALENT TO BE PLACED 24' STORAGE BASIN 1 FINISHED SURFACE BENEATH CROSS SECTION NOT TO SCALE COVER/ACCESS TOP COVERIACCESS TOP ELEt = 20.0 ELEV = 20.0 TOP OF BOX = 2111) 2.0 FT WEIR ELEV. = 17.1 4 FT 12' CONC. 2 FT SUMP FOR CLEANOU 30' RCP IE = 14.1 12' CONC. l 2 FT SUMP 1 FOR CLEANOUT I 30' RCP SEE DETAIL THIS TO BASIN AC= 00WR SHEET FOR STORMWA TER P.S. DETAIL LOCATED INV = 13.7 IN THIS BOX 24' RCP TO DITCH INV= 17.1 =ASE i SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT PLAN VIEW JUNCTION BOX/ 1 A Q (2) NC PRODUCTS 4848 OR EQUI ALZ? T BOX • BYPASS STRUCTURE NOT TO SCALE z BYPASS STRUCNRE / 1.A PRE-TREATMENT DEVICE _ SMART WIER (SEE DETAIL THIS SHEET) IW/ (2) - 4' x 4' BOXES W/ ACCESS COVER COVER =20.0 IE 30' PIPE = 14.1 IE 30' PIPE = 13.7 (S) IE 24' BYPASS PIPE = 17.1 IE OF BOX = 12.1 TOP OF EMBANKMENT ELEVA7ION = 22.0 EMERGENCY SPILLWAY ELEVA71ON = 1&0 3' STATE STORAGE ELEVA71ON = 15.8 p NAIUKAL UKUUNU S TORA GE BA SIN 1 EMBANKMENT SECTION NOT TO SCALE /Y .t l" , r • %, ,, Y„y, A y�J I!'►�/�1c1� ,.ky ��{il'Ii ''I 1\ �'. ' "-+,,": ,t':; Y ~ 1.%•,'Ki ,k'- ;yam � \.� ' - ` 1 'b 31. 67.1 FT FT \ \ .sue �F •�\\\ \ \ 5 CY CL 11 RIPRAP 1.5 FT DEEP \ 1 FT _ Wit�, \\\ , i SIO MWAIER INRLMAnav BASIN"'\ BOTTOM-,ELEVATFON= 19.0 \ ` \ \ 3' STORAGE ELEVA71ON = 20.6 I SURFACE' AREA = 14,625 SF J STORAGE = 21,095 CF FLO DIS7RIBU710N PIPE SEE DE7i11�SHEET EC7 ` 8.4 FT \. �?10.7 FT % 11.3 FT 20 FT EMERGENCY OVERFLOW SPILLWAY EL= 20.6 NOTES: 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSil:M. 2. PORTABLE PUMP TO BE USED TO DRAIN SYSTEM IN CASE OF EMERGENCY. 3. BASIN TO BE LINED WITH CENTIPEDE SOD. 4, BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. I NFI L TRA TI ON BASIN 1 DE TA I L SCALE: 1 "= 30' i PUMP MODEL: TSURUMI NK2-SERIES SEMI -VORTEX DEWATERING PUMP SEE SPECIFICATIONS FOR ADDITIONAL DETAIL EL.= 20.0 FT DEPTH OF WELL 7.9 FT DISCHARGE ELEVATION EL.= 17.0 FT TO INFILTRATION BASIN ' LOCKING HATCH COVER n n,`V01- STEPS 16" _ oar GROUND ®f EL.= 20.0 NOTE: 2' PVC ELECTRICAL PIPE GOING FROM CONTROL PANEL TO WET WELL MUST SEAL BOTH ENDS OF III_ PIPE WITH ELECTRICAL PUTTY. 0 2"CONDUIT REQUIRED ELECTRIC POWER CABLE NOTE:1/4' CHAIN ' 1ITH 1/4' SHACKELS d LIFTOUT CHAIN 1/4' (STAINLESS STEEL) ' 4 C.I. FLANGE SWING CHECK PUMP ON EL.= 14.4 FT d VALVE IN LINE PUMP OFF EL.= 13.9 FT ' PREFABRICATED REINFORCED ' CONCRETE PIPE OR MH I t BASE ELEVATION EL.= 11.7 FT B�ANCHOR BOLT (2" PROJECTION) 4 FT X 4 FT PRECAST BOX WITH STEPS SECTION VIEW N TS NTS e M 00 1 1/4- SIDE ELEVATION 1/2" GRADE 60 ®STEEL REINFORCEMENT COPOLYMER POLYPROPYLENE PLASTIC ELEVATION SECTION A -A MANHOLE STEP DETAIL NTS L Lu ® C2 `'7 � _�50 .. CC �9 a rr uj z r3 ° I 1 N07 COASTAL SITE DESIGN, PC ENGINEER/NG LAND PLANNING COMMERCIAL /RE SIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 r E a mot -M A JIB, $gas B µWCARO, b 0 0 07 O O t0 3 3 3 V) w 0 0 0 Y E E S W Z F H 0_ :D m z w z w z w V) p O U o U O U 3 O 0- Q. a L_ o o 0 0 o a 5 w w 5 w Of 5 w w z M N •- w 0_ DA TE: 10-10- 06 HORZ. SCALE. AS SHOWN VERT. SCALE. N/A DRAWN BY- RL W CHECKED B Y.• HSR PROJECT NO.: 05-0043 Sheet No C2 Of EC7 X NOTES: 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSTEM. 2. PORTABLE PUMP TO BE USED TO DRAIN SYSTEM IN CASE OF EMERGENCY. J. BASIN TO BE LINED WITH CENTIPEDE SOD. 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. 5. INSTALL FLOATING FOUNTAIN IN STORAGE BASIN J� A� RAO = 264 FT y� LENGTH = 71.1 FT / �C ��16.OFT�,3S / NGTH = FT s0.8 14 15 9 10z1` 0„j 71 12-�1??13 LE = 8.0 5 CY CL II RIPRAP 1.5 FT DEEP STORMWATER STORAGE BASIN BOTTOM ELEVA710N= 8.0 3" STORAGE ELEVATION = 12.2 SURFACE AREA = 14,106 SF STORAGE = 46,713 CF 20 FT EMERGENCY OVERFLOW \, SPILLWAY EL= 14.5 Fjj3; �• �� STORAGE BASIN 2 DE TA I L SCALE. 1 ''= '0' 23 FT TOP OF EMBANKMENT ELEVATION = 15.0 20 FT ELEV. = 14.5 STORAGE BASIN 2 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE 21.2 FT TOP OF EMBANKMENT ELEVATION = 20.0 20 FT ELEV. = 19.8 INFILTRATION BASIN 2 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE 0 30" RCP TO CREEK IN = 12.2 BYPASS STRUCTURE 2.A PRE-TREATMENT DEVICE W/ SMART WIER (SEE DETAIL THIS SHEET; (2) - 4' x 4' BOXES W/ ACCESS COVER COVER = 18.5 IE 36' PIPE = 13.1 IE 36" PIPE = 8.8 IE 30' BYPASS PIPE = 12.2 IE OF BOX = 6.8 1 I.E = 12,0 5 CY CL II RIPRAP 1.5 FT DEEP 29 LF 30" CL III RCP WITH F.E.S 26 LF 36" CL III RCP W►TH F.ES ' LINER MUST HAVE A HYDRAULIC CONDUCTIVITY LESS THAN 1 X 10-4CM/SEC TOP OF EMBANKMENT ELEVATION = 15.0 TOP OF GRA TE = 18.5 SEE DETAIL THIS SHEET FOR STORMWATER P.S. DETAIL LOCATED IN THIS Box BOX LE= 6.8 BOTTOM OF BOX = 5.3 3ERIES �g GEOSYNTHETIC MEMBRANE OR EQUIVALENT TO BE PLACED 24' STORAGE BASIN 2 FINISHED SURFACE BENEATH CROSS SECTION NOT TO SCALE COVER ACCESS TOP COVFR/ACCESS TOP LEV = 18.5 ELEV. = 18.5 TOP OF ROY = 1 R 5 z SECTION VIEW Q (2) - 4 FT x 4 FT PRECAST CONCRETE BOX �o II (2) - 4 FT x PLAN PRECAST CONCRETE 80X NC PRODUCTS 4848 OR EQUIVALENT NC PRODUCTS 4848 OR EQUIVALENT JUNCTION BOX/ 2. A B YPASS STRUCTURE NOT TO SCALE 30' PIPE INV= 12.2 =ASE tTn C7 NOTES: 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THC STORM DRAINAGE COLLECTION SYSTEM. 2. PORTABLE PUMP TO BE USED TO DRAIN SYSTEM IN CASE OF EMERGENCY. 3. BASIN TO BE LINED W7H CENTIPEDE SOD. 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. TOP OF EMBANKMENT ELEVATION = 15.0 3" STATE STORAGE ELEVATION = 12.2 3' STATE STORAGE VOLUME = 46,713 CF BASIN BOTTOM ELE'/ = &0 NAIUKAL UTCUUNU . .. I I " 1 `' " " STORAGE BASIN 2 EMBANKMENT SECTION NOT TO SCALE INFILTRATION BASIN 2 DETAIL SCALE. 1 "= 30' PUMP MODEL: TSURUMI NK2-SERIES SEMI -VORTEX DEWATERING PUMP SEE SPECIFICATIONS FOR ADDITIONAL DETAIL LOCKING EL.= 18.5 FT HATCH COVER =I I =I STEPS `R DEPTH OF WELL 16" 7.4 FT GROUND ® /EL.= 18.5 NOTE: 2" PVC ELECTRICAL PIPE f GOING FROM CONTROL PANEL TO WET WELL MUST SEAL BOTH ENDS OF -_ PIPE WITH ELECTRICAL PUTTY. j 1-11 r 2"CONDUIT REQUIRED ELECTRIC POWER CABLE DISCHARGE ELEVATION EL.= 15.5 FT TO INFILTRATION BASIN NOTE: 1 /4' CHAIN -72 WITH 1/4' SHACKELS d' UFTOUT CHAIN 1/4" (STAINLESS STEEL) 4 C.I. FLANGE SWING CHECK PUMP ON EL.= 9.8 FT G VALVE IN LINE \ PUMP OFF EL.= 9.3 FT PREFABRICATED REINFORCED ' CONCRETE PIPE OR MH 4' r' ^Xj�. O BASE ELEVATION EL.= 6.8 FT "ANCHOR 8BOLT (2" PROJECTION) 4 FT X 4 FT PRECAST BOX WITH STEPS SECTION VIEW NTS N TS :�' ao 1 1/4- SIDE ELEVATION 1/2" GRADE 60 STEEL REINFORCEMENT COPOLYMER POLYPROPYLENE PLASTIC ELEVATION SECTION A -A MANHOLE STEP DETAIL NTS lk JAN 311 2007 COASTAL SITE DESIGN, PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 O v� J o O z o 3 QOlt Z Z Q z J CL O _� z U cr Qti O z Z °Oaf Q O O Q W U t` oZz_o � ••► z Z L , j C QA�FIp���-9 i SEAL® y 0 2 }� p9 8 151 s ,• J01417 1 oo��o O Q FEE 3 w 0 In 0 V) O- 2 M Y zz < M Z z Z It m w w W p O U O U O U 3 W W W W 0 U1 0 N 0 N 0 o 5 w S w 5 w O M N r Z W of DATE: 10-10- 06 HORZ. SCALE- AS SHOWN VERT. SCALE.' N/A DRA WN B Y.- JDH CHECKED BY- HSR PROJECT NO.: 05-0043 Sheet N EC3 0, EC/ ' RAD. = 20 FT LENGTH = 13.3 FT `'� i ' ------------- -- - i i 253.2 FT 23 gg 22 20 FT 21 7.7 FT 20 19 t8 172Q17®,-�� 15 A I f; 5 CY CL II RIPRAP , 1.5 FT DEEP- 40, FT EMERGENCY OVERFLOW ' SPILL Y ELF 21.0 %' STORMWATER SWRAGE BASIN ' i 1'1 \ ( %" BOTTOM ELEVA770N= 15.0 / GE ELEVATION 2 a T7.2.._-_.._.._.._._.._.__.______.--- AREA = 29,427 SF ............. = 59,454 CF 31 LF 42' H�PE WITH F.E.S RAD. = 20 FT LENGTH = 35.8 FT �3.7FT RAD. = 20 FT Z fT LENGTH = 19.3 FT 3' STORMWATER FM BYPASS STRUCTURE 3.A PRE-TREATMENT DEVICE W/ SMART WIER (SEE DETAIL TNJS SHEET) RAD. = 20 FT, (2) - 4" x 4' BOXES W/ ACCESS COVER LENGTH = 17.0 FT COVER = 23.0 IE 42" PIPE = 15.1 IE 36" BYPASS PIPE = 17.2 IE OF BOX = 13.2 LE = 15.0 �0 60 LF 36' HOPE 5 CY CL If RIPRAP '` WITH FES 1.5 FT DEEP I.E = 16.8 '' RAD. = 20 FT',''`, CY CL II RIPRAP LENGTH = 20.3 FT', 1.5 FT DEEP \ 44 LF 30" HOPE WITH F.ES -- == ___ ,_; NOTES, ` -;_`- = = RAD. = 20 FT 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED LENGTH - 30.4 FT _ INTO THE STORM DRAINAGE COLLECTION SYSTEM. -_ '2 LF 24' HOPE �_ _ :. -WITH F.ES 2. PORTABLE PUMP TO BE USED DRAIN S TORA GE BA SIN 3 DE SYSTEM IN CASE OF EMERGENCY. 3. BASIN TO BE LINED WITH CENTIPEDE SOD. 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENTSCALE: 1 "= 30' 5. INSTALL FLOATING FOUNTAIN IN STORAGE BASIN �o PLAN VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT ACCESS COVER ACCESS COWR II aA z� Z� Cn No I PLAN VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT _-= BYPASS STRUCTURE 3A.A PRE-TREATMENT DEVICE W/ SMART W1ER (SEE DETAIL THIS SHEET) / (2) - 4' x 4' BOXES W/ ACCESS COVER I.E = 15.8 COVER = 23.0 IE 30' PIPE = 15.1 IE 24" BYPASS PIPE = 16.0 IE OF BOX = 13.1 CY CL !I RIPRAP 1.5 FT DEEP COVE_ f�ACCESS TOP COVE.EV ACCESS TOP TOP OF GRATE = 23.0 ELE . = 23.0 EL = 230 TOP OF BOX = 23.0 M' HOPE TO CREEK IE = 17.2 BOX IE= 13.1 BOTTOM OF BOX = 11.6 2.0 FT WEIR ELEV. = 17.2 4FT 42' HOPE 15.1 12" CONC. 2 FT SUMP + FOR CLEANOUT. 12" CONC. 2 FT SUMP FOR CLEANOUT .;:: .1. : ;.: `. I SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT JUNCTION BOX/ 3. A BYPASS STRUCTURE NOT TO SCALE TOP OF GRATE = 23.0 BOX IE= 13.1 BOTTOM OF BOX = 11.6 SEE DETAIL THIS I SHEET FOR STORMWATER P.S. DETAIL LOCATED IN THIS BOX =ASE CCVWACCESS TOP COVE. ACCESS TOP E = 23.0 E = 230 TOP OF BOX = 23.0 2.0 FT WEIR 4 FT ELEV. = 17.2 30' 24' RCP HOPE IE = 15.1 IE = 16.0 12' CONC. 12' CONC. 2 FT SUMP 2 FT SUMP FOR CLEANOUT + FOR CLEANOU SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT JUNCTION BOX/ 3A. A BYPASS STRUCTURE NOT TO SCALE =ASE 3° STORMWATE FM / NOTES.• 1. ALL BUi=, 1�3 ROOF DRAINS MUST BE DIRECTED INTO TFE -TORM DRAINAGE COLLECTION SYSTEM. 2. PORTA6 ?UMP TO BE USED TO DRAIN I SYSTEM ;ASE OF EMERGENCY. I J. BASIN T., LINED WITH CENTIPEDE SOD. 4. BASIN TC 5: PLACED IN A RECORDED I DRAINAGE EASEMENT. 62 FT TOP OF EMBANKMENT ELEVATION = 23.0 50 FT ELEV. = 21.0 S TORA GE BA SIN 3 EMERGENCY SPILL OVA Y FRON T VIEW NOT TO SCALE 11.2 FT TOP OF EMBANKMENT _ __ ELEVATION = 24.0 INFILTRATION BASIN 3 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE FLOW DISTRIBUTION PIPE SEE DETAIL SHEET EC7 STO MWATER INRLTRATION BASIN BOTTOM ELEVA770N= 22.0 3' STORAGE ELEVATION = 23.7 SURFACE AREA = 38,016 SF STORAGE = 64,132 CF 299.7 FT 104jPT 20 FT EMERGENCY OVERFLOW SPILLWAY EL= 23.8 INFILTRATION BASIN 3 DETAIL SCALE: 1 "= 30' LINER MUST HAVE A HYDRAULIC CONDUCTIVITY LESS THAN 1 X 10-QCM/SEC TOP OF EMBANKMENT ELEVATION = 23.0 ;FRIES GT vLw )1Y me nL; MEMBRANE OR EQUIVALENT TO BE PLACED 2 BENEATH STORAGE BASIN 3 FINISHED SUU RFACE CROSS SECTION NOT TO SCALE TOP OF EMBANKMENT ELEVATION = 23.0 EMERGENCY SPILLWAY ELEVATION = 21.0 3' STATE STORAGE ELEVATION = 17.2 `7 3' STATE STORAGE VOLUME = 59,454 CF i\\ \\ �\ BASIN BOTTOM ELEV. = 15.0 NAIUKAL UKUUNU STORAGE BASIN 3 EMBANKMENT SECTION 'SOT TO SCALE PUMP MODEL: TSURUMI NK2-SERIES SEMI -VORTEX DEWATERING PUMP SEE SPECIFICATIONS FOR ADDITIONAL DETAIL NOTE: 2" PVC ELECTRICAL PIPE GOING FROM CONTROL PANEL TO WET WELL MUST SEAL BOTH ENDS OF PIPE WITH ELECTRICAL PUTTY. LOCKING GROUND EL.= 23.0 FT HATCH COVER /EL.= 23.0 1 1 1-I STEPSl l l l l l DEPTH OF WELL 10.1 FT DISCHARGE ELEVATION EL.= 20.0 FT TO INFILTRATION BASIN ' .100000 16" 2"CONDUIT REQUIRED ELECTRIC POWER CABLE NOTE:1/4' CHAIN ' WITH 1/4- SHACKELS d LIFTOUT CHAIN 1/4- m (STAINLESS STEEL) S=t C.I. FLANGE SWING CHECK PUMP ON EL. = 16.1 d VALVE 9� IN LINE ' \ PUMP ON EL. = 15.6 '° ' \ <14 .. ' , Q BASE ELEVATION = 13.1 FT n o n o n sr ANCHOR BOLT (2" PROJECTION) 4 FT X 4 FT PRECAST BOX I�ECFIVh" WITH STEPS SECTION VIEW JAN 3 1 ZOO? NTS STORM WA TER PUMP STA TI OFFLINE BYPASS DETAIL 3.A N TS COASTAL SITE DESIGN, PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 J z CL O _ � n U z Qzo Z Z o Q o � a _j �z Q U Q w OZ?p z cc U cs M jR co O_w v) �YZ20 cn Q � o o it J W O � V¢t%A GARO, � g SEAL a M O N Q 3 3 3 w Y 0 a 0 0 0 cy- Q z E LE ff _2 LLI O F f2 p H ` m w w w 0 0 0 0 3 a a a 2 W rn U) CO 0 0 5 w Ir 5 w 0 5 w O z w (If DA TE.• 10-10-06 HORZ. SCALE.• AS SHOWN VERT. SCALE.- N/A ORA WN B Y_ RL W CHECKED B K HSR PROJECT NO.: 05-0043 Sheet No C4 Of eC7j 3" STORM WATER LE = 18.0 5 CY CL ll RIPRAP 1.5 FT DEEP 1_.....�.__. _ _. _..._.__ UNNAMED TRIBUTARY it RAD. = 20 Fr/ LENGTH = 33,6 FT RAD. = 20 FT L£NG714 = 29.8 FT WITH F.E.S BYPASS STRUCTURE 4A.A PRE-TREATMENT DEVICE W/ SMART MER (SEE DETAIL THIS SHEET) (2) - 4' x 4' BOXES W/ ACCESS COVER LE = 18.6 COVER = 23.D 5 CY CL 11 RIPRAP IE 30' PIPE = 16.1 1.5 FT DEEP IE 30" PIPE = 16.1 1E 24 BYPASS' PlI? = 2Q 0 JE 9F :BOjE 1,4 12 LF 42" HDPE PIPE - -_ WITH F.ES 2423FT 5' x 5' BOX W/ ACCESS COVER COVER = 23.5 IE = 18.7 � 40 LF 42' HDPE PIPE "= =~ - 5 x 5' BOX W/ ACCESS COVER J ,�7 COVER = 23.5 1E = 18.8 65 LF 7 42' HDPE PIPE 22 LF 30 HDPE `\ RAD. = 20 FT - WITH F.ES �-- \\� LENGTH = 19.2 FT � -- --- LE = 16.0 40 FT EMERGENCY OVERFLOW_� \ 5 CY CL 11 RIPRAP SPILLWAY EL= 20.2 1.5 FT DEEP , - 65 LF 42" HDPE PIPE ... _ _ STARMWATER; S70RAGE 'SA \ ;\\ _1- �\ 5 LF 4 " HDR,E W1 FE.`$ \ ..... _..... _..... ..__....... __........... __.... ......... .......- \ 3' STORAGE ELEVA7ION = 19.7 1... ✓ SURFACE AREA = 23,897 SF STORAGE = 74,005 CF \;\ NOTES• 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLEC71ON SYSTEM. 2. PORTABLE PUMP TO BE USED TO DRAIN SYSTEM IN CASE OF EMERGENCY. J. BASIN TO BE LINED WITH CEN7IPEDE SOD. 4. BASIN TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. 5. INSTALL FLOA77NG FOUNTAIN IN STORAGE BASIN 161 42�P \N Z0 7.20_- 21 277.2 FT 23 STORAGE BASIN 4 DETAIL TOP OF GRATE = 23.5 BOX IE= 14.1 BOTTOM OF BOX = 12.6 BYPASS STRUCTURE 4.A PRE-TREATMENT DEVICE W/ SMART WER (SEE DETAIL THIS SHEET) (2) - 5' x 5' BOXES W/ ACCESS COVER COVER = 23.5 IE 42' PIPE = 16.1 IE 42" BYPASS PIPE = 19.0 lE OF BOX = 14.1 COVE_ VACCESS TOP COVE, IIACCESS TOP E v = 23.5 ELEV = 23.5 TOP OF BOX = 23.5 2.0 FT WEIR ELEV. = 19.7 42' RCP IE = 16.1 12" CONC. 2 FT SUMP2 FOR CLEANOUT 5 FT 12' CONC. FT SUMP + FOR CLEANOU tN� I SECTION VIEW (2) - 5 FT x 5 FT PRECAST CONCRETE BOX NC PRODUCTS 6060 OR EQUIVALENT JUNCTION BOX/ 4. A PLAN E (2) - 5 FT x 5 FT PRE A/ST CONCRETE BOX BYPASS STRUCTURE NC PRODUCTS 6060 OR EQUIVALENT NOT TO SCALE n I � ACCESS CODER ACCESS COAX U u no Z PLAN VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS MM OR EQUIVALENT COVE_ IfACCESS TOP TOP OF GRATE = 23.0 ELtV = 23.0 2.0 FT WEIR ELEV. = 19.7 24' HDPE IE = 20.0 12' CONC. 2 FT SUM. BOX IE= 14.1 FOR CLEANOL IOTTOM OF BOX = 12.6 42' HDPE TO CREEK IE = 19.0 =ASE COVE&ACCESS TOP ELI�t ►►�� = 23.0 TOP OF BOX = 23.0 4 FT 30" HDPE IE = 16.1 SEE DETAIL ]HIS SHEET FOR STORMWAIER P.S. DETAIL LOCATED 12" CONC. IN THIS BOX 2 FT SUMP FOR CLEANOU SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT JUNCTION BOX/ 4A. A BYPASS STRUCTURE NOT TO SCALE =ASE -� A 20 FT t`✓ TH = 43.1 FT \\J 26 FT NOTES 1. AI_ BUILDING ROOF DRAINS MUST BE DIRECTED INi'O THE STORM DRAINAGE COLLECTION SYSTEM. 2. PORTABLE PUMP TO BE USED TO DRAIN SYSTEM IN CASE OF EMERGENCY. J. BASIN TO BE LINED W17H CENTIPEDE SOD. 4. B/ ",N TO BE PLACED IN A RECORDED DRAINAGE EASEMENT. TOP OF EMBANKMENT ELEVA7ION = 31.0 INFILTRATION BASIN 4 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE INFILTRATION BASIN 4 D�TAIL SCALE: 1 "= 30' 56.8 FT TOP OF EMBANKMENT ELEVATION = 2J.0 40 FT ELEV. = 20.2 �1\\\ STORAGE BASIN 4 EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE TOP OF EMBANKMENT ELEVATION = 230 i /\\/�\/, \ \\/\\�\\ ELEV. = 16.0 RUFCO 1000 SERIES 24' GEOSY NTHE7TC MEMBRANE OR EQUIVALENT TO BE STORAGE BASIN 4PLACED FINISHED2SURFACEEATH CROSS SECTION NOT TO SCALE TOP OF EMBANKMENT ELEVA77ON = 23 0 EMERGENCY SPILLWAY ELEVA 17ON = 20.2 3' STATE STORAGE ELEVATION = 19.7 �7 3' STATE STORAGE VOLUME = 74,005 CF j\\ BASIN BOTTOM ELEV. = 16.0 IVAIUKAL UKUUNU ' STORAGE BASIN 4 EMBANKMENT SECTION NOT TO SCALE TER FM PUMP MODEL: TSURUMI NK2-SERIES SEMI -VORTEX DEWATERING PUMP SEE SPECIFICATIONS FOR ADDITIONAL DETAIL NOTE: 2" PVC ELECTRICAL PIPE GOING FROM CONTROL PANEL TO WET WELL MUST SEAL BOTH ENDS OF PIPE WITH ELECTRICAL PUTTY. LOCKING GROUND EL.= 23.0 FT HATCH COVER f EL.= 23.0 I Fill STEPS � ` '�`� III -Ili- DEPTH OF WELL I 9.1 FT DISCHARGE ELEVATION 77 -EL.= 20.0 FT TO INFILTRATION BASIN NOTE:1 /4" CHAIN WITH 1/4' SHACKELS LIFTOUT CHAIN 1/4" (STAINLESS STEEL) C.I. FLANGE 4 SWING CHECK Q VALVE IN LINE . &Mr 16" 2"CONDUIT REQUIRED I ELECTRIC POWER CABLE !` PUMP ON EL. = 17.6 , APUMP OFF EL. - 17.1 Pw O BASE ELEVATION = 14.1 FT s ANCHOR BOLT (2" PROJECTION) 4 FT X 4 FT PRECAST BOX REC�1F IVE-L.._.. WITH STEPS SECTION VIEW Jac 31 z007 NTS STORM WA TER PUMP STA � `` OFFLINE BYPASS DETAIL 4A.A NTS COASTAL SITE DESIGN, PC ENGINEERING LAND PLANNING COMMERC/AL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 pit sti.1 � s � U O O.S a sad fli b i0i Ev $ �13E1; �J SEAL O ' l( D allG o tM 0)F- O N 10 Z Q 3 3 3 w A a Y 0 0 0 Q Z O � L w MZZZ m w w Li (nn p O 0 O C) O U 3 ui cL a a cn (n V) 0 Laa � O z •- LIJ DA TE.• 10-10- 06 HORZ. SCALE, AS SHOWN VERT. SCALE: N/A DRAWN BY- RL W CHECKED BY.• HSR PROJECT NO.: 05-004J Sheet No C5 01EC Construction Road Stabilization SpedBaatim 16.80 - Construction Specifications 1. pear roadbed and parking areas of all vegetation, roots and other objectionable material 2 Ensure that road construction follows Me naturd contours of Me terrain if it is posswe J. Locate parking areas on naturally Hat areas If they am avulabla Keep Fades sufficient for drainage but generally not more Man 2 to 31 4. Provide surface drainage; and divert excess runoff to stable arws by using water bars or turnouts (References: Runoff Control Measures). 5 Keep cuts and His at 21 or flatter for safety and stability and to focfitate estabiishment of vegetation and maintenance. 6. Spread a 6-inch course of ABC' gushed stone evenly over Me AN width of the road and smooth to avoid depressions. 7. More seepage seas or seasonally wet areas must be aossed, Instal subsurface drains or geotextie fabric cloth before placing the gushed stone (Practice 6.81, Subsurface Drain). & Vegetate al roadside ditches, cuts; hills and other disturbed areas a otherwise appropriately stabilize as scan as grading is complete (References: Surface Stabilization). 9 Provide appropriate sedhnent control measures to prevent off -site sedimentation. Maintenance inspect construction roads and poking asks parlay for condition of surface. Topoim with new gravel as needed prodk road ditchas and other seeded seas for aaalon and sedimentation after runoff -producing robs. Maintain ell vegetation In a hedthy, vigorous condition. Sedknent-pmdkdng seas should be treated Immedktdy Temnorary Gravel Construction Entrance/Exit CE Specification 16.06 - Construction SpedHcations 1. pea the entrance and exit area of all vegetation, roots and other objectionable material and properly grade it 2 Place the gavel to the specitic grade and dimensions shown on the plans and smooth it J. Provide daoge to carry water to a sediment trap or other suitable outlet 4. Use geotextfe fabrics because they hmprove stability of the foundation In locations subject to seepage or high water table, Maintenance Maintain the growl pad In a aandttion to prevent mud or sediment from leaving the construction site This may require periodic fWdwskmg with 2-Inch stone. After each rainfall, inspect any structure used to trap sedknent and dean It out as necessary. Immediately remove all objectionable materials spllet washed, or tracked onto public roadways:. Temndxary Seeding Spacilkation 16.10 - 4)edHcations Complete grading before preparing seedbeds and Install all necessary erosion control proctkes, such as dikes, waterways and bash& Minimize steep slopes because they make seedbed pmparotlm difficult and Increase the erosion hazard. H soils become compacted during grading loosen Mom to a depth of 6-8 Inches using a roar; harrow, or chisel plow. Seedbed Preparation Good webbed preparation is essential to successful plant establishment A good seedbed is well -pulverized, loose and uniform. Mom hydrossedhg methods are used the surface may be left with a more hnsg*da surface of loge clods and stones. Lining - Apply Ilene occrdng to soil test recommendation& if the pH (addty) of the soil is not known, an applkoli m of ground agricultural limestone at the rate of 1 to 1 1/2 tons/acre on coarse -textured sots and 2-3 tons/saes on the -textured sans is usually suffkdant Apply limestone umthxndy and incorporate Into the top 4-6 intros of mi. Sots with a pH of 6 or higher need not be ihrod Fodder- Base gpplkdW rates on mi tests MMen these are not poss6k apply a 10-10-10 grade AwtiTzer of 700-1,000 b./sae. Both fatfizer and line should be Incorporated Into Me tap 4-6 kndros of mi. If a by r uak seeder Is used, do not mix seed and "Lear mare than 30 minutes before opplkation. Surface roughening- If recent tllor operations have resulted In a loose surface, additional roughening may not be r@WW except to break up large dads. If rohidl causes the surfaos to become NOW or crusted, loosen it just prior to seeding by disking raking harrowing or other suitable methods, Ghoove or furrow slopes steeper than 3:1 on the contour before seeding (Practice 6.4 Surface Roughening). Plant Selection Select an appropriate spades or specks mbdure from Tame 6.10a, for seeding in late winter and ealy Wh% Tame 6.10b for summer, and Table 610c for 1d1. Seeding Evenly apply seed using a cyclone seeder (broadcast), drill, cul4mc ker seeder, or hydroseeder. Use seeding rotes given In Table 610o-610c. Broadcast $eeding and hyroseedhg are approprate for steep dopes where equllrrm-t cannot be driver. Hand broadcasting is not recommended because of the difficlty in achieving a uniform dstrbutkxn. Smdl grabs should be planted no more Mon I inch deep, and grasses and legumes no mom Man 1/2 heh. Broadcast seed must be covered by raking or chain dragging and then I100Y fumed with a rafter ar cul4maer. Hyfoseeded mixtures should kmdudef a wood Aber (celkrlose) mulch. Mulchin 7he useof appropriate mulch w8 h* ensure establishment under normal conditions and Is essential to seeding success under harsh ate condtim (Practice 6.14, Mulching). Harsh site conditions indude: -seeding in fall for winter cover (wood fiber muldm are not considered adequate for this use), -slopes steeper than 3:1, -acesavdy hot or dry weather, -adverse sds(shdow, rocky, or high In day or sw4 and -areas rw"g concentrated flow. If the area to be mulched is subject to concentrated waterHow, as In channels, anchor mulch with netting (Practice 614, Mulching). Land Gradlna S)»dRkwtion 16.02 - Constructive 5pedficotims 1.Consbuct and maintain d erosion and sedimentation control practices and measures In accordance with the opproved sedmentation control plan and construction schedule 2Remove good topsoil from areas to be graded and Mod, and pmseve It for use in finishing the grading of all adticd areas. .1Scarify areas to be topsded to a mioImum depth of 2 hd►es before placing toped (Practice 6.04, Topeoling). 4.Cfew and grub areas to be Mod to remove trees, vegetation, roots, or other objectionable material that would affect the planned stability of the HI. 5.F•nsure Mot d material is flee of Mush, rubbish, racks, logs, stumps, building do& and other materiels kngpropriate for constructing stabs AfI& 6.Pface all All In layers not to exceed 9 inches In thickness, and compact Me layem as required to reduce erosion, sloM settlement or other related p warm& 7.1)o not Incorporate frozen material or soft, mucky, or highly compressible materials Into N slope& &Do not place N on a frozen foundation, due to possible subsidence and stoage. 9Keep diversions and other water conveyance measures Area of sedment during d phases of development lailands seeps or airings encountered during construction In accordance WM approved methods (Practice 6.8f, Subsurface Drain). 11.Permanently stabilize d graded areas Immediately alter find Fooling Is completed on each area In the grading plan. Apply temporoy stabilization measures on all Faded am when wok in to be htampted or dtda)W for 30 waking days or longer. 12.Dwre that toped stocples, borrow area; and spa areas am adequately protected from erosion with temporary and 8nd stablizatim measurer, Including sedinent fencing and temporary seeding as necessary. Maintenance Periodkaly, check d graded areas and the suppofthg erosion and sedmentatim control proathoes, especially after heavy rohfdls Promptly remove all sedment from dversAms and other water-dlepaed practices. If washouts or breaks occur, repair them Immediately. Prompt maintenance of smd/ eroded areas before they become dFlikant gullies Is an essential part of an effective erosion and sedimentation control plan. Permanent Seeding Sped6catlons 16.11 - 5fedficattais Seedbed Requirements Establishment of vegetation should not be attempted on sites that am unsuitable due to khgproprMe soil future (Table 6.11a), poor drohogs, concentrated overland flow, or steepness of slope until measures haw been taken to correct these problems. To maintain a good stand of vegetation, the soil must meet certain mhimum requirements as a growth medFxn. The existing soil shoukf haw these cflerda - Enough fine-grained (sit and day) material to maintain adequate moisture and nutrient supply (avaidle water eg)adty of at least .05 Inches water to I Inch of soil). - Sufficient pore space to permit root penetration. - Suuftklent depth of soil to provide an adequate mot zone. The depth to rock or h*wmeabk layers such as har*ans should be 12 Inches or more, except an stapes steeper than 21 where the addtim of soil is not feasible. - A favorable pH range for plant growth, usually 6.0-6.5. - Freedom from lags roots, brono m stones, large dodo of earth, or trash of my kind Clods and stones may be left on slopes steeper than 31 If they are to be hydrosseded. ft any of the above criteria are not met -La, If the existing soil Is too coarse, dense, "low or acidic to foster vegetation-specid amendments are raWked The sal condboners described blow may be bweRetd or, preferably, topsoil may be opplfed In accordance with Practice 6.04 Tapdoing. Soi conditkx►ers In order to Improve Me structure or drainage dwwterMtks of a sot the fallowing material may be added Mass amendments should ady be necessary wirer» soil have limitations that moue them pow far pint growth or for fie trf establishment (see Chapter d Vegetative Conslderotkxns). Peat -Appropriate types we sphagnum MOSS peat, hyprwxn mass Peat readeedge peat or peat humus, all from fvsh-water sources Peat should be shredded and conditioned in storage plan for at newt 6 months after excavation. Said -dean and free of took materlds Vamkufite-horthadturd grade and free of took substances. Rotted manure -stable or cattle manure not containing undue amounts of straw or other bedding mateids Thoroughly rotted sawdust- free of stones and debris. Add 6 b. Of nitrogen to each cubic )Q'd Sludge -Treated sewage and hdustnld sludges are awiable In various famms: Mere should be used ody in occarclance with ked, State and Federd regulations Spades Selection Use Me key to Permanent Seeding Mbrtuues (Table 6.11b) to select the most appropriate seeding mbdure based on the general site and maintenance factors A listing of species Including scientific names and cha►acterbilm b glwn In Appemilx &02 Seedbed Preparation Instal necessary mechanical erosion and sedimentation control proctk a before seeding, and complete grading according to the approved pkn. Line and fertilizer needs should be detamhed by son tests. Sol testing Is performed free of charge by Me North Carolina Department of Agriculture soil testing laboratory. Directions, sanple cartonsi and hfamaMw sheets am available through county agricultural enktenslon offices a fiam NWA. Because the NCDA ad testing lab requires 1-6 weeks for sample fir n-around sampling must be planned well In advance of find gadng. Testing is also done by commercial laboratories. Man soil feet are not avdalable, klow rates suggested on the indvidud spedHcaUon sheet for the seeding mbx chosen (Tables 6.11c through 611v). Appikwtions rates usually fdl Into the follawhg ranges: - Around oFiculturd limestone Light-texturg sandy sots; 1-1 1/2 tons/sae Heavy textwet ddayey sots 1-3 ,one/acre - Fertilizer (gasses 800-1200 Ib/acre of f0-10-10 (a the equhdant) Gnass-legume mkhree: 800-1200 lb/acre of 5-10-10 (a the equhabnt) Appfy Ilene and fertilizer evaWy and howporate Into the top 4-6 Indw of sal by disking or other suitable mean& Operate machinery on the contour. Man using a hydoseedw, gply lime and fertiftm to a rough, loose surface. Roughen surfaces according to Pmcilce 6.0.E Surface Roughening. Complete seedbed preparation by &ad* up urge dads and raking Into a smooth, uniform surface (dope Ives than 11) IN In or level depressions than can collect water. Broadcast seed '-into a freshly loosened seedbed that has not been seded by rainfall. Table 6.10b - Temporary Seeding Recommendation for Late Minter and Eaty Spring Seeding mlxtwe Spades- Rye(grala), Annual lespedaw (Xcbe In Piedmont and Coastal Pfau Rate (Ib/acro - 120 Omit annud lespedaza when duration ore` tenporay cover Is not to extend beyond ,erne Seeding dates -Coastal Plain - Deg. 1 - Apr. 15 Sol amendments- Fdlow recommendations of mi tests or apply Z000 6/mm Found agricultural limestone and 750lb/bare 10-10-10 ferUaer. Mulch -Apply 4,00pb/acre straw. Mchw straw by hocking wfM asphalt netting or a mulch anchoring too, A aisle wfth blades set nearly straight can be used as a mulch andhorkhg foal Maintenance - Refertlize N growth B not fully adequate Reseed refertiize and madeh knmedlotdy Wowing erasion or other damage Table 6.i0b - Temporary Seeing Recomimandatkns for Simmer Seeding mixture Spedea-Garman mitt Rafe(Ib/ass)- 40 Seeding dates -Coastal Plain- Apr. 15-Au4 15 Sol amandments-Fdkw reconmendatins of s>l tests or apply 2000 IIfame Found agrloultud limestone and 750 lb/ore 10-10-10 fertilizer. Mulch -Apply 4,000 ib/aae straww. Anchor straw by tacking with asphalt, netting or a mulch anchoring tod. A disk with blades set Marry straOt can be used as a match anchahg tool Mdntenahx-Refatiae If growth is not Wy adapuate, Reseed, ref lea, and mulch Inmediately following erosion or other damage Table 6.10c - Temporary Seeding Raomnandatim for Fdl Seeding mixture SPedes-Rye(gaim) Rate(iblwq) - 120 Seeding dates - Coastal Ptah and Piedmont -Aug 15 - Dec. 30 Sod amendments - Fallow mi tests or xpPly Z000 lb./ocre ground oFloul urd lirratane and 1,0o0 b/acre 10-10-10 father. Mulch- Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt netting, or a mulch w4h ring tod. A d1sk with blodes set nearly straight can be used as a mulch ondnaring tod. Maintenance- Repair and re*dtze damaged areas immediately T**m with 50 Ib/acre of nitrogen ion Marco, If It is roes ary to extend to rponry cover beyond tune M ovrseed with 50 b/are Kobe (PAso nont and Coastal Ptah) Outlet Stabilization Structure Spedflcotiw 16.41 - Construction Spedfiaatims 1. Ensure that the subgrode for the titer and Trap follows the required Iher and Bodes shown in Me plan. Compact my All requred in Me subgode to the denslty of tine surrou ndhg undisturbed materfd low areas In the subgrads on unfabrbad mi may also be Mad by rww ro g the rilrgp thickness. 2 The rjorap and gravel After must conform to the spedHed goring limits shown on the plans 3. Filter doth, when used mot meet design reWrements and be properly protected from pundnknf or toerN during midiabon. Repair any damage by removing the rWrap and placing another pow of After cloth over the damaged area Al connecting pots should ow* a mhImum of I It if the damage is extensive, replace Me entire After doth. 4. ROW may be placed by equipment but take cars to avid damaging the After. 5 The minhxm Midanew of the rWrap should be 1.5 tines the maxImum stone diameter. 6. Rprap may be field stow or rough quarry stone. it should be hat-4 mgWar, highly weaMa-msrstant and wef graded 6. Construct the apron an zero grade with no overfill at the end Make the tap of the romp at Me downstream and level with the receiving area or siody below It 6 Ensure Mat the apronn is prapety dfgW writs the receiving stream and preferably shot throughout b Mngth. if a curve is needed to fit Me conditions; place ft in the upper section of the apron. 9. immediately after construction, stabilize ell disturbed areas with vegetation (Practice 610, Ternperay Seeding and 6.11, Permanent Seeding). Maintenance inspect roW outlet structures after heavy rains to see if my erosion around or below the roW has taken place or If stones have been dislodged immedately make d needed repairs to prevent father damage. SFSediment Fence (Silt Fence) Specification 6.62 - Construction Spe d6oatims MAIDIIALS 1.Use a s)nMetk titer fabric or a pavious sheet of pdyprop)lena nylon, polyaster, or poi}ethylene yam, which is certHled by the mawfactwv or supplier as conkrmhg to Me requirements shown In Table 6.62b. Synthetic Altar fabric should contain ultraNdet my Inhibitors and stabilizers to provide a minimum of 6 months of expected usable constuctm /he at a Imparatre range of 0 to 120 F. 2Fnsrro Mat posts for sediment fences are a ion, 4-" diameter pine; 2-inch diameter oak or 1.331b/►hear If steel r M a mvkwm length of O ft Make sum that steel posts haw projections to facilitate fastening the fabric. 5For rainkreement of standard strength After fabric; use wire hence with a mhhurn 14 gauge and a maxkwm mesh spacing of 6 Indro& Table 662b SpedfioaBons For Sedinent Fence Fabric Phyekd Property Requirements Fiterhg Ef deny - 85X (mm) Tensile Strength at Standard Strength- 301bAki in (min) Extra Strength- 50 b/Ih in (mm) Slurry flow Rate - Q3 gd/sq It/min (min) CONSiRUC710H (.Construct the sediment barker of standard strength or extra strength synthetic After fabrics 2tnsure that the height of the sediment Rance does not exceed 18 hdnat above Me groand surface. (Higher fences may Ipou►d volumes of water sufficient to curse failure of the structure) lConstruct the ater fabric from a continuous roll cut to the length of the barrier to avold Joints. Men joints are necessary, securely fasten the After cloth only at a support post with ovdwr* to the next post 4.Sapport standard strength After fabric by wire mesh fastened securely to the W slope side of Me posts using heavy duty wine staples at bast 1 halo kng, or be wires. Extend the wire mesh support to the bottom of the trench. S.Mhen a wire mesa awpport fence is used space posts a maxhwm of 8 ft apart Support posts should be then securely into the ground to a minimum of 18 iodine& 6.Extra strength Alter fabric with 6ft post spacing does not require wire mesh support fence. Staple or wire the After kbrk directly to pasts ZE cawte a trench approxhlately 4 inches wide and 8 how deep along the proposed the of posts and upsope from the barrier (figure 6.62a). &6ockti the trench with compacted soil or Fravel placed over the After fabric. 9.Do not attach After fabric to eAdbg trees Maintenance inspect sentiment fences at least once a week and after each rahfdL Make my rewired repairs hmme"ally. Should the fabric of a sediment fence cdgmse tea, decompose or became heffecit* replace it promptly. Replace budop every 60 days. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take are to avoid undermining the fence during deanout Remove of faking materials and unstable sedimant deposits and Draag the raw to grade and stabilize 4 after Me contdbuthg drainage am has been properly stabilized &=ffrY Sediment Trap - continued Protection from piing -Place After cloth an the foundation below the mini to prevent pok4 M alternative would be to excavate a keyway trench across the nprap foundation and up the sibs to tiro height of the don. Main length and depth - Keep the spillway weir at Most 4 ft long and sized to pose the peat* discharge of the 10-yr storm. A me rxum How depth of 1 ft a mhhnanm 6eeboad of (15 ft and maxhmun aide dopes of 21 are noon mendsd Moir length may be selected from Table 6.6W sham for most site locations in North Carolina Table 6.60a Design of Swbilwoys Dmalnage Area Mai, Length(i) (ate) 010 1 4.0 2 6.0 3 8.0 4 iao 5 120 (1) Dimensions dawn are minimum Construction Vadfcations 1. pea; grub, and str p the asa under the embankment of al vegetation and root mat Remove d1 •rt= soil containing high anoints of agmb matter and stodyle or depose of it properly. Hal di objectionable matadd to the daioxnfed dbpoed area 2 Ensure that pill material far the embankment is free of roots; woody vegetation, organic matter, and other obJeetlonable mat&14 Piece the N In lifts not to exceed 9 Inches and machine compact It Over 2 the embankment 6 hones to allow for settlement J. Construct the outlet section In the er0mlanent Protect the connection between the rjorrp and be mi from p4*g by using After fabric or a ke)mY cutoff tmndh between the 47rop structure and the mi. (Place the titter fabric between the *W and soli Extend the fabric across the spilwway fandatkn and sides to the top of the don; or (Excavate a keyway trench dong the centerline of the spiway foundation extending W the odes to the height of the dam. The trench would be at least 2 ft deep and 2 ft wide whh k I side dope& 4. pea the pond arso below the elevation of the crest of the spillway to facilitate sediment demout 5 Ai art and hM slopes should be 21 or Hatter. 6 Ensure that the stone (alai►age) section of the anbarkio nent has a minimum bottom width of 3 ft and maximum ode napes of 1: i that extend to the bottom of Me spillway section. 7. Construct the mhImum finished stone spillway bottom width, as shown on Me plans, vet 21 ode •lapse extending to the top of Me over /iced embdnkrnent Keep the thickness of the aides of the spNway outset structure at a minimum of 21 hoes the weir must be kW and constructed to grade to assure deign cola -fly. IL Material used In the stone section should be a wdi-Foaled mbrture of stone with a d50 size of 9 hales (dam B erosion control stone is recommended) and a maxkmrn stone size of 14 homes. The stone may be mochhe placed and the smote, stones worked Into the ►oida of the larger stone& the stone should be hard mgn, and hWy weather -resistant. 9. Ensure that the stone spillway outlet section extends downstream past the toe of the •nbanianent untl stable candttives are reached and outlet velocity is acceptable for the receiving staan. Keep the edges of the stone outlet section Huth wIM Me srroandding ground and shape the center to confine the outflow abeam (Refs avow Outlet Protection). 10. Direct emergency bypass to naturd, stable areas. Locate bypass outlets so Mat flow wil not damage the embankment It. Stabilize the arr"A meat and of disturbed areas above the sediment pool and downstream tom the trap hmedhately after construction (References: Surface Stalikative). 12 Show the distance from the tap of the spillway to the sediment deanout level (one-half the design depth) on the pions and mark It In the field. Inspect temporary sedknent trips after each period of agmlfk-t r*ha . Remove sediment and restore ths bV to its mod dimmo w when the sedtiment has accumulated to ** half the design depth of the trap. Place the sediment that is removed to Ma designated Aposd area and replace the contaminated port of the gravel facing. Chadic the structure for damage from erosion or p0#4 Periodically check the depth of the spillway to ensure it is a mknhnm of 1.5 ft below the low point of the embankment hhmedlotely N any settlement of the embankment to slightly above design grade. Any 4wW displaced ham Me spillway must be replaced Immediately. After d sedIment-produehg ones haw bee► permma * stabllzd4 remove Me structure and all unstable astimsot Smooth the area to biend with the adfohhg areas and stabilize property (References: Sirfacs Std 1Zzr ion). GC Grass -Lined Channels Specification 16.30 - Construction *eaflcatians 1. Remove all trues, brush, stamps, and other objectionable material (ram the foundation area and dhpose of property. 2 Frcavote the chapel and shops It to neat linear and dfrnenaons shown on Me plans plus a Q2 ft overcut around the crowd perimeter to allow for &"g during sombed preparations and sod buildup. 3. Remove and property dispose of ell excess soil so that sdufoce outer may enter the channel hdy. 4. the procedure used to establish grass in the channel will depend upon the severfty of the conditions and selection of specla& Protect Me channel with mulch or a temporary liner sufficient to withstand andcodad velocities duhg Me establishment parkd (Appw& 8.05). Maintenance AAg Me estabfidhment perig check grass-Ihed channels after every rainfdl. After grass is sstoblisha4 periodically chat* the chard; check it after every heavy rahfd event Immediately make repairs. It is particularly Important to check Me ohm* outlet and d road crossings for bank stability and evidence of pphg or scour hales Remove ell significant sediment accumulations to maintain the deslg W carybg capacity. Keep the grass in a health, vigorous cmdtim at all thus, slice it is Me primary erosion protection for Me dnamrol (Practice 6.11, Permanent Seeding). Table 6.11s - Seeding No, 4CP for. W-Droned Sandy !owns to Dry Smds, Coostd Plan; Low to Medkrn-Coe Lawns Seeding mixture Spades - C04"degrass - Rate - 10-20 b/are (seed) or 33 bu/wra ( ) Seeding dates - Mar. - Am (Sprigging can be done through July where water is avalabfe for higatim.) Sol amendments - Apply lIme and ferilher according to soil test, or gpply 300 b/acre 10-10-10 *l9g1ng - Pint sprigs In furrows with a tractor-okown transplanter, or broadcast by hand Furrows should be 4-6 how deep and 2ft spat Place sprigs about 2 It We In the row with one and at or above ground Mvel (Figure 6.11d). Broadcast at rotes shown above, and press sprigs into the top 1 1/2 indw of sol oft a disk set sk*t so that a; alp are not brought back toward the Mulch - Do not mulch Mahtenance - Fertlae very spwlagly- 20 b/ace nitrogen in spring wa no phosphorus Centbedegross coot tolerate NO pH or excess fatiker. Maintenance Tabu 6.11t - Seeding M% 5CP for: Mali-DroW Sandy Looms to Dry Sands; Low Seeding mixture Suedes Rate (!b/sae) Pensacola Bahiagrass 50 Serkao lespedem 30 Caron Bamudagoss 10 German millet 10 Seeding notes I. Mare a neat gppeafmce Is desired omit serkea 2 Use common Bermu6ograss any an Isolated sites whore If cannot became a pest Swmudogoss may be replaced with 5 b/acre centrpedFass. Seeding dates - Apr. I - ,Ady 15 Soil amendments - Ap'ply lime and ferti¢er according to soi tests, or apply 3,000 Ib/aae ground o7oc Mural limestone and 500 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 b/ace Fah straw or equhdent cover of another suitable mulch. Anchor by too *wilt! asphalt roving and netting or by groping with a mulch anchorN tool A disk with bkrdes set nearly straight can be used as a mulct anchoring tool Maintenance - Refixdae Me fo%wing Apr. with 50 6/sae nitrogen. Repeat as growth movies May be moved only once a yea. Mare a neat appearance is dawned omit serkao and now as often as needed. Table 6.1ifv - Seedhn'!c. 7CP for: Gras -fined amann k Cooed PbIn Seeding ilbdure Species -• Common Bemudogass - Rate - 40-M (112115/1,000 If ) Seeding dotes - Caasttn °bin Apr - duly Sol amendments - Aaly lime and fertilzer accoraGmg to mi teats, or q*y IWO blare Found . ulhurd Ihmestone and 500 b/acre 10-10-10 fertl¢a. Mich - Use Jute, exdalaar matthg, or other effective c ann l Inning material to cover fine bottom of channels and dtdmes. The Ihhg should extend above the highest calculated depth of Now. On c onnal side dopes above this height and In damages not requkka tempa wy lhinq% apply 4,000 IB/age groin straw and anchar straw by s,*Jnq netting over the top. Adch and anchoring mdadds must be allowed to wash down slopes where they, can dog drainage devices Maintenance -A mhhxim of 3 weeks is required for establishment Inspect and repair mulch fmquanMy Rwfertiae the following Apr. vet 50 B/care Refer to Appendix 8.02' for botanical names ID Black and Ginyl unfit Frotecilan r SpedBcati n 16.5.'. - ConshcUve Specifications I. Lay one Nod u: each side of the structure on Its side In the bottom row to allow pod danoge. The foundation should be excavated at bast 2 indies below Me cent of Me storm doh. Pierce the bottom row of the blocks og2nst the edge of the storm drarh for lateral support and to av ld washouts when ovr&v ocoum If needed give lead support to subsequent rows by placing 2 x 4 wood studs &m* black cparhp 2 Carefuiy fit hardware doeh or comparabie We mesh with i12-inch openings over d block comings to hold gravid In plom J. Use de- gravel, 3/4- to 1/2-Inch In daneter, placed 2 how below the top of the block on a 21 &*a or Hatter and smooth It to an even gads. hwoT 157 washed stone Is recommended A If only stone ax' yovel are used keep the dope toward the hiet no steeper Man 11. Leave a mhhmum 1-ft wide level stow area between the structure and around the kdeet to prevent gavel from anteing klet On Me slope toward Me Inlet use stem 3 how in diameter of krger. On the slope away cram the use 1/2 - 3/4-rin gavel (NCIUT 157 weed stake) at a mhknwn Mkdmess of 1 ft Maintenance Inspect the fabrk barley after each rah and mike repars at needed Remove sediment from the pod area as necessary to provide odepfate storage volume for the next rain. Man Me contrDutrrg drainage area has bear odequafdy stabiaed remove dI materiels and any unstable sediment and depose of Man properly. Br rg the defrbed area to the grade of the drop InMt and smooth cad compact t Appropriately stdbias d bare avers around the r 4t COMPACTED FILL OF GRAVEL, EXTENSION OF FABRIC AND Win : INTO THE TRENCH FILTER FABRIC MINIMUM 8" THICK LAYER OF GRAVEL 8'MINiMUM �-TRENCH 6 FT. ULNTER 1• 1' I •„ C / a a' sF SEDiMENT FENCE ( SILT FENCE Pract'ce 6.62 Sediment Basin Speedflcations 16.61 - CdnatnucUm Specifications I -Site preparations -pear, grub and s4 topsoil from areas under the embankmat to remove trees, vegetation, roots and other objectIonable material Delay dowbg fine pod area until Me dam Is complete and then remove brush, Imes and other objectionable materials to facilitate sedment demout Stodple all Nadal or wall containing organic matter for use on the outer shelf of Me emmbanament to facilitate vegetative establishment Place tanpanry sediment control measures below Me basin as needed 20d-off trenc-Excavats a cut-off tra►dn dung Me centerline of the earth N embankment Cut Me trench to stable soil material, but In no case make it hens Man 2 ft deep. fie cut-off trench must extend into both abutments to at host Me devotion of the riser nest Make the minimum bottom width wide enough to permit operation of excavation and compaction sW omwt but In no can lees than 2 ft. Make side slopes of the bendn no steeper Man 1.1. Corpacton requirements are the some as those for the embankment, Keep Me trench dry during badkfilhg and compaction operations. 3Fmbmkrrnent-Take N material from Me gVmwd areas shown on the plans, It should be dew mineral soq On of roots, woody vwgetatiox rocks and other objectionable moterd Scatty areas on which N Is be placed before placing All. Rae fir material must contain suffident moisture so it can be famed by hand Into a bail without crumbling If water can be squeezed out of the bat, It Is too wet for proper compaction. Pierce 9 moteufd In 6 to 8-hoh continuous la)wv over the entire length of the Hi area and then compact it Compaction may be obtained by routing the construction hauling aqua wont over the fiI so Mat the entire surface of each layer is frawsed by at least one wheel or traod track of the heavy a%fonent or a wMactor, may be used Construct the embanianent to an elevation IOX higher than the design height to slow for settling. AConduR spiwaya-Sac rely attach the riser to Me barrel or barrel stub to make a watertight structure connection. Secure d connections between barrel sections by gftvW watertight assemWks Place the bard and riser on a firm, smooth kundaMm of Impervious soil. Do not use pervious material such as =4 gavel, or aushed stone as bodkHl around the pipe or anti -seep coins Place the fir motarlal around the po spilway In 4-hah layrs and crrpact It under and around the pot to at least Me some density as the adjaoent embankment Care must be taken not to raise the p{oe from firm contact with its foundation when compacting under Me pipe haurtcmes. Place a mhhrum depth of 2ft. of hand-canpocted badclil over Me pipe *IhW before aoeahg It with constructive equpxment Anchor the riser in place by cnaste or other satisfactory means to prevent flotation. In no pose should the Am candult be Installed by cutting a trench thrauglm Mine don after the ambankmant Is completa 5Emergency spllwar4wtol the emergency, sMlwaY in undstrbed sail The achievement of planned elevations, grade, design width, and entrance and exit ahaxrol skies are altkd to Me successful operation of emergency spillway 6-I lets-Dled►age water Into Me bash In a mater to prevent erasion. Use dverekns with outlet protection to avert sedinent-fallen water to Me upper and of the pod area to improve bash bW of Clancy (References: Runoff Control Measres and outlet Protection). 7.Eroskn contrd-Construct Me structure so that Me disturbed area is minimized Divert surface water away from bare area& Carpiete the embankment befog fine area is dewed Stabilize Me emergency gpNwoy embankment and of other disturbed am above be ant of Me pri4d so tway mmedately after construction (Rehre cew Surface Stabfizatim), rlSafety-Sedinent basks may attract children and can be dangerous Avoid steep side sdpm and fence and mark basks with waning signs If truing is May: Follow ell state and local requirements Maintenance Chedk sediiment basins after periods of slgrd/kmt runoff. Remove w*nmt and restore the bash to lob origfnd dmanaons when sediment accumulates to one- half the design depth. Check the embankment * rays, and outlet for erosion dkmaga and Inspect the anbankment for piping and settlement Make at necessary repars kmmediately. Remove all bash and other debris from the riser and pool area. I M= 3 _ VARIES n= 0.03 3 �1 GRASS LINED WITH CENTIPEDE BERMUDA OR EQUiLVALENT 3: 1 GRASSED CHANNEL N. T. S PUBLIC ROAD GRAVEL CONSTRUC77ON ENTRANCE, KIDTH AS REQUIRED CE ENTRANCE/EXIT DETAIL Practice 6.06 NTS OVERFILL 6" ?r1 FOR SETTLEMENT 4'MINIMUM EMERGEN6 Y \ BYPASS BELOW �j/ G �2;1, SIDE�� SETTLED TOP OF DAM Q j SLR E MAX. NATURAL GROUND /� FILTER /\��FABRIC \� - - - - X SECTION VIEW 3'MINIMUM WASHSTONE I' NOTE: THICK ON FACE SEE NARRATIVE FOR FROM TOE OF DAM 5'MINIMUM MORE DETAIL. TO WEIR. 1,800 CF / ACRE X Q ri 2:1 SIDE 2:1 SIDE SLOPE MAX. in SLOPE MAX. CROSS SECTION Q TEMPORARY SEDIMENT TRAP Practice 6.60 NOT TO SCALE ,IATELR�IORTEX EL=15.8 #57 WASHED STONE 0 0�0 0 0 0 0 0 1/2'HOLES WITH 0 0� 0 oq 3" SPACING itz EL=13.0 Xl „ 18 HOPE TEE 18 HDPE OUTLET PIPE _._-CONCRETE ANTI- FLOTATION BLOCK TEMPORARY OUTLET _STORAGE STRUCTURE DETAIL BASIN 1 NOT TO SCALE La 4' �000 00000o4L REFERENCE EROSION CONTRC ono°o° CALCULATIONS FOR SPECIFIC mam*m*mamama DIMENSIONS. OUTLET PIPE DIAMETER o°°° (DO) d50 = REFERENCE EROSION CONTROL CALCULATIONS dMAX = REFERENCE EROSION CONTROL CALCULA7IONS Lo = REFERENCE EROSION CONTROL CALCULATIONS MIN. APRON THICKNESS = 4.5' NOTE: FILTER FABRIC IS TO BE PLACED JNDER ALL STONE JAN 3 ZOO OUTLET PROTECTION. I OUTLET PROTECTION DETAIL NOT TO SCALE COASTAL SITE DESIGN, PC ENGINEER/NG LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 OW LU � Q L O Q ZOQ O � 0 CL .0 ¢ �_ 30 �2 �OV Z Q Z U ti U W� J(n o �U ZW! to Q LLJ co tq- r") Qti0 Wt~r Q) U tt- I o Z ZO h- Z I co CL ZW �WO Iyj�zO� �Z LU �Z r�, �k q s O q Q wY w a s rd 10 0-1 �, �pf�SS+4pi q � 0 EAL 2 o W Q � (n Y Q W lY a �++ J wo A8 5 W Ix O C4 .- Z W DA TE.• 10-10- 06 HORZ. SCALE. N/A VERT. SCALE. N/A DRAWN BY- RL W CHECKED BY' HSR PROJECT NO.: 05-004J Sheet No EC6 pf4 C7 STORM DRAIN DESIGN COMPUTA77ONS I LOCA7]ONE RUNOFF I PIPE DESIGN FROM TO POINT POINT PIPE D.A. D.A. LENGTH INCR TOTAL (ft) (ACRES) (ACRES) RNOFF � CA COEFF INCR (C) m CA TOTAL Tc RAIN DISCH. INLET DESIGN N Q TIME TIME (in/hr) ( fps) CAP. (cfs) VEI_. (fps) DIA. (in) LOPE INV. UP (9) (ft) IN V. DOWN (ft) HGL. UP (ft) HGL. DOWN (ft) GRND/RIM ELEV GRND/RIM ELEV UP DOWN (ft) (ft) 1.A OUT 32.0 0.00 3.34 0.00 1 0.00 1.50 0.0 8.7 7.4 1 12.25 76.04 1 2.50 30 3.44 14.10 13.0 17.45 17.42 20.00 20.00 1.B 1.A 41.0 0.38 3.34 0.45 0.17 1.50 5.0 8.4 7.5 12.25 28.64 2.50 30 0.49 14.30 14.10 1749 17.45 19.80 20.00 1. C 1. B 23.0 0.19 0.19 0.45 0.09 0.09 5.0 5.0 8.1 0.70 6.92 0.39 18 0.43 14.40 14.30 17.58 17.58 19.80 19.80 1.D 1.B 70.0 0.00 2.77 0.00 0.00 1.25 0.0 7.9 7.6 10.16 26.85 2.07 30 0.43 14.60 14.30 17.56 17.52 20.00 19.80 1.E 1.D 198.0 0.66 1.14 0.45 0.30 0.51 5.0 5.4 8.1 4.18 12.45 1.33 24 0.30 15.20 14.60 17.67 1760 19.10 20.00 1.F LE 23.0 0.48 0.48 0.45 0.22 0.22 5.0 5.0 8.1 1.76 6.92 1.00 18 0.43 15.30 15.20 17.68 17.68 19.10 19.10 1.G 1.D 222.0 0.77 1.63 0.45 0.35 0.73 5.0 5.2 8.1 5.98 13.58 1.90 24 0.36 15.40 14.60 17.72 17.57 18.50 20.00 1. H 1. G 23.0 0.86 0.86 0.45 0.39 0.39 5.0 5.0 8.1 3.15 6.92 1.78 18 0.43 15.50 15.40 17.75 1773 18.50 18.50 2.A OUT 26.0 0.00 7.09 0.00 0.00 3.19 0.0 10.2 7.2 26.00 117.0 3.68 36 3.08 8.80 8.0 13.40 13.36 18.30 16.70 23 2.A 14.0 0.07 7.09 0.45 0.03 3.19 5.0 70.1 7.2 26.00 56.37 6.75 36 0.71 13.20 13.10 15.051 14.53 18.20 18.30 2.0 23 23.0 0.23 0.23 0.45 0.10 0.10 5.0 5.0 8.1 0.84 6.92 0.48 18 0.43 13.30 13.20 15.55 15.55 18.20 18.20 2.D 2.B 134.0 0.00 6.79 0.00 0.00 3.06 0.0 9.5 7.3 24.90 36.44 4.82 36 0.30 13.60 13.20 15.57 15.36 18.60 18.20 2.E 2.D 122.0 0.72 6.53 0.45 0.32 2.94 5.0 8.9 7.4 23.94 26.26 5.83 30 0.41 14.10 13.60 16.01 15.60 18.00 18.60 2. F 2.E 23.0 0.65 0.65 0.45 0.29 0.29 5.0 5.0 8.1 2.38 6.92 1.35 18 0.43 14.20 14.10 16.54 16.53 1 & 00 18.00 2.G 2.E 150.0 0.40 5.16 0.45 0.18 2.32 5.0 8.3 17.5 18.92 23.58 4.32 30 0.33 14.60 14.10 16.58 16.33 18.10 18.00 2. H 2• G 23.0 0.45 0.45 0.45 0.20 0.20 5.0 5.0 8.1 1.65 6.92 0.93 18 0.43 14.70 14.60 76.89 16.89 18.10 18.10 2.1 2.G 188.0 0.00 4.31 0.00 0.00 1.94 0.0 7.3 7.7 15.80 23.17 3.89 30 0.32 15.20 14.60 16.97 16.74 20.10 18.10 2. J 2.1 112.0 0.20 0. 73 0.45 1 0.09 0.33 5.0 15.3 8.1 2.68 6.28 1.51 18 0.36 15.60 15.20 17.29 17.22 19.50 20.10 2. K 2. J 23.0 0.53 0.53 0.45 0.24 0.24 5.0 5.0 8.1 1.94 6.92 1.10 18 0.43 15.70 15.60 17.32 17.31 19.50 19.50 2.L 2.1 110.0 0.24 3.58 0.45 0.11 1.61 5.0 6.9 7.8 13.13 13.64 4.53 24 0.36 15.60 15.20 17.30 16.98 19.40 20.10 2.M 2.L 23.0 0.52 0.52 0.45 0.23 0.23 5.0 5.0 8.1 1.91 6.92 1.08 18 0.43 15.70 15.60 17.62 1761 19.40 19.40 2. N 2. M 114.0 0.00 2.82 0.00 0.00 1.27 0.0 6.3 7.9 10.34 13.40 3.86 24 0.35 16.00 15.60 17.50 17.30 20.20 19.40 2.0 2.N 153.0 0.50 1.45 0.45 0.23 0.65 5.0 5.2 8.1 5.32 6.00 3.01 18 0.33 16.50 16.00 18.00 17.62 19.50 20.20 2.P 2.0 23.0 0.95 0.95 0.45 0.43 0.43 5.0 5.0 8.1 3.48 6.92 1.97 18 0.43 16.60 16.50 18.09 18.07 19.50 19.50 2. Q 2. N 169.0 0.74 1.37 0.45 0.33 0.62 5.0 5.3 8.1 5.02 6.26 2.89 18 0.36 16.60 16.00 17.99 17.64 19.30 20.20 2. R 2. Q 23.0 0.63 0.63 0.45 0.28 0.28 5.0 5.0 8.1 2.31 6.92 1.33 18 0.43 16.70 16.60 18.09 18. o8 19.30 19.30 2. S 2.D 46.0 0.20 0.26 0.45 0.09 0.12 5.0 8.1 7.5 0.95 6.92 0.54 18 0.43 13.80 13.60 15.96 15.96 18.30 18.60 2.T 2.S 23.0 0.06 0.06 0.45 0.03 0.03 5.0 5.0 8.1 0.22 6.92 0.12 18 0.43 13.90 13.80 15.97 15.97 18.30 18.30 3.A OUT 38.0 0.00 8.05 0.00 0.00 3.62 0.0 9.6 7.3 22.66 51.61 2.41 42 0.26 15.10 15.00 18.35 18.34 23.00 20.00 33 3.A 203.0 0.95 8.05 0.45 0.43 3.62 5.0 8.2 7.5 22.66 59.08 2.77 42 0.34 15.90 15.20 18.41 18.35 22.00 23.00 3. C 3.8 138.0 0.53 1.53 0.45 0.24 0.69 5.0 5.3 8.1 5.61 6.32 3.18 18 0.36 16.40 15.90 18.81 18.41 21.60 22.00 3. D J. C 23.0 1.00 1.00 0.45 0.45 0.45 5.0 5.0 8.1 3.67 14.91 1.17 24 0.43 16.50 16.40 18.95 18.94 21.50 21.60 3.E 33 8.0 0.92 5.57 0.45 0.41 2.51 5.0 8.1 7.5 17.05 45.85 3.49 30 1.25 16.00 15.90 18.42 18.41 22.00 22.00 3.F 3.E 254.0 0.85 3.41 0.45 0.38 1.53 5.0 7.1 7.7 12.50 12.69 3.98 24 0.31 16.80 16.00 19.20 18.42 19.80 22.00 3.G 3.F 23.0 0.41 2.56 0.45 0.18 1.15 5.0 7.0 7.7 1 9.39 6.92 5.31 1 18 0.43 16.90 16.80 19.38 19.20 19.80 19.80 3.H 3.G 190.0 0.39 0.92 0.45 0.18 0.41 5.0 5.3 8.1 3.37 5.90 1.91 18 0.32 17.50 16.90 19.96 19.77 20.90 19.80 3.1 3. H 23.0 0.53 0.53 0.45 0.24 0.24 5.0 5.0 8.1 1.94 6.92 1.10 18 0.43 1760 17.50 20.01 20.00 20.90 20.90 3. J 3. G 117.0 0.00 1.23 0.00 0.00 0.55 0.0 6.0 7.9 4.51 6.14 2.55 18 0.34 17.30 16.90 19.94 19.72 20.40 19.80 3. K 3. J 16.0 1.02 1.23 0.45 0.46 0.55 5.0 5.9 8.0 4.51 8.30 2.55 18 0.63 17.40 17.30 19.97 19.94 20.10 20.40 3. L 3. K 23.0 0.21 0.21 0.45 0.09 0.09 5.0 5.0 8.1 0.77 6.92 0.44 18 0.43 17.50 1740 20.07 20.07 20.10 20.10 3.M 3.E 127.0 0.66 1.24 0.45 0.30 0.56 5.0 5.3 8.1 4.55 5.89 2.57 18 0.31 16.30 15.90 18.75 18.51 21.60 22.00 3.N 3.M 23.0 0.58 0.58 0.45 0.26 0.26 5.0 5.0 8.1 2.13 6.92 1." 0 I 18 0.43 16.40 16.30 18.84 18.83 21.30 21.60 3A. A OUT 44.0 0.00 2.77 0.00 0.00 1.25 0.0 7.9 7.6 10.16 19.55 2.,,-7 30 0.23 15.10 15.00 18.37 18.34 23.00 20.00 3A.B 3A.A 197.0 0.00 2.77 0.00 0.00 1.25 0.0 6.9 7.8 10.16 12.38 3.23 24 0.30 15.69 15.10 18.76 18.37 22.00 23.00 3A. C 3A. B 134.0 0.55 0.85 0.45 0.25 0.38 5.0 5.6 8.0 3.12 5.75 1.76 18 0.30 16.09 15.69 19.00 18.88 21.30 22.00 3A.D 3A.0 23.0 0.30 0.30 0.45 0.14 0.14 5.0 5.0 8.1 1.10 5.75 0.62 18 0.30 16.16 16.09 19.04 19.04 21.30 21.30 3A.E 3A.B 154.0 0.89 1.92 0.45 0.40 0.86 5.0 5.2 8.1 7.04 5.75 3.98 18 0.30 16.15 15.69 19.46 18.76 20.80 22.00 3A.F 3A.E 23.0 1.03 1.03 0.45 0.46 0.46 5.0 5.0 8.1 3.78 5.75 2.14 18 0.30 16.22 16.15 19.66 19.63 20.80 20.80 4.A OUT 31.0 0.00 9.04 0.00 0.00 4.07 0.0 12.1 6.9 33.15 57.14 3.45 42 0.32 16.10 16.00 20.26 20.23 23.50 20.00 4.B 4.A 16.0 0.12 9.04 0.45 0.05 4.07 5.0 12.1 6.9 33.15 79.54 3.45 42 0.63 16.20 16.10 20.28 20.26 23.80 23.50 4.0 4.B 34.0 0.48 8.92 0.45 0.22 4.01 5.0 11.9 6.9 32.71 54.56 3.40 42 0.29 16.30 16.20 20.32 20.29 23.80 23.80 4. D 4. C 269.0 0.68 8.44 0.45 0.31 3.80 5.0 10.5 7.1 30.95 54.87 3.22 42 0.30 17.10 16.30 20.59 20.34 23.00 23.80 4. E 4. D 34.0 0.23 0.23 0.45 0.10 0.10 1 5.0 5.0 8.1 0.84 5.70 0'_48 18 0.29 17.20 17.10 20.75 20.75 23.00 23.00 4. F 4. D 106.0 0.00 7.53 0.00 0.00 3.39 0.0 10.0 7.2 2761 40.97 3'. 91 36 0.38 17.50 17.10 20.77 20.59 23.70 23.00 4. G 4. F 169.0 0.88 4.30 0.45 0.40 1.94 5.0 9.2 73 15.77 24.44 3.21 30 0.36 18.10 17.50 21.10 20.85 22.70 23.70 4.H 4.G 34.0 0.59 0.59 0.45 0.27 0.27 5.0 5.0 8.1 2.16 5.70 1.22 1 18 0.29 1 18.20 18.10 21.25 21.24 22.70 22.70 4.1 4. G 249.0 0.70 2.83 0.45 0.32 1.27 5.0 7.9 7.6 10.38 12.82 3.30 24 0.32 18.90 18.10 21.62 21.10 22.40 22.70 4. J 4.1 34.0 0.86 0.86 0.45 0.39 0.39 5.0 5.0 8.1 3.15 5.70 1.78 18 0.29 19.00 18.90 21.77 21.74 22.40 22.40 4. K 4.1 10& 0 0.00 1.27 0.00 0.00 0.57 0.0 7.2 7.7 4.66 6.39 2.64 18 0.37 19.30 18.90 21.90 21.68 23.00 22.40 4. L 4. K 78.0 0.42 0.70 0.45 0.19 0.32 5.0 6.0 7.9 2.57 6.51 1.45 18 0.38 20.0 19.70 22.02 21.97 22.30 23.00 4.M 4.L 34.0 1 0.28 0.28 0.45 0.13 0.13 5.0 5.0 8.1 1.03 5.07 0.58 18 0.29 20.10 20.00 22.05 22.05 22.30 22.30 4.N 4.K 112.0 0.15 0.57 0.45 0.07 0.26 5.0 5.7 8.0 2.09 6.28 1.18 18 0.36 19.70 19.30 22.03 21.98 22.70 23.00 4.0 4. N 34.0 0.42 0.42 0.45 0.19 0.19 5.0 5.0 8.1 1.54 5.70 0.87 18 0.29 19.80 19.70 22.04 22.04 22.70 22.70 4. P 4. F 144.0 0.24 3.23 0.45 0.11 1.45 5.0 8.0 7.5 11.84 24.17 2.41 30 0.35 18.00 17.50 21.04 20.92 22.30 23.70 4. Q 4. P 23.0 0.51 0.51 0.45 0.23 0.23 5.0 5.0 8.1 1.87 6.92 1.06 18 0.43 18.10 18.00 21.12 21.11 22.30 22.30 4.R 4.P 100.0 0.00 2.48 0.00 0.00 1.12 0.0 7.5 7.6 9.09 12.39 2.89 24 0.30 18.30 18.00 21.20 21.04 22.80 22.30 4. S 4. R 118.0 0.85 2.48 0.45 0.38 1.12 5.0 6.8 7.8 9.09 13.17 2.89 24 0.34 18.70 18.30 21.39 21.20 22.10 22.80 4. T 4. S 19.0 0.41 0.41 0.45 0.18 0.18 5.0 5.0 8.1 1.50 7.62 0.85 18 0.53 18.80 18.70 21.51 21.51 22.10 22.10 4. U 4. S 170.0 0.00 1.22 0.00 0.00 0.55 0.0 5.7 8.0 4.47 6.24 2.53 18 0.35 19.30 18.70 21.73 21.42 22.20 22.10 4. V 4. U 63.0 0.60 1.22 0.45 0.27 0.55 5.0 5.2 8.1 4.47 5.92 2.53 18 0.32 19.50 19.30 21.84 21.73 22.90 22.20 4. W 4. V 19.0 0.62 0.62 0.45 0.28 0.28 5.0 5.0 8.1 2.27 7.62 1.29 18 0.53 19.60 19.50 21.93 21.92 22.90 22.90 4A.A OUT 28.0 0.00 2.96 0.00 0.00 1.33 0.0 10.9 7.0 10.85 24.51 2.21 30 0.36 16.10 16.00 20.25 20.23 22.00 23.20 4A. B 4A. A 180.0 0.63 2.96 0.45 0.28 1.33 5.0 9.5 7.3 1 10.85 23.68 2.21 30 0.33 16.70 16.10 20.38 20.25 23.30 22.00 4A. C 4A. B 34.0 0.83 2.33 0.45 0.37 1.05 5.0 9.3 7.3 8.54 12.27 2.72 24 0.29 16.80 16.70 20.42 20.38 23.30 23.30 4A. D 4A. C 138.0 0.00 1.50 0.00 0.00 0.68 0.0 8.6 7.4 5.50 6.32 3.11 18 0.36 17.30 16.80 20.80 20.42 25.40 23.30 4A. E 4A. D 258.0 0.49 1.21 0.45 0.22 0.54 5.0 5.3 8.1 4.44 5.85 2.51 18 0.31 18.10 17.30 21.32 20.86 21.80 25.40 4A.F 4A.E 23.0 0.72 0.72 0.45 0.32 0.32 5.0 5.0 8.1 2.64 6.92 1.49 18 0.43 18.20 18.10 21.39 21.38 21.80 21.80 4A.G 4A.D 63.0 0.14 0.29 0.45 0.06 0.13 5.0 6.8 7.8 1.06 5.92 0.60 18 0.32 17.50 17.30 20.95 20.95 26.60 25.40 4A. H 4A. G 34.0 0.15 0.15 0.45 0.07 0. 07 5.0 5.0 & 1 0.55 5.70 0. 31 18 0.29 17.60 17.50 20.96 20.96 26.60 26.60 CULVERT 1 55 2.13 2.13 .50 1.07 1.07 10.0 10.0 7.2 7.66 8.96 5.70 18 0.73 27.7 27.3 28.77 28.37 30.0 30.0 CULVERT 2 78 93.48 93.48 .45 42.07 42.07 30.0 30.0 4.9 207.8 186.5 10.58 60 0.51 15.4 15.0 20.5 20.0 24.0 24.0 CUL VERT 3 58 26.99 26.99 .45 12.15 12.15 25.0 25.0 5.4 65.0 39.16 9.2 36 0.34 1 & 0 i 7.8 21.35 20.8 24.67 24.67 CULVERT 4 68 107.53 1075 .45 48.39 48.39 35.0 35.0 4.6 222.1 144.7 11.31 60 0.31 13.21 13.0 18.5 18.0 22.0 22.0 CULVERT 5 78 108.24 108.2 .45 48.71 48.71 35.0 35.0 4.6 223.6 142.3 7.91 72 0.38 12.3 1 12.0 1 18.74 18.0 19.5 19.5 CULVERT 6 68 122.36 122.4 .45 55.06 55.06 45.0 45.0 4.0 221.7 -777-t 152.4 7.84 72 0.44 10.3 10.0 16.64 16.0 18.2 18.2 STORM DRAIN DESIGN COMPUTA7701VS LOCA 77ON /y RUNOFF fY� A. =. RNOFF MLA MCA TcAN LENGTH INCR TOTAL COEFF y.^a INLET DESIGN (i) (ft) (ACRES) (ACRES) (C) TOTAL 77ME TIME (inAri 59 56.89 56.89 .45 2: 5 25.6 30.0 30.0 4.9 PIPE DESIGN FROM POINT ^'0lNT DISCH. Q (fps) CAP. (cfs) VEL. (fps) DIA. (in) LOPE (Y) INV. UP (ft) INV. DOWN (ft) HGL. UP (ft) HGL. DOWN (ft) GRND/RIM ELEV UP (ft) GRND/RIM ELEV DOWN (ft) CULVERT 7 126.5 102.4 10.06 48 0.51 13.5 13.2 1766 17.2 19.5 19.5 CULVERT 8 68 16.75 15 - 45 4 754 _ 20.0 35.0 5.5 4,65 44.05 757.2 36.17 185.7 6.23 10.62 36 60 0.29 0.51 17.6 12.0 174 11.7 20.7 15.52 20.4 15.23 21.4 19.0 21.4 19.0 CUL VER T 9 59 76.13 7c . ' ? 0.45 34.26 34.26 2 f CULVERT 2 2 100.2 1 G .:. 2 0.45 45.10 45.10 3 30.0 4.9 222.3 175.6 11. 35 60 0.451 14.9 14.8 19. 96 19.8 21.0 21.0 CUL VER T ' ' _ 105.9 105. 0 1 0.45 47.581 47.68 _ - 35. 0 4.6 2' 8. 8 ? 94.1 11.15 60 0.56 13.40 13.30 18.401 18.30 21.0 21.0 N'CT=S, 4LL STORM DRAINAGE PIPE TO BE CLASS ll! OR ✓ RCP UNLESS OTHERWISE SPECIFIED. 2. JLVERTS 2-11 SZED FOR DOUBLE CULVERTS. HALF OF DRAINAGE AREA USED FOR CALCULATIONS. TEMPORARY MIN. TRAP SEDIMENT BASIN SUMMARY: VOL - 1,800 CF/ACRE DISTURBED A)'CA (10 YEAR STORM) (SEDIMENT MUST BE REMOVED TWICE A YEAR) 10 YR SEDIMENT DISTURBED MINIMUM BASIN VOLUME FLOW MIN. SURFACE SURFACE AREA BASIN AREA (ACRESI VOLUME ((a &SMULM AREA (So PROVIDED (SFl 1 4.55 81190 20.612 7.09 3,089 9,753 1 8.40 15,120 46,713 9.94 4,330 14,106 1 11.49 20,682 59.454 13.94 6,073 29,427 1 13.50 24,300 74,005 20.44 8,904 23,897 TEMPORARY SEDIMENT TRAP SUMMARY,• MIN. TRAP VOL - 1,800 CF/ACRE DISTURBED AREA (10 YEAR STORM) (SEDIMENT MUST BE REMOVED TWICE A YEAR) 10 YR SEDIMENT DISTURBED MINIMUM TRAP WEIR DEPTH FLOW MIN. SURFACE LENGTH WIDTH IS& AREA (A2= VOLUME (M LENGTH (E (M AREA (Z k 1 0.73 1.314 4 5 1.58 689 35 20 2 0.20 360 4 5 0.43 188 10 20 3 0.72 1,296 4 5 1.58 680 35 20 4 0.44 792 4 5 0.95 414 21 20 5 0.29 522 4 5 0.63 275 14 20 6 0.18 324 4 5 0.39 170 9 20 OUTFALL RIP RAP DIMENSIONS L X W X D CLASS QUANITY CULVERT 11 9' X 6' X 4.5' 11 5 CY CULVERT 2 25' X 18' X 8' II 15 CY CULVERT 3 12' X 9' X 4.5' If 10 CY CULVERT 4 25X 18' X 8' 11 15 CY CULVERT 5 29' X 21' X 10' II 20 CY CULVERT 6 29' X 21' X 10' II 20 CY CULVERT 7 22' X 15' X 8' 11 10 CY CULVERT 8 12' X 9' X 4.5' 11 5 CY CULVERT 9 25' X 18' X 8' 11 15 CY CULVERT 101 25' X 18' X 8' 11 15 CY CULVERT 111 25' X 18' X 8' 11 15 CY FM BASIN 1 7' X 4' X 4.5' 11 5 CY FM BASIN 2 7' X 4' X 4.5' 11 5 CY FM BASIN 3 7' X 4' X 4.5' 11 5 CY BASIN 4 7' X 4' X 4.5' N 1 5 CY 6" PERFORATED PLASTIC PIPE CULT IN HALF ANCHORED TO BASIN BOTTOM ANCHORS TIES FLOW DISTRIBUTION MECHANISM MECHANISM DETAIL NOT TO SCALE SILT FENCE W/ WIRE BACKING (STAKE SPACING 3 FT ON CENTER) 2 FEET MIN TOP AREA TO.B EXIST DITCH TO X TEMP EARTHEN BERM 10 SETTLEMENT 2 FT ABOVE FLOW '��.•.•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:�.�:•:•:•:•::•:•:•:•:•:•:•:•:•�9f BE FILLED IMMEDIATEL SOLID TOP SOLID TOP V/�i, �7 - /X\//\\//\ f \,�\//\/ STORM STORM \\�\\/\\/ \/\\/\\/ PIPE PIPE 9 FT 8 FT STORM PIPE STORM PIPES .STORM PIPES STORM WATER FM STORM STORM STORM PROP. STORM PIPE PIPE PIPE PROP. STORMWA TER FM SIDE VIEW FRONT VIEW PLAN VIEW 21 FT X 9 FT X 8 FT BOX TO BE BUILT ON SI TE INTERFERENCE STRUCTURE 1 NOT TO SCALE SOLID TOP SIDE WEW STORM PE 'ttUt'. 31 UKMWA I LK FM STORM PIPE STORM PIPE SOLID TOP PIPE 21 FT =ASE FRONT VIEW 1 21 FT X 9 FT X 8 FT BOX TO BE BUILT ON SITE INTERFERENCE NOT To SCALE 2 PLAN VIEW STRUCTU 20 FT MIN WIDTH GENERAL NOTES FOR TEMP. PLUG DETAIL 1. BUILD RIDGE HIGHER THAN DESIGN AND COMPACT WITH WHEELS OF CONSTRUCTION EQUIPMENT. COMPACTED RIDGE MUST BE AT OR ABOVE DESIGN GRADE AT ALL POINTS. 2. LEAVE SUFFICIENT AREA TO PERMIT CLEAN OUT AND REGRADING. 3. CONSTRUCT SILT FENCE ON DOWNSTREAM SIDE OF BERM. 4. MIN. PLUG LENGTH OF 25' TO PREVENT BLOWOUT. 5. IMMEDIATELY DIVERT WATER AWAY FROM PLUGS TO APPROPRIATE TP DEVICES TO PREVENT PLUG BLOWOUT. TEMPORARY PLUG DETAIL NTS 18" KDPE TEE �I�TLLRYORTEX #57 WASHED STONE 1/2"HOLES WITH 3" SPACING 8'HOPE OU71E7 PIPE CONCRETE ANTI - FLOTATION BLOCK TEMPORARY OUTLET STRUCTURE DETAIL STORAGE BASIN 3 NOT TO SCALE EL=19.7 �I��1R�lORTEX #57 WASHED � STONE 0 0�0 0 0 0 0 0 1/2"HOLES WITH ' 0 oWo 0 0� 3" SPACING EL= 16.0A c� 18" HDPE TEE D D 181NOPE OURET PIPE ANTI -FLOTATION BLOCK TEMPORARY OUTLET STRUCTURE DETAIL STORAGE BASIN 4 NOT TO I� COASTAL SITE DESIGN, PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENT/AL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 `*���H�trrurr/ry� s SEAL ct ft: Ld D o 0 rn 0 � � .- � Q a Q d a = z a U � rr vi J Q O U o w Q � w � � w 0 Q 1 Q 0: Y <C F o ? ¢ U :2 DATE: 10-10- 06 HORZ. SCALE.• N/A V7=RT. SCALE.• N/A DRAWN BY- RL W CHECKED B Y.• HSR PROJECT NO.: 05-0043 iA N t ,a,. EC7 EC Sheet No. Of LOCATION MAP T TO SCALE LEGEND 1 TEST PIT LOCATION LOT LINE CENTERLINE OF RIGHT OF WAY —zi-•--,----.._ CONTOUR LINE & ELEVATION I I —I I— 30' DRAINAGE EASEMENT I I {— 15' I I TEST PIT ND. ar►ni Utrfn (INCHES) mraucAuu►v RA1t (1N/i1R) NOTES/COMMENTS FROM SOILS SCIENTIST LM 1 42 2 SEE REPORT DATED FEBRUARY 23, 2006 FAR SOIL PROFILE LM 2 32 2 SEE REPORT DAZED FEBRUARY 23, 2006 FOR SOIL PROFILE LM 3 24 1 SEE REPORT DATED FEBRUARY 23, 2006 FOR SOIL PROFILE LM 4 44 2 FSEF REPORT DAZED FEBRUARY 23, 2006 FOR SOIL PROFILE LM 5 60+ 10 1 SEE REPORT DAZED FEBRUARY 23, 2006 FAR SOIL PROFILE NOIE INFIURAIION SIZE NSIT/SEASONAL HIGH GROUNDWATER DETERMINATION WAS PEWOO ON 02123106 BY LAND MANAGEMENT GROUP, INC RECEIVED JAN 1 0 2007 BY: 0v COASTAL SITE DESIGN' PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 ViImington, NC 28406 (910) 791-4441 Q� ZO 3 v° Wjo O sZC5 9z �W o z_ W O SEAL 025403 'f v /r,4pro '7 0 0, o o .- ui P o z w 4. U Z S c � m �- w Wo F— Y Q Z 0 Q Z W a J Q 0 3 w m w w a o � o W 0 5 aly- 0 z N W Of DATE. • 10-10-06 HORZ. SCALE- 1' 100' VERT. SCALE. N/A DRA WN BY HSR CHECKED BY- HSR PROJECT NO.: 05-0043 Sheet No. Of k� C" L NO T TO SCALE c!1 7 c`- LEGEND 1 TEST PIT LOCATION - - LOT LINE CENTERLINE OF RIGHT OF WA) --21 - ----- CONTOUR LINE & ELEVATION -I I- 30' DRAINAGE EASEMENT I I i j- 15' I I NR 1 ) \ 3 gm m Z r 0C), 100 50 D 100 - 200 300 SCALE 1N FEET: 1 "= 100' Out 1 �?6(-LiED r� COASTAL SIT DESIGN, PC ENGINEERING LAND PLANNING COMMERCIAL f RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 i FZ ffi�� t4 Jo1r F- Y Ov Q W rY z w DATE: 10-10- 06 HORZ. SCALE- 1 "= 100' PERT. SCALE. N/A DRA WN BY- HSR CHECKED BY: HSR PROJECT NO.: 05-0043 [Sh..t No=W-1 K- "FCIZV (j"—its /,,DtL O-Y\ a®sdeA'd®�'Q ppA BASIN ACREAGE 1 4.55 2 8.40 3 11.49 �_4 13.50 F _ _ t _ EXHIBIT MAP "C" i i I go dW �co C" 1 a i r 1 1 / Ai%E BASIN 1 Sif-ET EC 2) % co �0J) NOTES. 1. 7HE BUILT UPON AREA (BUA) FOR EACH LOT MUST BE LOCATED IN THE AREAS DEUlJEAIID FOR EACH LOT. ��TT j�CEIvED NOV 2 8 7006 BY: 100 50 100 200 300 SvALE IN FEET. 1 "= 100' E COASTAL SITE DESIGN, PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDEN77AL P.O. Box 4041 Wilmington, NC 28406 (910) 791— 4441 O v.. vJ O ;t O Q _ m z w Q Q z O Q U � O Q Zz O� U Q IL Z z� �WO Z Z al Q � Z W J j QtWuo�pel-� �n10h O Zit cc w8, p2 ii O DATE: 11-27— 06 HORZ. SCALE. 1`- 100' VERT. SCALE. N/A DRAWN BY- RL W CHECKED B Y.- HSR PROJECT NO.: 05-004J Leet= / / 20 FT D.E. I/ 1, 70 '� 71 e� l! 7, 72 1 10 FT D.E. .1 i i I n DEED BOOK 25E1, PAGE 63 LEGEND 21 DRAINAGE PIPE AND RIP RAP LOT LINE CENTERLINE OF RIGHT OF WAY CONTOUR LINE & ELEVATION I I -I (- 30' DRAINAGE EASEMENT II r 15' 1 1 4 - 77/•• 10 FT D.E. • 1,NF1LTR,4 nON BAS;?J 4 \� (SEE SHEETEC 5) de 1 1 1 CLARP AND __z 1 s i �10 F D.E. DEED BOOK 1902, PAGF 294 1 • _ �Lil� f1 l e ® n%% rSTORAGE BASPN 1 (SEE SHEET EC 2) INLET ACREAGE1 INLET ACREAGE 1.8 a37 im 0.65 1.0 0.19 3.N 0.58 1.E a65 3A.0 a54 V a47 3A.D 0.30 1.0 0.77 3A.E 0.89 1.H a8B 3A.F 1.03 28 0.06 4.8 0.12 2.0 0.22 4.0 0.48 2.E a72 4.D 0.68 ZF 0.65 4.E 0.23 2G a39 4.G 0.86 2H a44 4.H 0.59 2J 0.19 4.1 0.69 2K a52 4.J 0.85 2L a24 tL 0.41 2M 0.51 4.M 0.28 20 a49 4.N a15 2P a95 4.0 0.42 2Q a74 AP 0.24 ZR 0.63 to 0.51 2.S 0.19 4:S a85 2T 0.05 4.T 0.41 3.0 a92 4.V 060 3D 1.00 4.W 0.61 IF 084 4A.B 0.63 3.G 0.40 4A.0 0.83 3.H 0.38 4A.E 0.49 3.1 0.53 4A.F 0.71 U 1.01 4A.G 0.13 3L 021 4A.H 0.15 04 low APPROVED NORTH CAROLINA ENViRONMEMAI MANAGEMENT COMMISSION DIVISION OF WATER QUALITY 100 5C 0 100 200 300 I SCALE IN FEET 1 "= 100' DESIGN, PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDEN77AL P.O. Box 4041 i ilmington, NC 28406 (910) 791- 4441 2 cn � c) 0 Lij p O O 2 O U W O U ¢ 7 U� J j U j ('0 p C)ti_Z cl I Lu < C�I��Q,tQi. W O tw- Q C] Y fy Q w Q Z w DATE: 10-10- 06� HORZ. SCALE. 1 "= 100' VERT. SCALE. NIA DRA WN B Y.• JSM CHECKED BY- HSR PROJECT NO.: 05-004J Sheet No. Of