HomeMy WebLinkAboutNCC223108_Site Plan or Location Map_202209072 4 I , Y� w 8 0 10 E 7 SITE QUADRANG"'LE MA NITS S��rr�t� Lake �v t INITIAL PHASE: 1. RECEIVE FORT BRAGG DIRECTORATE OF PUBLIC WORKS APPROVAL AND CERTIFICATE OF COVERAGE FROM NCDEQ. 2. PRIOR TO ANY LAND DISTURBING ACTIVITY, CONDUCT A SWPPP PRF-CONSTRUCTION CONFERENCE. GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT SWPPP PRE CONSRTUCTION MEETING WITH SWPPP PREPARER, FORT BRAGG DPW, CONTRACTING OFFICER'S REPRESENTATIVE AND ALL LAND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. 3. CONDUCT LIMITED DEMOLITION AS REQUIRED TO INSTALL SILT FENCE, CONSTRUCTION ENTRANCE, AND ALL OTHER PERIMETER EROSION CONTROL MEASURES. 4. INSTALL SILT FENCE, SILT FENCE OTLETS, INLET PROTECTIONS, TREE PROTECTION, AND CONSTRUCTION ENTRANCE AS SHOWN ON THE PLANS. 5. DEMOLISH AND REMOVE EXISTING PAVEMENT WITHIN LIMITS OF DISTURBANCE. 6. UTILIZE PUMPS AND TEMPORARY SWALES TO DRAIN SITE AS NECESSARY. 7. MAINTAIN BEST MANAGEMENT PRACTICES THROUGHOUT CONSTRUCTION PERIOD UNTIL SITE IS FULLY STABILIZED. 8. COMPLETE INSPECTION REPORTS IAW THE CONSTRUCTION GENERAL PERMIT. 9. TEMPORARILY SEED OTHER DISTURBED AREAS IAW THE PLANS AND THE CONSTRUCTION GENERAL PERMIT. CONTRACTOR BATCH PLANT AREAS: 1- CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY AND ALL REQUIRED PERMITS, INCLUDING LAND DISTURBANCE PERMIT, ASSOCIATED WITH BATCH PLANT LOCATIONS. 2. CONCRETE WASHOUT LOCATIONS NOT SHOWN WITHIN LIMITS OF DISTURBANCE ON THESE PLANS SHALL BE PROVIDED AT CONTRACTOR BATCH PLANT LOCATIONS AND INCLUDED IN CONTRACTORS PERMIT PACKAGE. CONSTRUCTION PHASE: 1. CONDUCT GRADING OPERATIONS. 2. ADJUST AND STABILIZE SILT FENCE AND SILT FENCE OUTLETS AS SITE IS BROUGHT TO ROUGH GRADE. 3. BEGIN INSTALLATION OF PERMANENT STORM DRAINAGE SYSTEM. INSTALL INLET PROTECTION AROUND INLETS AS THEY ARE INSTALLED. 4. BEGIN INSTALLATION OF AIRFIELD ELECTRICAL FEATURES. 5_ FINE GRADE SITE TO ELEVATION GIVEN ON GRADING PLANS. 6. PREPARE SITE FOR PAVING. 7. COMPLETE PAVING OPERATIONS. 8. COMPLETE ANY REMAINING GRADING. 9. STABILIZE SITE. 10- MAINTAIN BEST MANAGEMENT PRACTICES THROUGHOUT CONSTRUCTION. 11. REMOVE ACCUMULATED SEDIMENT AND DEBRIS FROM EXISTING AND NEW STORM DRAINAGE SYSTEM WITHIN THE LIMITS OF DISTURBANCE. 12. PERMANENTLY STABILIZE DISTURBED AREAS IAW PROJECT PLANS. 13- REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AFTER APPROVAL OF FORT BRAGG DPW, THE ENGINEER, AND CONTRACTING OFFICER, AND STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF THE BMPs. 14- CONTINUE INSPECTION REPORTS IAW CONSTRUCTION GENERAL PERMIT UNTIL THE SITE IS FULLY STABILIZED AND PERMIT MAY BE TERMINATED. 15. SUBMIT NOTICE OF TERMINATION. EROSION CONTROL NOTES: 1. SITE IS LOCATED IN THE FRENCH BROAD RIVER BASIN. FRENCH BROAD RIVER BASIN DOES NOT HAVE ANY RIPARIAN BUFFERS ACCORDING TO NCDEQ DIVISION OF WATER RESOURCES. 2. ALL CONTRACTORS/SUBCONTRACTORS/PERSON THAT WILL BE ENGAGED IN LAND DISTURBING ACTIVITIES SHALL COMPLY WITH ALL EROSION CONTROL AND STORMWATER POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS, AND PERMITS. 3. THE, CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL BMP INSPECTIONS IAW SWPPP AND NCDEQ REQUIREMENTS. 4. REMOVE ACCUMULATED SEDIMENT AND DEBRIS FROM EXISTING AND NEW STORM DRAINAGE SYSTEM WITHIN THE LIMITS OF DISTURBANCE. L PLANS VF101 FIELD SURVEY 6/3/2022 CD101 DEMOLITION PLAN 1 6/3/2022 CD102 DEMOLITION PLAN 2 6/3/2022 CD501 PAVEMENT DEMOLITION DETAILS 6/3/2022 CP101 PAVING PLAN 6/3/2022 CU101 DRAINAGE PLAN 6/3/2022 CU201 PIPE PROFILES 6/3/2022 CU501 DRAINAGE DETAILS 1 6/3/2022 CU503 DRAINAGE DETAIL 3 6/3/2022 CU511 SUBDRAIN DETAIL 1 6/3/2022 EC101 EROSION CONTROL PLAN 6/3/2022 EC102 EROSION CONTROL DRAINAGE PLAN 6/3/2022 EC501 EROSION CONTROL DETAILS 6/3/2022 EC502 EROSION CONTROL NOTES 1 6/3/2022 EC503 EROSION CONTROL NOTES 2 6/3/2022 EC504 EROSION CONTROL NOTES 3 6/3/2022 EC505 EROSION CONTROL NOTES 4 6/3/2022 CONSTRUCTION DURATION NOTE: �} r 0 f 4- 1. APPROXIMATE DURATION OF CONSTRUCTION IS 4 MONTHS. 2. CONTRACTOR TO REFER TO SOLICITATION, SPECIFICATIONS, CONSTRUCTION PHASING PLANS FOR EXACT TIME, FRAMES AND DURATIONS I M US Arm Corps :. Y or p of Engineers W 1 i l i i 1 z O F- I � U W 0 Y o 0 L�jO OLu z U Q ©,F Q U 0 U) c �LLI p mIO m:Q m U! �chWF- UI— UF— U Lu .. m W� �C6 zo ii- ti l Od ujco J imp z'maQaLL- a I} m W ;o W cd in Y W W Z�Czac3;X W z I75 O��2 � z ❑ N W ta6801UUu3cUi0< D�Wz W W z W Wcu I? > z LU 0-0 0 �. !O ❑0 I� Q W o z�z� O N <U)< �■ Q i O F— W W F¢ Q _ U) O�Q¢ W` W J W LIJ c¢� [ LJ O U �QU© J OQ wQ Q z Lt)<Lu O a m0Z(9 U z r <C O o �° 2 0� W W d SHEET ID EC1 00 Sheet 1 of 18