Loading...
HomeMy WebLinkAboutNCG070057_Inspection Report_20220902DocuSign EAvelope ID: BFAA1D73-7688-4C56-9C99-5F3814852A38 ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH C.AR?C UNA; September 2, 2022 Hitachi Metals North Carolina Attention: Patrick Barton, Permit Owner 1 Hitachi Metals Drive China Grove, North Carolina 28023 Subject: Compliance Evaluation Inspection Hitachi Metals North Carolina NPDES Certificate of Coverage — NCG070057 Rowan County, North Carolina Dear Mr. Barton: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Hitachi Metals Facility on August 16, 2022. Please note that in the stormwater inspection report summary we ask that you continue to operate and maintain the stormwater pollution prevention plan per the current permit cycle. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at jesse.mcdonnell@ncdenr.gov. Sincerely, DmuSigned by: 1=�4 42CFABFC08C459... Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosure c: Laserfiche North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 4A P 704-663-1699 Compliance Inspection Report Permit: NCG070057 Effective: 06/01/18 Expiration: 05/31/23 Owner: Hitachi Metals North Carolina SOC: Effective: Expiration: Facility: Hitachi Metals North Carolina County: Rowan One Hitachi Metals Dr Region: Mooresville China Grove NC 28023 Contact Person: Jeff Goodman Title: Phone: 704-855-2800 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/16/2022 Entry Time 11:20AM Primary Inspector: Jesse M McDonnell Secondary Inspector(s): Certification: Phone: Exit Time: 12:15PM Phone: 704-235-2139 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG070057 Owner - Facility: Hitachi Metals North Carolina Inspection Date: 08/16/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The stormwater pollution prevention plan and associated documents are current and complete. Based on discussions with the plant manager, the facility will be closing starting at the end of September. A recission request needs to be submitted to the Raleigh Central office to rescind the permit after operations have ceased. Page 2 of 3 a O Permit: NCG070057 Owner - Facility: Hitachi Metals North Carolina Inspection Date: 08/16/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? N ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? N ❑ ❑ ❑ Comment: The stormwater pollution prevention plan (SWPPP) is current and complete. All associated documents are current. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Qualitative monitoring is current and complete. Future monitoring needs to be conducted on the current monitoring form on the NCDEQ website. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ E ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Analytical monitoring is not required due to the facility not having vehicle maintenance. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? N ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? N ❑ 1111 Comment: All outfalls were observed during the inspection. Two outfalls near Highway 152 are eroded and need to be repaired. Page 3 of 3