LETTER OF APPROVAL WITH MODIFICATIONS
Bowman Rd Partners LLC
Attention: James Parker Jr., Manager
504 Meadowlands Dr
Hillsborough, NC 27278
RE: Project Name: Meadows Subdivision Phase IV
Acres Approved: 27.66
Project ID: ALAMA-2022-024
County: Alamance
City: Mebane
Address: Campaign,Drive
River Basin: Cape Fear
Stream Classification: WS-V, NSW
Submitted By: Summit
Date Received by LQS: July 25, 2022
Plan Type: Revised
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
modifications required for approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for
this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deg.tic.ggy/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible party must obtain a new COC.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Winston-Salem Regional Office 1450 Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105
l 336-776-9800
n.w�
Letter of Approval with Modifications
Bowman Rd Partners LLC
August 1, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Meadows Subdivision Phase IV
Project ID: ALAMA-2022-024
County: Alamance
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Silt fencing below fill slopes should be installed a minimum of 10 feet off the proposed toe
of the slope. This will allow room for sediment storage and maintenance access, as well as
minimize the potential for damage to the silt fence during fill slope construction. [G.S. 113A-
57(3)]
2. Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities