Loading...
HomeMy WebLinkAboutNCC222983_ESC Approval Submitted_20220831ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director P ,p,[�1( (li s 1" NORTH CAROLINA Environmental Quality August 1, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Bowman Rd Partners LLC Attention: James Parker Jr., Manager 504 Meadowlands Dr Hillsborough, NC 27278 RE: Project Name: Meadows Subdivision Phase IV Acres Approved: 27.66 Project ID: ALAMA-2022-024 County: Alamance City: Mebane Address: Campaign,Drive River Basin: Cape Fear Stream Classification: WS-V, NSW Submitted By: Summit Date Received by LQS: July 25, 2022 Plan Type: Revised Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deg.tic.ggy/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1450 Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 l 336-776-9800 n.w� Letter of Approval with Modifications Bowman Rd Partners LLC August 1, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Meadows Subdivision Phase IV Project ID: ALAMA-2022-024 County: Alamance Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Silt fencing below fill slopes should be installed a minimum of 10 feet off the proposed toe of the slope. This will allow room for sediment storage and maintenance access, as well as minimize the potential for damage to the silt fence during fill slope construction. [G.S. 113A- 57(3)] 2. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities \%moo/ U y � � c Z u U o o � � 4-o o c o 4wo W ago c� a� o4-4 � o U o PLO 4-4 U o W o A U