1 Project Name Bryson's Ridge Subdivision - Phase 1
2 Project Area ac 19.73 Phase 1 Only)
3 Coastal Wetland Area ac 0
4 Surface Water Area ac _ 0.01
5 Is this project High or Low Density? _ _ _ Both High and Low Densit
6 Does this project use an off -site SCM? No
COMPLIANCE WITH 02H .1003(4)-�
7 Width of vegetated setbacks provided feet 30
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback, does It meet NCAC 02H.1003 4 c-d ? _ N/A _
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12
Bioretention Cell
13
Wet Pond
1 _
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
_
17
Rainwater Harvesting RWH
18
Green Roof
19
Level Spreader -Filter SirLS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
22
1 Dry Pond
23
StormFilter
24
Silva Cell
25
Ba filter
26
Filterra
FORMS LOADED
DESIGNER CERTIFICATION_ s z 27 Name and Title: J. Michael Stocks, P.E. CEO
28
Organization:
Stocks Engineering
29
Street address:
801 E Washington St.
30
City, State, Zip:
Nashville, NC 27856
31
Phone numbers :
252-459-8196
32
Email:
mstocks@stocksengineering.com
;Certification Statement:
certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided In the form Is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
(specifications, operation and maintenance agreements and other supporting information are consistent with the Information provided here.
11
%�1 �;11 F;+,I +f''i
r ♦� S[Al. �`. r
19843 M
Seal h4fi1144%
r MW
re t
ciestigner
S 22
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
Yes
4
If so, number of low density drainage areas
1
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site
4 Type of SCM (�
5 Total drainage area (sq ft 859,694
6 Onsite drainage area (sq ft 859,694
1
LD 1
Wet Pond
None
604868
604868
254826
254826
7
Offsite drainage area (sq ft
0
0
0
8
Total BUA in project (sq ft
304449 sf_
243409 sf
61040 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft
185500 sf
141740 sf
43760 sf
10
New BUA not on subdivided lots (subject to
1 permitting)s
118949 sf
101669 sf
17280 sf
11
Offsite BUA(sq ft
sf
sf
sf
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
4236 sf
4236 sf
sf
Sidewalk (sq ft
29185 sf
25410 sf
3775 sf
- Roof (sq ft
sf
sf
sf
- Roadway s ft
85528 sf
72023 sf
13505 sf
- Future (sq ft
sf
sf
sf
Other, please specify in the comment box
below (sq ft
sf
sf
sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
sf
sf
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
sf
sf
sf
15
Existing BUA that will remain (not subject to
1 permitting)s ft
sf
sf
sf
16
Existing BUA that is already permitted (sq ft
sf
sf
sf
17
Existing BUA that will be removed (sq ft
sf
sf
sf
18
Percent BUA
35%
40%
24%
19
Design storm inches
1.0 in
20
Design volume of SCM cu ft
25234 cf
21
Calculation method for design volume
Simple
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
WETPOND
1
Drainage area number
1
21
Minimum required treatment volume cu ft
25234 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM H: ?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
91
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC 9 ?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
151
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
171
Was the SCM desi ned bv an NC licensedprofessional?
I Yes
WET POND
MDC FROM 02H .3053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
232.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
233.00
221
Elevation of the bottom of the vegetated shelf fmsl)
239.00
23
Elevation of the permanent pool fmsl)
239.00
24
Elevation of the top of the vegetated shelf (fmsl)
240.00
25
Elevation of the temporary pool fmsl
240.63
26
Surface area of the main permanent pool (square feet)
10136
27
Volume of the main permanent pool (cubic feet)
46705 cf
28
Average depth of the main pool (feet)
4.60 ft
29
Average depth euation used
Equation 2
30
If using equation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay cubic feet
7667 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
48 in
35
Design volume of SCM (cu ft)
25234 cf
361
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
3 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
No
431
Depth of forebay at entrance (inches)
60 in
44
Depth of forebay at exit (inches)
36 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Centipede
54
Hasa lanting plan been rp ovided for the vegetated shelf?
Yes
ADDITIONAL INFORMATION
55 Wet pond(s)this space to provide any additional information about the
3
't ftfkometer is 2.6' .
4:04 PM 5/13/2022