Loading...
HomeMy WebLinkAboutSW8990732_APPROVED PLANS_20031112STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 �9n�32 DOC TYPE ❑ CURRENT PERMIT ® APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2003 �1 �2 YYYYMMDD NOTES: 1. SURVEYED DECEMBER 2003 & APRIL 2006. 2. ALL DISTANCES ARE HORIZONTAL 3. ELEVATIONS BASED ON NGVD 29 4. THE MAP IS NOT FOR RECORDATION, CONVEYANCE, OR SALES 5. FOR REFERENCE SEE AS NOTED / 4 O 2 Q C A& . . "4// ONSERVATION AREA / 0 183 185 me 182 25'C. 0. D. SETBACK 187 J -- 194 9 Q° 4- MAINTENANCE PLAN - 1. All measures to be inspected weekly and after any rainfall event and needed repairs made immediately. 2. Sediment Basin to be cleaned out when the level of sediment reaches 5.6' below oriface opening. Riser structure to be cleaned if excess water above design surface no longer drains properly. 3. All seeded areas shall be fertilized, mulched, and re -seeded as necessary, according to specifications provided, to maintain a suitable vegetative cover. VEGETATIVE PLAN - 1. Permanent vegetation to be established in accordance with "North Carolina Erosion and Sediment Control Planning and Design Manual", Section 6.11, latest version. 188 181 AS -BUILT AREAS: EL7.0- 31,850 of EL8.0- 37,100 sf State storage- 34,375 cf , 1178 78 79 XMF 176 177 175 IN 165 I I I I 172 171 E174 173 I I I V ' 170 168 R"" 167 \ iss /. \ Z ZZ ,. 164 ' 163 w - A PORTABLE PUMP 161 TO BE USED TO DRAIN POND IN AN Q \ EMERGENCY. 162 1. POND DESIGN DATA 12.39 ACRES NEW LOTS (42 LOTS) 12.39 ACRES TO BE DIRECTED TO POND IMPERVIOUS AREA ae 1.67 oc. IN STREETS + 3.86 OC.IN LOTS (DEED RESTRICTED TO 4,000 sf EA.) 5.53 ACRES TOTAL IMPERVIOUS EMBANKMENT TOP = 12.0 EMERGENCY SPILLWAY EL = 10.8 STATE STORAGE _e 34,375 cf TOP OF INLET = 8.9 / IDELEVATION - 8.0 W6IG rI IT ct PVAnnN = a_n f IR G. SECTIONEMBANKMENT NOT TO SCALE BOTTOM EL= -2.70 40 20 0 40 SCALE IN FEET SCALE 1" = 40' 160 e e 159 158 157 N 81-43'34nE 2315 70AL WELDED RESAR TOP EL= 8.89 WELDED BAR TRASH RACK �y BOLTED IN PLACE EL=7.95 FIWV=6.99 WSEL= 70 EXISTING 36"CMP OUTLET PIPES 010- INV=5.94 3" PERFORATED PVC W/ GRAVEL AND FABRIC FILTER SECTION VIEW OUTLET STRUCTURE DETAIL NOT TO SCALE REV. NO. REVISIONS DATE Goppy,t a Hamm Do,* SVWM P.A, N right, rnwwd Reproduction or uw of the contents of the, doou & or aMtiwa or dek horu to tNe d,canw f. n ehote w port, without when accent W Me two Sxwp or Eegiaser, it prohWed ady coper Bann me dgi,d o, tWr d, t, mvAed ath the wiped dpwlwe and oripnd sed oe the swwyr or Enginow, Mae he con " ed to a mood end rue eyr. r LEGEND: ECM Exietnp Cancrete Moxwmant EIP Existing Yon F" RfM Right of Ray 9s MH sanitary s.Wer Mm Ham Pr Po~ Palo tTw car W" M'lM wow Maw FW Re Hydrant EXIST. 5101011 DRAIN MANaE WCH BASIN DW SANITARY SEWER MM00O E 1 W EXIST. WATERLINE & FIN ASSEMRlY EXIST. DRAINAGE PPE ---c--�, p137. GAS UNE DRAINAGE ROW POND SUMMj6R`L STATE WATER QUALITY POND CONSIDERATIONS - Surface Area required = 13,332 sf Surface Area permitted = 29,788 sf Surface Area provided = 31,650 sf 1'Storage Volume required = 24,643 cf 1,Storage Volume permitted = 32,460 cf I Storage Volume provided = 34,375 cf Storage Volume 2 Weir Cut (etev, 8.0) = 34,375 cf BREWSTER PLACE PHASE TWO Additional Calculation Summary for DWQ - WATER QLALITY CONSIDERATIONS - Impervious area colculations: See Project Data Sheet x No offsite areas drain to pond STREETS= 1. 67 acres BUILDINGS <42 LOTS 2 4000 sf ea. )= 3.86 acres TOTAL IMPERVIOUS = 5.53 acres TOTAL AREA DRAINING TO POND = 12.39 acres III Retention of first 1' of run-off, 12.39 acres total - 5.53 acres Impervious = 6.86 acres green area SA REQUIRED 5. 53 x 0. 98 + 6. 86 x 0. 20 / 12. 39 = 0, 548, or 54. BY At 7. 5' depth, 90% TSS removal, from chart - SA factor = 1. 69 12. 39 x 0, 01 x 1. 69 = 0. 209 acres = 9, 118 sf SA REQUIRED At Elw. In 7.0 SA w 0.7e7 acres w 31,650 sf SA PROVIDED VOLUME REQUIRED: (5. 53 x 0. 98 + 6. 86 x 0.20) x 1/12 = 0.57 acre-ft 24,653 cf REQUIRED STORAGE Vwir Cut Elevation & 0 34,375 cf PROVIDED STORAGE Average head from I' storage elevation to orifice - 8.0 - 7.0 / 2 = 0. 5' 3' PVC drain to draw -dorm ponds Orifice equation, Q = CA<29h)^1/2 Q = 0.6(0.0491)(64.4 X 0.5)^1/2 = 0. 167 cfs T - 205, 690 sec w 2. 4 days OKAY AS -BUILT SUMMARY (4-06)i ITEM AS -BUILT 1. Impervious area (b ldgs. , etc.) <5. 53 acres 2. Normal pool surface area 31,650 sf 3. N°rma l p°o l Surface E levat i on 7. 0 M :L Actual pool Surface Elevation <7.0 MSL 4. Pond depth ( deepest point) 9.7 feet 5. Bottom elevation < deepest) -2. 7 MSL 6. Orifice elevation 7.0 MSL 7. Weir elevation ( State storage) 8.0 MSL 8. State storage volume 34,375 cf 9. 6' shelf Yes 10. 10' access NA 11. Forebay Yes 12. Outlet elevation 5.9 MSL 13. Primary Spillway elevation 8.9 MSL 14. Emergency Spillway elevation 10.9 MSL 15. Average embankment elev. 12.0 MSL 16. Side slopes (typical) 2, 51 1 to 4: 1 17. Orifice size 3' PVC POND RECORD DRAWING (AS -BUILT) FOR POND 2 BREWSTER PLACE (PHASE 2, POND 2) DENR / DWQ SW8 990732Modification MASONBORO TOWNSHIP NEW HANOVER COUNTY NORTH CAROLINA DATE: 4-12-06 OWNER: SATURN DEVELOPMENT CORP. BREWSTER PLACE, PHASE 2 OCATED IN MASONBORO TOWNSHIP IEW HANOVER COUNTY, NORTH CAROLINA Dote: 4-12-06 sods 1 "=40' Drawl: Cheated: DSH Project Na: 3Bt98pondos i ------ -- - BREWSTER LANE_- --- T T - -- -"' -----'-- 'PUBLIC R/W) - 149 SATURN DEVELOPMENT COPR. FUTURE DEVELOPMENT M.B. 35 PG- 100 MAINTENANCE PLAN - 1. All measures to be inspected weekly and after any rainfall event and needed repairs made immediately, 2. Sediment Basin to be cleaned out when the level of sediment reaches 4,9275' below oriface opening. Riser structure to be cleaned if excess water above design surface no longer drains properly, 4. All seeded areas shall be fertilized, mulched, and re -seeded as necessary, according to specifications provided, to maintain a suitable vegetative cover. VEGETATIVE PLAN - 1. Permanent vegetation to be established in accordance with "North Carolina Erosion and Sediment Control Planning and Design Manual", Section 6.11, latest version. do ri 1 w t.T 0 NOTES: SATURN DEVELOPMENT COPR. FUTURE DEVELOPMENT M.B. 35 PG- 100 I I I I I I I ku I I 139 I 138 61 141 140142 BEWSTER PACE 14.4 143 PH SE 2 SECT1 2145 M. 42 PG. 3 3 148 I 147 146 I BREWSTER PLACE PHASE 2 SECTION 2 I I I I I M.B. 42 PG. 373 I I r EMERGENCY SPILLWAY ELEv, - 11.50 30, D. E. � I \ 124 125I I I126 127 128 / \ I BREWSTER PLACE I I PHASE TWO SECTION 1 123 M.B. 41 PG. 230 \ TISBURY LANE - I _- 122 I - (50e PUBLIC R/w) - 117 I 116 BREWSTER PLACE 118 I swALE a PHASE TWO SECTION 1 119 1 3.24 M.B. 41 PG. 230 / 120 I TOB I 121 I r 16.49r- RIP RAP CONSERVA TION AREA M.B. 42 PG. 373 T08 SWALE CL 1472•X;l X1104 RIP RAP AS -BUNT AREAS SURFACE AREA B EL- 8.07 - 37,558 s/ 91RFAPF ARFA B Ft. Q n7 - A9 R5A e! POND 1 4.44 - i SW8 990732 x �' . x BL�37 . - �` �- is••'�r�-- a BREWSTER 1-----�•--ii=•i ia, .. S ' EMBANKMENT TOP - 12.00 EMERGENCY SPILLWAY EL - 11.50 STATE STORAGE - 37,121 CF TOP OF GRATES - 10.50 / O ELEVATION 9.07 LF 24" IE- 7.62 EMBANKMENT SECTION Nor ro SCAM I. SURVEYED SEPTEMBER 2001 & SEPTEMBER 2002 2. ALL DISTANCES ARE HORIZONTAL 3. ELEVATIONS BASED ON NGVD 29 4. THE MAP IS NOT FOR RECORDATION, CONVEYANCE, OR SALES 5. FOR REFERENCE SEE AS NOTED RIP RAP OUTLET STRUCTURE (PRIMARY S✓_Atia, - TOP OF GRABS - 1 Sd� REIfRES�EtE . - 9.07 AS -BUILT DATA - (PHASE -�INYERT OF 2 Pp - 8.07 -� INVERT OF 24'RLP's AS -BUILT ITEM: AS -BUILT DATA OUT OF BOX e, 7.62 INVERT OF 24'RCP's - 184 a- 10.50 GRATE TOP ..0111N 8.07. 1 •�i�i�i�iY,i�i!�'� (2) - EX/SIING 24'RCP OUILEr PIPES OUTLET STRUCTURE DETAIL NOT TO SCALE 1. IMPERVIOUS AREA PERMITTED 2. NORMAL POOL SURFACE AREA 3,82 SF (7.78 ACRES) 377,55558 SF S W8 990732 3. NORMAL POOL ELEVATION 8.07 MSL 4. POND DEPTH (DEEPEST POINT) 6.7 FT 5. POND BOTTOM ELEVATION (DEEPEST PONT) 6. ORIFICE INVERT ELEVATION 1.33MSL M A S O N B O R O TOWNSHIP NEW HANOVER COUNTY 8.0707 MSL 7. WEIR CREST ELEVATION 9.07 MSL 8. STATE STORAGE VOLUME 37,121 CF NORTH CAROLINA 9. 6 FT VEGETATED SHELF PRESENT W/ VEGETATION ESTABLISHEC 10. 10 FT ACCESS N/A 11. FORESAPRIMARY N/A 12. PRIMARY SPILLWAY ELEVATION 10.0.50 MSL DATE: SEPTEMBER 30, 2002 13. EMERGENCY SPILLWAY ELEVATION 11.50 MSL 14. EMBANKMENT ELEVATION (LOWEST POINT) 11.84 MSL 15. ORIFICE SIZE 3 INCHES 1. WEIR CUT CREST LENGTH FT OWNER: SATURN DEVELOPMENT CORP. 17. SIDESLOPES (TYPICAL) 3:1 3:do 6:1 ALONG SHELF 18. INV. OF PIPES FROM OUTLET STRUCTURE 7.62 MSL STATE WATER QUALITY POND CONSIDERATIONS - SURFACE AREA REQUIRED - 20,400 SF SURFACE AREA PROVIDED - 37,558 SF 1"STORAGE VOLUME REQUIRED - 37.121 CF 1" STORAGE VOLUME PROVIDED - 37,121 CF STORAGE VOLUME AT WEIR CUT (ELEV. 9.07) - 40,190 CF 1" STORAGE DRAWDOWN TIME - 4.2 DAYS DRAWDOWN TIME FROM WEIR CUT (ELEV. 9.07) - 4.4 DAYS POND DESIGN DATA - 20.54 ACRES NEW LOTS (65 LOTS) 20.54 ACRES TO BE DIRECTED TO POND IMPERVIOUS AREA - 1.81 ACRES IN STREETS + 5.97 ACRES IN LOTS (TO BE DEED RESTRICTED TO 4,000 s1 EA.) 7.78 ACRES TOTAL IMPERVIOUS REV. NO. REVISIONS DATE owptet • fl-e er OWq, swww%. P.A. N do& sense. Repr"mel " w -e el " eonMb w fee ee--w.4 w adore- r eneeee, to -h der" k a e„ele w Mb de,e"t -Nf- eeee-t w tM tree S-WW w bvh ' Y wen " aM' "Aw M Ne wbhet eI feed e" W4 sake! rq Me 0141M Nsee W wt,hw -M of U,e Awwow w &4wsw, ~ M ee" ' fo " wee ee ew 0*" r APPROVE--.!) AVL 40 20 0 40 NORTH CAROLINA ENVM3:: '.:.-:,JTAL MANAGEMENT C04i;v:1�3IC:1 4 DIVISION OF WATER QUALITY 1Z N(( ZW3 SCALE IN FEET SCALE 1 " = 40' POND AS -BUILT FOR POND 1 BREWSTER PLACE, PHASE II LOCATED IN MASONBORO TOWNSHIP NEW HANOVER COUNTY, NORTH CAROLINA 1lnuluq,0j 3FESs/Ot• 9 s 02 54483 _z OWNER: SATURN DEVELOPMENT 1904 EASTWOOD ROAD, SUITE 212 WILMINGTON, NC 28403 (910) 256-1045 HANOVER DESIGN SERVICES, P LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET 1NUIINGTON, N.C. 20401 PHONE: (910) 343-8002 Dote 10-01-02 Scale: 1 " = 40' Drawn: HSR Checked: HSR Project No: 3MMMpondosb Sheet No: OF. 30' M= 3 n= 0.03 M= 3 3 ' n= 0,03 3 �1 1 3' 3 I /r %i /5yx /AYAYAl \ �1 VARIES GC a r GRASS LINED GRASS LINED nominal s= 1% � O nominal s= 0.5% STORM SEWER PIPE CAPACITY = 75+cfs CAPACITY = 55+cfs 0 2.1 fps GRASSED CHANNEL 0 1.2 fps GRASSED CHANNEL (30' DRAINAGE EASEMENT) (30' DRAINAGE EASEMENT) (ALONG SOUTHERN PROPERTY LINE) (BETWEEN BRECKNOCK CT. & GEROME PL.) NOT TO SCALE NOT TO SCALE TEMPORARY DIVERSION TO BE PROVIDED JUST OUTSIDE m RIGHT-OF-WAY. DIRECT FLOW to STREET LENGTH SUMMARY, 2' 12.5' 3 STREET NAME LENGTH _ --------------------------------------- 30' M= 5 n= 0.03 I 20' M= 5 n= 0.03 t 1' BREWSTER LANE 1,690 LF 5 1 5 3 ULLDA PLACE 577 LF �1 3' �I 2' S• TISBURY LANE 486 LF GEROME PLACE 651 LF BRECKNOCK COURT 367 LF GRASS LINED GRASS LINED OETAIL 1E11iIRARY OIYOIIIIN 9 --------------------------------------- nominal s= 0.1% 81+cfs nominal s= 0.5% CAPACITY = 75+cfs Practice 6.20 do Q TOTAL STREET AREA INCLUDING CUL-DE-SACS = 3.48 GRASSED (30' DRAINAGE CAPACITY = SWALE ®1.e fps EASEMENT) GRASSED (20' DRAINAGE SWALE 01.3 fps EASEMENT) G G �� �� acres ` I' 1 30' NAGS '"`EASEME 11--MENT TO SEDIMENT BASIN. DIVERSION R. NOTE ALL LDTS TO BE GRADED SUCH MAY BE REMOVED AFTER STORM -0 THAT ALL STORMWATER FLOWS DRAINAGE HAS BEEN INSTALLED m fT1 TO ONSITE STREETS OR SWALES r_ CT LIMITS OF £ D DISTURBANCE 34.3 acres m SILT FENCNG TO CE BE PROVIDED ALONG LIMITS OF DISTURBANCE \ 9e�1. / > i j ( f5 S 36.41 ' 33' W¢ k IN CONSERVATION APPROXIMATE LOCATION AREA OF CENTERLINE OF • / i l�p MOTTS CREEK. RUN OF / i Cj MOTTS CREEK IS PROPERTY LINE. S 01. 15' 52 E 93.37 S 78.09' 27' W 83.86CON rq �.� I ; ► =. S- I to to S 46' 49' 14' W 164.22to *� 7d s 07• os' 26' w to / S 5082.65 i cL1 n �� 1 �'� ��-.__.'-� „,7 60 �I 1 I,1`'''i 5 CY CL II R7•,P t Q.•'a"I I, S 20.34' 34' W 175.B6 � \ � I / ✓ � . � � I EASEMENT IP SILT Faq G To �� 161 BE PROVIDED ALONG l / LIMITS OF DISTURBANCE �� �� �' /5 bEYOC III RIPRAP 30 0.E S 83' 26' 41 " E 75.88 �B - SILT FENCING TO BE PROVIDED ALONG TOE OF SLOPE a - �p D,f._. ! = �, w•• S 17.36' 30' E /- \ SEE SHEET 3 MR \ �' SILT FENCING TO 9.39 1 D.E. '-<- = i1•� i POND 2 DETAIL PROVIDED UP TO AND AROUND SPILLWAY AREA 25' C.O.D. es, SETBACK - v Uh17LlY LE.-4.0 N 8. SEDIMENT BASIN AS/tMEN Practice G 61 r' 1N071� CREEK The Sediment Basin is to be constructed first (see NEW / OUTrALL Construction Schedule) and Is the primary Practice to i prevent sediment from leaving the site. Detailed design and SWAMP �, / spillway configurationare specified In the CALCULATIONS FOREST %/ \ `" sect I on of the narret I s ve, The PVC Outlet is to be blocked LINE % \,,,` during sedimentation function (or not Installed) untit entire watershed Is permanently stab l Ized and pond Is converted to permanent stormwater management detent Ian / retention function. O 9, TEMPORARY SEDIMENT TRAP Practice 6.60 Sediment traps we to be Installed as indicated on plan at the downstream end of swales as shown. PLANNED EROSION AND SEDIMENT CONTROL PRACTICES - MAINTENANCE PLAN - 1. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE CIE Practice 6.06 1. All measures to be inspected weekly and after any reinfall Shall be Installed at the entrances to the project event and needed repairs made Immediately. from an existing roadway ( at existing Brewster Lane 2. Sediment Basin to be cleaned out when the level of sediment and George Place ). Drainage should be away from the reaches 5.5' below criface opening. Riser structure to be road and eroslon will be controlled with downstream cleaned If excess water above design surface no longer practices, During wet weather It may be necessary to wash drains property, truck tires at these locations, 3. Sediment to be removed from swales when they are 2. LAND GRADING Practice 6.G2 approximately 507. r filled osediment level Is within V of top of swale bank. horn an the to areas as Fence and Grading should Slopes Limited 4. Sediment to tI removed from behind any Slit Fen Plans. Cut and fell slopes shalt be 3i1 or flatter except Inlet protection devces when it becomes 0. 5' deep. Fencing where specifically Indicated. Care shall be taken during Ind Inlet protect for to be repalred as needed to ma Intl -In a land grading activities not to damage existing trees that barrier. are Identified as 'to be preserved'. 5. All seeded Drees snail be fertilized, nu lahed, and re -seeded O 3. SEDIMENT FENCE as necessary, accord lag to spec l f scat i ons prow Ided, to Practice 6.62 maintain a suitable vegetative cover, Sediment fencing should be Installed as shown on the 6. Construction entrance to be maintained in such a manner as to Plan, to dellneote and protect wetlands and specified areas, prevent mud or sedim:nt from leaving the construction site. and around any temporary stockpile areas as necessary to Periodic topciressing with 2-Inch stone may be required. prevent any graded Interior area from eroding onto adjacent Inspect after each rainfall and Immediate ly remove all lands ar roadway, or into Inlets, or as directed by Engineer objectionable matericis spilled, washed, or tracked onto or New Hanover County Erosion Control personnel. public roadways. O 4. GRASS -LINED CHANNELS 7, Inspect temporary sediment traps after each period of significant Practice 6.30 rainfall. Remove sed=nt and restore the trap to Its original All overflow awn lea to be graded to design dimensions when the sediment has accumulated to 1/2 the design noon, seeded, and stab I l i zed I f necessary with depth of the trap. Place the sediment that is removed in the conf I gun designated disposal •rea and replace the contaminated part of the temporary straw -net liners to collect and convey site water gravel facing. Chec; the structure for damage from erosion or to the Sediment Basin as shown on Plan. After final project piping, Periodically check the depth of the spillway to ensure It stabilization, swales to be re -graded and cleaned of Is a ml nl mum of 1.9 't below the low point of the embankment, siltation as needed to establish original contours for ImmedI ate ly fl 11 any settlement of the embankment to st Ight I above stormwater• conveyance. design grade, Any ri prnp dl sp laced from the spillway must be IP replaced Immediately. After all sediment producing areas have 5. INLET PROTECTION been permanent ly stabll lzed, remove the structure and all unstable Practice 6.52 sediment. Smooth the area to blend with the adjoining areas and Storm serer Inlet barriers of silt fencing or block tisnd stabilize properly. gravel Inlet protection are to be constructed to help prevent sediment from entering the storm sewer system CONSTRUCTION SCHEDULE - QP 6. OUTLET STABILIZATION Practice 6.41 1. Obtain approval of P'.an and any necessary permits, and hold Riprap aprons wilt be located at the downstream end of a pre -construction conference prior to commencing any work. at( discharge pipes to prevent scour. 2. Flag work limits and stakeout roadway, primary ditches, and Sediment Basin for Pr•e:!minoi grading. 7. CONSTRUCTION ROAD STABILIZATION 3. Install Gravel Construction Entrances. Practice 6.80 Upon reaching final grade and after utilities have been 4• Install Sediment Basin as shown on Plan prior to clearing Installed, roadway areas are to be stabilized by placing and grubbing site. sub -base course of approved 4' marl stone, as shown In the typical street cross-section detail on the Plan, to reduce 5. Construct ditches end any other sediment control Prnctices eroslon and dust tlu•Ing the remainder of building shown, prior to rotgh grading roadways and site, stockpiling construct l om material and topsoil as necessary. 7 IP 15 34' E NOT TO SCALE NOT TO SCALE LIMITS OF �T MARQUIS HILLS SUBDIVISION / DISTURBANCE 34.3 axes -�1- 154 1 T5 I 1 T.B-M. TOP OF E.C.M. ELEV. 20.22 LOCATION MAP ( NOT TO SCALE ) � DR* AN¶ONE 0 �BREWSTER F'5PINER LANE nSBURY LANE z lift W d I fr�[� � -•--'-'_ `_ 1�• .❑.._.- it III ----�� "_ _-_ • �_ '�.�'- _ _ •. r-.. �'��RV7T�♦ice -_ � ..�m��sa.�� �-_�,...! D •w��a2 f'lA�.-----_- ---_ ¢.•-'-� � . wr��GR��4c1.4.4"-. :.-.-ra��� _.-__.,,. c. bra\. 10c] MAIN so Ll ^---.=a=.=-=_ - - - _ ,_ � . �� :"%.♦.1.1_ .��..- - _ --�.�---•_'_ 1, -- -- ..may. �.., oe�l/o�0.•�14 - >�♦:� �.ld����♦♦jam K� • _ . • ��i�� II , ••' 1. 1 ° • � • L - '/ !ram' � ������♦ �� �4, _ ° . r ��t••�`y,`Elt�'��� R �'!�� ♦> .. i�1►:0. �p4►Vr���:1. Mr �:•ti iL!♦j .t W SEDIMENT TRAP SUMMARY- •' ., i 1 1 • I r, r BLACKMON CONSTRUCTION CO. EXISTING TEMPORARY SEDIMENT TRAPS- D.B. S - MOD26 6. Insta l l ut I I. I t I es I n roadway, estab I I sh f I na l road grades base DRAINAGE AREAS and stabilize road with stone course. 7. FIna.I grade, Install non-municlpat utilities as needed, and (BY INLET): vegetatively stabilize areas where building construction is not imminent, 1, h 0. 75 acres e. Atl erosion and sediment control Prnctices are to be 1, C 1, 20 acres Inspected weekly and after any rainfall, and repaired as - 2, B 0. 84 acres necessary, 2. C 1.86 acres 9. Upon completion of construction, the roadway Is to be paved 3. B 0, 55 0.Cres and all areas permanently vegetatively stabilized, After 3. C 1. 18 acres site stabilization, temporary measures are to be removed amid 4. B 0. 45 acres the Sediment Basin cleaned to Its original design contours, 4. C 1. 56 acres If necessary, and riser structure orlfaces opened, so as to 5. B 1, OS acres functl on as a stormwatef management / water quality retention pond. 5. C 2. 13 acres 6. C 0, 29 acres VEGETATIVE PLAN - 6. D 0. 43 acres 7. B 1. 64 acres 1. Permanent vegetation to be established In accordance with B. A 0, 29 acres 'North Carolina Erosion and Sediment Control Planning and 9. A 0, 14 acres Design Manual', Section 6. 11, latest version. See Sheet 3, 10. A 2, 25 acres 50' R\W 10' l 25.0' 25.0' i--- 10' UTILITY I 18' - 18 - I UTILITY EASEMENT I 16' 18' I EASEMENT I 1 p• 1-2 ASPHALT 11110�•e•dii•••o...._ MODIFIEDABC MODIFIED VALLEY CURB TYPICAL PUBLIC STREET DETAIL NOT • SCALE SITE DATA TOT. # OF UNITS ALLOWED IN BREWSTER 66 ACRES x 3.3 = 217 UNITS 1 ACRE x 2.5 = 2 UNITS TOTAL ALLOWED = 219 UNITS PHASE ONE BREWSTER PLACE APPROVED 99 UNITS PHASE TWO BREWSTER PLACE APPROVED 120 UNITS NUMBER OF UNITS TOTAL 219 UNITS PARKING SPACES REQUIRED PRIVATE DRIVEWAYS TOTAL AREA TO BE DISTURBED 33.0 AC t IMPERVIOUS AREA (BLDG.' S DRIVEWAYS, STREETS, ETC.) 13.3 ACRES (SEDIMENT MUST BE REMOVED TWICE A YEAR) SEDIMENT LENGTH OF DISTURBED MINIMUM TRAP HEIR DEPTH MIN. SURFACE M& DITCH 411.0 AREA(ACRES) VOLUME (Mo LENGTH' /,E0 Xa AREA 4M 1 1,630 3,37 6,065 10 5 3,033 2 Z310 4v77 8,586 12 5 4,293 Y X 4' FRAME AROUND CREST OF OVERFLOW 1.6 MAxMUM HEIGHT SEE NARRATIVE FOR MORE DETAIL AND ALTERNATE METHODS AT GfAAERS - DISTURBED AREAS BASED ON 90 FT WIDE DISWRBED AMA FOR DIITCH AND ACCIESS TEMPORARY SEDIMENT TRAP: (SEDIMENT MUST BE REMOVED TWICE A YEAR) FABRICMIN. TRAP VOL on 11,800 CF/ACRE DISTURBED AREA EXTENSIC OF SEDIMENT DISTURBED MINIMUM TRAP WEIR DEPTH MIN. SURFACE INTO TRENCH M& AREA (MM VOLUME (Ca LENGTH OM AREA (M 4" CRUSHED E OR / giv ���� � 4,NEW �� MORMONISM STORM DRAIN DESIGN COMPUTATIONS LOCA770N RUNOFF I PIPE DESIGN FROM TO D.A. PIPE 77ME OF CONC. MIN. IN DISCH. ELEV. ELEV. SLOPE DIA. CAP. VEL. INLET FLOW DESIGN POINT POINT ACRES MCA (L) (1) Q In. OUR. MIN. IN. af-s. fp.s. 77ME TIME TIME 1.A 1.8 0.8 0.78 137 5 - 5 8.1 6.4 15.8 15.5 0.002 18 4.7 3.6 1.8 1.0 1.2 0.48 36 5 - 5 8.1 3.9 15.9 15.8 0.003 18 5.8 2.2 2,A 2,B 0.8 0.99 132 5 - 5 8.1 8.0 14.7 14.4 0.002 18 4.7 4.6 2-B 2.0 1.9 0.65 1 35 5 - 5 8.1 5.3 14.8 14.7 0.003 18 5.9 3.0 3.A 3.8 0.6 0.69 132 5 - 5 8.1 5.6 15.7 15.4 0.002 18 4.7 3.2 3.8 3.0 1.2 0.47 37 5 - 5 8.1 3.9 15.8 15.7 0.003 18 6.0 2.2 4.A 4.B 0.5 0.80 156 5 - 5 8.1 6.6 9.9 9.5 0.003 18 5.6 3.7 4.8 4.0 1.6 0.62 35 5 - 5 8.1 5.1 f0.0 9.9 0.003 18 S.7 2.9 5.A 5.8 1.1 1.27 130 5 - 5 8.1 10.7 8.7 8.3 0.003 18 5.8 5.9 5.8 5.0 2.1 0.85 48 5 - 5 8.1 6.9 8.8 8.7 0.003 18 5.7 3.9 6.A 6.B - 0.29 46 5 - 10 Z7 2.4 Z2 7.0 0.003 18 5.7 1.4 6.B 6.0 0.3 0.29 340 5 - 5 6.1 2.4 8.2 72 0.003 18 5.8 1.9 6.0 6.D 0.4 0.17 35 5 - 5 8.1 1.4 8.3 8.2 0.003 18 5.7 0.8 7.A ZB 1.6 0.66 150 1 5 1 - 5 7.2 1 4.7 Z7 7.2 0.003 18 5.7 2.8 &A - 0.3 0.12 CONCRETE FLUME - SEE STORM DRAINAGE CALCULATIONS FOR NORMAL DEPTH PROCEDURE 9.A - 0.1 0.06 CONCRETE FLUME - SEE STORM DRAINAGE CALCULATIONS FOR NORMAL DEPTH PROCEDURE 10.A - 2.3 0.90 CONCRETE FLUME - SEE STORM DRAINAGE CALCULATIONS FOR NORMAL DEPTH PROCEDURE I 1 REVISED 70 SHOW AD0111ONAL DRAINAGE EASEMENT 10/31 /00 REV. NO. REVISIONS DATE dm 'ia t h .l,d. or Pat t weE~n coAN ntt a HasLand Y WoMM" Only M. MpM at d.vme,t makes/ *NA Oe Mod NPtawo aM a'low •er a Wo sow,ar or epmw, nMtl be oonedwW to be wed tow woe aoyHn o FILTER FABRIC: PERVIOUS SHEET OF NYLON. POLYESTER. OR I DROP INLET ETHYLENE YARN. EXTRA I I WITH GRATE I j STRENGTH ( 50 PSI MIN.) WITH ULTRAVIOLET RAY INHIBITORS AND STASIUZERS ISOMETRIC VIEW L� FABRIC DROP INLET PROTECTION APPROVED PNT9 RACiICE 8.51 NORTH CAROLINA ENVIRONMENTAL --- -- MANAGEMENT COMMISSION (� DJvISION OF WATER UUALI7Y --- lZ-Nov-ZW-3 THIS PLAN TO BE U77LJZED AND 100 50 0 f00 Z00 300 REVIEWED ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE; WHICH IS AN INTEGRAL PART OF SCALE IN FEET: I'- 100' THIS EROSION AND SEDIMENT CONTROL PLAN. NOTE IIELL: ANY AREAS ON-SIIE 611HOUT ACDWTY IN A 15 DAY PERIOD SHALL BE DaIPWANY STABIUZED AS PER THE SPECIFICATIONS EROSION & SEDIMENT CONTROL and WATER QUALITY PLAN BREWSTER PLACE PHASE TWO LOCATED IN MASONBORO TOWNSHIP NEW HANOVER COUNTY, NORTH CAROLINA OWNER: SATURN DEVELOPMENT 3901 OLEANDER DRIVE WILMINGTON, NC 28403 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS ENG/NEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON. N.C. 28401 PHONE: (910) 343-8002 Sheet No: 1 4 "Of. W= Pi (2 1.5 FT DEEP SEE DETAIL r yr T ✓ r ✓ � r SCALE. 1" = 40' FOUR STANDARD c 2'X3' GRATES ° NC OR EQUIVALENT c 0 ALL SLOPES € 00 00 01= oo 3:1 MAXIMUM ° 00 1=0 00 00 � 0 0 0 0 0 E= o l= 6'min 12'min. SEE PLAN ° T o0 0o Ego 1=0 ° GRATE PLAN VIEW o I= 0 /= o 0 0 o Forebay volume 0o t=o 00 0o POND 20X of required WSEL storage, typical w La I_. 2' TYP moo',"' 4' min. E- ~ OUTLET PIPE do -j- CR° f0'-3' 71 OUTLET TECTION FOREBAY SECTION DETAILS ON PLANS c o i TYPICAL AT ALL STORM OUTFALLS 70 POND SEE DETAIL THIS SHEET 'I' NOT TO SCALE FOR TRASH RACK 0.8' WEIR CUT vzdzzdlj PLAN VIEW OUTLET STRUCTURE DETAILS NOT TO SCALE 25' so' EMBANKMENT SECTION NOT TO SCALE L1 I La-40' 0 o a0°0° o°o° P o000 20' 0°00 MIN. 0 0 24' ° °000 d50 - 6' STONE 1 2 - 24"RCP diAx" 9' La _ 40' APRON DeCI(NESS _ 1.5' OUTLET PROTECTION DETAIL NOT TO SCALE POND OUVALL OP NOTE: FILTER FABRIC IS TO BE PLACED UNDER ALL STONE OUTLET PROTECTION. CL- I.U, a MUC WSEL= 8.0 0 0 m e 0 NOTE PORTABLE PUMP TO BE USED TO DRAIN POND IN CASE O EMERCENCY. PUMP TO BE PLACED ON TOP OF BERM WITH SCREEN ATTACHED TO HOSE INLET AND COVERED WITH STONE. HOSE OUTLET TO DRAIN DIRECTLY INTO POND OUTLET STRUCTURE. OUTLET PIPE OUTLET PROTECTION DETAIL (SIDE VIEW) NOT TO SCALE COMPACTED FILL OR,,,, - GRAVEL, EXTENSION OF FABRIC AND WIRE INTO THE TRENCH NOTE: SEE NARRATIVE FOR MORE DETAIL. ISOMETRIC VIEW FILTER FILTER FABRIC FABRIC EXTENSION OF BACKFILL FABRIC AND WIRE MINIMUM 8" jRjEOMPACTED E TRENCH THICK LAYER IWIREOF GRAVELLL 8" MINIMUM " MINIMUM V-TRENCH 14" MINIMUM 4' MINIMUM SECTION SECTION sF SEDIMENT FENCE ( SILT FENCE Practice 6.62 NTS PUBLIC ROAD - - Q CENTERLINE MODIFIED GUTTER F ;4 ANGLE AS NEEDED Z 10' MINIMUM L a-T• 4 PLAN VIEW CENTERUNE MODIFIED GUTTER / , ( /2' per foot CROSS-SECTION -1- • SPILL GUTTER CONCRETE CHANNEL -I 1' V AS NEEDED u MINIMUM 10' N.T.S. SECTION VIEW NOTE COLLAR TO BE POURED AFIER ' ld POPES ARE IN PLACE II/ REINFORCING AS NECESSARY. Y 1YP. b 3w. z ::. MIN ANA-SEEP COLLAR NOT TO SCALE do boom ONE boom .4:. aw Noma NOTE. • ORIFICE 70 BE 7EMPORARAY COLER£D Nf1H NWE AND 57 STONE UNIX SnF IS STABLE 1.00' WELDED BAR TRASH RACK GRATE TOP 1 BOLTED IN PLACE EL=10.5 on, ON m� PERFORA. r FABRIC FILTER ELEV. 0.5 SECTION VIEW 4' x /0' Precast ConaBox, ; Tindall UVO410 OR EQUIVALENT OUTLET STRUCTURE DETAILS NOT TO SCALE 8=14' GRAVEL CONSTRUCTION ENTRANCE, WIDTH AS REQUIRED STD.CURB 4' - 6" 4' - 6" SECTION 2,0 E`+ N EXPANSION i JOINT / JOINT TNSIO r m NCDOT CATCH BASIN TRANSITION SECTION STD.840.02 aw w pU 00 PLAN VIEW l_W� � a4 L v FRAME, GRATE AND HOOD NCDOT STD. 840.038 CURB OF NORMAL GUTTER FLOW LINE FRAME &GRATE ---- ---- ww,.vlvewwwm ww...... nti IOPENING Ar------ -- PRECAST CONCRETE CATCH BBA/SSIIN�\\/\\/�� � SEE NCDOT S 852.05 840.02 SECTION V! 840.03B FRONT SECTION FOR FURTHER DETAIL PRECAST CURB INLET N.T.S. 40 20 0 40 80 120 SCALE IN FEET : 1'- 40' DEPRESSED GUTTER OUTLET PIPE (2) - 24"RCP OUTLET PIPES Me =BASE OVERFILL 6" <°i+ FOR SETTLEMENT 4' MINIMUM EMERGENCY BYPASS 6" BELOW SETTLED TOP OF DAM NATURAL GROUND SECTION VIEW F-� V MINIMUM WASHSTONE I' NOTE: THICK ON FACE SEE NARRATIVE FOR FROM TOE OF DAM 5' MINIMUM MORE DETAIL. TO WEIR. \ ` :•e OF ACRE mews 0; i�•••••••••w•` SLOPE2:1 SIDE 2:1 SIDE •i•••w•••w•w•w�SLOPE MAX. :-•••••••••••••••w� CROSS TEMPORARY SEDIMENT A ■ Practice • •0 1 MODIFIED PER COMMENTS FROM NCDENR/DWQ 4/27/00 REV. NO. REVISIONS DATE TYPICAL CUL-DE-SAC 50' R\W NOT TO SCALE POND SUMMARY: STATE WATER QUALITY POND CONSIDERATIONS - Surface Area required = 13,332 sf Surface Area provided = 50,676 sf 1'Storage Volume required = 37,121 cf I'Storage Volume provided = 37,121 cf Storage Vo lume @ Wei r Cut (e Lev. 9.0) = 52,800 cf Required 1'Storage Volume Drawdown Time = 3.1 days PEAK DISCHARGE SUMMARY (NHC SWM) - Q( 2) pre -developed = 15 cfs Q(IO) pre -developed = 29 cfs Q( 2) post -developed = 2 cfs @ WSEL = 10.3 Q(10) post -developed = 19 cfs @ WSEL = 10.9 Q(100)post-developed = 44 cfs @ WSEL = 11.6 POND SEDIMENTATION CONSIDERATIONS - Storage Volume required = 20.5 X 1800 = 36,900 cf Storage Volume provided = 52,800 cf BREWSTER PLACE PHASE TWO Addlt tonal Calculation Summary for DWQ - WATER QUALITY CONSIDERATIONS - Impervious area cm lcu latlonsi See Project Data Sheet ■ No offs lte areas drain to pond STREETS= 1.81 acres BUILDINGS (65 LOTS 8 4000 sf ea )= 5.97 acres TOTAL IMPERVIOUS = 7.78 acres TOTAL AREA DRAINING TO POND - 20. 54 acres w Retention of first 1' of run-off, 20. 54 acres total - 7.78 ar_res impervl ous -12. 76 acres green area SA REQUIRED 7. 78 x 0. 98 + 12. 76 x 0. 20 / 20, 54 = 0. 495, or 49, 5% At 7.5' depth, 902 TSS removal, from chart - SA factor = 1.49 20.54 x 0. 01 x 1,45 = C. 306 acres = 13,332 sf SA REQUIRED At Elev, - 8,0 SA = 1.16 acres - 50,676 sf SA PROVIDED VOLUME REQUIREID (7,70 x 0.98 + 12. 76 x 0. 20) x 1/12 = 0. 85 acre-ft 37,121 cf REQUIRED STORAGE I' Storage At Elev. = 8.7 37,121 cf PROVIDED STORAGE Weir Cut Elevation - 9.0 52,800 cf PROVIDED STORAGE Average head from I' storage elevation to orifice - S.7-S.0 /2.0. 35' 3' PVC drain to dre,-down pond, Orifice equation, Q - CA(2gh)^1/2 9 = 0. 6(0. 0491)(64, 4 X 0. 35)^1/2 - 0. 1399 cfs T = 315,978 sec. - 3.1 days OKAY POND DESIGN DATA 20.54 ACRES NEW LOTS (65 LOTS) 20.54 ACRES TO BE DIRECTED TO POND IMPERVIOUS AREA - 1.81 ac. IN STREETS k 5.97 cc. IN LOTS (TO BE DEED RESTRICTED TO 4,000 of EA.) 7.78 ACRES TOTAL IMPERVIOUS 12' 12" 1 1/2- MIN. BITUMINOUS PAVEMENT 1 1 I � CONCRETE CURB DETAIL NOT TO SCALE NOTE: THIS PLAN TO BE UTILIZED AND RENEWED ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE, KfilCH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. NOTE WELL - ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 15 DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. EROSION & SEDIMENT CONTROL and WATER QUALITY PLAN BREWSTER PLACE PHASE MO LOCATED IN MASONBORO TOWNSHIP NEW HANOVER COUNTY, NORTH CAROLINA OWNER: SATURN DEVELOPMENT 3901 OLEANDER DRIVE WILMINGTON, NC 28403 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON. N.C. 28401 PHONE (910) 343-8002 Dalr. 3-29-00 Scale: 1"=40' Drawn: HSR Checked: HSR Project No: 3888ecp2HSR Sheet No: 2 4 DF c 0 ii La-40' i_ o 3 O 0 O 00.0 0 O O 2' 0000 o 000a ARM 24' 0 0000 O d50 - 6' S7cw 1 W 2 - 24' RCP dYAx - 9' - Le - 40' uI APRQV iil/q(NESS - i.s' O OUTLET PROTECTION DETAIL OUTLET PIPE NOT TO SCALE POND OUTFALL OP OUTLET PROTECTION DETAIL GRATE TOP (SIDE VIEW) 4; ...:... r .. . NOTE: FILTER FABRIC IS TO NOT TO SCALE 4 \�"--"" --- , BE PLACED UNDER ALL STONE 4' �- 4 OUTLET PROTECTION. 0.67' C / � / R CUT WELDED BAR, GALVANIZED, OR r7 n, ► EQUIVALENT La-15' 000,°,00 10' 4i1o0o' 18' 0 0 tt 18' d50 - 6' SMNE T dWAX - 9' V O/7 2.8 rps La - 15, APRON 7HIOGffSS - 1.5' OUTLET PROTECTION DETAIL NOT TO SCALE SURFACE AREA O EL= 7.0 = 29,788 af� \ SURFACE AREA O EL= &0 = AIJI sf \ I \ \ \ L 54.9' 368 FT EXISTING WETLANDS BOUNDARY \ ormwatsl Re entron% `"---_ \ Detention P d =" BOTTOM ELEVATION- -0.5 -� EMERGENCY SPILLWAY EL- 11.0 MINIMUM 50 CY ` _ O SETTL D SPR01EC110N SPILLWAY \ \ CONSTRU TED W= 40', Depth= 1.5' \ aq ELEV=12• 5 PLACE FILTER FABRIC u �S UNDER STONE sot Fence Required \, \, OUTLET STRUCTURE at Too of Bank and SEE DETAIL THIS SHEET across top of Pipes \ 5 CY CL II RIPRAP 1.5 FT DEEP \ ' ANTI -SEEP COLLAR IE = 58 SEE DETAIL f0 CY a 11 RIPRAP (2) - 57.0 LF 24'CL III RCP's 1.5 FT DEEP VARIES i V 15.0' 16' I I it /777Th SEE DETAIL 36' 25.5' MEIN= U �Y NOTE ORIFICE 70 BE TEMPORARILY COVERED WTH V NINE AND 57 S70NE UNTIL 5/7E IS STABLE 2 00' G , WELDED BAR 3 O v rl, TRASH RACK i r BOLTED IN PLACE EL=9.0 GRATE TOP MO 90 ELBOW DOWN 1.8' x 0.5S� 4 8'B£LOW OUSEL 4• EL-8.0 4 OUSEL= MIN. 8' INV= 7.0 Z 0 (2) - 24-RCP OU71ET SB -61 1r2 Cava �INV=6.0 PIPES _ o 1 2-1/2- PERFORATED for CEA OUT PVC W/ GRAVEL AND FABRIC FILTER o EL- JO =BASE POND BOTTOM ELEV= -0.5 SECTION VIEW 4'x 10'Precost Conc.Box, Tindall UV0410 OR EQUIVALENT OUTLET STRUCTURE DETAILS I NOT TO SCALE 2� B=14' 6:1 VEGETATED SHELF FROM EL- 7.0 TO EL= 6.0, 6' WIDE WSEL- 7.0 POND 2 DETAIL SCALE: 1 " = 40' EMBANKMENT TOP- 12.00 (SETTLED). - 12.25 (CONSTRUCTED) 100�AR WSEL- 10 64WSEL- 10 64 EMERGENCY SPILLWAY EL = 11.0 STATE STORAGE _ 10-YEAR WSEL- 9.71 24.653 CF O ELEVATION 7.8 SIR GAT ELEVA N-8.0GUT ELEVA N-8.0 NORMAL WSE = 7.0 8:1 3.1 BOTTOM SWM STRUCTURE EL- 3.0._.._...._............................ 47' EMBANKMENT SECTION NOT TO SCALE IE - 7.20 5 CY CL 11 F 1.5 FT DEEP E = 7.08 5 CY CL 0 RIPRAP 1.5 FT DEEP N01E: COLLAR TO BE POURED AFTER PIPES ARE IN PLACE REN'ORCOIO AS NECESSARY. , �d 3:1 DRY SIDE SLOPE - STEEPER SLOPES ARE FOREBAY OVERFLOW REQUIRED TO BE SPILLWAY ELEV = 6.0 ARMOURED WITH RIP -RAP. NOTE: PORTABLE PUMP TO BE USED TO DRAIN POND IN CASE OF EMERGENCY. PUMP TO BE PLACED ON TOP OF BERM WITH SCREEN ATTACHED TO HOSE INLET AND COVERED WITH STONE. HOSE OUTLET TO DRAIN DIRECTLY INTO POND OU7LET STRUCTURE. 0 n co ALL SLOPES € 3:1 MAXIMUM O s m 6' min 12' min. SEE PLAN we Foreba volume II o DEL 20% of required storage, typical w 4' OP 0 PIPE �$11r min. OUTLET do T- �e OUTLET PROTECTION FOREBAY SEC77ON DETAIL AS ON PLANS TYPICAL AT ALL STORM OUTFALLS To POND NOT TO SCALE r . 40 :. 120 N FOUR STANDARD 2'X3' GRATES NCDOT OR EQUIVALENT WO SEE DETAIL THIS SHEET FOR TRASH RACK 1.8' WEIR CUT 5' PLAN VIEW OUTLET STRUCTURE DETAILS NOT TO SCALE 1 MODIFIED PER COMMENTS FROM NCDENR/DWO 4/27/00 REV. NO. REVISIONS DATE \',!i T 111EI •.0 p Volume Required = 120,263 X 20% = 24,053 cf Volume provided = 11,313 cf STATE WATER QUALITY POND CONSIDERATIONS - Surface Area required = 9,118 sf Surface Area provided = 29,788 sf l'Storage Volume required = 24,653 cf 1'Storage Volume provided = 24,653 cf Storage Volume @ Weir Cut (elev. 8) = 32,460 cf Required I' Storage Volume Drawdown Time = 2.7 days PEAK DISCHARGE SUMMARY (NHC SWM) - Q(2) pre -developed = 18.2 cfs Q(10) pre -developed = 34.8 cfs Q(100) pre -developed = 63.1 cfs Q(2) post -developed = 11,4 cfs @ WSEL = 9.3 Q(10) post -developed = 33.3 cfs @ WSEL = 9.7 Q(100) post -developed = 44.3 cfs @ WSEL = 10.6 POND SEDIMENTATION CONSIDERATIONS - Storage Volume required = 33.0 X 1800 = 22,500 cf Storage Volume provided = 32,460 cf BREWSTER PLACE - PHASE TWO, POND 2 Additional Calculation Summary for DWQ - WATER QUALITY CONSIDERATIONS - Impervious area calculations, See Project Data Sheet Is No offsite areas drain to pond STREETS- 1.67 acres BUILDINGS (42 LOTS Q 4000 sf ea.)= 3.86 acres TOTAL IMPERVIOUS = 5.53 acres TOTAL AREA DRAINING TO POND = 12.39 acres w Retention of first 1' of run-off, 12.39 acres total - 5.53 acres Impervious - 6.86 acre green area SA REQUIRED, 5.53 x 0. 9b + 6.86 x 0.20 / 12.39 = 0.548, or 54. BX At 7.5' depth, 90% TSS removal, from chart - SA factor = 1.69 12.39 x 0.01 x 1.69 = 0.209 acres = 9,118 sf SA REQUIRED At Elev. - 7, 0 SA = 0. 68 acres = 29, 788 sf SA PROVIDED VOLUME REWIRED, (12. 39 x 0. 98+ 6.86 x 0. 20) x 1/12 = 0. 57acre-ft 24,653 cf REQUIRED STORAGE 1' Storage At Elev. = 7.8 24,653 cf PROVI➢E➢ STORAGE Weir Cut Elevatl on - 8.0 32,460 cf PROVIDED STORAGE Average head from 1'storage elevation to orifice - 7.8-7.0 /2-0. 4' 2-1/2-PVC drain to draw -down pond, Orifice equatlom 0 - CA(2gh)^1/2 0 = 0. 6(0. 0341) 164. 4 X 0.4)-1/2 - 0.1038 cfs T - 237,406 sec. - 2.7 days OKAY FOREBAY REQUIREMENTS - Mini mum capacity = 120,263 X 20X = 24,053 cf Provided capacity = 24, 053 cf POND DESIGN DATA 12.39 ACRES NEW LOTS (42 LOTS) 12.39 ACRES TO BE DIRECTED TO POND IMPERVIOUS AREA - 1.67 cc. IN STREETS + 3.86 cc. IN LOTS (TO BE DEED RESTRICTED TO 4,000 sf EA.) 5.53 ACRES TOTAL IMPERVIOUS NOTE: SEE SHEETS 1 & 2 FOR ADDITIONAL DETAILS THIS PLAN TO BE UTILIZED AND REV1EWE0 ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. NOTE WELL, ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 15 DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. EROSION & SEDIMENT CONTROL and WATER QUALITY PLAN BREwSTER PLACE PHASE TTO LOCATED IN MASONBORO TOWNSHIP NEW HANOVER COUNTY, NORTH CAROLINA ANlllnuugrrpN 0H CAROB �,f FESS/ri•ti9 SEAL 025483 OWNER: SATURN DEVELOPMENT 3901 OLEANDER DRIVE WILMINGTON, NC 28403 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON, N.C. 28401 PHONE (910) 343-8002 a Construction Road Stabilization Specification / 6.80 - Construction Speciflcatons 1. Clear roadbed and parking areas of all vegetation, roots and other objectionable material. 2. Ensure that road construction follows the natural contours of the terrain if It is possible. 3. Locate parking areas an naturally flat era" If they are available. Keep grades wi icient for drainage but generally not more than 2 to 3X 4. Provide surface drainage, and divert excess runoff to stable areas by using water bare or turnouts (References: Runoff Control Measures). 5. Keep cute and fills at 2.1 or flatter for safety and stability and to facilitate establishment of vegetation and maintmonce. e. Spread a 6-Inch course of ' ABC' cashed stone evenly over the full width of the road and smooth to amid depressions. 7. Where seepage areas or seasonally wet areas must be crossed. Install subsurface drains or geotextne fabric cloth before placing the crushed stone (Practice if.81, Subsurface Drain). 8. Vegetate all roadside ditches, arts, fill@ and other disturbed areas err otherwise appropriately stabilize "Boon as grading is complete (References: Surface Stabilization). 9. Provide appropriate sediment control measures to prevent off -alto sedimentation. Maintenance Inspect construction roads and parking areas periodically for condition of surface. Tpdress with new grovel ere needed. Check road ditch" and other seeded areas for erosion and mdlmntatlm after mnoff-producing rains. Maintain all vegetation In a healthy, vigorous condition. Sediment -producing areas should be treated Immediately. Temporary Gravel Construction Entrance/Exit Specification / 6.06 - Construction Specifications 1. Clear the entrance and exit wee of all vegetation, roots and other objectionable material and properly grade It 2. Place the graved to the specific grade and dimensions shown on the plans and smooth It. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geatextlle fabrics because they Improve stability of the foundation In locations subject to seepage or high water table, Maintenance Maintain the gravel pad In a condition to prevent mud or sediment from leaving the construction site, This may require periodic topdre"ing with 2-inch aim& After each rainfall, inspect my structure used to trap sediment and clam It out as neceseary. Immediately remove all objectionable materials pilled, washed, or tracked into public roadways. Temporary Seeding Specification / 6.10 - Specifications Complete grading before preparing seedbeds and install all necessary erosion cmtrol practices, such " dices, waterways and basin& Minimize step slopes because they make "ached preparation difficult and Increaw the erosion hazard. If sole become compacted during grading, loon them to a depth of 6-8 Inches using a ripper, harrow, or chiral Plow. Seedbed Preparation Good seedbed preparation is essential to successful plant establishment A good seedbed Is well -pulverized, loose and uniform. Where hydromading methods are used, the surface may be left with a more Irregular surface of large clods and atones Lkning - Apply time according to soil test recommendation& If the pH (acidity) of the son is not known, an application of ground agricultural limestone at the rate of i to 1 1/2 tone/acre an coaree-textured mile and 2-3 tone/acres an fine -textured soils Is usually sufficient. Apply limestone uniformly and Incorporate Into the top 4-5 inches of sell. Sono with a pH of 6 or higher need not be limed. Fertilizer- Be" applicatim rates an soil tests. Whin than we not pomibie, apply a 10-1D-10 grade fertilizer at 700-1,000 lb./acre. Both fertilizer and lime should be incorporated Into the top 4-6 inches of con. if a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening- If recant tillage operations haw resulted In a loose surface, additional roughening may not be required except to break up large dodo. If rainfall causes the surface to become mated or created, loosen it just prior to seeding by disking, raking, harrowing, or other suitable method& Groove or furrow slopes steeper than 3:1 an the contour before seeding (Practice 6:03, Surface Roughening). Plant Selection Select an appropriate species w peal" mixture from Table 8.100. for seeding In late winter and early spring. Table 6.10b for summer, and Table 6.10e for fail. Seeding Evenly apply seed using a cyclone seeder (broadcast), drill, cultipacker seeder. or hydroe"dar. Use seeding miss given In Table 6.10o-6.10c. Broadcast seeding and hyromedIng are appropriate for step slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty In achieving a uniform distribution. Small grains should be planted no more than 1 Inch deep, and gross" and legumes no more than 1/2 Inch. Broadcast seed meet be covered by raking or chain dragging, and than lightly firned with a roller w cWtipacker. Hydroseedod mixtures should Include a wood fiber (cellulose) mulch. in effuse o The f appropriate mulch will help ensure establishment under normal conditions and in essential to seeding success under harsh site condition (Practice 6.14, Mulching). Harsh site conditions Include: -ending In fall for winter cover (wood fiber mulches ore not considered adequate for this use), -dopes steeper than 30, -excemively hot or dry weather, -adverse soils(shollow, rocky, or high in day or sand), and -areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as In channels. mchw mulch with netting (Practice 6.14. Mulching). Table 6.10o - Temporary Seeding Recommendation for Late Winter and Early Spring Seeding mixture Species- Rye(gmin), Annual Impod"a (Kobe In Piedmont and Coostal Plain Rate (Ib/sae)- 120 Omit annual lepedeza when duration of temporary cover is not to extend beyond June Seeding dates -Coastal Plain - Dec. i - Apr. 15. Sop amendments- Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 ib/ocre 10-10-10 fertilizer. Mulch -Apply 4,000lb/aae straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades vet nearly straight can be used as a mulch anchoring tool. Maintenance - Refertllize H growth Is not fully adequate, Reseed, refortilze and mulch Immediately following erosion or other damage. Table 6.101, - Tarnporory Seeding Reoommendatione for Summer Seeding mixture Species -German millet Rcte(lb/acre)- 40 Seeding dates-Coostol Plain- Apr. 15-Aug. 15 Soil omandments-Follow recommendatons of soil tests or apply 2,000 lb/owe ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch -Apply 4.000 lb/acre straw. Anchor straw by tacking with asphalt netting or a mulch anchoring tool. A disk with blades set nearly straight con be used as a mulch anchoring tool. Mointenoncs-Refer filze If growth is not fully adequate, Rowed, refertnlze and mulch Immediately following er"im or other damage. Table 6.10c - Temporary Seeding Recommendation for Fall Seeding mixture Specee-Rye(grain) Rats(lb/acre) - 120 Seeding dates - Coastal Plain and Piedmont -Aug 15 - Dec. 30 Soil amendments - Follow son tests or apply 2,000 lb./acre ground agricultural limestone and 1,000 Ib/acre 10-10-10 fertllizw. Mulch- Apply 4.000 lb/acre straw. Anchor straw by tacking with asphalt netting, or a mulch anchoring tool. A disk with blades vet nearly straight can be used an a mulch anchoring tool. Maintenance- Repair and refertllze damaged arms Immediately. Topdrew with 50 lb/acre of nitrogen In March, If it is necessary to extend temporary cover beyond June 15. overawed with 50 lb/acre Kobe (Piedmont and Coastal Plain) Permanent Seeding Specifications # 6.11 - Specificatons Seedbed Requirements Establishment of vegetation should not be attempted on sites that are unsuitable due to inappropriate soil texture (Table 6.11o), poor drainage, concentrated overland flow, or steepness of elope until measures hove been token to correct these problems. To maintain a good stand of vegetation, the wall must meet certain minimum requirements as a growth medium. The existing sob should haw thew criteria: - Enough fine-grained (ant and day) materiel to maintain adequate moisture and nutrient supply (available water capacity of at least .05 Inches water to I Inch of sop). - Sufficient pore pose to permit root penetration. - Sufficient depth of soil to provide an adequate root zons. The depth to rock or knpanneabie layers such as hordpans should be 12 Inches ar more, except an slopes steeper than 2:1 where the addition of won to not feasible, - A favorable pH range for plant growth, usually 6.0-6.5. - Freedom from large roots, branches, storm large clods of earth, " trash of wry kind. Clods and atones may be left an slopes stepw than 3.1 If they are to be hydroseeded. If my of the show criteria are not met -La., if the existing soil Is too comes. dense, shallow or acidic to foster vegetation -special amendments are required. The sag conditioners described below may be beneficial or, preferably, topsoil may be applied in accordance with Practice 6.04, Tpsoling. Soil Conditioners In order to Improve the structure or drainage characteristics of a soil, the fallowing material may be added. These amendments should only be necessary where sole haw limitations that make them poor far plant growth or for fine turf establishment (see Chapter 3, Vegetative Considerations). Peat -Appropriate types are sphagnum move peat, hypnum moss peat readsedge peat, w peat humus, all from fresh -water source& Pact should be shredded and conditioned In storage piles for at least 6 monthe after excavation. Sand -dean and free of toxic materials Vermiculite-hortIculturd grade and free of toxic substances. Rotted manure -stable or cattle manure not containing undue amounts of straw or other bedding materlds. Thoroughly rotted sawdust- free of stores and debris. Add 6 lb. Of nitrogen to each cubic yard. Sludge -Treated sewage and Industrial sludges are available In various forme: thme should be used only In accordance with local. State and Federal regulations. Spaces Selection Use the key to Pannonnt Seeding Mixtures (Table 6.11b) to select the most appropriate seeding mixture based an the general site and maintenance factors A listing of species, including scientific nomm and characteristics, is given In Appendix 8.02. Seedbed Preparation Install necessary mechanical er"con and sedimentation control practices before wading, and complete grading according to the approved plan. Lime and fertilizer needs should be determined by soil tests. Soil testing Is performed free of charge by the North Carolina Department of Agriculture sol testing laboratory. Dlrectlms, sample cartons, and Information sheets we available through county agricultural extension offices or from NCDA. Because the NCDA son testing lob requires 1-6 weeks for sample turn -around, sampling must be planned well In advance of final grading. Testing Is also done by oommerclal laboratories. When soil test are not available, follow rat" suggested an the Individual speciflcatlm sheet for the seeding mix chose (Tables 6.11c through 6.11v). Applications rates usually full Into the following ranges: - Ground agricultural limestone Light -textured, sandy sons; 1-1 1/2 tone%cre Heavy textured, clayey sole 2-3 tans/acre - Fertilizer. Gromes 800-1200 Ib/acre of 10-10-10 (ar the equivalent) Gram -legume mixtures: 800-1200 blame of 5-10-10 (or the equivalent) Apply lime and fertilizer evenly and Incorporate Into the top 4-6 inches of sob by disking or other suitable means. Operate machinery on the contour. When using u hydroseeder, apply lime and fertilizer to a rough, loose surface. Roughen surfaces according to Practice 6.03, Surface Roughening. Complete seedbed preparation by breaking up large clods and raking Into a smooth, uniform surface (slope two than 3:1) Fill In or level depressions than can collect water. Broadcast mad Into a freshly loosened seedbed that has not been sealed by rainfall. Table 6.11a - Seeding No. 4CP far. Well-Dralned Sandy loame to Dry Sands. Coastal Plain; Low to Medium -Care Lawns Seeding mixture Species - Cantipedegroas - Rate - 10-20 lb/acre (seed) or 33 bu/acre (prigs) Seeding dates - Mar. - June, (Sprigging can be done through July where water is available for Irrigation.) Son amendments - Apply line and fertilizer according to sell test or apply 300 lb/acre 10-10-10. Sprigging - Plant prigs in furrows with a tractor -drown transporter, or broadcast by hand. Furrows should be 4-6 Inch" deep and 2ft apart Place sprigs about 2 ft. apart In the row with one and at or above ground level (Figure 6.11 d). Broadcast at rates shown chow, and press sprigs Into the top 1 1/2 Inches of soil with a disk rut straight so that prigs are not brought back toward the surface. Mulch - Do not mulch Maintenance - Fertilize very sparingly- 20 lb/acre nitrogen In spring with no phosphorus. Cntipedegmes cannot tolerate high PH or excess fertilizer. Table 8.11t - Seeding No. 5CP far. Well-Dralned Sandy Looms to Dry Sands: Low Maintenance Seeding mixture Species Rate (lb/acre) Pensacola Bohlograss 50 Serlow lepedezo 30 Common Bermudagram 10 German millet 10 Seeding not" 1. Where a neat appearance is desired, omit sericea 2 Use common Bermudagrom only an isolated cites when it cannot became a pest Bernudogrove may be replaced with 5 Ib/sae centipedgrae& Seeding dates - Apr. 1 - July 15 Son amendments - Apply lime and fertilizer according to sal taste, or apply 1000 Ib/ame ground agricultural limestone and 500 lb/acre 10-10-10 fertilizer. Mulch Apply 4.000 lb/acre grain straw or equivalent cover of another suitable mulch. Anchor by tacking with asphalt roving and netting or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance - Refertllize the following Apr. with 50 lb/acre nitrogen. Repeat as growth require& May be moved only was a yow. Where a neat appearance is desired, omit sericea and now as often as needed. Table 6.11v - Seeding No. 7CP for: Gram -lined Channels; Coastal Plain Seeding Mixture Species - Common Bermudogrom - Rate - 40-80 (1/2 Ib/I.000 ft ) Seeding dates - Coastal Plain; Apr - July Soil amendments - Apply lime and fertilizer according to soil tests. or apply 3,000 lb/acre ground agricultural limestone and 500 Ib/ocre 10-1G-10 fertilizer. Mulch - Use jute, excels[" matting, or other effective channel lining material to cover the bottom of channels and ditch". The lining should extend above the highest calculated depth of flow. On channal side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 lb/acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must be allowed to wash down slopes where they can dog drainage devices. Maintenance -A minimum of 3 weeks is required for establishment Inspect and repair mulch frequently. Refertllize the following Apr. with 50 lb/acre nitrogen. Refer to Appendix 8.02 for botmled names Grass -Lined Channels Specification III 6.30 - Construcilon Specifications 1. Remove all trees. brush, stumps, and other objectionable material from the foundation area and dispose of property. 2. Excavate the channel and shape It to neat Imes and dimensions shown an the plans plus a 0.2 ft overot ormnd the channel pedmeter to allow for bulking during seedbed preparations and sod buildup. 3. Remove and property dispose of all excess soli so that surface water may enter the channel freely. 4. The procedure used to establish gross In the channel will depend upon the sewrity of the conditions and selection of species. Protect the channel with mulch or a temporary liner sufficlent to withstand anticipated velocities during the establishment period (Appendix 8.05). Maintenance During the establishment period, check gross -lined channels after every rainfall. After grass is established, periodically check the channel; check It after every heavy rainfall event Immediately make repairs. It Is partloulariy important to check the channel antlet and all road crossings for bank stability and evidence of piping or scour holes. Remove all significant sediment accumulations to maintain the designed carrying capacity. Keep the gross In a health, vigorous condition at all tines, since It is the primary woolon protection for the channel (Practice 6.11. Permanent Seeding). Outlet Stabilization Structure Specification / 6.41 - Construction Speclfloatione 1. Ensure that the subgrode for the filter and riprop follows the required lines and grodes shown In the plan. Compact my fill required in the subgrade to the density of the surrounding undisturbed material. Low areas In the subgrade an undisturbed eon may also be filled by Increasing the rlprap thickness. 2. The rlprap and gravel filter must conform to the specified grading limits shown an the plans. 3. Filter cloth, whan used, must meet design requirements and be properly protected from punching or taming during Installation. Repair any damage by removing the rlprap and placing another piece of filter cloth over the damaged area. All connecting joints should overtop a minimum of I ft. If the damage Is extensive, replace the entire filter cloth. 4. Riprap may be placed by equipment but take care to amid damaging the filter. 5. The minimum thickness of the rprap should be 1.5 times the maximum stone diameter. 6. Riprop may be field atone or rough quarry stone. It should be hard, angular, highly weather -resistant and wen graded. S. Construct the apron an zero grade with no overfall at the and. Make the top of the rlprap at the downstream and level with the receiving area or slightly below It 8. Ensure that the apron to property aligned with the receiving stream and preferably straight throughout Its length. If a curve is needed to fit site conditions, place it in the upper section of the apron. 9. Immediately after construction, stabilize all disturbed areas with vegetation (Practice 6.10. Temporary Seed!-..5, and 5.11. Permanent Seeding). Maintenance Inspect rlprap outlet structures after heavy rains to s" If any erosion around or below the rlprap has taken place o, If stone* haw been dislodged. Immediately make all needed repairs to prevent further damage. Fabric Drop Inlet Protection (Temporary) Specification / 6.51 - Construction Specifications 1. As synthetic fabric, use a pervious sheet of nylon, polyester, or ethylene yam -extra strength (50 lb/1 Inch minimum) -that contains ultraviolet ray Inhibitors and stabilizers. Fabric should be sufficiently porous to provide adequate drainage of the temporary sediment pod. Burlap may be used for short-term applications. It must be replaced every 60 days. 2. Cut fabric from a continuous roll to eliminate joints. 3. For wicks& use 2 x 4 Inch wor+. (preferred) w equivalent metal with a minimum length of 3 ft. - 4. Space stakes evenly around the %wrimetsr of the inlet a maximum of 3ft. apart and securely drive them Into the ground, approximately 18 Inches dap. 5. To provide needed stability to the installation, frame with 2 x 4-Inch wood strips around the most of the overflow area at a maximum of 1.5 ft above the drop Inlet crest. 6. Place the bottom 12 Inches of the fabric In o trench and backfin the trench with at least 4 Inches of crushed stone or 12 Inches of compacted son. 7. Fasten fabric securely to the stakes and from& Joints must be overlapped to the next stake. 8. The top of the frame and fabric must be well below the ground elevation down slope from the drop Inlet to keep runoff from bypassing the Inlet It may be necessary to build a temporary dike an the down slope side of the structure to prevent bypass flow. Material from within the sediment pod may be used for diking. Maintenance Inspect the fabric border after each min and make repairs at needed. Remove sediment from the pod area as necessary to provide adequate storage volume for the next rain. Take core not to damage or undercut the fabric during sediment removal. When the contributing drainage area has bean adequately stabilized, remove all materials and any unstable sediment and dispose of them properly. Bring the disturbed err" to the grade of the drop Inlet and smooth and compact It. Appropriately stabilize all bare areas around the Inlet. Land Grading Specification / 6.02 - Construction Specl6catlone 1.Cmstmct and maintain all erosion and sedimentatim control practices and measures In accordance with the approved sedimentation control plan and construction schedule. 2.Ramove good topsoil from areas to be graded and filled, and preserve It far use in finishing the grading of all critical areas. 3.Scarify areas to be topeolled to a minimum depth of 2 Inch" before placing topsoil (Practice 6.D4, Topwlling). 4.CIeor and grub areas to be filled to remove tram, vegetation, facts. or other objectionable material that would affect the planned stability of the fill. 5.Enwm that fill material is free of brush, rubbish, rocks, loge, stumps, building debris. and other materials Inappropriate for constructing stable fit& 6.PIace all fill In loyere not to exceed 9 inches In thickness, and compact the layers as required to reduce er"Ion, slippage, settlement ar other related problems. 7.Do not incorporate frozen material or soft, mucky, or highly compressible materials Into fill slopes. B.Do not place fill an a frozen foundation, due to possible subsidence and slippage. 9.Keep diversions and other water conveyance measures free of sediment during all phases of development 10.Handle seeps or springs encountered during construction In accordance wlth approved methods (Practice 8.81, Subsurface Drain). 11.13ermonently stabilize all graded areas Immediately after final grading is completed an each area in the grading plan. Apply temporary stabilization measures an all graded areas when work Is to be Interrupted or delayed for 30 working days or longer. 12.Ensure that topsoil stockpiles, borrow area*. and spoil areas are adequately protected from erosion with temporary and final stabilization measures, Including sediment fencing and temporary ending as necessary. Maintenance Periodically check all graded areas and the supporting waslon and wdimmtotim control practices, especially after heavy rainfalls. Promptly remove oil sediment from diversions and other water-disposol practices. If washouts or breaks occur, repair them Immediately. Prompt maintenance of small eroded areas before they become significant gullies to an essential part of an effective sroalm and sedimentation control plan. NOTE WELL: EROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL' OF THE STATE OF NORTH CAROLINA, DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, LATEST EDITION. PRACTICE NUMBERS REFER TO THIS MANUAL. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A COPY OF THIS MANUAL ON -SITE AND ENSURING THAT ALL SUPERVISORS ARE FAMILIAR WITH THE STANDARDS AND SPECIFICATIONS SHOWN IN THE MANUAL AND ON THE PLAN. Temporary Sediment Trap - continued Protection from piping - Place filter cloth an the foundation below the riprop to prevent piping. An alternative would be to excavate a keyway trench across the riprop foundation and up the aid" to the height of the dam. Weir length and depth - Keep the spillway weir at least 4 ft long and sized to pass the peak discharge of the 10-yr storm. A maximum flow depth of 1 ft, a minimum freeboard of 0.5 ft, and maximum side slopes of 2:1 are recommended. Weir length may be selected from Table 6.60a shown for most site locations In North Carolina. Table 6.60o Design of Spillways Drainage Area Weir Langth(l) (am") (ft) 1 4.0 2 6.0 3 8.0 4 10.0 5 12.0 (1) Dlmmslms shown are minimum Construction Specifications I. Clear, grub, and strip the area under the embonkmant of all vegetation and root mat Remove oil surface soil containing high amounts of organic matter and stockpile ar dispose of It properly. Haul all objectionable material to the designated disposal area. 2 Ensure that 61 material far the embankment Is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 Inches and machine compact It Ow fill the embankment 6 Inches to allow for settlement. 3. Construct the outlet section in the embankment Protect the connection between the rlprap and the soil from piping by using filter fabric or a keyway cutoff trench between the rlprap structure and the soil. (Place the fitter fabric between the rprop and eon. Extend the fabric comes the spillway foundation and sides to the top of the dam; or (Excavate a keyway trench along the cmtertlns of the spillway foundation extending up the sides to the height of the dam. The trench should be at least 2 ft deep and 2 ft wide with 1:1 side elopes. 4. Clear the pond area below the elevation of the amt of the spillway to facilitate sediment clmnout 5. NI cut and PoI slop" should be 2:1 or flatter. S. Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 ft and maximum side slopes of 1:1 that extend to the bottom of the spillway section. 7. Construct the minimum finished stone spillway bottom width, as shown an the plane, with 2:1 side slop" extending to the top of the over filled embankment Kep the thickness of the aides of the spillway outlet structure at a minimum of 21 Inches. The weir must be level and constructed to grade to assure design capacity. 8. Material used in the atone nation should be a well -graded mixture of stone with a d50 size of 9 Inches (dose B erosion control atone is recommended) and a maximum stone size of 14 inches. The stone may be machine placed and the amd1w atones worked Into the wide of the larger stones. The stone should be hard, angular, and highly weather-reelstant 9. Ensure that the store spillway outlet section extends downstream past the too of the embankment until stable wnditime on, reached and outlet velocity Is acceptable far the receiving stream. Keep the edges of the atone outlet soctlon flush with the surrounding ground and shape the center to confine the outflow stream (References: Outlet Protection). 10. Direct emergency bypa" to natural, stable area& Locate bypass outlets so that flow will not damage the embankment 11. Stabilize the embankment and all disturbed areas above the sediment pod and downstream from the trap Immediately after construction (References: Surface Stabilizatim). 12, Show the distance from the top of the spillway to the sediment deanout I" (one-half the design depth) an the plans and mark It In the field. Maintenance Inspect temporary sedlmmt traps after each period of significant rainfall. Remove sediment and feature the trap to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that Is removed in the designated disposal err" and rplam the contaminated port of the gravel facing. Check the structure far damage from woclon or piping. Periodically check the depth of the spillway to ensure it is a minimum of 1.5 ft below the low point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any rlprap displaced from the spillway must be replaced Immediately. After all sediment -producing areas haw been permanently stabilized, remove the structure and all unstable sediment Smooth the area to blend with the adjoining areas and stabilize properly (References Surface Stabilization). PRELIMINARY PLAN NOTES: 1. TOPOGRAPHIC SURVEY AND PROPOSED CONTOURS BY HANOVER DESIGN SERVICES, P.A. 2. ALL ELEVATION ARE NGVD 1929 3. THIS PLAT IS PRELIMINARY, IT IS NOT INTENDED FOR RECORDATION, SALES OR CONVEY 4. A PORTION OF THIS PROPERTY IS LOCATED WITHIN A 100 YEAR FLOOD HAZARD AREA. (BASE FLOOD ELEV. = 10.0) 5. SANITARY SEWER TO BE PUBLIC. 6. WATER TO BE PUBLIC. 7. THIS PROPERTY IS ZONED R-15 (PERFORMANCE DEVELOPMENT) 8. THIS MAP IS IN CONDUCTION WITH AND A PART OF BREWSTER PLASE PHASE TWO OVEI 9. FOR REFERENCE SEE D.B. 2085 PG. 894 10. FOR DRAINAGE DESIGN SEE EROSION CONTROL PLAN. 11. CLASS IV SOILS ARE TO BE LEFT IN THEIR NATURAL STATE. 12. ALL STREETS AND DRIVES TO BE PRIVATE. 13. TAX PARCEL # 76-00-06-24-00 14. NO PORTION OF ANY BUILDING WILL BE LOCATED WITHIN THE 100 YEAR FLOOD ZONE. 15. 39.6 ACRES IN THIS PHASE. NOTE: DETAILS SHOWN ARE TYPICAL OF INSTALLATIONS REQUIRED BY NEW HANOVER COUNTY. THIS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED CONSTRUCTION DETAILS, BUT RATHER SERVES AS A GUIDE. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL COUTY AND STATE CODES AND CONSTRUCTION STANDARDS. IIIIIIIIIIIIIIIIIIIIIIIIIIII E IIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIII •IIIIIIIIIIIIIIIIIIIIIIIIIIII M7 Sediment Fence (Silt Fence) Specification 6.62 - Cwstructim Specifications MATERIALS 1.Use a synthetic filter fabric or a pervious sheet of polypropylene, nylon, polyester, or polyethylene yam, which is certified by the manufacturer " supplier as conforming to the requirements shown in Table 6.62b. Synthetic filter fabric should contain ultraviolet ray Inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F. 2-Ensure that poets for sediment fences ore elther 4-Inch diameter pine, 2-Inch diameter oak, or 1.33 ib/Ilnew ft steel with a minimum length of 4 ft Make sure that steel poets have projections to facilitate fastening the fabric. 3.For reinforcement of standard strength filter fabrie, use wire fence with a minimum 14 gauge and a maximum mash spacing of 6 Inches. Table 6.62b Specifications Far Sediment Farm Fabric Physical Property Requirements Filtering Efficiency - 85X (mm) Tensile Strength at Standard Strength- 30 1 Inn in (min) Extra Strength- 50 Ib/Iin In (mm) Slurry Flow Rate - 0.3 gal/sq ft/min (min) CONSTRUCTION 1.Construct the sediment baffler of standard strength or extra strength synthetic filter fabrics. 2.Ensure that the height of the sediment fence does not exceed 18 Inches above the ground surface. (Higher fences may Impound volumes of water sufficient to cause failure of the structure.) 3.Construct the filter fabric from a continuous roil cut to the length of the barrier to amid joints. When joints are necessary, securely fasten the filter cloth only at a support post with overlap to the next post 4.Support standard strength filter fabric by wire mash fastened sewraly to the up elope side of the poste using heavy duty wire staples at twat 1 inch long, or tie wire& Extend the wire mesh support to the bottom of the trench. 5.When a wire mash support fence la used, space posts a maximum of 8 ft apart Support poste should be driven securely Into the ground to a minimum of 18 Inches. 6.Extra strength fitter fabric with Bft poet spacing does not require wire mash support fence. Staple or wire the filter fabric directly to poste. 7.Exoawte a trench approximately 4 Inches wide and 8 Inches deep along the proposed line of poets and upslope from the barrier (figure 6.62a). B.Bockfiil the trench with compacted son or gravel placed over the filter fabric. 9.Do not attach filter fabric to misting trees. Maintenance Inspect sediment fences at ]east once a week and after each rainfall. Make any required repairs Immediately. Should the fabric of o sediment fence collapse, tear, decompose or become Ineffective, replace It promptly. Replace burlap awry 60 days. Remove sediment deposits as necessary, to provide adequate storage volume for the next rain and to reduce pressure an the fence. Take care to amid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the arm to grade and stabilize it after the contributing drainage area has been property stabilized. Sediment Basin Specifications B 6.61 - Construction Specifications 1.SIte preparations -Clear, grub and strip topsoil from areas under the embankment to remove trees, witatatim, facts and other objectionable material. Delay clearing the pod area until the dam is complete and than rernove brush, tram and other objectionable materials to facilitate sediment cleanout Stockpile all topsoil or soil containing organic matter for use an the outer shell of the embankment to facilitate vegetative establishment Place temporary sediment control measures below the basin as neaded. 2Cut-off trench-Excowte a cut-off trench along the cmtedlne of the earth fill embankment. Cut the trench to stable sol material, but in no Gave make it less than 2 f. deep. The cut-off trench must extend Into both abutments to at least the elevation of the riser met. Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment but In no cam less than 2 ft Make aide slop" of the trench no steper than 1: 1. Compaction requirements are the some as than for the embankment Keep the trench dry during backfllling and compaction operations. 3.Embankment-Take PoI material from the approved areas shown on the plane. It should be clean mineral soil, free of roots, woody vegetation, rocks and other objectionable material. Scarify areas on which fill Is be placed before placing fill. The fill material must contain sufficient moisture so It can be formed by hand Into a ball without crumbling. If water cm be squeezed out of the ball. It Is too wet far proper compaction. Place fill material In 6 to 8-Inch continuous layers over the entire length of the fill area and then compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer Is traversed by at twat one wheel or tread track of the heavy equipment w a compactor may be used. Construct the embmkmmt to an elevation 10% higher than the design height to allow far settling. 4.Cmduit epilways-Securely attach the floor to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight asaanblles. Place the barrel and riser an a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backflll around the pipe " anti -sap collars. Place the fill material around the pipe spillway In 4-Inch layers and compact It under and around the pipe to at twat the same density as the adjacent embankment Care must be token not to raise the pipe from firm contact with Its foundation when compacting under the pipe haunches. Place a minimum depth of 2ft. of hand-oompacted bockfgl over the pipe spillway before crossing it with construction equipment Anchor the riser In place by concrete or other satisfactory means to prevent flotation. In no cow should the pipe conduit be installed by cutting a trench through the dam after the embankment Is complete. 5.Emergwey spfllway-Instoll the emergency spillway In undisturbed soil. The achievement of planned elewtime. grade. design width, and entrance and "it channel elopes are critical to the successful operation of emergency spillway. 6.Inlets-Discharge water Into the basin in a manner to prevent erosion. Use diveralms with outlet protection to divert sedimant-laden water to the upper and of the pod arm to Improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection). 7.Erosion control -Construct the structure so that the disturbed area is minimized. Divert surface water away from bare Grace. Complete the embankment before the arm is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway Immediately after construction (References: Surface Stabilization). B.Safety-Sediment basins may attract children and con be dangerous. Amid step aide slopes, and fence and mark basins with warning signs if trespassing is likely. Follow all state and local requirements. Maintenance Check sediment basins after periods of significant runoff. Remove sediment and restore the basin to Its original dimenslans when sediment accumulates to we - half the design depth. Check the embwkment. spillways, and outlet for eroson damage, and Inspect the embankment for piping and settlement Make all necessary repairs Immediately. Remove all trash and other debris from the floor and pool wee. GENERAL EROSION CONTROL SPECIFICATIONS and ADDITIONAL DETAILS for BREWSTER PLACE PHASE TWO LOCATED IN MASONBORO TOWNSHIP NEW HANOVER COUNTY, NORTH CAROLINA SEAL 02W :51"lvo OWNER: SATURN DEVELOPMENT 3901 OLEANDER DRIVE WILMINGTON, NC 28403 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON. N.C. 28401 PHONE (910) 343-8002 (� Data 3-29-00 Scale: AS SHOWN Drawn: HSR Checked: HSR Project No 3888ecp4HSR Sheet No: 4 O4 C "(F:' SI IMM^RY Ve It •e^•ote .....r.Af f,. I.EI IF," I-�- --= - - ---.. B t IR...1 .16 1, E90 LF 3 A45 M 5 z' T2.5 �/ /, ,', 'll v/,•Y. AJ/ nl 5 3 3 5 t�E _ 711 I i I;E � n 0.03 � � 20n 0 03 I � 3 .,77 IF % tr ^r1E ?71 I �\< ?^` r • ' -I 1 -I 1 Ct r' 1 CE ---- -36I 1 F ---- lt(; �\/\������,/�\\.• c '. ./ � 113 � 6F � C( f•,g11R1 367 IF -- no;ninal s- 1% " GRASS LINED GRASS LINED f� ►l STERN SEWER PIPE CAPACITY - 754cfs to 2. 1,'fFs II•`• nominal s= 0.1% nominal s= 0.5% 5• CJ 'r11.I. STREET AFEA INCI TIDING CAPACITY = 81+cfs ® 1.8 fps CAPACITY = 75+cfs ® 1.3 fps TD OCTAL dVFRlION ao- �^ C•11 PE-S"CS = 39Liscres GRASSED -CHANNEL ,, k Practice e.zD GRASSED SWALE GALE -� NOT TO SCALE DRAINAGE (30' DRAINAGE EASEMENT) (20.EMENT) \ K<� Awl Eo' EME11T TEMPORARY DIVERSION TO _ JEASElAEI!'( BE PROVIDED JUST OUTSIDE NOT TO SCALE NOT TO SCALE RIGHT-OF-WAY. DIRHCT FLOW L , TOE— E I 1`) \ I J r INER R04D- ------ AFITIO c, K p U a: 0 5 LAI U � �¢ N On BREWSTER LANE vi J S/ T ` Ct TO SEDIMENT BASIN. DIVERSION) LIMITS T.B.H. TOP OF 6 TISBURY LANE MAY BE REMOVED AFTER STORE! " �1l DISTURBANCE \ E.C.II. ELEV. 20.22 z ' MARQUIS SILLS SUBDIVISION \ DRAINAGE HAS BEEN INSTA.1lFD Ay�t _ A _ 33 acres q O NOTE ALL LOTS TO BE GRADED SUCH LIMITS OF x" I c. THAT ALL STORMWATER FLOWS DISTURBANCE ;',� ' S 'I TO ONSITE STREETS OR SWALES .- �,'� 33, acres- IJ1 IIISTER w 7 70 T TAL / / - / I11111I'I I I 55 57 B.RE�ECTION�3ACE \\ n 1 / / / I 1 COM � II A43. 38 PG. 312 / SILT FENCING TO . w § f l -- -� \ , -- _... ) /i / / 213 214 215 216 I ?_ 171� 218 I �19 I III 56 ss 53 w I BE PROVIDED ALONG / �t \ / % _ " /� ' 2oy 211 s /, I I �R) �I I 54 1 52 /' 2� I LIMITS OF DISTURBANCESF Z 1 O 202 c0� _205. Ex cMP IPI, , - - __ -\_- -- _ s1 01 �� IP � NE �c S 36'4133" W175.95 y,� J Ih / 4.171 A c - - _ IN CONSERVATION ` WIT AREA ,iPPROXIMATE LOCATION OF CENTERLINE OF/ �j BA� II �...' r ..I, r MOTTS CREEK. RUN OF-��/,;� / / �, r; III 9�1 I( y y,' / �,-''� '�I ` 1. �{ 1 j %{�/ 4 A',c rrs CREEK S PROPERTYR K I - LINE S 01'15'S2"E 93.37 / i -! "i 1/ % / r I ` ) 1 \ r, 4' `�� 1 (e`(.` _ -.ate S 78'09'2/"W 8.3.8EL CON If S 45.49' 14" IV 164.22 "or TD 0T09'26"IY 1�� // �,�• /,/.,,I I �� Ti1 li 1;V) t IP t3REF1"_, IE,4 PLACE 5ECTIoN 3 �� 62 0.3 38 PG. 3/2/ ' 142 m 1411 401 139 138 I 137 _LL3 135 34 33 132 63 64 I -� 67 J / ® GY II TRAP �" ® DITCH 5 CY a. AP b_ QU 5 CY CL0 RIPR �GP / 124 ,G� I126 I �1271 128 I 19 / 1/E 107 II 103 toIO/10s s./C� AC o / (; IN CONSERVATION p® ?p•O2 b � 11a 82 EXISTING ® ,i WETLANDS i1 2 �'•�� PL, <Y�1 /' 41 �( J' 9 T ,r 2'�� _ 11 I 01 O 16(7_-�1 B 79.91 U A _r / 1 'I I / I _ % I I 1 1 11 c �- - , PiL A I 1 1 118 I 7 I tr/tt- S 5045 3? E /f 81 ' 1 ��/f . j.:lr11o.5 \ Ur9� / 154 / �� I 1 1 111 I s' S i �: 107 tt A2.u5 ;L . , �r I 5 C..I CI. n Ry h -/'l I _. / J 1 < IPAi:E 1 ,E!.fuN , II _ ( � �� EX. c.-wsa isaA •� , 1 ; Ij� r. 160 U S9 - w w w w s w _ 33 6 S _D-.34 , \ .-'.' S • 5 cr a II•hIPR`4P�`, 1 `l ' tl ; ! \ \ �i \ 8�._.i \ 155 •' w w 8.: - 34 {. I I. It t ,__ -... _ ._. I Y CPR., ! + Il /�.4. �(. -r I / _ \ 1 p �_...:� - w - w w w (t ` 11ise's_ _ O 175.35 ; - l _ •'( '.' . ■',. (� ( / '.� � wMAY/r ✓L - (-' I TI' IG I,! I r l IF , . -E I' EASEMENT i ` '' j / 181, / / n . -q S ) O \ --- / I rc MAI I SOON w w CONSTRUCTION EN RANCE E t " - / f I 1 \ ,_/ , ) TO w ► BE NECESSARY IF CONTRACTOR I 1 {r •11 "�I I A! N = F " TI L 1 I 'i " • SILT FEN G TO� g' DI CH w w w l� , �.• BE PROVIDED ALONG 1 l32 �` . 163 161 , 1 6 E w w w. w w w w w ENTERS. SITE IN THIS LOCATION �� ; ` ` ;5� 1 Z P - w w SEtE SHEET 2 FOR LIMITS OF LIMITS of DISTURBANCE _ _ \\D i r IP 1 DETA� �, r 5 Cy CL II RIPRAP DISTURBANCE k - �_% \ \\ •; \ ti r s' DEEP _ E. _ \ 23b3.70 TOTAL acres_Ej(, 33 a S 83, 26' 41' E \ - 3o D N 81' 43' 34" E C/2 16 ST/1 75.88 8 I S;LT FENCING TO LIE PROVDED- W. E. BLACKMON CONSTRUCTION CO. ' ALONG TUE OF SLOT-E --- D. B 1499 PG 433 SILT FENCING TO BE PROVIDEDajl��PORARY SEGIIAE`NT TRAP SUI��>3(jY: �� �= - ,rSHEET 3 c! q ALONG TGE OF SLOPE _ r MIN. TRAP VOL 1.800 CF/ACRE DISTURBED AREA :WOODEN rkf.:E t'R• I 1 \ -�'�f�--�.r'� 1 ! - ' •AEC '" }. 4. - I S 7T36'3J"E -�� Ini r102UET.4.1. 7• Le::. { I,� 1� (SEDIMENT MUST BE REMOVED TWICE A YEAR) Sr ---SILT F> IICINtr 70 E';E PROVI!;;' \ / r \ T u n UP TO AND AR01i1.'1 bi"d II a' .e x; t. r AREA 6. [nstn I I Lit I l I t I es I n roadway, base l I sh £ I no l road grades SEDIMENT LENGTH OF DISTURBED MINIMUM TRAP WEIR fit ! t r ,r r' ti �� ; 25'C.O.D. 30'UTITI.IY I I \ a ,. and stab Ilze road with stone base course. DRAIi�AGE AREAS f 1 . y SETBACK \ EASEMENT - - 18� AlTl�11LEi,i�E...((ii'1 1,E[i i..(Eil ( n .'1 / X -�I S8 8. SEDI NL TIT Oki FIT 7. FInoI grade, Install non -nun I Ipa1 ut 11I t I es as needed, and � INLET): - (..A fi E: :cSS `' /., - �--= - ---- ----, \ Prac tic Sr 61 vegetatively stabilize areas where building construction Is 1 11630 3.37 6,06E 10 - r 7 . i 'C - - - I -T I - \ - '� _MOT7S CRFI'K tl se Jis�ent Baser, is to kweanstructed first (see not Imminent. Al R 4E'dS �•`/ - Ai c Biers / tt 1. B 0. 75 acres 2 2.310 4.77 8,5e6 1.2 a • y //J I I T OIJ IT ALL Contra-tlon Scneduld �'J is the primaryPractice to -d _ 8. All erosion and sediment control Practices are to be 1. C 1. 20 acres -1 -`I 1 I SWAlv1P prevent eat crL,.:er< fr : !.oving tT le site. le. Detal led design and ^�,Isolitway tors garat.,:ri are specified in the CALCULATIONS Inspected weekly and after any rainfall, and repaired as 2. H 0,84 acres -DISTURBED AREAS BASED ON 90 FT MADE DISTUR[ED AREA'i'Qr'1 DITCi I) AC FOREST / sect Ion of iI nurrotl v;. The PVC cutlet Is to be blocked necessary. 2. C 1.. 86 acres A �RO\/�F1 �• / /"' I//1 'i _ I i\ LINE 1 ,�pdttrinasedim..,ntation r.-Lion (or not Installed) until 3. B 0. 55 acres - (R : Y R,J,-- 1 eat l re,watei shed Is Lz went ly stabI IIzed and pond Is 9. Upon coop let Ion of construction, the roadway Is to be paved NC .OLINA ENVIRONLIE'TAL /I' ', !• _ ;� I converted to•permcnrr:t ;tormwater management detention / and nil areas permanently vegetatively stabilized. After 3. C 1. IS acres - HMENT COMMISSION �� \ I\ retention function. site stabilization, temporary measures are to be removed and 4. B 0. 45 acres - - EY7FtI5IOl OF / the Sediment Basin cleaned to Its original design contours, 4. C 1. 56 acres t -.UN OF WATER QUALITY FAER•) r l,aL-' • I �' - f_ ,-�S `�j J O If necessary, and riser structure Orlfaces opened, so as to IBTO TRENCH- 1 9. TEMPORARY SEDIh1ErlT f'!1" function as a stormwnter management / water unlit 5. H 1. OS acres 12'C01!F.o ST^.NF. ORI i"1ay ZL�O 11' C(N!F.'.^ILL COIL Practice 6. FO retention pond. 5. C 2, 13 acres I ✓//I I I I 1 Sediment- ed lment, trG ps v I,.. l.e Instal led as Indicated on pion 6. C D, 29 acres wCW3ryt 3Z at 4z downMg I I VV��� I III\ I I '•\ i I n I I 7, B 1, 64 acres i t 1. Permanent vegetation to be established in accordance with 8. A 0. 29 acres FILTER FABRIC: • . VJ ', , _ ._ I PLANNED EROSION AND SEDIMEN( LONTRDI_ PRACTICES'- MAINTENANCE PI IJI -- _. _ _ 'North Carolina Erosion and Sediment Control Planning and 9. A 0, 14 acres PERMOUS SHEET OF n Design Manual Section 6. 11, latest version. See Sheet 3. IO. A 2.25 acres I 1. TF9PGRARY GRAVEL CONSTRUCTION ErITRANCE €bF \� :root ice 6.0E 1. All nee tr _ ;E be ;;'l - eu wer.0 y'And after any ra l nfall Shall he Installed at the entrances to the project event and nmed cl repair 'aw_ Irmccilately, From an existing roadway ( at existing Brewster Lane 2. i� Sediment B-_si,n to t:: •:r - - �.,:d o„t when the level of sediment I and C.•crge Place ). Dralrege should be away from the reacle 5 t'Icy, o - opening.: Riser structure to be 1 road and erosion will be con -trailed with downstream � ,.a cleaned if:Q,tl s ve deslgrr surface no longer practices. Miring wet weather It may be necessary to rash aralns pro:,crJ truck tires at these lozoticns. 50' R\W 2. I (90 GPA0171Ci 3. Sedl en[ tkJ i+, i en )1 fl s.ro tc. hen the ore ♦ y level CAL I 'act E OP_ approx l mat t; 1 _�.• sedl n3nt Is vlthln 1' of Ice top of. s I}�c elk G'-odlnl :,h..ulJ b II:IIted to areas as shown ,r. tile and 4 ,ell L [it r.m �_I - h-t., nd my Silt Fence and F tars. Ctit fI II I pes shill be 311 or flatter except 'v,.wa Inter. tea fare shall be taken during IrJ t pl rl ';1 i de I,. P, I be ones 0, 5' deep. Fenc I ng I I~ s,^^.eel°Ically a..t 1,1 t I, .tic.. Tr' - repaired a� neTded to maintain n 70' -25.0• 25.0' 10• I lanc' nrading nctivl{I n a to damage existing trees thrt bore UTILITY UTILITY , Id:rtIfI -d o: ., h.- preserved'. w,{yt EASEMENT I 16 - 1B I E4SEMEN T I ,., S. Al I sec a .r .,I� rtIII'IIC. mulched, end re -seeded 16' - 16' .1 0. SELIOENT FENCE o r ce r y, c r - sptclflco 'lore provided, to Procticc 6.6? r-Ir aln !rh kl R -I:C CG '' - I ! 1 /yI-2 ASPHALT f Sadlnent fencing should be Installed as sho-v,,:in the - 6. - a: stet Ic..l• era- s maintained in uch manner as to a ed s c 3 -1 Jf T, 1/4' T. P Len, tc delineate and p;^atect wetlands and speck led areas, Prvv m«,d,:.,t seel.} '�. - ro Teo vi rg the construction site. �l 0.5'/FT. 4 05'/Fl.� and m-ound any ter,pornry stockpile areas as necessory to IL rer lc c tr,,c'- Irt 2- inch s..rie may be regwlred. prevent on coded inter la.' ereas from eroding onto adjacent Y e a 1 Ins ect of+:.tic.-h r 1; p .� It and immzdlotel remove all - y 6• ABC lands or rm.iwn , or Into Inlets, arias dire-ted by Cnglnenr X . cL lest Lorna l:r nc .eel I c S]1ltcd, bosh: d, or tracked onto cr few Ho nn er uairty Ern, I on Control personnel, p utl lc ror-!',e•,., - MODIFIED MODIFIED /•,-•,\ 4. GkASS-LINFp CI IANNELS _ •. - 'each VALLEY CURB VALLEY CURB !�/ Practice 6 SD 7, Lisps t te..p':rkry .I I,. after period of slgnl£ICant rn lnfall f.+ o c ,�Ilr. , and re st_re the trap to Its original and r All swales to be to design dinensl.:ns wh n the -a 11 A has ocClInuloted to 1/2 the design TYPICAL PUBLIC STREET DETAIL overflow graded depth of the trop PI the sedinant that Is removed In the 6.. col,f lguratlon, seeded, and stabilized If necessary with des lgnnted all po al-..k" .d replace the contaminated part of the temporary straw -net liners to collect and convey site water Grovel Facin;a Ch _ e-trurtur•e for dnmage From erosion or NOT TO SCALE to the Sediment Basin as shown on Plan. After final project - piping. Per l rdl cIt, ';Ir Vie d.-pth of the spillway to ensure it stablll-a.tlon, swales to be re-gradzd and cleaned of Is a minimum ar 1 5 Tel --law the low point of the embankment. =l Ltatlon as needed to establish original contours for Ir d, t 1 fill r 'lament of the embankment to slightl above storrwater comeyance. , - .me a e y _ deslFn grade. Any r. ipr .. y 1. di placed from the spillway must be replci a Ior.•di Ott Lr 'r er oil secilloent produclrg areas have IP5. INLE1 PRGTECTI!'.`1 been parmanently sI.': 11 is+d, remove ''.he structure and all unstable Proctic4 E.52 cede menu. Smooth tr.rr. +a to blend w,th-the adjoining areas and stab)l Ize-pr:per ly. Storm sewer Inlet barrlers of slit fencing or block and - -' - gravel Inlet protection are to be constructed to help .,, prevent 5edlr:exit from enuring the storm sewer system. ' coksTRucTIDr1 scltuulL ^ YP 6. OUTLET STABILIZATION Practice 6.41 • _- 1, - Obta In of rro,aI f;:•jar ::,d any necessary permits, and hold a pre ca SR'•u_t, er-Lsai I.rrir,cc ,prior to commencing any work, Riprop aprons will he located,ot the downstream end of all discharge pipes to prevent scour, 2. Flag wurk limits an:1 I- I,e-out roadway,.prlmory ditches, and - - Sediment: Basin forFrol -Incry grading. - /. T T 'r 'T.ABILIZATION COILS RUC IL I ROAD S '" 3. Instoll Gravel Cor_ln l,:•n -- Entrances. Practice 6.00 - -. Upon reaching��fine( grade and after uVilitles have been q, Install Sediment Basl•, s shown m, Plan prior to clearing Installed, roadway areas .are to be sttiblllzed by placing and Drubbing site, sub -base course of approved 4' mark stone, as'shown In the . typical street cross secticn detail on the Plan, to reduce 5. '� Construct ditches and r.a other sediment controL Practices erosion and dust drrino the remainder of handing "=shown, prior to rou:h r ling roadways and site, stockpiling _ans-ir, ict l an mater l al and topsoil y. STORM DRAIN DESIGN COMPUTAT►ONS LOCATION RUNOFF PIPE DESIGN FROM TO D.A. PIPE TIME OF CONIC. MIN. TNT, D1SCH. ELEV. ELEI: SIOT'f. INLET FLOW DESIGN POINT POINT ACRES MCA (L) (1) 0 INL. OUR. MIN. IN.. �•- TIME TiME TIME 1.A 1.B 0.8 0.78 137 5 - 5 8.1 6.4 15.8 15.5 0.002 .18 1. 1.S 1.0 1.2 0.48 36 5 - 5 8.1 3.9 15.9 15.8 0•.003 18` 2-A 2.B 0.8 0.99 132 5 - 5 8.1 8.0 14.7 14.4 0,002 18 4 2-B 2.0 1.9 0.65 35 5 - 5 8.1 5.3 14.8 1.1.7 0.003' 18 5 3.A 3B 0.6 0.69 132 5 - 5 8.1 5.6 15.7 15.4 0002 16 i 3.8 3C 1.2 0.47 37 5 - 5 8.1 3.9 15.8 15.7 0100:3 0.003; 18 18 5 4.A 4.B 0.5 0.80 155 5 - 5 8.1 6.6 9.9 9.5 4.B 4.0 1.6 0.62 35 5 - 5 8.1 5.1 10.0 .9.9 0.003 -'10 5. 5.A 5.B 1.1 1.27 130 5 - 5 8.1 10.7 8.7 8.3 0. DO 18 5 5.8 5.0 2,1 0.85 48 5 - 5 8.1 6.9 8.8 8.7 0-003 18 5. 6.A 6.B - 0.29 46 5 - 10 77 2.4 72 70 0.00T 18 5 6.8 6.0 0.3 0.29 340 5 - 5 8.1 2.4 9.2 Z2. 0,003 18 F 6. C 6. D 0.4 0.17 35 5 - 5 8.1 1.4 8.3 8.2 0.003 18 5 7A ZB 1.6 0.66 150 5 - 5 7.2 4.7 7.7 7.2 0.003 /8 ':5. B.A - 0.3 0.12 CONCRETE FLUME - SEE STORM DRAINAGE CALCULATIONS FOR NORMAL DEP771 F 9.A - 0.1 0.06 CONCRETE FLUME - SEE STORM DRAINAGE CALCULATIONS FOR NOR11AL DEPTH F 10.A - 2.3 0.90 CONCRETE FLUME - SEE STORM DRAINAGE CALCULATIONS FOR NORMAL DEPT,'I T• •• ` NYLON, POLYESTER, OR ET.4YIBIE YARN, EXTRA RO IMF I I '--- STRENGTI ( 5o Psi 11M.j WITH ULTRAIIOLET NAY INN161TORS AND STABNZE:RS -EL- E Il r/ PEPP wLF�r .n-1 ; 'ir11:1 �� "-t- _I�� _ RECEIVED NTS PRACrCE 6.51 2 2 APR 2 8 20M t IF ` g •° w,gv732 5? PROD # e. t I :r'.0 50 0 700 :nU TC OE I1TII17cD ANO 2. r' - - -- .3uu E', 7C.''d Or J'-,' d, -. . "Cl: ri rr( itr PAR T OF 3.9 -SC-' c IN r: ET . r PITS LrZO:.rc , rJ `13,7, l,7 1.4 I NO -11.: 1.9 R'Y. ,.-1S OA' SITE r,- All 7 1 /Y IN A 15 04, •ki;.00 t 0L� SIMI! ,:-.itP, -S'.1 -Tf1 Rt _7 TIP- `•,:, Iiftr,T-;VS p g EOS101J &: SEi�!MENT CONTROL and WATER ONALI1 / ;_.' AN nit l L rr('RE i ��'.7N ! :>i' r!_PO Tf 7 BS� .Jdb i �l t .il.: t ., r[..^? .1r 1 , 45E LOCATED IN MASONB')RO TOWNSHIP 7i ^E ` NEW 11ANOWER COUNTY, fIORTII C.a.ROLIrJ,1 I rc --- - Om .n: .• _ (� -- _--_-- ._� ___.____._.___ r �-'TIT „III I/il/q// Ch keel. ----- ----._ G•4k ''"%, 011TIFR: SATURN OEVEI.nl'k,, NT _- �i 3901 OLEANP!t_R PRIVE -4F e.-f k) W1.1."GIOPI, NC 284Y'3 SEAT. - - ------ ---- - - --- ._ � _ ---_ - - - 025483 = r -- ------ - - - -- A 1 C- '. \ II,.fIGtiE_P, Cf_�I .(I .�Ef, /ICES, f-.�`,� `N (AA?.7 Sllr'I?71�45, E'r;'S/PJ=E.;S & LA AID oC �1 /•'"rERS = I 1 1 310 Y", RI1 r STREET All"IM'MN I.C. i2lil ♦ . i REVISIONS " f - /-(• ( I_ l or i REV NO - 3858ecp 1, d,vgHSR I _: . T n,I. l.4b•'. �, a..4'•. � UniYN ',, 4 41'I . SITE DATA TOT. j/ OF UNITS ALLOWED IN BREWSTER 66 ACRES x 3.3 = 217 UNITS 1 ACRE x 2.5 = 2 UNITS TOTAL ALLOWED = 219 UNI1S PRASE ONE BREWSTER PLACE APPROVED 99 UNITS PHASE TWO BREWSTER PLACE APPROVED 120 UNITS NUMBER OF UNITS TOTAL_ 219 UNITS PARKING SPACES REQUIRED PRIVATE DRIVEWAYS TOTAL AREA TO BE DISTURBED 33.0 AC t IMPERVIOUS AREA (BLDG.- S DRIVEWAYS, STREETS, ETC.) 13.3 ACRES EMERGENCY SPILLWAY EL= 12.0 MINIMUM 50 CY STONE SPILLWAY PROTECTION W= 40', Depth= 1.5' PLACE FILTER FABRIC UNDER STONE 1 l•A=52.0' / L= .4' EXISTING WETLANDS BOUNDARY","","/ /SURFACE AREA 6 EL= 8.0 = 50,676 sf is SURFACE AREA EL= 9.0 = 54,924 sf .1001CD Stormtrotef Retentions g4.7' I I sp I I ---- 6:1 SIDESL. E ----------------------- L=397.8' POND 1 USES VEGETATIVE FILTER FOR PRETREATMENT SEE SHEET i FOR POND 1 PRETREATMENT FLOW PATH ' OUTLET SIRUC77JRE (2) - 52.0 LF 24'CL 111 RCP's SEE DETAIL THIS SHEET 3.1 DRY SIDE SLOPE - 5 CY CL 11 RIPRAP STEEPER SLOPES ARE 1.5 FT DEEP REQUIRED TO BE ARMOURED W11H RIP -RAP. IE = 6.8 6:1 VEGETATED SHELF 10 CY CL II RIPRAP ANTI -SEEP COLLAR POND 1 DETAIL FROM EL- 8.0 TO EL= 7.0. 6' WIDE 1.5 FT DEEP SEE DETAIL WSEL= 8.0 NOTE: PORTABLE PUMP TO BE USED TO SCALE: 1 ' = 40 DRAIN POND IN CASE OF EMERGENCY. PUMP TO BE PLACED ON TOP OF BERM WITH SCREEN ATTACHED TO HOSE 1141T AND COVERED WITH STONE HOSE OUTLET TO DRAIN DIRECTLY INTO POND OUTLET STRUCTURE. FOUR STANDARD c 2'X3' GRATES ° NCDOT OR EQUIVALENT n 0 ALL SLOPES c 00 00 00 00 3:1 MAXIMUM c DO E=E= 00 0o t m ° �C� o0 �O 00 oL� 00 E_O 00 6'min 12'min. SEE PLAN G-RATE Ego o� o0 00 ° 00 00 00 0o II PLAN VIEW o0 00 00 0o Forelay volume 0 0 0 0 0 0 0 o POND 20% of required 0 WSEL storage, typical w 51 f 7c-3. I_5. -_..-� ---- OP o- ~ yl 1t - 1" TYP. a'<`'O 0 4, 4' min. OUTLET PIPE IT o. OUTLET •. / PROTECTION 10'-3' 'ti' AS ON PLANS FOREBAY SEC77ON DETAIL h_ o TYPICAL AT ALL STORM OUTFALLS TO POND SEE DETAIL THIS SHEET 'E NOT TO SCALE FOR TRASH RACK 0.8' WEIR CUT a PLAN VIEW OUTLET STRUCTURE DETAILS NOT TO SCALE 20 - L I La-40' 0 o a000a 2• o000 20' 000o MIN. 0 0 24' r ° ocoo d50 - 6' STOVE 1 2 - 24"RCP dMAx - 9- La - 40' APRON THICKNESS - 1.5' OUTLET PROTECTION DETAIL NOT TO SCALE POND OUTFALL OP NOTE: FILTER FABRIC IS TO BE PLACED UNDER ALL STONE OUTLET PROTECTION. VARIES 1 10' 1 15.0' 1 25.5' 16' CIO tIS I I EMBANKMENT TOP= 13.00 (SETTLED) = 13.25 (CONSTRUCTED) = 12.00 - EMERGENCY SPILLWAY EL - - YEAR WSEL- 11 56 EMERGE C 100 YE STATE STORAGE - � 10-YEAR WSEL= 10.91 37,121 CF ®ELEVATION 8.7 0 =' WEIR CUT ELEVATION = 9.0 OOP w NORMAL WSEL= 8.0 - 52 LF 24" RC 6:1 3:1 EL= 4.0 BOTTOM SWM STRUCTURE ANTI -SEEP COLLAR, EL= 3.0 ANT -SEEP COLLAR IE=5.0 SEE DETAIL BOTTOM = 0.5 28' 25' I 50' 1 EMBANKMENTSECTION DSCALE n OUTLET PROTECTION DETAIL (SIDE NEW) NOT TO SCALE COMPACTED FILL OR a GRAVEL, EXTENSION OF FABRIC AND WIRE INTO THE TRENCH NOTE: SEE NARRA7TIVE FOR MORE DETAIL. ISOMETRIC VIEW FILTER FILTER FABRIC FABRIC EXTENSION OF BACKFILL FABRIC AND WIRE MINIMUM 8" INTO THE TRENCH THICK LAYER WIRE COMPACTED WIRE OF GRAVEL FILL 8" MINIMUM 8" MINIMUM V-TRENCH 14" MINIMUM 4" MINIMUM SECTION SECTION sF SEDIMENT FENCE ( SILT FENCE Practice 6.62 NITS r 11' 1. 1' I- \ CENTERLINE _ MODIFIED GUTTER F 'A ANGLE AS NEEDED Z 10' MINIMUM 1J a- Z� �p• 4 o_ , PLAN VIEW CENTERLINE MODIFIED GUTTER C 1 /2` Par rant CROSS-SECTION -J- 6- COSPILL GtJ 11 �I-1 NCRETE CHANNEL MINIMUM NEEDED 4 N.T.S SECTION VIEW NOIE COLLAR TO HE POURED AFTER �I//• PIPES ARE IN PLACE r REINFORCING AS NECESSARY. Y TYP. n r id " MIN AN7I-SEEP COLLAR NO'r TO SCALE NOTE ORIFICE TO BE 7EUPORARILY COVERED WITH MIRE AND 57 STONE UN77L S17F IS STABLE I WELDED BAR TRASH RACK ,!may 1 80L7E0 /N PLACE EL=10.5 GRATE TOP `' 90 ELBOW DOWN 0.8' x 1.0WEIR 4 8" BELOW WSEL 4' EL-9 0 a WSEL- \'i 8' INV= 8.0 8.0 (2) - 2;'"RCP - OUTLET 1 PIPES • CONC. INV=7.0 6 or GROUT SB 3 1.5' SUMP 1 3" PERFORATED for a.EANOUT PVC W/ GRAVEL .. AND FABRTC FTL TER EL= 4.0 =BASE POND BOTTOM ELEV= 0.5 SECTION VIEW 4'x 10'Precost Conc.Box, Tindall UV0410 OR EQUIVALENT OUTLET STRUCTURE DETAILS NOT TO SCALE B= 14' GRAVEL CONSTRUCTION ENTRANCE, WIDTH AS REQUIRED TAIL SECTION STD.CURB I 4' - 6" I 4' - 6" EXPANSION \ ENNUI/ / E) JOINT m NCDOT CATCH BASIN TRANSITION SECTION STD.840.02 5' - 0" I.J1 Z PLAN VIEW ' 00 Lz 4 FRAME, GRATE AND HOOD NORMAL GUTTER FLOW LINE 7 NCDOT STD. 840.038 FRAME & GRATE ®�.............:.::::......::::::.............................. OPENING IAr ------------------# 1 I b I PRECAST I I I CONCRETE CATCH , 1 L_L_ BASIN I. I L-e - I I I.i I I 1 W I I > I I I I i I 1 - • 1 IF F • . o. v + C1 SEE NCDOT STDS. I ' 852.05 840.02 SECTION VI0 840.03E FRONT SECTION FOR FURTHER DETAIL PRECAST CURB INLET N.T.S. 40 20 0 40 80 120 SCALE IN FEET : i"= 40' CURB DEPRESSED GUTTER OUTLET PIPE OVERFILL 6" FOR SETTLEMENT EMERGENCY BYPASS 6" BELOW SETTLED TOP OF DAM NATURAL GROUND TYPICAL CUL-DE-SAC 50' R\W NOT TO SCALE GRATE TOP ,.. . ... 4• 4 ; 4 4, 4' _ - WEIR: 1.1 T CUT WELDED BAR, GALVANIZED, OR I T= EQUIVALENT 1.00' -4' MINIMUM I� SECTION VIEW I-■-� S MINIMUM WASHSTONE 1' NOTE: THICK ON FACE SEE NARRATIVE FOR FROM TOE OF DAM 5 MINIMUM MORE DETAIL. TO WEIR. 1800 CF / ACRE 1 X a 2:1 SIDE 2:1 SIDE in SLOPE MAX. SLOPE MAX. CROSS SECTION S © TEMPORARY SEDI/viENT TRAP Practice 6.E0 N.T.S. 1 MODIFIED PER COMMENTS FROM NCDENR/DWQ 4/27/00 REV. NO, REVISIONS DATE POND SUMMARY: STATE WATER QUALITY POND CONSIDERATIONS - Surface Area required = 13,332 sf Surface Area provided = 50,676 sf I' Storage Volume required = 37,121 cf 1'Storage Volume provided = 37,121 cf Storage Volume B Weir Cut (e lev. 9.0) = 52,800 cf Required 1'Storage Votume Drawdown Time = 3.1 days PEAK DISCHARGE SUMMARY (NHC SWM) - Q( 2) pre -developed = 15 cfs Q(10) pre -developed = 29 cfs Q( 2) post -developed = 2 cfs E WSEL = 10.3 Q(10) past -developed = 19 cfs 8 WSEL = 10.9 Q(100)post-developed = 44 cfs 2 WSEL = 11.6 POND SEDIMENTATION CONSIDERATIONS - Storage Volume required = 20.5 X 1800 = 36,900 cf Storage Volume provided = 52,800 cf BREWSTER PLACE PHASE TWO Additional Calculation Summary for DWQ - WATER QUALITY CONSIDERATIONS - Impervlous area calculatlonso See Project Data Sheet • No offslte areas drain to pond STREETS= 1.81 acres BUILDINGS (65 LOTS E 4000 sf ea.)= 5.97 acres TOTAL IMPERVIOUS = 7.78 acres TOTAL AREA DRAINING TO POND = 20.54 acres • Retention of first l' of run-off. 20.54 acres total - 7.78 acres Impervious = 12.76 acres green area. SA REQUIRED, 7.78 x 0.98 + 12.76 x 0.20 / 20.54 = 0.495, or 49. 5% At 7.5' depth, 90% TSS removal, from chart - SA factor = 1.49 20.54 x 0.01 x 1.49 = 0.306 acres = 13,332 sf SA REQUIRED At Eiev. = 8.0 SA = 1.16 acres = 50,676 IF SA PROVIDED VOLUME REQUIRED, (7.78 x 0.913 + 12.76 x 0.20) x 1/12 = 0.85 acre-ft 37, 121 cf REQUIRED STORAGE 1' Storage At Elev. = 8.7 37,121 cf PROVIDED STORAGE Weir Cut Elevation = 9.0 52,800 cf PROVIDED STORAGE Average head from I' storage elevation to orifice - 8. 7 - 8. 0 / 2 = 0. 35' 3' PVC drain to draw -down pondb Orifice equation, 0 = CA(2gh)^1/2 Q = 0. 6(0. 0491)(64. 4 X 0. 35)-1/2 = 0,1399 cfs T = 315, 978 sec. = 3. 1 days OKAY POND DESIGN DATA 20.54 ACRES NEW LOTS (65 LOTS) 20.54 ACRES TO BE DIRECTED TO POND IMPERVIOUS AREA = 1.81 oc. IN STREETS + 5.97 oc. IN LOTS (TO BE DEED RESTRICTED TO 4,000 sf EA.) 7.78 ACRES TOTAL IMPERVIOUS 12" 1 12" N 1 1/2" MIN. BITUMINOUS PAVEMENT I CONCRETE CURB DETAIL NOT TO SCALE NOTE: THIS PLAN TO BE UTILIZED AND REVIEWED ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. NOTE WELL. ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 15 DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. EROSION& SEDIMENT CONTROL and WATER QUALITY PLAN E TWO C PHAS EWSTER PLIA E BR LOCATED IN MASONBORO TOWNSHIP NEW HANOVER COUNTY, NORTH CAROLINA OWNER: SATURN DEVELOPMENT 3901 OLEANDER DRIVE WILMINGTON, NC 28403 Dale 3-29- 00 Scale: 1"=40' Drawn: HSR Checked: __HSR Vralect No: 3888ecp2HSR HANOVER DESIGN SERVICES, P.A."//°� LAND SURVEYORS, ENGINEERS & LAND PLANNERS ` '19 WALNUT STREET WILMINGTON, N.C. 28401 PHONE: (810) 343-8002 oc 20' L � La -,a' 0 0 o°000 0000 2' 00oo 20' 0a 00 MIN. 0000 21' °°°aaa d50 - 6' STONE 1 2 - 24" RCP dMAx - 9• La - 40' APRON THICKNESS - 1.5' OUTLET PROTECTION DETAIL NOT TO SCALE POND OUTFALL OP NOTE: FILTER FABRIC IS TO BE PLACED UNDER ALL STONE OUTLET PROTECTION. 10 La -IS' 1 10 aaa 11u11u" nnoo, 18- oo Do 18" d50 - 6" STONE dAIAx = 9 V OUT- 2.8 fps La - 15' APRON THICKNESS - 1.5' OUTLET PROTECTION DETAIL NOT TO SCALE EXISTING WERANDS BOUNDARY \ EMERGENCY SPILLWAY EL= 11.0 \ \ MINIMUM 50 CY STONE SPILLWAY \ PROTECTION W= 40', Depth= 1.5' \ �� PLACE FILTER FABRIC is UNDER STONE Silt Fence Required at Toe of Bank and across top of Pipes I IE=5.8 10 CY CL 11 RIPRAP 1.5 FT DEEP A II 0 a 0 0 0 0 0 LLi o OUTLET PIPE OUTLET PROTECTION DETAIL (SIDE MEW) NOT TO SCALE SURFACE AREA 0 EL= 70 = 29,788 sf SURFACE AREA 0 EL= 8.0 = 35,131 sf t-15,4 .._'� --� � � � �•`r � / i BOTTOM ELEVA \,OU71ET STRUCTURE SEE>ETAIL THIS SHEET 5 CY CL II RIPRAP 1.5 I T DEEP \ AND -SEEP CD;.LAR SEE DETAIL - (2) - 570 IF 24%L III RCP's VARIES 110' 1 I I 6 �taY • R,I, I®_ 25.5' n If 6:1 VEGETATED SHELF FROM EL= 7.0 TO EL= 8.0, 8' VIDE WSEL= 7.0 POND 2 DETAIL SCALE: 1 " = 40' EMBANKMENT TOP= 12.00 (SETTLED), = 12.25 (CONSTRUCTED) 100-YEAR WSEL= 10.64 EMERGENCY SPILLWAY EL = 11.0 STATE STORAGE _ 10-YEAR WSEL= 9.71 24,653 CF O ELEVATION 7.8 HEIR CUT ELEVATION = 8.0 - NORMAL WSEL= 7.0 C7 6: 1 t 26' 1 36' 47' EMBANKMENT SECTION NOT TO SCALE EL= I:1m NOTE. ORIFICE TO BE TEMPORARILY COVERED MYTH WRE AND 57 S70ME UNIIL SITE IS STABLE WELDED BAR TRASH RACK BOLTED IN PLACE EL=90 GRATE TOP I• ■ .✓lsi�iyi (2) - 24" RCP OUTLEr 1 PIPES 6 2-1/2" PERFORATED PVC W/ GRAVEL AND FABRIC FILTER EL= 3.0 6-BASE POND BOTTOM ELEV= -0.5 SECTION VIEW NOTE COLLAR TO BE POURED AFTER PIPES ARE IN PUCE REMPoRCe10 AS NECESSARY. i INV'= zo 12 �T . I INV=6.0 1 I.5' SUMP for LYEANd1T 4'x )0'Precost Conc.Box, Tindall UV0410 OR EQUIVALENT OUTLET STRUCTURE DETAILS NOT TO SCALE 8=14' :.1 DRY SIDE SLDICE - SIEEPER SLOPES ARE FOREBAY OVERFLOW REWIRED TO BE SPILLWAY ELEV. = 6.0 ARMOURED WITH RIP -RAP. NOTE, PORTABLE PUMP TO BE USED TO GRAIN POND IN CASE OF EMERGENCY. PUMP TO BE PLACED ON TOP OF BERM M1H SCREEN ATTACHED TO HOSE INLET AND COVERED W17H STONE. HOSE OUTLET TO DRAIN NECRY INTO POND OUTLET STRUCTURE. n c ALL SLOPES c 3:1 MAXIMUM s 0 t a 6' min 12' min. SEE PLAN e N Foreboy volume f= WSEL 20R of required S storage, typical w 4' min. OP PIPE OUTLET a e�OQ OUTLET .y, PROTECTION AS ON PLANS FOREBAY SEC77ON DETAIL TYPICAL AT ALL STORM OUTFALLS TO POND NOT TO SCALE FOUR STANDARD 2'X3' GRATES NCDOT OR EQUIVALENT GRATE PLAN VIEW 1_ WI_ / 41 Ol= DO ;CEO I=ice G 00 OO 00 I=O :=0 ,�0 00 OO !-3 � I ' I to' - SEE 5' 0.67' WELDED BAR, GALVANIZED, OR EQUIVALENT ^I PLAN VIEW OUTLET STRUCTURE DETAILS NOT TO SCALE 1 MODIFIED PER COMMENTS FROM NCDENR/DWQ 4/27/00 REV. NO. REVISIONS DATE LOCA77ON MAP ( NOT TO SCALE ) TE DR. AN710NET� -R LANE :T- LANE TR Lw Volume Required = 120, 263 X 20% = 24, 053 cf Volume provided = 11,313 cf STATE WATER QUALITY POND CONSIDERATIONS - Surface Area required = 9,118 sf Surface Area provided = 29,788 sf l'Storage Volume required = 24,653 cf 1'Storage Volume provided = 24,653 cf Storage Volume E Weir Cut <elev. 8) = 32,460 cf Required 1'Storage Volume Drawdown Time = 2.7 days PEAK DISCHARGE SUMMARY (NHC SWM) - Q(2) pre -developed = 18.2 cfs G(10) pre -developed = 34.8 cfs Q(100) pre -developed = 63.1 cfs 0(2) post -developed = 11. 4cfs B WSEL = 9.3 Q( 10) post -developed = 33.3 cfs I? WSEL = 9.7 0(100) post -developed = 44.3 cfs E WSEL = 10.6 POND SEDIMENTATION CONSIDERATIONS - Storage Volume required = 33.0 X 1800 = 22,500 cf Storage Volume provided = 32,460 cf PINER ROAD BREWSTER PLACE- PHASE TWO, POND 2 Additional Calculation Summary for DWO - WATER QUALITY CONSIDERATIONS - Impervlous area calculations, See Project Data Sheet w No offsite areas drain to pond STREETS- 1.67 acres BUILDINGS (42 LOTS 111 4000 sf ea.)= 3.86 acres TOTAL IMPERVIOUS - 5.53 acres TOTAL AREA DRAINING TO POND = 12. 39 acres ■ Retention of first I' of run-off, 12.39 acres total - 5. 53 acres Impervious = 6. 86 acre preen area SA REQUIRED, 5.53 x 0.98 + 6.86 x 0,20 / 12.39 = 0.548. or 54. 8% At 7.E' depth, 90% TSS removal, from _hart - SA factor = 1.69 12,39 x 0.01 x 1.69 = 0.209 acres = 3,118 sf SA REQUIRED At Elev. = 7, 0 SA = 0.68 acres = 29,788 sf SA PROVIDED VOLUME REQUIRED, (12.39 x 0.98 + 6.86 x 0. 20> x 1/12 = 0.57 acre-ft 24,653 cf REQUIRED STORAGE I' Storage At Elev. - 7.8 24, 653 cF PROVIDED STORAGE Weir Cut Elevation • 8.0 32,460 cf PROVIDED STORAGE Average head from I'storage elevation to orifice - 7.8-7.0/2. 0. 4' 2-1/2'PVC drain to draw -down pond, Orifice equation, Q = CA(2gh>^I/2 Q = 0. 6(0. 0341)(64. 4 X 0.4)-1/2 - 0.1038 cfs T = 237,406 sec. = 2. 7 days OKAY FOREBAY REQUIREMENTS - Minimum capacity = 120.263 X 20% = 24,053 cf Provided capacity = 24, 053 cf POND DESIGN DATA 12.39 ACRES NEW LOTS (42 LOTS) 12.39 ACRES TO BE DIRECTED TO POND IMPERVIOUS AREA = 1.67 ac. IN STREETS + 3.86 Do. IN LOTS (TO BE DEED RESTRICTED TO 4,000 at EA.) 5.53 ACRES TOTAL IMPERVIOUS NOTE: SEE SHEETS 1 & 2 FOR ADDITIONAL DETAILS THIS PLAN TO BE UTILIZED AND RENEWED ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. NOTE WELL, ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 15 DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS, EROSION & SEDIMENT CONTROL and WATER QUALITY PLAN BRErwr00 PLACE PHASE TWO LOCATED IN MASONBORO TOWNSHIP NEW HANOVER COUNTY, NORTH CAROLINA OWNER: SATURN DEVELOPMENT 3901 OLEANDER DRIVE WILMINGTON, NC 28403 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON, N.C. 28401 PHONE: (910) 343-8002 Dots: 3-29-00 Scale: 1 " =40' Drawn: HSR Chedrod: HSR Project No: 3888ecp2HSR Construction Road Stabilization Specification / 6.80 - Construction Specifications 1. Clear roadbed and parking areas of all vegetation, roots and other objectionable material. 2. Ensure that road construction follows the natural contours of the terrain if it Is possible. 3. Locate parking areas on naturally flat areas If they are available. Keep grades sufficient for drainage but generally not more than 2 to 3R 4. Provide surface drainage, and divert excess runoff to stable areas by using water bars or turnouts (References: Runoff Control Measures). 5. Keep cuts and fills at 2:1 or flatter for safety and stability and to facilitate establishment of vegetation and maintenance. 6. Spread a 6-inch course of ' ABC' crushed stone evenly over the full width of the road and smooth to avoid depressions. 7. Where seepage areas or seasonally wet areas must be crossed, install subsurface drains or geotextile fabric cloth before placing the crushed stone (Practice 6.81. Subsurface Drain). B. Vegetate all roadside ditches, cuts, fills and other disturbed areas or otherwise appropriately stabilize as soon as grading Is complete (References: Surface Stabilization). 9. Provide appropriate sediment control measures to prevent off -site sedimentation. Maintenance Inspect construction roads and parking areas periodically for condition of surface. Topdress with new gravel as needed. Check road ditches and other seeded areas for erosion and sedimentation otter runoff -producing rains. Maintain all vegetation in a healthy, vigorous condition. Sediment -producing areas should be treated immediately, Temporary Gravel Construction Entrance/Exit Specification / 6.06 - Construction Specifications 1. Clear the entrance and exit area of all vegetation, roots and other objectionable material and properly grade it. 2. Place the gravel to the specific grade and dimensions shown on the plans and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable uuuet. 4. Use geotextlle fabrics because they Improve stability of the foundation In locations subject to seepage or high water table. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic toperessing with 2-Inch stone. After each rainfall, inspect any structure used to trap sediment and clean It out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. Temporary Seeding Specification / 6.10 - Specifications Complete grading before preparing seedbeds and install all necessary erosion control practices, such as dikes, waterways and basins. Minimize steep slopes because they make seedbed preparation difficult and Increase the erosion hazard. If soils become compacted during grading, loosen them to a depth of 6-8 Inches using a ripper, harrow, or chisel plow. Seedbed Preparation Good seedbed preparation is essential to successful plant establishment. A good seedbed Is well -pulverized, loose and uniform. Where hydroseeding methods are used, the surface may be left with a more Irregular surface of large clods and stones. Liming - Apply lime according to soil test recommendations. If the pH (acidity) of the soil is not known, on application of ground agricultural limestone at the rate of 1 to 1 1/2 tons/acre on coarse -textured soils and 2-3 tons/acres on fine -textured soils is usually sufficient. Apply limestone uniformly and Incorporate Into the top 4-6 Inches of soil. Soils with a pH of 6 or higher need not be limed. Fertilizer- Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700-1,000 lb./acre. Both fertilizer and lime should be Incorporated into the top 4-6 inches of soil. If a hydro4lic seeder Is used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening- If recent tillage operations have resulted In a loose surface, additional roughening may not be required except to break up large clods. If rainfall causes the surface to become sealed or created, loosen it just prior to seeding by disking, raking, harrowing, or other suitable methods. Groove or furrow slopes steeper than 3:1 on the contour before seeding (Practice 6:03, Surface Roughening). Plant Selection Select an appropriate species or species mixture from Table 6.10a, for seeding In late winter and early spring. Table 6.10b for summer, and Table 6.10c for fall. Seeding Evenly apply seed using a cyclone seeder (broadcast), drill, cultipacker seeder, or hydroseeder. Use seeding rates given in Table 6.10a-6.10c. Broadcast seeding and hyroseeding are appropriate for steep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty in achieving a uniform distribution. Small grains should be planted no more than 1 Inch deep, and grosses and legumes no more than 1/2 Inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a roller or cultipacker. Hydroseeded mixtures should Include a wood fiber (cellulose) mulch. Mulchina The use of appropriate mulch will help ensure establishment under normal conditions and Is essential to seeding success under harsh site condition (Practice 6.14. Mulching). Harsh site conditions include: -seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use), -slopes steeper than 3:1. -excessively hot or dry weather, -adverse soils(shollow, rocky, or high in clay or sand), and -areas receiving concentrated flow. If the area to be mulched is subject to concentrated woterflow, as in channels, anchor mulch with netting (Practice 6.14, Mulching). Table 6.10a - Temporary Seeding Recommendation far Late Winter and Early Spring Seeding mixture Species- Rye(groin), Annual lespedeza (Kobe in Piedmont and Coastal Plain Rate (lb/awe)- 120 Omit annual lespedeza when duration of temporary cover Is not to extend beyond June Seeding dates -Coastal Plain - Dec. 1 - Apr. 15. Soil amendments- Follow recommendations of soil tests or apply 2.000 Ih/acre ground agricultural limestone and 750 Ib/ocre 10-10-10 fertilizer. Mulch -Apply 4,000lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set neady straight can be used as a mulch anchoring tool. Maintenance - Refertilize if growth is not fully adequate. Reseed, refertllize and mulch Immediately following erosion or other damage. Table 6.10b - Temporary Seeding Recommendations for Summer Seeding mixture Species -German millet Rate(lb/acre)- 40 Seeding dates -Coastal Plain- Apr. 15-Aug. 15 Soil amendments -Follow recommendotions of sod tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch -Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance-Refertilize If growth Is not fully adequate. Reseed, refertilize and mulch immediately following eroslon or other damage. Table 6.10c - Temporary Seeding Recommendation for Fall Seeding mixture Species-Rye(graln) Rate(lb/ocre) - 120 Seeding dates - Coastal Plain and Piedmont -Aug 15 - Dec. 30 Soil amendments - Follow soil tests or apply 2,000 lb./acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch- Apply 4.000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance- Repair and refertilize damaged areas Immediately. Topdress with 50 lb/acre of nitrogen in March, if It is necessary to extend temporary cover beyond June 15. overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) Permanent Seeding Spacificatlone 11 6.11 - Specifications Seedbed Requirements Establishment of vegetation should not be attempted an sites that are unsuitable due to inappropriate soil texture (Table 6.11o), poor drainage, concentrated overland flow, or steepness of slope until measures have been taken to correct these problems. To maintain a good stand of vegetation, the soil must meet certain minimum requirements as a growth medium. The existing sod should have those criteria: - Enough fine-grained (alit and day) material to maintain adequate moisture and nutrient supply (available water capacity of at least .05 Inches water to I Inch of soil). - Sufficient pore space to permit root penetration. - Sufficient depth of soil to provide an adequate root zone. The depth to rock or impermeable layers such as hardpans should be 12 Inches or more, except on slopes steeper than 2:1 where the addition of soil is not feasible. - A favorable pH range for plant growth, usually 6.0-6.5. - Freedom from large roots, branches, stones, large clods of earth, or trash of any kind. Clods and stones may be left on slopes steeper than 3:1 If they are to be hydroseeded. If any of the above criteria are not met-I.e., If the existing soil Is too coarse, dense, shallow or acidic to foster vegetation -special amendments are required. The sod conditioners described below may be beneficial or, preferably, topsoil may be applied in accordance with Practice 6.04, Topeoding. Soil Conditioners In order to Improve the structure or drainage characteristics of a soil, the following material may be added. These omwdmwts should only be necessary where soils have limitations that make them poor for plant growth or for fine turf establishment (see Chapter 3, Vegetative Considerations). Peat -Appropriate types are sphagnum moos peat, hypnum moss pact, reedeedge peat, or peat humus, oil from fresh-woter sources. Pact should be shredded and conditioned In storage plies for at least 6 months after excavation. Sand -dean and free of toxic materials Vermiculite -horticultural grade and free of toxic substances. Rotted manure -stable or cattle manure not containing undue amounts of straw or other bedding materials. Thoroughly rotted sawdust- free of stonee and debris. Add 6 It. Of nitrogen to each cubic yard. Sludge -Treated sewage and industrial sludges are available In various forme: these should be used only In accordance with local, State and Federal regulations. Species Selection Use the key to Permanent Seeding Mixtures (Table 6.11b) to select the most appropriate seeding mixture based an the general site and maintenance factors. A listing of species, including scientific names and characteristics. Is given in Appendix 8.02. Seedbed Preparation Install necessary mechanical erosion and sedimentation control practices before seeding, and complete grading according to the approved plan. Lima and fertilizer needs should be determined by soil tests. Sod testing Is performed free- of charge by the North Carolina Department of Agriculture soil testing laboratory. Directions, sample cartons, and Information sheets are ovallable through county agricultural extenslon offices or from NCDA. Because the NCDA soil testing lab requires 1-6 weeks for sample tum-around, sampling must be planned well In advance of final grading. Testing Is also done by commercial laboratories. Man soil test are not available, follow rates suggested on the individual specification sheet for the seeding mix chosen (Tables 6.11c through 6.114 Applications rates usually fall Into the following ranges: - Ground agricultural limestone Light -textured, sandy soils; 1-1 1/2 tona/acre Heavy textured, clayey sods 2-3 tons/ocre Fertilizer. Grasses 800-1200 lb/acre of 10-10-10 (or the equivalent) Grass -legume mixtures: 800-1200 lb/acre of 5-1D-10 (or the equivalent) Apply lime and fertilizer evenly and Incorporate Into the top 4-6 Inches of soil by disking or other suitable means. Operate machinery on the contour. When using a hydroseeder, apply lime and fertilizer to a rough, loose surface. Roughen surfaces according to Practice 6.03, Surface Roughening. Complete seedbed preparation by breaking up large clods and raking Into a smooth, uniform surface (slope less than 3:1) Fill In or level depressions than can collect water. Broadcast seed Into a freshly loosened seedbed that has not Lean sealed by rainfall. Table 6.119 - Seeding No. 4CP for: Well-Dralned Sandy looms to Dry Sands, Coastal Plain; Low to Medlum-Care Lawns Seeding mixture Species - Centipedegrass - Rate - 10-20 lb/acre (seed) or 33 bu/acre (sprigs) Seeding dates - Mar. - June, (Sprigging can be done through July where water is ovalloble for irrigation.) Soil amendments - Apply lime and fertilizer according to soil test, or apply 300 lb/awe 10-10-10. Sprigging - Plant sprigs In furrows with a tractor -drown transplanter, or broadcast by hand. Furrows should be 4-6 inches deep and 2ft apart. Place sprigs about 2 ft. apart in the row with one and at or above ground level (Figure 6.11d). Broadcast at rates shown above, and press sprigs Into the top 1 1/2 Inches of soil with a disk set straight so that sprigs are not brought back toward the surface. Mulch - Do not mulch Maintenance - Fertilize very sparingly- 20 lb/acre nitrogen In spring with no phosphorus. Centlpedegrose cannot tolerate high pH or excess fertilizer. Table 6.1111; - Seeding No. 5CP for. Well -Drained Sandy Looms to Dry Sands; Low Maintenance Seeding mixture Species Rate (lb/acre) Pensacola Bohiagraas 50 Sericeo lespedeza 30 Common Bermudogrose 10 German millet 10 Seeding notes 1. Where a neat appearance Is desired, omit sericea 2. Use common Bermudagrass only on isolated sites where it cannot become a pest. Bermudagmes may be replaced with 5 lb/acre centipedgras& Seeding dates - Apr. 1 - July 15 Soil amendments - Apply lime and fertilizer according to soil tests, or apply 3.000 Ib/awe ground agricultural limestone and 500 lb/acre 10-10-10 fertilizer. Mulch Apply 4.000 lb/awe grain straw or equivalent cover of another suitable mulch. Anchor by tacking with asphalt, roving and netting or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchwing tool. Maintenance - Refertilize the following Apr. with 50 lb/acre nitrogen. Repeat as growth requires. May be moved only once a year. Where a neat appearance Is desired, omit sericea and now as often as needed. Table 6AIv - Seeding No. 7CP for. Grose -lined Channels; Coastal Plain Seeding Mixture Species - Common Bermudogross - Rate - 40-BO (1/2 Ib/1,000 ft ) Seeding dates - Coastal Plain; Apr - July Soil amendments - Apply lime and fertilizer according to soil tests, or apply 3,000 lb/acre ground agricultural limestone and 500 lb/acre 10-10-10 fertilizer. Mulch - Use lute, excelsior matting, or other effective channel lining material to cover the bottom of channels and ditches. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 lb/acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must be allowed to wash down slopes where they con clog drainage devices. Maintenance -A minimum of 3 weeks Is required for establishment. Inspect and repair mulch frequently. Refertilize the following Apr. with 50 Ib/awe nitrogen. Refer to Appendix 8.02 for botanical names Gross -Lined Channels Specification / 6.30 - Conatmetlon Specifications 1. Remove all trees, brush, stumps, and other objectionable material from the foundation area and dispose atproperly. 2. Excavate the channel and shape It to neat lines and dimensions shown on the plans plus a 0.2 ft overcut around the channel perimeter to allow for bulking during seedbed preparations and sod buildup. 3. Remove and properly dispose e. nil excess sod so that surface water may enter the channel freely. 4. The procedure used to establish grass in the channel will depend upon the severity of the conditions and selection of species. Protect the channel with mulch or a temporary liner sufficient to withstand anticipated velocities during the establish,. -sit period (Appendix 8.05). Maintenance During the establishment period, check grass -lined channels otter every rainfall. After grass Is established, periodically check the channel; check it after every heavy rainfall event. Immediately make repairs. It is particularly Important to check the channel cutlet and all road crossings for bank stability and evidence of piping or scour h71es. Remove all significant sediment accumulations to maintain the designed carrying capacity. Keep the grass In a health, vigorous condition at all times, since It Is the primary erosion protection for the channel (Practice 6.11, Permanent Seeding). Outlet Stabilization Structurg Specification / 6.41 - Conatructlor,apecifloatims 1. Ensure that the subgrade for tl s filter and riprap follows the required lines and grades shown In the plan. 'bmpact any fill required in the subgrade to the density of the surrounding undisturbed material. Low areas In the subgrade on undisturbed soil mi-, also be filled by Increasing the riprap thickness. 2. The riprap and gravel Miter must conform to the specified grading limits shown an the plans. 3. Filler cloth, when used, must moo: design requirements and be properly protected from punching or truth,q during Installation. Repair any damage by removing the riprop and placing .mother place of filter cloth over the damaged area. All connecting Pits should overlap o minimum of I ft. If the damage Is extensive, rspicc` the entire Miter cloth. 4. Rpprop may be placed by equipment, but take care to avoid damaging the Miter. 5. The minimum thickness of the riprap should be 1.5 times the maximum stone diameter. 6. Riprop may be field stone or ronp4 quarry stone. It should be hard, angular, highly weather -resistant and well graded. 6. Construct the apron on zero grr.l,. with no overfall at the end. Make the top of the rlprap of the downstredn, and level with the receiving area or slightly below It. 8. Encore that the apron is properly aligned with the receiving stream and preferably straight throughout Its length. If a curve Is needed to fit site conditions, place it In the uppe• section of the apron. 9. Immediately after construction, ztabfllze all disturbed areas with vegetation (Practice 6.10, Temporary Seedrg, and 6.11. Permanwt Seeding). Maintenance Inspect riprop outlet structures after heavy rains to see If any erosion around or below the riprap has taken place or if stones have been dislodged. Immediately make oil needed repairs to prevent further damage. Fabric Drop Inlet Protection (]arv) rOpora Specification / 6.51 - Construction :'peciflcatlona 1. As synthetic fabric, use a pervicon sheet of nylon, polyester, or ethylene yam -extra strength (50 lb/1 Imh minimum) -that contains ultraviolet ray Inhibitors and stabilizers. Fabric should be sufficiently porous to provide adequate drainage of the temporary sediment pool. Burlap may be used for short-term applications. It must be replaced every 60 days. 2. Cut fabric from a continuous ro. a eliminate joints. 3. For stakes, use 2 x 4 Inch we.-,' preferred) or equivalent metal with a minimum length of 3 ft. 4. Space stakes evenly around tt.• re1meler of the Inlet a maximum of 3ft. apart, and securely drive them ' :, the ground, approximately 18 Inches deep. 5. To provide needed stability to the Installation, frame with 2 x 4-Inch wood strips around the crest of the ,,erflow, wee at a maximum of 1.5 ft above the drop Inlet crest. - 6. Place the bottom 12 inches of the fabric in a trench and badkMil the trench with at least 4 inches of crushed stone or 12 Inches of compacted sod. 7. Fasten fabric securely to the stnkae and frame. Joints must be overlapped to the next stake. B. The top of the frame and fabric must be wall below the ground elevation down slope from the drop Inlet to keep runoff from bypassing the inlet. It may be necessary to build a temporary %:ke an the down slope side of the structure to prevent bypass flow. Mated:l from within the sediment pod may be used for diking. Maintenance Inspect the fabric bwrlw after each rain and make repairs at needed. Remove sediment from the pod area as necessary to provide adequate storage volume for the next rain. Take care not to damage or undercut the fabric during sediment removal. Whan the contributing drainage area has been adequately stabilized, remove all materials and any unstable sediment and dispose of them properly. Bring the disturbed area to the grade of the drop Inlet and smooth and compact It. Appropriately stabilize all bare areas around the Inlet. Land Grading Specification / 6.02 - Construction ':peolficatim3 1.Cmatruct and maintain all erosion and sedimentation control practices and measures In accordance with the approved sedimentation central pion and construction schedule. 2.Remove good topscd from areas tc to graded and filed, and preserve It far use in finishing the grading of al! critt;al areas. 3.Scarlfy areas to be topsoiled to aminimum depth of 2 Inches before placing topsoil (Practice 6.04, Topeolling). 4.CIear and grub areas to be filled t•j remove trees, vegetation, roots, or other objectionable material that would otinct the planned stability of the fill. 5.Enwre that fill material is free of 1,-, h, rubbish, rocks, logs, stumps, budding debris, and other materialw.pproprlate for constructing stable into. 6.Place all fill in layers not to exdeal 0 Inches In thickness, and compact the layers as required to reduce arosin, c!Ippoge, settlement, or other related problems. 7.Do not Incorporate frozen material or soft, mucky, or highly compressible materials Into fill slopes. B.Do not place fill an a frozen founantion, due to possible subsidence and slippage. 9.Keep diversions and other water conveyance measures free of sediment during ail phases of development. 10.Handle seeps or springs wcountar�l during construction in accordance with approved methods (Practice 6.81, ::ubwrfoce Drain). 11.Peanonwtly stabilize all graded areas. Immediately after Mal grading is completed on each area In the grading plan. Apply temporary stabilization measures on all graded areas when work Is to be Interrupted or delayed for 30 working days or longer. 12.Enwre that topsoil stockpiles, borrow areas, and spoil areas are adequately protected from erasion with temprrary and Mal stabilization measures, Including sediment fencing and temporary wisding as necessary. Maintenance Periodically check all graded areas aid the supporting erosion and sedimentation control practices, especially after harry rainfall& Promptly remove all sediment from diversions and other water -disposal practices. If washouts or breaks occur, repair them immedieti'y. Prompt maintenance of amall eroded areas before they become significant gullies Is an essential part of an offset[" erosion and sedimentation control pion. EROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" OF THE STATE OF NORTH CAROLINA, DEPARTMENT' OF ENVIRONMENT AND NATURAL RESOURCES, LATEST EDITION. PRACTICE NUMBERS REFER TO THIS MANUAL. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A COPY OF THIS MANUAL ON -SITE AND ENSURING THAT ALL SUPERVISORS ARE FAMILIAR WITH THE STANDARDS AND SPECIFICATIONS SHOWN IN THE MANUAL AND ON THE PLAN. Temp rary Sgdlment Trap. - continued Protection from piping - Place Miter cloth m the foundation below the rlprap to prevent piping. An alternative would be to excavate a keyway trench across the riprap foundation and up the sides to the height of the dam. Weir length and depth - Keep the spillway weir at least 4 ft long and sized to pass the peak discharge of the 10-yr atom. A maximum flow depth of 1 ft, a minimum freeboard of 0.5 ft, and maximum side slopes of 2:1 are recommended. Weir length may be selected from Table 6.600 shown for most site locations in North Carolina. Table 8.60a Design of Spillways Drainage Area Weir Length(1) (acres) (ft) 1 4.0 2 6.0 3 ida 4 10.0 5 12.0 (1) Dimensions shown are minimum Construction Specifications 1. Clear, grub, and strip the area under the embankment of all vegetation and root mat. Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill In lifts not to exceed 9 Inches and machine compact It. Over fill the embankment 6 Inches to allow for settlement. 3. Construct the outlet section in the embankment. Protect the connection between the riprap and the soil from piping by using filter fabric or a keyway cutoff trench between the riprap structure and the soil. (Place the fitter fabric between the rlprap and sod. Extend the fabric across the spillway foundation and sides to the top of the dam; or (Excavate a keyway trench along the centerline of the spillway foundation extending up the sides to the height of the dam. The trench should be at least 2 ft deep and 2 ft wide with 1:1 side slopes. 4. Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cleanout 5. All cut and fill slopes should be 2:1 or flatter. 6. Ensure that the atone (drainage) section of the embankment has a minimum bottom width of 3 ft and maximum side slopes of 1:1 that extend to the bottom cf the spillway section. 7. Construct the minimum finished stone spillway bottom width. as shown an the plane, with 2:1 side slopes extending to the top of the over filled embankment Keep the thickness of the sides of the spillway outlet structure at o minimum of 21 Inch". The weir must be level and constructed to grade to assure design capacity. B. Material used in the stone section should be a wall -graded mixture of stone with a 4150 size of 9 Inches (dose 8 erosion control stone Is recommended) end a maximum stone size of 14 Inches. The stone may be machine placed and the amclar stones worked Into the voids of the larger stones. The stone should be hard, angular, and highly weather -resistant. 9. Ensure that the stone spillway outlet section extends downstram post the toe of the embankment until stable conditions we reached and cutlet velocity Is acceptable for the recelving stream. Keep the edges of the stone outlet section flush with the surrounding ground and shape the center to confiris the outflow stream (References: Outlet Protection). 10. Direct emergency bypass to natural, stable areas. Locate bWass outlets so that flow will not damage the embankment. It. Stabilize the embankment and all disturbed areas above the sediment pool and downstream from the trap Immediately after construction (References Surface Stabilization). 12. Show the distance from the top of the spillway to the sediment dawout level (one-half the design depth) on the plans and mark It in the field. Maintenance Inspect temporary sediment traps after each period of significant rainfall. Remove sediment and restore the trap to Its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that Is removed In the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage from erosion or piping. Periodically check the depth of the spillway to ensure it is a minimum of 1.5 ft below the low point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any rlprap displaced from the spillway must be replaced immediately. After all sediment -producing oreas have been permanently stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly (Referances Surface Stabilization). PRELIMINARY PLAN NOTES: 1. TOPOGRAPHIC SURVEY AND PROPOSED CONTOURS BY HANOVER DESIGf; SERVICES, P.A. 2. ALL ELEVATION ARE NGVD 1929 3. THIS PLAT IS PRELIMINARY, IT IS NOT INTENDED FOR RECORDATION, SALES OR CONVEY 4. A PORTION OF THIS PROPERTY IS LOCATED WITHIN A 100 YEAR FLOOC HAZARD AREA. (BASE FLOOD ELEV. = 10.0) 5. SANITARY SEWER TO BE PUBLIC. 6. WATER TO BE PUBLIC. 7. THIS PROPERTY IS ZONED R-15 (PERFORMANCE DEVELOPMENT) B. THIS MAP IS IN CONJUCTION WITH AND A PART OF BREWSTER PLASE 'HASE TWO OVEI 9. FOR REFERENCE SEE D.B. 2085 PG. 694 10. FOR DRAINAGE DESIGN SEE EROSION CONTROL PLAN. 11. CLASS IV SOILS ARE TO BE LEFT IN THEIR NATURAL STATE. 12. ALL STREETS AND DRIVES TO BE PRIVATE. 13. TAX PARCEL N 76-00-06-24-00 14. NO PORTION OF ANY BUILDING WILL BE LOCATED WITHIN THE 100 YEAR FLOOD ZONE. 15. 39.6 ACRES IN THIS PHASE. NOTE: DETAILS SHOWN ARE TYPICAL OF INSTALLATIONS REQUIRED BY NEW HANOVER COUNTY. THIS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED CONSTRUCTION DETAILS, BUT RATHER SERVES AS A GUIDE. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL COUTY AND STATE CODES AND CONSTRUCTION STANDARDS. REV. NO. REVISIONS DATE Sediment Fence (Silt Fence) Specification 6.62 - Construction Specifications MATERIALS 1.Use a synthetic filter fabric or a pervious sheet of polypropylene, nylon, polyester, or polyethylene yam, which Is certified by the manufacturer or supplier as conforming to the requirements shown in Table 6.62b. Synthetic Miter fabric should contain ultraviolet ray Inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F. 2.Ensure that posts for sediment fences ore either 4-Inch diameter pine, 2-Inch diameter oak, or 1.33 Ib/Iineor ft steel with a minimum length of 4 ft. Make sure that steel posts have projections to facilitate fastening the fabric. 3.For reinforcement of standard strength Miter fabric, use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 Inches. Table 6.62b Specifications For Sediment Fence Fabric Physical Property Requirements Filtering Efflclancy - 85X (mm) Tensile Strength at Standard Strength- 30 Ib/Iln In (min) Extra Strength- 50 Ib/Iin In (mm) Slurry Flow Rate - 0.3 gal/eq ft/min (min) CONSTRUCTION i.Construct the sediment barrier of standard strength or extra strength synthetic Biter fabrics. 2.Ensure that the height of the sediment fence does not exceed 18 inches above the ground surface. (Higher fences may impound volumes of water sufficient to cause failure of the structure.) 3.Construct the filter fabric from a continuous roll vet to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with overlap to the next post. 4.Support standard strength Miter fabric by wim mash fastened securely to the up slope side of the poste using heavy duty wire staples at least 1 Inch long, or tie wires. Extend the wire mesh support to the bottom of the trench. 5.When a wire mash support fence is used, space posts a maximum of 8 ft apart. Support posts should be driven securely Into the ground to a minimum of 18 Inches. 6.Extro strength Miter fabric with 8ft past spacing does not require wire mesh support fence. Staple or wire the filter fabric directly to posts. 7.Excavele a trench approximately 4 Inches wide end 8 inches deep olong the proposed line of posts and upelope from the border (figure 6.62a). 8.BackMil the trench with compacted sod or gravel placed over the filter fabric. 9.Do not attach filter fabric to existing trees. Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs Immediately. Should the fabric of a sediment fence collapse, tow, decompose or become Ineffective, replace it promptly. Replace burlap every 60 days. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce premium an the fence. Take care to aveld undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize It after the contributing drainage area has been properly stabilized. Sediment Basin Specifications / 6.61 - Construction Specifications 1.9ta preparations -Clear, grub and strip topsoil from areas under the embankment to remove trees, vegetation, roots and other objectionable material. Delay clearing the pod area until the dam In complete and then remove brush, trees and other objectionable materials to facilitate sediment cleanout. Stockpile oil topsoil or soil containing organic matter for use on the outer shall of the embankment to facilitate vegetative establishment. Place temporary sediment control measures below the basin as needed. 2.Cut-off trench -Excavate a cut-off trench along the centerline of the earth MiI ambankmant. Cut the trench to stable sod material, but In no case make It Ins than 2 ft. deep. The cut-off trench must extend Into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to pemf operation of excavation and compaction equipment but In no case less than 2 ft. Mare side slopes of the trench no steeper than 1:1. Compaction requirements are the some as those for the embankment. Keep the trench dry during backfilling and compaction operations. 3.Embonkment-Take tilt material from the approved areas shown an the plans. It should be clean mineral sod, free of roots, woody vegetation, rocks and other objectionable material. Scarify areas on which RII Is be placed before placing Mi. The fill material must contain sufficient moisture so it can be formed by hand Into a ball without crumbling. If water can be squeezed out of the ball, It Is too wet for proper compaction. Place fill material In 6 to 8-Inch continuous layers over the entire length of the MiI area and than compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer Is traversed by of least one wheel or tread track of the heavy equipment, or a compactor may be used. Construct the embankment to an elevation 10R higher than the design height to allow for settling. 4.Conduit spillways -Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on o Mn, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed alone as backf ll around the pipe or ant[ -seep collars. Place the fill material around the pipe spillway In 4-Inch layers and compact it under and around the pipe to at least the some density as the adjacent embankment. Care must be taken not to raise the pipe from firm contact with Its foundation when compacting under the pipe haunches. Place a minimum depth of 2ft. of hand -compacted backflll over the pipe spillway before crossing it with construction equipment. Anchor the riser In place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be Installed by cutting a trench through the dam after the embankment Is complete. 5.Emergency spillway -Install the emergency spillway In undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and all channel slopes are critical to the successful operation of emergency spillway. 6.Inlets-Discharge water into the boom in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper and of the pod area to Improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection). 7.Erosion control -Construct the structure so that the disturbed area is minimized. Divert surface water away from bore areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction (References: Surface Stabilization). B.Safety-Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and farce and mark basins with warning signs if trespassing is likely. Follow all state and local requirements. Maintenance Check sediment basins after periods of significant runoff. Remove sediment and restore the basin to Its original dimensions when sediment accumulates to one- half the design depth. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool wee. GENERAL EROSION CONTROL SPECIFICATIONS and ADDITIONAL DETAILS for BREWSTER PLACE PHASE TWO LOCATED IN MASONBORO TOWNSHIP NEW HANOVER COUNTY, NORTH CAROLINA OWNER: SATURN DEVELOPMENT 3901 OLEANDER DRIVE WILMINGTON, NC 28403 HANOVER DESIGN SERVICES, P.A. LAND SURI£YORS, EN0VEERS dr LAND PLANNERS 319 WALNUT STREET 0WILMINGTON. N.C. 28401 PHONE: (910) 343-8002 Data 3-29-DO Scale: AS SHOWN Drawn: HSR Checked: HSR Project No: 3888ecp4HSR Sheet No: 4 4 Or. _ _ I M= 3 33' n= 0.0.3 3 If 31 GC GRASS LINED nominal s= 17 Sllll,fl SLwLI? I'll' CAPACl1) = 754-cls 0 2.1 fps GRASSED CHANNEL NOT TO SCALE TEMPORARY DIVERSION TO BE PROVIDED JUST INSIDE LIMITS OF DISTURBANCE S 364133"W if, 175.95 1` APPROXIMATE LOCATION OF CENTERLINE OF = 5 ('- MOTTS CREEK. RUN OF 1 '% SETS, MOTTS CREEK IS PROPERTY - LINE. S 0195'52"E 93.37 S 78'0927"W ; 1 83.86 1 2 i 30 S 4649'14"W 164.22--- 0 1 1910 S 07.09'26"W x I 79.91 I 8 I S 50'4552"E 82.65 ll i� 'I S 175. 64"W 30'U T/L TIY EASEMENT TEMPORARY DIVER ON TO BE PROVIDED JUST INSIDE LIMITS OF DISTURBANCE - (DIRECT FLOW TO BASIN) \ S 83 26'41 "E _ 75.88 LIMITS OF DISTURBANCE 33 acres 193 1 1 LaN rn o O -6 7� w rTI 70 4 D n m 2 FOR 1,41E , 16 1NG )RR( PIT � 1 - 2' -' 12.5' 11 _ ' 3 78" 1 L_ I, 3 1.- 5' TD DETAIL 7E1i'DRARY blill Practice 6.20 MAY BE NECESSARY TO USE IN PLACE OF SEDIMENT FENCE NOTE: ALL LOTS TO BE GRADED SUCH THAT ALL STORMWATER FLOWS TO ONSITE STREETS OR SWALES STREET LENGTH SUMMARY, STREET NAME LENGTH BREWSTER LANE 1,728 LF WAWONA COURT 351 LF VICENT COURT 363 LF ULLOA PLACE 571 LF UNNAMED STREET 341 LF GEORGE PLACE 601 LF STREET 'E' 140 LF TOTAL STREET AREA INCLUDING CUL-DE-SACS = 4.04 acres _1 203 204 2G TIR i 160 p vi 16 164 `�� I of to 163 5 CY CL II RIPRAP "A 1.5' DEEP 15 MARQUIS HILLS SUBDIVISION 149 1- PIPE INLET 144 '1431 147 DRAINAGE AREAS (8Y INLET): 2 0. 5 acres 18 0:7 acres 3 0. 5 acres 19 0. 7 acres 4 0. 5 acres 19A 2, 0 acres 6 0. 3 acres 20 0. 3 acres 7 1. 7 acres 20A 0. 3 acres 9 0.8 acres 21 0.8 acres 9A 1, 2 acres 23 0. 8 acres 10 0. 5 acres 24 1.0 acres IDA 0, 5 acres 24A 2. 5 acres 11 0.5 acres 25 0.5 acres 13 0. 3 acres 25A 0. 2 acres 14 0. 5 acres 26 1. 5 acres 14A 0. 5 acres 27 1, 2 acres 15 0. 2 acres 28 0. 5 acres 15A 0,5 acres 30 L 0 acres 16 1.0 acre 31 1. 3 acres GT �A �(N p 4 o LIMITS OF DISTURBANCE 33 acres t e%' 215 22116 217 1218 2 210 1211 21213 214 i i IP 2 CY CL II RIPRA4 FOR `o� /• , r 1 SLOPE STABILIZATION AND IP I IP Kin PIPE INLET PROTECTION 41 � � 132 131 �/30 129 128� 5 CY RI RAP �P �I1/wn\ / r 1.5' DEEP 140 IP 139 138 I 137 145 5 CY CL II RIPRAP' Dip1 33 I 5 DEEP 1 144 �19 / 36 e 2363.70 TOTAL N 81-43'34"E W.E. BLACKMON CONSTRUCTION CO. D.B. 1499 PG. 433 139.39 SILT FENCING TO BE PROVIDED ALONG TOE OF SLOPE SILT FENCING TO BE PROVIDED F 30'UTITLIY UP TO AND AROUND SPILLWAY AREA EASEMENT VEGETATIVE PLAN - SB 8. SEDIMENT BASIN Practice 6.61 1. Permanent vegetation to be established In accordance with MOTTS CREEK The Sediment Basil Is to be constructed first (see 'North Carolina Erosion and Sediment Control Planning and OUTFALL Construction Schedule) and Is the primary Practice to Design Manuol', Section 6. It, latest version. See Sheet 3. SWAMP prevent sediment from leaving the site. Detailed design and FOREST spillway configuratlows are specified in the CALCULATIONS section of the narrative. The PVC outlet is to be blocked LINE during sedimentation FVynctlon (or not installed) until entire watershed is peFinanently stabilized and pond Is converted to permanent stornwater management detention / retention function. MAINTENANCE PLAN - 1. All measures to be inspected weekly and after any ralnfail event and needed repairs made immediately. PLANNED EROSION AND SEDIMENT CONTROL PRACTICES - 2. Sediment Basin to be cleaned out when the level of sediment reaches 5. 5' below e opening. Riser structure be 1, TEMPORARY GRAVEL CONSTRUCTION ENTRANCE cleaned If excess waternten,above design surface no longer O QE Practice 6.06 drains properly, w Shall be Installed at the entrances to the project 3. Sediment to be removedfromswales when they are From an existing roadway ( at existing Brewster Lane approximately 50% flll�l or sediment level Is within 1' of and George Place ). Drainage should be away from the - top of swale bank. rood and erosion will be controlled with downstream - Practices.During wet weather It may be necessary to wash 4. Sediment to be removecArom behlr* any SI It Fence and ruck trres at these locations. Inlet protection devices when It becomes 0.5' deep, Fencing and inlet protection to be repaired as needed to maintain a 2. LAND GRADING barrier. Practice 6,02 5. All seeded areas shall be fertilized, mulched, and re -seeded Grading should be limited to areas as shown on the as necessary, according to s,,eclflcntlons provided, to Plans. Cut and fill slopes shall be III or flatter except maintain a suitable vegetative cover. where specifically Indicated. Care shall be taken during land grading activities not to damage existing trees that 6. Construction entrance to be*:,olntalned Im such a manner as to are Identified as 'to be preserved'. prevent mud or sediment from leaving the construction site. Periodic topdressing with 2-Inch stone may be required. Inspect after each rainfall and Immediately remove all SF3. O SEDIMENT FENCE objectionable materials spilled, washed, or tracked onto Practice 6.62 public roadways. Sediment fencing should be installed as shown on the Plan, to delineate and protect wetlands and specified areas, and around any temporary stockpile areas as necessary to CONSTRUCTION SCHEDULE - prevent any graded Interior areas from eroding onto adjacent lands or roadway, or Into Inlets, or as directed by Engineer - or New Hanover County Erosion Control personnel. 4. GRASS -LINED CHANNELS 1. Obtain approval of Plan and any necessay perm l ts, and hold Practice 6.30 a pre -construction conference prior to ILommencing any work. All overflow swales to be graded to design 2. Flog work limits and stoke -out roadway, primary ditches, and conf l gurat l on, seeded, and stab l l zed IF necessary wl th Sediment Basin For preliminary grading. temporary straw -net liners to collect and convey site water 3. Install Gravel Construction Entrances. to the Sediment Basin as shown on Plan. After final project stabilization, swales to be re-groded and cleaned of 4. Install Sediment Basin as shown on Plan prior to clearing siltation as needed to establish original contours for and grubbing site. stornwater conveyance. 5. Construct ditches and any other sediment control Practices O 5. IP INLET PROTECTION shown, prior to rough grading roadways and site, stockpi l Ing Practice 6.52 material and topsoil as necessary. Storm sewer Inlet barriers of silt fencing or block vind gravel Inlet protection are to be constructed to help 6. Install utilities in roadway, establish final road grades prevent sediment from entering the storm sewer system. and stabl l Ize road with stone base course. OP 6. OUTLET STABILIZATION 7. Final grade, Install non-munic Ipol utilities as needed, and vegetatively stabilize areas where building construction Is Practice 6. 41 not Imminent. Riprop aprons will be Located at the downstream end of S. All erosion and sediment control Practices are to be all discharge pipes to prevent scour. Inspected weekly and after any rainfall, and repaired as necessary. 7. CONSTRUCTION ROAD STABILIZATION 9. Upon completion of construction, the roadway is to be paved Practice 6.80 Upon reaching final grade and after utilities have been and all areas permanently vegetatively stabilized. After Installed, roadway areas are to be stabilized by placing site stab II zat l on, temporary measures are to be removed and sub-bose course of approved 4' marl stone, as shown In the the Sediment Basin cleaned to Its original design contours, typical street cross-section detail on the Plan, to reduce IF necessary, and riser structure orifaces opened, so as to erosion and dust during the remainder of building function as a stornwater management / water quality construction. retention pond. STORM DRAIN DESIGN COMPUTATIONS LOCA77ON RUNOFF PIPE DESIGN FROM TO D.A. PIPE TIME OF CONIC. MIN. IN DISCH. ELEV. ELEV. SLOPE DIA. CAP. VEL. INLET FLOW DESIGN POINT POINT ACRES sCA (L) (1) 0 - INL. OU TL. MIN. IN. o. f. S. f.p.s. TIME TIME TIME LA 1.B 1.5 0.52 94 10 - 10 7.2 3.8 9.5 8.2 .0138 18 12.4 3.2 2. A 2.B 0.8 1.22 134 10 - 10 6.9 9.5 8.5 I 7.5 .0075 24 19.5 4. 1 2.B 2.0 0.5 0.52 219 5 - 10 71 3.5 10.0 9.0 .0046 18 7.1 27 2.0 2.D 0.5 0.17 102 10 - f0 7.2 1.3 10.4 10.0 .0039 18 6.6 0.8 2.B 2.E 1.2 0.42 35 5 - 5 - 8.1 3.7 9.2 I f 9.0 .0057 18 7.9 :.2 2.0 2F 0.5 1 0.17 32 5 - 5 8.1 1.1 1 10.1 10.0 1 .0031 18 5.9 0.7 3.A 3.B 0.0 a70 37 0 - 10 6.3 4.1 8.1 7.9 .0054 18 7.7 2.4 3.8 3.0 0.3 0.70 157 5 - 10 6.4 4.1 8.6 8.1 .0032 18° 5.9 25 3.0 3.D 1.7 0.60 32 15 - 10 6.4 2.5. 8.7 8.6 .0031 18 5.9 1.5 4.A 4.B 0.3 1.05 20 5 - 10 - 5.3 46.0 8.5 + 8.4 .0050 36 47.2 6.5 4.B 4.0 0.5 0.35 24 5 - 10 5.3 40.7 8.6 ) -8.5 .0047 36 45.7 5.7 4.0 4.D 0.5 0.17 20 25 - 10 5.3 39.2 8.7 8.6- `0050 36 472 5.6 4.B 4.E 0.5 0.59 93 5 - 10 7.1 4.2 10.7 I 10.2 .0054 18 7.7 2.4 4.E 4.F 1.0 0.35 67 10 - 10 72 2.5 10.9 10.7 I .0030 18 5.7 1.4 4.E 4.G 0.2 0.07 32 5 - 5 8.1 0.5 10.8 10.7 .0031 18 5.9 0.3 5.A 5.B 0.7 1.68 20 10 - 10 70 38.3 9.3 9.2 .0050 (2)-30 58.0 3.9 5.B 5.0 0.7 1.44 24 10 - 10 70 36:6 9.5 9.3 .0062 (2)-30 58.0 3.9 5.0 5.D 2.0 0.70 20 20 -. 10 5.8 3L1 9.6 ( 9.5 .0050 (2)-30 58.0 3.9 5.0 5E 0.3 0.49 93 5 - 10 7.1 3.6 11.1 I 10.5 .0065 18 8.4 2.2 5. E 5. F 0.8 0.28 67 10 - 10 7.2 2.0 11.3 11.1 .0030 18 5.7 1.2 5.E 5.13 0.3 0.11 24 5 - 5 - 8.1 0.75 11.2 11.1 .U042 18 6.8 U.4 6.A 6.B 0.8 2.27 20 10 - 10 7.1 27.0 10.1 10.0 .0050 (2)-24 32.0 4.5 6.8 6.0 2.0 1.99 24 10 - 10 7.2 25.0 10.3 - l a ii .0062 (2)-24 32.0 4.5 6.0 6.D 1.5 0.52 20 10 - 10 7.2 14.2 10.4 ( 10.3 .0050 (2)-24 32.0 4.5 6.0 6.E 0.5 0.77 93 5 - 10. 7.1 5.4 11.1 10.8 .0032 18 6.0 3.! 6.E 6.F 1.5 0.52 67 10 - 10 7.2 3.8 11.3 I 11.1 .0030 18 5.7 2.1 6.E 6.G 0.2 0.07 24 5 - 5 8.1 0.5 11.2 11.1 .0042 18 6.8 0.3 7A 7B a5 0.60 125 10 - 10 7.2 4.7 12.2 11.8 .0032 18 5.9 2.7 7.B 7C 1.2 0.42 32 5 - 5 8.1 3.4 12.3 12.2 .0031 18 5.9 2.0 &A 8.B 1 1.0 0.80 1 120 10 - 10 7! 5.8 13.8 1 13.4 .0033 18 6.1 3.9 8. B 8. C 1.3 0.45 58 10 - 10 7.2 3.3 14. 0 13.8 .00 54 18 6.2 2.0 LOCATION MAP ( NOT TO SCALE ) J v 00 TE DR' PINER ROAD ANTI 0, o I , % 00 O w ^ CO `^ EASEMENT Z v a o BREWSTER LANE J SITZS \ \ T.B.M. TOP OF TISBURY LANE v E.C.M. ELEV. 20.22 Z BREWSTER PLACE " 58 57 SECTION 3 11 I M.B. 38 PG. 312 I j 56 55 II, 54 � 53 ��- 52 i11 51 \� --- � � 1 1 50 49 BREWSTER PLACE SECTION 3 59 so 61 i 6` I M. B. 38 PG. 312 r 63 64 jl 65 _ I j 66 67 68 J 10 1 i 106 5 104 103 '102 _ l 4 r 69 '�- 11 - 70 101 „ / '� � ' I 77 / 100 97 6 II 1 r it t; 95 1 r H u}I 82 1 , 17 f 80 IP I L 135 118 11 1f151 114i 113 - 11_ '111 110 %� li �/ 109 ` 108 1 ! I 107 / 98 BREWSTER T LACE j M. B. 38 PC. 312 J' CONSTRUCTION ENTRANCE MAY CE �� 83 �' 84 I' 86 ` BE NECESSARY IF CONTRACTOR 85 \\ ENTERS SITE IN THIS LOCATION I / 87 WM17S.OF tIISIUdBANCE' ' 33 acres LINO�SEY DIN'K-INS , co 100 50 0 100 200 300 SCALE IN FEET 1 t00' i 12y�I 1223'I 1 IP i 2"X 4" FRAME AROUND CREST OF OVERFLOW STAKED 2"X 4" 1.5' MAXIMUM HEIGHT ' WOODEN FRAME 3' LENGTH SEE NARRATIVE FOR MINIMUM 3' SPACING MORE DETAIL AND ALTERNATE METHODS. GATHER EXCESS FILTER FABRIC AT CORNERS sr SITE DATA TOT. III OF UNITS ALLOWED IN BREWSTER 66 ACRES x 3.3 = 2�7 UNITS 1 ACRE x 2.5 = 2 UNITS TOTAL ALLOWED = 219 UNITS PHASE ONE BREWSTER PLACE APPROVED 99 UNITS ,. PHASE TWO BREWSTER PLACE APPROVED 120 UNITS NUMBER OF UNITS TOTAL 219 UNITS PARKING SPACES REQUIRED PRIVATE DRIVEWAYS TOTAL AREA TO BE DISTURBED 33.08 AC t' IMPERVIOUS AREA (BLDG.'S DRIVEWAYS, STREETS, ETC.) 13.9 ACRES .. EXTENSION OF ry FABRIC 1' MIN. ' I\ Z INTO TRENCH \ 4"CRUSHED STONE OR I - 12'COMPACTED SOIL I I I I I I \ I Z FILTER FABRIC: \� /yI�I _ _ \LJ_ PERVIOUS SHEET OF NYLON, POLYESTER, OR I DROP INLET ETHYLENE YARN. ERA I I NTH GRATE I I STRENGTH (50 PSI XTMIN.) l NTH ULTRAVIOLET RAY INHIBITORS AND STABILIZERS ISOMETRIC VIEW �LJ FABRIC DROP INLET PROTECTION NIS PRACTICE 6.51 IP 50' R\W Y CIL APPROVED NORTH CAROLINA ENVIRONMENTAL E C E I V E NOTE: MANAGEMENT COMMISSION Ni� 10' -- 1 I---+9' DIVISION OF WATER QUALITY SEP 211999 THIS PLAN TO BE UTILIZED AND RENEWED UTILITY I 25.0' 25.0' /{j��� ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE 18' - 18' I UTILITY ITV 14(�� _j9'1"� EASEMENT I -EASEMENT I Date D &JEAU732 WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT - 16' 16, 1 p" I-2 ASPHALT I �jdT yggg13Z _ StofalWatef PerteR Non PHOj p CONTROL PLAN. 1" FT 1 /FT. 114' _ I"/ FT. 3 NOTE WELL, ANY AREAS ON -SITE WITHOUT ACTIVITY SHALL BE TEMPORARILY STABILIZED IN A 15 DAY PERIOD AS PER THE sPFCTFi CATIONS MODIFIED 1 MODIFIED VALLEY CURB VALLEY CURB TYPICAL PUBLIC STREET DETAIL NOT TO SCALE - 1 MODIFIED PER COMMENTS FROM NHC AND NCDENR 9/20/94 REV. NO. REVISIONS DATE e I'4: SEAL } $ i 20007 j z EVICT N`L;;� J 8 ..S. NOV ov I 1,% OWNER: SATURN DEVELOPMENT 3901 OLEANDER DRIVE WILMINGTON, NC 28403 HANOVER DESIGN SERVICES,P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON, N.C. 28401 -PHONE: (910) 343-8002 Sheet No O1: j, 1 r 20 2' Dave 20' aaaa MIN. aa0a 24' 0 aoaooa d50 - 6" STONE 2 - 24 "RCP dMAX - 9" Lo - 40' APRON THICKNESS 1.5' OUTLET PROTECTION DETAIL NOT TO SCALE POND OUTFALL OP NOTE: FILTER FABRIC IS TO BE PLACED UNDER ALL STONE OUTLET PROTECTION. 28' 10' 13.5 19' I FOUR STANDARD 2'X3' GRATES NCDOT OR EQUIVALENT GRATE PLAN VIEW 0 a ° 0 3 0 LJ N a II a w OUTLET PIPE NOT TO SCALE �I I-2'TYP. 10 -3" h " o SEE DETAIL THIS SHEET ' FOR TRASH RACK i' WEIR CUT i 4 > PLAN VIEW OUTLET STRUCTURE DETAILS NOT TO SCALE WE 01A`''� 6:1 VEGETATED SHELF FROM EL= 7.5 TO EL= 5.5, 12'WIDE WSEL= 6.5 36' EMBANKMENT TOP= 12.00 (SETTLED) = 12.25 (CONSTRUCTED) inn vrno ,ucr:_ •, n• ruronrlAry coa:wAv ci _ In Sn 36 050 = 6" STLXJE d/4AX = 9" V OOT= 4.2 fps La = 15' APRON THICKNESS = 1.5' OUTLET PROTECTION DETAIL NOT TO SCALE IE = 7.5 5 CY CLASS II RIPRAP 1.5' DEEP 12 CY CLASS II RIPRAP --�' DITCH OUTFALL PROTECTION ' 1.5' DEEP I ACE AREA 0 EL= 6.5 = 59,739 SIT ACE AREA 0 EL= 7.5 = 69,720 sf l 3:1 DRY SIDE SLOPE - STEEPER SLOPES ARE REQUIRED TO BE ARMOURED WITH RIP -RAP. SEE SHEET 1 FOR ADDITIONAL DETAILS POND DETAIL SCALE: 1 "= 40' POND DESIGN DATA 32.84 ACRES NEW LOTS (107 LOTS) 32.93 ACRES TO BE DIRECTED TO POND IMPERVIOUS AREA = 4.04 ac. IN STREETS +9.83 ac. IN LOTS (TO BE DEED RESTRICTED TO 4,000 sf EA.) 13.87 ACRES TOTAL IMPERVIOUS It = ts.,55 8 CY CLASS II RIPRAP 1.5' DEEP NOTE COLLAR TO BE POURED AFTER PIPES ME IN PLACE. REINFORCING AS NECESSMY. i M77-SEEP COLLAR NOT TO SCALE IE = 7.9 5 CY CLASS II RIPRAP 1.5' DEEP POND SUMMARY: FOREBAY VOLUME: Volume Required = 293,527 X 20% = 58,705 cf V, ',ume provided = 58, 705 cf (ATE WATER QUALITY POND CONSIDERATIONS - Surface Area required = 23,238 sf Surface Area provided = 59,739 sf Storage Volume required = 63,179 cf Storage Volume provided = 64,781 cf Storage. Volume Drawdown Time = 2.5 days PEAK DISCHARGE SUMMARY (NHC SWIM) - Q( 2) pre -developed = 27 cfs Qt10) pre -developed = 52 cfs Q( 2) post -developed = 11 cfs @ WSEL = 9.6 0(10) post -developed = 45 cfs @ WSEL = 10.4 1)(100)post-developed = 107 cfs @ WSEL = ILO POND SEDIMENTATION CONSIDERATIONS - Storage Volume required = 33.0 X 1800 = 59,400 cf Storage Volume provided = 69,720 sf '� WEIR CUT ELEVATION = 7.50 _ OP Li SHELF o NORMAL WSEL= 6.5 INVERT OUT= 6.5 \� a 44LF2=4"RCP c ® 6• i ANTI -SEEP COLLAR, EL= 4.0 ALL SLOPES ° 3:1 MAXIMUM o ANTI -SEEP BOTTOM SWM STRUCTURE EL 3.50 r COLLAR, ELEV= ��j\ 6'min. 12'min. SEE PLAN N SEE DETAIL 7.5 Foreboy volume 1- WSEL 20% of required p \\ \ storage, typical w 24 1 BOTTOM EL=\-1.0 w - 4'min. �P OUTLET PIPE 32' 52' � _i e OUTLET PROTECTION AS ON PLANS EMBANKMENT SECTION FOREBAY SECT ON DETAIL TYPICAL AT ALL STORM OUTFALLS TO POND 40 20 0 40 80 120 NOT TO SCALE NOT TO SCALE - - SCALE IN FEET: 1"= 40' NOTE ORIFICE TO BE TEMPORARILY COVERED MTN WRE AND 57 STONE UN77L SITE IS STABLE WELDED BAR TRASH RACK BOLTED IN PLACE EL=9.50 GRATE TOP 90' ELBOW DOWN \� 8'BELOW WSEL 1 WEIR 4 J \ \ 4' WSEL= A N. 8, 2 - 24 RCP 6.50 INV= OUTLET 6.50 PIPES �' lNV=6.20 12" CONC. S`B or GROUT 1.2SUuPI 4" PERFORATED for CLEANOUT PVC W/ GRAVEL - AND FABRIC FILTER EL= 150 ASE POND BOTTOM ELEV= -1.0 SECTION VIEW 4'x 10'Precast Conc.Box, Tindall UV0410 OR EQUIVALENT OUTLET STRUCTURE DETAILS 1 1 MODIFIED PER COMMENTS FROM NHC AND NCDENR 9/20/ REV. NO. REVISIONS DATE NOT TO SCALE B=14' BREWSTER PLACE PHASE TWO GRATE TOP 1.67' 2.17 WELDED BAR, GALVANIZED, OR EQUIVALENT Additional Calculation Summary for DWQ - WATER QUALITY CONSIDERATIONS - Impervious area calculations: See Project Data Sheet • No offslte areas drain to pond STREETS= 4.04 acres BUILDINGS (107 LOTS @ 4000 sf ea.)= 9.83 acres TOTAL IMPERVIOUS = 13.87 acres TOTAL AREA DRAINING TO POND = 32.93 acres w Retention of first I' of run-off: 32.93 acres total - 13.87 acres impervious = 19.06 acre green area SA REQUIRED: 13. 87 x 0. 98 + 19. 06 x 0.20 / 32. 93 = 0. 53, or 53% At 7.5' depth, 90% TSS removal, from chart - SA factor = 1.62 32.93 x 0.01 x 1.62 = 0.5 acres = 23,238 sf SA REQUIRED At Elev. = 6.5 SA = 1.37 acres = 59,739 sf SA PROVIDED VOLUME REQUIRED (13.87 x 0.98 + 19.06 x 0.20) x 1/12 = 1.45 acre-ft 63,179 cf REQUIRED STORAGE At Eieo. = 7.5 64,781 cf PROVIDED STORAGE Average head from storage elevation to orifice - 7.5 -6.5 / 2=0. 5' 4' PVC drain to draw -down ponds Orifice equation: Q = CA(2gh)^1/2 Q = 0. 6(. 09)(64.4 X 0. 75)-1/2 i. = 0.297 cfs T = 234.668 sec. = 2.7 days OKAY FOREBAY REQUIREMENTS - Minimum capacity = 293,527 X 20% = 58,705 cf Provided capacity = 58,705 cf NOTE: THIS PLAN TO BE 071LIZED AND REVIEWED ONLY IN CONJUNC77ON WITH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. NOTE WELL, ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 15 DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. EROSION & SEDIMENT CONTROL and WATER QUALITY PLAN RREWSTER PLACE PHASE TWO LOCATED IN MASONRORO TOWNSHIP NEW HANOVER COUNTY, NORTH CAROLINA • CAROt j''•, ESSIO,-% -y SEAL 20007 Date: 7-26- 99 Scale: 1 "= 40' Drown: HSR Checked: DSH Pro)ect No: 3888ecp2HSR HANOVER DESIGN SERVICES, root No: P.A.2 LAND SURVEYORS, ENGINEERS &LAND PLANNERS WIL WALNUT STREET WILMINGLON, N.C. 28401 PHONE: (910) 343-8002 )WNER: SATURN DEVELOPMENT 3901 OLEANDER DRIVE WILMINGTON, NC 28403 Construction Road Stabilization Specification / 6.80 - Construction Specifications 1. Clear roadbed and parking areas of all vegetation, roots and other objectionable material. 2. Ensure that rood construction follows the natural contours of the terrain If it is possible. 3. Locate parking areas on naturally flat areas If they are available. Keep grades sufficient tar drainage but generally not more than 2 to 3% 4. Provide surface drainage, and divot excess runoff to stable areas by using water bars or turnouts (References: Runoff Control Measures). 5. Keep cuts and fills at 2:1 or flatter far safety and stability and to facilitate establishment of vegetation and maintenance. 6. Spread a 6-inch course of 'ABC" crushed stone evenly over the full width of the road and smooth to avoid depressions. 7. Where seepage areas or seasonally wet areas must be crossed, install subsurface drains or geotexlile fabric cloth before placing the crushed stone (Practice 6.81, Subsurface Drain). 8. Vegetate oil roadside ditches, cuts, fills and other disturbed areas or otherwise appropriately stabilize as soon as grading is complete (References: Surface Stabilization). 9. Provide appropriate sediment control measures to prevent off -site sedimentation. Maintenance Inspect construcllon roads and parking areas periodically for condition of surface. Topdress with new gravel as needed. Check rood ditches and other seeded areas far erosion and sedimentation after runoff -producing rains. Maintain all vegetation in a healthy, vigorous condition. Sediment -producing areas should be treated Immediately. Temporary Gravel Construction Entrance/Exit ESpecification 6.06 - Construction Spe cifications 1. Clear the entrance and exit area of all vegetation, roots and other objectionable material and properly grade it. 2. Place the grovel to the specific grade and dimensions shown on the plans and smooth It. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geotextle fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the grovel pad In a condition to prevent mud or sediment from leaving the construction site. This may require periodic lopdressing with 2-inch stone. After each rainfall, inspect any structure used to trap sediment and dean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. Temporary Seeding Specification III 6.10 - Specifications Complete grading before preparing seedbeds and install oil necessary erosion control practices, such as dikes, waterways and basins. Minimize steep slopes because they make seedbed preparation difficult and Increase the erosion hazard. If soils become compacted during grading, loosen them to a depth of 6-8 inches using a ripper, harrow, or chisel plow. Seedbed Preparation Good seedbed preparation is essential to s^.ccessrul plant establishment. A good seedbed is well -pulverized, loose and uniform. Where hydroseeding methods are used, the surface may be left with a more irregular surface of large clods and stones. Liming - Apply lime according to soil test recommendations. If the pH (acidity) of the soil is not known, on application of ground agricultural limestone at the rate of 1 to 1 1/2 tons/acre on course -textured soils and 2-3 tons/acres on fine -textured soils Is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed. Fertilizer- Bose application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700-1.000 lb./acre. Both fertilizer and lime should be incorporated Into the top 4-6 Inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening- If recent tillage operations hove resulted in a loose surface, additional roughening may not be required except to break up large clods. If rainfall causes the surface to became sealed or crusted, loosen It just prior to seeding by disking, raking, harrowing, m other suitable methods, Groove or furrow slopes steeper than 3:1 on the contour before seeding (Practice 6:03, Surface Roughening). Plant Selection Select on appropriate species or species mixture from Table 6.10a. for seeding In late winter and early spring, Table 6.10b for summer, and Table 6.10c for fall. Seeding Evenly apply seed using o tYc Ione see der broodtast). drill culti otter seeder. in I 10a-6.1 Oc. Broadcast seeding or hydroseeder. Use seeding roles given Tob a 6. g and hyroseeding are appropriate far sleep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty in achieving a uniform distribution. Small grains should be planted no more than 1 inch deep, and grasses and legumes no more than 1/2 inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a roller or cultipacker. Hydroseeded mixtures should inch de a wood fiber (cellulose) mulch. Mulching The use of appropriate mulch will help ensure establishment under normal conditions and is essential to seeding success under harsh site condition (Practice 6.14, Mulching). Harsh site conditions include: -seeding in fall far winter cover (wood fiber mulches are not considered adequate far this use), -slopes steeper than 3:1, -excessively hot or dry weather, -adverse solls(shollow, rocky, or high in clay or sand), and -areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as in channels, anchor mulch with netting (Practice 6.14, Mulching). Table 6.10a - Temporary Seeding Recommendation for Late Winter and Early Spring Seeding mixture Species- Rye(grain), Annual lespedezo (Kobe in Piedmont and Coastal Plain Rate (lb/acre)- 120 Omit annual lespedeza when duration of temporary rover is not to extend beyond June Seeding dates -Coastal Plain - Dec. 1 - Apr. 15. Soil amendments- Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch -Apply 4,00016/acre straw. Anchor straw by tacking with asphalt, netting or o mulch anchoring tool. A disk with blades set nearly straight can be used as o mulch anchoring tool. Maintenance - Refertlize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.10b - Temporary Seeding Recommendations for Summer Seeding mixture Species -German millet Rate(lb/acre)- 40 Seeding dates -Coastal Plain- Apr. 15-Aug. 15 Soil amendments -Follow recommendations of soil tests or apply 2.000 lb/acre ground agricultural limestone and 750 Ib/ocre 10-10-10 fertilizer. Mulch -Apply 4.000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance-Refertilize If growth is not fully adequate. Reseed. refertilize and mulch immediately following erosion or other damage. Table 6.10c - Temporary Seeding Recommendation for Fall Seeding mixture Species-Rye(grain) Rate(lb/acre) - 120 Seeding dates - Coastal Plain and Piedmont -Aug 15 - Dec. 30 Soil amendments - Follow soil tests or apply 2.000 Ib./ocre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch- Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance- Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March, If It is necessary to extend temporary cover beyond June 15, overseed with 50 Ib/ocre Kobe (Piedmont and Coastal Plain) Permanent Seeding Specifications / 6.11 - Specifications Seedbed Requirements Establishment of vegetation should not be attempted on sites that are unsuitable due to Inappropriate soil texture (Table 6.11o), poor drainage, concentrated overland flow, or steepness of slope until measures have been taken to correct these problems. To maintain a good stand of vegetation, the soil must meet certain minimum requirements as a growth medium. The existing soil should have these criteria: - Enough fine-grained (silt and clay) material to maintain adequate moisture and nutrient supply (available water capacity of at least .05 Inches water to I Inch of sail). - Sufficient pore space to permit root penetration. - Sufficient depth of sell to provide an adequate root zone. The depth to rock or impermeable layers such as hardpons should be 12 inches or more, except on slopes steeper than 2:1 where the addition of son is not feasible. - A favorable pH range for plant growth, usually 6.0-6.5. - Freedom from large roots, branches, stones, forge clods of earth, or trash of any kind. Clods and stones may be left on slopes steeper than 3:1 if they are to be hydroseeded. If any of the above criteria are not met -Le., if the existing sell is too coarse, dense, shallow or acidic to foster vegetation-speclet amendments are required. The soil conditioners described below may be benericbl or. preferably, topsoil may be applied in accordance with Practice 6.04, Topsoling. Soil Conditioners In order to Improve the structure or drainage characteristics of a sal, the following material may be added. These amendments should only be necessary where soils have limitations that make them poor for plant growth or for fine turf establishment (see Chapter 3, Vegetative Considerations). Peat -Appropriate types ore sphagnum moss peat, hypnum moss peat, reedsedge peat, or peat humus, all from fresh-woter sources. Peat should be shredded and conditioned In storage piles far at least 6 months after excavation. Sand -clean and free of toxic materials Vermiculite -horticultural grade and free of toxic substances. Rotted manure -stable or cattle manure not containing undue amounts of straw or other bedding materials. Thoroughly rotted sawdust- free of stones and debris. Add 6 Ib. Of nitrogen to so& cubic yard. Sludge -Treated sewage and industrial sludges ore available in various forms: these should be used only in accordance with local, State and Federal regulations. Species Selection Use the key to Permanent Seeding Mixtures (Table 6.11b) to select the most appropriate seeding mixture based on the general site and maintenance factors A listing of species, Including scientific names and characteristics, is given In Appendix 8.02. Seedbed Preparation Install necessary mechanical erosion and sedimentation control practices before seeding, and complete grading according to the approved plan. Lime and fertilizer needs should be determined by soil tests. Sol testing is performed free of charge by the North Carolina Deportment of Agriculture soil testing laboratory. Directions, sample cartons, and information sheets are available through county agricultural extension offices or from NCDA. Because the NCDA soil testing lab requires 1-6 weeks for sample turn -around, sampling must be planned well in advance of find grading. Testing is also done by commercial laboratories. When soil test ore not available, follow rates suggested on the individual specification sheet for the seeding mix chosen (Tables 6.11c through 6.11v). Applications rates usually fall Into the following ranges: - Ground agricultural limestone Light -textured, sandy soils; 1-1 1/2 tons/acre Heavy textured, clayey soils 2-3 tons/acre - Fertlinrr: Grasse- 800-1200 lb/acre of 10-10-10 (or the equivalent) Grass -legume mixtures: 800-1200 lb/acre of 5-10-10 (or the equivalent) Apply lime and fertilizer evenly and incorporate into the top 4-6 inches of son by diskinri or other suitable means. Operate machinery on the contour. When using a bydroseeder, apply lime and fertilizer to a rough, loose surface. Roughen surfaces according to Practice 6.03, Surface Roughening. Coopleb� seedbed preparation by breaking up large clods and raking Into a smooth, uniform surface (slope less than 3:1) FIfi in or level depressions than can coll,�ct water. Broadcast seed Into a freshly loosened seedbed that has not been sealed by rainfall. Table 6AIs - Seeding No. 4CP for: Well -Drained Sandy looms to Dry Sands, Coastal Plain; Low to Medium -Core Lawns Seeding mixture Species - Centipedegrass - Rate - 10-20 Ib/acre (seed) or 33 bu/acre (sprigs) r - June. (Sprigging can be done through Jul where water ' Seeding dates Mar. Ju S q 9 (D99 9 9 Y available far irrigation.) Sol amendments - Apply lime and fertilizer according to soil test. or apply 300 lb/acre 10-10-10. Sprigging - Plant sprigs In furrows with a tractor -drown transplanter, or broadcast by hand. Furrows should be 4-6 Inches deep and 2ft apart. Place sprigs about 2 ft. apart in the row with one end at or above ground level (Figure 6.11d). Broadcast of rates shown above, and press sprigs Into the top 1 1/2 Inches of soil with a disk set straight so that sprigs ore not brought bock toward the surface. Mulch - Do not mulch Maintenance - Fertilize very sparingly- 20 lb/acre nitrogen in spring with no phosphorus. Centipedegro rs cannot tolerate high pH or excess fertilizer. Table 6.111 - Seeding No. 5CP for: Well -Drained Sandy Looms to Dry Sands; Low Maintenance Seeding mixture Species Rate (lb/acre) Pensacola Bohlogross 50 Sericea lespedeza 30 Common Bermudograss 10 German millet 10 Seeding notes 1. Where o neat appearance is desired, omit sericea 2. Use common Bermudagrass only on Isolated sites where it cannot became a pest. Bermudograss may be replaced with 5 Ib/acre centipedgre". Seeding dates - Apr. 1 - July 15 Soil amendments - Apply lime and fertilizer according to soil tests, or apply 3,000 lb/acre ground agricultural limestone and 500 Ib/acre 10-10-10 fertilizer. Mulch Apply 4.000 fib/acre grain straw m equivalent cover of another suitable mulch. Anchor by tacking with asphalt, roving and netting or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance - Refertllze the following Apr, with 50 Ib/acre nitrogen. Repeat as growth requires. May be moved mly once a year. Where a neat appearance is desired, omit Sericea and now as often as needed. Table ISIN - Seeding No. 7CP for: Gross -lined Channels; Coastal Plain Seeding Mixture Species - Common Bermudograss - Rate - 40-80 (1/2 Ib/1,000 ft ) Seeding dates - Coastal Plain; Apr - July Soil amendments - Apply lime and fertilizer according to soil tests, m apply 3,000 Ib/acre ground agricultural limestone and 500 lb/acre 10-10-10 fertilizer. Mulch - Use jute, excelsior matting, or other effective channel lining material to cover the bottom of channels and ditches. The lining should extend abow the highest calculated depth of flow. On channel side slopes above this height. and In drainages not requiring temporary linings, apply 4,000 lb/acre groin straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must be allowed to wash down slopes where they can dog drainage devices. Maintenance -A minimum of 3 weeks is required for establishment. Inspect and repair mulch frequently. Refertllze the following Apr. with 50 lb/acre nitrogen. Refer to Appendix 8.02 far botanical names Grass -Lined Channels Specification / 6.30 - Construction Specifications 1. Remove all trees, brush, stumps, and other objectionable material from the foundation area and dispose of property. 2. Excavate the channel and shape it to neat lines and dimensions shown on the plans plus a 0.2 ft overcut around the channel perimeter to allow for bulking during seedbed preparations and sod buildup. 3. Remove and properly dispose of all excess soil so that surface water may enter the channel freely. 4. The procedure used to establish gross in the channel will depend upon the severity of the conditions and selection of species. Protect the channel with mulch or a temporary liner sufficient to withstand anticipated velocities during the establishment period (Appendix 8.05). Maintenance During the establishment period, check grass -lined channels after every rainfall. After grass is established, periodically check the channel; check it after every heavy rainfall event. Immediately make repairs. It is particularly Important to check the channel outlet and all road crossings for bank stability and evidence of piping or scour holes Remove all significant sediment occumulotlons to maintain the designed carrying capacity. Keep the grass in a health, vigorous condition at all times. since it Is the primary erosion protection for the channel (Practice 6.11, Permanent Seeding). Outlet Stobilizotion Structure Specification j 6.41 - Construction Specifications 1. Ensure that the subgrade far the filter and riprap follows the required lines and grades shown in the plan. Corpact any fill required in the subgrade to the density of the surrounding undisturbed material. Low areas In the subgrade on undisturbed soil may also be filed by Increasing the riprap thickness. 2. The riprap and gravel filter must conform to the specified grading limits shown an the plans. 3. Filter cloth, when used, must meet design requirements and be properly protected from punching m tearing during Installation. Repair any damage by removing the riprap and placing another piece of filter cloth over the damaged area. All connecting joints should overlap o minimum of 1 It. If the damage is extensive, replace tie entire filter cloth. 4. Riprop may be placed by equipment, but take care to avoid damaging the filter. 5. The minimum thickness of the riprcp should be 1.5 times the maximum stone diameter. 6. Riprop may be field stone or rough quorry stone. It shwld be hard, angular, highly weather -resistant and well aroded. 6. Construct the apron on zero grade with no overfail at the end. Make the top of the riprap at the downstream end level with the receiving area or slightly below It. S. Ensure that the apron is properly aligned with the receiving stream and preferably straight throughout its length. If a curve is needed to fit site conditions, place it in the upper section of the apron. 9. immediately after construction, stabilize all disturbed areas with vegetation (Practice 6.10. Temporary Seeding, and 6.11, Permanent Seeding). Maintenance Inspect riprap outlet structures after heavy rains to see if any erosion around or below the riprap has token place or if stones have been dislodged. Immediately make all needed repo" to prevent further damage. Fabric Drop Inlet Protection (Temporary) Specification # 6.51 - Construction Specifications 1. As synthetic fabric, use a pervious sheet of nylon, polyester, or ethylene yarn-extro strength (50 Ib/1 inch minimum) -that contains ultraviolet ray Inhibit" and stabilizers. Fabric should be sufficiently porous to provide adequate drainage of the temporary sediment pod. Burlap may be used for short-term applications. It must be replaced every 60 days. 2. Cut fabric from a continuous roll to eliminate joints. 3. For stakes, use 2 x 4 Inch wood (preferred) or equivalent metal with o minimum length of 3 ft. 4. Space stakes evenly around the perimeter of the inlet a maximum of 3ft. apart, and securely drive them into the ground, approximately 18 inches deep. 5. To provide needed stability to the installation, frame with 2 x 4-Inch wood strips around the crest of the overflow area at a maximum of 1.5 ft above the drop inlet crest 6. Place the bottom 12 inches of the fabric in a trench and buckilt the trench with at least 4 inches of crushed stone or 12 Inches of compacted soil. 7. Fasten fabric securely to the stakes and frame. Joints must be overlapped to the next stoke. 8. The top of the frame and fabric must be well below the ground elevation down slope from the drop Inlet to keep runoff from bypassing the Inlet. It may be necessary to build a temporary dike on the down slope side of the structure to prevent bypass flow. Material from within the sediment pool may be used far diking - Maintenance Inspect the fabric barrier after each rain and make repairs at needed. Remove sediment from the pool area as necessary to provide adequate storage volume far the next rain. Take core not to damage or undercut the fabric during sediment removal. When the contributing drainage area has been adequately stabilized, remove all materials and any unstable sediment and dispose of them property. Bring the disturbed orea to the grade of the drop inlet and smooth and compact it. Appropriately stabilize all bore areas around the inlet. Land Grading Specification # 6.02 - Construction Specifications 1.Construcl and maintain all erosion and sedimentation control practices and measures in accordance with the approved sedimentation control plan and construction schedule. 2.Remove good topsoil from areas to be graded and filled, and preserve it for use in finishing the grading of all critical areas. 3.Scarify areas to be topsoiled to a minimum depth of 2 Inches before placing topsoil (Practice 6.04, Topsoling). 4.Clem and grub areas to be filed to remove trees, vegetation, roots, or other objectionable material that would affect the planned stability of the fill. S.Ensure that fill material Is free of brush, rubbish, rocks, logs, stumps, building debris, and other materials inappropriate for constructing stable fills. 6.Place an fill In layers not to exceed 9 inches in thickness, and compact the layers as required to reduce erosior, slippage. settlement. or other related problems. 7.Do not Incorporate frozen material or soft, mucky, m highly compressible materials into fill slopes. S.Do not place fill on a frozen foundotion, due to possible subsidence and slippage. 9.Keep diversions and other water conveyance measures free of sediment during all phases of development. 10.Handle seeps or springs encountered during construction in accordance with approved methods (Practice 6.81, $absurface Drain). 11.Peananenlly stabilize all graded areas immediately after final grading is completed on each area in the grading plan. Apply temporary stabilization measures on all graded areas when work is to be Interrupted or delayed far 30 working days m longer. 12.Ensure that topsoil stockpiles, borrow areas, and spoil areas are adequately protected from erosion with temporary and final stabilization measures. Including sediment fencing and temporary seeding as necessary. Maintenance Periodically check all graded areas ord the supporting erosion and sedimentation control practices. especially after heavy rainfalls. Promptly remove an sediment from diversions and other rooter -disposal practices. If washouts or breaks occur, repair them immediately. Prompt maintenance of small eroded areas before they become significant gullies is an essential port of an effective erosion and sedimentation control plan. NOTE WELL: EROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" OF THE STATE OF NORTH CAROLINA, DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, LATEST EDITION. PRACTICE NUMBERS REFER TO THIS MANUAL. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A COPY OF THIS MANUAL ON -SITE AND ENSURING THAT ALL SUPERVISORS ARE FAMILIAR WiTH THE STANDARDS AND SPECIFICATIONS SHOWN IN THE MANUAL AND ON THE PLAN. Sediment Basin Specifications III 6.61 - Construction Specifications 1.Site preparations -Clear, grub and strip topsoil from areas under the embankment to remove trees, vegetation, roots and other objectionable material. Delay clearing the pool area until the dam is complete and then remove brush, trees and other objectionable materials to facilitate sediment cleanoul. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment. Place temporary sediment control measures below the basin as needed. 2.Cut-off trench -Excavate a cut-off trench along the centerline of the earth fill embankment. Cut the trench to stable soil material, but In no case make it less than 2 ft. deep. The cut-off trench must extend Into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment but in no case less than 2 ft. Make side slopes of the trench no steeper than 1:1. Compaction requirements are the some as those far the embankment. Keep the trench dry during backfnlling and compaction operations. 3.Embankment-Take fill material from the approved areas shown on the plans. It should be clean mineral son, free of roots, woody vegetation, rocks and other objectionable material. Scarify areas on which fill is be placed before placing fill. The fill material must contain sufficient moisture so It can be formed by hand into a boil without crumbling. If water can be squeezed out of the ball, it Is too wet for proper compaction. Place fill material In 6 l0 8-Inch continuous layers over the entire length of the fill area and then compact It. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer is traversed by at least one wheel m tread track of the heavy equipment. or a compactor may be used. Construct the embankment to an elevation 10% higher than the design height to allow for settling. 4.Conduit spillways -Securely attach the riser to the barrel m barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on o firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, m crushed stone as backfill around the pipe or anti -seep collars. Place the flI material around the pipe spillway in 4-Inch layers and compact it under and around the pipe to at least the same density as the adjacent embankment. Care must be token not to raise the pipe from firm, contact with Its foundation when compacting under the pipe haunches. Place a minimum depth of 2ft. of hand -compacted backfill over the pipe spillway before crossing It with construction equipment. Anchor the riser In place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment Is complete. S.Emergency splltwoy-Install the emergency spillway In undisturbed soil. The achievement of planned elevations, grade. design width, and entrance and exit channel slopes ore critical to the successful operation of emergency spinway. 6.InleLs-Dischorge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection). 7.Eroslon control -Construct the structure so that the disturbed area Is minimized. Divert surface water away rrom bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction (References: Surface Stabilization). B.Sofety-Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs if trespassing is likely. Follow all state and local requirements. Maintenance Check sediment basins after periods of significant runoff. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one- half the design depth. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment far piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area. , rPRELIMINARY PLAN NOTES: 1. TOPOGRAPHIC SURVEY AND PROPOSED CONTOURS BY HANOVER DESIGN SERVICES, P.A. 2. ALL ELEVATION ARE NGVD 1929 3. THIS PLAT IS PRELIMINARY, IT IS NOT INTENDED FOR RECORDATION, SALES OR CONVEYANCE 4. A PORTION OF THIS PROPERTY IS LOCATED WITHIN A 100 YEAR FLOOD HAZARD AREA. (BASE FLOOD ELEV. = 10.0) 5. SANITARY SEWER TO BE PUBLIC. 6. WATER TO BE PUBLIC. 7. THIS PROPERTY IS ZONED R-15 (PERFORMANCE DEVELOPMENT) 8. THIS MAP IS IN CONJUCTION WITH AND A PART OF BREWSTER PLASE PHASE TWO OVERALL. 9. FOR REFERENCE SEE D.B. 2085 PG. 894 10. FOR DRAINAGE DESIGN SEE EROSION CONTROL PLAN. 11. CLASS IV SOILS ARE TO BE LEFT IN THEIR NATURAL STATE. 12. ALL STREETS AND DRIVES TO BE PRIVATE. 13. TAX PARCEL ill 76-00-06-24-00 14. NO PORTION OF ANY BUILDING WILL BE LOCATED WITHIN THE 100 YEAR FLOOD ZONE. 15. 39.6 ACRES IN THIS PHASE. PUBLIC ROAD 6" MINIMUM 2"-3" COARSE.,% AGGREGATE NOTE: SEE NARRATIVE FOR MORE DETAIL. 1 GRA cE ENTRANCE/EXIT Practice 6.06 N.T.S. GRAVEL CONSTRUCTION ENTRANCE, WIDTH AS REQUIRED 12' 1 12" N / 1 1 1/2" MIN. BITUMINOUS PAVEMENT I 10 f - CONCRETE CURB DETAIL NOT TO SCALE Sediment Fence (Silt Fence) Specification 6.62 - Construction Specifications MATERIALS 1.Use a synthetic filter fabric or a pervious sheet of polypropylene, nylon, polyester, or polyethylene yarn, which is certified by the manufacturer m supplier as conforming to the requirements shown in Table 6.62b. Synthetic filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide o minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F, 2.Ensure that posts for sediment fences are either 4-inch diameter pine, 2-inch diameter oak, or 1.33 lb/linear ft steel with a minimum length of 4 ft. Make sure that steel posts have projections to facilitate fastening the fabric. 3.For reinforcement of standard strength filter fabric. use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 Inches. Toni- 6.62b Specifications For Sediment Fence Fabric Physical Property Requirements Filtering Efficiency - 85% (min) Tensile Strength at Standard Strength- 30 Ib/IIn In (min) Extra Strength- 50 Ib/lin in (min) Slurry Flow Rate - 0.3 gal/sq ft/min (min) CONSTRUCTION 1.Conslruct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2.Ensure that the height of the sediment fence does not exceed 18 Inches above the ground surface. (Higher fences may impound volumes of water sufficient to cause failure of the structure.) 3.ConRtruct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with overlap to the next post. 4.Support standard strength filter fabric by wire mesh fastened securely to the up slope side of the posts using heavy duly wire staples at least I inch long, or Ile wires. Extend the wire mesh support to the bottom of the trench. 5.When a wire mesh support fence is used, space posts a maximum of 8 ft apart. Support posts should be driven securely into the ground to a minimum of 18 Inches. 6.Extra strength filter fabric with Eft post spacing does not require wire mesh support fence. Staple or wire the filter fabric directly to posts. 7.Excavate a trench approximately 4 Inches wide and 8 inches deep along the proposed line of posts and upslope from the barrier (figure 6.62o). B.Backflll the trench with compacted soil or gravel placed over the filter fabric. g.Do not alloch filter fabric to existing trees. Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs Immediately. Should the fabric of a sediment fence collapse, tear, decompose or become Ineffective, replace It promptly. Replace burlap every 60 days. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during deanout. Remove oil fencing materials and unstable sediment deposits and bring the area to grade and stabilize It after the contributing drainage area has been properly stabilized. STD.CURB I 4' - 6" SECTION II co \�\ UuuuuuuNI N N EXPANSION ����������� JOINT z 16NCDOT CATCH BASIN 0 Z I STD.840.02 Sou a Z _1 PLAN VIEW W ou wa a >0 0 5NORMAL GUTTER FLOW L FRAME & GRATE INE r 4' - 6" EXPANSION I JOINT t: . TRANSITION SECTION 5, - n„ FRAME, GRATE AND HOOD NCDOT STD. 840.038 - 1 t OPENING f ---------------------r ej I IC PRECAST I I I .. CONCRETE I I I CATCH BASIN w Z I i I-- 5 i i h-% m a - a 1 I of a > w I 1 1 1 kwn I _0____ I c 1 o 'a SEE NCDOT STDS 852.05 ' SECTION VIEW 840840,02 038 FRONT SECTION FOR FURTHER DETAIL PRECAST CURB INLET N.T.S. TYPICAL CUL-DE-SAC 50' R\W NOT TO SCALE NOTE: DETAILS SHOWN ARE TYPICAL OF INSTALLATIONS REQUIRED BY NEW HANOVER COUNTY. THIS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED CONSTRUCTION DETAILS, BUT RATHER SERVES AS A GUIDE. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL COUTY AND STATE CODES AND CONSTRUCTION STANDARDS. t REV. NO. I REVISIONS I DATE J COMPACTED FILL OR/ "- �Wll GRAVEL, EXTENSION OF FABRIC AND WIRE INTO THE TRENCH NOTE: SEE NARRATIVE FOR MORE DETAIL. ISOMETRIC VIEW FILTER FILTER FABRIC EXTENSION OF FABRIC FABRIC AND WIRE BACKFILL MINIMUM 8" INTO THE TRENCH THICK LAYER OF GRAVEL WIRE COMPACTED FILL 8"MINIMUM , 8"MINIMUM ...._... V-TRENCH 14-MINIMUM 4"MINIMUM SECTION .SECTION GENERAL EROSION CONTROL SPECIFICATIONS and ADDITIONAL DETAILS for BREWSTER PLACE PHASE TWO LOCATED IN MASONBORO TOWNSHIP NEW HANOVER COUNTY, NORTH CAROLINA 2 wl FAM OWNER: SATURN DEVELOPMENT 3901 OLEANDER DRIVE WILMINGTON, NC 28403 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS ENGINEERS & LAND PLANNERS i1J 319 WALNUT STREET }e WILMINGTON, N.C. 28401 PHONE: (910) 343-8002 CURB DEPRESSED GUTTER OUTLET PIPE 7-26-99 I [►`116wo]�l Drawn: HSR Checked: OSH Project No Sheet No: 3 Of 3