Loading...
HomeMy WebLinkAboutSW8980502_HISTORICAL FILE_19990628STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 ggp50Z DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE �gggp�,928' YYYYMMDD Stat.e of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B Hunt, Jr , Governor Wayne McDevitt, Secretary Division of Water Quality June 28, 1999 Mr Joel Tomaselli, Member Manager Lumina Station II, LLC 1900 Estwood Road, Suite 10 Wilmington, NC 28403 © � _ 'a ; 'al NCDENR NORTH C.AROUNA DEPARTMENT OF ENVIRONMENT ANO NATURAL RESOURCES Subject Permit No SW8 980502 Lumina Station II High Density Stormwater Project New Hanover County Dear Mr Tomaselli The Wilmington Regional Office received a complete Stormwater Management Permit Application for Lumina Station I1 on May 5, 1999 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 980502 dated June 28, 1999, for the construction of Lumina Station II This pemut shall be effective from the date of issuance until June 28, 2009, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts requirements, or limitations contained in this permit are unacceptable you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P 0 Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding If you halve any questions or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900 Sincerely, [-)-, L-L' Rich. Shiver Water Quality Regional Supervisor RSS/arl S \WQS\STORMWAT\PERMIT\980502 JUN cc Perry Davis P E Tony Roberts, New Hanover County Inspections Beth Easley, New Hanover County Engineering Linda Lewis Wilmington Regional Office Central Files 127 Cnrdmnl Dr Ext, Wilmington North Cirolmq 28405 Telephone 910 395 3900 FA\ 910 390 2004 An Equil Opportumti Affirmitne Action Emploier 50% rec)c1ed/10% post consumer piper State Stormwater Management Systems Permit No SW8 980502 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Lumina Station II LLC Lumina Station H New Hanover County FOR THE construction, operation and maintenance of 3 underground infiltration trenches in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Qualitv and considered a part of this permit This permit shall be effective from the date of issuance until June 28, 2009 and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS I This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet The stormwater control has been designed to handle the runoff from a total of 125,454 square feet of impervious area The overflow from each trench is directed into the existing low area which acts as the vegetated filter, prior to discharge from the site 3 Approved plans and specifications for this project are incorporated b) reference and are enforceable parts of the permit 4 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans State Stormwater Management Systems Permit No SW8980502 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name Lumina Station II Permit Number SW8 980502 Location New Hanover County Applicant Mr Joel Tomaselli, Member Manager Mailing Address Lumina Station II, LLC 1900 Estwood Road, Suite 10 Wilmington, NC 28403 Application Date May 5, 1999 Water Body Receiving Stormwater Runoff Wrightsville Beach Recreational Area (CFR 18-87-24) Classification of Water Body "SB#" 1 2 3 Trench Dimensions L x W, ft 114 x 84 302 x 42 124 x 84 Trench Height, feet 1 5 1 5 1 5 Trench Bottom Elevation, FMSL 12 12 12 Seasonal High Water Table Elevation, FMSL 10 10 10 Total Impervious Surfaces ftz 32 670 56,629 36.155 Offsite Area entering Site, ft' Required Storage Volume, ft' Provided Storage Volume, ft' Trench Overflow Elevation, FMSL Tvpe of Soil Expected Infiltration Rate Time to DraNdown hours none, per Engineer 2,601 4,498 2,875 5,809 7,681 6,313 13 5 13 5 13 5 Kureb with 20" fill 416 inches per hour 78 102 8 3 State Stormwater Management Systems Permit No SW8 980502 II SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface except roads During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to Semiannual scheduled inspections (every 6 months) Sediment removal Mowing and revegetation of side slopes Immediate repair of eroded areas Maintenance of side slopes in accordance with approved plans and specifications Debris removal and unclogging of bypass structures, filter media, catch basins and piping Access to the bypass structures must be available at all times Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the A ork and what actions were taken Decorative spray fountains will not be allowed in the stormwater treatment system The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit the approved plans and specifications, and other supporting data Upon completion of construction prior to issuance of a Certificate of Occupancy and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property 10 The petmittee is responsible for verifi ing that the proposed built -upon area does not e%teed the allowable built -upon area 11 The runoff from all built -upon area on the project must be directed into the permitted stormwater control system 12 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility rd State Stormwater Management Svstems Permit No SW8 980502 13 The following items will require a modification to the permit a Any revision to the approved plans, regardless of size b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area e Further subdivision of the project area f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 14 The Director may determine that other revisions to the project should require a modification to the permit 15 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made III GENERAL CONDITIONS This permit is not transferable In the event there is a desire for the facilities to change ownership or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction 4 In the event that the facilities fall to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit maybe modified, revoked and reissued or terminated for cause The filing of a request fora permit modification, revocation and reissuance or termination does not stay any permit condition Permit issued this the 28th day of June, 1999 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Kerr T Ste%ens Director Division of Water Quality By Authont) of the Environmental Management Commission Permit Number SW8 980502 State Stormwater Management Systems Permit No SW8 980502 Lumina Station II Stormwater Permit No SW8 980502 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction "as observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Signature Registration Number Date SEAL of State Stormwater Management Systems Permit No SW8980502 Certification Requirements The drainage area to the system contains approximately the permitted acreage The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drams to the system 4 The outletibypass structure elevations are per the approved plan 5 The outlet structure is located per the approved plans 6 Trash rack is provided on the outletfbypass structure 7 All slopes are grassed with permanent vegetation 8 Vegetated slopes are no steeper than 3 1 9 The inlets are located per the approved plans and do not cause short-circuiting of the system 10 The permitted amounts of surface area and/or volume have been provided 1 1 Required dray down devices are correctly sized per the approved plans 12 All required design depths are provided 13 All required parts of the system are provided, such as a vegetated shelf, and a forebav 14 The overall dimensions of the system, as shown on the approved plans, are provided cc NCDENR-DWQ Regional Office Tony Roberts New Hanover County Building Inspector LOMCL USE ONLY State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM I his form may he photocopied for use as an original I GENERAL INFORMATION 1 Applicant's name (specify the name of the corporation, individual, etc who owns the project) LUMINA STATION. LLC 2 Print Owners/Signing Official's name and title (the person who is legally responsible for the facility and its compliance) JOEL TOMASELLI, MANAGER/MEMBER 3 Madmg Address for person listed in item 2 above 1900 EASTWOOD ROAD, SUITE 10 City WILMINGTON Telephone Number (9 256-0900 State NC Zip 28403 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements etc ) LUMINA INN 5 Location of Facility (street address) EASTWOOD ROAD City WILMINGTON County NEW HANOVER 6 Directions to facility (from nearest major intersection) ' APPROXIMATELY 400-FT SOUTH WEST OF THE INTERSECTION OF EASTWOOD ROAD AND SOUTHERLAND AVE AND SOUTH OF THE EXISTING LUMINA STATION 7 Latitude 34-13-00 Longitude 7749-00 of facility 8 Contact person who can answer questions about the facility Name JOEL TOMASELLI Telephone Number (910 ) 256-0900 II PERMIT INFORMATION I Specify whether project is (check one) X New Renewal Modification 2 If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) Form SWU 101 April 1998 Page 1 of State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM I his form may he photocopied for use as an original I GENERAL INFORMATION 1 Applicant's name (specify the name of the corporation, individual, etc who owns the project) LUMINA STATION. LLC 2 Print Owners/Signing Official's name and title (the person who is legally responsible for the facility and its compliance) JOEL TOMASELLI, MANAGER/MEMBER 3 Madmg Address for person listed in item 2 above 1900 EASTWOOD ROAD, SUITE 10 City WILMINGTON Telephone Number (9 256-0900 State NC Zip 28403 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements etc ) LUMINA INN 5 Location of Facility (street address) EASTWOOD ROAD City WILMINGTON County NEW HANOVER 6 Directions to facility (from nearest major intersection) ' APPROXIMATELY 400-FT SOUTH WEST OF THE INTERSECTION OF EASTWOOD ROAD AND SOUTHERLAND AVE AND SOUTH OF THE EXISTING LUMINA STATION 7 Latitude 34-13-00 Longitude 7749-00 of facility 8 Contact person who can answer questions about the facility Name JOEL TOMASELLI Telephone Number (910 ) 256-0900 II PERMIT INFORMATION I Specify whether project is (check one) X New Renewal Modification 2 If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) Form SWU 101 April 1998 Page 1 of 3 Specify the type of project (check one) Low Density X High Density Redevelop General Permit Other 4 Additional Project Requirements (check appropriate blanks) CAMA Major X Sedimentation/Erosion Control 404 Permit III PROJECT INFORMATION 1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project PROJECT IS HIGH DENSITY AND DRAINS TO SB WATER UNDERGROUND INFILTRATION TRENCHES WILL BE UTILIZED TO COLLECT AND TREAT RUNOFF 2 Stormwater runoff from this project drams to the CAPE FEAR River balm 3 Total Project Area 464 acres 4 Project Built Upon Area 6444 % 5 How many drainage balms does the project have? 3 6 Complete the following information for each drainage basm If there are more than two drainage basms in the project, attach an additional sheet with the information for each basm provided in the same format as below Basin Information Drainage Basin 1 Drainage Basin 2 Receiving Stream Name SEE ATTACHED SHEET SEE ATTACHED SHEET Receiving Stream Class Drainage Basin Area Existing Impervious* Area ProposedImpervious* Area %Impervious* Area (total) Impervious* Surface Area Drainage Basin 1 Drainage Basin 2 On -site Buildings On -site Streets On -site Parkin On -site Sidewalks Other on -site Off site Total * Impervious area is defined as the built upon area including but not limited to buildings roads parking areas sidewalks gravel areas etc 7 How was the off -site impervious area listed above denved9 OFFSITE RUNOFF WILL BY-PASS THE PROPOSED SYSTEMS IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions pnor to the sale of any lot Please see Attachment A for the specific items that must be recorded Form SWU-101 April 1998 Page 2 of 6 Compkte the following informatio i for e _h drat 5( b-is n If there are more than two drainage basins in the pro)ect, attach an additional 51 eU wit t thr_ In ri tatio i for each basin provided in the same format as below ,Bashffiformation k-, Fn = =Draina ee&a W--; . p "Draina eEBastn—S�' ; K Receiving Stream Name LLg- UZptjG(Tot J Svtug 4gczepmmvtl Aw—A Receiving Stream Class 461S 'SIS Drainage 3asin Area p Ae— 0 V,AG Existing Im ervious' Area O O Proposed Im ervious'Area O AG O 9 CcAG % Impervious* Area (total) 1 191 S41 el S .Im ervi6s�Surface6Area ,' e, ��` -,,,,,Drainage Basini-� �� ' aWDrainage 13a4e,' �,f On -site Buildings O. OAG On -site Streets p On site Prrkin O Colo AG O41 AG On -site Sidewalks O 1 ZAG o Other on -site 0p Off -site O O _ Tot-11 E= O TAG E= O 9CoAC Basin Information-V —, " ram' -Draina &Bas n o :_' 'Drama re'Basin Receiving Stream Name L444 ArwiLLC e Receiving Stream Class S Drainage 'Basin Area Ae— Existing tin ervious" Area O Proposed Im ervious'Area , D AG % Impervious* Area (total) q :Im iervibus,Surface,Area' $%VCgiy Drainage Basin`s— _ ;£ "1Dralitage Basin' �? has On -site Buildings O I Co A On -site Streets On -site P? rkin G On -site Sidewalks Other on site p Off -site p Total E_ oo AG E_ Basin Information "K " " rl, Draina a Bati"n," Drainage Basin" w Receiving Stream Name Receiving Stream Class Drainage 'basin Area Existing lm ervious' Area Proposed Im ervious Area % Impervious* Area (total) dm' ervious* SurfacetArea-I&- 44C Drainage;Basint ; ���� -,z40pe&,Drainage.BasCh1 On -site Buildings On -site Streets On -site Prrkin On -site Sidewalks Other on site Off -site Total ­.f•­—cs, tc vill-1 to Inc utuir upon area incutaing, wit not ionited to, buildings, roads, harking areas, sidewalks, gravel areas, etc By your signature below you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State and that they will be recorded prior to the sale of any lot VI AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section Designated agent (individual or firm) Cape Fear Engineering, Inc Mailing Address So4e b-IEL.l 6Sk4TZF- R=Ne , 5LLtTS D City Wilmington State N C Zip 28403 Phone ( 910) - Zg0 ggg¢ Fax ( 910) �]y0-8583 VII SUBMITTAL REQUIREMENTS This application package will not be accepted by the Division of Water Quality unless all of the applicable items are included with the submittal Please indicate that you have provided the following required information by signing your initials in the space provided next to each item Applicant s Initials • Original and one coov of the Stormwater Management Permit Aoalicatton Form • One cony of the anohcable Sunolement Form(s) for each BMP (see Attachment Al • Permit annhcation orocessmg fee (see Attachment Al • Detailed narrative descriotion of stormwater treatment/management • Two comes of clans and snecifications including - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours proposed contours spot elevations, finished floor elevations - Details of roads parking, cul-de-sacs, sidewalks, and curb and gutter - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe saes runoff calculations - Drainage basins delineated - Vegetated buffers (where required) VIII APPLICANT'S CERTIFICATION 1, (print or type name of person listed in General Information item 2) JOEL TOMASELLI certify that the information included on this permit application form is correct, that the project will be constructed in conformances will approved plans that the deed restrictions in accordance with AttachmeAttachmentA of this form l be recorded ith ll required permit conditions, and that to the best of my knowledge the proposed project complies with e req r�ments of 1„5"CAC 2H 1000 Signature q / Date 12/23/98 Title JOEL TOMASELLI- MEMBER/MANAGER Form SWU-101 April 1998 Page 3 of 4 ATTACHMENT A 1 Deed Restriction Requirements The following statements must be recorded for all low density projects and for all projects that involve the subdivision and selling of lots or outparcels I No more than square feet ofany lot including that portion of the right-of-way between the edge of pavement and the front lot line shall be covered by impervious structures including asphalt gravel concrete brick stone slate or similar material but not including wood decking or the surface ofswimming pools This covenant is intended to insure continued compliance with the stormwater permit issued by the State of North Carolina The covenant may not be changed or deleted without the consent of the State 2 No one may fill in pipe or alter any roadside swale except as necessary to provide a minimum driveway crossing NOTE If lot sizes vary significantly, the owner/developer must provide an attachment listing each lot number size and the allowable built -upon area for each lot For commercial projects that have outparcels or future development the following statements must also be recorded 3 The conneenon from the outparcel or future area into the stormwater system must be made into the foreboy such that short -circulating of the system does not occur 4 All built -upon area from the outparcel or future development must be directed into the permitted stormwater control system 5 Built -upon area in excess of the permitted amount will require a permit modification prior to construction For curb outlet systems the following statement in addition to items 1 and 2 above must be recorded 6 No one may pipe fill on or alter any designated 100 foot long grassed Swale used to meet the requirements ofNCAC2H 1008(g) 2 Supplement Forms The applicable supplement form(s) listed below must be submitted for each BMP specified for this project Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River basin Nutrient Management Strategy Supplement 3 Permit Application Fees (check made payable to NCDENR and submitted to the appropriate Regional Office) Type of Permit Low Density High Density Other Director s Certification General Permit New Modification or Late Renewal $225 $385 $225 $350 $50 Timely Renewal Without Modification n/a $225 n/a n/a n/a Form SWU-101 April 1998 Page 4 of State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I GENERAL INFORMATION I Applicant s name (specify the name of the corporation, individual etc who owns the project) LUMINA STATION II, LLC 2 Print Owners/Signmg Official's name and title (the person who is legally responsible for the facility and its compliance) JOEL TOMASELLI, MANAGEP/MEMBER 3 Mailing Address for person listed in item 2 above 1900 EASTWOOD ROAD, SUITE 10 City WILMINGTON Telephone Number (910) 256-0900 State NC Zip 28403 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans specifications, letters, operation and maintenance agreements, etc ) LUMINA STATION II 5 Location of Facility (street address) EASTWOOD ROAD City WILMINGTON County NEW HANOVER 6 Directions to facility (from nearest major mtersection) APPROXIMATELY 400-FT SOUTH WEST OF THE INTERSECTION OF EASTWOOD ROAD AND 5OUTHERLAND AVE AND SOUTH OF THE EXISTING LUMINA STATION 7 Latitude 34-13-00 Longitude 77-49-00 8 Contact person who can answer questions about the facility Name JOEL TOMASELLI Telephone Number II PERMIT INFORMATION 1 Specify whether project is (check one) X New Renewal of facility (9 )0) 256-0900 Modification 2 If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) Form SWU-101 April 1998 Page I of 3 Specify the type of project (check one) Low Density X High Density Redevelop 4 Additional Project Requirements (check appropriate blanks) CAMA Major X SedimentatiOn/ErOsion Control III PROJECT INFORMATION General Permit Other 404 Permit 1 hi the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project PROJECT 15 HIGH DENSITY AND DRAINS TO 513 WATER UNDERGROUND INFILTRATION TRENCHES WILL BE UTILIZED TO COLLECT AND TREAT RUNOFF 2 Stormwater runoff from this project drams to the 3 Total Project Area 4 64 acres 5 How many drainage basins does the project have? CAPE FEAR 4 Project Built Upon Area 3 River balm 5475 % 6 Complete the following information for each drainage basm If there are more than two drainage balms in the project, attach an additional sheet with the information for each basm provided in the same format as below Basin Information Drainage Basin I Drainage Basin 2 Receiving Stream Name SEE ATTACHED SHEET SEE ATTACHED SHEET Receiving Stream Class Drainage Basin Area Existing Impervious* Area ProposedImpervious* Area Impervious* Area (total) Impervious* Surface Area Drainage Basin 1 Drainage Basin 2 On -site Buildings On -site Streets On-srte Parkin On-site Sidewalks Other on -site Off site Total * Impervious area is defined as the built upon area including but not limited to buildings roads parking areas sidewalks gravel areas etc 7 How was the off -site impervious area listed above derived? OFF51TE RUNOFF WILL BY-PASS THE PROPOSED SYSTEMS IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot Please see Attachment A for the specific items that must be recorded Form SWU-101 April 1998 Page 2 of 6 Complete the following mformatton for each dramage basin If there are more than two drainage basins in the project attach an additional sheet with the information for each basin orovided in the same format as below Basin Information Drainage Basin 1 Drainage Basin 2 Receiving Stream Name Wncjht5ville Beach Recreation Area Wri ht5ville Beach Recreation Area Receiving Stream Class SB * 5B Drainage Basin Area 0 83 AC 1 38 AC Existing Impervous* Area 0 00 AC 0 00 AC Proposed Impervious* Area 0 75 AC 1 30 AC % Impervious* Area (total) 90 36 % 94 20 Impervious* Surface Area Drainage Basin I Drainage Basin 2 On -site Buildings 0 I O AC 0 51 AC On -site Streets 0 00 AC 0 00 AC On -site Parking 0 55 AC 0 43 AC On -site Sidewalks 0 I O AC O 36 AC Other on -site 0 00 AC O 00 AC Off site 0 00 AC 0 00 AC Total E= 0 75 AC E= I O-`Mt AC Basin Information Drainage Basin 3 - Drainage Basin 4 Receiving Stream Name Wnght5ville Beach Recreation Area Receiving Stream Class 5B Drainage Basin Area 0 90 AC Existing Impervious* Area 0 00 AC Proposed Impervious* Area 0 83AC % Impervious* Area (total) 92 2 % Impervious* Surface Area - Drainage Basin 3 - - -Drama a Basin 4-- On-site Buildings 0 I O AC On -site Streets 0 00 AC On -site Parking 0 63 AC On -site Sidewalks 0 I 0 AC Other on -site 0 00 AC Off site 0 00 AC Total E= 0 83 AC E_ Basin Information Drainage Basin 5 Drainage Basin 6 Receiving Stream Name Receiving Stream Class Drainage Basin Area Existing Impervous* Area Proposed Impervious* Area %Impervious* Area (total) Impervious* Surface Area Drainage Basin 5 Drainage Basin 6 On -site Buildings On -site Streets On -site Parking On -site Sidewalks Other on -site Off site Total *Impervious area is defined as the built upon area including but not hmired to buildings roads parking areas sidewalks gravel areas etc Page 2A of 4 By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot VI AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section Designated agent (individual or firm) Cape Fear Engineenng Inc Mailing Address 5040 New Centre Dr 5uite D City Wilmington State N C Zip 28403 Phone ( 910 ) 772-9000 Fax ( 91 0 ) 772-9G79 VII SUBMITTAL REQUIREMENTS This application package will not be accepted by the Division of Water Quality unless all of the applicable items are included with the submittal Please indicate that you have provided the following required information by signing your initials in the space provided next to each item Applicant s Initials • Original and one couv of the Stormwater Management Permit Aovhcatnon Form • One conv of the anohcable SuDDlement Form(s) for each BMP (see Attachment A) • Permit anolication orocessins fee (see Attachment A) • Detailed narrative descrintion of stormwater treatment/manaaement • Two conies of olans and specifications including - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, parking, cube -sacs, sidewalks, and curb and gutter - Wetlands delineated or a note on plans that none exist - Existing drainage (including off -site), drainage easements pipe sizes, runoff calculations - Drainage basms delineated - Vegetated buffers (where required) VIII APPLICANT'S CERTIFICATION I, (print or type name ofperson listed in General Information item 2) JOEL TOMASELLI certify that the information included on this permit application form is correct that the project will be constructed in conformance with the approved plans, that the deed restrictions in accordance with Attachment A of this form will be recorded with all required permit conditions, and that to the best of my knowledge the proposed project complies with the requirements of 15A NCAC 2H 1000 Signature Title JOEL TOMASELLI- MEMBEP/MANAGEP Date 5/3/99 Form SWU-101 April 1998 Page 3 of 4 ATTACHMENT A 1 Deed Restriction Requirements The following statements must be recorded for all low density projects and for all projects that involve the subdivision and selling of lots or outparcels I No more than square feet of any lot including that portion of the right-of-way between the edge of pavement and the front lot line shall be covered by impervious structures including asphalt gravel concrete brick stone slate or similar material but not including wood decking or the surface ofswimming pools This covenant is intended to insure continued compliance with the stormwater permit issued by the State of North Carolina The covenant may not be changed or deleted without the consent of the State 2 No one may fill in pipe or alter any roadside swale except as necessary to provide a minimum driveway crossing NOTE If lot sizes vary significantly the owner/developer must provide an attachment listing each lot number, size, and the allowable built -upon area for each lot For commercial projects that have outparcels or future development the following statements must also be recorded 3 The connection from the outparcel or future area into the stormwater system must be made into the forebay such that short -circulating of the system does not occur 4 All built -upon area from the outparcel or future development must be directed into the permitted stormwater control system 5 Built -upon area in excess of the permitted amount will require a permit modification prior to construction For curb outlet systems the following statement in addition to items 1 and 2 above must be recorded 6 No one may pipe fill on or alter any designated 100 foot long grassed Swale used to meet the requirements ofNCAC 211 1008(g) 2 Supplement Forms The applicable supplement form(s) listed below must be submitted for each BMP specified for this project Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off-Srte System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River basin Nutrient Management Strategy Supplement 3 Permit Application Fees (check made payable to NCDENR and submitted to the appropriate Regional Office) Type of Permit Low Density High Density Other Director s Certification General Permit New, Modification, or Late Renewal $225 $385 $225 $350 $50 Form SWU-101 April 1998 Page 4 of 4 Timely Renewal Without Modification n/a $225 n/a n/a n/a Permit No 560,3 q �U 52 o (to be provided by DMQ) State of Noi th Cai ohna Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM UNDERGROUND INFILTRATION TRENCH SUPPLEMENT 1 hi c form cony be photocopied for ace a% an anginal DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an underground infiltration trench supplement for each system, design calculations, plans and specifications showing all stormwater conveyances and system details, and a signed and notarized operation and maintenance agreement PROJECT INFORMATION (please complete the following information) Project Name LUMINA INN Contact Person JOEL TOMASELLI Phone Number ( 910 )256-0900 For projects with multiple infiltration systems, a supplement form must be completed for each system This worksheet applies to Trench 1 in Drainage Basin-1 II DESIGN INFOMATION (please complete the following information and attach supporting calculations/documentation) Sods Report Summary (based upon: an actual field investigation and soil borings) Soil Type KUREB Infiltration Rate 5 in/hr r ef/hr/sf (uncle appropriate :nits) SHWT Elevation 10 fmsl (Seasonal High Water Table elevation) Trench Design Parameters Design Volume 3396 c f (1 5 inch event for SA waters 1 inich evens for others) Design Storm I inch event Drawdown Time 36 hours Perforated Pipe Size 6 inch diameter Perforated Pipe Length 300 ft No Observation Wells n/a wells Fill Material (if used) 532 c y of washed stone Trench Elevations (in feet mean sea level) Bottom Elevation 13 fmsl Overflow Elevation 145 finsl Storage Elevation 145 finsl Trench Dimensions Height 15 ft Length 114 ft, Width 84 ft Volume Provided 5799 cu ft V 11 REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N C Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Initials g h i System is located 50 feet from class SA waters and 30 feet from other surface waters System is located at least 100 feet from water supply wells Bottom of system is at least 2 feet above the seasonal high water table (SHWT) Bottom of the system is 3 feet above any bedrock or impervious soil horizon Off-line system, runoff in excess of the design volume bypasses the system (bypass detail provided) System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days based upon filtration through the bottom only ( ahydrogeologic evaluation may be required) Sods have a minimum hydraulic conductivity of 0 52 inches per hour System is not sited on or in fill material or DWQ approval has been obtained Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public nght-of-way System captures and infiltrates the runoff from the first 1 0 inch of rainfall (1 5 inch event for areas draining to SA waters) Drainage area for the device is less than 5 acres A pretreatment device (filter strip, grassed swale, sediment trap, etc ) is provided Trench bottom is covered with a layer of clean sand to an average depth of 4 inches Sides of the infiltration trench are lined with geotextile fabric Rock used is free of fines (washed stone) and has a large void ratio Side to bottom area ratio is less than 4 1 Observation well(s) are provided (case -by -case basis) Vegetated filter is provided for overflow (50 feet for SA waters, 30 feet for other waters) and detail is shown on plans IV UNDERGROUND INFILTRATION TRENCH OPERATION AND MAINTENANCE AGREEMENT 1 After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, grass cover, and general condition 2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 After every runoff producing rainfall event and at least monthly inspect the bypass/overflow structure for blockage and deterioration Remove blockage and repair structure to originally approved design specifciations 4 Remove accumulated sediment annually or when depth is reduced to 75% of the original design depth Restore depth to original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed 5 The water level in any monitoring wells will be recorded after a 1 inch rainfall event and at least once a month Chronic high water table elevations (within 1 foot of the bottom of the system for a period of three months) shall be reported to DWQ immediately 6 If DWQ determines that the system is fading, the system will immediately be repaired or replaced to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures I agree to notify DWQ of any problems with the system or changes in the name of the project, responsible party, or address Print name JOEL TOMASELLI- Address 190 EASTWOOD P Phone (9 0)256-0900 Signature NA STATION, LLC SUITE 10 WILMINGTON, NC 28403 �+tle MANAGER/MEMBER Date 12/23/1998 1_ H SCOTT KFNNEDY tR , a Notary Public for the State of NORTH CAROL INA County of NEW HANOVER do hereby certify that JOEL TOMASELLI personally appeared before me this 23 day of DECEMBER , 19. 98— , and acknowledge the due execution of the forgoing infiltration system maintenance requirements Witness my hand and official seal, ��600o��•KEP�P,,FO �": O SEA�� O M commission expf e MAR 2 2002 = PIOiF,CIY ' —� — PU C TE 97133 Permit No (to be prov`ded by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DW O Stormwater Management Plan Review A complete stormwater management plan submittal includes a wet detention basin suDolement for each basin design calculations plans and specifications showing all basin and outlet structure details, and a fully executed ope-anon and maintenance agreement I PROJECT INFORVLATION (please complete the following information) Project Name Lumina Inn Contact Pe'Son Joel Tomaselli Phone Number (910 ) 256-0900 For projects with multiple basins specify which basin this worksheet applies to Basin 1 Basin Bottom Elevation 3 0 ft (average elevation of the floor of the basin) Pe-manent Pool Elevation 8 5 ft (elevation of the once) Temoorary Pool Eievanon 10 0 fL (elevation of the dsc'iarRe smicnure ove low) oe manenr Pool Sur -,ace Area 3,403 se tt Drainage Area Imoe-vious Area Permanent Pool 'volume Temporary Pool'v olume Foreoav 'volume SA/DAI used Diameter of Orifice Design TSS Removal 2 82 ac 1 114 ac 9,475 cu ft 6,022 cu ft 998 cu ft 0 025 1 0 in 90 Cc II REQUIRED ITEMS CHECKLIST (water surtax- area at Lhe orifice elevation) (on -sue and off site drainage to the basin) (on -site and off -site drainage to the basin) (combined volume of main basin and toreoav) (volume detained above the pe--anent pool) (surface area to drainage area rauo) (8590 TSS removal required see item It below) The following checklist outlines design requirements per the SLormwater Bes, Management Pracuces manual (N C Department of Environment Health and Natural Resources Novemoe, 1995) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to inaicate the tollowing design requirements have oeen met and suoportmg documentation is attached If the anolrcani has designated an agent in the Stormwate- Manage nent Permit ADDlicauon Form the agent may initial below If a requirement has not been met attach justification Form SwL 102 Januan 1998 Pale I of I Permit No '56V F L 7 90 5Z0 (to be prat ided by DIVQ) State of North Carolina Department of Environment and Natural Resources Division of Water Qu-ihty STORMWATER MANAGEMENT PERMIT APPLICATION FORM UNDERGROUND INFILTRATION TRENCH SUPPLEMENT Thi v form mov be photocopied for use as an original DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an underground infiltration trench supplement for each system, design calculations, plans and specifications showing all stormwater conveyances and system details, and a signed and notarized operation and maintenance agreement PROJECT INFORMATION (please complete the following information) Project Name LUMINA INN Contact Person JOEL TOMASELLI Phone Number ( 910 )256-0900 For projects with multiple infiltration systems, a supplement form must be completed for each system This worksheet applies to Trench 2 in Drainage Basin-2 II DESIGN INFOMATION (please complete the following information and attach supporting calculations/documentation) Sods Report Summary (based upon at actual field investigation and sort boring~) Sod Type KUREB Infiltration Rate 5 in/hr or cf/hr/sf (cucle appropriate units) SHWT Elevation 10 msl (Seasonal High Water Table elevation) Trench Design Parameters Design Volume 3323 c f (1 5 itch event for SA waters I inch event for others) Design Storm 1 inch event Drawdown Time 3 6 hours Perforated Pipe Size 6 inch diameter Perforated Pipe Length 368 ft No Observation Wells n/a wells Fill Material (if used) 513 e y of washed stone Trench Elevations (in feet mean sea level) Bottom Elevation 13 0 frisl Overflow Elevation 145 fmsl Storage Elevation 145 fmsl Trench Dimensions Height 15 ft Length 220 ft, Width 42 ft Volume Provided 5570 cu ft 11 REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N C Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Applicants Initials g h System is located 50 feet from class SA waters and 30 feet from other surface waters System is located at least 100 feet from water supply wells Bottom of system is at least 2 feet above the seasonal high water table (SHWT) Bottom of the system is 3 feet above any bedrock or impervious soil horizon Off-line system, runoff in excess of the design volume bypasses the system (bypass detail provided) System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days based upon filtration through the bottom only ( ahydrogeologic evaluation may be required) Sods have a minimum hydraulic conductivity of 0 52 inches per hour System is not sited on or in fill material or DWQ approval has been obtained Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any oft -site drainage System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way System captures and infiltrates the runoff from the first 1 0 inch of rainfall (1 5 inch event for areas draining to SA waters) Drainage area for the device is less than 5 acres A pretreatment device (filter strip, grassed swale, sediment trap, etc ) is provided Trench bottom is covered with a layer of clean sand to an average depth of 4 inches Sides of the infiltration trench are lined with geotextde fabric Rock used is free of fines (washed stone) and has a large void ratio Side to bottom area ratio is less than 4 1 Observation well(s) are provided (case -by -case basis) Vegetated filter is provided for overflow (50 feet for SA waters, 30 feet for other waters) and detail is shown on plans IV UNDERGROUND INFILTRATION TRENCH OPERATION AND MAINTENANCE AGREEMENT After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, grass cover, and general condition Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 After every runoff producing rainfall event and at least monthly inspect the bypass/overflow structure for blockage and deterioration Remove blockage and repair structure to originally approved design specifciatlons 4 Remove accumulated sediment annually or when depth is reduced to 75% of the original design depth Restore depth to original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed 5 The water level in any monitoring wells will be recorded after a 1 inch rainfall event and at least once a month Chronic high water table elevations (within i foot of the bottom of the system for a period of three months) shall be reported to DWQ immediately 6 If DWQ determines that the system is fading, the system will immediately be repaired or replaced to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures I agree to notify DWQ of any problems with the system or changes in the name of the project, responsible party, or address Print name JOEL TOMASELLI- LUMINA STATION, LLC Address 1900 EASTWOOD ROAD, SUITE 10 WILMINGTON, NC 28403 Phone (9 IA 256-0900 Title MANAGERIMEMBER Signature � �� Date 12/23/1998 I_ H SCOTT KENNFDY IR , a Notary Public for the State of NORTH CAROL INA County of NEW HANOVER do hereby certify that _JOEL TOMASFI ILI personally appeared before me this-2-3-day of DECEMBER , 19 98 , and acknowledge the due execution of the forgoing infiltration system maintenance requirements Witness my hand and official seal, N L1 40TARY TE 97133 Permit No'',() X g 5OC-oZ (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT Tnis form may be pnotocopted for use as an orig,nal DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes a wet detention basin supplement for each basin design calculations plans and specrficauons showing all basin and outlet structure details, and a fully ececated operation and maintenance agreement I PROJECT INFORMATION (please complete the following information) Project Name Lumina Inn Contact Person Joel Tomaselli Phone Number ( 910 ) 256-0900 For projects with multiple basins, specify which basin this worksheet applies to Basin 2 Basin Bottom Elevation 4 0 ft (average elevation oI the floor of the basin) Pe manent Pool Elevation 9 5 ft (elevation of the office) Temporary Pool Elevation 11 0 ft (elevation of the discharge stricture ove slow) Pe manevt Pool Surface Area 3,330 sq It (cater sartace area at the onfice elevation) Drainage Area 1.82 ac (on -site and off -site drainage to die basin) Impervious Area 0 847 ac (on -site and off -site drainage to the basin) Permanent Pool 'Volume 9,158 cu ft (combined volume of main basin and torebav) Temporary Pool 'Volume 5,816 cu ft (volume ae,ained above the permanent pool) Fore Day Volume 905 cu tt SA/DAi used 0 0292 (surface area to drainage area rauo) Diameter of Office 3/4 in Design TSS Removal 90 io (85% TSS removal required see item k below) II REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Pracuces manual (N C Department of Environment Health and Natural Resources November 1995) and Administrative Code Section 15 A NC AC 2H 1008 Initial in the space provided to indicate the tollowing design requirements have been met and surmorring documentation is attached If the applicant has designated an agent in the Stormwam, Management Pe -mu Application Form the agent may initial below If a requirement has not been met attach justification Form SWU 102 lanuary 1998 Paee 1 of 2 Permit No 56v3g1()S2z) (to be provided by DIVOT State of North Carolina Department of Environment and Natural Resources Division of W-iter Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM UNDERGROUND INFILTRATION TRENCH SUPPLEMENT 7ta s form inav he photocopied for use as an original DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an underground infiltration trench supplement for each system, design calculations, plans and specifications showing all stormwater conveyances and system details, and a signed and notarized operation and maintenance agreement I PROJECT INFORMATION (please complete the following information) Project Name LUMINA INN Contact Person JOEL TOMASELLI Phone Number ( 910 )256-0900 For projects with multiple infiltration systems, a supplement form must be completed for each system This worksheet applies to Trench 3 in Drainage Basm-3 I I DESIGN INFOMATION (please complete the following information and attach supporting calculations/documentation) Sods Report Summary (based upon an actual field investigation and sail borings) Sod Type KUREB Infiltration Rate 5 m/hr or cf/hr/sf (uncle appropriate units) SHWT Elevation 10 msl (Seasonal High Water fable elevation) Trench Design Parameters Design Volume 3639 c f (1 5 inch event for SA waters I inch event for others) Design Storm 1 mch event Drawdown Time 3 6 hours Perforated Pipe Size 6 inch diameter Perforated Pipe Length 300 ft No Observation Wells n/a wells Fill Material (if used) 578 c y of washed stone Trench Elevations (infeet mean sea level) Bottom Elevation 13 0 fmsl Overflow Elevation 14 5 fmsl Storage Elevation 14 5 finsl Trench Dimensions Height 15 ft Length 124 ft, Width 84 ft Volume Provided 6264 cu ft 11 REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N C Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Initials a System is located 50 feet from class SA waters and 30 feet from other surface waters b System is located at least 100 feet from water supply wells c Bottom of system is at least 2 feet above the seasonal high water table (SHWT) —d Bottom of the system is 3 feet above any bedrock or impervious soil horizon e f QO 9 h i Off-line system, runoff in excess of the design volume bypasses the system (bypass detail provided) System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days based upon filtration through the bottom only ( ahydrogeologic evaluation may be required) Soils have a minimum hydraulic conductivity of 0 52 inches per hour System is not sited on or in fill material or DWQ approval has been obtained Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way System captures and infiltrates the runoff from the first 1 0 inch of rainfall (1 5 inch event for areas draining to SA waters) Drainage area for the device is less than 5 acres A pretreatment device (filter strip, grassed swale, sediment trap, etc ) is provided Trench bottom is covered with a layer of clean sand to an average depth of 4 inches Sides of the infiltration trench are lined with geotextile fabric Rock used is free of fines (washed stone) and has a large void ratio Side to bottom area ratio is less than 4 1 Observation well(s) are provided (case -by -case basis) Vegetated filter is provided for overflow (50 feet for SA waters, 30 feet for other waters) and detail is shown on plans IV UNDERGROUND INFILTRATION TRENCH OPERATION AND MAINTENANCE AGREEMENT 1 After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, grass cover, and general condition 2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 After every runoff producing rainfall event and at least monthly inspect the bypass/overflow structure for blockage and deterioration Remove blockage and repair structure to originally approved design specifciations 4 Remove accumulated sediment annually or when depth is reduced to 75% of the original design depth Restore depth to original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed 5 The water level in any monitoring wells will be recorded after a 1 inch rainfall event and at least once a month Chronic high water table elevations (within 1 foot of the bottom of the system for a period of three months) shall be reported to DWQ immediately 6 If DWQ determines that the system is fading, the system will immediately be repaired or replaced to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures I agree to notify DWQ of any problems with the system or changes in the name of the project, responsible party, or address Print name Address Phone Signature JOEL I- LUMINA STAT LLC 1900 EASTWOOD ROAD, SUITE 10 WILMINGTON, NC 28403 (910) 2 - 900 Title MANAGER/MEMBER Date 12/23/1998 I_ H SCOTT KENNEDY IR a Notary Public for the State of NORTH CAROi iNA County of NEW HANOV R do hereby certify that JOEi. TOMASELLI personally appeared before me this 23 day of DE R , 19 _98 , and acknowledge the due execution of the forgoing infiltration system maintenance requirements Witness my hand and official seal, i(EN/y,� �r�o SEAL�`�� comnussion expires MA C 2 2002 e r NUT.^v S' /'P/fflli 5040 New Centre Dr 5ulte D Wilmington NC 28403 TEL (910) 790 8584 FAX (910) 790 6563 cfe@bellsouth net May 4 1999 Linda Lewis NCDENR Water Quality 127 Cardinal Drive Ext Wilmington NC 28403 Re Lumina Inn SW8 980502 Dear Ms Lewis RECEIVED MAY 0 5 1999 BY S(c)t� q$oSaZ On behalf of Lumina Station II, LLC , attached is the revised submittal for the above referenced project based on your comments dated April 16 1999 The following is a detailed listing of the revisions 1 The DB#8 detail has been revised to show the 10" HDPE line from former DI#11 entering the grated inlet side DI#11 has been replaced with a trench drain (see attached plan) 2 One inlet per system is sufficient to receive the volume from 1 of runoff and divert flow to the infiltration system Infiltration pipes are sufficiently sized to distribute the volume from 1 of runoff without bypass Please see Appendix C, design report 3 Invert elevations for all cleanouts shall be the same The invert elevation has been added to the infiltration trench detail 4 Supplement forms with original signatures are attached, please see Appendix A, design report 5 Drainage Basin#1 has been properly labeled The name of the project has also been revised The project is now known as Lumina Station II, owned by Lumina Station II LLC Attached please find a revised application reflecting the new project name and responsible party I trust this information to be sufficient for your review If you have any questions or require additional information regarding this matter please contact this office Sincerel K Davis Fennell El Cc Joel Tomaselli I STORM WATER MANAGEMENT DE5IGN REPORT WOO LUM/NA 5TATION // OWNER LUMINA 5TAT/ON //, L L C / 900 EASTWOOD ROAD WILM/NGTON, NC 26403 256-0900 MAY 1999 205- / 0-96 ,A�E FEAF� o rver cameo- s, n Vd (910)� F. (919)� EmW tle®Ee .d STORMWATER D E C E I V E MAY 0 51999 D PROS &L `1_ b'OSDZ- Q� = SEAL 20! G GENERAL Lumina Station 11, LLC is proposes to construct a development called Lumina Station II just south of existing Lumina Station The project consists of 4 G4 acres and will be considered high density The proposed improvements involve the installation of utilities, roadway, parking and buildings STORMWATER MANAGEMENT The Storm Water Management Plan will consist of underground infiltration trenches and pipes The site in located in the City of Wilmmgton's Phase- I annexation and will meet City requirements as well as State requirements regarding stormwater management The City requires that the runoff rate for the post -developed condition be no greater than the runoff rate for the existing or pre -developed condition for the 10-year storm events In addition, the State requires that the first I -inch of runoff from impervious surfaces must be contained and treated for water quality concerns The existing site consists of relatively large trees and slopes that range from 0 5% to 4% The soils consist of Kurbe sands and are ex well -drained fine sands A site investigation indicated that the seasonal high water table is at elevation 10 0 msl Hand auger borings were preformed across the site to verify the location of the water table The infiltration rates for this type soils are in excess of 5-mches per hour for the purposes of this report and calculations, 5-mche5 per hour is used for the infiltration rate This site is suited for infiltration swales See Appendix 13 for the soils report The proposed storm drainage improvements consist of 3- underground infiltration systems The bottoms of all infiltration systems are located at least 2-feet above the seasonal high water t table This is the minimum separation allowed by the State storm water design regulations The infiltration systems are designed to infiltrate the I 0-year storm and by-pass all other larger storm events by utilizing diversion basin The infiltration systems are also designed to have adecpate capacity to store the first I -inch of runoff from impervious surfaces Design calculations are attached to this report Appendix A contains information and calculations for the infiltration systems and Underground linfiltration Trench Supplements Appendix B contains the soils investigation SEDIMENTATION AND EROSION CONTROL There is an approved S*E plan for the site The plan will be resubmitted to New Hanover County for approval due to the change in land plan and stormwater management system APPENDIX A DESIGN CALCULATIONS $ UNDERGROUND INFILTRATION TRENCH SUPPLEMENT Z 05- ;3 u E crvar� 3 �kAll"A(7F reAi�,P �-' -1 = 0,03 AG CIO { MP ER JIo�s = 90.3(0 CTj 0�°zld�r FOR J1 iUcw CDS) C p g) Vo1,sme fLEcz'p = UB + pS " zv wHee�;. Za = D, o5t D, 009 CIi R4=0,8(63Z JOI.Jt1E QE6?b =Z�OIGF `OL'oHe ?Rovb =6110C�F Csre Ro,rr�Na GALcs - ?0,6 F- 3 `/01. (ZE(pZ) - z1voIV < <517CLF _ VOL,?EDJ,p I 1506AL,&S. 1205-1a 3 ZI. - 'ler N LA-� �(�pNT) —v AuutiAoFF Ia 5xcess of 'DEs16rl SToam 6y-PASS-r7-sw-v\ dIR, $/asitl -- 9ZAWp>CKO pF SJwT-Sr l = Nf\AVAT QF'r?V:Wfn IOFIUMA- Ou ZArE Qjlwl 5 i �/►+e ��Wbok,itj <1raE = 3, Co N25 313 Koo-no, Fo1= 10 Y?<,toem PIPESTOR LUMINA STATION ll DRAINAGE BASIN-1 Wilmington, NC MASS INFLOW / STORAGE / AND EXFILTRATION FROM INFILTRATION SYSTEM-1 Procedure in Accordance With FHWA TA80.218 Design Guide Lines 04/21/99 Uralnage area (Ac)= U w vipe size (n) = U 6I Storm event = 10 Trench width (ft) = 840 Length of pipe and trench= 114 Pipe area (ft2) = 04 Trench side height (ft) = 15 Stone area (ft2) = 1256 A = Area of exfiltration = 9578 ft2 Stone voids 40% (ft2) = 503 K = Coeff of permeability = 4 0E-03 cm/sec Available storage per it = $0 6 I = Hydraulic gradient = 100 Total Available Storage 5770 m Es 126 cfsttreneh INFLOW / EXFILTRATION I STORAGE RATINGS CHART TIME (min) MASS INFLOW (cubic feet) VOLUME (cubic feet) REQUIREMENTS (cubic feet) STORAGE (cubic feet) (DEFICIT) (cubic feet) 0 4510 10 2 872 754 2118 3 652 15 3 845 1 131 2 714 6 3 056 20 4 637 1 508 3129 5 T70 2 640 25 5 299 1 885 3 414 5770 2 356 30 5 861 2 262 3 599 5770 2 170 40 6 776 3 016 3 760 b flu 2010 60 8 078 4 524 3 554 2 215 80 8 987 6 032 2 955 _ 2 815 100 9 673 7 540 1 2 132 0 3 637 120 10 218 9 048 1 170 5 77Y 4 599 180 11 383 13 572 (2 189) 5 T70 7 959 240 12 171 18 096 (5 925) 0 11 695 360 13 239 27 145 (13 905) 19 675 720 15 000 54 289 (39 289) 45 059 1,440 16 756 108 578 (91 822) 5 7M 97 592 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 01 0 0 Insy-1 4/21/99 1\ I - Vo GAIA;s I205- tt:2 I N FI1,7-.eA7-/Dv4 / rLE,wN '-'Z 9,tAltJA(7F e ^z-% p '-�' Z = I - ? 0 AG CDB) °/oIMPERdio�s= 44,Z C7-1 9r,.ei6o FoR -1. lacq sroem LP5) VOL. SMC fLEczb = DB k4 DS wHEe�� 0105t 0,009 Q� = C. 697 S e Ze&b - 4498(,F VowHE ?povb CS,r Rovrlr A 6A�V,-?A6E.3 Qc)L. (Zra0 - A4`lScr < <1l4'8Gv = yot.,?zoip r o� l 150 GALZS 205-10 Z13 -rQEµ(,aLI Z (a,4r.) —v ALLZ\)�►oFF Ita excess of VgFis 60 -foam u«L- 8l-PPSS 'ifGEti1G�� J�p DNE85�oN $/aS1�1, ---> �jZAWDONI� OF SySrEK = C!E 0f\/,NT 6E'52G06-n INFILTP-A„ov-1 7-ArE 3/3 Roo-r„16 vo?- 10 Y2-,soen PIPESTOR LUMINA STATION II 0421M DRAINAGE BASIN-1 Wilmington, NC MASS INFLOW / STORAGE / AND EXFILTRATION FROM INFILTRATION SYSTEM-1 Procedure In Accordance With FHWA TA80-218 Design Guide Lines Infiltration Rate 0 10s)= 9' Drainage area (Ac)= 083 Pipe size (ft) = 067 Stone event = 10 Trench width (it) = 840 Length of pipe and trench= 114 Pipe area (11:2) = 04 Trench side height (ft) = 15 Stone area (111:2) = I Z 6 A = Area of exfihration = 0576 112 Stone voids 40% (111:2) = $0 3 K = Coeff of permeability = 4 0E-03 cm/sec Available storage per ft = I50.6 I = Hydraulic gradient = 100 Total Available Storage 5770 Q/ = 1.26 cfshrench Ql = AS gpdfR2 INFLOW I EXFILTRATION I STORAGE RATINGS CHART TIME (min) MASS INFLOW (cubic feet) VOLUME (cubic feet) REQUIREMENTS (cubic feet) STORAGE (cubic feet) (DEFICIT) (cubic feet) 3 4 10 2 872 754 2 118 3 652 15 3 845 1 131 2 714 5 T70 3 056 20 4 637 1 508 3 129 b t1U 2 640 25 5 299 1 885 3 414 2 356 30 5 861 2 252 3 599 2170 40 6 776 3 016 3 760 b tfU 2 010 60 8 078 4 524 3 554 5770 2 215 80 8 987 6 032 2 955 t 770 2 815 100 9 673 7 540 2 132 70 3 637 120 10 218 9 048 1 170 5770 4 599 180 11 383 13 572 (2189) 0 795 240 12 171 18 096 (5 925) 11 695 360 13 239 27145 (13 905) 19 675 7201 150001 54 289 (39289)1 577045 059 1,440 16 756 108 578 (91 822) 77097 592 0 0 0 0- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Iney-1 4/21/99 W W W N N N 000 000 h ;Na va I NF/Irx arOW Tjeo1jcN 63 1;kAItJA46eAS,P 1-1 3 _ 0,10 AC 0/01 HF E7-4100s = 9Z 2 G=1 of s j,� hl rO R J� I UC;4 -rroZM C pS � VOU. Sme IZsc4,D = V$ u pS * 7%/ WKC2F,I JOI.JrtE TG�mb s 2875c� VOLUME ?povb z&Z-Vocc ----1 CseE 20urNa GALVL - ?0,6E3 1ea : 0, 05t 0, 009 (I� 7-4 = 015-1% VJVL, <6 50 m MAv�I �21: �QEN�N 3 �GoNT) —� AUU Z04OPF It' VACX-ss OF 'VESK5r SvDP-M WtL.L- 8y-PASS -rVV., \ JIR, plvEeS,©r► BAS,rA I kf\F, NT 6G �Pc n1GF1 IP5it-TEA-„ IA ZATE �I�WbOkIfJ''I�irtt= 3�(�H� 40�1 -rl Y6 iv� `PIPESTOR LUMINA STATION II 04121/99 DRAINAGE BASIN-3 Wilmington, NC MASS INFLOW / STORAGE / AND EXFILTRATION FROM INFILTRATION SYSTEMS Procedure in Accordance With FHWA TAB0-218 Deslan Guide Lines Infiltration Rate 0 cfs = * A Drainage area (Ac)= 090 Pipe size (ft) = OS Stone event = 10 Trench width (ft) = 840 Length of pipe and trench= 124 Pipe area (ft2) = _ 0 4 Trench side height (ft) = 15 Stone area (ft2) = 126 G A = Area of exfittrahon = 10416 ft2 Stone voids 40% (ft2) = 503 K = Coeff of permeability = 4 OE-03 cm/sec Available storage per ft = S" I = Hydraulic gradient = 100 Total Available Storage 6276 Q/ = 137 cfs/trench 01 = AS gpdM2 INFLOW I EXHURATION I STORAGE RATINGS CHART TIME (min) ACCUMULATED MASS INFLOW (cubic feet) EAFILTKATION VOLUME (cubic feet) STORAGE REQUIREMENTS (cubic feet) AVAILABLE STORAGE (cubic feet) STORAGE 5UKPLU9' (DEFICIT) (cubic feet) 1 61 410 1 Jbi odto4 10 3 090 820 2 270 6 4 006 15 4137 1 230 2 907 6 6 3 369 20 4 990 1 640 3 6 6 2 926 25 5 701 2050 3 651 9W 2 625 30 6 307 2 460 3 847 2 429 40 7 291 3 281 4 010 2 2G6 60 8 692 4 921 3 771 2 5Q4 80 9 670 6 561 3 103 6276 3 167 100 10 408 8202 2206 6 2 6 4 070 120 10 995 9 842 1 153 5 122 180 12 249 14 763 (2 514) 8 7 240 13 097 19 684 (6 587) ballb 12 863 360 14 246 29 526 (15 280) 21 556 720 16140 59 051 (42911)1 2 1 49 1B7 1440 18 030 118103 (100 073) T015349 0 0 0 0- 0 0 0 0 0 0 0 0 0 0 0 0 0 of 0 0 Insy-3 4/21/99 5OIL5 INVESTIGATION THE SITE IS CURRENTLY COVERED WITH SPARSE VEGATATION DUE TO THE RECENT GRADING THAT HAS TAKEN PLACE THE SITE WAS PREVIOUSLY A DEBRIS LANDFILL ALL THE DEBRIS HAS BEEN REMOVED AND THE SITE HAS BEEN GRADED TO ALLOW FOR A I % TO 2% SLOPE ACROSS THE SITE THE EXISTING SOILS ON -SITE ARE CONSISTANT WITH THE KUREB SANDS FOUND IN THE SURROUNDING VICINITY FIVE HAND AUGER BORINGS WERE TAKEN ACROSS THE SITE FROM THESE BORINGS IT IS WAS DETERMINED THAT THE 5EA50NAL HIGH GROUND WATER TABLE IS AT 10 0' MSL THE EXPECTED INFILTRATION RATE OF THESE SOILS WAS DETERMINED TO BE 5- INCHES PER HOUR ATTACHED IS A COPY OF A LOCATION MAP SHOWING WHERE THE BORINGS WERE PERFORMED ' I I I I Im f¢irmril � i a iw. Ia m I I I I 7r•w � .nil r t`® m tam Mtn -� Lppo uIN \ / -#BORE-2 / _ Tad Tmd Ana \ 0 5 oS--lo MAY99 • LJ • 0 ( -I V-ATE 114 LPT- 64:gokGITy — DfV EZVON BoKr4 AgAt t-&E AS OF-tOGE '-1 Q =GD A J �lti &j ,CO, �)(�,c�1� T3ZI.-,) Atrp, i7TL-Pop o 31 b=�4ewl CL-C�.� L➢_ 0,(00 Cryp,) 4,t�lsr- 9�_o,tUlFT S s 1 z 3 ,rJINe C (DYRy rLL 6mod) f4 Q _ 43 _ O RC. I,9 AG SXC.EEDS 0OZ LAQ49Sl' ►DQA%r-lA6E BA51h4 AVOA- —4 1 �N6ETISySTEM 1 SOIL, 50 P�z.Fo>z�r�y Pt�t � �I�FIl�TBPT-ro� fZATE eL \3,6 �/FL.3�g"� i�EE�liS(A.-D,00a ✓` C81f r Pt�c� A-sesi MG - Ft) LL rR9PAc" AAo.Ly:LF- I�EEp pzLI:'s P-s DZtGILC. Ai NEAoC o �)� 13,5-12,33= 1.\7I (�= CpA ZV 5h �JIiE¢E (gyp= ©.Lo Lryn-� S = 3i s Q/_1 Q,OO�i OFSIW et�iio�El Ci g k0t.is'FT ' ��c ©= Q,03Z GCS/Fr = 3,ZGFs'boFT OASIS AQEA JOrLou1 L- E uUT1t FIFE T�eWG mom 1 O 83AG 5 1OC.FS 3 4 o Fr U cFS Z ` : b q, S f.Fs 3 Fr 11 SC.FS 3 0.9 o G Z. CK 33 F,- 9 (o cps F40M ko-\fz STVZM c4zaAre2 rvAo,' FVaS711�LN� UJ\CI�OVT LAJS\Wl $y QASS. State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B Hunt, Jr , Goiernor Wayne McDevitt, Secretary Division of Water Quality April 16, 1999 Mr Perry Davis P E Cape Fear Engineering 5040 New Centre Drive Suite D Wilmington, NC 28403 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No SW8 980502 Lumma Inn New Hanover County Dear Mr Davis The Wilmington Regional Office received a Stormwater Management Permit Application for Lumma Inn on February 8, 1999 A preliminary review of that information has determined that the application is not complete The following information is needed to continue the stormwater review The 10" HDPE line from DI-11 needs to be shown on the DB #8 detail as entering into the grated inlet side The detail currently does not show this line 2 Is one inlet per system sufficient to distribute the volume of the 1" runoff throughout the infiltration system without causing a bypass? 3 Please add the inverts for each of the cleanouts on the 6 ' lines, or if they are all the same, add it to the trench detail 4 Please provide the original supplement forms with original signatures We cannot accept copies 5 Drainage Basin 1 has been erroneously labelled as Drainage Basin 3 Please revise 127 Cardin it Dr Eat Wilmington North Carolina 28409 Telephone 910 395 3900 FAX 910 350 2004 An Equal Opportumt3 Affirmative Action Employer 50 % recycled/10 % post consumer paper Mr Davis April 16, 1999 Stormwater Project No SW8 980502 Please note that this request for additional information is in response to a preliminary review The requested information should be received by this Office prior to May 16, 1999, or the application will be returned as incomplete The return of a project will necessitate resubmtttal of all required items, including the application fee The Division is allowed 90 days from the receipt of a completed application to issue the permit The construction of any impervious surfaces associated with this project prior to receipt of the stormwater permit is considered a violation of NCGS 143-215 1 and is subject to enforcement action RSS/arl cc If you have any questions concerning this matter please feel free to call me at (910) 395-3900 Sincerely, (/` ,dwv Ms Linda Lewis Environmental Engineer S \WQS\STORMWAT\ADDINFO\980502 APR Linda Lewis Joel Tomaselli CAPE FEAR 4VEngineering, Inc. 3963 Market Street Wilmington NC 28403 (910) 772 9600 FAX (910) 772 9679 February 5, 1999 Linda Lewis NCDENR Water Quality 127 Cardinal Dnve Ext Wilmington, NC 28403 Re Lumina Inn SW8 980502 Dear Ms Lewis FEB 0 8 1999 On behalf of Lumina Station, LLC attached is the revised submittal for the above referenced project based on your comments dated January 8, 1999 The following is a detailed listing of the revisions The drainage basin boundaries have been delineated with the areas from each basin listed on the plan In addition, we have reduce the number of basins and infiltration trenches to a total of three We talked about this during your on -site meeting on January 12 2 Section III of the application has been revised per your instructions The site evaluation on January 12"' was conducted and the Regional Soil Scientist agreed with the soils investigation submitted 4 You will venfy that our statement regarding wetland is adequate 5 All buildings, parking, walks and trench widths have been dimensioned Additionally all trenches are a uniform depth of 18-inches 6 The spacing and sizing for all laterals in the infiltration trenches are noted 7 The plans have been revised to reflect a more efficient design of the entire drainage system We have also included separate details for each diversion box 8 The elevation of the diversion spillway wall has been noted on the appropnate diversion box detail The calculations as will as the application have been modified to show the actual impervious percentage for each drainage basin 10 The void ratio used in the revised calculations is now 40% Thank you for your assistance with this project If you have any questions or comments please contact our office Sincerely, Perry avis Cc Joel Tomaselli n 5TORM WATER MANAGEMENT DE5IGN REPORT - WOO LUMINA INN rN . MAy: LUMINA 5TATION, LLC / 900 EA5TWOOD ROAD WILMINCTON, NC 20403 256-0900 DECEMOER /998 205- l 0-96 CAPE FEAR Engineering, Inc. 3963 Market Street Wilmington N C 28403 E C E I V E FEB 08 1999 D Frio a ,w2g$0502 �2-Z3 qg CAR0, 1 �V FESSIp` y i SEAL ; 2U`63 _ —IL I Voice (910) 772 9600 GENERAL Lumina Station, LLC is proposes to construct a development called Lumina Inn Just south of existing Lumina Station The project consists of 4 G4 acres and will be considered high density The proposed improvements involve the installation of utilities, roadway, parking and buildings STORMWATER MANAGEMENT The Storm Water Management Plan will consist of underground infiltration trenches and pipes The site in located in the City of Wilmincgton's Phase- I annexation and will meet City requirements as well as State requirements regarding stormwater management The City requires that the runoff rate for the post -developed condition be no greater than the runoff rate for the existing or pre -developed condition for the 10-year storm events In addition, the State requires that the first I -inch of runoff from impervious surfaces must be contained and treated for water quality concerns The existing site consists of relatively large trees and slopes that range from 0 5% to 4% The soils consist of Kurbe sands and are well -drained fine sands A site investigation indicated that the seasonal high water table is at elevation 10 0 msl in the low area of the property and 5-ft (min) below the existing grades at all other areas of the property Hand auger borings were preformed across the site to verify the location of the water table The infiltration rates for this type soils are in excess of 5-inche5 per hour for the purposes of this report and calculations, 5-inche5 per hour is used for the infiltration rate This site is suited for infiltration swales See Appendix B for the soils report The proposed storm drainage improvements consist of 3- under6jround infiltration systems The bottoms of all infiltration systems are located at least 2-feet above the seasonal high water table This is the minimum separation allowed by the State storm water design regulations The infiltration systems are designed to infiltrate the 10-year storm and by-pass all other larger storm events by utilizing diversion basin The infiltration systems are also designed to have adequate capacity to store the first I -inch of runoff from impervious surfaces Design calculations are attached to this report Appendix A contains information and calculations for the infiltration systems and Underground [infiltration Trench Supplements Appendix B contains the soils investigation SEDIMENTATION AND EROSION CONTROL There is an approved StE plan for the site The plan will be resubmitted to New Hanover County for approval due to the change in land plan and stormwater management system APPENDIX A DESIGN CALCULATIONS UNDERGROUND INFILTRATION TRENCH SUPPLEMENT CALCULATIONS PROJECT CLIENT Lum113a- SUBJECT_ U420—z4f7o,)�1x:�> I1,�t-- IJTTZ45'D01P=-s � 1� DATE fZ�z3 �S PROJ NO 10 DESIGNED BY P4(-:-) CAPE FEAR Engineering, Inc. 3963 Market Street Wdmmgton NC 28403 CALCULATIONS PROJECT CLIENT SUBJECT _ul i PEP(PoI-14D I��I LT�TIoI� �, TE1 l DATE PROJ NO DESIGNED BY ■ I ' I I =,FP �Igt'll_' —T r--=-- I 1— eD -L- -- fi '4— , I I I � —fi T I I —I i I 1I II i—�—;-- 1 I 1 I CAPE FEAR Engineering, Inc. 3963 Market Street Wilmington N C 28403 F—OOTIdcr HER- to--fia smizn LUMINA INN 02/01/99 DRAINAGE BASIN-1 Wilmington, NC MASS INFLOW / STORAGE / AND EXFILTRATION FROM INFILTRATION SYSTEM-1 Procedure in Accordance With FHWA TA-80 218 Design Guide Lines Infiltration Rate cfs = K"A Drainage area (Ac)= 1 07 Pipe size (ft) = 1 Storm event = 10 Trench Width (ft) = 840 Length of pipe and trench= 114 Pipe area (ft2) = 08 Trench side height (ft) = 15 Stone area (ft2) = 128 2 A = Area of exfiltrahon = 0576 112 Stone voids 40% (ft2) = Sol K = Coeff of permeability = 4 0 E-03 cm/sec Available storage per ft = sag I = Hydraulic gradient = 100 Total Available Storage 5799 d = 126 cfs/trench Q/ = 85 gpd/ft2 INFLOW / EXFILTRATION / STORAGE RATINGS CHART TIME (min) ACCUMULATED MASS INFLOW (cubic feet EXFILTRATION VOLUME (cubic feet) STORAGE REQUIREMENTS (cubic feet) AVAILABLE STORAGE (cubic feet) STORAGE SURPLUS' (DEFICIT) (cubic feet) 2 15799 4 2 10 3641 2 99 2913 15 4 875 131 1 131 3 744 9 056 2056 20 5 15oB 4 371 9 1 25 6 717 1 885 4 83 967 30 7 431 431 265 2 5 169 630 40 8 3 016 5 574 225 282 60 10 242 4 524 5 718 9 82 80 11 393 6 032 361 5361 gg 438 120 12 263 7 540 540 4 1 077 120 955 12 955 9o48 3 907 1 893 14 432 13 572 572 859 859 940 4940 240 15 431 -18o96 (2 666) 99 8465 360 360 16 785 145 27 145 (10 360) 99 16 159 720 19 017 54 289 (35 272) 5 7W 41 072 1 "0 21 244 108 578 (87 335) 93 134 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 01 0 0 PIPESTOR 3�J TII Y-] 2/1/t1<1 CALCULATIONS PROJEC CLIENT SUBJECT __U4Pt3tzrr,-o,),J I1.(t%tL'fTr o t J 14rJ 1� DATE fzlz3(18 PROJ NO 2-IC) DESIGNED BY P4(� ' -- , I �4 --- =-• - j , I I ICp 1 , 1 —}— i ' r I-4�' ' I d;FCAPE FEAR Engineering, Inc. 3963 Market Street WlI-ington N C 28403 CALCULATIONS PROJECT CLIENT SUBJECT -U` r-E� jPod4r) I��ILT�TIoI� � TE1� DATE PROJ NO DESIGNED BY l1 r I 17 I�-T� L r 1 � I I 1 I - I l --I-� I I I _________���____��� I I ' I I r I I l l l I r 1 I I I I I I CAPE FEAR Engineering, Inc. 3963 Market Street IIllmington N C 28403 M.. 19ml 779—oann c.v 'n—% --- ---- PIPESTOR 3/3 vvoll oci Ole- l o -i tC 51v tu-1 LUMINA INN 02/05/99 DRAINAGE BASIN-2 Wilmington, NC MASS INFLOW / STORAGE / AND EXFILTRATION FROM INFILTRATION SYSTEM-2 Procedure In Accordance With FHWA TABO 218 Design Guide Lines uramage area (Hc)= 1 U3 Pipe size (it) = 0 Storm event = 10 Trench width (ft) = 420 Length of pipe and trench= 220 Pipe area (ft2) = 02 Trench side height (it) = 1 5 Stone area (ft2) = 628 A = Area of exflltration = 9240 ft2 Stone voids 40% (ft2) = 251 K = Coeff of permeability = 4 OE-03 cm/sec Available storage per ft = 253 1 = Hydraulic gradient = 100 Total Available Storage 5570 o/ = 121 cfs/trench INFLOW / EXFILTRATION / STORAGE RATINGS CHART TIME (min) ACCUMULATEu MASS INFLOW (cubic feet) EXFILTRATIUN VOLUME (cubic feet) STORAGE REQUIREMENTS (cubic feet) STORAGE (cubic feet) STORAGE SURPLUS (DEFICIT) (cubic feet) 011 646 2 10 3 527 726 2 800 55 2 770 15 4 723 1 091 3 632 5 MID 1938 20 5 697 1 455 4 242 1 328 25 6 509 1 819 4 690 880 30 7201 2 183 5 018 0 552 40 8 323 2 910 5 413 55762 157 60 9 924 4 365 5 558 0 12 80 11 040 5 820 5 219 0 351 100 11 882 7 276 4 607 g� 120 12 553 8 731 3 822 p 1 748 180 13 984 13 096 888 0 4 682 240 14 952 17 461 (2 510) 8 080 360 16 264 26 192 (9 928) 0 15 498 720 18 427 52 384 (33 958) 5570 1 39 528 1,440 20 584 104 769 (84 184) 89 754 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 0 Insy-2 2/5/99 CALCULATIONS PROJECT CLIENT LuM+IJ�� tiI SUBJECT oly l71 DATE L2-17-3 km PROJ NO 205-lo DESIGNED BY F�-"t I:> + I ( t15 b 11-L4 i— I I + =Ibv5 toa� -- � 0 10 S� I i- p-i�- Im ii j ' 4 _ Z —��Ij'ad�iDE1�_ Ll --t_— f- -.�—r 1 T�:�1 I e C{-z60 � lot I I T�f _ _ I I I I I I ! ; , 1 I 1—r-1•-�-H� + I I I I I 4-- �_- _ l j l i I l i—F_ - + CAPE FEAR Engineering, Inc. 3963 Market Street WI mington N C 28403 CALCULATIONS PROJECT CLIENT SUBJECT - F4 PE-?- } 2oLl4t:> If4rl CT�TIoI� ��TE� r ■ DATE PROJ NO DESIGNED BY CAPE FEAR Engineering, Inc. 3963 Market Street Wllmmgton NC 20403 TFi. lain\ PIPESTOR 3�3 LUMINA INN 02/05/99 DRAINAGE BASIN-3 Wilmington, NC MASS INFLOW / STORAGE / AND EXFILTRATION FROM INFILTRATION SYSTEM-3 Procedure in Accordance With FHWA TA-80 218 Design Guide Lines infiltration Rate Q cls = K'I'A Drainage area (Ac)= 1 15 Pipe size (ft) = 05 Storm event = 10 Trench width (it) = 840 Length of pipe and trench= 124 Pipe area (112) = 02 Trench side height (ft) = 15 Stone area (112) = 125 9 A = Area of ex0ltratlon = 10416 ft2 Stone voids 40% (ft2) = 503 K = Coefl of permeability = 4 OE-03 cm/sec Available storage per ft = 505 I = Hydraulic gradient = 100 Total Available Storage 6264 O/ = 137 cfs/trench d = 85 gpd/ft2 INFLOW / EXFILTRATION / STORAGE RATINGS CHART TIME (min) ACCUMULATED MASS INFLOW (cubic feet) EXFILTRATION VOLUME (cubic feet STORAGE REQUIREMENTS (cubic Feet) AVAILAWLE STORAGE (cubic feet) STORAGE SURPLUS (DEFICIT) (cubic feet) 4W32816016 83 6q q q 10 3 940 120 62641 3 144 15 5 276 045 6 2 219 20 6 363722 1 542 25 7 270 220 1 045 30 8042 582 64 682 40 9 297016 264 248 60 11 084163 264 101 80 12 330 6 561 5 769 64 495 100 13 271 8202 5 070 4 1 194 120 14 020 9 842 4 179 64 2 G86 180 15 619 14 763 856 6 264 5 408 240 16 700 19 684 (2 984) 6 2 9 248 360 18 165 29 526 (11 360) 62 17 624 740 20 051 (95 6 264 44 735 1 440 22 991 991 1 118 103 (95 112) 112) 1013 376 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U 0 Insy-3 2/5/99 Lumina J�n DIVISION OF WATER QUALITY INFILTRATION SYSTEM INVESTIGATION I 3 S 1 The mimmum bore depth �5 / (p I S - 13 -l35 Ae� j �2 4f Y 3-5 JZL-� 7-0 /4 C7U14-L 2 The type of soil )�Urel7 S�C�S I�U�¢{j `4 2Elmre--'n 4c7t),4L 3 The expected infiltration rate 5 F,--Mr-rev ,46 IDAL 4 The depth to the Seasonal High Water Table 10' FYSL 2 ANv W z><� cou/i/6-.ec( /v S'. 5 Additional comments N, � /a Q ¢ {P/min� eK Ccil C>l A�y)f Sure 11' Rll, I s n eed�✓ HZ/ce sine bofk 0-F I-re-,ch 17 in qhe Ko�-e Signature of Regional Office Personnel Linda Lewis, DWQ Vincent Lewis, Soil Scientist Permit Application No :S�U3 qL 502- Date /—/2— r I S \WQS\STORMWAT\FORMS\INFINVST FOR MOM �✓1(�i�?R�5 Ib (ZAnse Suyjm,i'fa� Suyye4CCL reloczh/y lahj ps55 PrP �y ('�01 n n ej- over O w la k� pz5/S �d yx-)f -the Fll, h) cap, b,,,,z_ troches t h eve 3 au-- o-F 1/7 F I h-zh c,-1 "A,-e25 ()-vm cI v ei 5+ u^ 1z;,7X ' State of North G^rolina Department of Environment and Natural Resources Wilmington Regional Office James B Hunt, Jr , Governor Wayne McDevitt, Secretary Division of Water Quality January 8, 1999 Mr Perry Davis, P E Cape Fear Engineering 3963 Market Street Wilmington, NC 28403 '�� ,51 " NCDENR NORTH GROLINA DEPARTMENT OF ENVIRONMENT AND NQ RAL RESOURCES Subject ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No SW8 980502 Lumma Inn New Hanover County Dear Mr Davis The Wilmington Regional Office received a Stormwater Management Permit Application for Lumma Inn on December 23, 1998 The submittal option has changed from a detention pond to underground infiltration trenches A preliminary review of that information has determined that the application is not complete The following information is needed to continue the stormwater review 1 Please provide a plan sheet that delineates the drainage area to each of the 7 trench systems, including buildings 2 Please complete Section III of the permit application for each of the 7 drainage areas I am unable to verify the calculations until this information is provided 3 I have scheduled a site evaluation with the Regional Soil Scientist for the morning of Tuesday, January 12 Please have the proposed trenches flagged 4 Delineate all wetlands on site, or note on the plans that none exist I am not sure if the statement you have provided, "To the best of our knowledge " is acceptable I will check on this and get back with you 5 Please dimension all buildings, parking, walks, and the trench widths The trench detail notes that the width varies, so you need to specify how wide the trench is on the plans Additionally, some trench depths are 30" Please specify which trenches are 18" and which are 30" 6 Please indicate the spacing pattern for the laterals off of the 12" N12 pipe Also, please indicate the diameter for the laterals 127 Cardinal Dr Ext , Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Mr Davis January 8, 1999 Stormwater Project No SW8 980502 7 The plans do not show where the 12" N12 pipe is to be laid, but the diversion box detail indicates that it is to be laid perpendicular to the 18" RCP oveflow pipe You need to indicate that for systems 1, 5, and 7, the 12" N12 pipe is laid underneath the 18" RCP although I am not sure how this can be achieved, since the inverts for the 18" and the 12" are so close, they would end up occupying the same space Please check Please indicate the elevation of the diversion spillway wall for each Diversion Box It appears that the calculations assume 90% impervious for each trench drainage area Please provide the actual percent impervious for each basm so that we can verify that none exceed the 90% assumed 10 Most stones used for infiltration trenches have a void ratio of 40% By using 50%, you are technically saying that more storage is available Please be aware that the State uses 40% voids to verify the design, unless Justification is provided to use the larger void ratio The Justification normally takes the form of a certified analysis of the proposed stone If Justification cannot be provided, please revise the calculations to reflect a void ratio of 40% Per my preliminary calculations, the trench volumes provided using a void ratio of 40% are still sufficient to meet the required volumes Please note that this request for additional information is in response to a preliminary review The requested information should be received by this Office prior to February 8, 1999, or the application will be returned as incomplete The return of a project will necessitate resubmittal of all required items, including the application fee The Division is allowed 90 days from the receipt of a completed application to issue the permit If you have any questions concerning this matter please feel free to call me at (910) 395-3900 Sincerely, 'ey� ddc 3 Ms Linda Lewis Environmental Engineer RSS/arl S \WQS\STORMWAT\ADDINFO\980502 JAN cc Linda Lewis Joel Tomaselli Central Files CAPE FEAR Engineering, Inc. 3963 Market Street Wilmington NC 28403 VP (910) 772 9600 FAX (910) 772 9679 7DEC,2 3 1998 December 23 1998O Linda Lewis NCDENR Water Quality 127 Cardinal Drive Ext Wilmington, NC 29403 Re Lumina Inn SW8 980502 Dear Ms Lewis On behalf of Lumma Station, LLC attached is the revised submittal for the above referenced project The land plan has been revised as well as the stormwater treatment system We spoke on the phone regarding this project on 12/18/98 Thank you for vour assistance with this project If you have anv questions or comments please contact our office Sincerely Perry G Da is Cc Joel Tomaselli Sep 23 '98 12 29 0 K 1 97635631 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B Hunt, Governor Date:To; Oh I l -Ir- CO: FAX #: (p3 5(031 REMARKS - Wayne McDevitt, Secretary FAX COVER SHEET No Of Pages: 3 From- b nc4 - C4� S CO: FAX#: - - F i 127 Cardinal Dnve Extension Wilmington N C 25405 384STeieppane (910) 39"900 Fax (910) 350 2004 An E4uat Oppnrtwnq AllirmaUve Action Emp10) Er t 9 x Ptpate o7ortiCarolina Department of Environment and Natural Resources Wilmington Regional Office James B Hunt, Jr, Governor Wayne McDevitt, Secretary Division of Water Quality September 23, 1998 Mr Phil Tripp, P E Tripp Engineering 507 Chestnut Street Wilmington, NC 28401 M • : , NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No SW8 980502 Lumina Inn New Hanover County Dear Mr Tripp The Wilmington Regional Office received previously requested information for the Stormwater Management Penult Application for Lumina Inn on July 21, 1998 A preliminary review of that information has determined that the application is not complete The following information is needed to continue the stormwater review 1 Comments 9 and 10 of my June 23, 1998, letter were not addressed in the resubmittal a The 3/4" orifice specified in for Pond 1 is too small The orifice size is based on the volume provided in the pond, not the minimum required Please recalculate the range of orifice sizes using the provided volume of 5,816 cubic feet b Please indicate compliance with the 3 1 L W ratio 2 Please provide 2 sets of revised plans Only one set was received on July 21, 1998 127 Cardinal Dr Ext Wilmington, North Carolina 28405 Telephone 910 395 3900 FAX 910 350 2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10°/ post consumer paper pppppp� Mr Tripp September 23, 1998 Stormwater Project No SW8 980502 Please note that this request for additional information is in response to a preliminary review The requested information should be received by this Office prior to October 23, 1998, or the application will be returned as incomplete The return of a project will necessitate resubmrttal of all required items, including the application fee If you have any questions concerning this matter please feel free to call me at (910) 395-3900 Sincerely, Ms Linda Lewis Environmental Engineer RSS/arl S \WQS\STORMWAT\ADDINFO\980502 SEP cc Linda Lewis Joel Thomaselli Central Files July 20, 1998 0 TRIPP ENGINEERING, P.C. 507 Chestnut Street Wilmington, North Carolina 28401 Phone (910) 763-5 100 • Fax (910)763-5631 NCDENR Division of Environmental Management Water Quality Section 127 Cardinal Drive Wilmington, NC 28405-3845 Attn Ms Linda Lewis Re Lumma Inn SW8 980502 New Hanover, NC TE 97133 Dear Linda you RECEIVES JUL 2 1 19M In response to your correspondence dated June 23, 1998, we offer the following 1 We have provided a Page No 4 2 Page 3 has been initialed 3 We have noted the 20% volume for forebays 4 We have provided dimensions requested 5 CI No 2 is connected to the collection system 6 Runoff from bridge will sheet flow to new site and be collected at CI No 1 and CI No 2 A structural plan or detail has not yet been supplied to us Once provided, if changes are needed we will act accordingly 7 Drainage areas have been delineated Please review for approval and contact us with questions or comments Thank Sincerely, Tripp Engineering, P C - 0 Charles D Caner, E I T CDC Iss Eric State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B Hunt, Jr, Governor Wayne McDevitt, Secretary Division of Water Quality June 23, 1998 Mr Phil Tripp, P E Tripp Engineering 507 Chestnut Street Wilmington, NC 28401 ®t, 0 0 NCDENR NORTH CJ ROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No SW8 980502 Lumina Inn New Hanover County Dear Mr Tripp The Wilmington Regional Office received a Stormwater Management Permit Application for Lumma Inn on May 1, 1998 A preliminary review of that information has determined that the application is not complete The following information is needed to continue the stormwater review 1 Page 4 of 4 of the application, while not requiring a signature, is a part of a complete application Please provide 2 Access to a pump qualifies as having an emergency dram for the pond Please initial the supplement form that a pump will be provided if draining the pond is needed 3 For future submittals, please note that the forebay volume is now interpreted as 20 % of the combined forebay and main basin volume 4 Provide building, sidewalk, and patio dimensions Also, dimension each side of the figure created by the permanent pool contour, including radii 5 CI-2 in the northwest corner of the parking area is not connected to the collection system 6 Please indicate how runoff will be collected on the traffic bridge Are there curbs along the sides to prevent runoff from entering the low area9 Does the section have a crown of any kind, or is it flat across9 Please detail, or provide the structural plan for the bridge, if this information is on it 7 Delineate the drainage area to each pond 127 Cardinal Dr Ext , Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Mr Tripp June 23, 1998 Stormwater Project No SW8 980502 8 Please delineate and label the normal pool contour in the forebay As before, the surface area and volume within the forebay is included to meet the m iniums required The inclusion of these items will increase your surface area and volume provided, which will affect the orifice size Please revise 9 The 3k " orifice specified for Pond 1 is too small for the increased volume Please revise 10 Please provide a 3 1 L W ratio in the pond 11 I am unable to duplicate the 3,403 square feet of surface area for Pond 2 Perhaps the addition of the dimensions will help solve this I can only get about 3,270 square feet Please note that tlus request for additional information is in response to a preliminary review The requested information should be received by this Office prior to July 23, 1998, or the application will be returned as incomplete The return of a project will necessitate resubmittal of all required items, including the application fee If you have any questions concerning this matter please feel free to call me at (910) 395-3900 Sincerely, / GfiGV P x/A'1 Ms Linda Lewis Environmental Engineer RSS/arl S \WQS\STORMWAT\ADDINFO\980502 JUN cc Linda Lewis Central Files 127 Cardinal Dr Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper TRIPP ENGINEERING, P.C. 0 507 Chestnut Street Wilmington, North Carolina 28401 Phone (910) 763-5100 • Fax (910) 763-5631 MAY 0 11998 May 1, 1998 NCDENR Division of Environmental Management Water Quality Section 127 Cardinal Drive Wilmington, NC 28405-3945 Attn Ms Linda Lewis Re Lumina Inn New Hanover County, NC TE No 97133 Dear Linda Enclosed please find two (2) sets of plans one (1) signed original and one (1) copy of the application form with narrative, two (2) wet detention supplements, one (1) maintenance agreement, two (2) sets of sealed calculations and one (1) check to cover the application fee Please review for approval and contact us with any questions or comments Thank you Sincerely, Tripp Engineering, P C 04 J�,ZZ Phillip G Tripp PGT/1 ss Enc Stormwater Narrative May 1, 1998 Re Lumina Inn New Hanover County TE 97133 The 4 64 acre site of Lumina Inn is cleared and is to be graded for the construction of a 24,710 sf office/hotel facility Also included is 50,145 sf of asphalt parking, access and unloading area, and 10,580 sf of concrete sidewalk The proposed bridge is included within the total asphalt square footage Runoff from this site will be routed to two 92) proposed detention ponds designed to detain the first one inch of runoff for 90% TSS removal IS - • 1 D E C E I V E MAY 011998 D D E M PROJ #