Loading...
HomeMy WebLinkAboutSW8980434_HISTORICAL FILE_20001108STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 °►gp�}3`i DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 0o I \ b $ YYYYMMDD Jtat( of North CM0111M Dc> miIntent of Cmuonmcnt and `Atuta] Resources NN dia—I Rcrlanal Office lame B hunt ll , GoALrnoi Bill Holm in, �(Clhtai\ Dn moll of Watu Qu MIN Novcmhcr S 2000 Mi humeth A hu 6man Altot nc\ m 1 let Ill ill I IC id Isl and I muted PO liov ,069 R Ild I Iced Isl and NC 2S461 1� NCDENR NOR1H CAROLINA DEBAR MENT OF ENVIRONMENT AND NATURAL REsou RCE5 Sublect Permit No SWS 9SO434M0D Ro\\ Boat Ro\\ Subdt\ ision Hlgh DenI;It) Subdlvlcion itommdtct Plolcct Brunw ick Count\ Dcu NI klikill I1 I hC A\ IlnIn-, loll Rcslonal Office ILIV( d d eomplcic Slot Ill vlatu N 111"Cnwnl Purnn Apphe Icon for the Mod lf e it of Rovv Roit Rovv Subdiv Ismn on OLtOhLI 2 2000 Stdff ICVICvv ofdIL plain Ind spLu(iCauons hav clCtumnlLd ihal the pu11LLt 14 plohosed vvIII comply with the Stommatei Repulauonc set forth m rule IAA NCAC 2H 1000 We nc fonv 11dln_ Punt No e\VS 9 d,,IMOD dated November S 2000 foi the Lonunucd eonstlucuon of the plolLct Rove Ro it Rovv Subdly Ision I his pu mlt sh III he effectIVL fian the d uc of issuanc,C untll Arid 7 2010 and shall be subject to thL condnlons and IunuauonsdsspcclfiLdthuLill PILIsCav specidlattcnuontothLOpcianon indMamtLndnccieqununcntill thispcnnit 1 adul c to establish an adequate 9v stem for operation and maintenance of the stornvvater lit magemCni systun will Icstllt Ill ftIMIL complldlILc plohlunq If u)\ parts icquuuncnts oI Itn)nauons Contautcd In this pcnnu me unaccCptdbIL Vou IWVC ihL HLIll to Icqucst an adludIG Ilory 11Lal in; upon vvI Men Icquest x+ithln them (30) dw s follow In; Iccclpt of this punnl I hls ILqucsl must he m if,- toi m of 1 vvntlul pcullon confonnine to Ch iptei I SOB of the North C.molm 1 Gcnelal Statutes and filCd With the OIfILL of Millinisu Itive IILum,s P O Dia"Li 27447 Ralcigh NC 27611-7447 Unless such dun uulti uc made this Punt sh ill hL final and bmcfin- If \ou ha\L m\ questions of need additional mfoimation conc.Lnung this Ill tttu please contact Scott Vinson of me ai (910) ;9� ;900 Sincere h r _, Rick Shtvcl WatLI Qudhty RC,umdl Supuvlcol RS / s iv S \WQS\S I ORMWA f\PI RMI 1 \9SO4>4 APR LL Pern D I\ is DLI mev Aycock Biunw el, Counh Inspectionv Scon Vinton \\ dnonion Rc_ion it OfficL Cum it file\ 127 ( irdni it I), 1 tit Wilntmr,ton North ( Irohn i 2840 \n I qu it Opportunm Vtfrmi LL Action I mplovu I dephnm 910 `19�, 3900 1 AA 911) 3�0 2004 5,O, rnnilLCIM/ pool umcunu.i pipet State Stonmwater Management Systems Permit No SW8 980434MOD S I A IF OF NORTII CAROLINA DFPAR I MFN7 OF FNVIRONMGN 1 AND NA I URAI RESOURCES DIVISION OF WA 1 FR QUALI 1 Y S I A I E STORM WA I LIZ MANAGEMFN7 PERMI I HIGH DFNSI 1 Y DEVEI OPMFN 1 In iccoidance with the piovrsions of Attiele 21 of Chaptei 143 Geneial Statutes of Noith Carolina as amended, and othu applicable I awS RUIC9 and Regulations PI RMISSION IS I I1-RCI3Y GRAN I LD 10 Bold Head Islam/Lumied Roil, Boat Roil, Subdrntston Bi unsuvtck Counly IOR IHh constiucUon operation and maintenance of one mfiltiatiom wench systum and thi c infiltiauon basins in comphancc with the pIovisions of 15A NCAC 211 1000 (hcicattcr icfei led to as the "slot nni a2t t ulcs ") and the appIovul st0I mwatu management plans and specifications and other suppoi ling data as attached and on file with and appiovc.d b) the Division of Water Qualit} and considcied a pail of this pumrt I his peumit shall be cffcctrvc from the date of issuance until Apid 7 2010 and shall be subject to the following specified conditions and limitations I DP SIGNS] ANDARDS [Ills permit is elrectivc only with iespCct to the natuic and volume of stoimwatei desuibed in the application and other supporting data 2 1 his stonmwatel system has been approved loi the management of stoumwatei iunoff as dc.su ibcd on pages 3 till u 6 of this pei mit the Piolcct Data Sheets I he subdn,ision is pcimitted foi 18 lots, sec I ahibit A for the, allowable built -upon circa for each lot and common aica 3 Appiovulplansandspccificationsfoithispiolectaieinempoiatedbyiefuenceandaiecnfoiccableputs of lhcpunmt State Stoimwatei Management Systems Permit No SW8980434MOD DIVISION OF WA 1 ER QUALI I V PRO IFC I' DA I A SIIFET PiolcLt Nam, Row Boat Row Subdivision, Dramagc Bain 91 Pcimit Numbu SW8 980434MOD I o,aUon Brunswick County Applicant Mi Kcnncth A Kii1mian, Attoincy in 1 act Mailing Addiess Bald I lead Island I imitcd PO Box 3069 Bald Ilead Island NC 28461 Application Dale OLtobet 2, 2000, Modification submitted Name of Receiving Sticam / Ind,v # Bald I lead Island Mauna / 18-88-8-5 Classification of Wat,r Body "SC" If Class SA, chloride sampling 1,wltS n/a DLvgn YO1 m1 1 Infilllation IienchDepth feet 250 DiamagL Aiea aucs 1 15 1 Dial I mpci vIous SUI faLC,, ft2 23,958 Offsite Atca enteimg I iLnch, ft2 1 tench Dimensions L It (13 huichcs 11-1 Ihia ll-l3) W It H It RLquuLd StoragL VOIUmL, Ft' I'iovid,d StoiagL VolumL, ft' I op of Stoiage hlevation I-MSI Controlling 01111" IypLof Soil/I;xpLLted Infiltration Rate S,asonal I ligh Watei '1 able I ime to Diaw Down none per I ngineu 11-1=375' 11-2=315' II-3=315',11-4=385', 11-5=385' 11-6thiull-13=31 5' 11-1 thru 1 1-13 = 2 5' 11-1 thiull-13=25' 2006 2,287 750 18" (� inlet grate overflow (invest 7 50 I-MSI ) Sand Newhann & I i ipp / 30 0 in,hks pet horn 2 0 I-MSL 1 0 hour 3 Statc Slotmwatcj Management S)stuns Permit No SW8 980434MOD DIVISION OI' PRO IEC 1 Ilioleet Name I'umit Numbu I ovation Applicant Mailing Address Application Date Name of Rceervmg '-III Will / Indc,x 4 Classification of Water Body If Class SA, chloride sampling tcu lts Dcsrgn Stone Infiltration Basin Depth, feet Bottom Flcvation, I-MSI Dramage Atca acres 1 olal Impervious Sur tacks, it' 011site Atca entering Basin, ft' Basin Diniemaons I \ W x 11, ft Ruluncd Storage VOIUm(,, ft' Provided Storage Volume W I op of Sloragc Clevation, I MY I ypc of Sorl Lxpccted Infilhatton Ratc Seasonal high Wale. IAIC I imc, to Draw Down WA I FR QUALI I Y DAIASIILEI Row Boat Row Subdivision, Dramagc Basin #2 SW8 980434MOD Brunswick County Mt Kenneth A Kukman Attotncy m I act Bald head Island LrnutCd PO Box 3069 Bald 1 lead Island NC 28461 Apt tl6 2000 Cape I cat Rive / 18-(87 5) "SA" n/a 1 5" 1 00 900 091 13 939 none per Lngtnecr 250' x 5 0' x 1 0' (bottom dimension',) 1,816 2 000 1000 Sand Newhdnn R I upp 20 0 niches pet hour 2 0 I-MSL I 0 hour 9 State Stoi mwatei Management Systems PumitNo SW8980434MOD DIVISION OR WAI ER QUALI I V PRO U"C 1 DATA S11I F 1 Piolcu Name Row Boat Row Subdivision, Drainage Basin#3 Peimit Numbei SW8 980434MOD Location Bumswi(,k Count% Applicant Mi Kenneth A Kukman Attoinc% in Fact Mailing Addicss Bald I lead Island Limited PO I3o\ 3069 Bald I lead Island NC 28461 Application Dat(, April 6 2000 Name of Receiving Sticam / Indcx # Cape I car Rivet / 18-(87 5) Classification of Watei Body "SA" If Class SA chlondc sampling icsults n/a Design Stonn 1 5" Infiltiatlon Basin Depth feet 1 00 Bottom 1-ovation, FMSI 700 Diamage Aica, aucs 070 1 otal Impci VIOus Sui facts, ih 13,939 Of kite Aica Cntumg Basin, It none, pci Lngmeu Basin Dimensions, I x W x 11, It 240' x 5 0' x 10' (bottom dmnensiom) Requnud StoiagC Volume ft' 1,759 Piovided StoiagC V01umc It' 1 920 I op orStoiage hlcvaUon FMSI 800 1 ype of Soil Sand Newhann & hi ipp I \pected Infiltiation Rat(, 20 0 m(,hcs pci hour Seasonal I Iigh Wate I able 2 0 FMSI I nnc to Di aw Down 1 0 hour 5 Statc Stoi mwatei Management Systenn Peimit No SW8 980434MOD DIVISION OF WATER QUALI I V PRO IECT DATA SIIFF 1 Piolect Name Row Boat Row Subdivision Drainage Basin 44 Pcimrt Numbu SW8 980434MOD I ocation Brunswick County Applicant Mi Kenneth A Kukman Attoincy m fact Mailing Addiess Bald I Ieac1 Island I imit(,d PO Box 3069 Bald Head Island, NC 28461 Application Date April 6 2000 Name of Receiving SUcam / IndCx # Cape Feat River / 18-(87 5) ClassIlication of Watu Bod) "SA" 11 Class SA, chloride sampling results ]I/,I DcSIgn Storin 1 5" InhlUatum Basin Depth feet 1 00 Bottom I levation, I'MSI 750 Dminagc Aiea aces 065 I otal Impuvious Sul faces ft, 9 583 Olfsite AILd entumg Basin, it' none, pet I nginccl Bw,in Dimensions, L x W x 11, It 160' x 5 0' x 1 0' (bottom dimensions) RequuCd StoIagc Volume ft' 1 255 Provided Storage Volume ft' 1 280 1 op of Storage I lLVahOn, I"MSl 850 1)pe of Soil Sand Newhann & Tripp I \pcCtcd In11111d11On Rdtc 20 0 inches per how Seasonal I IIgh Watt. I iblL 2 0 FMSI I ime to Draw Down 1 0 hour 6 State Stotmwater Managemuit Systems Permit No SW8980434MOD 11 SCIIFDULF OF COMPLIANCL No hOmLOvv'net/lot ownci/developct shall fill in altei, of pipe any diamagc featnte (such as swalcs) shown on the approved plans as pat t ofthc stoi mwateI Ina nagcinent systun without submitting a t LVISIOn to the peuntt and reLervmg approval fiom the Division 2 1 he pu nnttce is i esponsible foi veu fymg that the pt oposed built -upon ai ca does not eacced the allowable built -upon area OnCC the lot ltanslet Is complete thL built -upon aiLa may not be icvised mthout approval hom the Division of WatCI Quality, and iesponsibilrty fot mcLttng the built -upon nea limit is tianstuied to the individual ptopetty ownu 3 I he lollowmg items will Icqune a modification to the pei nit a Any ievision to lhC approved plans icgardless of stiL b PIoILLI name change L I i ansfci of owner ship d Redesign of addition to the approved amount of built -upon aica c 1 In filet subdivision of thepiolect area I filling in aItuing of piping of any vegetative c,onvcyancc, shown on the tpptoved plan 4 1 he Dn ectoi may delci nine that othct Icvtstons to the ptolCct should Iequue a modtftcation to the pei not 5 1 he Du ectot may notify the per mntcc when the per nutted site does not meet one of mot C of the minimum icquucmcnts of the pcunit Within the time hamc specified in the notice the pumittce shall submit a mitten time schedule to the Dueetor lot modtf)mg the site to meet minimum Icquuuncnts IhC pu m rltc c shall pt ovidc topics of revised plans and Lct n fication in wt tong to the Du cctot that the changes have bLCII made 6 1 he stonnwatci managenu,nt system shall be Lonstiucted in it's CntitLly vegetated and opuattonal lot its intended use prtoi to the eonstruUton of any built -upon sw face c\cept roads 7 During constiucuon etoston shall be Lcpt to a minimum and any cioded areas of the system will be ILpauLd Immediately 8 1 he pcinutux giants pumtsston to DCNR Staff to cntu the piopcity for the purposes of Inspecting the ploleLt for compliance with the Conditions of this peinit 9 Upon ComplCttom Ofconstt action, pt iot to issuance of Cctttficatc of Occupancy, and plot to opuation of this pci nrtted facility a cciblication must be Icccrvcd fiom an appropriate dcstgnct lot the system Installed Citifying that the punuttcd facility has been installCd In aCLotdanee with thn punul, thL approved plans and spcuttcaltons and other supporting documciriatron My deviations fiom the approved plans and spcuftCations must be nolLd on thL Cutifieation 10 DLCOrdtJVL spray lountams will not be allowLCl in the ,toimwatcr ttcatmuit syslLm 11 11 the ,tormwatLI system was used as an I roston Control devrcc it must be testotcd to dcstgn Condition pi lot to opciatton as a slonnwatu neatmcnt dcvlcL, and plot to oLutpancy of thL IaulIty 12 Pnol to transfer of owncishtp, the system must be inspCUcd by DWQ personnel, and determined to bL In compliance with all pcinnt conditions Recoids of mamtcnancc activities will be required 7 State Stoi nhwalet Management Systuns PCImit No SW8980434MOD 13 I he pci nuttec shall at all IImCA pi ovidc the opu atton and maintenance ncccssai y to asxm c the pet milted stormknateis)stern functionsatOptimum elficicncy IhcappiovedOpciationand Maintenance Plan Must bC follo"Ld in its entirety and maintenance must occur at the schcdulcd intervals including but not Imutcd to a Sumannual schcdulcd inspections (evciy 6 months) b Sediment Iemoval c Mowing and ieveget won of side slopcs d Immediate ICpan ofeioded aicas e MdlnlenduLc of vde ,lope- in accordance with approved plans and spccilications f Debus iemoval and unclogging of outlet sUuctute onfrce device and catch basins and piping g Access to the outlet suuctme must be availablC at all limes 14 Rccoids of maintenance actMuCe must be kept and made, available upon ICqucst to authorvcd pu sonnet of DWQ Hie tecoids will indicate the date, activity, name of person per foinung the work and what actions werC taken 15 Pr ror to the sale of any lot deed iestrictions must be hecotdcd which limit the built -upon aiea pu lot to the amount as shown on the Pi elect Data Shect per Section I Pait 2 1 he Iecor(led statcmcnts must follow the form a "I he mavumun built -upon died per lot rs, sec Lvhibit A I his allotted amount includes anv built - upon aica constiuctcd within the lot property boundaucs, and that portion of the tight -of -way between the front lot hnc and the edge of the pavement Built upon area includes but Is not lunrtcd to stn elutes asphalt, eoncrc L, gravCl, back stone, slate, and coquina but does not Include r msed, open wood decking, of the water sut face of swimming pools " b "The covenants pertunmg to stonnwater Icgulattons may not be changed of deleted without Concuh knee of the State " c "Altuation of the dtamage as shown on the approved plan may not take place without the concur Ience of the State " d "I ots within CAMA's Atea of Lnvuonmental Concern may be urbcct to a rcductron in then allowable built -upon area due to CAMA regulations " e "All nmoffon the lot must chain Into the permitted systems I his may be accomplrshcd through ptovtdtng roof dram guttus which dlatn to the stiect grading the lot to di on toward the street oh gtadtng pu anon swalcs and duceimg them Into the pond of sUcet Lots that nalutally drain Into the system arc not re(uucd to provide thcsC mcasuics 16 A Copy of the ICcorded dccd ICstt iUtons must be submitted to the Drvi aon within 30 d rys of the date of recotdrng the plat and pttot to selling lots I he recorded Cop) must beat the srgmdtute ofthC PCrnnttee the dCLd book number and page and stamp/srgnatute of the Regtstet of Dec& 17 1 his puma shall become voidable unless the facilities dIC COuStIULted In accordance with the Conditions Of this permit the apptovcd plans and speufiCauons, and other suppotthng data 18 A Copy of the approved plans and speafrLtrons shall be matntamcd on file by the PCImIttLC lot a muhnnum Often yedrs fiom the date of the Completion of consU uctton R State ';tot rnwater Management Systems Permit No SW8 980434MOD III GRNF RAI, CONDI 1 IONS I his pemit is not tiansfctablc in the cvutt thciLis a dcsuc lot the idulItICs to change ownuship of thcie is a name, change of the PCII111ttcL, a "Name/Owneiship Change horn" must be submitle.d to the Division of Watu Quality accompanied by apptopuate documentation from the panics involved such as a copy of the deed of LtuSL Other supporting mates ials, such as a signed Operation and Maintenance plan in the case of engineered s)stcros will also be icquncd I he ptolect must be in good standing with DWQ I he approval of this tequcst will be consideied on its mciits and mad or may not be approved I ailuie to abide by the conditions and limitations contained In this punt may subu,t the PCimlltCC to eniotcement action by the, Division of Watci Quality, in aecotdanec with Noith Carolina Gu7ual Statute 143-215 6A to 143-215 6C I he issuance of this punt does not preclude the PCIIII it LL fiom complying with any and all statutes rules regulations or oidinances which may be imposed b) othu govunment agencies (local state and lederal) which have lunsdtcthon In the event that the faulities fail to pet form satisfactonly including the ueation ofnuisancC conditions the Per puttee shall tale immediate cos rec,tivc action, including those as may be i cquned by this Division such as the conslructton ofadditional or icpla(,uncnt stonnwatu management systurns Hie permit may be modified ievokcd and rcissucd of ternunatcd tot cause 1 he filing of a request for a peuntt modification icvoeatron and ]Cissuanee of teunmation does not stay an) pcinnt condition Pcimittee grants pet mission to staff of lhc, DWQ to access the propet tv lot the purposes of ntspccting the stonnwater facilities dining normal butitn(AS horns I he pet nnttce shall notify the Division of any mailing addtcss changes within 30 days Pu mit issued this the 8th day of Novembc.i, 2000 NOR I I I CAROI INA 1 NVIRONMEN I AI MANAGI-MI N I COMMISSION AA, A ✓I o Ken `l Stevens, Duector Division of Water Quality By Authority of the 1 nvuonmental Man rgunurl Conunrssron Pet nut Numhu SW8 980434MOD OFFICE USE ONLY tal z D -n = J(. x- . 9 /J S23 1116D t State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may he photocopied for use as an original I GENERAL INFORMATION 1 Applicant's name (specify the name of the corporation, individual, etc who owns the project) Bald Head Island Limited 2 Print Owner/Signing Official s name and title (person legally responsible for facility and compliance) Kenneth M Kirkman Attorney in Fact 3 Mailing Address for person listed in item 2 above P O Box 3069 City Bald Head Island State NC Zip 28461 Telephone Number (910) 457-7000 4 Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements etc ) Row Boat Row Subdivision 5 Location of Project (street address) Row Boat Row City Bald Head Island 6 Directions to project (from nearest major intersection) Take the ferry from Indueo Plantation Marina located in County Brunswick NC G, 7 Latitude 33052 25Longitude 78000 10" 8 Contact person who can answer questions about the project Name Ken Stewart Telephone Number I1 PERMIT INFORMATION 1 Specify whether project is (check one) New Renewal U of project 1457-7326 X Modification Form SWU 101 Version 3 99 Pagel of 4 2 If this application is being submitted as the result of a renewal or modification to an existing permit, list the Existing permit number SW8 980434 Modification And its issue date (if known) April 7, 2000 3 Specify the type of project (check one) Low Density X High Density Redevelop General Permit Other 4 Additional Project Requirements (check applicable blanks) X CAMA Major X Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623 6748 III PROJECT INFORMATION 1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project This project implements stormwater control systems for a high density development consisting of infiltration swales _and underground infiltration trenches The swales and trenches will be located in recorded drainage easements 2 Stormwater runoff from this project drams to the Cape Fear 3 Total Project Area 49 acres 4 Project Built Upon Area 5 How many drainage basins does the project have? 6 River basin 28 8 % 6 Complete the following information for each drainage area If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Bald Head Island Marina Cape Fear River Receiving Stream Class SC SA Drainage Area 1 15 acres 0 91 acres Existing Impervious* Area 0 0 Proposed Impervious* Area 0 55 acres 0 32 acres % Impervious* Area total 47 8% 35 2% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On site Buildings 0 37 acres 0 23 acres On -site Streets 0 14 acres 0 07 acres On -site Parking 0 0 On -site Sidewalks 0 03 acres 0 02 acres Other on -site 0 01 acres(Amenity Area 0 Off site 0 0 Total 0 55 acres Total 0 32 acres * Impervious area is defined as the built upon area including but not limited to buildings toads parking areas suleivalks gravel areas etc Form SWU 101 Version 3 99 Page 2 of 4 6 Complete the following information for each drainage basin If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below Basin Information Drainage Basin 3 Drainage Basin 4 Receiving Stream Name Cape Fear River Cape Fear River Receiving Stream Class SA SA Drainage Basin Area 0 70 acres 0 65 acres Existing Impervious* Area 0 0 Proposed Impervious* Area 0 32 acres 0 22 acres % Impervious* Area total 45 7 % 33 8 % Impervious* Surface Area Drainage Basin 3 Drainage Basin 4 On site Buildings 0 23 acres 0 17 acres On site Streets 0 07 acres 0 04 acres On site Parking 0 0 On site Sidewalks 0 02 acres 0 01 acres Other on -site 0 0 Off site 0 0 Total 0 32 acres E= 0 22 acres Basin Information Drainage Basin 5 Drainage Basin 6 Receiving Stream Name Cape Fear River Cape Fear River Receiving Stream Class SA SC Drainage Basin Area 122 acres 0 27 acres Existing Impervious* Area 0 0 Proposed Impervious* Area 0 0 % Impervious* Area total 0 0 Impervious* Surface Area Drainage Basin 5 Drainage Basin 6 On site Buildings 0 0 On -site Streets 0 0 On site Parking 0 0 On -site Sidewalks 0 0 Other on site 0 0 Off site 0 0 Total E= 0 E= 0 7 How was the off -site impervious area listed above derrved9 No offsite area IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment 1 The following covenants are intended to ensure ongoing compliance with state stormwater management permit number SW8 980434 as issued by the Division of Water Quality These covenants may not be changed or deleted without the consent of the State 2 No more than _** square feet of any lot shall be covered by structures or impervious materials Impervious materials include asphalt gravel concrete brick stone slate or similar material but do not include wood decking or the water surface ofswimming pools 3 Swales shall not be filled in piped or altered except as necessary to provide driveway crossings 4 Built upon area in excess area of the permitted amount requires a state stormwater management permit modification prior to construction 5 All permitted runofffrom outparcels or future development shall be directed into the permuted stormwater control system These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permuted * *See attached Exhibit A By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land , that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot V SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU 106 Off -Site System Supplement Form SWU 107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3 99 Page 3 of VI SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items listed below The complete application package should be submitted to the appropriate DWQ Regional Office Please indicate that you have provided the following required information by initialing in the space provided next to each item Initials • Original and one copy of the Stormwater Management Permit Application Form S� • One copy of the applicable Supplement Form(s) for each BMP 34P • Permit application processing fee of $420 (payable to NCDENR) �6P • Detailed narrative description of stormwater treatment /management 3�C� • Two copies of plans and specifications, including S�3P -Development/Project name -Engmeer and firm -Legend -North Arrow -Scale -Revision number & date -Mean high water line -Dimensioned property / project boundary -Location map with named streets or NCSR numbers -Original contours, proposed contours, spot elevations, finished floor elevations -Details of roads, drainage features, collection systems, and stormwater control measures -Wetlands delineated, or a note on plans that none exist -Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations -Drainage areas delineated -Vegetated buffers (where required) VII AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section Designated agent (individual or firm) Cape Fear Engineering Mailing Address 5040 New Centre Drive, Suite D City Wilmington State Phone (910)790-8584 Fax (910)790-8583 VIII APPLICANT'S CERTIFICATION Zip 28403 I, (print or type name ofperson listed in General Information item 2) Kenneth M Kirkman, Atty inFact certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H 1000 , Signature Date q/I Form SWU 101 Version 3 99 Page 4 of 4 DO-11B/T A TABLE OF LOT S/ZES AND BU/L T UPON AREAS FOR ROW BOAT ROW5U522/1//5/0N BALD HEAD /SLAM/? LOT # LOT AREA (ACRE) ALLOWABLE BUILT UPON AREA (SO FT ) 200 0 12 2500 202 0 14 2500 204 014 2500 20G 010 2500 207 011 2500 208 0 10 2500 209 0 II 2500 210 0 II 2500 211 0 II 2500 212 012 2500 213 011 2500 214 0 12 2500 215 0 11 2500 216 0 13 2500 217 011 2500 218 014 2500 219 015 1000 220 0 17 2500 common area 0 14 500 TOTAL 44,000 Cape Fear Engineering Revised 09/15/00 File lot sizes and built upon areas doc Permit No SGJF i10 y3H 1hvo (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM UNDERGROUND INFILTRATION TRENCH SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an underground infiltration trench supplement for each system, design calculations, and plans and specifications showing all stormwater conveyances and system details I PROJECT INFORMATION Project Name Contact Person Row Boat Row Subdivision Ken Stewart Phone Number (910) 457-7326 For projects with multiple infiltration systems, a supplement form must be completed for each system This worksheet applies to Trench IT-1 in Drainage Area #1 (SC waters) (from plans) (from Form SWU-101) II DESIGN INFOMATION (attach supporting calculations/documentation) Sods Report Summary (based upon an actual field investigation and soil borings) Soil Type Infiltration Rate SHWT Elevation Trench Design Parameters Newhan&Fnpp 30 Z i>7Ft or cMulsf (circle appropriate units) finsl (Seasonal High Water Table elevation) Design Volume 184 c f Design Storm 10 inch event (1 5 inch event for SA waters I inch event for others) Drawdown Time 002 days Perforated Pipe Size �O--inch diameter Perforated Pipe Length 37 5 11 No Observation Wells o (may be required on a case by case basis) Stone Type (if used) N/A Stone Void Ratio N/A Trench Elevations (in feet mean sea level) Bottom Elevation 40 fmsl Storage/Overflow Elevation 7 5 fins] Trench Dimensions Height Width FomSWU 107 Rev 399 25 ft ft Page I of 4 Length 375 ft Volume Provided 184 cu ft III REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N C Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Applicants Initials �32 a System is located 50 feet from class SA waters and 30 feet from other surface waters 7SSS (' b System is located at least 100 feet from water supply wells ­Z� 7?� c Bottom of system is at least 2 feet above the seasonal high water table d Bottom of the system is 3 feet above any bedrock or impervious soil horizon STSP e Off-line system, runoff in excess of the design volume bypasses the system (bypass detail provided) S1P f System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days based upon infiltration through the bottom only (a hydrogeologic evaluation may be required) _t\3Q g Soils have a minimum hydraulic conductivity of 0 52 inches per hour h System is not sited on or in fill material or DWQ approval has been obtained S13 P 1 Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized S� P I System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage S TICS k System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way 313P I System captures and infiltrates the runoff from the first 10 inch of rainfall (1 5 inch event for areas draining to SA waters) I3P m Drainage area for the device is less than 5 acres Q n A pretreatment device (filter strip, grassed swale, sediment trap, etc) is provided QP o Trench bottom is covered with a layer of clean sand to an average depth of 4 inches 373P p Sides of the infiltration trench are lined with geotextile fabric q Rock used is free of fines (washed stone) and has a large void ratio S Q�' r Side to bottom area ratio is less than 4 1 Form S W U 107 Rev 3 99 Page 2 of 4 s Observation well(s) are provided (case -by -case basis) t *Vegetated filter is provided for overflow (50 feet for SA waters, 30 feet for other waters)and detail is shown on plans SQ uA benchmark for checking sediment accumulation is provided yc T� 5E,r PR.SE[-r /vARR AT1 1-6- IV UNDERGROUND INFILTRATION TRENCH OPERATION AND MAINTENANCE AGREEMENT After every runoff producing rainfall event and at least monthly inspect the bypass/overflow structure for blockage and deterioration and the infiltration system for erosion, trash accumulation, grass cover, and general condition Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash and blockages as needed to maintain system performance Remove accumulated sediment annually or when depth is reduced to 75% of the original design depth Restore depth to original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed The water level in any monitoring wells will be recorded after a 1 inch rainfall event and at least once a month Chronic high water table elevations (within 1 foot of the bottom of the system for a period of three months) shall be reported to DWQ immediately If DWQ determines that the system is failing, the system will immediately be repaired or replaced to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed Remove accumulated sediment from the infiltration system annually or when depth in the unit is reduced to 75% of the original design depth The system shall be restored to the original design depth without over - excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i e stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the infiltration system The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the depth at the benchmark reads 4 625 msl , the accumulated sediment shall be removed from the system Form SWU 107 Rev 3 99 Page 3 of 4 ME I acknowledge and agree by my signature below that I am responsible maintaining the stormwater collection system in accordance with the six maintenance procedures listed above I agree to notify of any problems with the system or prior to any changes to the system or responsible party Print Name and Title Kenneth M Kirkman, Attorney in Fact Address Phone Signature P O Box 3067, Bald Head Island, NC 28461 (910)457-7000 Date Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I — ,a Notary Public for the State of Y14*) la ny✓<. %4- County of I r do hereby certify that Kenn a1 h m . �, r 12 rn n %j personally appeared before me this �& day of �,�.�,, a0 0 0 and acknowledge the due execution of the foregoing infiltration basm maintenance requirements Witness my hand and official seal, Gik�" OFFICIALSEAL Notary Public Nwth Caiobns COUNTY OF BRUNSWICK B.J. OORMAN MY Commission Expltes SEAL My commission expires 3kD Form SWU 107 Rev 3 99 Page 4 of 4 Permit No Sw8 � �o�3yrrloa (to be provtdcd by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM UNDERGROUND INFILTRATION TRENCH SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an underground infiltration trench supplement for each system, design calculations, and plans and specifications showing all stormwater conveyances and system details PROJECT INFORMATION Project Name Contact Person Row Boat Row Subdivision Ken Stewart Phone Number (910) 457-7326 For projects with multiple infiltration systems, a supplement form must be completed for each system This worksheet applies to Trench IT-2, 1T-3, IT-6 thru IT-13 in Drainage Area #1 (SC waters) (from plans) (from Form SWU-101) II DESIGN INFOMATION (attach supporting calculations/documentation) Soils Report Summary (based upon an actual field investigation and soil borings) Soil Type Newhan&Fnpp Infiltration Rate 30 © or cf/hr/sf (circle appropriate units) SHWT Elevation 20 fmsl (Seasonal High Water Table elevation) Trench Design Parameters Design Volume 154 c f Design Storm 10 inch event (1 5 inch event for SA waters I inch event for others) Drawdown Time 0 02 days Perforated Pipe Sizeinchdiameter Perforated Pipe Length 31 5 ft No Observation Wells 0 (may be required on a case by case basis) Stone Type (if used) N/A Stone Void Ratio N/A Trench Elevations (in feet mean sea level) Bottom Elevation 40 fmsl Storage/Overflow Elevation 7 5 fmsl Trench Dimensions Height 25 ft Length 31 5 $ Width 25 ft Volume Provided 154 cu ft Forth SWU 107 Rev 3 99 Page 1 of 4 III REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N C Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Applicants Initials P a System is located 50 feet from class SA waters and 30 feet from other surface waters -TB O b System is located at least 100 feet from water supply wells c Bottom of system is at least 2 feet above the seasonal high water table SQP d Bottom of the system is 3 feet above any bedrock or impervious soil honzon SCi P e Off-line system, runoff in excess of the design volume bypasses the system (bypass detail provided) P f System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days based upon infiltration through the bottom only (a hydrogeologic evaluation may be required) SC3 P g Soils have a minimum hydraulic conductivity of 0 52 inches per hour S 6I' h System is not sited on or in fill material or DWQ approval has been obtained j T3 P i Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized S�3P j System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage SC33P k System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way QP 1 System captures and infiltrates the runoff from the first 1 0 inch of rainfall (1 5 inch event for areas draining to SA waters) �C3P in Drainage area for the device is less than 5 acres —SQL A pretreatment device (filter strip, grassed Swale, sediment trap, etc ) is provided n D P o Trench bottom is covered with a layer of clean sand to an average depth of 4 inches -YP p Sides of the infiltration trench are lined with geotextile fabric TVtp q Rock used is free of fines (washed stone) and has a large void ratio Sl3P r Side to bottom area ratio is less than 4 1 Forth SWU 107 Rev 3 99 Page 2 of 4 3 s Observation well(s) are provided (case -by -case basis) J QP t *-Vegetated filter is provided for overflow (50 feet for SA waters, 30 feet for other _ waters)and detail is shown on plans u A benchmark for checking sediment accumulation is provided SEE v-itc3Ecr /1�RaaA'rivE IV UNDERGROUND INFILTRATION TRENCH OPERATION AND MAINTENANCE AGREEMENT 1 After every runoff producing rainfall event and at least monthly inspect the bypass/overflow structure for blockage and deterioration and the infiltration system for erosion, trash accumulation, grass cover, and general condition 2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash and blockages as needed to maintain system performance 3 Remove accumulated sediment annually or when depth is reduced to 75% of the original design depth Restore depth to original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed 4 The water level in any monitoring wells will be recorded after a 1 inch rainfall event and at least once a month Chronic high water table elevations (within I foot of the bottom of the system for a period of three months) shall be reported to DWQ immediately 5 If DWQ determines that the system is failing, the system will immediately be repaired or replaced to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed 6 Remove accumulated sediment from the infiltration system annually or when depth in the unit is reduced to 75% of the original design depth The system shall be restored to the original design depth without over - excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i e stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the infiltration system The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the depth at the benchmark reads 4 625 msl , the accumulated sediment shall be removed from the system Form SWU 107 Rev 3 99 Page 3 of 4 DWQ I acknowledge and agree by my signature below that I am responsible maintaining the stormwater collection system in accordance with the six maintenance procedures listed above I agree to notify of any problems with the system or prior to any changes to the system or responsible party Print Name and Title Kenneth M Kirkman, Attorney in Fact Address Phone Signature P O Box 3067, Bald Head Island, NC 28461 (910)457-7000 Date 9, Note The legally responsible parry should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I, t ,a Notary Public for the State of '7?OA tAn.4e+n� County of�me do hereby certify that 94LQ ' A C-7 A M , PXM An personally appeared Q'^ day of a0 O 6 and acknowledge the due execution of the foregoing infiltration basin maintenance requirements Witness my hand and official seal, ^ O AL Notary Public NeM Carol' W COUNTY OF BRUNSWICK `— B.J GORMAN My Commisslon Expiia9 SEAL My commission expires Form SWU 107 Rev 3 99 Page 4 of 4 Permit No Jiff 5XO113y /i7010 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM UNDERGROUND INFILTRATION TRENCH SUPPLEMENT Thu form may be photocopied for use as an original DWQ Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an underground infiltration trench supplement for each system, design calculations, and plans and specifications showing all stormwater conveyances and system details I PROJECT INFORMATION Project Name Contact Person Row Boat Row Subdivision Ken Stewart Phone Number (910) 457-7326 For projects with multiple infiltration systems, a supplement form must be completed for each system This worksheet applies to Trench IT-4, IT-5 in Drainage Area #1 (SC waters) (from plans) (from Form SWU-101) II DESIGN INFOMATION (attach supporting calculations/documentation) Soils Report Summary (based upon an actual field investigation and soil borings) Soil Type Newhan&Fripp Infiltration Rate 30 m or cf/hr/sf (circle appropriate units) SHWT Elevation 20 fins] (Seasonal High Water Table elevation) Trench Design Parameters Design Volume 189 c f Design Storm 10 inch event (1 5 inch event for SA waters 1 inch event for others) Drawdown Time 002 days Perforated Pipe Size fit— inch diameter Perforated Pipe Length 38 5 ft No Observation Wells 0 (may be required on a case by case basis) Stone Type (if used) N/A Stone Void Ratio N/A Trench Elevations (in feet mean sea level) Bottom Elevation 40 fmsl Storage/Overflow Elevation 75 fmsl Trench Dimensions Height 2 5 ft Length 38 5 ft Width 25 ft Volume Provided 189 cu ft Form SWU 107 Rev 3 99 Page I of 4 III REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N C Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Applicants Initials J6P a System is located 50 feet from class SA waters and 30 feet from other surface waters 3\3P b System is located at least 100 feet from water supply wells c Bottom of system is at least 2 feet above the seasonal high water table QP d Bottom of the system is 3 feet above any bedrock or impervious soil horizon 7S5 3 P e Off -]me system, runoff in excess of the design volume bypasses the system (bypass detail provided) f System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days based upon infiltration through the bottom only (a hydrogeologic evaluation may be required) ti N3 p g Soils have a minimum hydraulic conductivity of 0 52 inches per hour S1 E' h System is not sited on or in fill material or DWQ approval has been obtained =`3 i Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized STSP I System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage QP k System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way SBA 1 System captures and infiltrates the runoff from the first 10 inch of rainfall (1 5 inch event for areas draining to SA waters) SQ P in Drainage area for the device is less than 5 acres 3Q1? n A pretreatment device (filter strip, grassed swale, sediment trap, etc ) is provided _AMP o Trench bottom is covered with a layer of clean sand to an average depth of 4 inches S SP p Sides of the infiltration trench are lined with geotextile fabric -SS9 q Rock used is free of fines (washed stone) and has a large void ratio SQP r Side to bottom area ratio is less than 4 1 Form SWU 107 Rev 3 99 Page 2 of 4 �p s Observation well(s) are provided (case -by -case basis) 5I3P t A('degetated filter 1s provided for overflow (50 feet for SA waters, 30 feet for other waters)and detail is shown on plans u A benchmark for checking sediment accumulation is provided .SoF PRosecr IV' kAR.ari✓E IV UNDERGROUND INFILTRATION TRENCH OPERATION AND MAINTENANCE AGREEMENT After every runoff producing rainfall event and at least monthly inspect the bypass/overflow structure for blockage and deterioration and the infiltration system for erosion, trash accumulation, grass cover, and general condition Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash and blockages as needed to maintain system performance Remove accumulated sediment annually or when depth is reduced to 75% of the original design depth Restore depth to original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed 4 The water level in any monitoring wells will be recorded after a 1 inch rainfall event and at least once a month Chronic high water table elevations (within 1 foot of the bottom of the system for a period of three months) shall be reported to DWQ immediately If DWQ determines that the system is failing, the system will immediately be repaired or replaced to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed Remove accumulated sediment from the infiltration system annually or when depth in the unit is reduced to 75% of the original design depth The system shall be restored to the original design depth without over - excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i e stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the infiltration system The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the depth at the benchmark reads 4 625 ms1_, the accumulated sediment shall be removed from the system Form SWU 107 Rev 3 99 Page 3 of 4 DWQ I acknowledge and agree by my signature below that I am responsible maintaining the stormwater collection system in accordance with the six maintenance procedures listed above I agree to notify of any problems with the system or prior to any changes to the system or responsible party Print Name and Title Kenneth M Kirkman, Attorney in Fact Address Phone Signature P O Box 3067 Bald Head Island, NC 28461 (910) 457 7000 Date Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I _ ,a Notary Public for the State of 7 [.:piLOxt. County of do hereby certify that Ken A aTA / , e" r ..r n A personally appeared before me this/sAl- day of oZ O O 0 ,and acknowledge the due execution of the foregoing infiltration basin maintenance requirements Witness my hand and official seal, 0 OFFrlAL SEAL Notary PubIc North Cerdlna COUT't NOF 8RUNSNflCK B J GORMAN My Gpmmtlyg 0n ExP485 SEAL My commission expires 311410 Form 8 W U 107 Rev 3 99 Page 4 of 4 Permit No go �3y (to be provided by DWQJ State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes a stonmwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details I PROJECT INFORMATION Project Name Row Boat Row Subdivision Contact Person Ken Stewart Phone Number (910) 457-7326 This worksheet applies to Basin No SW-2 in Drainage Area #2(SA waters) (as identified on plans) (from Form SWU 101) II DESIGN INFOMATION — Attach supporting calculations/documentation The soils report must be based upon actual field investigation and soil bonngs County soil maps are not an acceptable source of soils information All elevations shall be in feet mean sea level (frisl) Soils Report Summary Soil Type Newhan&Fripp Infiltration Rate 30 m or cf/hr/sf (circle appropriate units) SHWT Elevation 20 fmsl (Seasonal High Water Table elevation) Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation 15 inch 1816 c f 003 days 250 ft x 50 2000 c f 90 fmsl 100 fmsl 100 fmsl (1 5 inch event for SA waters I inch event for others) ft — 1250 sq ft (bottom dimensions) Form SWU 103 Rev 3 99 Page I of 3 III REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the f ollowing design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Applicants Initials -SUP a System is located 50 feet from class SA waters and 30 feet from other surface waters _333P b System is located at least 100 feet from water supply wells VIP c Bottom of system is at least 2 feet above the seasonal high water table -SQP d Bottom of the system is 3 feet above any bedrock of impervious soil horizon SQP e System is not sited on or in fill material or DWQ approval has been obtained s�3P f System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way —SQP g Drainage area for the device is less than 5 acres Ji3 P h Soils have a minimum hydraulic conductivity of 0 52 inches per hour and soils report is attached Q P i System captures and infiltrates the runoff from the first 10 inch of rainfall (1 5 inch event for areas draining to SA waters) Design volume and infiltration calculations attached 'S�3P System is sized to take into account the runoff at the ultimate built -out potential from all I surfaces draining to the system, including any off -site drainage Calculations attached "SQP k All side slopes stabilized with vegetated cover are no steeper than 3 1 (H V) S QP 1 A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided SC3P in Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided J 13 P n Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters) "S(3P o Flow distribution mechanism within the basin provided -S\IP p A benchmark is provided to determine the sediment accumulation in the pretreatment device -7:s"Q(' q *tRunoff in excess of the design volume bypasses off-line systems (bypass detail provided) SIIlF r System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days A soils report and all pertinent draw - down calculations are attached _aP i Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized ((� � SES 1—RoSKr /✓�iR kATi✓t Form SWU 103 Rev 3 99 Page 2 of 3 IV INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1 After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition 2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration Remove any blockage and repair the structure to approved design specifications 4 Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth The system shall be restored to the original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i e stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the pretreatment unit The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken The measunng device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the design depth reads _0 25_ feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin If the Division determines that they system is failing, the system will immediately be repaired to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Print Name and Title Kenneth M Address Phone 1 Signature P O Box 3069, Bald Head Island, NC 28461 10) 457- in Fact Date Note The legally responsible party s'houTd not be a homeowners association unless more than 50% of the lots have been sold and a resident o the subdivisdion has been named the president /1 a Notary Public for the State of ��M 49w101s.., , County of K] do hereby certify that ke nn cY is m , KZ r K m O N personally appeared before me this day of y iand and .,,_ woe and acknowledge the due ecution of the foregoing infiltration basin maintenance requirements Witness rn hand and official seal OfflCi4l SEAL / SEAL Notary Puhlic Norm CaroP�O 3 /O 0 3 exirm of enuNswicx My commision expires �_.� B J GORMAN My Commfasion Enplres Form SWU 103 Rev 3 99 Page 3 of 3 Permit No 50r'! 5%4 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details I PROJECT INFORMATION Project Name Row Boat Row Subdivision Contact Person Ken Stewart Phone Number (910) 457-7326 This worksheet applies to Basin No SW-3 in Drainage Area #3(SA waters) (as identified on plans) (from Form SWU-101) Il DESIGN INFOMATION —Attach supporting calculations/documentation The soils report must be based upon actual field investigation and soil bonngs County soil maps are not an acceptable source of soils information All elevations shall be in feet mean sea level (fmsl) Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Newhan&Fnpp 30 20 © or cf/hr/sf (circle appropriate units) fmsl (Seasonal High Water Table elevation) 15 inch 1759 c f 003 days 240 ft x 50 1920 c f 70 fins] 80 fmsl 80 fmsl (1 S inch event for SA waters I inch event for others) ft = 1200 sq ft (bottom dimensions) Form SWU 103 Rev 3 99 Page I of 3 III REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the f ollowing design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Applicants Initials SBP a System is located 50 feet from class SA waters and 30 feet from other surface waters b System is located at least 100 feet from water supply wells gP c Bottom of system is at least 2 feet above the seasonal high water table -SQF d Bottom of the system is 3 feet above any bedrock of impervious soil horizon -SC3P e System is not sited on or in fill material or DWQ approval has been obtained SQP f System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way -TSP g Drainage area for the device is less than 5 acres SQ P h Soils have a minimum hydraulic conductivity of 0 52 inches per hour and soils report is attached —S l3 P 1 System captures and infiltrates the runoff from the first 10 inch of rainfall (1 5 inch event for areas draining to SA waters) Design volume and infiltration calculations attached j System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage Calculations attached _:MP k All side slopes stabilized with vegetated cover are no steeper than 3 1 (H V) S C3P 1 A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided in Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided n.VLVegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters) Sy3'F o Flow distribution mechanism within the basin provided -S,�Sp p A benchmark is provided to determine the sediment accumulation in the pretreatment device q*Runoff in excess of the design volume bypasses off-line systems (bypass detail provided) r System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days A soils report and all pertinent draw - down calculations are attached �(3(' s Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized l!�� � Form S WU 103 Rev 3 99 Page 2 of 3 IV INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1 After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition 2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration Remove any blockage and repair the structure to approved design specifications 4 Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth The system shall be restored to the original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i e stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the pretreatment unit The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the design depth reads _0 25_ feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin If the Division determines that they system is failing, the system will immediately be repaired to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Print Name and Title Kenneth M Kirkman Attorney in Fact Address Phone I P O Box 3069, Bald Head Island, NC 28461 1 Ol 457- Date Signature Z--� I Note The legally re o ible parry s ould not be a homeowners association unless more than 50% of the lots have been sold and a iesident of the subdivisdion has been named the president I �0 ,y.� Q.► a Notary Public for the State of `" &� County of R AMON do hereby certify that ,Q e n eT�f M K. t-"A" RA/ personally appeared before me this day of A000 ,and acknowledge the due execuho of the going infiltranon basin maintenance requirements Witness /J OFFtCIALS�EAI 17,j/'J� ' Notary PuMlin ie NerM Caroms COUNTv OF t�tiUNSWiCK SEAL B J GOFiMAN My commision expires /G D 11 My Commission Expires Form SWU 103 Rev 3 99 Page 3 of 3 PermitNo 5hT g T&(3yme0 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT Thu form may be photocopied for use as an original DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details I PROJECT INFORMATION Project Name Row Boat Row Subdivision Contact Person Ken Stewart Phone Number (910) 457-7326 This worksheet applies to Basin No SW-4 in Drainage Area #4(SA waters) (as identified on plans) (from Form SWU-101) II DESIGN INFOMATION — Attach supporting calculations/documentation The soils report must be based upon actual field investigation and soil borings County soil maps are not an acceptable source of soils information All elevations shall be in feet mean sea level (fmsl) Soils Report Summary Soil Type Newhan&Fripp Infiltration Rate 30 ® or ef/hr/sf (circic appropriate units) SHWT Elevation 20 finsl (Seasonal Molt Water Table elevation) Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation 15 inch 1255 c f 003 days 160 ftx 50 1280 c f 75 fmsl 8 5 fmsl 8 5 fins] (1 5 inch event for SA waters I inch eventfor others) $ = 800 sq ft (bottom dimensions) Form SWU 103 Rev 3 99 Page I of 3 III REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the f ollowmg design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met Applicants Initials 7YUP a System is located 50 feet from class SA waters and 30 feet from other surface waters SQP b System is located at least 100 feet from water supply wells SP c Bottom of system is at least 2 feet above the seasonal high water table -SW? d Bottom of the system is 3 feet above any bedrock of impervious soil horizon �SC3P e System is not sited on or in fill material or DWQ approval has been obtained SQP f System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way "-SC3P g Drainage area for the device is less than 5 acres 1Q P h Soils have a minimum hydraulic conductivity of 0 52 inches per hour and soils report is attached 3 Q P 1 System captures and infiltrates the runoff from the first 10 inch of rainfall (1 5 inch event for areas draining to SA waters) Design volume and infiltration calculations attached ARP I System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage Calculations attached SQP k All side slopes stabilized with vegetated cover are no steeper than 3 1 (H V) 5 6P 1 A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided in Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided 5 Q P n Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters) "S(3P o Flow distribution mechanism within the basin provided Slap p A benchmark is provided to determine the sediment accumulation in the pretreatment device oaf' q*Runoff in excess of the design volume bypasses off-line systems (bypass detail provided) r System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days A soils report and all pertinent draw - down calculations are attached -$Q(' s Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized( Sfg nRo$�T /vgRaATI✓r< Form SWU 103 Rev 3 99 Page 2 of 3 IV INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1 After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition 2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration Remove any blockage and repair the structure to approved design specifications 4 Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth The system shall be restored to the original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i e stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the pretreatment unit The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the design depth reads _0 25_ feet inthe pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin If the Division determines that they system is failing, the system will immediately be repaired to original design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above I agree to notify DWQ of any problems with the system or pnor to any changes to the system or responsible party Print Name and Title Kenneth M Kirkman, Attorney in Fact Address P O Box 3069 Bald Head Island, NC 28461 Phone (910) 457-7000 Date Signature 7 Note The legally response e party s! o ild not be a homeowners association unless more than 50% of the lots have been sold and a Q resident of the subdivisdion has been named the president I, 8 QlJiMIOn._ a Notary Public for the State of`�t� w , County of C do hereby certify that 4nno.'Fh ;� , i r U.",Nn personally appeared before me this, $' day of 66 ,and acknowledge the due execution of the regoing infiltration basin maintenance requirements WitnessAN s Yes Q liC NOdh Gsrotn0� BRUNMCKSEALN My commision ex GOFlMA ires �I Form SWU 103 Rev 3 99 Page 3 of 3 N a Row Boat Row Subdivision Stormwater Permit No SW8 980434MOD Bnmswick County Designer's Certification State Stormwater Management Systems Permit No SW8980434MOD Page 1 of 2 1,_✓ % �PN6✓ D /�cA1EE ,asaduly registered 4,✓'4 E, R in the State of North Carolina, having been authorized to observe (penodically/weekly/full rime) the construction of the project, w for LOAM HEAD Lsr. FerZ, LI�I rE D (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used inthe observation ofthe project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form are a part of this Certification Noted deviations from approved plans and specifications T.vFILTnArror TQE✓cH T-r-1. W4r E&IMI✓AT,TO DIIE To SPAc£ 60,✓rra4r✓rs To RE G.FI✓ rar✓cm Ao£Ar TT -a, Wir L£N4wCMED 6 Peer AND TT-S .4ND 1'T--L WfttE 13orm LENATYr�eo 7 Frer. ALL S.v%arM.4r1o. TaC ✓cHEr wrRE A—ro L3.✓cirH0-Nit) l s FEET To , Acca-N ct 4rc T Hi PIPE nt Bo T. PERMITTED %RE.✓cN Di^ rvxicvr 144✓e tUFE�, MET ✓IrH 7-were 446o,F-tc.4n*�-r. RoLLED LI/R[ t.✓G U/RS UrEO, TNEndFone No 6✓a0 CVrS W;ffir i4/C6DED jCV1310-6 �TSPe?uJ '5 a-5i/YNTIAt, bonl%77TLw1f�N�(> 6/iTb f •e+`+�/ // Mb3S� }1,9 rFrb S SEAL Signature /yr7 ��— u Registration Number 63 if Q�r FESS/ Date �QO SEAL d�pE FE�rr. E�117/NQ.srL LNG N 025634 -a lnn �NGINEEi State Stormwater Management Systems Permit No SW8980434MOD Certification Requirements Page 2 of 2 ✓ 1 The drainage area to the ✓2� g system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area ✓ f�" 3 All the built -upon area associated with the project is graded such that the runoff drams to the system N i_4 The outlet/bypass structure elevations are per the approved plan / b piS4/-,j4Lko,� tl�5 The outlet structure is located per the approved plans tql Dl X y r tLI,L6 Trash rack is provided on the outlet/bypass structure '15" 7 All slopes are grassed with permanent vegetation &7,0&k ^J ✓LA:L8 Vegetated slopes are no steeper than 3 1 './S^'X9 The inlets are located per the approved plans and do not cause short-circuiting of the system V, f 10 The permitted amounts of surface area and/or volume have been provided GSM 1 I Required drawdown devices are correctly sized per the approved plans �S^ `12 All required design depths are provided H IA 13 All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter 4-n 14 The overall dimensions of the system, as shown on the approved plans, are provided cc NCDENR-DWQ Regional Office Delaney Aycock, Brunswick County Building Inspector Ke,✓ ST Ew,*nTr rS H i �o CAPE FEAR Engineering, Inc 5040 New Centre Din Suae D 250 North Chumh St WAmegton N C 28403 Spartanburg SC 20 M TEL (910)T908584 TEL (884J 598 8801 FAX (910) 700 8583 FAX (864) 508 8802 www cape(eareng coin Transmittal To NCDENR 127 Cardinal Drive Extension Wilmington, NC 28405 ATTENTION Linda Lewis DATE 10/2/00 PROJECT No 300-07 RE Row Boat Row Bald Head Island SW8 980434 Mod Quantity Drawing No Description 2 Stormwater Plans 2 Original and Copy of Permit Application 2 Design Report and Calcs 2 Soils Report w/ Attached Plan 1 Original Supplement Forms (SWU-107 SWU 103) 1 Power of Attorney Document 1 $420 Application Fee REMARKS If you have any questions please contact this office cc File Bruce Marek Signed CAPE FEAR Engineering Inc L \Admin\Std Forms\cfe-trans doc CAPE FEAR Engineering, Inc. October 2, 2000 Ms Linda Lewis NCDENR 127 Cardinal Drive Extension Wilmington, NC 28405 RE Soil Borings and On -site Soils Investigations Row Boat Row Bald Head Island, Brunswick County, NC Dear Ms Lewis, �ECE'11E OCT 022= D PROD # �W=— The Row Boat Row Subdivision is located on the boat basin/manna of Bald Head Island The soil types encountered in this investigation are excessively well drained and can be expected to have infiltration rates in excess of 30 inches per hour The Seasonal Mean High Water Table will reach a maximum elevation of 2 0 This data was obtained through numerous bonngs and test wells as seen on the attached plan If you have any other questions, please contact this office Sincerely, Davis, P E 5040 New Centre Or 5wte D • Wilmington NC 25403 • TEL (910) 790 5554 FAX (910) 790 5553 250 North Chuch 5treet 5partanburg 5C 29306 • TEL (564) 596 5501 • FAX (564) 596 3502 CAPE FEAR Engineering, Inc. October 2, 2000 Ms Linda Lewis NCDENR 127 Cardinal Drive Extension Wilmington, NC 28405 RE Row Boat Row Mo S=Mod Dear Ms Lewis, OCT 0 2 2000 proo 1 V14e, In response to your letter dated September 21, 2000, the following information is provided • The original infiltration trench and basin supplement forms are included, however it was our understanding that we provide copies based on Section VI -Submittal Requirements of the permit application, which states "one copy of the applicable Supplement Form(s) for each BMP" • Earlier this year, NCDENR staff Scott Vinson and Vincent Lewis augered and observed Seasonal High Water Table with CFE representatives The results of this testing and observation support 2 0 MSL for Seasonal High Water Table A revised soils report is included I hope this information is sufficient to process the Stormwater Management Permit application If you have any other questions, please contact this office Sincerely, Jeffrey Petrof , Ef I 5040 New Centre Or 5wte O • Wilmington NC 26403 • TEL (910) 790 5554 FAX (910) 790 5553 250 North Chuch Street • 5partanburg 5C 29300 TEL (564) 596 5507 FAX (564) 596 5502 DESIGN REPORT POR ROW BOAT ROW SUBDIVISION PREPARED FOR BALD HEAD ISLAND LIMITED Revised September 15, 2000 BY CAPE FEAR ENGINEERING, INC 5040 New Centre Drive Suite D WILMINGTON NC 28403 (910) 790-8584 SEAL 025634 Cape Fear Engineering 09/18/00 Project Narrative_Ht_density doc PROJECT NARRATIVE General Due to modification5 made during construction 5tormwater Management Permit #SW8 980434 Row Boat Row 15 being resubmitted The placement of the underground infiltration system was changed resulting in a hicJher capacity The three infiltration 5wale5 were not modified This Submittal will reflect these changes Storm Water Management The total area of Row Boat Row Subdivision 15 approximately 4 9 acres The proposed impervious built upon area would be 1 4 1 acres corre5pondmg to an impervious ratio of 28 8% This project would be considered a high -density project with deed re5triction5 limiting the amount of built upon area per lot in accordance with the schedule shown in Exhibit A The existing 50115 are Newhan t- Fripp fine sands These 50115 are extremely well drained with an infiltration rate of approximately 30 mche5 / hour Storm water runoff will be conveyed to infiltration ba5m5 and underground infiltration trenches u5mg 5heetflow The 5tormwater control systems will be located in recorded dramage easements No impervious surfaces will be allowed in the 5tormwater control area The following ju5tification for design pursuant to Section III "Required Items Checklist Form 5WU-103 Rev 3 99 15 noted below Item n ) Due to the extremely high infiltration rate of the Newhan 4 Pripp sands the 25-year design storm event would be contained within the infiltration ba51n shown on the plans (See attached calculations) Since the Soil characteri5tic5 of the entire area outside the infiltration basin con5i5t5 of the same highly permeable sands an overflow vegetated filter does not appear to be warranted Item q ) Due to the extremely high infiltration rate of the Newhan * Fripp sands the 25-year design storm event would be contained within the infiltration ba5m shown on the plans Since the soil characteri5tic5 of the entire area outside the infiltration ba5m con515t5 of the same highly permeable sands, a bypass for off-line systems does not appear to be warranted In the unlikely event that the infiltration basin nears capacity the overflow volume would 5heetflow to adjacent permeable sands This 15 preferred in lieu of concentrating runoff in a by-pass system Cape Fear Engineering 09/18/00 Project Narrahve_Hi_density doc The following ju5tification for design pursuant to Section III, "Recluired Items Checkh5t" Form 5WU-107 Rev 3 99 15 noted below Item t ) The design storm event would be contained within the underground infiltration trench a5 shown on the plans (See attached calculations) Since the Soil characteri5tic5 of the entire area outside the infiltration trench con5i5t5 of highly permeable 5and5 an overflow vegetated filter does not appear to be warranted Sedimentation * Erosion Control This project will disturb 1 7 acres of land Silt fencing and vegetative 5wale5 will be the primary controls for Sedimentation and erosion control The velocities in the 5wale5 are Ie55 than I-ft/5ec and will not be erosive All areas that will be disturbed will be grassed or paved according to the schedules on the drawings Bald Head Island Limited will be the financially responsible party for all land d15turbm6j activities Cape Fear Engmeenng 09/18/00 Project Narrative_Hi_densrty doc INFILTRATION TRENCH Design Calculations for Row Boat Row Bald Head Island NC CAPE FEAR �r% Engineering, Inc 5040 New Centre Drive Suite D Wilmington N C 28403 Voice (910) 790 8584 FaX (910) 790-858d E mad cte6pbe//south net BASIN DATA Onsite Impervious Area = Offsite Area = Offsite Impervious Area = Using the runoff volume calculations per "Simple Method" as Pro/ No 300-07 09/18/2000 infiltration —basin As 1 acres where Rv = runoff coefficient = storm runoff (inches) / storm rainfall (inches) I = Percent Impervious = Impervious portion of the drainage area (acres) / Drainage area (acres) Rv = 0 05 + 0 009(I) Rv = 0 05 + 0 009 ' 478 = 0 480 (in/in) Volume to be controlled from the design storm event where Design rainfall = 1 (in) Rv = 0 480 (in/in) Drainage Area = 1 15 (acres) Volume required (cf) = rainfall (in) x Rv (in/in) x Drainage Area (acre) x 1/12(feethnches) x 43560 (sf/acre) Vreq d = 1 ' 0 480 ' 1 15 ' 1/12 ' 43560 = 2005 cubic feet Vprov = ( 13 Trenches) = 2107 cubic feet 1Vreq d = 2005 cf < 2107 cf Vprov 11 Determine drawdown time Compare infiltration system drawdown time to maximum drawdown period of 5 days where I = infiltration rate of soil (Soil Type = Newhan & Fripp sands) = 30 Whir A = bottom area of Swale = = 1649 sf Qavail = IA = 30 Whir 1649 sf ' 1 fU12 ' 1 hr/3600sec = 1 15 cfs T = V req / Q avail 1 hr/ 3600 sec T = 2005 cf / 1 15 cfs = 0 49 hours (OK- system draws down in less than 5 days) PIPESTOR IUM-111MAXICIM:• , Infiltration Rate Q Drainage area (Ac)= 1 15 Pipe size (ft) = 25 Storm event = 25 Trench width (ft) = 25 Length of pipe and trench= 4295 Pipe area (ft2) = 49 Trench side height (ft) = 25 Stone area (ft2) = 00 A = Area of exFlltrat(on = 1849 ft2 Stone voids 40% (ft2) = 00 K = Coeff of permeability = 2 1E-02 cm/sec Available storage per ft = 49 1= Hydraulic gradient = 1 00 Total Available Storage 2107 Q/ = 1 15 cfs Q/ = 449 g d/ft2 TIME (min) ACCUMULATED MASS INFLOW (wbic feet) EXFILTRATION VOLUME (cubic feet) STORAGE REQUIREMENTS cubic feet) AVAILABLE STORAGE (cubic feet) STORAGE SURPLUS (DEFICIT) (cubic feet 5 1088 344 744 2107 1363 10 1898 687 1211 2107 896 15 2 532 1 031 1 502 2 107 606 20 30,46 1 374 1 672 2 107 435 25 3 474 1 718 1 756 2 107 351 30 3 838 2061 1 777 2 107 331 40 4 429 2 748 1 680 2 107 427 60 5 274 4 123 1 151 2 107 956 80 5 868 5 497 371 2 107 1 736 100 6 320 6 871 (551) 2 107 2 659 120 6 682 8 245 (1 563) 2 107 3 670 180 7 467 12 368 (4 901) 2 107 7 008 240 8 007 16 490 (8 483) 2 107 10 591 360 8 753 24 735 (15 982) 2 107 18 090 720 10 019 49 471 (39 452) 2 107 41 559 1 440 11 322 98 942 (87 620) 2 107 89 727 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 01 0 0 0 INSY 1 As 09/18/2000 INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row Bald Head Island NC CAPE FEAR ', Engineering, Inc 5040 New Centre Drive Suite D Wilmington N C 28403 Voice (910) 790 8584 Fax (910) 790 858,1 E mad cte(dbellsouth net BASIN DATA Prot No 300-07 09/18/2000 300_07infiltration_basin2_REV2700 xis 1 of4 Drainage ea Designation Swale Designation DRAINAGE AREA 2 SW-2 Receiving stream class SA waters Onsite Area = 09 acres Onsite Impervious Area = acres Offsite Area = acresOffsite WO Impervious Area = acres Total Area = 0 91 acres Total Impervious Area = 0 32 acres Percent Impervious = Impervious drainage area (acres)/Drainage area (acres) = 352 A) Determine volume to be controlled from storm (1 5 inch event for SA waters, 1 inch event for others) Using the runoff volume calculations per "Simple Method' as described by Schueler (1987) where Rv = runoff coefficient = storm runoff (inches) / storm rainfall (inches) I = Percent Impervious = Impervious portion of the drainage area (acres) / Drainage area (acres) Rv = 0 05 + 0 009(I) Rv = 0 05 + 0 009 ' 352 = 0 366 (in/in) Volume to be controlled from the design storm event where Design rainfall Rv Drainage Area = 1 5 (in) = 0 366 (in/in) 0 91 (acres) Volume required (cf) = rainfall (in) x Rv (in/in) x Drainage Area (acre) x 1/12(feethnches) x 43560 (sf/acre) Vreq d = 1 5 ' 0 366 ' 0 91 . 1112 ' 43560 = 1816 cubic feet INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row, Bald Head Island, NC CAPE FEAR Engineering, Inc 5040 New Centre Drive Suite D Wilmington N C 28403 Voice (910) 790-8584 Fax (910) 790-8583 E mad cte(qpbellcouth net Determine the volume of the proposed Swale SWALE DATA Cross -sectional Area (A) = bd +HdA2 = 8 00 sf bottom width (b) = 5 0 ft depth (d) = 1 ft sideslope (H V) = 3 1 length of swale (L) = 250 ft EASEMENT - WIDTH AS INDICATED Prol No 300-07 09/18/2000 300_07infiltration_basin2_REV2700 As 2of4 INLILTRATI❑N SWALE NOT TO SCALE Volume proposed (cf) = Cross -sectional area (so x length of swale (ft) Vprop = 8 sf 250 ft = volume proposed to volume required from the design storm event 2000 cubic feet 2000 cf > Vreq d = 1816 cf (OK -proposed swale volume is greater than minimum required volume) INFILTRATION SWALE - Schueler Method Prot No 300-07 Design Calculations for Row Boat Row, 09/18/2000 Bald Head Island NC 300_07infiltration_basin2_REV2700 AS 3of4 FCAPE FEAR Engineering, Inc 5040 New Centre Drive Suite D Wilmington N C 28403 Voice (910) 790-8584 Fax (910) 790-858.3 E mad cfe(q�bellsouth net B) Check swale infiltration rate for capacity to control the 25 year-24 hour storm event with no discharge The average weighted coefficient of runoff is determined by C ave = Sum[CA ] / Sum[A] Description AREA C CA Impervios Area 0 32 0195 0 304 Pervious Area 059 0 5 0 089 Sum A = 091 Sum CA = 0 393 C ave = 0 393 / 091 = 0 431 Determine required discharge from 25 year-24 hour storm event Q regd = Cave x I x A Q regd = 0 43 ' 0 33 ' 0 91 = 0 13 cfs where I = intensity for 25 year-24 hour storm event from Chart E-6 = 3 in/hr A = drainage area = = 0 91 acres Cave = weighted coefficient of runoff = 043 Check available rate of infiltration provided by proposed swale where I = infiltration rate of soil (Soil Type = Newhan & Fripp sands) = 30 in/hr A = bottom area of swale = 5 0 ft ' 250 ft = 1250 sf Qavail = IA = 30 in/hr ' 1250 sf ' 1 ft/12 in ' 1 hr/3600sec = 0 87 cfs rate of infiltration with runoff rate from the 25 year storm event 0 87 cfs > Q reqd = 0 13 cfs (OK -No Discharge for 25 yr-24 hr storm event) INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row, Bald Head Island NC CAPE FEAR ' r Engfneerfng, Inc 5040 New Centre Drive Suite D Wilmington N C 28403 Voice (910) 790 8584 Fax (910) 790-858.3 E mail cte(Nbellsouth net Prot No 300-07 09/18/2000 300_07infiltration_basin2_REV2700 As 4of4 C) Check the 10 year-10 minute storm event to confirm that swale has capacity without flushing system where I = intensity for 10 year-10 minute storm event from Chart E-6 = 6 3 in/hr A = drainage area = = 0 91 acres Cave = weighted coefficient of runoff = 043 Determine discharge rate from 10 year-10 minute storm event Q 10-yr = Cave x I x A Q10-yr= 043' 63 ' 091 = 247cfs Determine discharge volume from 10 year-10 minute storm event V 10-yr = Q 10 yr ' 10 min duration ' 60 sec/min = 1484 cf Check available volume of the proposed infiltration swale V avail = design volume (from swale data table) = 2000 cf Compare design volume of infiltration Swale to discharge volume from 10 year storm event of 10 minute duration Vavail = 2000 cfs > V 10-yr = 1484 cfs (OK Swale has adequate capacity for 10-yr event without flushing) Compare infiltration system drawdown to maximum drawdown period of d days T = V regd / Q avail 1 hr/ 3600 sec T = 1816 cf / 0 87 cfs 1 hr/ 3600 sec = 0 58 hours (OK- system draws down in less than 5 days) INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row Bald Head Island NC CAPE FEAR Engmeerfng, Inc 5040 New Centre Drive Suite D Wilmington N C 28403 Voice (910) 790-8584 Fax (910) 790-858.3 E mall cfeCdbellsouth net BASIN DATA Prol No 300-07 09/18/2000 300_07infiltration_basin3_REV2700 As 1 of4 Drainage ea ©esignahon DRAT GE READ#3 S a e Oe igna ion S_ - Receiving stream class SA waters Onsite Area = 0170 acres Onsite Impervious Area = 032 acres Offsite Area = 00 acres Offsite Impervious Area = 00 acres Total Area = 0 70 acres Total Impervious Area = 0 32 acres Percent Impervious = Impervious drainage area (acres)/Drainage area (acres) = 457 A) Determine volume to be controlled from storm 11 5 inch event for SA waters, 1 inch event for others) Using the runoff volume calculations per Simple Method as described by Schueler (1987) where Rv = runoff coefficient = storm runoff (inches) / storm rainfall (inches) I = Percent Impervious = Impervious portion of the drainage area (acres) / Drainage area (acres) Rv=005+0009(I) Rv = 0 05 + 0 009 ' 457 = 0 461 (in/in) Volume to be controlled from the design storm event where Design rainfall Rv Drainage Area 1 5 (m) = 0 461 (in/in) = 0 70 (acres) Volume required (cf) = rainfall (in) x Rv (in/in) x Drainage Area (acre) x 1/12(feettinches) x 43560 (sf/acre) Vreq'd = 1 5 ' 0 461 ' 0 7 ' 1/12 ` 43560 = 1759 cubic feet INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row Bald Head Island NC FCAPE FEAR Engineering, Inc 5040 New Centre Drive Suite D Wilmington N C 28403 Voice (910) 790 8584 Fax (910) 790 858.3 E mad cfe(dbellsouth net Determine the volume of the proposed swale SWALE DATA Cross -sectional Area (A) = bd +HdA2 = 8 00 sf bottom width (b) = 0 ft depth (d) = ft sideslope (H V) = 3 1 length of swale (L) = 2 D ft EASEMENT - WIDTH AS INDICATED Prot No 300-07 09/18/2000 300_07infiltration_basin3_REV2700 xls 2of4 INEILTRATI❑N SWALE NOT TO SCALE Volume proposed (cf) = Cross -sectional area (so x length of swale (ft) Vprop = 8 sf 240 It = 1920 cubic feet Compare volume proposed to volume required from the design storm event 1920 cf > Vreq d = 1759 cf (OK -proposed swale volume is greater than minimum required volume) INFILTRATION SWALE - Schueler Method Prot No 300-07 Design Calculations for Row Boat Row, 09/18/2000 Bald Head Island, NC 300_07infiltration_basin3_REV2700 As 3of4 4WCAPE FEAR Engineering, Inc 5040 New Centre Drive Suite D Wilmington N C 2840.3 Voice (910) 790 8584 Fax (910) 790 858,3 E mail cre(aPbellsouth net B) Check swale infiltration rate for capacity to control the 25 year 24 hour storm event with no discharge The average weighted coefficient of runoff is determined by C ave = Sum[CA I / Sum[A) Description AREA C CA Impervios Area 032 Or95 0 304 Pervious Area 038 0 i 0 057 Sum A= 07 Sum CA = 0361 Cave = 0361 I 07 = 0516 Determine required discharge from 25 year-24 hour storm event Q regd = Cave x I x A Qreqd= 052' 033 * 07 where I = intensity for 25 year-24 hour storm event from Chart E-6 A = drainage area = Cave = weighted coefficient of runoff Check available rate of infiltration provided by proposed Swale where I = infiltration rate of soil (Sod Type = Newhan & Fripp sands) A = bottom area of swale = 5 0 ft ' 240 ft Qavail = IA = 30 in/hr ' 1200 sf ' 1 fU12 in ' 1 hr/3600sec rate of infiltration with runoff rate from the 25 year storm event 0 83 cfs > Q reqd = 0 12 cfs (OK -No Discharge for 25 yr-24 hr storm event) 0 12 cfs = 33 in/hr 0 7 acres 052 30 in/hr = 1200 sf = 0 83 cfs INFILTRATION SWALE - Schueler Method Prot No 300-07 Design Calculations for Row Boat Row 09/18/2000300_07infiltration_basin3_REV2700 As Bald Head Island NC 4of4 FCAPE FEAR Engfneerfng, Inc 5040 New Centre Drive Suite D Wilmington N C 2840d Voice (910) 790 8584 Fax (910) 790 8581 E mall cfe(a_�belleouth net C) Check the 10 year-10 minute storm event to confirm that swale has capacity without flushing system where I = intensity for 10 year-10 minute storm event from Chart E-6 = 6 in/hr A = drainage area = = 0 7 acres Cave = weighted coefficient of runoff = 052 Determine discharge rate from 10 year-10 minute storm event Q 10-yr = Cave x I x A Q10-yr= 052' 63 ' 07 = 227cfs Determine discharge volume from 10 year-10 minute storm event V 10-yr = Q 10 yr ' 10 min duration ' 60 sec/min = 1365 cf Check available volume of the proposed infiltration swale V avail = design volume (from swale data table) = 1920 cf Compare design volume of infiltration Swale to discharge volume from 10 year storm event of 10 minute duration Vavail = 1920 cfs > V 10 yr = 1365 cfs (OK-swale has adequate capacity for 10-yr event without flushing) Compare infiltration system drawdown to maximum drawdown period of d days T = V regd / Q avail 1 hr/ 3600 sec T = 1759 cf / 0 83 cfs 1 hr/ 3600 sec = 0 59 hours (OK- system draws down in less than 5 days) INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row Bald Head Island, NC CAPE FEAR Engineering, Inc 5040 New Centre Drive Suite D Wilmington N C 28403 VOICe (910) 790 8584 Fax (910) 790-8584 E mail cte(cDbellsouth net BASIN DATA Prot No 300-07 09/18/2000 300_07infiltration_basin4_REV2700 As 1 of4 Drainage Area Designation DRAINAGE AR #4 Swale Designation SW-4 Receiving stream class S;4 waters Onsite Area = 0165 acres Onsite Impervious Area = 0 22 acres Offsite Area = 0 00 acres Offsite Impervious Area = 0 00 acres Total Area = 0 65 acres Total Impervious Area = 0 22 acres Percent Impervious = Impervious drainage area (acres)/Drainage area (acres) = 338 A) Determine volume to be controlled from storm (1 5 inch event for SA waters, 1 inch event for others) Using the runoff volume calculations per "Simple Method as described by Schueler (1987) where Rv = runoff coefficient = storm runoff (inches) / storm rainfall (inches) I = Percent Impervious = Impervious portion of the drainage area (acres) / Drainage area (acres) Rv=005+0009(I) Rv = 0 05 + 0 009 ' 338 = 0 355 (in/in) Volume to be controlled from the design storm event where Design rainfall Rv Drainage Area = 1 5 (in) = 0 355 (in/in) = 0 65 (acres) Volume required (cf) = rainfall (in) x Rv (in/in) x Drainage Area (acre) x 1/12(feethnches) x 43560 (sf/acre) Vreq d = 1 5 ' 0 355 ' 0 65 ' 1 /12 ' 43560 = 1255 cubic feet INFILTRATION SWALE - Schueler Method Design Calculations for Row Boat Row, Bald Head Island NC FCAPE FEAR Engineering, Inc 5040 New Centre Drive Suite D Wilmington N C 28403 Voice (910) 790 8584 Fax (910) 790 858.3 E mail cfe(g>belkouth net Determine the volume of the proposed Swale SWALE DATA Cross sectional Area (A) = bd +HdA2 = 8 00 sf bottom width (b) = 0 ft depth (d) = ft sideslope (H V) = 3 1 length of swale (L) = 1 0 ft EASEMENT - WIDTH AS INDICATED Prot No 300-07 09/18/2000 300_07infiltration_basin4_REV2700 As 2of4 INEILTRATINN SWALE NOT TO SCALE Volume proposed (cf) = Cross sectional area (sf) x length of swale (ft) Vprop = 8 sf 160 ft = 1280 cubic feet volume proposed to volume required from the design storm event 1280 cf > Vreq'd = 1255 cf (OK -proposed swale volume is greater than minimum required volume) INFILTRATION SWALE - Schueler Method Prot No 300-07 Design Calculations for Row Boat Row 09/18/2000 Bald Head Island NC 300_07infiltration_basin4_REV2700 As 3of4 FCAPE FEAR Engineering, Inc 5040 New Centre Drive Suite D Wilmington N C 28403 Voice (910) 790 8584 Fax (910) 790-858.3 E mail cfe(dbelkouth net B) Check swale infiltration rate for capacity to control the 25 year-24 hour storm event with no discharge The average weighted coefficient of runoff is determined by C ave = Sum[CA ] / Sum[A] Description AREA C CA Impervios Area 0 22 0195 0209 Pervious Area 043 15 0 065 Sum A = 065 Sum CA = 0 274 C ave = 0 274 / 065 = 0 421 Determine required discharge from 25 year-24 hour storm event Q regd = Cave x I x A Q regd = 0 42 ' 0 33 ' 0 65 where I = intensity for 25 year 24 hour storm event from Chart E-6 A = drainage area = Cave = weighted coefficient of runoff Check available rate of infiltration provided by proposed Swale where I = infiltration rate of soil (Soil Type = Newhan & Fripp sands) A = bottom area of swale = 5 0 ft ` 160 ft Qavail = IA = 30 in/hr 800 sf ' 1 ft/12 in ' 1 hr/3600sec rate of infiltration with runoff rate from the 25 year storm event 0 56 cfs > Q reqd = 0 09 cfs (OK -No Discharge for 25 yr-24 hr storm event) = 0 09 cfs = 0 33 in/hr = 0 65 acres 042 0 56 cfs INFILTRATION SWALE - Schueler Method Prol No 300-07 Design Calculations for Row Boat Row 09/18/2000 Bald Head Island, NC 300_07infiltration_basin4_REV2700 As 4of4 CAPE FEAR Engineering, Inc 5040 New Centre Drive Suite D Wilmington N C 28403 Voice (910) 790-8584 Fax (910) 790-858.3 E mail cte(dbel/south net C) Check the 10 year-10 minute storm event to confirm that swale has capacity without flushing system where I = intensity for 10 year-10 minute storm event from Chart E 6 = 3 in/hr A = drainage area = = 0 65 acres Cave = weighted coefficient of runoff = 042 Determine discharge rate from 10 year-10 minute storm event Q 10-yr = Cave x I x A Q 10-yr = 042 ` 63 ` 065 = 1 72 cfs Determine discharge volume from 10 year-10 minute storm event V 10-yr = Q 10-yr ` 10 min duration ` 60 sec/min = 1034 cf Check available volume of the proposed infiltration swale V avail = design volume (from swale data table) = 1280 cf Compare design volume of Infiltration swale to discharge volume from 10 year storm event of 10 minute duration Vavail = 1280 cfs > V 10 yr = 1034 cfs (OK swale has adequate capacity for 10-yr event without flushing) Compare infiltration system drawdown to maximum drawdown period of d days T = V regd / Q avail 1 hr/ 3600 sec T = 1255 cf I 0 56 cfs 1 hr/ 3600 sec = 0 63 hours (OK- system draws down in less than 5 days) INFILTRATION SWALE - Schueler Method Prot No 300-07 Design Calculations for Row Boat Row, 09/18/2000 Bald Head Island, NC 300_07infiltration_basin4_REV2700 As 4of4 CAPE FEAR Engineering, Inc. 5040 New Centre Drive, Suite D Wilmington, N C 28403 Voice (910) 790-8584 Fax (910) 790-8583 E-mail cfe(Lpbellsouth net C) Check the 10 year-10 minute storm event to confirm that swale has capacity without flushing system where I = intensity for 10 year-10 minute storm event from Chart E-6 = 6. in/hr A = drainage area = = 0 65 acres Cave = weighted coefficient of runoff = 042 Determine discharge rate from 10 year-10 minute storm event Q 10-yr = Cave x I x A Q 10-yr = 042 " 63 " 065 = 1 72 cfs Determine discharge volume from 10 year-10 minute storm event V 10-yr = Q 10-yr ' 10 min duration ' 60 sec/min = 1034 cf Check available volume of the proposed infiltration swale V avail = design volume (from swale data table) = 1280 cf Compare design volume of infiltration swale to discharge volume from 10 year storm event of 10 minute duration Vavail = 1280 cfs > V 10-yr = 1034 cfs (OK-swale has adequate capacity for 10-yr event without flushing) Compare Infiltration system drawdown to maximum drawdown period of d days T = V regd / Q avail 1 hr/ 3600 sec T = 1255 cf / 0 56 cfs 1 hr/ 3600 sec = 0 63 hours (OK- system draws down in less than 5 days) State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B Hunt, Jr, Governor Bill Holman, Secretary Division of Water Quality August 23, 2000, CERTIFIED MAIL N7000 0600 0023 4230 1206 RETURN RECEIPT REQUESTED Mr Kenneth Kirkman, Attorney Bald Head Island Limited PO Boa 3069 Bald Head Island, NC 28461 Dear Mr Kirkman �` � NCDENR NORTH CAROUNA DEPARTMENT OF ENVIRONMENT AND NATURAi. RE50URCE Subject REQUEST FOR STORMWATER MANAGEMENT PERMIT APPLICATION Row Boat Row Subdivision Stormwater Project No SW8980434 Brunswick County On August 18, 2000, the Wilmington Regional Office was notified that there has been a modification to the approved permit for Row Boat Row Subdivision The North Carolina Administrative Code requires any project that changes any portion of the approved plans must apply for and receive a modification to the Stormwater Management Permit by the Division of Water Quality Either a Stormwater Permit Application Package including 2 sets of plans, completed application form, fee, and supporting documentation, or a written response regarding the status of this project and the expected submittal date must be received in this Office no later than September 23, 2000 Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay Please reference the Project Number above on all correspondence If you have any questions, please call me at (910)- 395-3900 Sincerely, Scott Vinson Environmental Engineer RSS/sav S \WQS\STORMWAT\STORMSUB\980434 AUG cc Delaney Aycock, Brunswick County Inspections Perry Davis/Stephen McAree, Cape Fear Engineering, Inc ilmmgton-RegionaL(Dffice Central Files 127 Cardinal Dr Ext, Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportumt) Affirmative Action Employer 50 % recycled/10 % post -consumer paper 0 ru FOm1 Postage $ WIt,jf,^ N Certliietl Fee postm 1 Return Receipt Fee N(Endorsement Regmred) T`� Z O Resim ted D.I, Fee O (Fsdorsement Requeed) O Total Postage 8 Fee- 0 Name (Please nt Cfeerry)�(t(o compl9 2"' O (�i /s O 3reet o p Box No JO`` �f. 7 / o 11 GN renew �.✓ x0��(O� ' tt UNITED STATES POSTAL SERVICE I t_ rF ✓� I I I I I p m • Sender Please Iud.Z4P+4-iFl-thts_f10xi State of North Carolina DENR 127 Cardinal Drive l at Wilmington, NC 28405 (Attn Bev) ■ Complete Items 1, 2, and 3 Also complete item 4 if Restricted Delivery is desired ■ Print your name and address on the reverse so that we can return the card to you ■ Attach this card to the back of the mailpiece, or on the front if space permits 1 Article Addressed to II,, A Received by (Please Print Clearly) 16 Date of Delivery C Signature L X ❑Agent Addressee D Is delivery adaress dMerent from item 1? ❑ Yes ` r If YES; ent d@livery address below El No 20� 3 SServicc� T-Ypew--'� LTCertified Mail Cl Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C O D 4 Restricted Delivery? (Extra Fee) ❑ Yes 2 Article Number (Copy from service label) 70001 eo&00 1y2;-3CI, 111I/I3-0Co1111 I1 1 II II I 1 PS Form 3811, July 1999 Domestic Return Receipt 102595 00 M 0952 CAPE FEAR [RECETMVIFEngineerIng, Inc. / 5040NewCenbeDr" SvileD 250NoMChurohSl AUG 1 8 [U00 Wilmington N C 26403 Spartanburg SC 28308 TEL (910) 780-B584 TEL (884) 588 8801 FAX (910) ]SO B583 FA% (864) 50 8802 B V www capefeareng com 11 To NCDENR-Div Of Water Quality 127 Cardinal Dr Ext Wilmington, NC 28405 ATTENTION smittal DATE 8/15/00 PROJECT NO 300-07 RE Row Boat Row Subdivision Stormwater Certification Proi No SW8 980434MOD Quantity Drawing No Description 1 Copy of Row Boat Row Subdivision Stormwater Certification heeMMikki Wed. C& se REMARKS Please find the enclosed certification If you have any questions or comments regarding this protect, please contact this office at 790-8584 cc File CAPE FEAR Engineering, Inc Signed�� L \Admin\Std Forms\cfe-trans doc