Loading...
HomeMy WebLinkAboutSW8960605_HISTORICAL FILE_19960829STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 C lUoLo05 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS L$7 HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Ictc1\.o 08 2-9 YYYYMMDD .. • i State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B::Hunt, Jr., Governor Jonathan B. Howes, Secretary A Preston Howard, Jr., P.E., Director Mr. Michael G. Nadeau, Secretary Lakeside Estates, LLC Post Office Box 1213 Wilmington, North Carolina 28402 Dear Mr. Nadeau: ID FEf--INR August.29, 1996 Subject: Permit No. SW8 960605 Lakeside Park High Density Commercial Subdivision Stormwater Project New Hanover County The Wilmington Regional Office received the Stormwater Management Permit Application for Lakeside Park on June 5, 1996, with final information on August 6; 1996. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the StormwaterRegulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 960605,, dated August 29, 1996, for the construction of Lakeside Park. This permit shall be effective from the date of issuance until August 29, 2006, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems.. I . a If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an ajudicatory hearing upon written request within thirty (30) days following receipt of this permit.. This request must be in the form of a written petition, conforming to Chapter 150B of the Nortli Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. . If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, �n im Bushazdt, P.E. Acting Regional Water Quality Supervisor JBB/arl: S:\WQS\STORMWAT\PERMIT\960605.AUG cc: David Hollis, P.E. Tony Roberts, New Hanover County Inspections Beth Easley, New Hanover County Engineering Linda Lewis Wilmington Regional Office Central Files P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer m State Stormwater Management Systems Permit No. SW8 960605 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Lakeside Estates, LLC Lakeside Park New Hanover County construction, operation and inaintenance of two Detention Ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until August 29, 2006 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The subdivision is permitted for 30 lots, each allowed a maximum of 85 % of the available lot area as built -upon area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 2 Project Name: Permit Number: Location: Applicant: Mailing Address: DIVISION OF WATER QUALITY PROJECT DATA SHEET Lakeside Park Application Date: Water Body Receiving Stormwater Runoff: Classification of Water Body: Pond Depth: Permanent Pool Elevation: " Total Impervious Surfaces Allowed: 30 lots @85 % Offsite Area entering Pond: Green Area entering Pond: Required Surface Area: Provided Surface Area: Required Storage Volume: Provided Storage Volume: Temporary Storage Elevation: Controlling Orifice: State Stormwater Management Systems Permit No. SW8 960605 960605 New Hanover County Mr. Michael G. Nadeau, Secretary Lakeside Estates, LLC Post Office Box 1213 Wilmington, North Carolina 28402 June 5, 1996 Greenfield Lake Y[WTM POND 1 POND 2 7.5 feet 7.5 feet 10 MSL 865,238 square feet N/A 132,286 square feet 31,292 square feet 35,950 square feet 69,049 cubic feet 72,000 cubic feet 11.5 MSL 4" pipe 10 MSL 915,174 square feet 35,175 square feet 138,978 square feet 33,109 square feet 40,515 square feet 73,030 cubic feet 82,774 cubic feet 11.5 MSL 4" pipe 3 State Stormwater Management Systems Permit No. SW8 960605 4. No lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the permittee, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 6. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision of the project area. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 7. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's intended use prior to the construction of any built -upon surface except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The permittee grants permission to DEHNR Staff to enter the property for the purposes of inspecting the project for compliance with the conditions of this permit. 4 State Stormwater Management Systems Permit No. SW8 960605 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in it's entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Prior to the sale of any lot, deed restrictions must be recorded which limit the built -upon area per lot to the amount as shown on the Project Data Sheet, per Part I #2. The recorded statements must follow the form: a. "The maximum built -upon area per lot is 85 % of the available lot area. The built -upon area will include that portion of the right-of-way between the lot line and the edge of pavement, structures, pavement, walkways of brick, stone, or slate, but will not including open wood decking. " b. "The covenant"s pertaining to stormwater regulations may not be changed or deleted without concurrence of the State." C. "Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the State." d. "Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations." e. "All built -upon area from each of the lots must be directed into one of the ponds." f. "All connections into the pond must be made such that short-circuiting does not occur." 6. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 5 State Stormwater Management Systems Permit No. SW8 960605 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of the recording. The recorded copy must be signed by the permittee, dated, stamped with the deed book number and page, and bear the stamp of the Register of Deeds. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. M. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request form must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or 6rdinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 29th day of August, 1996. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION all reston Howard, Jr., P.E., Director ivision of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 960605 0 State Stormwater Management Systems Permit No. SW8 960605 Lakeside Park Stormwater Permit No. SW8 960605 New Hanover County Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: Signature Registration Number Date 7 DIVISION OF ENVIRONMENTAL MANAGEMENT NORTH CAROLINA STORMWATER MANAGEMENT PERMIT APPLICATION I. GENERAL INFORMATION 1. Project Name _L ( 5�,tcL2 Pra ✓-- '' pp r' - 2. Location, directions to project (include County, Address, State Road) Attach map. -� Pe0 � IRt�-—� v Mactt'�l--i ��M �T C�4t l R4J��lk4 1 p 3. Owner's Name Lekq-, Ldq � "L. C Phone (d -392 — (z Z J 4. Owner's Mailing Address PO ?QC 1 2- 3 City (k), [!ILIA�+a- State K.Ye zip 2©j�2 5. Application date V •�• Fee enclosed$ ��g51�sa 6. Nearest Receiving Stream—k, )u+c<aAe5-6 Gymic�acL Lkaass n�&-) ta- �•,cuQc�-crud- II. PERMIT INFORMATION 1. Permit No.((obefilledinbyl)EM) 5(/y(J It1/0&Q5 2. Permit Type ✓ New Renewal_ 3. Project Type: _Low Density ✓ Detention Modification (existing Permit No.) Infiltration Other:_ Redevelop _General Dir Cert 4. Other State/Federal Permits/Approvals Required (meek appropriate blanks) CAMA Major Sedimentation/Erosion Control ✓ 404 Permit t� III. BUILT UPON AREA (Please see NGC 211.1005 rhru .1007 for applicable density limits) `Povtd{ IJ? ( Part�Q92 C�vev cf 4 7, l urines Drainage Drainage Breakdown of Impervious Area Basin Basin (Please indicate below the design impervious area) Classification ZW C SW Allowable Impervious Area /L� t!J•CJg2G %15 &Cl Total Project Area 202, •QJ ac� 24"2 C-C Proposed Impervious Area i9• JLC % Impervious Area o 07 ! o e7 07o IV. STORMWATER TREATMENT (Describe how die runoff will be treated) Buildings dry. 4 QL.y25 Streets 5:60 Parking/SW Other Totals < 4L • O ac, V. VI VII. cc: DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded for the type of project applied for. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the covenant cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. OWNER'S CERTIFICATION I MlGv-aeJ. (57. UU10�_, certify that the information included on this permit (Please print or rype name clearly) application form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions will be recorded with all required permit conditions, and that to the best of my knowledge, the proposed project complies with the requirements of 15A NCAC 2H.1000. I authorize the bel w named persol r firm to submit stormwater plans on my behalf. wner/Authorized Agent Signature and T' e to AGENT AUTHORIZATION (MusTae COMPLETED) Person or firm name tAl Mailing Address 5 ( 5 ICSCi.kyutet �9+ City (. tf vvttvw G- State►3C- Zip Phoneme-3 C0 Please submit application, fee, plans and calculations to the appropriate Regional Office. Applicant/WiRO//Central Files STMUM, Uu IjECEIVEO U JUN 0.7y11996 W 8 �C? PROJ 8 SOWS HAW AIO, LyY.� ATTACIIMENT A LOW DENSITY AND SUBDIVISION PROJECTS GENERAL SUBMITTAL REQUIREMENTS A completed stormwater permit application. 2. Two sets of plans showing north arrow, scale, revision date, property/project boundaries, lot lines, proposed and existing contours, drainage areas, mean high water line, wetlands, easements, the 30' minimum vegetated buffer between impervious areas and surface waters, proposed impervious areas, and road cross -sections. 3. Calculations of the built -upon area, Forsubdivisions, please show the methodology for arriving at the per lot built -upon area. For non -subdivision projects, please break down the calculation into buildings, roads, parking, and other (include all impervious areas). 4. Low density projects with curb and gutter will require: a. Drainage area delineation and Swale locations shown on the plans. b. Detail of the swale, showing minimum 5:1 side slope. C. Velocity calculations, indicating a non -erosive flow for the 10 yr storm. d. Inlet and outlet elevations. Maximum longitudinal slope is 5 %. e. The type of vegetated cover specified on the plans. DEED RESTRICTION REQUIREMENTS The following statements must be included for all low density projects, and for all subdivisions: No more than 85 /C' square_feat of any lot, including that portion of the right-of-way between the edge of pavement and the front lot line, shall be covered by impervious structures, including asphalt, gravel, concrete, brick, stone, slate or similar material, not including wood decking or the water surface of swimming pools. This covenant is intended to ensure continued compliance with the stormwater permit issued by the State of North Carolina. The covenant may not be changed or deleted without the consent of the State. No one may fill in or pipe any roadside or lot -line swale, except as necessary to provide a minimum driveway crossing. For curb and gutter projects, no on may pipe, fill in, or alter any lot line swale used to meet North Carolina Stormwater Management Permit requirements. NOTE If lot sizes vary significantly, the owner/developer must provide an attachment listing each lot number, size, and the allowable built -upon area for each lot. HANOVER DESIGN SERVICES, P.A. MEMO LEppER---- I (910) 343.8002 319 WALNUT ST.���i WILMINGTON, NC 28401 ti�II�I11111J%Illlll ! AUG 0 G 1996 ...................�... To Subj�t f vL L.t I,c�- D4�- t-�Q�S a Leos c-> o y 0-Lk CL d/eol Sp—c� VLO'� C�bO�.�T� _ - , 2-9 . U �. � � te-S V�UL S-e� o�crz.�-4?z ►�-� � �az��e -A-n S p n1L �C<..�.c � ct->L-f 6e o f c eo(. 4% C.l c c..rc`..lEl SIGNED e � Please reply 7 No reply necessary o2e000 .JI tr 1 i a State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. DIVISION OF ENVIRONMENTAL MANAGEMENT Jonathan B. Howes Governor WATER QUALITY SECTION Secretary July 29, 1996 Mr.David Hollis, P.E. Hanover Design Services 319 Walnut Street Wilmington, North Carolina 28401 Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 960605 Lakeside Park New Hanover County Dear Mr. Hollis: The Wilmington Regional Office received previously requested information for the Stormwater Management Permit Application for Lakeside Park on July 3, 1996. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The forebay area should be shallower than the main body of the pond. The contours you have labelled indicate that the forebay depth is also 7.5'. Please shallow up the forebay to about 2' to 3' deep. 2. I have blacked out the words "where ever possible" in the note concerning the storm drainage from Lots 12 and 13 into Pond 1. In order to permit the pond, that runoff will be required to be'directed into the pond at that location, no exception. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer i Mr. Hollis July 29, 1996 Stormwater Project No. SW8 960605 _ ---------------------------------------------- € . Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to August 29, 1996, or the application will be returned as incomplete. The return of a project will necessitate resubnittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\960605.JUL cc: Linda Lewis Central Files 2 JUL u 3 19% 0 Hanover Design Services, P.A. --------------------------- Land Surveyors, Engineers, Land Planners July 2, 1996 Ms. Linda Lewis, Environmental Engineer Department of Environment, Health and Natural Resources Division of Environmental Management, Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Lakeside Park, SW8 960605 New Hanover County City of Wilmington Dear Linda: Please find attached two copies of the revised Plan, with the additions and revisions as follow: 1. The outfall structure for Pond No. 1 cannot be moved because of existing topographical features. After consulting with the City, I have indicated that storm drainage from Lots 12 and 13 should be directed to the pond in the rear where possible, eliminating the dead zone. I have relocated the outfall for Pond No. 2, to eliminate the dead zone and improve maintenance access. 2. As we discussed on the phone, the oriface sizing is at the structure, and flow rate is determined by head, not pipe hydraulics. For a very short pipe, perforations are not necessary, but for longer pipes, they serve to decrease maintenance and increase reliability in case of blockage, so there is at least some flow. We basically neglect the pipe completely in this calculation, the flow would be the same as if there was just a hole in the box. 3. I numbered the Lots as requested. My understanding is that these lot sizes are somewhat flexible, but any configuration Lot sold will be required to submit showing 85% to DEM and the City. 4. Street widths and cul-de-sac detail provided as requested. 5. Contours labelled as requested. E C E I V E JUL 0 31996 D PROJ # W Eq OS 319 Walnut Street Wilmington, N.C. 28401 (910) 343-8002 6. I have refined my calculation of volume to include grassed areas as directed. These were accounted for in SA determination. 7. SA at normal pool and State storage have been added. 8. The offsite 0.95 acre was included in all calculations at 85%. This was basically just a safety measure based on existing topography; these areas will probably be redirected when developed, but it was accounted for at current zoning as draining to Pond No. 2. Please call me if there are any problems or if I can be of any assistance whatever. Thanks for your attention to this matter. Sincerely, David S. Hollis, PE, RLS Attachments SrAiEo State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. DIVISION OF ENVIRONMENTAL MANAGEMENT Jonathan B. Howes Governor WATER QUALITY SECTION Secretary June 24, 1996 Mr. David Hollis, P.E. Hanover Design Services 319 Walnut Street Wilmington, North Carolina 28401 Subject: ADDITIONAL INFORMATION Stoimwater Project No. SW8 960605 Lakeside Park New Hanover County Dear Mr. Hollis: The Wilmington Regional Office received a Stormwater Management Permit Application for Lakeside Park on June 5, 1996. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The location of the inlet and outlet for each pond creates a dead zone, and the full pond will not be utilized for solids settling. Please relocate outlets or inlets to use all available pond area and eliminate dead zones. 2. Use of perforated pipe for the drawdown piping is OK as long as the total flowrate allowed through the perforations does not exceed .41 cfs. You must close off the downturned portion of the 4" pipe and allow the perforations to act as the orifice. You must also specify the number of perforations and calculate the flowrate. The easiest thing to do is to delete the perforated pipe and make it a solid 4" PVC pipe. 3. Number all the lots on Sheet 1 of 2, the Erosion Control and Water Quality Plan. Lots that require individual SEC plans must submit to DEM as an Offsite system, and provide 2 sets of plans, calculation of built -upon area to show compliance with the 85 % limitation, $225.00 application fee, and a completed application for their site. 4. Please provide the widths of Streets A, B and C, and add a cul-de-sac detail to the plans. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Hollis June 24, 1996 Stonuwater Project No. SW8 960605 5. Label the contour elevations in the forebay area; label and delineate the design pool contour for both ponds. 6. The calculation of percent built -upon, required surface area, and volume must all be based on the same number, the drainage area to the pond. Unless you can route the grassed areas around the pond, they must be included in the volume. 7. Please report the surface areas provided at the 11.5 design pool contour for both ponds. 8. What is the percentage of impervious area present in the off -site area draining to Pond 2? Base this on either the current zoning, or an actual survey. Since it is labelled as an off -site area, it is assumed that runoff enters Pond 2; please include it in the % built -upon, SA/DA, and volume calculations. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 24, 1996, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\960605.JUN cc: Linda Lewis Central Files 2 �,if�r��r•� l F l if f" TO HANOVER DESIGN SERVICES. P.A. (810) 2 mom 319 WALNUTLNUT ST. �:r 1J WILMINGTON, NC 28401 JUN 10f1C Date `'7L v coo suwec4 �2�SC��4s�lt K 2) Sp,� SUM E- c s P V. VVV TO ✓ � � „ ^,� C �C�otic ` �� N A 51996 J !` 1'LCA 41� JUN U 7 1 I Please reply No reply necessary tl�S 026000 .. , _-�.x �'-,,.�11 .'vfi I r'-'�.i.t'� �..> a"j',�•_ ,.r�'��) r.i f•..'.T+d ..,J i_J; ,l +.��a � J ' -r � �- .•. • f_r _}ITT' r:, •-_, .. .' : .��:�.- _`� ..�"j } 4. ,I r. 1..�� -, , )/���{��� +�lryf�jjj',�).,_�. �: J!„�` :.0 �),S .��J �•J �L.i[ 7 ,.. rJ- l' r .rE •-I Sri —�f .j � T � r r - �. A- A le STORMWATER MANAGEMENT & RETENTION POND CALCULATIONS for LAKESIDE PARK prepared for Lakeside L.L.C. A'Odi - a 2, i0-7 RECEIVED MAR 2 1 2003 PROJ # SOJPo CPUS S: �..�tl al �E C ETV ED ((IJJ��JS JUN 0.71996 D ry� PAOJ B CO OS Hanover Design Services, P.A. 319 Walnut Street Wilmington, NC 28401 N CAROZ-", SEAL 20007 5•-:�>t-13a -At I -) IN 41, O ee /� A 3 RECEIVED a MAR 2.1 2003�,,,R� PROJ # ',. sw JDW9roUCoUSMva� C n 'Z` t72A& /^J.4Ge,= •4JOd!:-=3b /`?dP �L,4;�s /us04=71!fn' E::�7Z= % 3 . ?Jp. 03 ❑m W I V , �Aol ' G p®,� r IP- gQ s ME 91 u ------__-- , 24•2o po cu tj G�- 22,30 (.V\- (04-, �d k `Po K3D PQd-fnL- Pok-�'rD �b f Io-o PfG -POOTD t'v-o r-t- _ i 119 it ®----------� I -0 1 1,35® ® 6 WOO C b� p�4 , / rO "LAKESIDE PARK" 1. DRAINAGE AREAS TO POND NO.1: Onsite - 22.9 acres Offsite - 0 acres TOTAL - 22.9 ACRES DRAINING TO POND NO.1 DRAINAGE AREAS TO POND NO.2: Onsite - 23.25 Offsite - 0.95 ac TOTAL - 24.2 ACRES DRAINING TO POND NO.2 2. RUNOFF FACTORS: Baymeade and Kenansville Series POND NO.1 Hydrologic Soil Group "A" Pre -developed - 20.65 acres CN = 50 Post -developed - 20.65 acres @ 85% imp. CN = 89 POND NO.2 Pre -developed - 24.2 acres CN = 50 Post -developed - 24.2 acres @ 85% imp. CN = 89 3. Sedimentation Phase Considerations: POND NO.1 Volume required = 11.7 acres X 1800 cf = 21060 cf Volume provided below normal WSEL = 135000+ cf Volume provided above normal WSEL = 1.69 acre-ft = 73850 cf to weir POND NO.2 Volume required = 12.3 acres X 1800 cf = 22140 cf Volume provided below normal WSEL = 150000+ cf Volume provided above normal WSEL = 1.95 acre-ft = 85100 cf to weir 4. For stormwater management ( SWM ) - POND NO.1 DA = 20.65 acres = 0.032 sq.mi. Tc (post) = 0.25 hr. RCN post -developed = 89 POND NO.2 DA = 24.2 acres = 0.037 sq.mi. To (post) = 0.25 hr. RCN post -developed = 89 NOTE: Use Rational Method to determine peak discharges for inlets, ditches, pipes and roadways. Use TR-20 for SWM and Basin routing. Use 24-hr. Type II distribution. For New Hanover County, use: 7 inches for 10-year event 9 inches for 50-year event 10 inches for 100-year event 6. PEAK DISCHARGE SUMMARY - POND NO.1 Q(10) pre -developed = 37 cfs Q(10) post -developed = 37 cfs @ WSEL = 13.6 Q(50) post -developed = 77 cfs Q(100) post -developed = 105 cfs @ WSEL = 14.4 POND NO.2 Q(10) pre -developed = 43 cfs Q(10) post -developed = 38 cfs @ WSEL = 13.6 Q(50) post -developed = 84 cfs Q(100) post -developed = 114 cfs @ WSEL = 14.5 See TR-20 Output. See attached sheets for Basin details. SWM SUMMARY - BASIN Q(10)IN Q(10)OUT Q(100)IN Q(100)OUT WSEL(10) WSEL(100) 1 128.1 37.2 189.5 104.6 13.6 14.4 2 148.1 38.0 219.1 113,7 13.6 14.5 ADDITIONAL COMPUTATIONS FOR STATE D.E.M. - Impervious calculations: POND NO.1 - A. Streets ( 37' BTB + 10' SW ) 1. Medical Center Drive 1550 LF 1.67 ac. 2. Street "A" 910 LF 0.98 ac. B. 22.9 ac. total - 2.65 ac. = 20.25 ac. @ 85% 2.65 ac. ( to be deed restricted to 85% max. impervious ) 17.21 ac. r C. 19.9 / 22.9 = 0.869, use 87% 19.86 ac. D. At 7.5' depth, 90% TSS removal, from chart: 22.9 X 0.1 X 3.15 = 0.72 ac. SA required E. SA provided ( see Stage -Storage ) = 0.83 ac. SA provided F. Volume required - 19.9 X 1/12 = 72,237 cf Z2c )( Volume provided - = 11.5 = 73,850 cf G. Drawdown time - Use 4"PVC Q = CA(2gh)^1/2 A = 0. 873 sf C = 0.6 Q = 0.297 cfs T = 248,550 sec. = 2.9 days ADDITIONAL COMPUTATIONS FOR STATE D.E.M. - Impervious calculations: POND NO.2 - A. Streets ( 37' BTB + 10' SW ) 1. Medical Center Drive 1760 LF 2. Street "B" and cul-de-sac 380 LF 3. Street "C" 400 LF B. 24.2 ac. total - 2.93 ac. = 21.27 ac. @ 85% ( to be deed restricted to 85% max. impervious ) 1.90 ac. 0.60 ac. 0.43 ac. 2.93 ac. 18.08 ac. 21.01 ac. C. 21.01 / 24.2 = 0.868, use 87% D. At 7.5' depth, 90% TSS removal, from chart: 24.2 X 0.1 X 3.15 = 0.76 ac. SA required E. SA provided ( see Stage -Storage ) = 0.93 ac. SA provided F. Volume required - 21.0 X 1/12 = 76,270 cf Volume provided - @ EL= 11.5 = 85,100 cf G. Drawdown time - Use 4"PVC Q = CA(2gh)^1/2 A = 0. 873 sf C = 0.6 Q = 0.297 cfs T = 286,300 sec. = 3.3 days Qc) a -Pcryt,� I es% f K r2 - 7� 12�-7 r- -� R-10 3 2 834843'SF 2018234 SF 19.165 Ac i1 46.286 Ac CB Y 952345 SF 21.883 Ac MF-M 1267997 SF DRAINAGE AREA TO 29.109 Ac NORTH CROSSING 8 321478 SF 7.380 Ac 16548008 Sr 9 0&—I 37a.ea A< 1 7802898 SF R-10 174.539 Ac .RIOT A R5 0 &- I 0 1524786 SF 7 35.004 Ac J� 5 M F- M 244175 SF 5.605 Ac 0&-I YRD 1694223 SF 8180 SF 38.894 Ac Yro 0.188 Ac 11 CEM R7 13988 SF YF-Y RB R7 10 0..321 Ac C6 c6 " MF—M RR-15 \ W ,.,. 16-Y ' R8 .r. R-15 r R-5 CS R9 R-15 cs R-5 •� DRAINAGE AREA TO ON "Y SOUTH CROSSING 17313665 SF 397.467 Ac 85% TSS REMOVAL 30 FOOT VEGETATED FILTER REQUIRED DBPITi 3' 3.5' 4.0' 4.5' 5.0' 5.5' 6.0' 6.5' 7.0' 7.5' IMP 9b 10 % .9 .8 .7 .6 .5 0 0 0 0 0 20 % 1.7 1.3 1.2 1.1 1.0 .9 .8 .7 .6 .5 30 % 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 .9 40 % 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50 % 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60% 5.0 t 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70 % 6.0 5.2 4.5 4.1 3.7 3.1 2.9 2.5 2.1 1.8 80% 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90 % 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100% 8.2 7.4 6.8 T 6.2 5.6 5.0 4.4 3.8 3.2 2.6 90% TSS REMOVAL NO VEGETATED FILTER REQUIRED DSP1'H 3' 3.5 4.0' 4.5' 5.0' 5.5' 6.0' 6.5' 7.0' 7.5' IMP % 1" 1.3 1.0 .8 .7 .6 .5 .4 .3 .2 .1 207 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 .9 .6 30 % 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 .8 40 % 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 50 % 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2-31.9 1.5 60 % 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70 % 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80 % 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90 % 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100 % 12.0 10.0 8.3 8.1 7.3 6.6 5.8 5.1 4.3 I3.6 Note: The required lurfaoe area calculated from the tables is to be provided at the permanent pool elevation. TOTAL P.02 Y ZONE C LAKE SHORE DR ZONE C LAKESIDE BOULEVARD ZONE) (EL 10) 11 GLEN MEADE ZONE C EWE _ ��C5CY,52nr1r,- -SV-p I ISO -- Z�---- ---- -- ��- o Yb �. I , I e -9 I ~l 1 tt111tttllttttit3I80-9O LIST OF INPUT DATA FOR TR-20 HYOROLOGYtlt11t11tltttttllt JOB TR-20 FULLPRINT SUMMARY TITLE 001 LAKESIDE 10-YR, 50-YR AND !00-YR BASIN Nc.l ROUTING TITLE 001 PRE -DEVELOPED, FILENAME 2260PRE1.T20 6 RUNOFF 1 01 1 .032 50. .25 1 0 0 1 0 ENDATA 7 INCREM 6 0.050 7 COMPUT 7 01 01 0. 7.0 1.0 2 2 01 01 ENDCMP 1 7 COMPUT 7,j 01 01 0. 9.0 1.0 2 2 01 02 ENDCMP 1 7 COMPUT 7 01 01 0. 10.0 1.0 2 1 01 03 ENDCMP 1 ENDJOB 1 Oltlittf111tJtt1tIt3I11ft21f2311END OF 80-80 LISTttJllltiftitlttllttJJttttillltlt 1 TR20 XEO 05-28-96 10:03 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN Nc.1 ROUTINE REV PC 091871.2) PRE -DEVELOPED, FILENAME 2260PPRE1.T20 EXECUTIVE CONTROL OPERATION INCREM MAIN TIME INCREMENT = .05 HOURS EXECUTIVE CONTROL OPERATION COMFUT FROM STRUCTURE i TO STRUCTURE 1 STARTIN6 TIME = .00 RAIN DEPTH = 7.00 RAIN DURATION= 1.00 RAIN TABLE NO.= 2 ALTERNATE NO.= t STORM NO.= 1 MAIN TIME INCREMENT = .05 HOURS OPERATION RUNOFF STRUCTURE 1 OUTPUT '."YOROGRAPH= 1 AREA= .03 SO Mi INPUT RUNOFF CURVE= 50. TIME OF CONCENTRATION= .25 HOURS INTERNAL HYDROERAPH TIME INCREMENT= .0333 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.08 36.96 (RUNOFF) JOB 1 PASS 1 PASE ! RECORD !D RECORD !D ANT. MOIST. COND= 2 RUNOFF VOLUME ABOVE BASEFLOW = 1.11 WATERSHED INCHES, 23.01 CFS-HRS, 1.90 ACRE-FEET; BASEFLOW = 00 CFS --- HYDR06RAPH FOR STRUCTURE 1, ALTERNATE 1, STORM 1, ADDED TO OUTPUT HYDR06RAPH FILE --- EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 1 O TR20 KEG 05-26-96 10:03 REV PC 09/83(.2) LAKESIDE 10-YR, 50-YR AND 100-YR BASIN No.l ROUTING PRE -DEVELOPED, FILENAME 2260PREI.T20 JOB I PASS ^{2 PAGE 2 EXECUTIVE CONTROL OPERATION COMPUT + FROM STRUCTURE 1 + TO STRUCTURE I RAIN DEPTH = 9.00 RAIN DURATION= 1.00 RAIN TABLE NO.= 2 STORM NO.= 2 MAIN TIME INCREMENT = .05 HOURS STARTING TIME = .00 ALTERNATE NO.= 1 OPERATION RUNOFF STRUCTURE OUTPUT HYDROGRAPH= 1 AREA= .03 SO MI INPUT RUNOFF CURVE= 50. TIME OF CONCENTRATION= .25 HOURS INTERNAL HYDROSRAPH TIME INCREMENT= .0333 HOURS P, AK TIME(HRS) PEAK ➢ISCHAR6E(CFS) PEAK ELEVATION(FEET) 12.07 67.27 (RUNOFF) RECORD TD ANT. MOIST. COND= 2 RUNOFF VOLUME ABOVE BASEFLOW = 2.03 WATERSHED INCHES, 41.96 CFS-HRS, 3.47 ACRE-FEET; BASEFLOW = .00 CPS --- HYDROSRAPH FOR STRUCTURE 1, ALTERNATE 1, STORM 2, ADDED TO OUTPUT HYDR06RAPH FILE --- EXECUTIVE CONTROL OPERATION ENDCNP + COMPUTATIONS COMPLETED FOR PASS 2 TR20 XEO 05-28-96 10:03 Lk --SIDE 10-YR',=.•0-YR AND 100-YR BASIN No.1 RDUTi46 REV PC 09/63t.2) PRE -DEVELOPED, FILENAME 2260P'REI.T20 EXECUTIVE CONTROL OPERATION COMPUT + FROM STRUCTURE 1 + TO STRUCTURE 1 STARTING TIME = .00 RAIN DEPTH = 10.00 RAIN DURATION= 1.00 RAIN TABLE NO.= 2 ALTERNATE MO.= 1 STORM NO.= 3 MAIN TIME INCREMENT = .05 HOURS OPERATION RUNOFF STRUCTURE i OUTPUT HYDROGRAPH= 1 AREA= .03 SO MI INPUT RUNOFF CURVE= 50. TIME OF CONCENTRATION= .25 HOURS INTERNAL HYDR06RAPH TIME INCREMENT= .0333 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK. ELEVATIONiFEET) 12.07 63.97 (RUNOFF) RECORD ID JOG . PASS PAGE 3 RECORD 10 ANT. MOIST. CON;:= 2 RUNOFF VOLUME ABOVE BASEFLOW = 2.55 WATERSHED '-INCHES, 52.71 CFS-HRS, 4.36 ACRE-FEET; BASEFLOW = .00 CFS --- HYDR06RAPH FOR STRUCTURE 1, ALTERNATE 1, STORM 3, ADDED TO OUTPUT HYDR06RAPH FILE --- EXECUTIVE CONTROL OPERATION ENDCNP RECORD ID COMPUTATIONS COMPLETED FOR PASS 7 EXECUTIVE CONTROL OPERATION ENDJOB i RECORD ID - TR20 KEG 05-28-96 10:03 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN Na.1 ROUTING REV PC 09/83(.2) PRE -DEVELOPED, FILENAME 2260PREI.T20 JDA 1 SUMMARY PAGE 4 SUMMARY TABLE I - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(l) AFTER THE PEAK DISCHARGE TIME AND RATE ICFS) VALUES INDICATES A FLAT TOP HYDROSRAPH A OUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF ---------------------------- iD OPERATION AREA S COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE (99 MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) l ALTERNATE 1 STORM 1 c RATE (CEM) I Aut, I UNE 1 RUNOFF 03 2 2 .05 .0 7.00 24.00 1.11 --- 12.08 36.96 1154.9 ALTERNATE 1 STORM 2 STRUCTURE 1 RUNOFF .03 2 2 .05 .0 9.00 24.00 2.03 --- 12.07 67.27 2'102.1 ALTERNATE I STORM 3 _...oL-..� . aLt.Orr .03 _ .t�,a .9 :a, AA 24.00 2.55 --- '2.0' ..7 .. 2°24.0 ZO X052B-]:03 1AS1 LAKESIDE tR, 54-YR N0:i+ EAIN-1 Stie.! ROUTING SJM:fRY REV PC 09/83(.2) PRE-DEVELOPE➢, FILENAME 2260PRE;.T20 WE SUMMARY TABLE 3 - DISCHARGE (CFS) AT XSEO':IONS AND STRUCTURES FOR A:L STORMS AND ALTERNATES XSECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... iD (SO MII I 2 3 0 ST+?)CTURE 1 .03 ALTERNATE 1 36.96 67.27 63.3, :END OF 1 JOBS IN THIS RUN tttttlttttttttittt00-80 LIST OF INPUT ➢ATA FOR TR-20 HYDROLOGYttttttttttttttttt JOB TR-20 FULLPRINT SUMMARY TITLE 001 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN No.l ROUTING TITLE 000 ULTIMATE ZONING, ULTIMATE BUILDOUT, FILENAME 2260PNDI.T20 3 STRUCT 02 8 10.0 0.0 0.00 8 11.0 0.4 1.01 8 11.5 0.5 1.70 8 12.0 5.3 2.38 0 13.0 1319 4.01 8 13.5 36.1 4.69 8 l 13.75 40.0 5.33 8 14.0 47.9 5.76 8 14.5 115. b.69 8 15.0 196. 7.62 9 ENDTBL 6 RUNOFF 1 01 1 .032 99. .25 1 0 0 1 0 6 RESVOR 2 02 1 2 10.0 1 1 0 1 0 ENDATA 7 INCREM b 0.050 7 COMPUT 7 01 02 0. 7.0 1.0 2 2 01 01 ENDCMP 1 7 COMPUT 7 01 02 0. 9.0 1.0 2 2 01 02 ENDCMP 1 7 COMPUT 7 01 02 10.0 1.0 2 2 0! 03 END, CMP I ENDJOB 2 OitTtiitttlfitftttitftttitifItifEND OF 80-80 LiSTJttlttlfttlllftY2tifttItfttitili TR20 XEO 05-28-96 11:45 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN No.! ROUTING REV PC 09183(.2) ULTIMATE ZONING, ULTIMATE BU!LDOUT, FILENAME 2260PNDI.T20 EXECUTIVE CONTROL OPERATION INCREM + MAIN TIME INCREMENT = .05 HOURS EXECUTIVE CONTROL OPERATION COMPUT + FROM STRUCTURE I + TO STRUCTURE 2 STARTING TIME = .00 RAIN DEPTH = 7.00 RAIN DURATION= !.00 RAIN TABLE NO.= 2 ALTERNATE NO.= I STORM NO.= I MAIN TIME INCREMENT = .05 HOURS JOB 1 'PASS PAGE 1 RECORD !D RECORD iD ANT. MOIST. COND= 2 )..., OPERATION RUNOFF STRUCTURE' . ,.., STRIICTIIRE=1?, OUTPUT H_YUR06BAPH=_1_:••:' - AREA- .03 SO MI INPUT RUNOFF CURVE= 69. TIME OF CONCENTRATION= .25 HOURS,' .- INTERNAL HYDROGRAPH TIME INCREMENT= .0333 HOURS PEAK TIME(HRS) PEAK DISCHAR6EICFS) 12.05 128.08 RUNOFF VOLUME ABOVE BASEFLOW = 4.68 WATERSHED INCHES, PEAK ELEVATION(FEET) (RUNOFF) .00 CFS --- HYDROGRAPH FOR STRUCTURE 1, ALTERNATE 1, STORM 1, ADDED TO OUTPUT HYDROGRRPH FILE --- OPERATION RESVOR STRUCTURE 2 INPUT HYDR06RAPH= i SURFACE ELEVATION= TIMEIHkl 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 6.50 9.00 9.50 l0.00 10. SD 11. DO I!.50 !2.00 12.5D i3.00 13.50 1 PEAK TIME(HRS) 12.33 OUTPUT HYDR06RAPH= 2 10.00 96.58 CFS-HRS, 7.98 ACRE-FEET; BASEFLOW = PEAK DISCHAR5E(CFS) PEAK ELEVATION(FEET) 37.22 13.57 FIRST HYDROBRAPH POINT = DISCH6 .00 00 DISCH6 .01 .01 DISCH6 .02 .02 DISCHS .02 .03 DISCH6 .04 .04 ➢ISCH6 .05 .05 DISCH6 .07 .07 DISCH6 .09 .09 DISCHS .11 .12 DISCH6 .14 .15 DISCHG .15 .16 DISCHS 2 22 DISC•H..6 .27 .2B DISCHS .33 .34 DISCH6 .41 .41 DISCH6 .46 .47 DISCHS 10.64 13.11 DISCHS 35.69 34.24 DISCH6 21.45 20.37 DISCH6 13.75 13.61 .00 HOURS TIME INCREMENT = .05 HOURS .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .04 .04 .04 .04 .04 .06 .06 .06 .06 .06 .07 .03 OB .06 .08 .10 .10 .10 .10 .10 .12 .12 .12 .!3 .13 15 15 i6 .16 .16 .19 .19 .!9 .20 .20 .23 .23 .24 .24 .25 28 Inj .29 .30 3n .35 .35 .36 .,, .38 .42 .42 .43 .43 .44 .48 .49 .97 2.05 3.30 21.23 29,84 35.l. 36.19 77.18 32.58 30."r5 25.36 27.65 26.E2 19.37 16.42 l7.52 16.67 2.88 13.47 13.34 13.0 13.05 12.91 TR20 XED 05-26-96 11:45 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN N0.1 ROUTING REV PC 09/63(.2) ULTIMATE ZONING, ULTIMATE BUILDOUT, FILENAME 2260PND!.T20 14.00 DISCHS 12.33 12.19 12.04 11.90 11.76 11.62 11.48 i4.50 DISCH6 10.93 10.79 10.65 10.52 10.38 10.25 10.11 DRAINAGE AREA = .01 .01 .01 .01 .02 .02 .03 .03 .05 .05 .06 .07 .09 .09 .11 .11 13 .14 I7 .17 .21 .21 .25 ._6 .39 .40 .44 .45 4.83 6.45 37.20 36.77 25.06 23.81 15.15 !4.46 12.76 12.62 03 SO.MI. .01 .01 .02 .04 .05 .07 .09 .11 .14 .17 .22 .26 .32 40 .46 6.36 36.56 22 60 13.88 12.47 JOB 1 PASS I PAGE 11.34 11.20 11.07 9.98 9.05 9.73 RUNOFF VOLUME ABOVE BASEFLOW = 2.79 NATERSHED INCHES, 57.61 CFS-HRS, 4.76 ACRE-FEET; BASEFLOW = .00 CFS --- HYDROGRAPH FOR STRUCTURE 2, ALTERNATE 1, STORM 1, ADDED TO OUTPUT HYDROGRAPH FILE --- EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID + COMPUTATIONS COMPLETED FOR PASS 1 TR20 XEO 05-28-96 11:45 REY PC 09/83(.2) LAKESIDE 10-YR, 50-YR AND 100-YR BASIN No.1 ROUTING ULTIMATE ZONING, ULTIMATE BUILDOUT, FILENAME 2260PND1.T20 30B I ` PASS 2 PAGE 3 EXECUTIVE CONTROL OPERATION COMPUT RECOR➢ ID + FROM STRUCTURE * TO STRUCTURE 2 STARTING TINE _ .OG RA114 DEPTH = 9.00 RAIN DURATION= 1.00 RAIN TABLE NO.= 2 ANT. MOIST. COND= 2 ALTERNATE NO.= I STORM NO.= 2 MAIN TIME INCREMENT = .05 HOURS OPERATION RUNOFF STRUCTURE 1 OUTPUT HYDROGRAPH= I 1, AREA= .03 SO MI INPUT RUNOFF CURVE= 89. TIME OF CONCENTRATION= .25 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0333 HOURS PEAK TIMEIRRSI PEAK DISCHARGE(CFS) PEAK ELEVATION(fEET) 12.04 169.10 (RUNOFF) RUNOFF VOLUME ABOVE BASEFLOW = 6.33 WATERSHED INCHES, 130.72 CFS-HRS, 10.80 ACRE-FEET; BASEFLON = 00 CFS --- HYDR06RAPH FOR STRUCTURE 1, ALTERNATE 1, STORM 2, ADDED TO OUTPUT HYDROGRAPH FILE --- OPERATION RESVOR STRUCTURE 1 INPUT HYDROGRAPH= i OUTPUT HYDROGRAPH= 2 s_'RFAC: ;-EV::ION= 10.00 PEAK TIME(FIRS) PEAK DISCHARGEfCFS) PEAK ELEVATION (FEET) 12.24 77.37 14.22 TIMEIHRS) FliST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .05 HOURS DRAINAGE AREA = 03 SB.MI. 3.50 DISC .CI .01 .01 .01 .01 .01 .0i .01 4.00 DISCHG .01 .01 .01 .01 .02 .02 .02 .02 .01 .01 4.50 DISCHG .02 .03 .03 .03 .03 .03 .03 .03 .02 .02 5.00 DISCHE .04 .04 .04 .04 .05 .05 .05 .04 .04 5,50 DISCHE 06 .06 .06 .06 .06 .07 .07 .05 .05 G7 .05 O7 6.00 DISCHE .08 .08 .08 .08 .09 .09 .09 .07 6.50 DISCH6 .10 .11 .11 .11 .11 .12 " .09 1? .10 .10 7.00 DISCH6 ,i3 .14 .14 .14 .15 .15 .15 .13 .13 7.50 DISCHE .17 .17 .17 .16 is .18 .1? .16 .19 .16 .16 0.00 DISCH6 .20 .20 .21 .71 .21 ?2 .19 .20 6.50 DISCH6 .24 .25 .25 .2b .16 .17 27 .23 .23 .24 9.00 DTSCHG .19 .30 .31 .31 .32 .32 .33 .28 .28 .29 9.50 DISCH6 .36 .36 .37 ,38 .38 .39 .40 .34 .34 .35 10.00 DISCH6 .41 .41 .42 .42 .42 .42 .43 .40 .4p .41 10.50 ➢ISCHfi .44 .45 .45 .45 .46 .46 .47 .43 .43 .44 11.00 DISCH6 .49 .50 .65 .96 1.28 1.61 1.93 .47 2.26 .45 2.60 .48 2.95 11.50 DISCH6 3.31 3.71 4.22 4.97 5.95 6.64 8.01 9.49 11.43 13.98 12.00 DISCHE 27.56 37.96 45.01 62.90 75,39 77.29 73.47 67.25 60.25 53.26 12.50 DISCH6 47.60 45.95 44.27 42.57 40.88 39.62 36.83 38.04 37.24 36.45 13.00 ➢ISCH6 34.87 32.78 30.85 29.06 27.39 15.83 24.40 23.07 21.84 20.70 13.50 DISCH6 19.64 18.66 17.75 16.90 16.10 15.34 14.65 14.00 13.79 13.66 14.00 DISCH6 13.53 13.40 13.2b 13.13 13.00 12.66 12.73 12.60 12.46 12.33 14.50 i DISCH6 12.20 12.06 11.93 11.79 11.66 11.52 11.39 11.25 11.12 10.99 TR20 XEO 05-28-96 11:45 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN No.1 ROUTING JOB I PASS' 2 REV PC 09/63(.2) ULTIMATE ZONING, ULTIMATE BUILDOUT, FILENAME 2260PND1.T20 PAGE 4 RUNOFF VOLUME ABOVE BASEFLON = 4.30 NATERSHED INCHES, E6.80 CFS-HRS, 7,35 ACRE-FEET, BASEFLON = .00 CFS --- HYDR06RAPH FOR STRUCTURE 2, ALTERNATE 1, STORM 2, ADDED TO OUTPUT HYDR05RAPH FILE --- EXECUTIVE CONTROL 3F•ERATION ENDCMP RECORD ID + COMPUTATIONS COMPLETED FOR PASS 2 1 re TR20 XED OS-28-96 11:45 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN No.l ROUTING REV PC 09/83(:2) ULTIMATE ZONING, ULTIMATE BUILDOUT, FILENAME 2260PNDI.T20 EXECUTIVE CONTROL OPERATION COMPUT FROM STRUCTURE I TO STRUCTURE 2 S?ARTIKG TIME = RAIN DEPTH = i0.00 RAIN DURATION= L.OP RAIN TABLE ND.= 2 ALTERNATE N.,.= 1 STORY NO.= 3 MAIN TIME iNCREMEMT = .F HOUR' :1PERATiCrc RUBDFF =?2 icRE '. Wirt, aVDi lli i•n'ir . nnEA= OFF C E9, TIME OF EONC_NTRATToN= ..5 HO Y. INTEF.kA 'r.YDF.D'uRA 'r, TIME iNCREMENT= .0333 HOURS FEAK TI%E(HkSi FEAK DISCHAkSEl6.a1 12.04 189.48 RUNOFF VOLUME ABOVE BASEFLOW = 7.16 k'ATEREHED INCHES, FEAK ELEVATIONIFEE i IRUNOFFI JOB I PASS 3 PAGE 5 RECORD ID ANT. MCIST. CDND= 2 147.9i CFS-HRS. 12.22 ACRE-FEET; RASEFLON = O0 CFS :.YDROSRAF'H FOR STRUCTURE 1, ALTERNATE 1, STORM 3, ADDED TO OUTPUT HYDROGRAPH FILE --- __ OPERATION RESVOR STRUCTURE 2 INPUT HYDR06RAPH= I OUTPUT HYDR06RAPH= 2 SURFACE ELEVATION= 10.00 PEAK TIME(HRS) PEAK ➢ISCHARGE(CFS) PEAK ELEVATION(FEET) 12.21 104.57 14.42 TIME(HRS) 3.00 FIRST HYDR06RAPH POINT = .00 HOURS TIME INCREMENT = ,05 HOURS DRAINAGE AREA = SD.MI, DISCH6 .00 .00 .00 .00 .01 .01 .01 .03 3.50 DISCH6 .01 CI .01 Oi Oi Oi .01 .01 01 4.00 DISCH6 .02 .02 .02 .07 .02 .03 .01 .03 .02 .02 .01 4.JO DISCHG 03 04 04 .04 .04 .04 .05 .03 .03 .03 J.00 D!SCH6 C5 C'6 .06 .06 .06 .06 .07 .05 .05 •05 J,50 DISCH6 .08 .08 .06 .08 .09 .09 .09 .0- ,07 07 6.00 DISCHG .10 .10 .11 .11 .11 li i2 .09 .10 .10 6,50 DISC•r'S .13 .i4 .14 .14 .15 .15 .12 7.00 DISCH6 .17 .17 .18 .18 .18 .19 .15 .19 .!6 .19 .16 .16 7.50 8.00 DISCH6 DISCH6 .21 .21 .21 .22 .22 .23 n3 .23 .20 24 .20 .24 8.50 DftCH6 .25 .25 .26 .26 .26 .27 ,27 .28 .26 .29 9.00 DISCH6 .30 .36 .30 .31 .31 .32 .33 .33 .34 •35 ,35 9.50 DISCH6 .41 .36 .4! .37 42 .38 .42 .38 ,39 .40 .40 .41 .41 10.00 DISCH6 .44 .44 .45 .45 .42 .45 .43 .43 .43 .43 .44 10,50 DISCH6 .48 .46 .49 .49 .50 .46 .46 .47 1.17 .47 .47 11.00 DISCH6 2.03 2.32 2.62 2.92 3.23 .63 3.55 .90 3.87 4.20 1.45 4.2 1.74 4.89 11.50 12.00 DISCH6 DISCH6 5.26 5.57 5.90 6,59 7.47 8.58 9.89 11.53 13.69 25.68 12.50 DISCH6 37.49 45.73 75.75 97.42 104.38 101.31 93,IS 83.36 73.40 64.02 13.00 DISCHo 5J.65 49.49 46.39 44.71 43.03 41.38 39,90 35.14 38.37 37.60 13.JG DISCH6 36.82 "1 3J.97 33.87 31.93 30.11 26,42 26.86 25.42 24,08 22.83 i4.00 DISCH6 67 13.84 2^ ".60 ±9.c1 ^, !8,68 17.60 i6.98 16.2. 15,50 14.S4 14,22 13.72 6' 1' 4 13.36 13.23 13, 11 iZ 9i sc TR20 XED 05-28-96 11:45 REV PC 09JG3L2) 14.50 LISCHG LAKESIDE l ULiI TE tUO-YR 2ASI6'R8L"?ib'G ZON!RG, UL?IMATE BUILDOUT. FILENAME 226CPN➢1.?2C 12.6C 12.47 1_, j3 12.22 n q¢, V; BASE LOW = P S.Co WAiEB HED :NCHct. 12.02 104.97E.67 ACRE-FEET JOB 1 PASS PAGE t 11.44 - HYDkOERAP9 POR STRUC'UP.E 2, ALTERNATE 11 STORM 3, ADDED TO OUTPUT HYDR"u6n''AF'S FILE - -- EXECUTIVE CONTROL OPERA':ON ENDCMP COMPCTuT!ONS COMPLETED PDR PASS 3 RECORD ID t EXECUTIVE CONTROL OPERATION ENDJOE' RECORD ID 'TR20 XEO 05-28-96 11:45 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN No.1 ROUTING REV PC 09/83(.2) ULTIMATE ZONING, ULTIMATE BUILDOUT, FILENAME 2260PNDL.T20 JOB I SUMMARY PAGE 7 SUMMARY TABLE I - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS Ili THE ORDER PERFORMED (A STAR(I) AFTER THE PEAK. DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDS46RAPH A QUESTION MARK('! INDICATES A HYDRDERAPH WITH PEAK, AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC NAIN PkECIPIiATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- iD OrFERATION AREA E COND INCkEM BEGIN AMOUNT DURATION AMOUNT ELEVAIICN' TIME RATE RATE (ED MI) (RR) (HR) (IN) (HR) (iN) (FT) (HR) (CFS) (CEM) ALTERNATE 1 STORM 1 STRUCTURE 1 RUNOFF .03 2 05 .0 . 7.00 24.00 4.60 --- 12.05 128.06 STRUCTURE 2 RE5VOR 03 2 2 .05 .0 7.00 24.00 2.79 13.`.7 12.33 37.22 4002.7 1163.3 `r ALTERNATE 1 STORM 2 STRUCTURE 1 RUNOFF .03 2 2 .05 .0 9.00 24.00 6.33 --- 12.04 169.10 5264.4 STRUCTURE 2 RESVOR 03 2 .05 .0 9.00 24.00 4.30 14.22 12.24 77.37 2417.8 ALTERNATE I STORM 3 STRUCTURE 1 RUNOFF .03 2 01 0 10.00 24.00 7.16 --- 12.04 189.48 5921.3 STRUCTURE 2 RESVOR '03 2 .05 C.10.00 24.00 5.08 :•4.42 12.21 104.57 3267.7 ?R2v' 0 t 6 ii:S nKEE1OE 4'=. �. 0 ..: P 100-YR Gn-� AN. ,i .. ,:N „ n ,o.] R UTING of i S'iMMARY REV PC 09783.21 ULiIMA:E I0:'iL".'u, i;L-;!SATE BGILD3UT; FILENAME 2260PNDi,T'A • NEE 6 SUMMARY TABLE 3 DISCHARGE frFc, AT 15-1-THE!S A -ND STR'JCT"RES =0R ALL STORMS AND ALTERNATES XSECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID (SO Mi) 1 2 0 STRUCTURE .03 ALTERNATE '. 0 STRUCTURE 03 ALTERNATE 1 1END OF I JOBS IN THIS RUN 37,�. T1.7.7 104.5' u"8.00 t6+.1: i64.48 • (•� J ►_ ,-. cam, q-.- = `%`� .� ----' `t--1-�---- IN =hxu l0.00 zt( Sec rk Pr,-�- FIGURE 38 I FIGURES 235 HEAD FOR CIRCULAR CONCRETE PIPE CULVERTS FLOWING FULL n = 0.012 0 z 144 132 F 120 300 � 66 � 200 60 U z_ w 54 � = U 48 100 Z w CD 80 ? 42 = 60 0 36 U) M 50 n 33 0 0 w w _ // � 2 20 18 10 15 8 6 12 H w HW h z b .4 S/o�pe So SUBMERGED OUTLET CULVERT FLOWING FULL .5 HW=H+ho-SoL .6 For outlet crown not submerged, compute HW by methods described in the design procedure •$ 1.0 �F w co 2 3 �° FF Q 4 5 000 5°° 6 7°O ry P 0 10 o 'a s �20 f 3" 2-cP '0� �v t � -�5 2 c 5 4 2 `" (2r-P cp 5` � LRows 40 c�t BUREAU OF PUBLIC ROADS JAN. 1963 2_ D tom__ 2 O,�),) 3 q-)S. 100 I . S R-10 3 2 834843 SF 2016234 SF 19.165 At �1 46.286 A6 952348 SF CB Y 21.863 At MF-M DRAINAGE AREA T1 NORTH CROSSING 8 321476 3At 3 176 i� sr 7.80 Ad 9 08'-1 7602898 SF 174.539 At R-10 RIO R5 r 0&-1 11 p 7 135.004 SF 35.004 At MF-M 2sa15 A� a 03 pg�_ 6 0&-1 YIIO 1694223 SF w 8180 38.894 At w10` 1 1 0.188 At .._. CEM ft7 13988 SF YF-Y RB R7 1 0 0.321 At rr p cs a °i� Yrr MF-M R-15 W Mr YF-Y � err ft-13 Ry � ._. R-5 r a R9 R-15 _DrZA I fJbG� A fl � 09 UHO r ur_Y _ a 23 25 pcj��s� �e R-5 DRAINAGE AREA TO SOUTH Sr CROSSING 2il zo J °" 3.467 Ae "t = ss t co � i 2 (,I-.o C),(,-;) -+ 4-7 nj 1 1 0 - U.Urc, �3"z 0— A-5-,3S- --- ;E3 1 '35,2. --C)- 0 404 4- 6 re-A-iF,; -.� 1 5. COV 12A-0 Qom-- U,C) lilSitiXXitlittl1t60-80 LIST OF INPUT DATA FOR TR-20 HYDROLO5Yltitllltltllltlltt JOB TR-20 FULLPRINT SUMMARY TITLE 001 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN No.2 ROUTING TITLE 000 PRE -DEVELOPED, FILENAME 2260PRE2.T20 6 RUNOFF 1 01 1 .037 50. .25 1 0 0 1 0 ENDATA 7 INCREM 6 0.050 7 COMPUT 7 01 01 0. 7.0 1.0 2 2 01 Of ENDCMP 1 7 COMPUT 7 01 01 0. 9.0 1.0 2 2 01 02 ENDCMP I t 7 COMPUT 7 l01 01 0. 10.0 1.0 2 2 01 03 EN➢CMP 1 ENDJOB 2 OlttttltttttlittitttttttttttttttEND OF 80-BO LISTttlittttltittttttttttttttttttttt I TR20 XEO 05-31-96 02:54 LAKESIDE IO-YR, 50-YR AND 100-YR BASIN No.2 ROUTING REV PC 09/83(.2) PRE -DEVELOPED, FILENAME 2260PRE2.T20 EXECUTIVE CONTROL OPPEPATIDN INCREM MAIN TIME INCREMENT = .05 HOURS EXECUTIVE CONTROL OPERATION COMPUT FROM STRUCTURE TO STRUCTURE I STARTING TIME _ .00 RAIN DEPTH = 7.00 RAIN DURATION= 1.00 RAIN TABLE NO.= 2 ALTERNATE NO.= 1 STORM NO.= I MAIN TIME INCREMENT = .05 HOURS OPERATION RUNOFF STRUCTURE 1 OUTPUT HYDR06RAPH= ) AREA= .04 SO MI INPUT RUNOFF CURVE= 50. TIME OF CONCENTRATION= .25 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0333 HOURS PEAK TIME(HRS) PEAK DISCHAR6E(CFS) 12.05 42.73 RUNOFF VOLUME ABOVE BASEFLOW = 1.11 WATERSHED INCHES, PEAK ELEVATION(FEET) (RUNOFF) JOB 1 PASS 1 PAGE 1 RECORD ID RECORD ID ANT. MOIST. COND= 2 26.61 CFS-HRS, 2.20 ACRE-FEET; BASEFLOW = .00 CFS --- HYDRDERAPH FOR STRUCTURE 1, ALTERNATE 1, STORM 1, ADDED TO OUTPUT HYDR06RAPH FILE --- EXECUTIVE CONTROL OPERATION EN➢CMP RECORD ID' + COMPUTATIONS COMPLETED FOR PASS I T:: �2 .-.r.•.;..o-.'-,n:,.;; ga. .;. .. _ .,--.. .�.. ,i_+�r-.,�,�-..._;._:.,_...,...,�.yr+7+t!..,�::.�«.r+.:x TR2d XED;OS-31L96 `02 54 < LAKESIDE f0 YR,_�0-YR AND 100-YR'BASIN No:2 ROUTING',' .,;}.�, JDB-,-•. REV. PC.09/B3(.21 PRE -DEVELOPED, FILEkaME 2260PRE2.T20 , ASS EXECUTIVE CONTROL OPERATION COMPUT REC08➢ ID'%;--=.,.' x• ,.r - FROM STRUCTURE i = + TO STRUCTURE 1 STARTING TIME = .00 RAIN DEPTH = 9.00 RAIN DURATION= 1.00 RAIN TABLE NO.= 2 ANT. MOIST. COED= 2 ., ALTERNATE NO.= 1 STORM NO.= 2 MAIN TIME INCREMENT = .OS HOURS OPERATION RUNOFF STRUCTURE 1 OUTPUT HYDROGRAPH= 1 AREA= .04 SO MI INPUT RUNOFF CURVE= 50. TIME OF CONCENTRATION= .25 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0333 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.07 77.70 (RUNOFF) RUNOFF VOLUME ABOVE BASEFLOW = 2.03 WATERSHED INCHES, 49.54 CFS-HRS, 4.01 ACRE-FEET; BASEFLUN = .00 CFS --- HYDROGRAPH FOR STRUCTURE 1, ALTERNATE 1, STORM 2, ADDED 70 OUTPUT HYDROGRAPH FILE -- EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID + COMPUTATIONS COMPLETED FOR PASS 2 TR20 XED 05-31-96 02:54 LAKESIDE SO-YR, 50-YR AND 100-YR SASIN No.2 ROUTINE REV PC 09lE3i.2) PRE-DEVELOFED, FILENAME 2260PRE2.T20 EXECUTIVE C01:TROL OPERATION COMP'UT + FROM STRUCTURE 1 TO STRUCTURE I STARTIN5 TIME = .00 RAIN DEPTH = 10.00 RAIN DURATION= 1.00 PAIN TABLE NO.= 2 ALTERNATE NO.= I STORM NO.= 3 MAIN TIME INCREMENT = .05 HOURS OPERATION RUNOFF STRUCTURE 1 CUTFUT HYDROGRAPH= i AREA= .04 SO MI INPUT RUNOFF CURVE= 50. TIME OF CONCENTRATION= .25 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0333 HOURS PEAK TIME(HRS) PEAK DIECHARGE(CFS) PEAK ELEVATION(FEET) 12.07 97.07 (RUNOFF) JOB 1 PASS 3 PA5E 3 RECORD ID ANT. MOIST. COND= 2 RUNOFF VOLUME ABOVE BASEFLOW = 2.55 WATERSHED INCHES, 60.94 CFS-HRS, 5.04 ACRE-FEET; BASEFLOW = .00 CFS --- HYDROGRAPH FUR STRUCTURE 1, ALTERNATE 1, STORM 3, ADDED TO OUTPUT HYDROSRAPH FILE --- EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID + COMPUTATIONS COMPLETED FOR PASS 3 EXECUTIVE CONTROL OPERATION .EN➢JOB �:'�:';' '. - � ` "i;': �°fc? •`` ' ' a•. fr: TR20 SEA 05-31-96 02:54 LAKESI➢E 10-YR, 50-YR AND 100-YR BASIN No.2 ROUTING REV PC 09/63(.2) PRE-DEVELOPPE➢, FILENAME 2260PRE2.T20 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED IA STAR(t) AFTER THE PEAK DISCHARGE TIME AND RATE (CPS) VALUES INDICATES A FLAT TOP HYDROSRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF ------------------------------------ ID OPERATION AREA Y CORD INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SO MI) (HR) (HR) (IN) (HR) (IN) (FT) IHRI (CPS), - (CSML. ALTERNATE t I STORM 1 + STRUCTURE I RUNOFF .04 ALTERNATE 1 STORM 2 STRUCTURE 1 RUNOFF ,04 ALTERNATE 1 STORM 3 STRUCTURE I RUNOFF ,04 TR20 XED 05 31-96 02:54 REV PC 09/63(.2) 2 2 .05 .0 7.00 24.00 1.11 2 2 .05 .0 9.00 24.00 2.03 2 2 .05 .0 10.00 24.00 2.55 LAKESIDE 10-Y�, 50-YR AND 100-YR BASIN N,.2 ROUTING PRE -DEVELOPED, FILENAME 2260PRE2.T20 SUMMARY TABLE 3 DISCHARGE iCFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES XSECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID (SD MIi 1 2 STRUCTURE 1 .04 ALTERNATE 1 42.73 77.76 97,09 LEND OF 1 JOBS IN THIS RUN --- 12.07 77.78 21OL-f --- 12.07 97.09 2624.0 JOB I SUMMARY PAGE 5 I Iliitltltlttttttli80-6O LIST OF INPUT DATA FOR TR-20 HY➢ROL06Yttttttitttlttlttlt JOE TR-20 FULLPRINT SUMMARY TITLE 001 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN No.2 ROUTING TITLE 000 ULTIMATE ZONING, ULTIMATE BUILDOUT, FILENAME 2260PHD2.T20 3 STRUCT 02 8 10.0 0.0 0.00 E 11.0 0.4 1.15 8 11.5 0.5 1.96 8 12.0 5.3 2.76 8 13.0 13.9 4.66 8 13.5 36.1 5.69 8 [ 13.75 40.0 6.20 8 14.0 47.9 6.71 8 14.5 115. 131 8 15.0 198. 8.90 9 EN➢TBL 6 RUNOFF 1 01 1 .037 89. .25 1 0 0 1 0 6 RESVOR 2 02 1 2 10.0 1 1 0 1 0 ENDATA 7 INCREM 6 0.050 7 COMPUT 7 01 02 0. 7.0 110 2 2 01 01 ENDCMP 1 7 COMPUT 7 01 02 0. 910 1.0 2 2 01 02 ENDCMP 1 7 COMFUT 7 01 02 0. 10.0 1.0 2 2 011 03 ENDCKID ENDJOB 2 OtU gtttlYtliiltilitilit►tltlUEP.O OF 80-80 LIST ililitli►ttttlltliIllllllllUttt 1 TR20 XED 05-31-96 02:52 LAKESI➢E 10-YR, 50-YR AND 100-YR BASIN No.' ROUTING REV PC 09783(.2) ULTIMATE ZONING, ULTIMATE BUILDOUT, -FILENAME 2260PND2.T20 EXECUTIVE CONTROL OPERATION INCREM + MAIN TIME INCREMENT = .05 HOURS EXECUTIVE CONTROL OPERATION COMPUT + FROM STRUCTURE I + TO STRUCTURE 2 STARTING TIME = .00 RAIN DEPTH = 7.00 RAIN DURATION= 1.00 RAIN TABLE NO.= 2 ALTERNATE NO.= 1 STORM NO.= 1 MAIN TIME INCREMENT = .05 HOURS OPERATION RUNOFF STRUCTURE I OUTPUT HYDROGRAPH= 1 AREA= .04 SO MI INPUT RUNOFF CURVE= 09. TIME OF CONCENTRATION= .25 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0333 HOURS JOB 1 PASS i PAGE I RECORD ID RECORD ID ANT. MOIST. COND= 2 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) jOLUKE ABOVE BASEFLON = -4:68 WATERSHED INCHES, 111.66 CFS-HRS, - - HYDR06RAPH FOR STRUCTURE 1, ALTERNATE 1, STORM iION RESVOR STRUCTURE 2 INPUT HYDROGRAPH= 1 SURFACE ELEVATION= PEAK TIME(h'RS) 12.36 OUTPUT HYDROGRAPH= 2 10.00 9.23 ACRE-FEET;:`1ASEFLONI. CFS , s=. iq 1, ADDED TO OUTPUT WDR06RAPH FILE'.-r,? PEAK DISCHARSE(CFS) PEAK ELEVATION(FEET) 38.03 13.62 TINE(HRS) FIRST HYDROGRAFH POINT = 4.00 DISCHG .00 •00 4,50 DISCH6 .01 .01 5.00 DISCH6 .02 .02 5.50 DISCHG .03 .03 6.00 DI,SCH5 .04 .04 6.50 DISCH6 .05 .05 7.00 DISCH6 .07 .07 7.50 AISCHG .09 .10 8.00 DISCHG .12 .12 6.50 DISCH6 .14 .15 9.00 DISCHG .18 .19 9.50 DISCHG .23 .23 10.00 DISCH6 .28 .20 10.50 DISCHG .34 .35 I1.O0 DISCHG .41 •42 11.50 DISCH6 .47 .47 12 00 DISCH6 10.70 i2.50 DISCHG 37.29 i3.vU DISCH6 25.b4 24.50 .3.50 DISCHG 16.46 15.82 00 HOURS TINE INCR.ECFNT = .05 HOURSOt DRAINAGE AREA = OS SD. MI. .00 .00 .00 01 .01 .01 .00 .01 .01 .01 .01 .01 .0: .01 .02 .01 .02 .02 .02 .02 .02 .02 .02 .03 .01 .04 03 .03 03 .03 .03 .04 .04 .04 .04 .06 06 .07 .07 07 .06 •0E .08 .06 .09 .08 .06 .09 .09 .09 .08 .10 .10 .10 .10 .11 .11 .11 .11 .12 .12 .13 .13 .13 .14 .15 .16 .16 .16 .17 .17 .22 .22 .19 .19 .20 .20 .21 .21 .26 .27 .27 .23 .24 .24 .25 .25 .31 .32 .32 .33 .29 .29 .30 .31 .78 .19 .40 .40 .41 .35 .36 .37 .43 .44 .44 .45 .45 .46 .42 4B .43 1.08 ?.14 3.36 4.90 6.50 8.42 21.70 .49 S! 30..,J ib.15 37.29 37.84 38.02 31.95 37.bB 26. 36.31 S.i7 i3,64 '2.15 30.7'. ?9.39 18.74 28.09 17.95 7. .1c 23.41 22.:,5 21.SP .0.46 19.57 13.44 13.32 15.19 i4.59 !4.0! a, •-• 0 13.56 i3.56 TR20 SEG 05-3i 46 02:52 LAKESIDE 1(i YR, 50-YR AND 100 YS BkSiN Ho.2 RGO?iN6 3 REV PC 09181.21 L'Li. . :THINS, ULTIMATE GUIL' Ui, FILENAME 2260PND2•I11 - JO 1 PASS PASE - 14.00 DiSCHS ,3.20 13.06 12.95 12.93 12.7: 17.58 12.46 12.34 12. 22 12.09 14.50 DISCHG il.97 11.84 !1.72 11.60 11.47 !1.35 11.22 11.10 10.98 10.86 RUNOFF VOLUME ABOVE BASEFLOW = 2.65 WATERSHED INc`ES, 63,3E GS H+S, 5.24 ACRE-FEET; 6A cFLON = 00 CFS -- HYOR05RA"rH FpR STRUCIURE 2, ALTERNATE 1, STORM !, ADDED TO OUTPUT RYDR.OGRAPH FILE --- EIc UiiVE CONTROL OPERATION ENDCMP COMPUTATIONS COMPLETED FOR =ASS 1 TR20 XEO OS-3116 02:52 LAKESI➢E 10-YR, 50-YR AND 100-YR BASIN Nc.2 ROUTING REV PC 09/83(.21 ULTIMATE 7➢NIN6, ULTIMATE BUILBOUT, FILENAME 2260FND2.T20 RECORD IC• J08 1 PASS 2 PAGE 3 STARTING TIME = .00 RAIN DEPTH = 9.00 RAIN'DURATION= 1.00 ' RAIN TABLE.NO.= 2^"ANT: MOIST': COND '2;'r' ';,_•,;r, ALTERNATE NO.= I STORM NO.= 2 MAIN TIME'INCREMENT = .OS HOURS OPERATION RUNOFF STRUCTURE 1 OUTPUT HY➢R06RAPH= f AREA= .04 SO MI INPUT RUNOFF CURVE= 89. TIME OF CONCENTRATION= .25 HOURS INTERNAL HYDR05RAPH TIME INCREMENT= .0333 HOURS PEAK TIME(HRS) PEAK DISCHARSE(CFS) PEAK ELEVATION(FEET) 12.04 195.52 (RUNOFF) RUNOFF :'OLUPE ABOVE BASEFLOW = 6.33 RATERSHED INCHES, 151.14 Cf5-HkS, I'2.49 ACRE-FEET; fiASEFLOd = 00 CPS --- HYDROBRAPH FOR STRUCTURE 1, ALTERNATE 1, STORM 2, ADDED TO OUTPUT HYDROGRAPH FILE --- OPERATION RESVOR STRUCTURE 2 INPUT HYDROGRAPH= 1 OUTPUT HY➢8OGRAPH= 2 SURFACE ELEVATION= 10.00 1j PEAK TIME(HRS) PEAK DISCHARGE(CFSI PEAK ELEVATION(FEET) 12.25 84.47 14.27 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .05 HOURS DRAINAGE AREA = .04 SD,MI. 3.50 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 4.00 DISCH6 .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 4.50 DISCH6 .02 .03 .03 .03 .03 .03 .03 .03 .04 .04 5.00 DISCH6 .04 .04 .04 .04 .05 .05 .05 .05 .05 .06 5.50 DISCH6 .06 Ob .06 .06 .07 .07 .07 .07 .07 .08 6.00 DISCHG .08 .08 .06 ,DS .09 .09 .09 !0 .10 .10 6.50 2ISCH6 .10 ,il 11 .11 .12 .12' 12 .13 i3 .13 7.00 DISCHG .14 .14 .14 .15 .15 15 .16 ,i6 .1E .17 1,50 DISCHG .17 .17 .16 .18 .18 i9 i9 .19 2D .20 8.00 DISCHG .20 .21 .21 .22 .22 .22 .23 .23 .24 .24 E.50 DISCH6 .25 .25 .26 .25 .21 .27 .28 .2E 29 .30 9.00 D"CH6 .30 .31 .3! .32 :_ _. 34 .-4 .35 .36 9.50 ➢ISCH6 .36 .37 .38 .39 90 .40 41 41 .41 10.00 OiSC G .41 .42 .42 .42 .41 .4-1 .43 .43 .44 10.5C DISC 6 45 .45 ..5 .46 46 .4 .47 fiE 46 .99 11.00 DI6CHG 49 .50 1.09 :.4A 2.05 2.37 2.71 3.07 Ii.50 D?SCHG 3.43 3.63 4.35 5.10 J.95 6.96 8.15 9.61 11.5e 14.11 12.00 DISCHG 25.35 39.34 46.02 67.65 8L.25 B4.47 81.76 76.27 69.61 62,66 12,50 DISCH6 55.99 49.96 47.01 45.61 44.16 42.75 41.36 40.00 39.33 38.65 13.00 ➢ESC 6 31 37.28 36.60 35.60 33.77 32.04 30.43 26.92 27.51 26.18 i3.50 DiSCHG 24.93 23.76 22.67 2i.64 20.67 15.74 16.80 18.07 17.31 16.59 14.00 DISCHG 15.92 15.29 14.71 14.16 13.84 13.73 13.62 13.51 13.40 13.29 14.50 DISC 13.17 13.05 12.93 12.81 !2.70 :2.57 12.45 12.33 12.22 12.10 1 TR20 XEO 05-31-96 02:52 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN N0.2 ROUTING JOB I PASS 2 REV PC 09/83(.2) ULTIMATE ZONING, ULTIMATE BUILDOUT, FILENAME 2260PND2.T20 PAGE 4 RUNOFF VOLUME ABOVE BASEFLOW = 4.17 WATERSHED INCHES, 99.59 CFS-HRS, B.23 ACRE-FEET; BASEFLOW = .00 CPS --- HYDROGRAPH FOR STRUCTURE 2, ALTERNATE 1, STORM 2, ADDED TO OUTPUT HYDROGRAPH FILE --- EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 2 TR20 KEG 05-31-96 02:52 REV PC 091B3(.2) LAKESIDE 10-YR, 50-YR AND 100-YR BASIN No.2 ROUTING ULTIMATE IONIN6, ULTIMATE BUILDOUT, FILENAME 2260FKD2.T20 EXECUTIVE CONTROL OPERATION COMPUT + FROM STRUCTURE 1 + TO STRUCTURE 2 STARTING TIME = .00 RAIN DEPTH = 10.00 RAIN DURATION= 1.00 RAIN TABLE ND.= 2 ALTERNATE NO.= 1 STORM ND.= 3 MAIN TIME INCREMENT = .05 HOURS OPERATION RUNOFF STRUCTURE 1 OUTPUT HYDROGRAPH= 1 AREA= .04 50 MI INPUT RUNOFF CURVE= 89, TIME OF CONCENTRATION= .25 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0333 HOURS JOB" I RECORD ID ANT. MOIST. CDND= 2 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.04 219.09 (RUNOFF) RUNOFF VOLUME ABOVE BASEFLOW = 7.16 WATERSHED INCHES, 171.02 CFS-HRS, 14.13 ACRE-FEET, BASEFLOM = .00 CFS -- HYDR06RAPH FOR STRUCTURE 1, ALTERNATE 1, STORM 3, ADDED TO OUTPUT HYDR06RAPH FILE --- OPERATION RESVOR STRUCTURE 2 INPUT HYDROGRAPH= i OUTPUT HYDROSRAPH= 2 SURFACE ELEEVATION= 10.00 PEAK TIMEtHRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.22 113.72 14.49 TINE (HRS) FIRST HYDRUGRAPH POINT = .00 HOURS TIME INCREMENT = .05 HOURS DRAINAGE AREA = .04 50.MI. 3.00 DISCH6 .00 .00 .00 .00 .0i .0i .01 .01 .01 .01 3.50 DISCH6 .01 .01 .01 .01 .01 .0I ,O1 .02 .02 .02 4.00 DISCH6 .02 .02 .02 .02 .03 .03 .03 .03 .03 .03 4.50 DISCH6 .04 .04 .04 .04 .04 .04 .05 .05 .05 .05 5.00 DISCH6 .05 .06 .06 D6 .06 07 .01 .07 .07 .07 5.50 DISCH6 G8 .08 .09 .08 .09 O9 .09 .09 .10 .10 6.00 DISCH6 .10 .11 .11 .11 .11 .12 .12 .12 13 .13 6.50 DISCH6 .13 .14 .14 .15 .15 .15 .16 .16 .16 .11 7.00 DISCHG .17 .18 IB .18 .19 .19 .20 .20 .20 .21 7.50 DISCH6 .21 .22 .22 .22 .23 .23 .24 .24 .24 .25 6.00 DISCH6 .25 .26 .26 .27 .27 .28 .28 .29 .29 .30 8.50 DISCH6 .30 .31 .32 .32 .33 .33 .34 .35 .35 .36 9.00 DISCH6 .37 .37 .38 .39 .39 .40 .40 .41 .41 .41 9.50 DISCH6 .41 .42 .42 .42 .43 .43 .43 .43 .44 .44 10.00 DISCH6 .44 .45 .45 .45 .46 .46 .47 .47 .47 .48 10.50 DISCH6 .48 .49 .49 .49 .51 .77 1.03 1.30 1.57 1.86 11.00 DISCH6 2.15 2.44 2.74 3.05 3.36 3.68 4.01 4.34 4.69 5.05 11.50 DISCH6 5.40 5.71 6.13 6.75 7.64 8.76 10.06 11.74 13.97 76.91 12.00 DISCH6 37.98 46.91 81.14 104.20 113.03 111.68 104.79 95.65 85.89 76.30 12.50 DISCH6 67.44 59.61 52.98 47.68 46.29 44.68 43.50 42.15 40.82 39.75 13.00 DISCH6 39.09 38.42 37.76 37.10 36.44 35.20 33.45 31.B1 30.27 28.82 13.50 DISCH6 27.46 26.19 25.00 23.68 22.81 21.80 20.85 19.97 19.13 18.35 14.00 DISCHE 17.62 16.93 16.29 15.68 15.11 14.57 14.06 13.83 13.73 13.62 . PxEU PC 09/83(.2) �'ULTIMATE'ZONIN6;'ULTIMATE BUILDDUT, FILENAME'2260PND2.T20'•4'°.;;:;: 14.50 .OISCHG 13.52 13.41 13.30 13.19 13.08 12.96 12.65 12.73 12't62• 12,51 `✓'ti " 7-� RUNOFF VOLUME ABOVE BASEFLOW = 4.95 WATERSHED INCHES, 119.26 CFS-HRS, ' 9.77 ACRE-FEET; BASEFLOW = . .00 CFS --- HYDROEP.APH FOR STRUCTURE 2, ALTERNATE 1, STORM 3, ADDED TO OUTPUT HYDROSRAPH FILE --- EXECUTIVE CONTROL OPERATION ENDCMP + EXECUTIVE CONTROL OPERATION ENDJOB I rf TR20 XED 05-31-96 02:52 REV PC 09/83(.2) COMPUTATIONS COMPLETED FOR PASS 3 LAKESIDE 10-YR, 50-YR AND 100-YR BASIN No.2 ROUTING ULTIMATE ZONING, ULTIMATE BUIL➢OUT, FILENAME 2260PND2.T20 RECORD ID RECORD ID JOB I SUMMARY PAGE 7 SUMMARY TABLE i - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(J) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDR05RAPH A QUESTION MARKi?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) - SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- I6 OPERATTI AREA CONG INCREM EE6IN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) ICSM) ALTERNATE 1 STORM 1 STRUCTURE 1 RUNOFF 04 2 2 .05 .0 7.00 24.00 4.6E --- 12.05 :48.10 4002.7 STRUCTURE 2 RESVOR 04 2 OS 0 7.00 24.Of 2.65 13.62 12.36 3E.03 1027.E ALTERRATE i STORM 2 + STRUCTURE 1 RUNOFF .04 2 2 .05 .0 9.00 24.00 6.33 --- 12.04 195.52 5284,4 STRUCTURE 2 kESVGR 04 2 2 .05 .0 9.00 24.00 4.17 14.2/ 12.25 84.47 2283,i ALTERNATE i STORM STRUCTURE I SUNOfF 04 2 .OS .0 10.00 24.00 7.16 --- 12.04 219.07 5921.3 STRUCTURE 2 1 kESVOR 04 2 2 p5 .0 10.00 24.00 4.95 14.49 12.22 113,72 3073.4 TR20 XEO 05-31-96 02:52 LAKESIDE IQ-YR, 50-YR AND 100-YR BASIN No.2 ROUTING REV PC 09/B3(.2) ULTIMATE ZONING, ULTIMATE BUILDOUT, FILENAME 2260PND2.T20 SUMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES XSECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS........,. iD (90 Mil 1 7 1 ki JOB 1 SUMMARY PAGE 8 ALTERNATE I 0 STRUCTURE 1 .04 ALTERNATE I !END OF I jOBS IN THIS RUN 1l 38.03 84.47 113.72 148.10 195.52 219.09 41(p . C), 13 f�- .. - - �• � n ' i� IAIn Itlm fll • Atlllll� � III �� I�� �I AI� � .� .��II,� IH111�71111IIAllI Oliln 111� 1 III P. � / I! P�!�alltl'A! ' G!�{��Ilu�llslls�LlEi{{{I{II!�i��4®F.�I�%I��IiA111{�I{���{����► � �'j�®�� : fi� • r. , n.. I, ea tr • a i I nnm liliiii III IIes l�os�fi y�r p 1 I• 'II ' i1i{"un{�iP��'r�1npYtii{iii�{!IAn!I�Il'nIlp�mn, iiii�iP�11�h�ii8 • .• �® d �' , I'r �'�s';(✓Iiv'I 1 jl�,{'I��{�InINII1L ryyA��gg,,IIIIIII'p�p11''IIII'I'Ip@�@�I�� �r ��� • �� � 11 • fIN1YW 1111�1111111111� �, , y • �I nin Li�flgli 1 P:I®I�. %►'� � � r ����:iIIIOGiI!� • I 1 11 II 11 I,1 8.06.4 Rm 12,93 LA J 30�1 3 5 10 20 11 50 100 zUu ovu •• Discharge (O/sec) P1--) J 5p�� ("eel Curves may not be extrapolated. Figure 8.06b Design of outlet protection from a round pipe flowing full, maximum lailwater condition (T„ 2 0.5 diameter). VVIVI 7-�� 8.06.4 R,, 12,93 300 T I Outlet u ' Dot 0.4La pipe 4 1 diameter (OD)� La—� .�2 T�ai lwa tCr� O.SDo -�re➢ufel oc - QQ� 70 0 �r I ec� 60 60. . ,f DischarV a (ft3/sec) V (,QO� Curves may not be extrapolated. Figure 8.06b Design of outlet protection from a round pipe flowing full. maximum tailwater condilion( „2 0 5 diameter). ct 8.06.4 Rcv. 12,93