Loading...
HomeMy WebLinkAboutSW8061231_CURRENT PERMIT_20220223STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 01o1231 DOC TYPE] CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022 p223 YYYYMMDD ROY COOPER Governor EUZABETH S BISER Secret-y BRIAN WRENN Durcior February 23, 2022 TCW Enterprises, LLC Arm Cecil W Morton, Member 126 North Creek Drive Jacksonville, NC 28546 NORTH CAROLINA EnvBonntentar Quality Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 061231 Affordable Self Storage Onslow County Dear Ms Morton Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR") All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit On August 5, 2009, the Governor signed Session Law 2009-406 This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010 The law extended the effective period of any permit that was set to expire during this time flame to three (3) years from its current expiration date On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on February 22, 2022 The Division is hereby notifying you that permit SW8061231 has been renewed, updated, and re -issued on February 23, 2022, as attached Please be aware that the renewal and re - issuance of this stormwater permit does not Imply that the site is currently in compliance This permit shall be effective until January 19, 2029, which includes all available extensions, and does not supersede any other agency permit that maybe required The project shall be subject to the conditions and limitations as specified therein This permit does not impose new or increased stormwater control requirements, it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit Failure to comply with these requirements will result in future compliance problems Please note that this permit is not transferable except after notice to and approval by the Division If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH) The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Marl Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www NCOAH com Unless such demands are made this permit shall be final and binding If you have any questions concerning this permit, please contact Ashley Smith in the Wihnmgton Regional Office, at (910) 796-7215 or ashleym smith@ncdenr gov Sincerely, �'ak,QWSQ Brian Wrenn, Director Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality I Division of Energy Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405 9107967215 State Stormwater Permit No SW8 061231 Page 2 of 2 Enclosures DES/arcs cc Attachment C — Permitting History Renewal Application Documents %Stormwater\Permits & Prolects\2006\061231 HD\2022 02 permit 061231 Wilmington Regional Office Stormwater File �Q'p es North Carolina Department of Environmental Quality I DKwmn of Energy Mtneml and Land Rourres rVV"—"V C Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405 9107%7215 Post -Construction Stormwater Management Permit No SW8 061231 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO TWC Enterprises, LLC Affordable Self Storage 126 North Creek Dnve, Jacksonville, Onslow County FOR THE construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") The project shall be constructed, operated and maintained in accordance with these approved plans and specifications The approved plans and specifications are incorporated by reference and are enforceable part of this permit This permit shall be effective from the date of issuance until January 19, 2029 and shall be subject to the following specified conditions and limitations The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission, however, these actions do not stay any condition The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H 1000 and NCGS 143-215 1 et al I DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data This stormwater system has been approved for the management of stormwater runoff as described in Section 18 on page 2 of this permit The stormwater control has been designed to handle the runoff from 356,502 square feet of impervious area 3 A 50' wide vegetative buffer must be provided adjacent impounded structures, streams, rivers and tidal waters The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and per approved plans The built -upon area for the future development is limited to 100,000 square feet Page 1 of 5 Post -Construction Stormwater Management Permit No SW8 061231 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans The runoff from all built -upon area within the permitted drainage area of this protect must be directed into the permitted stormwater control system The following design criteria have been provided in the wet detention pond and must be maintained at design condition a Drainage Area, acres Onsite, ftZ Offsite, ft2 b Total Impervious Surfaces, ftZ Onsite, ft2 Offsite, ftz c Design Storm, inches d Average Pond Design Depth, feet e TSS removal efficiency f Permanent Pool Elevation, FMSL g Permanent Pool Surface Area, ftZ In Permitted Storage Volume, ft3 i Temporary Storage Elevation, FMSL t Pre-dev 1 yr-24 hr discharge rate, cfs k Controlling Onfice I Orifice flowrate, cfs m Permanent Pool Volume, ft3 n Permitted Forebay Volume, ft3 o Fountain Horsepower p Receiving Stream/River Basin q Stream Index Number r Classification of Water Body II SCHEDULE OF COMPLIANCE 1007 438,696 None 356,502 356,502 None 15 50 90% 360 33.697 44,687 3721 023 2 5"0 pipe Oil 166,507 31,095 1/2 Northeast Creek / White Oak 19-16-(0 5) "SC,NSW' The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to Semiannual scheduled inspections (every 6 months) Sediment removal Mowing and re -vegetation of slopes and the vegetated filter Immediate repair of eroded areas Maintenance of all slopes in accordance with approved plans and specifications Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping Access to the outlet structure must be available at all times Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR The records will indicate the date, activity, name of person performing the work and what actions were taken Page 2 of 5 Post -Construction Stormwater Management Permit No SW8 061231 5 The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division 6 Decorative spray fountains are allowed in the pond, subject to the following criteria a The minimum permanent pool volume is 30,000 cubic feet b The fountain must draw its water from less than 2' below the permanent pool surface c Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond d The fountain may not be placed into the forebay e The falling water from the fountain must be centered in the main pond, away from the shoreline f The maximum horsepower for a fountain in this pond is 1/2 horsepower Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification a Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc b Redesign or addition to the approved amount of BUA or to the drainage area c Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications d Altering, modifying, removing, relocating, redirecting, regrading, or res¢mg of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan e The construction of any allocated future BUA f The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications g Other modifications as determined by the Director 10 Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times 11 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made Page 3 of 5 Post -Construction Stormwater Management Permit No SW8 061231 III GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems These additional or replacement measures shall receive a permit from the Division prior to construction PERMIT RENEWAL A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H 1045(3) CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes 4 TRANSFER This permit is not transferable to any person or entity except after notice to and approval by the Director Neither the sale of the protect and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit TRANSFER REQUEST The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H 1045(2) This request must be submitted within 90 days of the permit holder meeting one or more of the following i A natural person who is deceased, u A partnership, limited liability corporation, corporation, or any other business association that has been dissolved, ni A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding IV A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur TRANSFER INSPECTION Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions Records of maintenance activities performed to date may be requested Protects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met 5 COMPLIANCE The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request a APPROVED PLANS AND SPECIFICATIONS A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times b DIVISION ACCESS The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted protect c ENFORCEMENT Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21 d ANNUAL CERTIFICATION The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the protects conformance with permit conditions Page 4 of 5 Post -Construction Stormwater Management Permit No SW8 061231 e OBTAINING COMPLIANCE The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made OTHER PERMITS The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215 1, and subject to enforcement procedures pursuant to NCGS 143-215 6 Permit renewed, updated and reissued this the 23rd day of February 2022 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION recto Brian renn, Director or Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History Affordable Self Storage Permit No SWS 061231 Approval permit Action BIMS Description of the Changes Date Version 1/19/2007 Original 10 Approval include construction of 33,206 square feet for built -upon area (BUA) in Phase 11 7/27/2009 Plan Revision l I that was allocated as future in the existing permit There will be 48,733 square feet of future BUA remaining Additional storage building, parking, and 10/14/2009 Modification 1 2 street area- North Creek Drive, enlarging the wet pond 2/23/2022 Renewal 20 Expires January 19, 2029 0 C T 0 r 2009 Permit Number-] �O_Ip 1 al31(Y! iD (to be provided by DWQ) Drainage Area Number Wet Dete �irftgin-10p-era 'on and Maintenance Agreement I will keep a maintenance record on this BMP This maintenance record will be kept in a log in a known set location Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become estabushed (commonly six weeks) - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency dram should be minimized to the maximum extent practical - Once a year, a dam safety expert should inspect the embankment After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 15 inches if in a Coastal County) Records of operation and maintenance should be kept in a known set location and must be available upon request Inspection activities shall be performed as follows Any problems that are found shall be repaired immediately BMP element Potential problem. How I will remediate the problem The entire BMP Trash/debris is present Remove the trash/debris The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed remove the gully, and then plant a ground cover and water until it is established Provide lime and a one-time fertilizer application Vegetation is too short or too Maintain vegetation at a height of long approximately six inches Form SW401-Wet Detention Basin O&M -Rev 4 Page 1 of 4 RECEIVED OCT 0 SO 2009 nY Permit Number (to be provided by DWQ) Drainage Area Number BMP element Potential problem How I will remediate the problem. The inlet device pipe or The pipe is clogged Unclog the pipe Dispose of the Swale sediment off -site The pipe is cracked or Replace the pipe otherwise damaged Erosion is occurring in the Regrade the swale if necessary to swale smooth it over and provide erosion control devices such as remforced turf matting or rrprap to avoid future problems with erosion The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible Remove the sediment and sediment storage dispose of it in a location where it will not cause impacts to streams or the BMP Erosion has occurred Provide additional erosion protection such as reinforced turf mattmg or rrprap if needed to prevent future erosion problems Weeds are present Remove the weeds, preferably by hand If pesticide is used, wipe it on the plants rather than spraying The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health Plants are dead, diseased or Determine the source of the dying problem soils, hydrology, disease, etc Remedy the problem and replace plants Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary Weeds are present Remove the weeds, preferably by hand If pesticide is used, wipe it on the plants rather than spraying The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible Remove the sediment and storage depth dispose of it in a location where it will not cause impacts to streams or the BMP Algal growth covers over Consult a professional to remove 50% of the area and control the algal growth Cattails, phragmites or other Remove the plants by wiping them mvasive plants cover 50% of with pesticide (do not spray) the basin surface Form SW401-Wet Detention Basin O&M -Rev 4 Page 2 of 4 OCT 0 $ 2009 I Permit Number —'A 03 CXo La 319 ,0,D (to be provided by DWQ) Drainage Area Number BMP element: Potential problem. How I will remediate the problem. The embankment Shrubs have started to grow Remove shrubs immediately on the embankment Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers A tree has started to grow on Consult a dam safety specialist to the embankment remove the tree An annual inspection by an Make all needed repairs appropriate professional shows that the embankment needs repair if applicable) The outlet device Clogging has occurred Clean out the outlet device Dispose of the sediment off -site The outlet device is damaged Repair or replace the outlet device The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quahty Regional Office, or outlet the 401 Oversight Unit at 919-733- 1786 The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the permanent pool depth reads 9 0 feet in the main pond, the sediment shall be removed When the permanent pool depth reads 10 0 feet in the forebay, the sediment shall be removed Sediment Removal :9i.0 2600 1 1 ----------------- BASIN DIAGRAM (fill in the blanks) '-ft Min Sediment Storage Permanent Pool Elevation 36 00 Pool \ Sediment Removal Elevation 27 00 Volume ------------------------ I ------ Bottom Elevation 26 00 1 1-ft Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M -Rev 4 Page 3 of 4 OCT a $ �QQ� I Perm it Number t23L#L.'4) (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Project name Affordable Self Storage Phase II BMP drainage area number Print name Title Address 3950 New Bem Hwy Jacksonville, NC 28546 Phone Signa Date Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president a Notary Public for the State of I\ l/4i eAv8I I hc-, County of atU5�dk1 do hereby certify that l (�CL tJoac T d^y,^ �, personally appeared before me this day of and acknowledge the due execution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal, j4�l �- t%�'/yKy SEAL My commission expires Ma!4' 6g, o2Q I3 Form SW401-Wet Detention Basin O&M -Rev 4 Page 4 of 4 DEMLR USE ONLY Date Received Fee Paid Permit Number Ilif 2 l0 2U22 0021103 505°- SIN% 6Di,2',>I NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H 1045(3), the current permit holder shall renew their high density permit 180 days poor to its expiration Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60 (c) This application form is for permit renewals only A PROJECT INFORMATION 1 State Stormwater Permit Number SW8 061231 2 Project name AFFORDABLE SELF STORAGE, LLC 3 Project street address 126 NORTH CREEK DRIVE City JACKSONVILLE County ONSLOW ZIP 28546 4 What, if any, changes have been made to the project as permitted? NONE If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at https //deo nc gov/about/dwisions/energy- mineral-land-resources/energy-mineral-land-rules/stormwater-program/post-construction B PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at https //deo nc qov/about/drnsions/energy-mineral-land- State Stormwater Permits do not automatically transfer with the sale of the property 1 Current Permit Holder's Company Name/Organization AFFORDABLE SELF STORAGE,LLC 2 Signing Official's Name CECIL WAYNE MORTON 3 Signing Official's Title MANAGER 4 Mailing Address 126 NORTH CREEK DR City JACKSONVILLE State NC ZIP 28546 5 Street Address 126 NORTH CREEK DRIVE City JACKSONVILLE State NC ZIP 28546 6 Phone (910) 347-7117 Email AffordableSelfStoraae(a)MCMRHS COM ZZOZ Z Z 93A Stormwater Permit Renewal Form Page 1 of 3 May 11 2018 C SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORI9 Only applications packages that include all required items listed below will be accepted and reviewed Initial each item below to indicate that the required information is provided in the application package CWM 1 A permit application processing fee of $505 00 payable to NCDEQ CWM 2 One original signed hard copy and one electronic copy of this completed form The signing official named on this application to represent the current permittee must meet one of the following a Corporation — a principle executive officer of at least the level of vice-president, b Limited Liability Company (LLC) — a manager or company official as those terms are defined in G S 57D "North Carolina Limited Liability Company Act," c Public Entity — a principal executive officer, ranking official, or other duly authorized employee, d Partnership or limited partnership — the general partner, e Sole proprietor, or f Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity CWM 3 One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including deed restrictions, protective covenants, condominium/planned community declaration and easements If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date CWM 4 O&M Pgreements, Please select one ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit, or ❑ 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent tome I agree to keep this on file with the permit CWM 5 Designer Certifications, Please select one ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division, or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed, or ❑ The project has not yet been built CWM 6 [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit CWM 7 [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC) Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C 2 per 15A NCAC 2H 1043(3)(b) https //www sosnc gov/online services/search/by title/ Business Registration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D PERMITTEE'S CERTIFICATION I, (7Q� �& h%D dd the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership All information provided on this permit renewal application is, to the best of my knowledge, correct �a��nd��comppllette% Signature 4:14elx !/UG%G/l��i Date t6l ��PTo� NOTARIZATION County of that f ' this the cnday of , f ebP, exqaQi% Wf ttre��64$®oing instrument Witness my \ �� r0Tq flVptary Seal) 9< _:'o ' O Ge av" My commission expires and official seal, a Notary Public for the State of do hereby certify personally appeared before me 20CRA_, and acknowledge the due Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 `4 Permit No (to be Mvfded by DWD) RECEIVE)--) OCT 0 " 2009 MDST J �0F INA TE�O LJ 1 O G h � NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, punted and submitted The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information I PROJECT INFORMATION --- a_ �-I -- - _ - Prolect name Affordable Self Storage Phase II Contact person David K Newsom, PE Phone number 910 325 0006 Date 90/2009 Drainage area number 1 II DESIGN INFORMATION, - Site Characterlisr Drainage area 438 696 fe Impervious area, past -development 356,505 fe %impervious 8126 % Design rainfall depth 15 in Storage Volume Non -SA Waters Minimum volume required 42,848 ft' Insufficient required volume Volume provided 44,687 (f' OK volume provided Is equal to or In excess of volume required Storage Volume SA Waters 15 runoff volume ft3 Pre development 1 yr, 24 hr runoff 1 ft3 Post -development 1 yr 24 hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Peak Flow Calculations Is the prelpost control of the lyr 24hr storm peak flow required? n (Y or N) 1 yr, 24 hr rainfall depth 37 in Rational C pre development 015 (unitless) Rational C, past development 076 (unitless) Rainfall Intensity 1 yr, 24 In storm 015 in/hr OK Pre -development 1 yr 24 In peak flow 023 ft'Isec Post development 1 yr 24 hr peak flow 1 16 ft'Isec Pre/Post 1 yr 24 hr peak fiow control 093 ftllsec Elevations Temporary pool elevation 3721 first Permanent pool elevation 3600 fmsl SHWT elevation (approx at the perm pool elevation) 3200 fmsl Top of 1Oft vegetated shelf elevation 3650 fmsl Bottom of 10ft vegetated shelf elevation 3550 fmsl Data not needed for calculation option p1, but OK if provided Sediment cleanout top elevation (bottom of pond) 2700 first Sediment clea rout bottom elevation 2600 first Data not needed for calculation option p1 but OK if provided Sediment storage provided 100 It Is there additional volume stored above the state required temp pooh n (Y or N) Elevation of the top of the additional volume first Form SW401 Wet Detention Basin Rev 7 8/13I09 Parts 1 & 11 Design Summary Page 1 of 2 Permit No;LAJ� Din 1 2-31 rrcd no be Mvmed by DW0) II DESIGN INFORMATION - Surface Areas Area temporary pool Area REQUIRED permanent pool SAIDA ratio Area PROVIDED permanent pool, A._,y Area bottom of 1 Oft vegetated shelf Abo_,r„ n Area, sediment cleanout top elevation (bottom of pond) A,., Volumes Volume, temporary pool Volume permanent pool Vp, _,,, Volume forebay (sum of forebays If more than one forebay) Foebay %of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used In SAIDA table) Calculation option 1 used? (See Figure 10 21b) Volume permanent pool V.-,d Area provided permanent pool Ap,,,, Average depth calculated Average depth used in SAIDA d„, (Round to nearest 0 5ft) Calculation option 2 used? (See Figure 10 2b) Area provided permanent pool Ap,,,,,. Area, bottom of 1011 vegetated shelf Amy„ n Area sediment deanout top elevation (bottom of pond) A o,., 'Depth' (distance b/w bottom of 10ft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d„ (Round to nearest 0 51t) Drawdown Calculations Drawdown through onfice? Diameter of onfice (d circular) Area of onfice (d nonciroular) Coefficient of discharge (CD) Diving head (H.) Drawdown through weir? Weirtype Coefficient of discharge (C,) Length of weir (L) Driving head (H) Pre -development 1-yr, 24 hr peak flow Postdevelopment 1-yr 24-hr peak flow Storage volume discharge rate (through discharge onfice or weir) Storage volume dmwdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & onfice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate buildcut? Drain mechanism for maintenance or emergencies 40166 fl 25818 ft' 589 (umtless) 33 697 ft OK 23 362 ft 5,482 8r OK 1Ci -r� 1f� EM 166 507 ft3 1�CEI V ii 31 095 ft' OCT 0 S 2009 187%% OK 90 % BY' y (Y or N) n (Y or N) 589 (umtless) y (Y or N) 166 507 ft' OK 33 697 It` OK 494 It Check calculation Need 3 It mm 49 ft Insufficient Check calculation n (Y or N) It, fl` ft2 y (Y or N) 2 50 in in 003 (unitless) 0 42 It n (Y or N) (umtless) (uniUess) It ft 023 ft"Isec Insufficient pre -development peak flow 011 ft'Isec OK 011 ft"Isec 471 days OK draws down in 2 5 days Drawdown time varying from expected value by more than a half day 3 1 OK 10 1 OK 100It OK 6 1 OK 55 1 OK y (Y or N) OK 10 It OK n (Y or N) OK y (Y or N) OK y (Y or N) OK Form SW401 Wet Detention Basin Rev 74V13I09 Pans I a 11 Design Summary Page 2 of 2 V Permit No510SSL`.0 Q -'' A_Q_ i (to be provided byL5WQ) III -REQUIRED ITEMS CHECKLIST Please Indicate the page or plan sheet numbers where the supporting documentation can be found An Incomplete submittal package will result in a request for additional information This will delay final review and approval of the project. Initial in the space provided to Indicate the following design requirements have been met If the applicant has designated an agent, the agent may Initial below its requirement has not been met, attach Justification Pagaf Plan Imt Is Sheet No 1 Plans (1" - 50' or larger) of the entire site shoving - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, High flow bypass system, 7RE7—D- - Maintenance access,- Proposed drainage easement and public night of way (ROW), - Overflow device, and $�— - Boundaries of drainage easement y, l/! l 2 Partial plan (1" = 30' or larger) and details for the wet detention basin showing - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond nth hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip I)ft!/ 3 Section view of the wet detention basin (1" = 20' or larger) shoving - Side slopes, 31 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures 4 If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin Z CJ 5 A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, to venty volume provided 6 A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized 7 The supporting calculations �fQdL r�� 8 A copy of the signed and notarized operation and maintenance (0&M) agreement / 9 A copy of the deed restrictions (if required) -� 10 A soils report that is based upon an actual field investigation, soil borings, and infiltration tests County soil maps are not an acceptable source of soils information Form SW401-Wet Detention Basin -Rev 741/13/09 Part III Required Items Checklist Page 1 of 1 w State Stormwater Management Systems Permit No SW8 061231 MOD Affordable Self Storage Stormwater Permit No SW8 061231 MOD Onslow County Designer's Certification I, +vrr� /L/1/c�.rrii✓/ , as a duly registered;3�a rrnirY! uV,-Lt&X)n the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for %iil/Ci 2 /kt— 7i�_,LG—Q.- (Protect Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specifications .,i`.{ O 11 Signature i / .i Registration Number � t �� Date ��,,,,,, Page 6 of 7 FEB 10 2022 �I j State Stormwater Management Systems Permit No SW8 061231MOD Certification Requirements Z�IqZ1 The drainage area to the system contains approximately the permitted acreage The drainage area to the system contains no more than the permitted amount of built -upon area �tZ3 All the built -upon area associated with the project is graded such that the runoff drains to the system 44e4 All roof drains are located such that the runoff is directed into the system �[ The outlet structure elevations are per the approved plan ( The outlet structure is located per the approved plans ' Trash rack is provided on the outlet structure 1(, 8 All slopes are grassed with permanent vegetatiori DUZg Vegetated slopes are no steeper than 3 1 Olt�/10 The inlets are located per the approved plans and do not cause short- circuiting of the system 1 The permitted amounts of surface area and/or volume have been provided Vlgl12 Required drawdown devices are correctly sized and located per the approved plans ��113 All required design depths are provided- ��14 All required parts of the system are provided, such as a vegetated shelf, and a forebay Pl'�15 The required system dimensions are provided per the approved plans A(dZ16 All components of the stormwater BMP are located in either recorded common areas, or recorded easements cc NCDENR-DWQ Regional Office Onslow County Budding Inspections FEB 10 2022 u I BY_ �J Page 7 of 7