Loading...
HomeMy WebLinkAboutSW8060702_HISTORICAL FILE_20080211STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 Q1D0-1 OZ DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 200 1� 0211 YYYYMMDD /oF W^^rf Michael haste) Go n> p RG Ross Jr Secret North Carolina Department o} Env onment ment and Natural Resources Coleen H Sullins D rector Di tston of Rater Qualm February 11 2008 Rosalind Fuller Manager Birdsey Napier Investment Group LLC c/o Atlantic Brokerage 321 N Front Street Wilmington NC 28401 Subject Approved Plan Revision Lot 6 Island Park Stormwater Project No SW8 060702 New Hanover County Dear Ms Fuller On February 7 2008 the Wilmington Regional Office received a plan revision for Stormwater Management Permit Number SW8 060702 The revisions include the construction of 45 086 ft2 of built upon area for Phase II A total of 101 598 ft2 of Future development BUA was accounted for under the July 7 2006 permit The amount of Future BUA remaining after the construction of Phase II is 56 512 ft2 It has been determined that a formal permit modification is not required for the proposed changes We are forwarding you an approved copy of the revised plans for your files Please add the approved plan sheets for Phase II to the previously approved plan set for Phase I Please be aware that all terms and conditions of the permit issued on July 7 2006 remain in full force and effect Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on a case by case basis Any other changes to this project must be approved through this Office prior to construction The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes rules regulations or ordinances which may have jurisdiction over the proposed activity and obtaining a permit or approval prior to construction If you have any questions concerning this matter please do not hesitate to call me at (910) 7967215 Sincerely Linda Lewis Environmental Engineer III ENB\arl S \WQS\STORMWATER\PERMIT\060702PR feb08 cc Tim Clinkscales P E Paramounte Engineering Tony Roberts New Hanover County Building Inspections Linda Lewis Wilmington Regional Office Central Files North Carol a Dt s on of R ater QuahR 127 Cardi al D ve Extension R ilmmgton NC 28405 Phone (910) 796 7215 Wilmington Regional Office trite net www ncwaterqualtty ore Pax (910) 350 2004 An Equal Opportunity/AKrmative Action Employer 50/Recycled110/ Post Consumer Paper N''o.ri,hCarohna waturally Customer Service 1 877 623 6748 -1-f-V MotJNTE E N G I N E E R I N G I N C 5 9 1 1 O L E A N D E R D R I V E S U I T E 2 0 1 W I L M I N G T O N N C 2 8 4 0 3 9 1 0 7 9 1 6 7 0 7( O) 9 1 0 7 9 1 6 7 6 0 ( F) L E T T F. R O F T R A N S M I T T A 1. To NCDENR Date 2/7/08 Re Lot 6 Island Park Attn Linda Lewis Pro ect No 1 07140 PE e are sendm ❑ Originals ® Prints ❑ Shop Drawmgs ® Calculations ❑ Correspondence ® Plans ❑ Specifications ® Other as listed below he followin items Quannty Date Dwg No Description 2 2/7/08 Plans for Plan Revision Issue Status ® For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ For I our Use ® I or Review and Comment ❑ Approved as Noted ❑ See Remarks enon Taken ❑ No P Nceptions Taken ❑ Ifake Corrections Noted ❑ Amend & Resubmit ❑ Rejected See Remarks ❑ Approved as Submitted ❑ Other Remarks Linda I am submitting the plan with the breakdown of impervious area for the arc FEB 0 7 2008 tCc_ _ Signed /z Tim Clinkscales PE I ' I I I I I I ' t I I I 11 i � I. Ili I I I! i, ,III l II II � i 1 1II I ! I I III I 600c 09C 016 XVd 941.1 arM6 DUOUd 579E gope6 eugojen gliolJ uo,6ulwlM lid anuQ lewp EZ) III i l' v Ip I 1 II ' hill 1 � 8 I I IV lliidl III I l � II11� ` I I I I i I I �h SiLltiulaN NOZ-05£-016 #X-VA •L I (Y)r10 I d(Y5 uotislni(l OD i Srvy,,f 2pV► woi,j JI2�� u1aJ2� oI, I I CSILi+ IrJV1� saoed# �cb2_S-Z a2cQ 20-t0OD0 133HS1U3WD VVA 1 I nic1�I��aS JI sso-d r) uleglTM IJ0wan0C) ,(al e3 A Iae4DI14N glu 961 (0l6) j I 1 I i' it I I 8D4101eu01628uol6ulwIIm sOO�nosa�lleanaeN pue uawuo�lnu� )o auawpedaa eug0-1e3 UIJoN II � 1 I f ( I .. I I � 1 I I � £ II S39dd S9z I ! HL I AO j l X1 Xd.d £ ` „9Z ! 09L916L6 WV 81 I[ 90-93.d d0 G 316N I 3dAl S3Odd 3wil Xi' � 1 i N�A1363N INVIS 31VO li I ON3SIi I I III I� F b00Z09E0i6 8N30ON NOJ Wd19I 11 � 3nL SOH-90-93d i ,I l '.I ll 1 1 II ADdH NOI,IOdSNvu I I Illl�,ii 1101dif ��li�l I� UUMMUMMMO l I I III I P ' I { I P 01 TRANSACTION REPORT FEB-05-2008 TUE111 20 AM >K FOR NCDENR 9103502004 � >K SEND I DATE START RECEIVER TX TIME PAGES TYPE NOTE i M# DP >K � K FEB-05 11 19 AM 92511658' 1'07" 1 3 FAX TX OK �� II 712 I 1 I III III � I I {, N I I Michael F Easley Governs I I � 1M 7S PAGES' t 3{1 ' II NCDENR I t' Carolina Department of Environment and Natural Resources Wilmington Regional Officel (910) 796 7215 �� llham G Ross Ir SeuLl I � i F,k\ COVER SHEET Date 2. 5' 2c<>? # Pages 3 Cl nC.1 Al Fc To �JI�� I t11Gr From L117da LZ4&4 ' I Co i'�2r1'}��-h �Jrv�G2 1 I Division 51N� — �1A11 r-1x 2S11 165? ' Fti\# 910-350-2004 , �II Rernai Ls 1' I 1 r c.aldmal Drive 1/1 Ndminglon Norlh Laro6na')8405 3845 Paone 910 79b 7' 15 FAX 910 35U °004 , I I !I � I I I I M 1i Plan Revision for Lot 6 Island Park SW8 060702 Subject Plan Revision for Lot 6 Island Park SW8 060702 From Linda Lewis <lmda Lewis@ncmail net> Date Tue 05 Feb 2008 11 09 37 0500 To Jeremy Blair <jblair@paramounte eng com> Jeremy On August 28 2007 I sent you an email requesting additional informatino regarding the plan revision for the subject project which was received on July 2 2007 To date I have not received the requested information I ve spoken to Bill Fuller this morning and he cleared up the ownership and mailing address questions I had The one remaining item to address is the breakdown of the proposed BUA for the project on the plans Thanks Linda 1 of 1 2/5/2008 11 12 AM Lot 6 Island Park SW8 060702 Subject Lot 6 Island Park SW8 060702 From Linda Lewis <hnda lewis@ncmail net> Date Tue 28 Aug 2007 16 41 17 0400 To Jeremy Blair <lblair@paramounte eng com> Jeremy I am reviewing the plan revision you submitted for the subject project showing the future development phase Can you please include a breakdown of the proposed impervious cover on the plans in square feet? The narrative indicates that a total of 1 28 acres is proposed which is below the 2 33 acres allocated but a breakdown helps the Division keep track of it better so that additional future development can be easily permitted Please break it down into buildings parking area sidewalks etc The developer is noted on your plans as Birdsey Napier LLC but the original permit was issued to Birdsey Napier Investment Group LLC Has the ownership actually changed The original permit mailing address for Birdsey Napier is 106 Martindale Lane Your plans show a different mailing address of 371 N Front Street Has the mailing address changed> If the ownership and/or mailing address of the owner has changed please have the owner complete sign date and return the attached Name/Ownership Change form Please keep in mind that Rosalind Fuller was the signatory on the original application If anyone but her signs the N/O change form please make sure that person is either a manager or a member manager and include supporting documentation verifying that person s title Please submit the requested information by September 28 2007 Thanks Linda SW Permit Ownership Name Change Form Content Type Content Encoding application/msword base64 1 of 1 8/28/2007 4 49 PM PARAMOUNTE \ E N G 1 N E E R 1 N G 1 N C ` 99 5 9 1 1 OLEANDER DRIVE S U I T E 2 0 1 ZCQQ, W I L M I N G T O N N C 2 8 4 0 3 9 1 0 7 9 1 6 7 0 7( O) 9 1 0 7 9 1 6 7 6 0 ( F) _ L E T T E R O F T R A N S M I T T A L To NCDENR Date 7/02/2007 Re Lot 6 Island Park Attn Linda Lewis Project No 1 07140 PE e ate sendm ❑ Originals N Prints ❑ Shop Drawings N Calculations ❑ Correspondence N Plans ❑ Specifications N Other as listed below The following items Quantity Date Dwg No Description i 2 7/2/07 Plans for Plan Revision 2 Calculations Issue Status N For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ For 1 our Use N For Review and Comment ❑ 1pproved as Noted ❑ See Remarks enon Taken ❑ No Frcepuons Taken ❑ Make Corrections Noted ❑ Amend & Resubmit ❑ Rejected See Remarks ❑ Approved as Submitted ❑ Other Remarks LOT 6 - ISLAND PARK NEW HANOVER COUNTY, NC STORMWATER NARRATIVE — PLAN REVISION TO SW8 060702 Prepared for BIRDSEY-NAPIER, LLC 371 NORTH FRONT STREET WILMINGTON NC 28401 Prepared by pARAMOUNTE ENCINIHERI N G INC 5911 Oleander Drive Suite 201 Wilmington NC 28403 Project #07140 PE July 2007 RECEIVED JUL 0 2 2007 DWQ PROJ # Ulu, LOT 6 - ISLAND PARK NEW HANOVER, NORTH CAROLINA Project #07140 PE DESIGN NARRATIVE Birdsey Napier LLC is proposmg to develop a warehouse facility on a 4 93 acre parcel in New Hanover County The site is located on Barbados Boulevard inside Island Park The project �% ill co i t of 3 27 acres of impervious area and 4 93 acrs of the site will be disturbed The site will be permitted for the entire site but the initial buildout will consist of 2 32 acres of disturbance and 0 94 acres of impervious acres This phase is permitted under SW8 060702 The rest of the site will be permitted based on 90 /. impervious area of the site Based on the design the final buildOUt will only consist of 1 28 acres of impervious area which is below the 2 33 acres allocated in the approved permit The site is currently a fairly covered grassland lot It is bordered by Barbados Boulevard on the west Lots within Island Park on the north and south and wctlands to the east The project is within a dramage basin that drains to an unnamed tributary of Prince Georges Creek (C SW 10 ) All stormwater " ill be conveyed through a stormdrain system into a wet detention pond for treatment and storage The wet detention pond has been designed to meet the New Hanoi er County Storm Water Management Ordinance and NCDENR s design requirements PROPOSED IMPROVEMENTS/ STORMWATER All stonnwater will be comeycd throul,h the means of a stormdrain system which will serve to convey the runoff into the wet detention pond The pond will outlet through a riser barrel structure which has been designed to hold back the 1 storm for the required 2 5 day drawdown in addition the outlet structure has been designed to discharge the 25 year storm cxcnt at a flow rate less than pre development and the 100 year storm event will overflow through the means of an emugency spillway The soil type for the site is Leon (Le) All supporhnj drama] e calculations and drainage basin information are provided within the following p-%cs of this report Per treatment calculations the procedure in the NCDENR Stormwater Best Management Practices Manual was used to determine the pond surface area volume and depth The pond s designed length to width ratio is approximately 31 and includes a forcbay of at least 20/ of the basin s overall volume Pond side slopes are 3H to IV with 61-1 to 1 V planted littoral shelf The permanent pool depth is 4 feet Stormwater in excess of the design storm will overflow the pond and discharge to the outfall waterway Page 1 Fhe outlet structure for the pond is configured to detain the 10 runoff volume The pcmmmcnt pool elevation for the pond was determined to be at elevation 2600 ind the 1 runoff %plume to be at elevation 26 76 In respect to these elevations a 1 50 orifice will draw down the t runoff volumc m 3 65 days In addition to the state stormwater iequircments the pond is designed to meet New Hanover s County 25 year pre/post requireme nt A pre development curve number of 69 was used which resulted in a peak flow of 2717 cfs This curve number was developed based upon the property having a type. B soil (Leon) and open space with fair cover A post development cure number of 903 was used which resulted in a peak flow of 3459 cfs This curve number nn as developed based upon calculating a weighted curve. number for the Lot 6 Upon routing the pond the peak flow which resulted is 14 13 cfs The elevation for the riser weir structure was placed at 26 80 This elevation permits the post development flow to be less than the pre development conditions for the 2 10 and 25 year events An emergency spillway is placed at an elex ation of 27 70 The top of the pond is placed at 29 00 with the 100 year elevation of 27 90 this maintains the 0 5 feet of freeboard that is required for the 100 year event All Supporting calculations and results are provided in the following pages of this report MAINTENANCE Contractor~ shall be responsible for periodic inspection and maintenance of all indicated crosion control devices In addition inspection and any necessary maintenance will be required immediately following any significant storm event Any erosion control measure that fails to function as mtendLd shall be repaired immediately Upon completion of construction and the establishment of stabilized ground cover the property owner shall be responsible for any on going site, mauntenancc Page 2