Loading...
HomeMy WebLinkAboutSW8060338_HISTORICAL FILE_20161021STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 Olo 033c3 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 c, I v k o z X YYYYMMDD A) % SCALE: I" = 40' 0 20 40 80 120 Wc n -� B 91 10 ------ ? J / _ _ ., ; ; —� -3 1 I 1 1 -4 OUTLET STRUCTURE TOP =7.99 18'RCP INV=6.09 BOTTOM ELEV=5.10 N a 10,6 "C m AYE i o aoz, Lu 0 C t U �a N * w tl' C LU Lo Z. Q AW' C rz� N o Woo W 09.9 Gou � Vi Z 00L W V c m Z Va°0 a H W =+ 1-. U O"O Z gNxav 1 vi-W-1 � rnmz 64a. G m U .. z �WzzIW..WIW3�Q�3 4QF-uMCAuu. 0 I in whole of in pa win Vrry onmmr Mn. Iron nn East Coast Enginn ENGINEERS• DATE TO FROM SUBJECT ig & Surveying, P.C. ERS•SURVEYORS TRANSMITTAL October 19, 2016 Steve g Pusey, PE Alan C Lewis 1VE GUT 2 12016 Bl Ocean Isle Palms - Phase 1 A & 1 B Please find attached the following Information for the subject project • 1 - 18" X 24" Copy AsBullt Survey of Pond 21 Ocean Isle Palms Should you have any questions or require additional Information please contact our office at your convenience Thanks 4918 Main Street * Post Office Box 2469 * Shallotte North Carolina 28459 * Tel 910-754-8029 * Fax 910-754-8049 Firm License Number C-3014 A'. 6 I b !9 B 1 l i ast Coast Engin_eWg &Surveying, 1_- POND 11 OCEAN ISLE PALMS East Coast Engir ENGINEERS August 30, 2016 Ms Georgette D Scott Stormwater Supervisor NCDENR Surface Water Protection Section 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 ig & Surveying, P.C. ERS•SURVEYORS Subject Ocean Isle Palms, Phase 1 Brunswick County, North Carolina Stormwater Permit No SW8 060338MOD Final Stormwater Certification Dear Ms Scott On behalf of our Client, OIP NC, LLC, please find enclosed the required Designer's Certification form and checklist for the Final Certification for the subject protect fhe construction of the Pond #12, Pond #14, and Pond #21 Portion of the project was completed and found to be built within substantial compliance and intent of the approved plans and specifications By copy of this letter, we are forwarding a copy of the enclosed Designer's Certification form and checklist to Ms Brigit Flora, PE, with the Stormwater Section of Brunswick County Engineering Should you have any questions or require any additional information, pleasL contact our office at your Robert E Tucker, P E Enclosures ECEIVE SEP 0 1 2016 BY - PC Mr hnc Masaschi, OIP NC, LLC w/enclosures Ms Bngit Flora, PE, Brunswick County Engineering w/enclosures File 3100 08 (Ocean Isle Palms Phase 1) 4918 MAIN STREET • POST OFFICE BOX 2469 • SHALLOTTE NORTH CAROLINA 28459 • TEL 910 754-8029 • Fax 910 754-8049 FIRM LICENSE NUMBER C 3014 PAT McCRORY Governor DONALD R VAN DER VAART 1C. Secretary Energy Mineral& TRACY DAVIS Land Resources Director ENVIRONMENTAL QUALITY August 31, 2016 Sebastian Drapac, Manager c/o Buck Altschul OIP NC LLC 1123 Zonohte Rd, NE, Suite 30 Atlanta, GA 30306 Subject Notice of Inspection — Not Compliant Ocean Isle Palms Phase I State Stormwater Management Permit No SW8 060338 Brunswick County Dear Mr Drapac On August 30, 2016, staff from the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR) inspected Ocean Isle Palms Phase 1, located off Ocean Isle Beach Rd (SR 1184) in Brunswick County to determine the status of compliance with the State Stormwater Management Permit Number SW8 060338, last modified on May 22, 2009 and transferred on November 23, 2015 DEMLR file review and site inspection revealed that the site is not in compliance with the terms and conditions of this permit Please find a copy of the completed form entitled "Compliance Inspection Report" attached to this letter which summarizes the findings of the recent inspection As indicated in the attached inspection report, the following deficiencies must be resolved 1 Pond 912 and Pond #14 For Pond 912, there seems to have been much work done However there is still a significant amount of erosion on the pond banks, some of which will have to be re -graded and re-seecded The orifice pipe for the outlet structure located on the north side of the pond is an angled piece of PVC pipe We recommend installing a submerged orifice outlet as shown in Fig 10-4 on page 10-18 of the BMP manual An engineer's certification is required for operation as a stormwater pond For Pond #14, there was some erosion in the right-of-way of Lucaya Circle with deep ruts that needs repair and reseeding The pond itself was in fair condition Grass needed cutting in areas around the pond Also, it is not clear if this pond has been converted to a stormwater pond yet or whether it is being used as a sediment basin There appeared to be markers for the forebay berm Please advise current status An engineer's certification is required for operation as a stormwater pond 2 Pond #21 The forebay had a large amount of sediment at the inlet pipe, which will need to be cleaned out before it is certified for final operation An engineer's certification is required for / operation as a stormwater pond o/ 3 Pond #22 This amenity pond has been completed with an outlet structure and piping Erosion issues have been addressed Pond 413 This amenity pond has been completed with an outlet structure and piping Erosion appears to be under control However, the outlet structure orifice appeared to be somewhat clogged This should be cleaned out State of North Carolina I Environmental Quahty I Energy Mineral and Land Rc sources Wilmington Regional Office 1 127 Cardinal Drive Exiemwn 1 Wilmington NC 28405 910 796 7215 State Stormwater Permit No SW8 060338 Page 2 of 2 5 Dill and debris has been removed from all road and drop inlets and is being maintained on a regular basis However, we did notice sediment buildup at a couple of curb inlets on Ocealn Isle Palms Way near Amenity Pond # 13 Please be reminded that it is your responsibility as the permittee of record to submit a completed and signed Name/Ownership Change Form to the Division of Energy, Mineral and Land Resources 30-60 calendar days prior to making any of the below listed changes These forms are available on our website at httos //deu tie aov/about/divisions/enerav-mineral-land-resources/enervN--mineral-land- a' An ownership change including the sale or conveyance of the permitted project area in whole or in part This does not include the conveyance of subdivided residential lots to individuals which are made subject to a recorded declaration of covenants and restrictions which contain the statements required by the stormwater permit, b The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256, c Foreclosure proceedings, d Filing for Bankruptcy, e Dissolution of the partnership or corporate entity Per NCGS 57D-6-07, a dissolved LLC shall wind up, which may include continuing the business of the LLC for a period of time The person charged with winding up the LLC shall collect the LLC s assets [which include the stormwater management permit], and distribute the assets as provided in NCGS 57D-6-08(2) f A name change of the owner / permittee, g A name change of the project h A mailing address change of the permittee Please be advised that until you submit the required Name/Ownership Change Form to the Division and receive approval from the Division to transfer the permit, you are required to comply with the terms, conditions and limitations of the Stormwater Management Permit under Title 15A North Carolina Administrative Code 2H 1003 and North Carolina General Statute 143-214 7, including the operation and maintenance of the permitted stormwater system Failure to provide the requested information, or to respond to this letter with a plan of action including a timeline to resolve the identified deficiencies, by September 30, 2016, are considered violations of the permit If the requested information is not submitted to this office by the due date, then DEMLR staff will re -inspect the site and may issue a Notice of Violation Please also note that any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules is subject to enforcement action as set forth in NCGS 143 Article 21, including the assessment of civil penalties of up to S25,000 per day If you have any questions, please contact me at the Wilmington Regional Office, telephone number (910)796-7215 or via email at Steven pusey@ncdenr gov Sincerely, Steve G Pusey Environmental Engineer Eric Compliance Inspection Report V'GDS\sgp \\\Stormwater\Permits & Prolects\2006\060338 HD\2000608 CEI_deficient�0J60338 cc Doug Talbot, Land Development Specialists Ao, & x q 13 % Alan Lewis, East Coast Engineering & Surveying Georgette Scott, Wilmington Regional Office Stormwater Supervisor WiRO Stormwater Permit File State of North Carolina I Enwonmental Quality I Energy Mineral and Land Resources Wilmington Regional Office 1127 Ca: dinel Dnw Exlen+inn I Wilmington NC 28405 910 796 7215 Compliance Inspection Report Permit SW8060338 Effective 11/23/15 Project Ocean Isle Palms Phase I Owner Dip NC LLC County Brunswick Region Wilmington Expiration 11/29/21 Adress 1338 Ocean Isle Beach Rd City/State/Zip Ocean Isle Beach NC 28469 Contact Person Buck Altschul Title Manacei Directions to Project Take Hwy 17 south to Ocean Isle Beach Rd turn left site approx 5 miles on left Type of Project Slate Stormwater HD Detention Pond Dram Areas 12 (Jinnys Branch) (03 07 59 ) ( C Sw) 14 (Jinnys Branch) (03 07 59 ) ( C Sw) 21 (Jinnys Branch) (03 07 59 ) ( C Sw) On Site Representative(s) Related Permits SW8060758 MAS Properties LLC Ocean Isle Palms Phase 2 Inspection Date 08/30/2016 Entry Time 10 30AM Primary Inspector Steven G Pusey Secondary Inspector(s) Reason for Inspection Follow up Permit Inspection Type Stale Stormwater Facility Status ❑ Compliant ® Not Compliant Question Areas ® State Stormwater (See attachment summary) Phone 678 794 9396 Exit Time 12 OOPM Phone Inspection Type Transfer Renewal page 1 Permit SW8060338 Owner Protect Oip NC LLC 11 Inspection Date 08/30/2016 Inspection Type Transfer Renewal Reason for Visit Follow up Inspection Summary The following deficiencies must be resolved 1 Pond #12 and Pond #14 For Pond #12 there seems to have been much work done However there is still a significant amount of erosion on the pond banks some of which will have to be re -graded and re-seecded The orifice pipe for the outlet structure located on the north side of the pond is an angled piece of PVC pipe We recommend Installing a submerged orifice outlet as shown in Fig 10 4 on page 10 18 of the BMP manual An engineers certification is required for operation as a stormwater pond For Pond #14 there was some erosion in the right of way of Lucaya Circle with deep ruts that needs repair and reseeding The pond Itself was in fair condition Grass needed cutting in areas around the pond Also it is not clear if this pond has been converted to a stormwater pond yet or whether it is being used as a sediment basin There appeared to be markers for the forebay berm Please advise current status An engineers certification is required for operation as a stormwater pond 2 Pond #21 The forebay had a large amount of sediment at the inlet pipe which will need to be cleaned out before it is certified for final operation An engineers certification is required for operation as a stormwater pond 3 Pond #22 This amenity pond has been completed with an outlet structure and piping Erosion Issues have been addressed 4 Pond #13 This amenity pond has been completed with an outlet structure and piping Erosion appears to be under control However the outlet structure orifice appeared to be somewhat clogged This should be cleaned out 5 Dirt and debris has been removed from all road and drop inlets and is being maintained on a regular basis However we did notice sediment buildup at a couple of curb inlets on Ocean Isle Palms Way near Amenity Pond #13 page 2 . Permit SVV8060338 Owner Protect Oip INC LLC Inspection Date 08/30/2016 Inspection Type Transfer Renewal Reason for Visit Follow up File Review Yes No NA NE Is the permit active? Signed copy of the Engineers certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? ❑ ❑ ❑ 09 Comment A partial engineer certification has been submitted for Pond #12 and #14 Final certifications will need to be submitted for both these ponds and for Pond #21 SW Measures Are the SW measures constructed as per the sop oved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Yes No NA NE ❑ ON El ❑ LY ■ ■ ■ Comment 1 Pond #12 and Pond #14 For Pond #12 we recommend installing a submerged orifice outlet as shown in Fig 10 4 on page 10 18 of the BMP manual For Pond #14 it is not clear if this pond has been converted to a stormwater pond Please advise current status 2 Pond 422 This amenity pond has been completed with an outlet structure and piping Erosion issues have been addressed 3 Pond #13 This amenity pond has been completed with an outlet structure and piping Erosion appears to be under control Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Yes No NA NE ❑ ® ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ 11 DWO upon request? Comment 1 For Pond #12, there is a significant amount of erosion on the pond banks, some of which will have to be re -graded and re seeded 2 For Pond #14. there was some erosion in the riaht-of-wav of Lucava Circle with deeo ruts that needs repair and reseeding The pond itself was in fair condition Grass needs cutting in areas around the pond 3 For Pond #21 the forebav had a large amount of sediment at the inlet pipe which will need to be cleaned out before it is certified for final operation 4 Pond #22 Amenity pond OK Built according to plans 5 Pond #13 Amenity pond Built according to plans Overflow orifice needs to be cleaned out 6 Sediment buildup at a couple of curb inlets on Ocean Isle Palms Way near Amenity Pond #13 need to be cleaned out page 3