Loading...
HomeMy WebLinkAboutNCC223018_Site Plan or Location Map_2022082430C W. Pennsylvania Ave. wthern Pines, NC 28387 Voice 910-725-1107 www.crawforddsn.com Landscape Architecture ♦ Fayetteville Civil Engineering ♦ Southern Pines Crawford Design Company © Copyright 2022 All drawings, specifications and designs prepared by Crawford Design Company are instruments of service and shall remain the property of Crawford Design Company. The Owner or any other parties shall not use the work on this or any project except by a proper agreement and appropriate compensation. IDES EC0�A g 7 CERT. No. 5 C-136 III.2 P ,� oRtp CAR°` �**01* I DES I .`�\NEER/�„ Q �7 0 CERT. No. C-2097 g 4-0 ���P N CARDLLE TOWN OF SOUTHERN PINES GENERAL NOTES FOR CONSTRUCTION t����ttit!lrtrt.r,, SEAL 027502 t+IEF4'�Q�=,`�� ALL WATER AND SEWER CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH THE TOWN OF SOUTHERN PINES STANDARDS AND SPECIFICATIONS FOR WATER AND SEWER CONSTRUCTION, CONTRACTOR SHALL CONTACT THE CONSTRUCTION INSPECTOR AT LEAST FORTY—EIGHT (48) HOURS PRIOR TO START OF CONSTRUCTION, PHONE NUMBER 910-692-1983, CONTRACTOR SHALL ALSO CONTACT THE CONSTRUCTION INSPECTOR BEFORE RESTARTING WORK AFTER WORK HAS STOPPED, 2, CONTRACTOR SHALL IMMEDIATELY CONTACT THE TOWN IF THERE IS A CONFLICT BETWEEN THESE PLANS AND THE PUBLISHED STANDARDS OF THE TOWN, APPROVAL OF THESE PLANS DOES NOT CONSTITUTE ANY WAIVER FROM THE TOWN STANDARDS, 3, ALL FIRE HYDRANTS THAT ARE INSTALLED, THAT ARE NOT YET OPERATIONAL, SHALL BE BAGGED, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FURNISH AND INSTALL THE REQUIRED MATERIALS AT THEIR COST, 4, CONTRACTOR SHALL NOT TAP OR OTHERWISE PENETRATE EXISTING WATER OR SEWER MAIN LINES WITHOUT PRIOR APPROVAL FROM NCDENR PUBLIC WATER SUPPLY SECTION AND THE TOWN, CONTRACTOR IS RESPONSIBLE TO AVOID SPILLAGE OF RAW SEWAGE, CONTRACTOR SHALL PROVIDE ALL SEWER PLUGGING AND PUMPING EQUIPMENT NECESSARY TO AVOID SPILLAGE, VIOLATIONS ARE SUBJECT TO FINES AND PENALTIES AND WILL BE ENFORCED TO THE FULL EXTENT OF THE LAW, 5, CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF TRAFFIC ON EXISTING ROADWAYS IN ACCORDANCE WITH NCDOT STANDARD SPECIFICATIONS LATEST EDITION AND TOWN REQUIREMENTS. 6, WATER AND SEWER MAIN CONSTRUCTION SHALL NOT COMMENCE UNTIL INVOLVED ROADWAYS, STORM DRAINS, AND UTILITY EASEMENTS HAVE BEEN GRADED AND CONTOURED TO APPROXIMATELY FINAL GRADE. PROPERTY CORNERS OF ALL LOTS ARE REQUIRED TO BE STAKED BY A LICENSED SURVEYOR PRIOR TO INSTALLING WATER AND SEWER SERVICE CONNECTIONS, 7, ONLY THE AMOUNT OF TRENCH THAT CAN BE OPENED, WORKED IN AND THEN STABILIZED IN A WORK DAY SHALL BE DONE SO, IF STABILIZATION DOES NOT OCCUR AT THE END OF THE WORK DAY, THEN APPROPRIATE EROSION, SEDIMENT, AND SAFETY CONTROLS SHALL BE INSTALLED, 8, A PRE —CONSTRUCTION MEETING IS REQUIRED PRIOR TO START OF CONSTRUCTION, MATERIALS SUBMITTAL SHALL BE DELIVERED AND APPROVED BY THE TOWN OF SOUTHERN PINES FOR WATER AND SEWER CONSTRUCTION PRIOR TO START OF WORK. 9, ALL PIPES SHALL BE CLEANED BEFORE THEY ARE LAID AND SHALL BE KEPT CLEAN UNTIL ACCEPTANCE OF THE COMPLETED WORK BY THE TOWN, OPEN ENDS OF PIPES SHALL BE FITTED WITH WATER TIGHT DEVICES TO PREVENT ENTRANCE OF FOREIGN MATTER WHEN PIPE —LAYING OPERATIONS ARE INTERRUPTED, 10. ALL PUBLIC SANITARY SEWER MAINS SHALL BE INSTALLED IN DEDICATED STREET RIGHT OF WAY OR IN DEDICATED UTILITY EASEMENTS, MAINS INSTALLED IN TOWN RIGHT OF WAY SHALL BE LOCATED IN THE CENTER OF PAVEMENT, 11, BEFORE THE SYSTEM MAY BE PUT INTO SERVICE THE TOWN WILL REQUIRE THE AS —BUILT INFORMATION FOR WATER, SEWER AND STORM DRAINAGE: CONTACT TOSP CIS DEPARTMENT FOR REQUIREMENTS, 12, ALL TRANSITIONS IN PIPE MATERIAL SHALL HAVE RESTRAINED JOINTS, ALL RESTRAINED JOINTS SHALL BE INSPECTED BY THE TOWN'S CONSTRUCTION INSPECTORS PRIOR TO BEING COVERED, 13, ALL FIRE HYDRANT LEGS SHALL BE DIP, BE RESTRAINED WITH THREADED RODS AND HAVE THRUST BLOCKING, ALL FIT LEGS SHALL BE INSPECTED BY THE TOWN'S CONSTRUCTION INSPECTORS PRIOR TO BEING COVERED, 14, ALL GRADES FOR ENTRANCES AND FIRE LANES SHALL BE FIELD VERIFIED BY THE FIRE DEPT, PRIOR TO ACCEPTANCE, THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH TESTING BY THE FIRE DEPARTMENT, 15, ALL UTILITIES SHALL BE ELECTRONICALLY LOCATABLE USING A LOCATING METHOD THAT IS GENERALLY ACCEPTED BY OPERATORS IN THE PARTICULAR INDUSTRY OR TRADE IN WHICH THE OPERATOR IS ENGAGED, ALL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND OTHER INFORMATION INDICATED ON THIS SHEET SHALL BE APPLIED TO ALL CONTRACT DOCUMENTS AND SHEETS IN THIS SET. GENERAL NOTES CAN BE FOUND ON DETAIL SHEET C6.0 THRU C6.4 Ravensbrook LLC Ravensbrook Residential Subdivision MOORE COUNTY, NORTH CAROLINA 'OPERTY INFOPiA AT...& Owner: Ravensbrook LLC Property Address / Location: 140 South Lakeshore Drive Whispering Pines, INC 28327 STORM SEWER SUMMARY REPORT DESCRIPTI❑N MATERIAL LENGTH T❑WN/PRIVATE PIPE 15" CLASS III RCP 34' PRIVATE DESCRIPTI❑N TYPE QUANTITY STORM BOXES SCM RISER 1 SEWER MAIN SUMMARY REPORT DESCRIPTI❑N MATERIAL LENGTH T❑WN/PRIVATE SEWER MAIN 8// SDR-35 PVC 337' TOWN DESCRIPTI❑N SIZE QUANTITY SEWER SERVICES 4// 10 6// MANHOLES 4' 3 5' SEWER APPLICATION SUMMARY # AND TYPE OF UNIT @ X DEMAND FLOW REQUESTED 10 SINGLE FAMILY 480 GPD/UNIT 4,800 GPD TOTAL DEMAND 4,800 GPD NOTE: 8" SS @ 0.5% can flow 276,859 gpd at half full (manning equation) Owner / Client Contact: Owner / Client Address: Owner / Client Phone & Email: Colin Webster, Managing Member 140 South Lakeshore Drive, Whispering Pines, NC 28327 (910) 639-1065 colin@ascotgroup.com STREET SUMMARY REPORT DESCRIPTI❑N MATERIAL LENGTH STREETS TOWN ASPHALT 462LF PRIVATE CURB AND GUTTER TOWN 0 PRIVATE SIDEWALK TOWN 5' CONCRETE 356LF PRIVATE WATER MAIN SUMMARY REPORT DESCRIPTI❑N MATERIAL LENGTH T❑WN/PRIVATE WATER MAIN 2" SDR21 PVC 280' TOWN 6// C900 SDR18 PVC 387' TOWN DESCRIPTI❑N SIZE QUANTITY WATER SERVICES 3" RES, 10 VALVES 6// Gate valves 1 2" Gate valves 1 HYDRANTS 1 SITE DATA TABLE PROJECT NAME: RAVENSBR❑❑K RESIDENTIAL SUBDIVISI❑N PHASE 3 OWNER: RAVENSBR❑❑K LLC OWNER EMAIL CONTACT: colin@ascotgrp,corn ENGINEER: KEVIN S, LINDSAY, PE, CRAWF❑RD DESIGN CO, ENGINEER EMAIL CONTACT: kevinlindsay@crawforddsn,corn PROJECT ADDRESS: Waynor Road, Whispering Pines, NC 28327 LATTITUDE: 35,237738N L❑NGITUDE: 79,410379W PARCEL ID#: 20180420 PIN: 857400703186 DEED BOOK & PAGE: 5220 -522 C❑NDITI❑NAL USE PERMIT: CU-06-20 LOT SIZE: PHSE3-6,7 acs, MIN LOT 22,500SF(CLUSTER) DISTURBED AREA: 6,28 Acres CURRENT Z❑NGIN: RS-3 PARKING PR❑VIDED: 2 spaces/unit WATERSHED: Nick's Creek RECEIVING WATER COURSE: Juniper Creek STREAM CLASSIFICATI❑N: WSIII-BW RIVER BASIN: CAPE FEAR HQW: Y ® FLOOD ZONE (FEMA PANEL #, DATE): 8573J & 8574J-10/17/2006 EXISTING IMPERVI❑US AREA: 0,0 AC 0,0% PROPOSED IMPERVI❑US AREA: 1,25 AC 19% TOTAL IMPERVI❑US AREA: 1,25 AC 19% PIN: Zoning: WATER APPLICATION SUMMARY DEMAND FLOW REQUIREMENTS FLOW PROVIDED DOMESTIC DEMAND 4,800 GPD 4,800 GPD PEAK DEMAND 10 GPM 10 GPM FIRE DEMAND 1,000 GPM 1,000 GPM SPRINKLER DEMAND 0 GPM 0 GPM IRRIGATION DEMAND 0 GPM 0 GPM 1,010 GPM TOTAL DEMAND 1,010 GPM @ 30 PSI TRAFFIC DATA # AND TYPE OF UNIT @ X TRIPS/DAY TPD 10 DETACHED SINGLE FAMILY DWELLINGS 9.44 TPD/UNIT 94.4 TPD TOTAL DEMAND 94.4 TPD TIA REQUIRED TDA REQUIRED < 300 TPD (1)ACCESS < 1,000 APT > 200 ADT Y,® Y,® - Phase 3 857400703186 RS-3 M A P IN.T.S. s r SITE Rd. SOUTHERN PINES, N.C. COVER C 0.0 NOTES PAGE C 0.1 PHASING PLAN C 0.2 EXISTING CONDITIONS PLAN C 1.0 PRELIMINARY PLAT PHASE 3 PP 1.0 SITE PLAN PHASE 3 C 2.0 FD OVERLAY PHASE 3 C2.1 LIGHTING PLAN PHASE 3 C 2.2 GRADING, DRAINAGE AND EROSION CONTROL PHASE 3 C3.0 SCM-6 C3.6 OVERALL UTILITY PLAN PHASE 3 C 4.0 PLAN AND PROFILE - CALEDONIA DRIVE (ROAD F) - ROAD AND STORM C 5.3C.1 PLAN AND PROFILE - CALEDONIA DRIVE (ROAD F) - WATER AND SEWER C 5.3C.FO PLAN AND PROFILE - CALEDONIA DRIVE WATER MAIN EXTENSION C 5.3D DETAILS C 6.0 - 6.7 LANDSCAPE PLAN L 1.0 TOWN OF SOUTHERN PINES CONSTRUCTION PLAN APPROVAL ALL CONSTRUCTION METHODS AND MATERIALS AND OTHER STANDARDS AND SPECIFICATIONS SHALL BE IN ACCORDANCE WITH THE TOWN OF SOUTHERN PINES STANDARDS AND SPECIFICATIONS AS OUTLINED IN THE MOST CURRENT UNIFIED DEVELOPMENT ORDINANCE (UDO). IN THE EVENT OF A CONFLICT BETWEEN METHODS, MATERIALS, STANDARDS AND/OR SPECIFICATIONS IN THE APPROVED PANS AND THE UDO, THE UDO GOVERNS UNLESS A WRITTEN WAIVER IS ISSUED BY THE TOWN ENGINEER, ANY CHANGE IN APPROVED PANS MUST BE AUTHORIZED BY PRIOR WRITTEN APPROVAL, PUBIC SANITARY SEWER AND UTILITY EASEMENTS SHALL BE RECORDED PRIOR TO FINAL ACCEPTANCE AND /OR ISSUANCE OF A CERTIFICATE OF OCCUPANCY BY THE TOWN, APPROVAL OF THESE PANS IN NO WAY IS MEANT TO RELIEVE THE DESIGN PROFESSIONAL OF HIS OR HER RESPONSIBILITY FOR PROJECT DESIGN APPROVED FOR CONSTRUCTION BY DATE PERMIT # PUBLIC WORKS (TOWN) PLANNING/ZONING (TOWN) FIRE (TOWN) M W s RUCT Crawford Design Company © Copyright 2022 - All drawings, specifications and designs prepared by Crawford Design Company are instruments of service and shall remain the property of Crawford Design Company. The Owner or any other parties shall not use the work on this or any project except by a proper agreement and appropriate compensation. V N N N N CD N N N C� z Cn V) N 0 0 i 0 i 0 Q 0 O O 0 0 0 CO 00 0 Q z 0 CD CD 00 U) 0 U cn Q Z Z Z Phasina Plan Timeline: Phase 1: 27 lots. Completed and homes under construction. will include temporary walking trail. Phase 2: 32 lots. Complete 1.5 years after recording of Phase 1 Final Plat. (Includes second entrance prior to Phase 2 Plat recording and clubhouse within one year of recording of Phase 2 plat) Phase 3: 10 lots. Complete 1 year after recording of Phase 2 Final Plat. Phase 4: 26 lots. Complete 1 year after recording of Phase 3 Final Plat. (Phase 4 shall include emergency connection to Forest Creek subdivision prior to recording of Phase 4 final plat.) Phase 1&2 Open Space Areas sf ac Total Area: 2,965,794 68.09 5% Open Space Req.= 1481,290 3.40 Additional Due to Clustering 235,755 5.41 Total Open Space Required= 394,045 8.82 Max 40% Water= 15311618 3.53 Min 60% Non Water= 230,427 5.29 Min 30% Dry/<10% slope= 115,213 2.64 Open Space Provided= 7761,596 17.83 Open Space Wetland= 266,233 6.11 Open Space Water= 39,277 0.90 Open Space Non -Water= 7371,319 16.93 Open Space Dry/<10% slope= 471,085 10,81 Phase 3 Open Space Areas sf ac Total Area: 285,484 6.55 5% Open Space Req.= 14,274 0.33 Additional Due to Clustering 47,023 1.08 Total Open Space Required= 61,297 1.41 Max 40% Water= 241 519 0.56 Min 30% Dry/<10% slope= 18,389 0,42 Open Space Provided= - - Open Space Wetland= - Open Space Water= - - Open Space Non -Water= - - Open Space Dry/<10% slope= - - Phase 1,2,&3 Open Space Areas sf ac Total Area: 31251J.278 74.64 5% Open Space Req.= 162,564 3.73 Additional Due to Clustering 282,778 6.49 Total Open Space Required= 4451P342 10.22 Max 40% Water= 178,137 4.09 Min 60% Non Water= 2671,205 6.13 Min 30% Dry/<10% slope= 133,603 3.07 Open Space Provided= 776,596 17.83 Open Space Wetland= 2661,233 6.11 Open Space Water= 39,277 0.90 Open Space Non -Water= 737,319 16.93 Open Space Dry/<10% slope= 471,085 10.81 >8.82 req'd >5.29, o k >2.64, o k >10.22 req'c >6.13, o k >3.07, o k ` ��� Phase 2 S'En � �,�� 42.98 acs IOm-, NcO NO 1 \ In5>T NWZ] I N�� 32 Lots N o N 1 1 \ 2 \ I �1N 0 3 � Includes Club House and Connection to Southern 4 REOER / / \ Phase 4 5 / 1 Pines Walking Trail ` /MARSHOMARY J. (Construction shall start upon recording of 18 1 acs j I O ; / DPC2, S241 / \ completed within Phase 2 Final Plat and shall be com p 26 Lots f+l ; MPR GE RGE1 EW II I 1 06ZONE: RR6 MARSH, WALTER T. II / ; one year of recording of Phase 2 Final Plat) D131569, P168 JONES, THO S 0. PC2, S241 / DB1712 P60 ZONE: RR ZO RR McPHAUL, JANE H. j i G pA D8383, P253 SGPR 6 ZONE: PD 0 P°� ""�... } I \ I „�oNE S ,o - O CHAVIS, BRENDA & OTHERS �,�,�, DB�4 1 93E/424 OPEN SPACE 104, P398 S !TIES, LLC ZONER1R V A \ \ \ ��� 21,757 SF - 0.49 AC ZONE PD % _ n n- \ - - - - PHASE 2 OPEN SPACE � - vv 43,882 SF - 1.0 AC o, ° o / V 1430 1431 IsI 0�+6b 00_ ` .." +_ _ "�w-�-_- --w O / - -��--------- yNAYNOR ROAD (S.R. 1897) I \h \ L 1 I \ K`� PHASE 2 OPEN SPACE I ° � -����\ , r--Ir �---_, 1 LJ 14z8 O 17,546 SF - 0.40 AC , // \� \ \17,50 SF PHASE 1 OPEN SPA E\�� °/ t I o I _ - �- V A \ \ o I I 0 Temporary Access to Greenway Trail /° s , / /- - _ '; \ \ o \� J �- _ J L - , ° o To be removed upon acceptance of r �s -' Greenway Trail and Parking �� xo� �� /,� / ° 1 Sewer Outfall to existing line in Phase 1 (S er Line in 20' easement to TSOP) 0 --co ED G -JLL r•!' JL--I Lam/ $.I 0 PHASE 2 OPEN SPACE 182,640 SF - 4.19 AC I O 1435 I ` �,,�. / oo r ✓ 1 1RP Greenway Trail Access / and Parking 1438 �s Phase6.7 acs 10 Lots s 1441 1440 q ---77 T___-�>�, Phase 1 gam.- 5+00 -.. - 4+00 3+00 .' \ \ 0 r wR, D210,JP8R17 I I A \ \ V,� ZONE: RR I L__-�-� 7 i PHASE 21 Il�o\ I I i 264,14' I+ a� \ \ \ \ \ \ DEHGHAN, ADRIANE C. D64482, P483 PC16, S540 ZONE: PD Temporary Access to Greenway Trail d -PHASE 1 OPEN SPACE 229,188 SF - 5.26 AC acs 27 Lots Under Constru I/ I I I I I i Landscape Architecture ♦ Fayetteville, NC Civil Engineering ♦ Southern Pines, NC 230C W. Pennsylvania Ave. ♦ Southern Pines, NC 28387 Voice: 910-725-1107 w w w. c r a w f o r d d s n. c o m ,,,��QIIIIII/II�j ,, ,,,,pQ111U1II�� , ,,� O pES I GN,,I���� �,,0 0 E S I GN���I�i O A�viT�r CO��= ,���l�O� 1NEER/�G�pCO�4j' �, -0 ♦ ♦ S� � 25 'o CERT. No. c C C CERT. No. N C-136 C-2097 g 2 P .c oRTH CARC`\� CARO�\� MI 11111691 SEALS FOR CONSTRUCTION REVISIONS 0 --- mm-dd-yy Description M W Q Z O 0 M U U 0Z a J �W= Y WZz o a °m � � Cl)?� m z W aJ Z Q J a. C' Z co Q PROJECT DETAILS Project Manager: KSL CAD Technician: RFN/GER Reviewed / Approved By: KSL Project Number: 17019 SCALE 0 200 400 Full Scale: Horiz.: 1" = 200' Half Scale: Horiz.: 1" = 400' ISSUE DATE 9/17/2021 SHEET NUMBER C092 Crawford Design Company © Copyright 2022 - All drawings, specifications and designs prepared by Crawford Design Company are instruments of service and shall remain the property of Crawford Design Company. The Owner or any other parties shall not use the work on this or any project except by a proper agreement and appropriate compensation. SITE NOTES 1. ALL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND OTHER INFORMATION INDICATED ON THE COVER SHEET SHALL APPLY TO THIS PLAN 2. CALEDONIA DRIVE SHALL BE CONSTRUCTED TO SOUTHERN PINES LIDO STANDARDS FOR LOCAL STREETS: 22' PAVED ROAD WITHOUT CURB AND GUTTER, 6' SHOULDER ON EACH SIDE, MIN 8' SWALE AND STREET TREE SECTIONS EACH SIDE. 3. SETBACKS ARE AS PER SOUTHERN PINES UDO: 30' FRONT AND REAR, 10' INTERIOR SIDE, 15' EXTERIOR SIDE (ALONG ROW). 4. NATURAL VEGETATION IN THE 30 FOOT BUFFER SHALL REMAIN UNDISTURBED BOTH DURING AND AFTER CONSTRUCTION AND SHALL BE NOTED ON THE FINAL PLAT. 5. ALL STRUCTURES MUST BE GREATER THAN 30' APART FROM ROOF EDGE TO ROOF EDGE. 6. ALL DRIVEWAY CULVERTS SHALL BE MIN 15" DIAM. RCP @ 0.5% MIN SLOPE OR SHALL HAVE A LOW AREA IN DRIVEWAY FOR WATER TO FLOW OVER WITHOUT IMPACTING STREET. Q N N 0 N N 0 N Cn Cn i 0 I- i 0 Q O In O O V) C N O 0 V) 0 INV IN=353.46 \ / T I INV OUT=353.34"'-% JO��// / CM SAG 6963 O�///// q�J\ BEN,CHMA K \ SEE SHEET 1 .0 �� ////// /tee/41 / IL00 oo U �oo in \ U cn Q -�� �' �y / S / \ ® RIMELEV=367. ® IM/IN=357.77 INV OUT=357.67 ^0 437 22,556 S.F. / \ 22,660 S.F. \ 1438 22,595 S.F. / 0 \ / / 1 1 63 439 \C \ 22,582 S.F. 1Y 06� OFF / \C 23,214 S.F. \ i 1440C-) \ \ / STREET LIGHT — / 65 / 30,033 S.F. I v I \ 1048 i \ i 1049 \ I \ I v \ I I I I I I I I I I I I I I I J00m I\ \ SSMH8 Q I I*LEV=369.10INO� OUT 6 INV OUT- 9.16 I � I � \ RIM[ it 5+00 I I 32 I I I I I I I I I I I I �\ I 4+00 I I I I 30 \ \ I 31 I I \ I I I \ I I I \ I I \ I I I \ I I I I I I I I I I IF�000 — Ioo,�EAR i i i 225 996 SF HP ASE 2 OPEN SPACE V/ \ / / SS' 6 PVC FEMA 100—YEAR FLOOD (ZONE AE) J 29,950 S.F. / /C-1 ------ / 5"X5"ECM6AG �� O R43' G 1 R66'---_---- / CONTROL CORNER/ / N(y): 540,060.8 3 USFT / E(x): 1 ,877,72�4.702 USFT. / NAD83/2011/ 00 3. / 221763 S.F. BqT�° I I66 a 30,527 S.F. I y / / I / / I / 1050 / 1051 1052 6 g INV OU-359.62 � — \ 26,657 S.F. / / / 7 JQ, / Landscape Architecture ♦ Fayetteville, NC Civil Engineering ♦ Southern Pines, NC 230C W. Pennsylvania Ave. ♦ Southern Pines, NC 28387 Voice: 910-725-1107 w w w. c r a w f o r d d s n. c o m ,,��QIIIIII/II�j ,, ,,,, EpQ111U1II�� O pS I GN44Iz��, �,,0 pES I GIV W**� ff 0 AR041 CO��� ,09.7.v � SNEER/% CO� , q . 1- 7 CERT. No. C CERT. No. N C-136 = C-2097 g I oRTH 1-00� ,� � T OATH CARO' ,,,,,,,, ,,z. SEALS FOR CONSTRUCTION REVISIONS --- I mm-dd-yy I Description M W Q Z 0 0 m U o �W= z _ J Y Waz z °o m�� Q �z� z W J J M z W >�z aw W > PROJECT DETAILS Project Manager: KSL CAD Technician: RFN/GER Reviewed / Approved By: KSL Project Number: 17019 5 oso ,0 Full Scale: Horiz.: 1" = 50' Half Scale: Horiz.: 1" = 100' ISSUE DATE 9/17/2021 SHEET NUMBER C2,0 Crawford Design Company © Copyright 2022 — All drawings, specifications and designs prepared by Crawford Design Company are instruments of service and shall remain the property of Crawford Design Company. The Owner or any other parties shall not use the work on this or any project except by a proper agreement and appropriate compensation. Q O N N O N N Q z CD 0 O O N U Cn 0 In a U Cn CD 0 0 i Q U O Q cn O O V) C N O O i V) 0 U v� VICINITY MAP1"=2000' AREA LIGHT IS❑F❑❑TCANDLE CURVES FIXTURE, TRADITIONAL LED MOUNTING HEIGHT, 16 FT POLE ASSY # LIGHT SOURCE, 50W LED'S, 4000K ASSY # LFIX-TRAD-LED-50-BLK-III-MULTIV-PVT-P PATTERN, TYPE III, BI-U3-G2 NOTE: THE FOOTCANDLE READINGS BELOW ARE MAINTAINED AND HAVE BEEN DEPRECIATED FOR LAMP LUMEN DEPRECIATION AND LUMINAIRE DIRT DEPRECIATION, FOR INITIAL FOOTCANDLES. DIVIDE THE READINGS BELOW BY .85. so 40 0 -40 -s0 -80 -40 0 40 EO LEGEND (OUTER to INNER): 0,100 , 0.200 , 0.300 16'(.h) STYLE V # LP0LE-S5-AB4L-WT-1LK-3T-PVT-P Ravensbrook (18-0305) LUMINAIRE SCHEDULE TYP SYMBOL I DESCRIPTION LAMP LUMENS MOUNTING/BALLAST I LLF I QTY TR1A ° COOPER LIGHTING TRAD_3 (1) 'TR3' TRADLED_3 (1) (7) REBEL ES 3357 12' MT HT SCREW IN 0.85 10 LIGHT /// / _ �• ` X. LIGHT / o o ofC00 0 o \ ® s IY :� RIMELEV=367. Z Z Z ^ IN =357.77 p0 \ \ \ ® ^ INV OUTUT=357.67 ^ \ C-) 7) 22,556 S.F. / \ / 22,660 S.F. / \ 1438 \ Ulo \ 22,595 S.F. / / 0 � L. i \ C < / 1439 \ , \ 22,582 S.F. Y\ - I , / \ � "6 4 I \ \C 23,214 S.F. \ 1440 \ O / — / 301 I \ I \ �0 I v I 1049 \ I v I v I \ I \ \ I \ / / SSMH/ RIMELEV=369. INV OUN-359.62 o FEMA 100-YEA OD \ 26 657 S.F. / / -7 (ZONE AE) ra \� 68 % 29,950 S.F. F ' 0 R43' O R55' �( 71 \ 0 G / 221763 S.F. � I 30,527 S.F. I � / I � 11 050 I .0 1051 I / / O 1052 Landscape Architecture ♦ Fayetteville, NC Civil Engineering ♦ Southern Pines, NC 230C W. Pennsylvania Ave. ♦ Southern Pines, NC 28387 Voice: 910-725-1107 w w w. c r a w f o r d d s n. c o m F-s IG O,,,,pQ111U1II1� , po�E I ��Iz , �� 0 p E S I N *4" 0' ARC4 T 001% ,���l�O� NEER/� COS j 7 Z 7 CERT. No. C - CERT. No. N C-136 = C-2097 g ,c oRTH cARO`\� ,,,,,,,, ,,,���LIE SEALS ` N%IIIIII/,f .``` �\A A r,'`�' a SEAL = 027502 FOR CONSTRUCTION REVISIONS 0 --- mm-dd-yy Description M W z O m U O Z �a J 0W= Y WZ/�z I.i o � Cl)c� � M0 z 0 W iE z W Wa Z Q J M C' Z C' J PROJECT DETAILS Project Manager: KSL CAD Technician: RFN/GER Reviewed / Approved By: KSL Project Number: 17019 5 o,00 zo ISSUE DATE 9/17/2021 SHEET NUMBER C2,02 Crawford Design Company © Copyright 2022 - All drawings, specifications and designs prepared by Crawford Design Company are instruments of service and shall remain the property of Crawford Design Company. The Owner or any other parties shall not use the work on this or any project except by a proper agreement and appropriate compensation. Q O Lri O N N O N N 0 Ni O z 0 Q Ch O 7D 1-9 a_ 0 (D O N� U T) cn T) 0 O cn 0 a_ U T) cn 0 a_ O 0 i 0 I` 0 Q U 0 2 cn _0 0 0 > 0 Ch 0 I` 0 > 0 U 6 GRADING / EROSION CONTROL NOTES 0 INSTALL GRAVEL CONSTRUCTION ENTRANCE (SEE DETAIL SHEET). CONTRACTOR SHALL REPAIR ANY DAMAGE TO THE EXISTING PAVEMENT RELATED TO CONSTRUCTION ACTIVITY. 2 INSTALL TEMPORARY SEDIMENT FENCING (SEE TOSP DETAIL E-6). 3 INSTALL SILT FENCE OUTLET (SEE TOSP DETAIL E-7) 4 INSTALL TEMPORARY INLET PROTECTION (SEE TOSP DETAIL E-4) 5 INSTALL HORSESHOE INLET PROTECTION (SEE DETAIL 6.0.8, 6.1.1,2) 6 INSTALL RIP -RAP DISSIPATER (SEE TABLE THIS SHEET FOR DIMENSIONS) 7 INSTALL SKIMMER BASIN (SEE DETAIL SHEET 6.0) 8 INSTALL TEMPORARY DIVERSION BERM AND SWALE (SEE DETAIL SHEET) GENERALNOTES 1. NC 811 SHALL BE CALLED PRIOR TO ANY ACTIVITY. 2. ALL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND OTHER INFORMATION INDICATED ON THE TITLE PAGE SHALL APPLY TO THIS PLAN 3. ALL ELEVATIONS SHOWN FOR THIS PROJECT ARE IN REFERENCE TO THE BENCHMARKS AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR WITH THE SURVEYOR OF RECORD PRIOR TO BEGINNING CONSTRUCTION. BENCHMARK TO BE SET BY SURVEYOR PRIOR TO CONSTRUCTION. PURSUANT TO G.S.113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATION COVER. IF ANY SEEDING FAILURE OCCURS, THOSE AREAS SHALL BE RE -SEEDED WITH RYE GRAIN FOR TEMPORARY STABILIZATION AND PREPARED FOR PERMANENT SEEDING. 4. SEE DETAIL SHEETS FOR EROSION CONTROL MEASURES & MAINTENANCE. 5. CONTACT: KEVIN LINDSAY, 910-920-7661 FOR QUESTIONS CONCERNING THESE PLANS. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING EROSION AND SEDIMENTATION CONTROL MONITORING ACCORDING TO NPDES PERMIT REQUIREMENTS. 7. SEE SHEET C6.1 FOR TEMPORARY & PERMANENT SEEDING REQUIREMENTS. 8. ALL BASIN SHALL BE TESTED FOR POSITIVE DRAINAGE, ANY NON-FUNCTIONING BASINS SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT ENGINEER. ANY DAMAGED OR NON-FUNCTIONING INLETS CAUSED BY CONSTRUCTION ACTIVITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. 9. AT LEAST 72-HOURS PRIOR TO ANY CONSTRUCTION ACTIVITY, EXCAVATION, GRADING, OR DIGGING ON THE SITE, THE GENERAL CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES TO VERIFY Al FIELD -LOCATE THEIR RESPECTIVE UTILITIES (THE NORTH CAROLINA ONE CALL CENTER-1-800-632-4949 (NC-811) EROSION CONTROL CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE -CONSTRUCTION CONFERENCE. 2. REFRESH ALL EXISTING PHASE 2 MEASURES. 3. INSTALL TEMPORARY SEDIMENT FENCE AND FENCE OUTLETS. 4. INSTALL TEMPORARY SKIMMER BASIN W/ POROUS BAFFLES, PERMANENT SCM BASINS THAT WILL BE USED AS TEMPORARY SKIMMER BASINS (SEE NOTE BELOW), AND TEMPORARY SEDIMENT TRAPS W/POROUS BAFFLES. 5. CONSTRUCT SWALES AND TEMPORARY DIVERSION BERMS AS PER TABLES SHEET 3.0 THIS SHEET AND DETAILS. 6. ROUGH GRADE SITE AND INSTALL CULVERTS, RIP RAP DISSIPATERS. 7. APPLY TEMPORARY SEEDING TO ALL DISTURBED AREAS. FINE GRADE SITE AND APPLY PERMANENT SEEDING (GROUND COVER) TO ALL DISTURBED AREAS. 8. TEMPORARY MEASURES SHALL BE REMOVED AFTER APPROVAL FOR REMOVAL OF ALL TEMPORARY EROSION CONTROL MEASURES BY TOWN OF SOUTHER PINES HAS BEEN OBTAINED. GROUND STABILIZATI❑N FOR DWQ REQUIREMENTS SITE AREA STABILIZATI❑ STABILIZATI❑N TIME FRAME DESCRIPTI❑N N TIME FRAME EXCEPTI❑NS PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES AND SL❑PES HIGH QUALITYWATER 7 DAYS NONE (HQW) ZONES SL❑PES STEEPER 7 DAYS IF SL❑PES ARE 10' ❑R LESS THAN 3:1 IN LENGTH AND ARE N❑T STEEPR THAT 2:1, 14 DAYS ARE ALLOWED SL❑PES 3J1 ❑R 14 DAYS 7 DAYS F❑R SL❑PES FLATTER GREATER THAN 50 FEET IN LENGTH ALL ❑THER AREAS 14 DAYS N❑NE (EXCEPT F❑R WITH SL❑PES PERIMETERS AND HQW ZONES) FLATTER THAN 4:1 I� I � \ _ _---------- - --- - -- --- --- _ , - \ \1 *\ - II II i i V Ii A\ V \ V A\� �V A�� / A // // \ �� - A 1 0 \ � �I� \ \ \ �`� 1 Vv v vl / A� �YY w/ // / / /' ' / y I v V ""_ - \\ V A \A AV A \\ _ A A �x0 / /// / 3 v v vv vvv/ v // / // / v� I 11 ;.� �k v� i ) - vv v� / v v �� R v A ' v ` vv v A v v A / /� / / / /, / /� V vv vv l v - // / / v 29 ` v v --- - / // / / / / % _ v \ \ \ \ \ / / / I \ \ \ \ \ \ \ / / ' ' \ \\ \\\A A\\ \\\ \\ `p \� �� \ �V A\ v �____ \ \ \ �` ��//- // /// / / / / / 1 AV I A \ \ \ V \\ \ V A A � �/ / // / , \ \ ����` A\ �v\ �� \�� �� vv v v\ / /�//�� / / / / 11 ` �\ \ \ v A / / 30 A \ v v �. \ \ \ ��.- _ \ \ / / \ \ \ \ / / \ \ vvv v vv V AV. `\ v v �� V \ I L, �/ // / 9 v v v v\ v v v ,/ / ��� `� \ v \� \� �,- \ v v v v - d� // A A v 3, \ ( I \ \ \ \ ,/\ \ / op \ \ \ \ \ \ \ \ I \ / // / I �`\\ \ \\\ vv A v ` ` v A. �`� v� ��� _ --- / �� / /�/ \ \ V v / / / / _ A vv v v v v vv �V - _ _ � _ p"p `\ v / / / / I A V A vv \v \v _ \ v vv / , // / // __ � vv v v v v �� `v ` 0 \ ` \� �' / / A \ \ V A A `v ' / / // / \ vv V vv v v v v A\ v _ A \ v / I I \\\ V A A v - / / v A \`, v`v A vv vv `v A, `V � `vv �`� ��- 1� t+- v A/ - / / / / / r' I A V A A v I `vv v� --���� / / / // // /'� vvv vv A \\ \\ \ \ \\ \ \ \ \\ / I / / // // ---� `�\ \\ \ v v v v v I AA _ ` / / A /I A \ v v A v ` / �- - --- , d v A \ \ \ \ � \ \ \ \ / / x \ I J � \ \ \ vvv vv vv \ \ vvv vv ��� ��� �\� _ \ �I� / // / / /�� I \ \V A \\ \\ V v I - -- / // /// // ��� /�� ���� vv \v` vv vvv v` ,\ \\ `` \ vv\ `` ``� ��` \ \ '-'`----�f ---- -_ A / / J' \ n I I \ AV v \ // ,/ _ _ _ - -� v\\ vv v`v vv / \ I \ \ v v ,, _ ! �// _ _ F �, \ X vvv v`v '`v vv -= _ - - - - �v� w /N�� � / //' I ��, I � I AV v, v - ,-' / /'/ ,'�� 3,0 v \v`v �`, v`, vv. -�_ - \\ `,Ivvv `\\vv \\ `vvv vvv v `�, v- - h / 3�>6 I�X� �� I I `v \----------- _ /' ,/----------- �- �, \ v \vv �\ x \ _ I \ \\ '�� �/ 2 ` / � � I \ I \ v �,� v v / \ \ \ \ `v Av `� v� \ \ `vv ��� ��>: v �� Riser #42 FES / �I A �� v ` i vv v� v y-_ �` w INV=363.66� v v v - ---_ \. v `----- --- TOP=366.21 \ �` `` \ ` v` v` �`� v` � may, �� ��� \ 3 �s�� \��� A\ \\ vv v v\\ - -------------I- �_''��' � � _ ��� ------ v �`v \ V �`v vwv \ v v -- i i / , v A v `� \\ \ `, \\ `� \ , 4 INV.=364.00 (Concrete Pipe 18"OUT-NE) \ \ � �\ \ \ vI.//,/,\J v .� `v \ �\ 5 ��° \ i v/� / /y/I � A A v------------- __--�I------------- _ v v ,0 v \ \ j A v v __ ___�� ,-' v \v \ vv V vv vv �`�; ��--------- 34 LF 18" RCP @ 1.00% � � A �`\ \` �` �` A v` v` �` �\ 2 v �� \ v`\ \� - - - -- - /�� �� \v vv vv A A ------- v,v `� I v � 0 L - --- ------------------ v ` \ -- _ _ _ \ \ \\ \ \\ _-- \- -----------I _ "" \ \\" \ \ \ --_ ---- v °�� - \ �� //%� _--� -- --- --- ----- // // /// vvv �, v v vv v � jv ____----�----- -� � v o � - � �- � 1 I-' � ,/ / v 11 6 0 v v v� / ;��_ - �_ v / - - - ��� �v \ v v \ v v _ / / `v, � - , -- , v> v �v v / % /, v-_____ -----_ i � � // /; /vvv --- ���rt_��y.-- ----- v v vv - v v ;�\\Iv /� // // / // // / /� ,�3/ / ,/ / / v v ---- - -- --- 'vim v vv y�� �,� v��vv �� v v v 3/ // ��,�� // // /// // /// /// �� //,% �� v _-_� - __ v ` ' v���s �- oo v v v v v // // / // / ////// // ///// / /; ;l'` v� a-- v �� �/ /// / �/ /// / /�/ \ \ \ -� -� �- ��.� A vv `� A `v ` `� \ A A �\ \ �� A V / / / / / /� / / � v v v ------ ----- vvv ,C v vv v , , " // /� / �� / //� / //� / i �v� / /// v --___� \� \ 20LF15"CLIVRCP@8.75% \ v J v �v v �,, v/ //�CM6&TSB / /' _ _ _ _----yry < ,\ v v INV IN=368.00 , v v \ v \ v �s 0 � - SEE SCM 6 DETAILS AND TEMP. SKIMMER BASIN, SKIMMER, AND BAFFLES DETAILS. - v � A \ `vv `v INV OUT=366.25j` � v\ v _ v v v p / // `\ `\ \ \ \, \` RIP RAP DISSIPATER' \ \ _ \ `\ `\ MUST BLOCK 15 ORIFICE AND INSTALL SKIMMER AND BAFFLES FOR TEMP. SKIMMER BASIN - \ '` , �'\ 1`, ,\ �`. `V L= 8.5-, � �- A - V �`v , , `v A 1* / / 11 \ \ `\ \ `\ W1=4', \ \ \\ \ 2 NOTE: AFTER CONVERSION BY CONTRACTOR TO PERMANENT SCM AND END OF CONTRACT \ \ g \\ \ \` \ \ a -WARRANTY, SCM MAINTENANCE SHALL BE RESPONSIBILITY OF POA. AT NO TIME SHALL // \ \\ \\ `\ \ W2=10, \ \ / \ � \ 12" CL A RIP RAP OVER FILTER FABRIC \ `A- \ \ 3�5 \ \-� ` `\ \ `\ a_1 / / / � \\ \\ ,� _ `� TOWN OF SOUTHERN PINES BE RESPONSIBLE FOR MAINTENANCE OF THE SCM OR ANY / \ \ \ \ \`\ \, \ \� ` \ .SWALE 3.2 \ 1 I `�\\ SSMae \ \ \ _ STORMWATER STRUCTURES OR PIPES OUTSIDE OF THE TOWN'S RIGHT OFWAY. / / /// v A1438 A \ \ vv > v V jl v38�v �V A \ � v � v `V.�M ErEv=Bss.Jo vV A v - / / �� // � /� / / �- / //�/// // ���__ v v V A AJ \v v v �� �I -�w� \ �� � vim` vvv vvv vvv \ \ v\ �' � ���� ��-// � � � /� /// /// //� //� /// ,,� \ \ v ��`� � � ��S} ALE3.1 v vvv�vvv v �� v ��� // " -� �� // / / , v i 0 v W v v v �" / ,/ / \ � - " ­171- v / X / ,� _ , '�l v� \ `vvv vv`� `� v v $ --- " 12" P E� / _ j %` // // / // ��`� _ 1 A - vQ9 v` v �v` _ v v � _��� ,>- _/ , � / / / / vvv v y �` v _�_ ---- - _ / / / / `% v- ��- -- �� / -_ A �A�VA A V v`v v`v vvv `v A ,/vim` �1171- - 7 ------ --/_ /_ /��/� \ - 63 - ,� � '� v v v v `� v v vv`v vv`DIVERSION BERM ---- - - --< // -9 \;-____ - ,; � _ _ _, -:3- - 0\V`P� \ \ \ \ \ \\ _1 ',\ SWALE 3.3 \ .0 �- %%------ - _---- ,,"--' - _ - __ \ , / _ -, ,_Y4 __ __ - -,' P `�F� \ \ \ \ `\ ` , \/ ,>< \ \ \ \ _ --- ``1/_ 11% - /_31116_ , "-\ - ___ __ " , I - 11 __ __ " -_ - \ I -*z - ,\, , ,��- \ \V P� �`i A / / \ \ \\\ V A V `. \ \ , , ,68 o / -- -- � -- �- A __ __ \'- -v`v v�\/Z�/,_ _ A v -_ ____ _ 1\/ �T \v/ V �v� --/ / _ -- ------ -- A- �� //1 \ \ , _ \ , ((JJ``��JJ� ` �/ /L ,� \I `, __� �,` �`` vvv < \\ V / /l x \ \ \ v v vvv ``, �`\ \ V `'\ �\ %� - /��------------ ---__ --- �. �� `v A vv vvr-- �/ \ `\ ' _ v \v / / �� v v v v v y v `v ' �� ''- .vvv vvv --- 1 `. \� �`� \\ 't, A / / / / V A V v`v �`, `v Av A vv �>� �� _-- - Av v�`v vv _/ � \ \ \ \\\ \ _ _ \ \ \ \ _ , \ \ \ / I \ \ \ \\ \ \ \ �v �� V I / � v v v v v�R I I'll, \ \ __�) \ I I/ / I , � \ -\ \I \ \ \`\ \` \` \` \ \\ ---- - - '- \ _ \` \ \\ \ \`\ ` \ \\ \ `\ , I IVA V \, � \\ I, <� I II ' / \ \ A V A A v\ vvv vvv vvv \ \ ��� `\__- �_ --' - - _ _ _ - - - --� -� - - v v v v v v v V y I 4, A \1 A \_ //�\J \ , � I \ II , \ \ \ \ \\\\ \\ \\ \\ \ / 11 / / \ \\ \\ \\ \\ \ \ ` \ \\ \ ^ I I I I II / \ \ \� \ \ \ \ \ \\ \\ \\ \ -� \ �g0 -------___ ,-' \ \\ \ \ / \\ \ �\ I (�-/�-J I I I < I I ( o \ \ \ \ \ \ \ \--- __--____-_ \ \\ \\ \ \\ \/ \-�� \ \ 0 \\ \ 1448\ \ I \ ` I I '] I I I ' _- \\\` \ \ \ \ \ \\\\1 \ \\ --- - ,_ /�---___-\ \ \\ \\\� / �\v \ I � I 1 / �% - �,\ v `v A \ \ V A _ ___ vv v v \/ v < __ \\\\ \\\ \ I � /' / / / / / 390 - \\\ \`\ \\\ \ \ \ \\ \ \ \ \ \\\\ \ / \\` \ \\ \\\ / \\ \\ \�\\ \ �__ \ > / / / / // �3 - \ \ \\ \ \ \ \ \ \ \ \` ____�/ ------ `\ `\ \ \ \ V I ""> / ��/ / / // 95 ` `�` `v A A v `V A V A--. \ \ \ I I \ \ rn / / r/ I �' \\ ` \ \` \` \ \ \ \ \ / \ `\ `\ \ \\ \ � \ \ \ I - I / i \ / // / �_ - ` \ \ \ \ \ \ \ 3 7 ---- -- \ \ \ \ I I \ / I \ \ \ \ \ \ \ 8 \ \ `\ I I I I / / ' / / ' \ \ \ \\ \ '\ \ \ S\ \ \ / V/// - �`\ `\ \\ \ / \\ \ \`-, __ v`v �I � i I �I l / / / / / �S // ��' I ` w w` A \ \ \ V A / / / / -/� �`V v wv \ vv v �I - , I / // / - \\`\ ,�, ` \ ` \ \ � / \ \ \ \ \ \ \ \ \ 1 I �. I I 1 / I I J \� / / / / / / o� ` .\ ° ` ` u' 1\ \ / ---_ \\ \ \ \ /\ \ \ \ \\\ I / �\ / V / / / / vt I `,\" ` V A \ I I /I J / �\ v / / `�/ / / / / // , \` \ `\ `\ \ / \ \ \ \ \ \ l I \\! I I l / i / ` / / / / /, // - \`` \\\ \ `C \ \ 11, \\1\ `\ \ \ \ \ \ _ - / / _ - __ \ \ \ \ / \ \ / i / / � / i i / � / ' // // /// __\ \ ���` / V v `v v\ vv \ V A \ _ / / / � � � \ \ \vv vv v v v`v / / / I / / / , / , \ / // `\� , ,/ / / / , � � \ '`. �,. '` , vv � V \\ � - � / / \ \ � A � A A A I / y y h ��v �`v v v v -_ _ � A , v / \ \ `\ J / / � / / /' / / A // /' _ -_-- v vv \ v - - V A A v vv / ",, / I / / / / / / / / / / /� / I ,/ `1'o _, \ \ \ \ \ \ \ /' i'� / / / / / / / % / // // W //' / // ///' /,/ -,\ \ �`\�\\\ \\\ \\\\ \ ---- -/�/� 1`��\ \ � \ \ \ \\\ \ `, --- '/ '/ ' / / ' / / / ' / / / / / / . / --- -- \\ \ \. 11 \ \ \ / \ / / / / / / / / / / `/ ' , �'` /,`v -_ / ` A \ \ \ \ -___- / / �I -- / / / / / / / / / / / ,� // // A / / ,' ,� o /' //' � �-�- v`v��`v A vvv\ vvv` V \�11 \ V �vV - `\ � \ \ \ \ \ vvvv / , / / / / / , - - - XX \ -2- \ \ \ --__ / i � 4 `/\\ `\\ \ \ \\ / 34/8 // / _____ / // / // / o I' / ---- ---- v / / / /// //J//"1'1 ,-11 -- I '11\ 11, I \\ \\, \\ \ \\ \,, , 1I-Q51111 \ - --_ 11� // / ____ --- / I : / J// // / / / ' / / )K //// 111 1 ,_ _____ /�",'',� \\,\,\, \,\ \1 \\\ \\\ \\\ \11 \\\\ 11,\ z \\ \ \N \\\ \ \ ______ - "I -_ // / , 1 04 /9 // // / / X / /` / / / \ \ \ \ , / --- I / / 1, , \\ \ \ \\ 1\ \ I- N N - � / / / / / `/ \, , ,\ �,\\\\_1\, \ \ " / , \_ // /// / / / / / / / / // /// \ / /// // 11 1 \ ,\ ,\ 1'\ ,\\ 11I\ N - --- - I /I / / // / / // // // \ \ // // A / I I - --- \ \\\\ '\\ ,\\ \ \\ - _­1 \\ \ \� ----- __ / _/ / / / / /I -I ,_ , __ --;,/-/, ___ \ I \ / / / / " ______ , I / __� _____/ �, /\ / // " 'I - , \\, //' / / / " I \ - -- \_ - 1 _____ / / / / / // / / , , \ \, \\ \, �� -,\ " \\\ � � \\ '\ / / / / / I I / / I / / / / / / / / / / YYY / / , / \ ' / / I ".(', -___ `\ \ \\, `\ \ ` \ "\,\ 1, \1\\ \\ \\ \ \ - _ - 1, \, / l / � // / / / / �, / 1,�\ // // 2 // _ `� �v v A \ vv \ \ v 1\ �\ vv vv vv \Z _ _ - - I I I i Swale Summary Minimum Depth Bottom Width Side Slope Top Width Channel Slope Channel 3.1 0.28 ft 2.00 ft 6.1 5.36 ft 4.93% Straw 3.2 0.46 ft 2.00 ft 6:1 7.52 ft 3.91 % SNRECP 3.3 0. 52 ft 2.00 ft 1 2:1 1 4.08 ft 1 5.00% SNRECP / / / / / \ / / \ \ / / " " ,_ ___\ 1� \\ 1� \\ " \ 1, -, \ \1 \11\ \\, I \\ 1, -"�\\\ \\\ \\\ ,\\ \ \\ \ \ I '_ - / / \/ / / � / / 4 ,z -- -10-�-�-2 --- -------- - I/ / // , I -� _ -/----- A v v ��`, \v \ \ , I��`, Av `, v 1\ \\ \ \ ` - --- -_ \ \ -� \ \ � 11 I I" \,\ 1, -, - - I � -_ \ I -------- ---------- ----------- � /, 11 \ \ M /'1 // // / ���i \` I i i / /� / � ' - v v ��v v v v - v v �`v vv A \ - - - ---- / - \1'\11 \ \\ -_ , \\ , I - 1� �, / // // // / �` ; I 1 / / / - IA I I I 11.A '` ��V A . vv ` vv \ �--- --, -, I \\ \- -- � ____ , \1 I I 11 - / I/ /A // \1\ \" I , "I ,_�_ ,\ 1\ " __1 ��_,"_\\ " 12 , , / / I, ( \ \, " I /� - \1 \ \\ -- \ \ / ) --------- ,\, \ ( I I\ \ I�,\ \\ I 1 // / i' - `` `\ \```� `` `\\\ ` \` \\` \ ` \ - - - - I II -------- �___ \I�1/1 - ---------------------------- -- , \ I / , -� � 1�\ I " - � ,-/\, vv v vV \\\\ v , ' - - - - - _� -1 I - - 11 I I ,\\ \\\ \ I r 11 I - - __� _1\ \,,\\ 1\ \ \ \ \\ \\ \\ - 1� - \ \ \ 1 I ­\ \\\ \ ,- \ 7 -- o / /I I x \ � �/ •11, \\• ,�/ , / I II'll A v v , v v \ A \ A \ i � /X - - - �11 AI - I I / A \ ��\ �V ��\ \ v \v v v` vv ` vv v �`\ \ __-__ __-_ o I `� \ \ \ ` i I' �1 '_ ---- . . \ . ` _ ___------- __ I 1 I / / \------- / / I i I( / I 1 11 II i � 11 I II \\����_\ I I o�Q o `\/ I\ \, '. � % I ---- `\`__ x____ \ \ \ `� \\` \\` \ \`\ \, \` \\\\ \ \`\ \`\ \\ \ __ _ - - - - - _ _ _ - I I ( I I I � � A I � ! a 1`> / \ I / _ __ - A A V `, v v \/ , v v - _ _ _ , _ Landscape Architecture ♦ Fayetteville, NC Civil Engineering ♦ Southern Pines, NC 230C W. Pennsylvania Ave. ♦ Southern Pines, NC 28387 Voice: 910-725-1107 w w w. c r a w f o r d d s n. c o m ,,,,,,��QIIIIII/II�j ,, ,,,,pQ111U1II�� , ,,� O pES I GN,,'141, �0 QES I GN���I�I ��O Att IT T CO�,i ��,,kOQ ,NE ER/� CIt, 01 �..-A' v : -- � 9 CERT. No. C � rJ CERT. No. N C-1 I 1 V C-2097 g ,� o ,, caRo`"\� A Ilk, �CARO\"\� ,,,,,#*1 '11II 11111 ,,,,,,,, ,,,,,,, II 111111 ��� ��,,,,,�� SEALS FOR CONSTRUCTION REVISIONS 0 --- mm-dd-yy Description M W U) l< M Z 0 U) 0 M U) U U Z ii a J oW= Y WZ13- Z 0 m c� � w �?F_ m ZiE Ii z W wa � �Z w �:2 0 Z l< W CD l< Z Z J 0. J 0 W Z 0 Z 0 U) 0 W W PROJECT DETAILS Project Manager: KSL CAD Technician: RFN/GER Reviewed / Approved By: KSL Project Number: 17019 5 oso 100 Full Scale: Horiz.: 1" = 50' Half Scale: Horiz.: 1" = 100' ISSUE DATE 9/17/2021 SHEET NUMBER C3,0 Crawford Design Company © Copyright 2022 — All drawings, specifications and designs prepared by Crawford Design Company are instruments of service and shall remain the property of Crawford Design Company. The Owner or any other parties shall not use the work on this or any project except by a proper agreement and appropriate compensation. See Site Plan for Design Width in. Grade 3,000 PSI Concrete 0' a 2% Max. Slope a d.. . 4 4 4 � 6' 11' 11' 4 4 FIN. GRADE (TYP) FIN. GRADE (TYP) �2% 8 zy a% Compacted Sub -Grade 2 —III II —III lll lll lll lll lll lll 11=111 I —III 1=11I =ll llll II —III —III 1=1II 1=1II I1=1II = ll _� / Standard Culvert Notes: SECTION VIEW N.TS. ' f' °1 1. All culverts shall be NCDOT Class III or IV. 2.5" SF 9.5 (2 ea. 1.25" LIFTS), & 8" ABC TO NDCOT STANDARDS 2. Driveways shall "bottom out" 8 inches below edge of pavement to allow over -topping without flooding road. COMPACTED SUB -GRADE 5' SIDEWALK (SEE DETAIL) (PER [NCDOT / CITY] RQMTS.) 3. 3. Minimum cover of 6" for 15" RCP & 8" for 18" RCP. Measured from top of RCP. (22" & 18.75" in drawing indicated distance from RCP invert to top of pipe). 4. Maintain positive drainage downslope to culvert. 5. Road compaction testing shall be done and shall pass NCDOT CALEDONIA DRIVE standards. 6. Geotechnical report from Ravensbrook Phase 2 is applicable for this site, and has been approved for use on this phase by the Town. 3 STANDARD CONCRETE SIDEWALK NOT TO SCALE \ 110, / 7' 3' 3' 7' FIN. GRADE (TYP) FIN. GRADE (TYP) 22%� �2 ft 2% �— 2% —� a1 5' SIDEWALK (SEE DETAIL) I I I —III I I=I I II I I —III I I —III I I —I I I� I I —I I I� I I=1I I� I I —I I I� I I —I I I� I I —I I —11=11111111= — I I —I I I� I I —I I I� I1— _ _ 5' SIDEWALK (SEE DETAIL) =1I I I1=1I I I I —III I I —III I I —I I I _11=11=11= a Standard Culvert Notes: /11= _11=11=1111= 2.5" SF 9.5 (2 ea. 1.25" LIFTS), & 8" ABC — — — \ 1. All culverts shall be NCDOT Class III or IV. "bottom TO NDCOT STANDARDS 2. Driveways shall out" 8 inches below edge of pavement to allow over -topping without flooding road. 3. 3. Minimum cover of 6" for 15" RCP & 8" for 18" RCP. Measured COMPACTED SUB -GRADE from top of RCP. (22" & 18.75" in drawing indicated distance from (PER [NCDOT / CITY] RQMTS.) RCP invert to top of pipe). 4. Maintain positive drainage downslope of culvert. 5. Road compaction testing shall be done and shall pass NCDOT ROAD CROSS -SECTION --CUL-DE-SAC - CALEDONIA DRIVE standards. 6. Geotechnical report from ravensbrook Phase 2 is applicable for this site, and has been approved for use on this phase by the Town. 2 Landscape Architecture ♦ Fayetteville, NU Civil Engineering ♦ Southern Pines, NC 230C W. Pennsylvania Ave. ♦ Southern Pines, NC 28387 Voice: 910-725-1107 w w w. c r a w f o r d d s n. c o m Crawford Design Company • -Copyright 2022 — All drawings, specifications and designs prepared by Crawford Design Company are instruments of service and shall remain the property of Crawford Design Company. The Owner or any other parties shall not use the work on this or any project except by a proper agreement and appropriate compensation. VICINITY MAP1"=2000' AI .a Red Maple 'October Glory' Honeylocust 'Moraine' Willow Oak There is 1012 linear feet of property line abutting the public street for Phase 3 of the Ravensbrook Subdivision. As per UDO 4.3.3 (C), one (1) two-inch caliper tree is required for thirty (30) feet of property line abutting a public street. 1012LF / 30 = 33.73 trees required. 8 trees along lots 60 and 61 were included in Phase 2, as that section of the public street was built. See TRC approval letter dated September 14, 2021. 26 trees provided in Phase 3 for a total of 34. General Notes- 1 . See specifications for topsoil mix. 2. Do not damage main roots or destroy root ball when installing tree stakes. 3. Water thoroughly after installation- 4- Remove tree rings and stakes two years after installation. 5. Provide drainage for planting pit in impermeable soil conditions- 6- Al trees must be tagged and approved by consultant within 14 days after tender closing. 7. The root collar shall be apparent at surface of root ball, or contractor shall be responsible for removing excess soil from the top of the root ball in order to establish the correct grade. Root collar shall be planted no more than 2-inches above grade. 8. Mulch shall not exceed 4-inches in depth and shall remain a minimum of 6-inches away from the base of any given tree- 1/2" Dia. Plastic Hose- (3) T-Bar Iron Support Stakes 13'x1.5"x8' Maintain Tree Base Slightly Higher Than Existing Grade, To Allow For Settlement Fin. C B&B Root Compacted Topsoil Mix As Specified SECTION VIEW - DECIDUOUS TREE N.rs. TYPICAL TREE INSTALLATION co 00 0 Q z 0 1- EEC>.0 (DOf> zzz Trim Branches to Retain Natural Form of Tree As Directed By Designer 1/8" (#11 Ga.) Galv. Wire. Coil Each End Tightly Shredded Mulch gate Saucer Around Tree. Cut & Remove Top 1/3 of Burlap From Root Ball Pit Bottom (Min. 6") O 4, Zvi 0 < \11J 0 O 3 ■ 31 I I 11 I 30 \\ \ I I I \ I I I I I \\ I I I I I \\ I I I I \ \ I I I \ \ I I I I I \\ I I I I I \\ I I I I I \\ I I I I I \\ I I I I \ \ L------� / V Zn J 1439 1440 ' O I I 1050 1051 / 1049 / 1052 M / I � / Landscape Planting Table Classification Key Common Name Botanical Name Quanity Type / Size Notes a� AR Red Maple Acer rubrum 'October Glory' 9 3.0" cal., 8' ht. minimum. Healthy, Well Branched, Full Foliage GT Honeylocust Gleditsia triacanthos 'Moraine' 8 3.0" cal., 8' ht. minimum. Healthy, Well Branched, Full Foliage QP Willow Oak Quercus phellos 9 3.0" cal., 8' ht. minimum. Healthy, Well Branched, Full Foliage n 2 t Ln / / Landscape Architecture • -Fayetteville, NC Civil Engineering • -Southern Pines, NC 230C W. Pennsylvania Ave. • -Southern Pines, NC 28387 Voice: 910-725-1107 w w w. c r a w f o r d d s n. c o m ,,�. 0 DE S I GN �W** p E S I GN r NITF O,,,I�,,5�(<o \NFFRjT. No. N CERT. No. C-136 a C-2097 i Imo, .cq cRTH cARcG. ,��� I�� .cq oRTy CARo`,\� G. SEALS 8/p't�/�i9�i 4L SEAL 0275©2 le- P FOR CONSTRUCTION REVISIONS M LU Q Z O 0 m U OZ a JOW= Y�Zaz O Cf) O Z F— m Z�J zWaJ � LU � �Z Q Q =� Z Q J M W M Q Z Q J PROJECT DETAILS Project Manager: KSL CAD Technician: RFN/GER Reviewed / Approved By: KSL Project Number: 17019 s oso 100 ISSUE DATE 9/17/2021 SHEET NUMBER L-1.0