Loading...
HomeMy WebLinkAboutNCC221230_Modification Review_20220819Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/16/2022 9:43:51 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany A 8/19/2022 11:19:30 AM (Construction COC ADD TO FILE Review - NCC221230) * Legally responsible person updated 8/19/2022. The task was assigned to Georgoulias, Bethany A. The due date is: August 19, 2022 5:00 PM 8/16/2022 9:43 AM Certificate of NCC221230 Coverage (COC) No.* Enter the Certificate of Coverage Number (Use capital letters) Information associated with this permit: Project Name PNG Line 142 Buffalo Road Main Extension Address Covered Bridge Road, Archer Lodge, NC County Johnston Latitude 35.6920 Longitude-78.3730 Permittee Listed Piedmont Natural Gas Company, Inc. Legally Responsible Jeremy Meads Individual NC Reference No. NCG01-2022-1230 E&SC Plan ID JOHNS-2022-042 Original NOI Tracking 85077 No. * Date COC Issued* 04/04/2022 Prior Rescission Date This field will populate only if COC has already been rescinded. Modification Information: Reason for Closed -Out Lots/Outparcels in E&SC Plan Modification* Additional Lots/Outparcels Approved - E&SC Revised Other Revision(s) to E&SC Plan Legally Responsible Individual and/or Site Contact Has Changed • Multiple Reasons (List) INCREASE IN DISTURBED AREA, CHANGE IN LEGALLY RESPONSIBLE INDIVIDUAL Addional Explanation More information (e.g., new Site Contact details). If lots are being added, please include specific lot numbers You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (Revised E&SC Approval, Close -Out Doc, etc.) Documentation JOH NS-2022-04220220622LOA.PDF 135.24KB JOHN S-2022-04220220622COA.PDF 327.84KB PNG Line 142 Location Map.pdf 2.31VIB Responsible Party Change Form.pdf 63.37KB FRO signed.pdf 138.66KB Must be PDF format North Carolina General Statute 143-215.613 (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). * I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* • The Legally Responsible Individual Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Ifs oc Type Name* Jeremy Koster Title * VP Strategic Operations Organization* Piedmont Natural Gas Company, Inc. Date * 08/16/2022 Email Address* jeremy.koster@duke-energy.com Email for confirmation Telephone Number* 9197055061 Contact number if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email john.farmer@eli-Ilc.com (Optional) Additional email for confirmation Original Permittee jeremy.meads@duke-energy.com Email Original Site Contact jeremy.meads@duke-energy.com Email Review Date 08/19/2022 Rescinded Since Submitted?