Loading...
HomeMy WebLinkAboutNCC222973_Site Plan or Location Map_20220819�A13 ' J 0 p I / o , r� n/f QZ / Live Oak / Crossroads, LLC D.B.6o -1329 37 Zoning: CB (CD) Land Use: Commercial / oyE / / � /FES LE / rcial 44 ♦ - o \ D p D SITE DATA � p p PARCEL ID: R05017-001-oo6-000 - ZONING: RB-REGIONAL BUSINESS / t CAMA LAND USE CLASSIFICATION: URBAN Dp / _ S.R. 1186 r _ - - _ PROJECT ADDRESS _ 24o RACINE DR. WILMINGTON, NC 28403 - - T BOULEVARD E-RENSION _ - _ _ _ _ CURRENT OWNERS: MATT PROPERTIES III LLC INDEPENDEl - - - - - - - - -_ - p p s� l- - 3356 GRANVILLE DR r WIDTI VARIES) _ - - - - RALEIGH, NC 276o9 - (R/W ------� - - _---_----_-_ TOTAL ACREAGE IN PROJECT BOUNDARY 54,893 S.F. (1.26 AC.) -� UPGRADE EX. H/C RAMPS TO � � - - � TOTAL DISTURBED AREA: 0.9 AC. CURRENT CITY STANDARDS _ - ° EX. SIDEWALK _ - - n/ CONCRETE _ CONCRETE CURBING _ D - p � - - FES I.E. \_ - - n/f City of Wilmin ton I n/f D.B.1452-839 ` / i City of Wilmington p � \ TIE TO EX. SIDEWALK �aa D.B.1452-324 Zoning: CB ±34.0 / Land Use: Vacant / Zoning: CB ` G� E =OHE a '\ Land Use: Vacant -OHE- / -OHE- n/f _OHE // �E RETAINING WALL o GK 3.4 / City.6f Wilmingtc 0H - P�STATIONS CANOPY FR 2 3j• _ (DESIGN BY OTH \ Cl #1 / 1 I 3 RIM: 32.8, / OHE i �♦ INV. 29.5 -OH Zoning: CB 30' UTILITY EASEME - - - - - _ - - TW: 3 5 Land Use: Vacant0CA'rTkN EX SWALE L�li PINGAPPROX L,- �ULa / - 6°.y.y... M� 33.1 33.35 33• '3 33.25 33.5 / y„ �LOA / PIgN PINE 15' / 33.1 33.35 33.5 - 32 CI #2 co / T 33.3 _ _ _31- / _ RIM: 32.8 33• r -1 F -1 r Y -1 F *1 W INV. 29.75 CI#3 \ �1-1i it !i i1 1 �� RIM: 32.8 '32-- . L J y J L J L � W W W W I / - i / INV.3o.1 � J 33• 4• 34.9 pROpSA�-VASH BUILDING 34.9 TW: 33.8 FFE: 35.o W DRAINAGE EASEMENT / / / MAP BOOK 37, PAGE 251 _ / 34.9- (PRIVATE) / 0.495 ACRES I��W 6 a WALK �' ° UP 33. 5 I 68" CMP D.B.1452-839 / Zoning: CB \ \ I Land Use: Vacant `-OHE -OHE_--_--7_ -OHE- II 30' UTILITY EASE 3.5 DI 15 yl I a' T.R. 32.25' W O TEMP. CONSTRUCTION ENTRANCE EX. ASPHALT x � / 6 34. 5 8 SIDE . f 5 ° / a a n/ 30.62' / v EXISTING STORMWATER / POND 20' CONSTRUCTION & DRAINAGE EASEMENT STATE HIGHWAY COMMISSION DEED BOOK 704, PAGE 624 DEED BOOK 719, PAGE 443 OyE / / I.E. 26.33' - - _- - - - - - - - ayE� / 332--- --- 333.6 / 3 _ LP* 3.3 �e 3.7 DI TR. L5C / GENERAL UTILITY EASEMENT CITY OF WILMINGTON DEED BOOK 1403, PAGE 836 n/f Nadar Abdelhamid \ D.B. 6069-2870 ` Zoning: CB (CD) Land Use: Proposed MAINTENANCE PLAN: i. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL. 2. ALL POINTS OF EGRESS WILL HAVE CONSTRUCTION ENTRANCES THAT WILL BE PERIODICALLY TOP -DRESSED WITH AN ADDITIONAL 2 INCHES OF 2-3 INCH STONE TO MAINTAIN PROPER DEPTH. THEY WILL BE MAINTAINED IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. IMMEDIATELY REMOVE OBJECTIONABLE MATERIAL SPILLED, WASHED OR TRACKED ONTO THE CONSTRUCTION ENTRANCE OR ROADWAYS. 3. SEDIMENT WILL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL INLET PROTECTION, ROCK DOUGHNUT INLET PROTECTION, SEDIMENT TRAP BAFFLES, AND ROCK PIPE INLET PROTECTION WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS AS DESIGNED. DEBRIS WILL BE REMOVED FROM THE ROCK AND HARDWARE CLOTH TO ALLOW PROPER DRAINAGE. SILT SACKS WILL BE EMPTIED ONCE A WEEK AND AFTER EVERY RAIN EVENT. SEDIMENT WILL BE REMOVED FROM AROUND BEAVER DAMS, DANDY SACKS AND SOCKS ONCE A WEEK AND AFTER EVERY RAIN EVENT. 4. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL. STAKE SPACING WILL BE 6 FEET MAX. WITH THE USE OF EXTRA STRENGTH FABRIC, WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAX WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS ARE DESIGNED AT LOW POINTS IN THE IN THE SEDIMENT FENCE THE ROCK WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED OR IS DAMAGED. RB Independence, LLC `LO / I ATCH EX. ASPHALT 34i �� I 33 6 34.15 34.25 .25 D.B. 5179-2950 33.43 � / 4.1 's I I / � 30' ACCESS EASEMENT Zoning: CB (CD) W I Land Use: Commercial 33.7 33' �� TEMP. CONSTRUCTIONrz (INGRESS & EGRESS) i� �" . I / 33.67 3.5 ENTRANCE / ! W (PRIVATE) M.65 34- - -CI #5 J MAP BOOK 37, PAGE 251 W W RIM: 33.0 DI CI #4, INV. 29.7 33.65 T.R 33.60' RIM: 33.15 W RCP 15" I W INV. 29.2 33.4 15" RCP 5' zd_� jjB I S1D 4V PL _ ` TION EX. SS MAIN _' 24- n - - - - -I � *LP 1±33.6 1 ETCH EX. ASPHALT IL LP 2.25 SDMH#1 RIM:33.75 - INV 27 o8 MATCH EX. ASPHALT t34.o ,TCH EX. ASPHALT 3o' ACCESS EASEMENT 3.1 (INGRESS ONLY) (PRIVATE) MAP BOOK 37, PAGE 251 I CONSTRUCTION SEQUENCE: CONSTRUCTION OF SITE TO START WITH INSTALLATION OF CONSTRUCTION ENTRANCE AND SILT FENCE ALONG ALL LOCATIONS PER PLANS. UPON INSTALLATION OF SILT FENCE, TREES SHOULD BE REMOVED IN LOCATIONS AS NECESSARY. ALL SLOPED AREAS SHOULD BE SEEDED IN ACCORDANCE TO SPECIFICATIONS. SLOPE STABILIZATION IS WITHIN 7-14 CALENDAR DAYS OF ANY PHASE OF CONSTRUCTION. ALL OTHER AREAS MUST BE STABILIZED WITH IN 15 WORKING DAYS. CONTRACTOR TO FOLLOW NPDES STABILIZATION REQUIREMENTS PER TABLE ON THIS SHEET AS WELL. MOST STRINGENT REQUIREMENT TO BE MET. L GENERAL CLEARING AND GRADING OF THIS SITE WILL NOT BE DONE UNTIL THE TEMPORARY SILT FENCE & CONSTRUCTION ENTRANCE HAS BEEN INSTALLED. 2. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR EVERY RUN OF 3 FEET (i VERTICAL TO 3 HORIZONTAL). 3. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION. 4. INSTALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION INCLUDING BUT NOT LIMITED TO GRAVELED CONSTRUCTION ENTRANCE, SILT FENCE, TREE PROTECTION FENCE & SEDIMENT BASINS. INSTALL ALL SECONDARY EROSION CONTROL MEASURES, SUCH AS INLET PROTECTION AS SOON AS POSSIBLE AFTER BEGINNING CONSTRUCTION. 5. ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. SILT FENCE AND INLET PROTECTION TO BE CLEANED WHEN HALF FULL. 6. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. 7. MAINTAIN ALL EROSION CONTROL MEASURES UNTIL PROJECT IS COMPLETE. 8. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS PLAN PROVE TO BE LESS EFFECTIVE. 9. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. APPROOCA Cl #6 RIM:33.0 ' �INV.30.1 ----- I DI T.R 33.95' I.E.27.95' I I I I I �1 ` ,• REVIEWED FORCOgE COMPLIANU NEW HANOVER C LMTY PLAMI IwGf1HSPECnQN5 SYMBOL GROUND STABILIZATION CRITERIA SITE AREA STABILIZATION STABILIZATION EFRAME DESCRIPTION TIMEFRAME EXXCCEPTIONS * Perimeter dikes, swales, ditches and slopes 7 Days None * High Quality Water (HQW) Zones 7 Days None If slopes are lo' or * Slopes Steeper less in length and than 3:1 7 Days are not steeper than 2:1, 14 days are allowed 7-days for slopes * Slopes 3a or flatter 14 Days greater than 50 ft. in length * All other areas with None (except for slopes flatter than 4:1 14 Days perimeters & HQW Zones) NORTH CAROLINA TEMPORARY GRASSING DETAIL SEEDING MIXTURE SPECIES APPLICATION RATE LATE WINTER & EARLY SPRING: Rye (grain) loo (lb/acre) Annual Iespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 (lb/acre) Omit annual Iespedeza when duration of temporary cover is not to extend beyond June SUMMER: German Millet In the Piedmont and Mountains, 40 (lb/acre) a small -stemmed sundangrass maybe substituted at a rate of 50 (lb/acre) LEGEND PROPERTY LINE EASEMENT CENTER LINE W EXISTING WATERLINE S S EXISTING SANITARY SEWER LINE LIMITS OF DISTURBANCE SF TEMP. SILT FENCE ® CURB INLET PROTECTION DANDY SACK INLET PROTECTION �5 5 SPOT ELEVATION 30' 15' Of 30' 6o' Scale: 1"=30' NORTH CAROLINA PERMANENT GRASSING DETAIL SEEDING MIXTURE SPECIES APPLICATION RATE FALL & WINTER: Tall Fescue (blend of two or 200 (lb/acre) three improved varieties) Rye (grain) 25 (lb/acre) SPRING & SUMMER: Pensacola Bahiagrass 50 (lb/acre) Sericea Lespedeza 30 (lb/acre) Common Bermudagrass to (lb/acre) German Millet to (lb/acre) Tall Fescue 50 (lb/acre) SEEDING DATES FALL: Rye (grain) 120 (lb/acre) FALL & WINTER: January - April August - December SEEDING DATES SOIL AMENDMENTS: Apply lime and fertilizer according to soil tests, or apply 3.000-5,000 lb/acre LATE WINTER & EARLY SPRING: ground agricultural limestone (use the lower rate on sandy soils) and 1,000 lb/acre Mountains - Above 2500 ft: Feb. 15-May 15 to-lo-lo fertilizer. Piedmont - Jan. 1-May 1 Coastal Plain - Dec. 1-Apr. 15 MAINTENANCE• Fertilize according to soil tests or apply 40 lb/acre nitrogen in January or february, SUMMER: 40 lb in September and 40 lb in November, from a 12-4-8, 16-4-8, or similar turf Mountains - May 15-Aug. 15 fertilizer. Avoid fertilizer applications during warm weather, as this increases stand Piedmont - May 1-Aug. 15 losses to disease. Reseed, fertilize, and mulch damaged areas immediately. mow to Coastal Plain - Apr. 15-Aug. 15 a height of 2.5-3.5 inches as needed. FALL: SPRING & SUMMER: Mountains - Aug. 15-Dec. 15 April 1-July 15 Coastal Plain and Piedmont - Aug. 15-Dec. 30 SOIL AMENDMENTS: SOIL AMENDMENTS: Follow recommendations of soil tests or apply 000 lb acre round agricultural 2 g g PP / Apply lime and fertilizer according to soil tests, or apply 3,000 lb/acre ground agriculture limestone and 500 lb/acre to-io-lo fertilizer. limestone and 750 lb/acre to-lo-lo fertilizer.. MULCH: MAINTENANCE: apply 4,000 lb/acre straw. anchor straw by tacking with asphalt, netting, or a Refertilize the following april with 50 lb/acre nitrogen. Repeat as growth requires. mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch maybe mowed only once a year. Where a neat appearance is desired, omit sericea and mow as often as needed. anchoring tool. MAINTENANCE: MULCH: apply 4,000 lb/acre straw. anchor straw by tacking with asphalt, netting, or a Refertilize if growth is not fully adequate. reseed, refertilize and mulch immediately mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch following erosion or other damage. anchoring tool. VICINITY MAP (NOT TO SCALE): O U bA O 00 V1 Odct S� O Q ct (n z �W � O kn N U w w S E A L C) 032555 CLIENT INFORMATION: Andy Lazzaro Three Guys Car Wash, Llc 5520 Oleander Dr. Wilmington, NC 28403 DRAWN: JAE SHEET SIZE: 24 X 36 CHECKED: CDC DATE: 1/6/2022 APPROVED: CDC SCALE: 1" = 30' PROJECT NUMBER: 2021-035 DRAWING NUMBER: C-2 3OF6