HomeMy WebLinkAboutNCC222891_Site Plan or Location Map_20220812PROJECT NARRATIVE THE PROPOSED TOYOTA TAP 100 KV TRANSMISSION LINE PROJECT IS LOCATED IN GUILFORD AND RANDOLPH COUNTIES, NORTH CAROLINA. THE PROJECT INCLUDES THE INSTALLATION OF A NEW RIGHT-OF-WAY EXTENDING FROM HUNT ROAD TO EAST OF THE FORMER BROWNS MEADOW ROAD WITHIN THE GREENSBORO-RANDOLPH MEGASITE (GRMS). THE PROPOSED LIMITS OF DISTURBANCE IS WITHIN AN APPROXIMATE 68-FT, 8.5-MILE LONG CORRIDOR WITH AN AREA OF 106.36 ACRES. IN ADDITION TO THE PROPOSED LIMITS OF DISTURBANCE PRESENTED WITHIN THESE PLANS AND TO ACCOUNT FOR POTENTIAL ALTERNATE CONSTRUCTION METHODS AND / OR A NEED TO ACCESS OTHER TRANSMISSION STRUCUTRES, A CONTINGENCY DISTURBANCE AREA OF 10.64 ACRES (AN ADDITIONAL 10% OF TOTAL PROPOSED WORK AREA ACREAGE) HAS BEEN INCLUDED IN THE PERMIT FEE FOR A TOTAL DISTURBANCE OF 117.0 ACRES. THE PROPOSED CONTINGENCY DISTURBANCE AREA IS TO FACILITATE MINOR ADJUSTMENTS TO THE LIMITS OF DISTURBANCE SHOULD ALTERNATE ACCESS TO THE RIGHT-OF-WAY BE IDENTIFIED DUE TO UNFORESEEN OBSTRUCTION, LANDOWNER REQUEST, OR OTHER VIABLE NEED. THE CONTINGENCY ACREAGE WILL NOT BE UTILIZED WITHOUT PRIOR REVIEW BY NCDEQ AND WILL ONLY BE PROPOSED IN AREAS WHERE THE TRANSMISSION EASEMENT LANGUAGE PERMITS ACCESS. NOTE THAT IN THE CASE OF THE TRANSMISSION EASEMENT BISECTING PARCELS, DUKE ENERGY EASEMENTS PERMIT ACCESS THROUGH THE PARCEL INTO THE RIGHT-OF-WAY, AND DUKE ENERGY WILL COORDINATE WITH THE LANDOWNERS TO UTILIZE THE LOWEST IMPACT ACCESS OPTION FOR THE IMPACTED OWNER. DUKE ENERGY WILL RESTORE / RECLAIM THE ACCESS TO THE PROPERTY OWNER'S PREFERENCE. PRIOR TO CONSTRUCTION, A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION. AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES WHENEVER POSSIBLE. EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ. THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN AUGUST 2022 AND BE COMPLETED IN JUNE 2023. GENERAL NOTES 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE FOR REFERENCE ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES. AERIAL PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE, BOTH VERTICAL AND HORIZONTAL, EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL NOT DISTURB UTILITY POLES, GUYS WIRES, OR ANCHORS WITHOUT PERMISSION FROM DUKE ENERGY. 5. PROJECT IS LOCATED IN THE CAPE FEAR RIVER BASIN AND THE RANDOLPH COUNTY ZONING ORDINANCE STREAM BUFFER. THE PROJECT IS SUBJECT TO STATE -REGULATED BUFFER REQUIREMENTS. 6. SEE SHEET PEN1 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. 7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY. APPROPRIATE BRIDGING AND MATTING OF THESE FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF THE RIGHT-OF-WAY. 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY PERMITTING PRIOR TO USE. 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. 10. WETLAND MATTING SHALL BE COMPOSITE AND/OR HEAVY DUTY TIMBER/"CRANE" MATS. NO LATTICE OR TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL WETLANDS AND/OR STREAMS. 11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 125 FEET OF WETLANDS OR SURFACE WATER WITHOUT CONTAINMENT. 12. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY/WEEK. 13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. 14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION. PERMANENT GROUND COVER SHALL BE USED FOR STABILIZATION. 0 10336526 07/22/2022 ISSUED FOR CONSTRUCTION REV FILE NO. DATE REVISION 0 ;AROLINA� TOYOTA TAP 100 KV GUILFORD AND RANDOPLH COUNTIES, NC START LATITUDE: 35°54'40" LONGITUDE:-79°45135" END LATITUDE: 35°53'59" LONGITUDE:-79°37152" N LSTART OF NC-62 PROJECT TOYOTA TAP 100 KV PARKWOO=525KV HUNTING LODGE RD HWY 421 OLD HWY 421 \ NC-22 1 INTERCHANGE `GRMS SITE BOUNDARY 42 RACINE RD � �_ END OF PROJECT CONTRACTOR SHALL NOTIF`( "NORTH CAROUNA ONE CALL" �S1 OR Pi LEAST 4S HOURS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION 70 HAKE EXISTING UTILITIES LOCATED . CONTRACTOR SHALL CONTACT NM LOCAL UTILITIES THAT PROVIDED THEIR OWN LOCATOR SERVICES INDEPENDENT OR "NORTH CAROLINA ONE CALL'. REPORT NM DISCREPANCIES TQ THE ENGINEER IMMEDIATELY. ASC BTA DTB DRAWN CHECKED APPROVED �l1 VICINITY MAP SCALE: 1 " = 2500' CAR N. s z 103 07/22/2022 HDR Engineering Inc of the Carolinas 440 S. Church St Suite 1000 Charlotte, NC 28202-2075 F )_4 704.338.6700 N.C.B.E.L.S. License Number F-0116 nnn TW%M NORTH & SOUTH CAROLINA STATE MAP SHEET LIST: TITLE SHEET SHEET PTL-01 EROSION & SEDIMENT CONTROL NOTES SHEET PEN-01 EROSION & SEDIMENT CONTROL NOTES SHEET PEN-02 EROSION & SEDIMENT CONTROL NOTES SHEET PEN-03 EROSION & SEDIMENT CONTROL SHEET LAYOUT SHEET PLA-01 EROSION & SEDIMENT CONTROL PLAN SHEET P1 EROSION & SEDIMENT CONTROL PLAN SHEET P2 EROSION & SEDIMENT CONTROL PLAN SHEET P3 EROSION & SEDIMENT CONTROL PLAN SHEET P4 EROSION & SEDIMENT CONTROL PLAN SHEET P5 EROSION & SEDIMENT CONTROL PLAN SHEET P6 EROSION & SEDIMENT CONTROL PLAN SHEET P7 EROSION & SEDIMENT CONTROL PLAN SHEET P8 EROSION & SEDIMENT CONTROL PLAN SHEET P9 EROSION & SEDIMENT CONTROL PLAN SHEET P10 EROSION & SEDIMENT CONTROL PLAN SHEET P11 EROSION & SEDIMENT CONTROL PLAN SHEET P12 EROSION & SEDIMENT CONTROL PLAN SHEET P13 EROSION & SEDIMENT CONTROL PLAN SHEET P14 EROSION & SEDIMENT CONTROL PLAN SHEET P15 EROSION & SEDIMENT CONTROL PLAN SHEET P16 EROSION & SEDIMENT CONTROL PLAN SHEET P17 EROSION & SEDIMENT CONTROL PLAN SHEET P18 EROSION & SEDIMENT CONTROL PLAN SHEET P19 EROSION & SEDIMENT CONTROL PLAN SHEET P20 EROSION & SEDIMENT CONTROL PLAN SHEET P21 EROSION & SEDIMENT CONTROL PLAN SHEET P22 EROSION & SEDIMENT CONTROL PLAN SHEET P23 EROSION & SEDIMENT CONTROL PLAN SHEET P24 EROSION & SEDIMENT CONTROL PLAN SHEET P25 EROSION & SEDIMENT CONTROL PLAN SHEET P26 EROSION & SEDIMENT CONTROL PLAN SHEET P27 EROSION & SEDIMENT CONTROL PLAN SHEET P28 EROSION & SEDIMENT CONTROL PLAN SHEET P29 EROSION & SEDIMENT CONTROL PLAN SHEET P30 EROSION & SEDIMENT CONTROL DETAILS SHEET PED-1 EROSION & SEDIMENT CONTROL DETAILS SHEET PED-2 EROSION & SEDIMENT CONTROL DETAILS SHEET PED-3 EROSION & SEDIMENT CONTROL DETAILS SHEET PED-4 MIGRATORY BIRD HOTLINE STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SERVICE AREA. INTERACTIONS OF BIRDS WITH GENERATING FACILITIES, TRANSMISSION AND DISTRIBUTIONS, SUBSTATIONS, OTHER STRUCTURES AND EQUIPMENT, AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. CAROLINAS:800.573.3853 FLORIDA:727.386.3084 M I DWEST: 317.430.4497 SPILL REPORTING HOTLINE IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT, FEDERAL AND STATE LAWS REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION. IMMEDIATELY NOTIFY YOUR SUPERVISOR AND THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS DISCOVERED. IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL, CONTACT ONE OF THE DUKE ENERGY SPILL REPORTING HOTLINES AT: CAROLINAS & MIDWEST: 800.527.3853 FLORIDA: 866.769.1266 CONTACTS OWNER: DUKE ENERGY CAROLINAS PERMITTING SPECIALIST 526 SOUTH CHURCH ST. CHARLOTTE, NC 28202 PH: (760) 445-3332 Jeffery.Goto@duke-energy.com ENGINEER: HDR Engineering Inc. David T. Baker 440 South Church St. Suite 1000 Charlotte, NC PH: (704) 338-6724 David.Baker@hdrinc.com RESPONSIBLE FOR MAINTENANCE: Eric Shook PH: (336) 416-9468 eric.shook@duke-energy.com TITLE DUKETOYOTA TAP 100KV TRANSMISSION LINE EN E RGY. TITLE SHEET CAROLINAS 526 SOUTH CHURCH STREET CHARLOTTE N.C. 28202 LINE INDEX: DRAWING SHEET TELEPHONE NO. (704)382-2741 10336526 PTL-01 W z J z O U) (1) U) z Q 0 O Q O O