Loading...
HomeMy WebLinkAboutSW6220201_Plansheet C3.2 - Grading_Drainage Plan_20220510GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7—DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) 1 1 ,7INv NURSERY ROAD (SR1117) 323.29� .i 60' R/W (PUBLIC) U �OC LOC LOC 335��\ \\ \ \\ \ zj Lor, 335 COC� tOC— 1— — — — — — — — — \— — — — — � �O TEMPORARY SKIMMER BASIN #4 L=60', W=30', D=3' \ — — --a SIDE SLOPES= 2:1 \ TOP OF BASIN: 306.00' \ BOTTOM OF BASIN: 302.00' Ol' _ 1 15' EMERGENCY SPILLWAY: 305.00' INVERT OF SKIMMER: 302.00' \ 1 SIDE SLOPES OF BASIN ARE TO BOG — 313.80 \ BE SEEDED WITHIN SEVEN DAYS. SF1 19 "ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) / ��h' \ 1 5 �= 313.0 3�S WITH 1.3" ORIFICE FOR DEWATERING THE 562 1 _ SEDIMENT BASIN DURING CONSTRUCTION. 312.91\ \ PAD 314.10\ \ 1 \ \ \ \ \313.21 / / \ 1 314.50 PAD 314.90 \\\ L \ \ \ \ \ \ \ \\ 12.93 'IPAD 313.50� _ v � I 313.70 � � *Air C Nr 563 - �� J PAD 390 14.13.03 _\ \ •• \\ Nr 11.93 V) ` \ \ �—r7/V 3 2.9 � _ \ 31 \ \ 1 \PAD\313.00 RIP RAP DISSIPATER' 3 L=1' W=0.5/2 �O 311 Dw=8" Duac=3p 12" s 310.85 ti CLASS B 18" THICK 11.E 0 ` \ NAG S75 � ' STP.PAT.0 c3.1 _� C3.2 C3.3 C3.4 TBM 4D ECS #181 N 568,836.892 E 2,008,250.099SHEET KEY ELEV 339.17.17 NC GRID NAD 83 CS (2011) NAVD 88 pp =77 AXLE — . N 568,828.20 — E 2,008,278.20 _ NC GRID NAD 83 1 (2011) DASHED LINES ARE GRADE LINES INDICATE TO STRAIGHT GRADE FROM GIVEN ELEVATIONS. O $31201�1 G��O NP NG LEGEND: PK PK—PK NAIL EIP Oo EIP—EXISTING IRON PIPE EIS O EIS —EXISTING IRON STAKE ENLO ENL—EXISTING NAIL ERBO ERB—EXISTING REBAR N/F — NOW OR FORMERLY R/W — RIGHT OF WAY PVC — POLYVINYL CHLORIDE RCP — REINFORCED CONCRETE PIPE CI — CURB INLET PROPERTY LINE ADJACENT PROPERTY LINE RIGHT—OF—WAY ss SANITARY SEWER LINE FM FORCE MAIN LINE sD STORM DRAINAGE WETLANDS PERMANENT EASEMENT X FENCE LINE TREE LINE x 208.47'SPOT ELEVATION BENCHMARK D4 WATER VALVE ��, FIRE HYDRANT [ WATER METER Iff CATCH BASIN TREE 0 GRAVEL SOIL 0 WETLANDS 330 MAJOR CONTOUR 337 MINOR CONTOUR — Loc— Loc— LIMITS OF CONSTRUCTION — sF — sF —SILT FENCE LINE — JN — JN — JUTE NETTING 0INLET PROTECTION lid go 60 on 800000000 so E SESE of 3.3 - UN GRAPHIC SCALE 40 0 20 40 80 160 ( IN FEET ) 1 inch = 40 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I G-2354 www.4Dsitesotutions.com REVISIONS PROJECT NAME WOODSHIRE SUBDIVISION PHASE 8 DETAILED GRADING AND EROSION CONTROL PLAN CLIENT WOODSHIRE HUFF, LLC 2919 Breezewood Avenue - Suite 100 Fayetteville, North Carolina 28303 Phone: (910) 486-4864 PROJECT INFORMATION DESIGNED BY: BRETT DRAWN BY: BRETT CHECKED BY: SCOTT PROJECT NUMBER: 1775 DRAWING SCALE HORIZONTAL: 1 "=40' DATE RELEASED MARCH 30, 2022 SHEET NUMBER C-302