Loading...
HomeMy WebLinkAboutNCC222810_Site Plan or Location Map_20220805South River Electric Membership Corporation A Touchstone Energy Cooperative 0A CUMBERLAND COUNTY, NC NOT TO SCALE Call before you dig. REBEKAH EVANS TRANSMISSION LINE UPTON TYSON RD, FAYETTEVI LLE, NC, 28306 LATITUDE: 34' 55' 53"N LONGITUDE: -78' 50' 4"W ISSUED FOR PERMITTING CUMBERLAND COUNTY, NORTH CAROLINA JULY 1412022 0 SITE e� �j CI 9' �mQ 8� e eU"c ? to U Blossom Rd Heys Land,ng 0, z x n S i G¢ �C'y`• o Rd N J�SeN ' fpd VICINITY MAP NOT TO SCALE PARCEL /SITE DATA: PROJECT OWNER: SO UTH RIVER ELECTRIC MEMBERSHIP CORPORATION 17494 US 421 SOUTH DUNN, NC 28335 PHONE: 910-892-8071 PHYSICAL PROPERTY ADDRESS: 5029 S NC 87 HWY FAYETTEVILLE, NC 28306 PIN: 0442-78-7881 PROJECT LIMITS OF DISTURBANCE: 20 ACRES ZONING: N/A RIVER BASIN: CAPE FEAR WATERSHED: UPPER CAPE FEAR LOWER CAPE FEAR STREAM NAME: HARRISON CREEK PROJECT DRAWING LIST: DWG. NO. DRAWING TITLE 17343 SHT.1 COVER SHEET 17343 SHT. 2 EROSION AND SEDIMENT CONTROL NOTES 17343 SHT.3 GROUND STABILIZATION NOTES 17343 SHT.4 SELF -INSPECTION, RECORD KEEPING AND REPORTING NOTES 17343 SHT. 5 EROSION CONTROL PLAN 17343 SHT. 6 EROSION CONTROL PLAN 17343 SHT. 7 EROSION CONTROL PLAN 17343 SHT. 8 EROSION CONTROL PLAN 17343 SHT. 9 ACCESS PLAN 17343 SHT. 10 EROSION CONTROL DETAILS 17343 SHT. 11 EROSION CONTROL DETAILS vT� w�N o °a PROJECT DESCRIPTION: W" ° m o SOUTH RIVER EMC IS CONSTRUCTING A NEW 115kV TRANSMISSION LINE TO SUPPORT 6 zz "' m THE GROWING ELECTRICAL NEEDS IN THE SERVICE AREA. k a < Z mm �za PROJECT NARRATIVE: A d Z <o° THE REBEKAH EVANS PROJECT IS LOCATED IN CUMBERLAND COUNTY, NORTH CA ROLINA. THE PROJECT REQUIRES THE INSTALLATION OF A NEW TRANSMISSION LINE BETWEEN ITS REBEKAH EVANS AND CAPE FEAR SUBSTATIONS. THE SOUTH RIVER CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES AS SHOWN WITHIN THE CONSTRUCTION LIMITS. PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA („) WILL BE STABILIZED AFTER COMPLETION OF CONSTRUCTION. AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES, WHENEVER POSSIBLE. THE PROJECT IS ANTICIPATED TO START IN 2Q OF 2022 Z AND BE COMPLETED IN 2Q OF 2023. W > Z Q J Z > U O w U _ 0 Z w = U w W SURVEY: PREPARED BV. DATED. GENERAL NOTES. NO SURVEY WAS PERFORMED FOR THIS PROJECT. m Z J w W 0 CO F_ SHEET 1 OF11 W L—