HomeMy WebLinkAboutNCC222810_Site Plan or Location Map_20220805South River Electric
Membership Corporation
A Touchstone Energy Cooperative 0A
CUMBERLAND COUNTY, NC
NOT TO SCALE
Call before you dig.
REBEKAH EVANS TRANSMISSION LINE
UPTON TYSON RD, FAYETTEVI LLE, NC, 28306
LATITUDE: 34' 55' 53"N LONGITUDE: -78' 50' 4"W
ISSUED FOR PERMITTING
CUMBERLAND COUNTY, NORTH CAROLINA
JULY 1412022
0
SITE e�
�j
CI 9' �mQ
8�
e eU"c ? to
U Blossom Rd
Heys Land,ng 0, z
x n
S
i
G¢
�C'y`• o
Rd
N J�SeN ' fpd
VICINITY MAP
NOT TO SCALE
PARCEL /SITE DATA:
PROJECT OWNER:
SO UTH RIVER ELECTRIC MEMBERSHIP
CORPORATION
17494 US 421 SOUTH
DUNN, NC 28335
PHONE: 910-892-8071
PHYSICAL PROPERTY ADDRESS:
5029 S NC 87 HWY
FAYETTEVILLE, NC 28306
PIN:
0442-78-7881
PROJECT LIMITS OF DISTURBANCE:
20 ACRES
ZONING:
N/A
RIVER BASIN:
CAPE FEAR
WATERSHED:
UPPER CAPE FEAR
LOWER CAPE FEAR
STREAM NAME:
HARRISON CREEK
PROJECT DRAWING LIST:
DWG. NO.
DRAWING TITLE
17343 SHT.1
COVER SHEET
17343 SHT. 2
EROSION AND SEDIMENT CONTROL NOTES
17343 SHT.3
GROUND STABILIZATION NOTES
17343 SHT.4
SELF -INSPECTION, RECORD KEEPING AND REPORTING
NOTES
17343 SHT. 5
EROSION CONTROL PLAN
17343 SHT. 6
EROSION CONTROL PLAN
17343 SHT. 7
EROSION CONTROL PLAN
17343 SHT. 8
EROSION CONTROL PLAN
17343 SHT. 9
ACCESS PLAN
17343 SHT. 10
EROSION CONTROL DETAILS
17343 SHT. 11
EROSION CONTROL DETAILS
vT�
w�N
o
°a
PROJECT DESCRIPTION:
W"
° m o
SOUTH RIVER EMC IS CONSTRUCTING A NEW 115kV TRANSMISSION LINE TO SUPPORT
6 zz
"' m
THE GROWING ELECTRICAL NEEDS IN THE SERVICE AREA.
k
a
< Z mm
�za
PROJECT NARRATIVE:
A
d
Z
<o°
THE REBEKAH EVANS PROJECT IS LOCATED IN CUMBERLAND COUNTY, NORTH
CA ROLINA. THE PROJECT REQUIRES THE INSTALLATION OF A NEW TRANSMISSION LINE
BETWEEN ITS REBEKAH EVANS AND CAPE FEAR SUBSTATIONS. THE SOUTH RIVER
CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES AS SHOWN WITHIN
THE CONSTRUCTION LIMITS. PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA
(„)
WILL BE STABILIZED AFTER COMPLETION OF CONSTRUCTION. AN AVOIDANCE AND MINIMIZATION
OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION
CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY
ACCESS ROUTES, WHENEVER POSSIBLE. THE PROJECT IS ANTICIPATED TO START IN 2Q OF 2022
Z
AND BE COMPLETED IN 2Q OF 2023.
W >
Z
Q J
Z
> U O
w U
_ 0
Z
w
=
U
w
W
SURVEY:
PREPARED BV.
DATED.
GENERAL NOTES.
NO SURVEY WAS PERFORMED FOR THIS PROJECT.
m Z J
w W
0
CO
F_
SHEET 1 OF11
W
L—