PORTERS NECK - CASTLE HAYNE - FOLKSTONE 230 kV
PROJECT NARRATIVE
THE PROPOSED PORTERS NECK - CASTLE HAYNE - FOLKSTONE 230 kV PROJECT IS LOCATED IN
NEW HANOVER COUNTY, NORTH CAROLINA. THE PROJECT INCLUDES INSTALLATION OF A
TRANSMISSION TAP LINE THAT WILL CONNECT TO A RECENTLY BUILT ELECTRICAL SUBSTATION
TO AN EXISTING TRANSMISSION DISTRIBUTION LINE NORTHEAST OF PORTERS NECK, NC. THE
PROJECT WILL REQUIRE DUKE ENERGY TO OBTAIN RIGHT OF WAY FOR +/- 4.5 MILES
THROUGHOUT A PORTION OF THE NORTHEAST SIDE OF NEW HANOVER COUNTY. THE DISTURBED
AREA IS 20.0 ACRES. THE PRIOR USE OF THE EXITING PARCELS EFFECTED ARE ZONED, I-2, R-15,
AND CZD B-2, HOWEVER THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE. PRIOR TO
CONSTRUCTION, A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION
CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS.
PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR
TO COMPLETION OF CONSTRUCTION. AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE
APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES
BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES,
WHENEVER POSSIBLE. EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING
USE ONLY BY NCDEQ. THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN AUGUST
2021 AND BE COMPLETED IN AUGUST 2022.
GENERAL NOTES
1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE
FOR REFERENCE ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION.
2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES. AERIAL
PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES.
3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE, BOTH VERTICAL AND HORIZONTAL,
EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC
811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT
OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO
REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR.
4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR
SHALL NOT DISTURB UTILITY POLES, GUYS WIRES, OR ANCHORS WITHOUT PERMISSION FROM DUKE
ENERGY.
5. PROJECT IS LOCATED IN THE CAPE FEAR RIVER BASIN. THE PROJECT IS NOT SUBJECT TO
STATE -REGULATED BUFFER REQUIREMENTS.
6. SEE SHEET PEN1 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE.
7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY. APPROPRIATE BRIDGING AND MATTING OF THESE
FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF
THE RIGHT-OF-WAY.
8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY
PERMITTING PRIOR TO USE.
9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU
OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE.
10. WETLAND MATTING SHALL BE COMPOSITE AND/OR HEAVY DUTY TIMBER/"CRANE" MATS. NO LATTICE
OR TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL WETLANDS AND/OR STREAMS.
11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 125 FEET OF WETLANDS OR
SURFACE WATER WITHOUT CONTAINMENT.
12. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY/WEEK.
13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE
DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION.
14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION. PERMANENT GROUND
COVER SHALL BE USED FOR STABILIZATION.
REV I FILE NO. I DATE I REVISION
NEW HANOVER COUNTY, NORTH CAROLINA
PHASE 1
LATITUDE: 34.321360
LONGITUDE:-77.820400
1js
PROPOSED PORTERS NECK - Ha
w CASTLE HAYNE - FOLKSTONE
230kV PROJECT LOCATION
Castle Ha,n (UNDER SEPARATE COVER)
eruwnrown
Skippers PROPOSED PORTERS NECK -
Corner CASTLE HAYNE - FOLKSTONE
230kV PROJECT PHASE 1
LOCATION
all
`.
Nor-t`1chas
1f7
t �
Bh&c Clay Fafr"[i5
� urrays-ville r' larnett Eight
Island
Wilmington Shell Bank
International
Hightsvilla Airport a, Grant Ogler
CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT
LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION
OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED.
CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE
THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811".
REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY.
DRAWN I CHECKED I APPROVED
Know what's below.
Call before you dig.
VICINITY MAP
SCALE: NTS
\N „CAR %
;
T � �
11 list"
FINAL DRAWING
1111
J
McADAMS
NORTH & SOUTH CAROLINA STATE NAP
SHEET LIST:
TITLE SHEET
EROSION & SEDIMENT CONTROL NOTES
EROSION & SEDIMENT CONTROL NOTES
EROSION & SEDIMENT CONTROL NOTES
EROSION & SEDIMENT CONTROL NOTES
EROSION & SEDIMENT CONTROL ESTIMATED QUANTITIES
EROSION & SEDIMENT CONTROL SHEET LAYOUT
EROSION & SEDIMENT CONTROL PLAN
EROSION & SEDIMENT CONTROL DETAILS
EROSION & SEDIMENT CONTROL DETAILS
MIGRATORY BIRD HOTLINE
SHEET PTL
SHEET PEN1
SHEET PEN2
SHEET PEN3
SHEET PEN4
SHEET PQTY1
SHEET PLA
SHEET P1
SHEET PED1
SHEET PED2
STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY
SERVICE AREA. INTERACTIONS OF BIRDS WITH GENERATING FACILITIES, TRANSMISSION AND DISTRIBUTIONS,
SUBSTATIONS, OTHER STRUCTURES AND EQUIPMENT, AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO
BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND
CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES.
CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497
SPILL REPORTING HOTLINE
IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT, FEDERAL AND STATE LAWS
REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER
REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION. IMMEDIATELY NOTIFY YOUR
SUPERVISOR AND THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS
DISCOVERED. IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL, CONTACT ONE OF
THE DUKE ENERGY SPILL REPORTING HOTLINES AT:
CAROLINAS & MIDWEST: 800.527.3853
FLORIDA: 866.769.1266
CONTACTS
OWNER:
DUKE ENERGY PROGRESS
PERMITTING SPECIALIST
410 S. WILMINGTON ST.
RALEIGH, NC 27601
OFFICE: (919) 546-2090
CELL: (919) 931-6655
NUWAN.WIJESURIYA@duke-energy.com
ENGINEER:
THE JOHN R. McADAMS COMPANY, INC.
2905 MERIDIAN PARKWAY
DURHAM, NC 27713
OFFICE: 919.361.5000
CELL: 919.633.3805
COVIL@mcadamsco.com
RESPONSIBLE FOR MAINTENANCE:
NAME
PH:
FAX:
EMAIL
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CURRENT DUKE
ENERGY PROGRESS, NEW HANOVER COUNTY, NCDOT ENGINEERING DESIGN
AND CONSTRUCTION STANDARDS
ANY CHANGES TO THE PLAN &DETAILS SPECIFIED HEREIN MUST BE APPROVED
BY THE DUKE ENERGY PERMITTING SPECIALIST PRIOR TO IMPLEMENTATION.
WLE
The John R. McAdams Company, Inc. DUKE ENERGY PROGRESS EAST
2905 Meridian Parkway
Durham, NC 27713 DUKE PORTERS NECK - CASTLE HAYNE - FOLKSTONE 230kV
phone 919. 361. 5000 FNERGY(
NEW HANOVER COUNTY, NORTH CAROLINA
fax 919. 361. 2269 1
license number: C-0293, C-187 TITLE SHEET
411 FAYETTEVILLE STREET
www.mcadamsco.com RALEIGH N.C. 27601 LINE INDEX: DRANANG SHEET
TELEPHONE NO. (919) 546-2090 #� 160707A03-5 PTL