Loading...
HomeMy WebLinkAboutNCC222784_Site Plan or Location Map_20220804CL C 0 U) CL N O M M N N O N O N \ U v 3 0/ 6) C I a J N Co o_ I m m O N I N � o o �bZ o N cy w Y a / H 0 d C:) C? 3 O o a o O N � O U w U Y y � C bLO 0 3 0 0 o a, U i V y hp C C mo F. PORTERS NECK - CASTLE HAYNE - FOLKSTONE 230 kV PROJECT NARRATIVE THE PROPOSED PORTERS NECK - CASTLE HAYNE - FOLKSTONE 230 kV PROJECT IS LOCATED IN NEW HANOVER COUNTY, NORTH CAROLINA. THE PROJECT INCLUDES INSTALLATION OF A TRANSMISSION TAP LINE THAT WILL CONNECT TO A RECENTLY BUILT ELECTRICAL SUBSTATION TO AN EXISTING TRANSMISSION DISTRIBUTION LINE NORTHEAST OF PORTERS NECK, NC. THE PROJECT WILL REQUIRE DUKE ENERGY TO OBTAIN RIGHT OF WAY FOR +/- 4.5 MILES THROUGHOUT A PORTION OF THE NORTHEAST SIDE OF NEW HANOVER COUNTY. THE DISTURBED AREA IS 20.0 ACRES. THE PRIOR USE OF THE EXITING PARCELS EFFECTED ARE ZONED, I-2, R-15, AND CZD B-2, HOWEVER THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE. PRIOR TO CONSTRUCTION, A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION. AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES, WHENEVER POSSIBLE. EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ. THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN AUGUST 2021 AND BE COMPLETED IN AUGUST 2022. GENERAL NOTES 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE FOR REFERENCE ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES. AERIAL PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE, BOTH VERTICAL AND HORIZONTAL, EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL NOT DISTURB UTILITY POLES, GUYS WIRES, OR ANCHORS WITHOUT PERMISSION FROM DUKE ENERGY. 5. PROJECT IS LOCATED IN THE CAPE FEAR RIVER BASIN. THE PROJECT IS NOT SUBJECT TO STATE -REGULATED BUFFER REQUIREMENTS. 6. SEE SHEET PEN1 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. 7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY. APPROPRIATE BRIDGING AND MATTING OF THESE FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF THE RIGHT-OF-WAY. 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY PERMITTING PRIOR TO USE. 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. 10. WETLAND MATTING SHALL BE COMPOSITE AND/OR HEAVY DUTY TIMBER/"CRANE" MATS. NO LATTICE OR TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL WETLANDS AND/OR STREAMS. 11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 125 FEET OF WETLANDS OR SURFACE WATER WITHOUT CONTAINMENT. 12. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY/WEEK. 13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. 14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION. PERMANENT GROUND COVER SHALL BE USED FOR STABILIZATION. REV I FILE NO. I DATE I REVISION NEW HANOVER COUNTY, NORTH CAROLINA PHASE 1 LATITUDE: 34.321360 LONGITUDE:-77.820400 1js PROPOSED PORTERS NECK - Ha w CASTLE HAYNE - FOLKSTONE 230kV PROJECT LOCATION Castle Ha,n (UNDER SEPARATE COVER) eruwnrown Skippers PROPOSED PORTERS NECK - Corner CASTLE HAYNE - FOLKSTONE 230kV PROJECT PHASE 1 LOCATION all `. Nor-t`1chas 1f7 t � Bh&c Clay Fafr"[i5 � urrays-ville r' larnett Eight Island Wilmington Shell Bank International Hightsvilla Airport a, Grant Ogler CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. DRAWN I CHECKED I APPROVED Know what's below. Call before you dig. VICINITY MAP SCALE: NTS \N „CAR % ; T � � 11 list" FINAL DRAWING 1111 J McADAMS NORTH & SOUTH CAROLINA STATE NAP SHEET LIST: TITLE SHEET EROSION & SEDIMENT CONTROL NOTES EROSION & SEDIMENT CONTROL NOTES EROSION & SEDIMENT CONTROL NOTES EROSION & SEDIMENT CONTROL NOTES EROSION & SEDIMENT CONTROL ESTIMATED QUANTITIES EROSION & SEDIMENT CONTROL SHEET LAYOUT EROSION & SEDIMENT CONTROL PLAN EROSION & SEDIMENT CONTROL DETAILS EROSION & SEDIMENT CONTROL DETAILS MIGRATORY BIRD HOTLINE SHEET PTL SHEET PEN1 SHEET PEN2 SHEET PEN3 SHEET PEN4 SHEET PQTY1 SHEET PLA SHEET P1 SHEET PED1 SHEET PED2 STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SERVICE AREA. INTERACTIONS OF BIRDS WITH GENERATING FACILITIES, TRANSMISSION AND DISTRIBUTIONS, SUBSTATIONS, OTHER STRUCTURES AND EQUIPMENT, AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 SPILL REPORTING HOTLINE IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT, FEDERAL AND STATE LAWS REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION. IMMEDIATELY NOTIFY YOUR SUPERVISOR AND THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS DISCOVERED. IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL, CONTACT ONE OF THE DUKE ENERGY SPILL REPORTING HOTLINES AT: CAROLINAS & MIDWEST: 800.527.3853 FLORIDA: 866.769.1266 CONTACTS OWNER: DUKE ENERGY PROGRESS PERMITTING SPECIALIST 410 S. WILMINGTON ST. RALEIGH, NC 27601 OFFICE: (919) 546-2090 CELL: (919) 931-6655 NUWAN.WIJESURIYA@duke-energy.com ENGINEER: THE JOHN R. McADAMS COMPANY, INC. 2905 MERIDIAN PARKWAY DURHAM, NC 27713 OFFICE: 919.361.5000 CELL: 919.633.3805 COVIL@mcadamsco.com RESPONSIBLE FOR MAINTENANCE: NAME PH: FAX: EMAIL ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CURRENT DUKE ENERGY PROGRESS, NEW HANOVER COUNTY, NCDOT ENGINEERING DESIGN AND CONSTRUCTION STANDARDS ANY CHANGES TO THE PLAN &DETAILS SPECIFIED HEREIN MUST BE APPROVED BY THE DUKE ENERGY PERMITTING SPECIALIST PRIOR TO IMPLEMENTATION. WLE The John R. McAdams Company, Inc. DUKE ENERGY PROGRESS EAST 2905 Meridian Parkway Durham, NC 27713 DUKE PORTERS NECK - CASTLE HAYNE - FOLKSTONE 230kV phone 919. 361. 5000 FNERGY( NEW HANOVER COUNTY, NORTH CAROLINA fax 919. 361. 2269 1 license number: C-0293, C-187 TITLE SHEET 411 FAYETTEVILLE STREET www.mcadamsco.com RALEIGH N.C. 27601 LINE INDEX: DRANANG SHEET TELEPHONE NO. (919) 546-2090 #� 160707A03-5 PTL r.�