Loading...
HomeMy WebLinkAboutNCC222750_Site Plan or Location Map_20220802a� DUKE ENERGY PROGRESS HOLLY SPRINGS UTLEY CREEK 230kV SUBSTATION 1520 DEXTER RIDGE DRIVE HOLLY SPRINGS, NORTH CAROLINA 27540 PROJECT INFORMATION DUKE ENERGY PROGRESS, LLC (DEP) 411 FAYETTEVILLE STREET LANDOWNER RALEIGH, NORTH CAROLINA 27601 PHONE: (919)-546-7169 MCADAMS COMPANY ENGINEER 2905 MERIDIAN PARKWAY DURHAM, NORTH CAROLINA 27713 PHONE: (919)-361-5000 ESP ASSOCIATES, INC. 211 RACINE DRIVE, SUITE 101 SURVEYOR WILMINGTON, NORTH CAROLINA 28403 PHONE: (910)-313-6823 EXISTING USE WIRELESS TELECOMMUNICATIONS TOWER (HS) PROPOSED USE INFRASTRUCTURE/UTILITIES (MAJOR) (HS) WIRELESS TELECOMMUNICATIONS TOWER (HS) EXISTING BUILDING N/A PROPOSED BUILDING N/A PARCEL ID 0638452323, 063869171, 0638780892 MAP BOOK AND PAGE NUMBER SEE PLANS DEED BOOK AND PAGE NUMBER SEE PLANS SITE ZONING RURAL RESIDENTIAL (RR) (HOLLY SPRINGS) R-80 (WAKE COUNTY) TOTAL ACREAGE SUBDIVIDED AREA 66.44 AC. (HOLLY SPRINGS)1,397.25 AC. (WAKE COUNTY) ACREAGE OF LAND TO BE 47.41 AC. DISTURBED/EXPOSED 0.46 AC. (HOLLY SPRINGS)N/A EXISTING IMPERVIOUS AREA (WAKE COUNTY) PROPOSED IMPERVIOUS AREA % 3.88% (HOLLY SPRINGS)N/A (WAKE COUNTY) PROPOSED IMPERVIOUS AREA (TOTAL) 2.56 AC. (HOLLY SPRINGS) 4.44 AC. (WAKE COUNTY) PROPOSED IMPERVIOUS AREA 2.56 AC. (HOLLY SPRINGS) (TOTAL INCLUDING FUTURE) 4.44 AC. (WAKE COUNTY) RIVER BASIN CAPE FEAR RIVER BASIN PARKING NONE EQUIPMENT HEIGHT 83 MIGRATORY BIRD HOTLINE STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SERVICE AREA. INTERACTIONS OF BIRDS WITH GENERATING FACILITIES, TRANSMISSION AND DISTRIBUTIONS, SUBSTATIONS OTHER STRUCTURES AND EQUIPMENT, AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. CAROLINAS: 800.573.3853 1 FLORIDA: 727.386.3084 1 MIDWEST: 317.430.4497 SPILL REPORTING HOTLINE IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT, FEDERAL AND STATE LAWS REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION. IMMEDIATELY NOTIFY YOUR SUPERVISOR AND THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS DISCOVERED. IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL, CONTACT ONE OF THE DUKE ENERGY SPILL REPORTING HOTLINES AT: CAROLINAS & MIDWEST: 800.527.3853 1 FLORIDA: 866.769.1266 Know what's below. Cal I before you dig. WAKE COUNTY LATITUDE: N 35.642628' LONGITUDE: W-78.873021 ° CONSTRUCTION DRAWINGS PROJECT NUMBER: E21004501 DATE: DULY 19th, 2022 ACCESS ROAD S I CI II7CTAT1l1H1 A,- t Holy Sp,ings Township VICINITY MAP CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811 ". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. N.T.S. EM] SHEET INDEX COVER SHEET SHT 1 OF 84 PROJECT NOTES SHT 2 OF 84 SURVEY - SHEET KEY MAP SHT 3 OF 84 SURVEY - ALTA/NSPS LAND TITLE SHT 4 OF 84 SURVEY - TOPOGRAPHIC MAP SHT 5 OF 84 SURVEY - TOPOGRAPHIC MAP SHT 6 OF 84 SURVEY - TOPOGRAPHIC MAP SHT 7 OF 84 SURVEY - TOPOGRAPHIC MAP SHT 8 OF 84 SURVEY - RECOMBINATION MAP SHT 9 OF 84 DEMOLITION AND CLEARING PLAN - OVERALL SHT 10 OF 84 DEMOLITION AND CLEARING PLAN - SUBSTATION SHT 11 OF 84 DEMOLITION AND CLEARING PLAN - SECONDARY PROPERTY ENTRANCE SHT 12 OF 84 DEMOLITION AND CLEARING PLAN - PRIMARY PROPERTY ENTRANCE SHT 13 OF 84 DEMOLITION AND CLEARING PLAN - TRANSMISSION ACCESS ROUTE SHT 13A OF 84 SITE PLAN - OVERALL SHT 14 OF 84 SITE PLAN - OVERALL SUBSTATION SHT 15 OF 84 SITE PLAN - SUBSTATION SHT 16 OF 84 SITE PLAN - SECONDARY PROPERTY ENTRANCE SHT 17 OF 84 SITE PLAN - PRIMARY PROPERTY ENTRANCE SHT 17A OF 84 SITE PLAN -TRANSMISSION ACCESS ROUTE SHT 17B OF 84 GRADING AND STORM DRAINAGE PLAN - OVERALL SHT 18 OF 84 GRADING AND STORM DRAINAGE PLAN - SUBSTATION SHT 19 OF 84 GRADING AND STORM DRAINAGE PLAN - SECONDARY PROPERTY ENTRANCE SHT 20 OF 84 GRADING AND STORM DRAINAGE PLAN - PERMANENT STOCKPILE SHT 20A OF 84 GRADING AND STORM DRAINAGE PLAN - PRIMARY PROPERTY ENTRANCE SHT 21 OF 84 GRADING AND STORM DRAINAGE PLAN - TRANSMISSION ACCESS ROUTE SHT 21A OF 84 PLAN AND PROFILE - NORTH/SOUTH BASELINE SHT 22 OF 84 PLAN AND PROFILE - EAST/WEST BASELINE SHT 23 OF 84 PLAN AND PROFILE - SOUTH RETAINING WALL SHT 24 OF 84 PLAN AND PROFILE - NORTH RETAINING WALL SHT 25 OF 84 PLAN AND PROFILE - SUBSTATION STORM DRAINAGE - SDA WEST SHT 26 OF 84 PLAN AND PROFILE - SUBSTATION STORM DRAINAGE - SDA EAST SHT 27 OF 84 PLAN AND PROFILE - ACCESS ROUTE SHT 28 OF 84 PLAN AND PROFILE - ACCESS ROUTE SHT 29 OF 84 PLAN AND PROFILE - ACCESS ROUTE SHT 30 OF 84 PLAN AND PROFILE - ACCESS ROUTE SHT 31 OF 84 PLAN AND PROFILE - ACCESS ROUTE SHT 32 OF 84 PLAN AND PROFILE - ACCESS ROUTE SHT 33 OF 84 PLAN AND PROFILE - ACCESS ROUTE SHT 34 OF 84 PLAN AND PROFILE - ACCESS ROUTE SHT 35 OF 84 PLAN AND PROFILE - ACCESS ROUTE SHT 36 OF 84 EROSION CONTROL PLAN - PHASE 1 - SUBSTATION SHT 37 OF 84 EROSION CONTROL PLAN - PHASE 2 - SUBSTATION SHT 38 OF 84 EROSION CONTROL PLAN - PHASE 3 - SUBSTATION SHT 39 OF 84 EROSION CONTROL PLAN - PHASE 1 - SECONDARY PROPERTY ENTRANCE SHT 40 OF 84 EROSION CONTROL PLAN - PHASE 2 - SECONDARY PROPERTY ENTRANCE SHT 41 OF 84 EROSION CONTROL PLAN - PHASE 3 - SECONDARY PROPERTY ENTRANCE SHT 42 OF 84 EROSION CONTROL PLAN - PHASE 1- PERMANENT STOCKPILE SHT 42A OF 84 EROSION CONTROL PLAN - PHASE 2 - PERMANENT STOCKPILE SHT 42B OF 84 EROSION CONTROL PLAN - PHASE 3 - PERMANENT STOCKPILE SHT 42C OF 84 EROSION CONTROL PLAN - ACCESS ROAD - PHASE 1 SHT 43 OF 84 EROSION CONTROL PLAN - ACCESS ROAD - PHASE 1 SHT 44 OF 84 EROSION CONTROL PLAN - ACCESS ROAD - PHASE 1 SHT 45 OF 84 EROSION CONTROL PLAN - ACCESS ROAD - PHASE 1 SHT 46 OF 84 EROSION CONTROL PLAN - ACCESS ROAD - PHASE 2 SHT 47 OF 84 EROSION CONTROL PLAN - ACCESS ROAD - PHASE 2 SHT 48 OF 84 EROSION CONTROL PLAN - ACCESS ROAD - PHASE 2 SHT 49 OF 84 EROSION CONTROL PLAN - ACCESS ROAD - PHASE 2 SHT 50 OF 84 EROSION CONTROL DETAILS SHT 51 OF 84 EROSION CONTROL DETAILS SHT 52 OF 84 EROSION CONTROL DETAILS - PERMANENT RISER BASIN AND SEDIMENT TRAP SHT 53 OF 84 EROSION CONTROL DETAILS - BASIN AND DISSIPATOR DETAILS SHT 54 OF 84 EROSION CONTROL DETAILS - TEMPORARY SEDIMENT TRAPS SHT 55 OF 84 EROSION CONTROL DETAILS - NCG01 SHT 56 OF 84 STORM DRAINAGE DETAILS SHT 57 OF 84 STORM DRAINAGE DETAILS SHT 58 OF 84 SITE DETAILS - SUBSTATION AND ACCESS ROAD DETAILS SHT 59 OF 84 STORMWATER MANAGEMENT PLAN SHT 60 OF 84 STORMWATER MANAGEMENT DETAILS SHT 61 OF 84 STORMWATER MANAGEMENT DETAILS SHT 62 OF 84 STORMWATER MANAGEMENT DETAILS SHT 63 OF 84 STORMWATER MANAGEMENT LANDSCAPE SHT 64 OF 84 LANDSCAPE PLAN SHT 65 OF 84 LANDSCAPE PLAN SHT 66 OF 84 LANDSCAPE PLAN SHT 67 OF 84 TREE PRESERVATION PLAN SHT 68 OF 84 SIGHT PLAN AND PROFILE - EQUIPMENT AND POLES SHT 69 OF 84 SIGHT PLAN AND PROFILE - ENTRANCE AND POLES SHT 70 OF 84 MSE RETAINING WALL DESIGN DRAWINGS SHT 71 OF 84 MSE RETAINING WALL DESIGN DRAWINGS SHT 72 OF 84 MSE RETAINING WALL DESIGN DRAWINGS SHT 73 OF 84 MSE RETAINING WALL DESIGN DRAWINGS SHT 74 OF 84 SITE LIGHTING ARRANGEMENT SHT 75 OF 84 CARO SEAL vim•: 034365 PRELIMINARY DRAWING — NOT FOR R CONSTRUCTION McADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com