Loading...
HomeMy WebLinkAboutNCC222707_ESC Approval Submitted_20220728ROY COOPER Governor ELIZABETH S. BISER Secretory BRIAN WRENN Director MOC Hope Mills, LLC Attn: Curtis Little, Managing Partner 500 6th Street San Antonio, TX 78215 NORTH CAROLINA Environmental Quality July 26, 2022 LETTER OF APPROVAL RE: Project Name: Starbuck's/Popeye's-Hopc Mills-2941 Towne Center Drive Approved Acres: 1.3 Project ID: CUMBE-2022-062 County: Cumberland, City: Hope Mills, Address: Town Center Drive River Basin: Cape Fear Stream Classification: Other Submitted By: Commercial Site Design Date Received by LQS: July 21, 2022 Plan Type: Revised Dear Mr. Little: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form. is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed atdeq.nc.gov/NCGO]. Please direct questions about the NOI form to Danny Smith at danny.smithLdincdenngov or Paul Clark at Pau1.Clark(c_r nedenr.Qov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. _ North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources -M E Q Fayetteville Regional Office 1 22.5 Green Street, Suite 714 ! Fayetteville. North Carolina 28301 o pem��earomao.,mrtnEcw�+w 910.433.3300 Letter of Approval MOC Hope Mills, LLC July 26, 2022 Page 2 of 2 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Eva�elyn Lowery- ac "s Environmental Engineer DEMLR Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: Chris Clayton, Commercial Site Design (electronic copy) David Reeves, Town of Hope Mills Inspections Department (electronic copy) DEMLR - Fayetteville Regional Office