HomeMy WebLinkAboutNCC212068_Modification Review_20220726Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 7/21/2022 11:32:06 AM (ADD TO FILE Submittal)
Approve by Georgoulias, Bethany A 7/26/2022 1:55:00 PM (Construction COC ADD TO FILE Review - NCC212068)
The task was assigned to Georgoulias, Bethany A. The due date is: July 26, 2022 5:00 PM
7/21 /2022 11:32 AM
Certificate of NCC212068
Coverage (COC) No.* Enter the Certificate of Coverage Number (Use capital letters)
Information associated with this permit:
Project Name Upper Piedmont Renewable Natural Gas Plant site
Address 9650 Oxford Road, Rougemont, NC
County Person
Latitude 36.3168
Longitude-78.8284
Permittee Listed Upper Piedmont Renewables LLC
Legally Responsible David Wentworth
Individual
NC Reference No. NCG01-2021-2068
E&SC Plan ID Perso-2021-010
Original NOI Tracking 49565
No. *
Date COC Issued* 04/06/2021
Prior Rescission Date This field will populate only if COC has already been rescinded.
Modification Information:
Reason for Closed -Out Lots/Outparcels in E&SC Plan
Modification* Additional Lots/Outparcels Approved - E&SC Revised
• Other Revision(s) to E&SC Plan
Legally Responsible Individual and/or Site Contact Has Changed
Multiple Reasons (List)
Addional Explanation More information (e.g., new Site Contact details). If lots are being added, please include specific lot numbers.
the original LOD was expanded and an amended E&S plan has been approved.
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload
applicable sheets).
For changes to the legally responsible individual, you must upload this form.
Supporting Upload Supporting Documentation (Revised E&SC Approval, Close -Out Doc, etc.)
Documentation PERSO-2021-010_20220720_LOA_Revision-1.pdf 259.1KB
PERSO-2021-010_20220720_COA_Revision-1.pdf 126.45KB
Must be PDF format
North Carolina General Statute 143-215.613 (1) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
* I hereby request modification to coverage under the NPDES Stormwater Permit for the
subject project site. I am familiar with the information contained in this request and to
the best of my knowledge and belief such information is true, complete and accurate.
Specify if you are:* • The Legally Responsible Individual
Authorized Responsible Person*
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item
(6) of that permit.
Signature
Type Name* David Wentworth
Title* President
Organization*
Upper Piedmont Renewables, LLC
Date *
07/21 /2022
Email Address*
dentworth@evensol.com
Email for confirmation
Telephone Number*
541-7191106
Contact number if we need to reach you
Note: Original permittee and site contact are copied on modification correspondence.
Additional Email jbeauchene@esisolutions.com
(Optional) Additional email for confirmation
Original Permittee dwentworth@evensol.com
Email
Original Site Contact ebrown@energyneeringsolutions.com
Email
Review Date 07/26/2022
Rescinded Since
Submitted?