Loading...
HomeMy WebLinkAboutNC0000396_Compliance Evaluation Inspection_20220718 (3)DocuSign Envelope ID: 0E1 ECE99-7BCA-4677-8ECC-73E64A40287F United States Environmental Protection Agency E PA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code 1 IN I 2 IL 21IIIIII NPDES yr/mo/day Inspection I 3 I NC0000396 111 121 22/06/09 117 Type 181 R I IIIIIIIIIII Inspector Fac Type 191 S I 201 IIIIIIIIIII IIIIIII I IIIIII P6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 I 70I I 711D 172 I N I 73I I 74 71 I I I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Asheville Steam Electric Power Plant 46 Duke Energy Ln Arden NC 28704 Entry Time/Date 09:OOAM 22/06/09 Permit Effective Date 22/03/01 Exit Time/Date 11:OOAM 22/06/09 Permit Expiration Date 23/11/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Teresa Lynne Williams/ORC/828-687-5240/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted William A Phipps,200 Cp L Dr Arden NC 28704//828-687-5201/8286875204 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Facility Site Review Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) Timothy H Heim Mika! Willmer of Inspector(s) Agency/Office/Phone and Fax Numbers Date r—pocusignedby; DWR/ARO WQ/828-296-4665/ 1114,16 A- tI DWR/Division of Water Quality/828-296-4686/ 7/18/2022 '-082B1105A3CA418... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date o s d 7/18/2022 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 DocuSign Envelope ID: 0E1 ECE99-7BCA-4677-8ECC-73E64A40287F 3I NPDES yr/mo/day N C 0000396 111 121 22/06/09 I17 Inspection Type 18 LB] (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Tim Heim and Mikal Willmer of the Asheville Regional Office performed a Bioassay Compliance Inspection on June 7th and 9th, 2022 for chronic toxicity. Teresa Williams (Duke Energy) was present at the time of the inspection. The facility appeared well maintained and operated at the time of the inspection, and in compliance with Permit NC0000396. No violations of permit requirements or applicable regulations were observed during this inspection. This sampling event result was reported as a pass by the Central Toxicity Lab in Raleigh for 3-Brood chronic pass -fail toxicity. A detailed DWR laboratory report is included. Page# 2 DocuSign Envelope ID: 0E1 ECE99-7BCA-4677-8ECC-73E64A40287F Permit: NC0000396 Inspection Date: 06/09/2022 Owner - Facility: Asheville Steam Electric Power Plant Inspection Type: Bioassay Compliance Yes No NA NE Page# 3