HomeMy WebLinkAboutNC0000396_Compliance Evaluation Inspection_20220718 (3)DocuSign Envelope ID: 0E1 ECE99-7BCA-4677-8ECC-73E64A40287F
United States Environmental Protection Agency
E PA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code
1 IN I 2 IL
21IIIIII
NPDES yr/mo/day Inspection
I 3 I NC0000396 111 121 22/06/09 117
Type
181 R I
IIIIIIIIIII
Inspector Fac Type
191 S I 201
IIIIIIIIIII IIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 I 70I I 711D 172 I N I 73I I 74 71
I I
I I I I I I 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Asheville Steam Electric Power Plant
46 Duke Energy Ln
Arden NC 28704
Entry Time/Date
09:OOAM 22/06/09
Permit Effective Date
22/03/01
Exit Time/Date
11:OOAM 22/06/09
Permit Expiration Date
23/11/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Teresa Lynne Williams/ORC/828-687-5240/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
William A Phipps,200 Cp L Dr Arden NC 28704//828-687-5201/8286875204
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Facility Site Review
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s)
Timothy H Heim
Mika! Willmer
of Inspector(s) Agency/Office/Phone and Fax Numbers Date
r—pocusignedby; DWR/ARO WQ/828-296-4665/
1114,16 A- tI DWR/Division of Water Quality/828-296-4686/ 7/18/2022
'-082B1105A3CA418...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
o s d 7/18/2022
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
DocuSign Envelope ID: 0E1 ECE99-7BCA-4677-8ECC-73E64A40287F
3I
NPDES yr/mo/day
N C 0000396 111 121 22/06/09
I17
Inspection Type
18 LB]
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Tim Heim and Mikal Willmer of the Asheville Regional Office performed a Bioassay Compliance
Inspection on June 7th and 9th, 2022 for chronic toxicity. Teresa Williams (Duke Energy) was present
at the time of the inspection. The facility appeared well maintained and operated at the time of the
inspection, and in compliance with Permit NC0000396.
No violations of permit requirements or applicable regulations were observed during this inspection.
This sampling event result was reported as a pass by the Central Toxicity Lab in Raleigh for 3-Brood
chronic pass -fail toxicity.
A detailed DWR laboratory report is included.
Page# 2
DocuSign Envelope ID: 0E1 ECE99-7BCA-4677-8ECC-73E64A40287F
Permit: NC0000396
Inspection Date: 06/09/2022
Owner - Facility: Asheville Steam Electric Power Plant
Inspection Type: Bioassay Compliance
Yes No NA NE
Page# 3