July 18, 2022
Teresa Williams, Lead Environmental Field Specialist - CNG
Duke Energy Progress
E-mail: teresa.williams@duke-energy.com
SUBJECT: Bioassay Compliance Inspection Report
Asheville Steam Electric Power Plant
NPDES WW Permit No. NC0000396
Buncombe County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Asheville Steam Electric
Power Plant on 6/09/2022. This inspection was conducted to verify that the facility is operating in
compliance with the conditions and limitations specified in NPDES WW Permit No. NC0000396. The
findings and comments noted during this inspection are provided in the enclosed copy of the inspection
report entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact me with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at
tim.heim@ncdenr.gov.
ATTACHMENTS
Ec: LF
Sincerely,
DocuSigned by:
tiklogUI�Uwt
'-082B1105A3CA418...
Tim Heim, P.E. — Environmental Engineer
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
North Carolina Department of Environmental Quelfy I olvtslon of Water Resources
Asheville Regional Office 12090 O.S. Highway 70 I Swannanoa, Noah CaroIOa 28778
828.2%450C