Loading...
HomeMy WebLinkAboutSW5220601_O&M Agreement/Plan_20220712Operation & Maintenance Agreement Project Name: Community Baptist Church Project Location: 2575 Hamp Stone Rd, Slier City, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & co Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: g O&M sheets will be added automaticall : Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: Dispersed flow only I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Community Baptist Church of Siler City, Inc. Title & Organization: Lois Lynch - Registered Agent Street address: 2575 Hamp Stone Road City, state, zip: Slier City, NC 27344 Phone number(s): Email: Signature: V1Date: & 0!?I21-? I, p"--h a Notary Public for the State of in County of C4, do hereby certify that ��l )-S LW n(,L�) personally appeared before me this .Le- day of m(, i zo Z-2— and acknowledge the due execution of the Operations and Maintenance Agreement Witness my hand and official seal, 2 LELA L PA TIN Notary P bllc Chatham C)unty North Car Ilna My CQMMISSlon Lxplrtt August 6, 2023 Seal My commission expires wz STORM-EZ 5/19/2022 Version 1 5 O&M Agreement Page 1 of 1 Low Density Maintenance Requirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area. After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer will not be applied to the vegetated receiving areas. The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Vegetation is too short or Maintain grassed vegetation such that the swale or vegetated Vegetation too long. area does not erode during the peak flow from the 10-year storm Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re - Vegetated receiving areas erosive gullies have sod (or plant with other appropriate species) and water until formed. established. Provide lime and a one-time fertilizer application. Clogging has occurred Clean out the outlet device. Dispose of the sediment off -site. The outlet device (if applicable) The outlet device is Repair or replace the outlet device. damaged Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. Discharges from the site The receiving water are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water.