Loading...
HomeMy WebLinkAboutSW6140902_APPROVED PLANS_20141010STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE cz� A` l YYYYMMDD VICI NO! EXIST WATER A PWC OF FAIY 955 Old Wilmngl Fayetteville, NoA 910-223-4734 Contact: Join All SITE a 1 i mm - OWNER/D=EVELOPE-R SURVEYOR 4D SITE SOLUTIONS, INC. CAVINESS LAND DEVELOPMENT, INC. 4D SITE SOLUTIONS, INC. • 409 Chicago Drive - Suite 112 o Fayetteville, North Carolina 28306 R c 1/F- 910-42 6-6777 Know what's below. 1j 14 Call before you dig. Contact: Scott Brown, PE email: sbrown@4dsitesolutions.com 639 Executive Place, Suite 400 Fayetteville,North Carolina 28305 910-481-0503 Contact: Watson Caviness email: watson@cavinessandcates.com 409 Chicago Drive - Suite 112 Fayetteville, North Carolina 28306 910-426-6777 Contact: Jimmy Holland, PLS email: jholland@4dsitesolutions.com Approved Stormwater Permit Documents Construction in accordance with these documents is requlred by the stormwater permit. North Carolina rules require that the stormwater system designer Inspect during construction; certify conformity with the plans and spars; and certify complience withthe stormwater rules. (15A NCAC 2H .1008(j)) Permit # i�G✓ C 1460L, Date /O •/D. by Sheet#Revision Date C/./L-? / 409 Chicago Drive -.suite 112 FayetWtL North Carolina 28306 Fax (W) 42 5777 \\\ License Number. C-2354 4d ,5ITL �501LUTION�5, INC AcN MccanK A�VLrgG AcP�A,�Tm,,T��,Oo A REVISIONS PROJECT NAME BLACKBRIDGE VILLAGE SUBDIVISION ZERO LOT LINE TAX ID# 0403-56-8794 BLACKBRIDGE ROAD ROCKFISH TOWNSHIP NEAR TOWN OF HOPE MILLS CUMBERLAND COUNTY NORTH CAROLINA CLIENT 639 Executive Place, Suite 400 Fayetteville, North Carolina 28305 Phone: (910) 481-0503 Fax: (910)964-9089 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 843 DRAWING SCALE SEE SHEETS DATE RELEASED SEPTEMBER16,2014 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 48 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED \SOS O S \ J 47) ` \ / y'Py EAST COAST HOMES, INC / �� BY COORDINATE COMPUTATION SOURCE OF TITLE OS F ! / DB 9161, PG 343 AREA: ( ) NOTES, 00 ! p of N: 436,831.320 PB 114, PG 132 �. DB 5753, PG 883 1. ALL DISTANCES SHOWN ARE HORIZONTAL ROUND DISTANCES 6 2 e z.00s.1z6sn, zoNlNc RID / 46) �� 880,588 SF (20.22 AC) GOV DR s / 146 CUMBERLAND COUNTY UNLESS OTHERWISE NOTED. SPKES NC GRID 01NAD 83'` N/F / ` REGISTER OF DEEDS 2. COMBINED SCALE FACTOR: 0.99988624 HpME 5 ( ) - TM OF / sTEPHAwE L. KIRer PIN N0: 0403-56-8794 LOCALIZATION POINT N: 437,286.435 E: 2,06,230.868 DB 7370, PG 593 CONTROL ESTABLISHED VIA NORTH CAROLINA GEODETIC SURVEY N68'19'18"E 's PB 114, PG 132 / EASEMENT REFERENCES: ,A 20 49' TIE >S zoN1Nc R10 \a5) / ` ZONING: R-7,5 DB 3032, PG 594 VIRTUAL REFERENCE SYSTEM. N G� o SITE / 1Re%'',,; >3• "/F a DB 3052, PG 139 3 WERE ESTABLISHED. THE HORIZONTAL USING SI GRTHE NRTHTICAL �CAROLINA GEODETIFOR THIS C B G / DANILO A. GREEN AND v O l \ / SURVEY VIRTUAL REFERENCE SYSTEM. �'� S/B" WIFE KATHRYN L. GREEN � 30' FRONT N/F ERB DB ]459, PG 828-� �� 10' SIDE (� 'P PB 459 PG 182 1 44 REFERENCED 4. LINES NOT SURVEYED ARE SHOWN AS DASHED LINES FROM t-JOHNNIE H. BUNNELLS & WIFE, ZONING R10 �) . 35' REAR DB 449, PG 283 INFORMATION REFERENCED ON THE FACE OF THIS MAP. Z �O Up y0� ELEANOR YATES BUNNELLS yA / N/F / 5. NONCONFORMING STRUCTURES HAVE NOT BEEN CREATED BY DB 3320, PG 260 THIS SURVEY. o VF l Sl DB 4024, PG 232 ^ lg3 \ ROBERT W. WANNAMAKER AND , DB 3583, PG 235 PG PB 626. THIS SURVEY WAS DONE WITHOUT BENEFIT OF A TITLE SEAR04 O o 'P , 93 / 9g• WIFE ANNA JENNINGS WANNAMAKER �� DB 3724, PG 357 G r DB 7384, PG 315 \ 3-) / DB 4024, PG 232 AND R BASED ON REFERENCED INFORMATION SHOWN HERE ON. 2 PB 114, PG 132 1 43 � ZONING RIO DB 6957, PG 140 OTHER DOCUMENTS RT . N RECORD MAY EXIST IS A COULD \ / N/F %� DB 7231, PG 136 AFFECT THIS PROPERTY. NO RESPONSIBILITY IS ASSUMED BY s/e' 2 JESSIE W. SASSER AND / THIS SURVEYOR FOR ANY CONDITIONS WHICH MAY PRESENTLY 0 PP \ ERB ERB WIFE LISA L. SASSER / �� `\ DB 7240, PG 63 o-p °N .x DB 7394, PG 176 - \ DB 7343, PG 699 EXIST BUT ARE UNKNOWN R REFERENCED HERE ON, SUCH AS 0 11 3/8- ^6 BO 3, SHED P6 O114. N PC13242) D8 7355, PG 83 BUT NOT LIMITED TO HAZARDOUS WASTE MATERIALS, EIR NC , / / N/F / DB 7355, PG 408 EASEMENTS, CEMETERIES, AND FLOOD AREAS. s�NORTH .0 1/2' \ `MLLIAM L. AMBROSE �.� h'OM Be 7370, PG 593 7. LOCATIONS OF ALL UNDERGROUND UTILITIES LYING WITHIN THIS ERB DB 8460. PG 111 / F ` DB 7384, PG 315 MAPPED AREA MAY NOT BE SHOWN ON THIS PLAN. PB 114, PG 132 60• `ST SUS SUBSURFACE N INVESTIGATIONS BUT SHOULD ALSOLALLOWEFR > 1 a1) qLL DB 7386, PG 148 CONTRACTORS 9 ZONING R10 �� R� '1� ^i e / W S� DB 7394, PG 176 VICINITY MAP z \ / N/F VI DB 7459, PG 828 CONTINGENCIES WHICH MIGHT ARISE BY REASON OF 1/2" ManvN HILL AND ,� G F ENCOUNTERING UNRECORDED LINES OR OF LINES BEING IN ED 77, P FILL101 DB 8284, PG 101 DIFFERENT LOCATIONS THAN INDICATED ON THIS SURVEY. NOT TO SCALE DB 8277, Pc 101 - 8. THIS PROPERTY DOES NOT LIE WITHIN A FLOOD ZONE = ^�% ERB 8 � PB na. Pc 13z / 1'a0 \ � � � DB 8284, PG 876 0 ) DB 8460, PG 111 03 . zoNwc R10 _ ACCORDING TO MAP 37200403J OF THE FLOOD INSURANCE N/F ^`� 30, / N/F DB 9161, PG 343 M 0 MARCIE Y. TAYLOR & HUSBAND, - 1/2" p G,q\ CURTIS RAY LESANE AND T DB 9170, PG 746 RATE, DATED JANUARY 5, 207. DONALD L. TAYLOR m ERB 6 30S Fq WIFE ELEANOR McLEITH LESANE/ �� DB 9288, PG 778 9• THE GAS LINE WAS MARKED BY OTHER AND SURVEYED BY 4D. DB 3320, PG 260 �4�> 8 pSM DB 7366. Pc 1aa / �� PB 62, PG 93 LEGEND: 9 f PB 114, PG 13z 39 EIP PB D PG 69 1as -'N ? F3 / ` THE LOCATION SHOWN ON THIS SURVEY REPRESENTS THE p0 EIP-EXISTING IRON PIPE 68'7 �+G gT\ / N/F) ��. ` PB 114. PG 132 MARKS PLACED BY OTHERS AND 4D IS NOT LIABLE IF ACTUAL >' 7 ZONING RID PB 72. PG 69 EPK tsa 7B^ 1/z" JOFIN MJRPHY AND LINE IS NOT LOCATED ACCORDINGLY. O EPK-EXISTING PK NAIL / F 70ERB \� WIFE MIIYJNG MURPHY / ERB ERB-EXISTING REBAR s�>4• 80.0 DB 2284�PG t8z6 138) 2' SHED 7.NwG Rio sRB0 SRB-SET REBAR /z \ / ALBERT D\N/cusnN AND N/F - NOW OR FORMERLY �\ L. AGU R/W -RIGHT OF WAY 7sg �64 ERB \> wIFOBH 7355 a3snN �` \ U 9,g / PB 114, PG 132 / 1\37 > \G R10 N/F RCP -REINFORCED CONCRETE PIPE / ceDRlc L. CRIER PROPERTY LINE - 1 z" ADJACENT PROPERTY LINE ERB DB 7231, PG 136 / _ �� SSMH /8004 / G 80 PB114, PC ZONING R10 2 1 36 ) \ RIM 159.83 V / -- RIGHT-OF-WAY 7y• / INV 151.68 (TOP) / ss SANITARY SEWER LINE 1/z. \ / N/F / \ INV IN50.56 (BOTTOM) �Q4 s0 STORM DRAINAGE ERB / aWFE"CA B. DLD DACELOCKEAR/ / �� Q / ^ De 9170, PG 32 1\35) / 5 W WATER LINE b 99j, PB 114, P, 13L _ PQ' J GAS UNDERGROUND GAS LINE / "/F ERB / Z �- /� ZONING RIC 5/8 Q OVERHEAD UTILITY C� "1 R2 `) SHED BERNARD FIELDS AND / _ ) J \ / N1FE DAWN FIELDS (BENT) I V' \ DB 7343. PG 699 5/8' PERMANENT EASEMENT PB 114. PG 132 34 ) ERB 4 _ 1 8' ZONING RID ' X FENCE LINE ]ss / r4 \ / (BENT) 1\32 ) ERB WIFE CATHERINE HUNNINGS / FRANKLIN D. RIVERA-MEDINA Ncs s- TREE LINE (\ ; 1�, 1/2" JOHN COHRON HUNNINGS AND h� N/F x 20e.47•SPOT ELEVATION \ / ,p ` T �8 DB 7355. PG 406 / AND WIFE UNDA RIVERA BENCHMARK i \N 3' QQ PB 114, PG 0 / DB 1140, PG 63 ® SIGN �'n':'. \# � 5/8' ZONING R70 / S PB 1NIN PG O / ZONING R10 ® BOLLARD \ ERB / / ERB MAILBOX W fO m TRANSFORMER ^ ,^ 78q I tRB \9235, 5/8' /\ / 1\ eIM", 62043 ERB SHELF 154.26 INV IN 153.59 (4-CO >$ LIGHT POLE / INV Ou�t53.53 PP UTILITY POLE 3 �'� i` 6007' S EVWIFENCW. LAI M. JR. AND [] TELEPHONE PEDESTAL N ;a \ � o• ti RB PB 114. PG 132 C GUY WIRE ,3 6 0o j� \ 5/8. DB 9288, PC 778 zoNlNc Rie CABLE PEDESTAL ..v -. / 0 D4 WATER VALVE Z y,, c, yyFIRE HYDRANT ' N 437 2861435 �0 ` U SANITARY SEWER MANHOLE 3 raj 0 TREE ASPHALT SOIL N/F DONALD TAYLOR, JR & MARCIE TAYLOR DB 3724, PG 357 PB 62, PG 93 110 r>> 29 ) N/F c� o ROBERT E. CLARK m AND WIFE, Q LONA E. CLARK o DB 3390, PG 337 5 PB 63, PG 29 ZONING RR V 173 >1 179 / 177 N/F GRAHAM W. RENF?OW JR. DB 7354, PG 594 PB 63, PG :9 ZONING F^ GRAPHIC SCALE 60 D 3° 60 120 ( IN FEET ) 1 inch = 60 ft. 171 po E ELDDie EEV4�e99 N/ 9'/e• ® NC GRID NAD 83 F 4 201 NAVD 188 / >�00' CEMETERY I of AREA N/F MARCIE YOUNG TAYLOR 1)FIRSz DB 449, PG 283 PB 62, PG 93 N: 436.831.320 E: 2,005,126.977 NC GRID NAD AD 3 64y3. 1 (2011) 9,g _ N/F / 6>, 1 CAVINESS LAND ^� EIP DEVELOPMENT, INC. DB 9446, PG 307 ' ,SON PB 62. PG 93 1 /2' ro 1Fi8 N I SHE I m y6 3/4' ^ EIP 160 a, 167 'ej rns A 7s9 ��.. \ p�� �� ro ALEJANDRO ROSADO �'�� aV1 cj1 A�kfj9 1^ DB 6957, PG 140 S� I6 rn zse 2 v � gs SRO w IN m \ N/F m rn C9- fir, WELDON W. MEL\UJ & WIFE, /-� W Q_ GERALDINE P. MELVIN \ Olom:N --. ' o, DB 3583, P 235 '>0 W � 172 1j7 .. PP PP ! 7j2 1/2. .. 1" /x SRB / / // //-S43'20'24"W 417.75' TIE EIP Approved Stomi water Permit Documen �- - - - - - - - - on-s rucf o in actor ante w fh 1l��ocuments is S43'25'49"W 1043.42' 168 167 __ �___ 166 ---- -165 165 1 1 1 /z" EIP a 162 required by the stormwater permk. North Carolina 4'X 84 (DISTURBED) rules require that the stormwater system designer %3'25'49"W.. 'ied�% Mall wring construction; certify conformity with the � Ins d EPK %; eh plans and specs; and certify compliance with the P 36.73' TIE stormwater 1 NC 2 008 - ter rules. ( 5A AC H .1 j) ) _15Rcs INV INV 164 163 , �Mq - 170 W8 = ,sa �� wE - Per-myk#, z�SL/[�/G�/�4� `l' O Z Date�Q��� -'� 169 113 ' SIN 0/ Sheet# G /. D Revision Date R•/G'l� W W PP 1, 9 \) I 1r 1 .) I N/F 1 O /n I, SEAN R. SEEVER, CERTIFY THAT THIS MAP WAS DRAWN F ;,,PI;r wolzswP CENTER CHURCH, INC. UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE ARJELIS EDIXON 1 it 1 DANIEL KEN HAFER DB 7216, PG 512 UNDER MY SUPERVISION (DEED DESCRIPTION RECORDED IN DB 3689, PC 560 1 E > 1 DB 4504, PG 743 I B 59, PG 110 P 1 BOOK SHOWN. PAGE HEREON OR OTHER REFERENCE PB 69, PG 99 I a I PB 69, PG 99 I I I, SEAN R. SEEVER, CERTIFY THAT THE CONTROL FOR THIS SOURCE ); THAT THE BOUNDARIES RR SURVEY WAS ESTABLISHED FROM AN ACTUAL GPSSURVEY NOT SURVEYED ARE INDICATED AS DRAWN FROM ZONING RR `-' ZONING UNDER MY SUPERVISION. THIS CPS SURVEY WAS INFORMATION IN BOOK PAGE OR OTHER O I, SEAN R. SEEVER, CERTIFY THAT THIS CLASS "C" PERFORMED TO C-211 FGCC SPECIFICATIONS RTK 4PS WITH REFERENCE SOURCE THAT THE TOPCA4 d0 ��i� PERFORMEDIC MAP U DER MY DIRECT SUPERVISION ANDFROM AN LTHAT IT WERE OBTAINED s FIELD CEDURES TH THROUGH GRIDRE ED. THE TTO ROUNDRDIIIATES RATIO OF ADJUSTMENT 1 100 O+PAND ISION OR THAT THIS MAPNAL MEETSCURACY IS THE REQUIREMENTS ����� •FESS%���?���i I, SEAN R. SEEVER, CERTIFY THAT THIS SURVEY IS OF AN MEETS OR EXCEEDS THE NORTH CAROLINA ADMINISTRATIVE USING THE COMBINED SCALE FACTOR SHOWN HEREON. THIS OF THE STANDARDS OF PRACTICE FOR LAND SURVEYING IN 240 ,Q� WL<'`99 EXISTING PARCEL OR PARCELS OF LAND AND DOES NOT CODE 21.56.1605 AND 21.56.1606. WITNESS MY HAND AND SURVEY WAS PERFORMED ON SEPTEMBER 26, 2015 USING NORTH CAROLNA (21 NCAC 56. 1600). WITNESS MY HAND '9 AL CREATE A NEW STREET OR CHANGE AN EXISTING STREET. SEAL THIS 16 DAY OF .SEPTLMDLR. A.D., 2014. TWO TRIMBLE 5700 RECEIVERS. AND SEAL THIS 16 DAY OF JEPTEMeER 2014. : 457 ✓IaL��Ga-'0``S' �l�'.c'�" r �' " "cam""' "` ' �7q�Qr�"r�• ,'.r-e�r/•''". • �/,LI[!w'+`.. s'1-�(/� . o �E ------ ,. FN k ---- -- SUR,.�lG`�� PROFESSIONAL LAND SURVEYOR - L-4571 PROFESSIONAL LAND SURVEYOR - L-4571 PROFESSIONAL LAND SURVEYOR - L-457 PROFESSIONAL LAND SURVEYOR - L-4571 bg lco I'+ 409 Chicago Drive - .bite 112 f=ayeHe ue. North Carolina 28306 Ph~ Ph(910) 426-6777 Fax (910) A26-5777 �\ LJcense Numben G235Q ,5oLUTION�, INc ALNpfxmtic A SuevCnNG A GPI A, CmUTlzaw N LAYOur A, bpi -Ica-14 REVISIONS PROJECT NAME BLACKBRIDGE VILLAGE SUBDIVISION ZERO LOT LINE EXISTING CONDITIONS CLIENT 639 Executive Place, Suite 400 Fayetteville, North Carolina 28305 Phone: (910) 481-0503 Fax: (910)964-9089 PROJECT INFORMATION SURVEYED BY: MATT DRAWN BY: SEAN CHECKED BY: JIMMY PROJECT NUMBER: 843 DRAWING SCALE HORIZONTAL: 1 "=60' DATE SURVEYED MAY 22, 2014 SHEET NUMBER C-1 ■ O A09 Chicago Nve - Suite 112 FareHe-Oue. North Carolina 28306 ¢Py yPP soRp4 �GN oR / / ` CONSTRUCTION SEQUENCE GRADING NOTES EROSION CONTROL NOTES Faa(910)-426-5777 47) \ a Lic�etnse I Number: C-235d \ 1 . OBTAIN ALL NECESSARY CONSTRUCTION CONFERENCE. RMITS AND APPROVALS AND HOLD PRE 1. ALL SPOT OTHERWISEELEVATIONS ARE TO THE FINISHED GRADE OF THE LOT, UNLESS 1 FAILURE EAOUTLET CH ACTIVE DAYPROTECTION ON SITE. BE CHECKED FOR SEDMENT WILL BE RE MOVED CE AND FROM THE /1 r � FF A) G \ Eo ° 9 / � `\ ❑ � 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE AND 2. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING SEDIMENT BASIN AND INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY T N: 436,851.32D / _ `a DIVERSION BERMS WHERE SPECIFIED. ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WALL BE CLEANED OR REPLACED L oI IoA I L r INCof 2 ° E: 2,005,126.977 46) a 3. CONSTRUCT TEMPORARY SEDIMENT BASIN aS SHOWN. SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. SEDIMENT WALL BE J L� T Nb 'V G G OR NC GRID NAD 83 • C/ a jPKEs 2011 \ / \T. 4. CLEAR AND GRUB THE SITE AS NEEDED. ALL EROSION NG CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON REMOVED FROM BEHIND THE SEDIMENT FENCE MIEN BE IT BECOMES ABOUT 0.5 �s ( ) z' EIP 5. ROUGH GRADE i}IE SITE AND APPLY TEMPORARY SEEDING TO AREAS REMAIN NEIGHBORING ROADS. DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO ;WITH NAIL a GRASSED. 3. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE MAINTAIN A PROPER BARRIER. 45) / `. 6. INSTALL EROSION CONTROL MATTING. CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES T� J� 7. INSTALL UTILITIES. NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL ay p SITE 5Ra / 8. INSTALL INLET/OUTLET PROTECTION ON Au_ NEW STORM WATER INLETS/OUTLETS. BEEN COMPLETED BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR am< .IRE 5/8" \ / 9. PERFORM FINE GRADING. 4. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. P Fiy� P N/F R6 - `. 10. INSTALL AND PREPARE BASE COURSE. TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING 3. TEMPORARY &PERMANENT EROSION CONTROL MEASURES SHALL BE �O P / JOHNNIE H. BUNNELLS & WIFE 144) / 11. PAVE ROADWAYS. OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN O sq ti0 ELEANOR YATES UNN BUNNELLS 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL ``�\\\\Stull//' \ / 13. UPON SITE STABILIZATION, SEEK NCDENR APPROVAL TO REMOVE ALL TEMPORARY PLAN PLANNING AND DESIGN MANUAL. �� \k RQ /� i DB 4024, PG 232 \. MEASURES. 5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF �� PB 62. PG 93 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDENR OFFICE A MINIMUMQ� ..........�/ �i� " \14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. rrESS/ ••• i •• 0 rm = < \ !/\ 143) / DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDENR EROSION CONTROL SHOWN N THESE PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE S10-433-3300 ,Q�- �G " �� j4 MANUAL TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO SEA 0 \ 5/8' %`1/2" / . \ 6. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE N A DAILY BASIS 02 = �p ERB i ERB \ / _ `\ a GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY WHEN TRACKING OCCURS. Po i1',t, 3/8" t S/C i 42) / ` PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY 6. LOCATE SOIL STOCKPILES NO LESS THAN TWENTY-FIVE (25) FEET FROM ANY �G T 15 \ M a PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE INE •••��` JCS -o� EIR -� 't ERB / / - `` y0 FS `\� 7. 3:1 SLOPESTOCKPILE AANDSSURROUNDED BTHAT WILL Y ESILTOFENCEEIGHT SHOULD BE GRADED WITH ORAOTHER MEANS. ONN SEVEN DAYS, ATROL EROSION BILIZE THE STOCKPILES FRJM ALL STOCKPILES BY PLACING SILT '''''S i 41 ) \ 0' %q ` 8. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES LOCATED ON PAVED V�C�NY MAP / R h, (pFSO ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. SURFACES MUST BE NO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER U l j .'t -1 y �T • •-'A• 16 1/2" /� l��. <c�/�F `�9 CONDITION SUCTING H ATHAT ETHEY CAN TRANSPORURSES THROUGH TTHEIS NATURAL DRAINAGE TE SHALL REMAIN NUNTIL 7. MAINTAIN A LINE ALL TEMPORARY D SHALL BE REROSION ED IF FAND OSEDI ENT CONTRORE THAN 24 L IN PLACE V NOT TO SCALE . ALL EXIS ERB y� / a0- / FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT r ' \ a SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND / ` DRAINAGE PATTERNS. REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES MARCIE Y. TAYLOR & HUSBAND, I 1 17 . 10. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO 1/2 IMMEDIATELY. DONALD L. TAYLOR - `� a I ERB THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH HAVE REVISIONS DB 3320, PG 260 .- '3 . 11. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH GRADING OR SITE LEGEND: PB 72, PG 69 - _ E - WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR UP CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST P 0EIP-EXISTING IRON PIPE EQUAL SUBSTITUTE. EROSION DUE TO RAIN, WIND AND RUNNING WATER WITHIN 14 DAYS. USE I EPK 1/2" \72. STORM PIPE DISTANCES SHOWN ARE TO THE BACK OF CURB FOR ALL CURB O EPK-EXISTING PK NAIL ERB SEEDING AND MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND ERB " . ( \ / INLETS AND TO THE CENTER OF THE BOX FOR. ALL OTHER STRUCTURES UNLESS '- / - STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE MEASURES. USE O ERB-EXISTING REBAR � -' -1 � t ,' � f` I�38) / OTHERWISE NOTED. EARLY BASE ON AREAS TO BE PAVED. 5RB0 SRB-SET REBAR \ s `. 19 `. �� 9. DONOT REMOVE APPLICATION ANY EROSION L AND SEDIMENT CONTROL DEVICES AFTER THE N/F - NOW OR FORMERLY 13 1 1/2" / / `� PROTECTED AREA HAS UNDERGONE FINAL STABIUZAT1N AND PERMANENT a ERB `. VEGETATION HAS BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDENR R/W -RIGHT OF WAY ! .". •<O(1, `\ / i 37> \ APPROVE THE ACTION PRIOR TO REMOVAL. RCP - REINFORCED CONCRETE PIPE i' 80'RO,gk a` 20 T�\ �\ 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE LI NE E / / .� - w(pU� , / ; 1/2" / INITIATION OF CONSTRUCTION ACTIVITY. T \ ERB / 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE ADJACENT PROPERTY LINE / /-/C� / / _ `\ r ��13 OVER ALL OTHER CONSTRUCTION ACTIVITIES. --RIGHT-OF-WAY) r,F >,: 12• THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND ss SANITARY SEWER LINE - \ �-v ,, s ^1s.i �� PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK ON THIS PROJECT. so STORM DRAINAGE -/ \ �� �/ `/ / ER \ J/� / I ) a� �w� 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL RUNOFF-PRODUCINGRATION FOLLOWING EVERY CHECKED FOR w WATER LINE ,12 _ / ® i a` /` O� \ / / 5/> ��2J MADIN E IMMEDSTABILITY ICASEIATES YE TO NMAINTA \ALL PR CTIESRY WEEK. Y AS DESGNEDNEEDED AIRS WILL 8E BUT sAs UNDERGROUND GAS LINE , / . ? \ 22 ERB \ ; -C f ` / `� 1/2 / (BENT) t ( (� 3 �14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS OVERHEAD UTILITY f ��.,� - / ERe ` \ ) r J / SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY PERMANENT EASEMENT / . ` / �\ ./ I\3q) ERe � X FENCE LINE /O J s/6. O-� / VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR 33 �1 < % / 23 \ (BENT y STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 „C y CALENDAR DAYS OF TREE LINE /� , I `a \ /f " 1/2 / J /`� OTHERWISE PROVIDEDCETION NTHLTEMPORARY OR PERMAOF ANY PHASE NENT GROUND COVER, DEVI ADING, BE PLANTED OR ES -Lac-Loc-LIMITS OF CONSTRUCTION I / I� `� \ 'ERB /"� OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. - s - sE -SILT FENCE LINE ( �32 ;� aj.4 EROSION 113A-57(MUSTROVISIONS BE ACCOMPLISHED PERMANENT FOR ALLGROUND COVER DISTURBED AREASFFWI THINT 140 RETAIN -JUTE NETTING / -]� . \\ 24 - \� "`•_ . - � ,./ / a �`\�; � / �� O i \ \ _5 Rg• / '/5/e: WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING -olv-olv-DIVERSION BERM 11 \ / t - _ \ E B / / ERe'�� COMPLETION OF CONSTRUCTION DEVELOPMENT. ' / ;"� \ / / 3. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES x 208.4r SPOT ELEVATION 1 35 a ' r. - • r V2 / SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE SEDIMENT BENCHMARK -, �� \a �, 25 % SRg 5/6- -� �+ /y/`��'1 / DURING THE COURSE OF CONSTRUCTION. • ,.... _ _. 7 / ® SIGN / , 1216. ED AS NECESSARY,AND PROJECT NAME -ALL SEEDED AREAS WALL BE FERTILIZED, RESEED -� 31 '�� � a � - - . a .. MULCHED ACCORDING TO THE DETAILS HEREIN. aL BOLLARD 17 E ON CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE SITE IS .� % \\` `. - ,'/ 5/8' WATSON CAVINESS. CONTACT 910-481 0503. m TRANSFORMER \\ \ X� LIGHT POLE 1 1 i / ' � �'- PP* UTILITY POLE \7 BLACKBRIDGE O l� ' I 30 _ _ _ �QM J TBM: 4D NAIL /t / C GUY WIRE III i . J N 437.286.435 1 - ` ` �'E 2,006.230.868 ❑T TELEPHONE PEDESTAL I 43 / r 1 �- Rv0, I ELEV164.89 VILLAGE © CABLE PEDESTAL 1 1 i �\ 1 r! I ,! r3 Z) NC GRID NAD 33 D4 WATER VALVE Nn2w &6 ,� SUBDIVISION S SANITARY SEWER MANHOLE N/F O INLET PROTECTION MARCIE YOUNG TAYLOR I•EIRS o / \ j _ DB 449, PG 283 ( 37 41 0 1 ( = PB 62, PG 93 N436,831ZERO LOT LINE S' : .320 77 N F j ...\ I 29 NC GRIDS NAD y83 DONMARCIE TAYLOR & 2 W ..,\ ,%�. _ ^, J - a \ 6 'r, ..". (zon f DB 3724, PG 357 O '" ^ PB 62, PG 93 tL N I W '- CAVIN N/ LAND I _ I Z EIP OVERALL DEVELOPMENT, INC. Q c� � 1 1 r l] m j I DB 9172 P11 307 r `1 m �...FFr:-_�_n �, I I I t '.. It Z? r IJQ� ���93GRADING AND EROSION CONTROL PLAN CLIENT 00 w ----- �---""-------�- ro p-`' ....... ..... ••-�_- _ -- -a--- (�1: -- _. _ ----- _.._.----�-- - ' �� - 29 ) _S 1 9 / I _ __ __ 00 -- N/F �HRIST WORSHIP CENTER CHURCH, INC. DB 7216, PG 512 a I FB 59, PG 110 CY _L0ristruction in acW cume required by the stor rules require e that l q t th 1 r 1 Insp ect during 9 0 P n con s9omGwi e w he plans and specs; and certify compliance with the W3 stormwater rules. ( ISA NCAC 2H .1008(j)) APO Permit 4/, Date •/O• \p by NC Division of Water QualAy O GQ• Sheet # 3 d Revision Date q 7 . /4 GRAPHIC SCALE 60 0 30 60 120 240 ( IN FEET) 1 inch = 60 ft. THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-63J-4949 A MINIMUM OF 48 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER LAKES, SWALES, DiTHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) 639 Executive Place, Suite 400 Fayetteville, North Carolina 28305 Phone: (910) 481-0503 Fax: (910)964-9089 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 843 DRAWING SCALE HORIZONTAL: 1 "=60' DATE RELEASED SEPTEMBER 16, 2014 SHEET NUMBER C-10 SITE Zp� 'p FiL 1'l. F FP F Sq y0,p ! & o= 10 CPOG 0NIn a o NORTH s� VICINITY MAP NOT TO SCALE LEGEND: EiP Oo EIP—EXISTING IRON PIPE FPNO EPK—EXISTING PK NAIL LRe0 ERB—EXISTING REBAR sRe0 SRB—SET REBAR N/F — NOW OR FORMERLY R/W — RIGHT OF WAY RCP — REINFORCED CONCRETE PIPE PROPERTY LINE —ADJACENT PROPERTY LINE — — RIGHT—OF—WAY ss SANITARY SEWER LINE sG STORM DRAINAGE w WATER LINE GAs UNDERGROUND GAS LINE OVERHEAD UTILITY — PERMANENT EASEMENT X FENCE LINE TREE LINE — we— Loc— LIMITS OF CONSTRUCTION — sF — s — SILT FENCE LINE — m — m — JUTE NETTING — oiv — mv— DIVERSION BERM X 208.47'SPOT ELEVATION BENCHMARK ® SIGN ® BOLLARD ® MAILBOX m TRANSFORMER 1 LIGHT POLE PP • UTILITY POLE CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE CONSTRUCTION CONFERENCE. 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE AND DIVERSION BERMS WHERE SPECIFIED. 3. CONSTRUCT TEMPORARY SEDIMENT BASIN AS SHOWN. 4. CLEAR AND GRUB THE SITE AS NEEDED. 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS REMAIN GRASSED. 6. INSTALL EROSION CONTROL MATTING. 7. INSTALL UTILITIES. B. INSTALL INLET/OUTLET PROTECTION ON ALL NEW STORM WA"rER INLETS/OUTLETS. 9. PERFORM FINE GRADING. 10. INSTALL AND PREPARE BASE COURSE. 11. PAVE ROADWAYS. 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. 13. UPON SITE STABILIZATION, SEEK NCDENR APPROVAL TO REMOVE ALL TEMPORARY MEASURES. 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDENR EROSION CONTROL MANUAL. I rn NF / \ DONALD TAYLOR, JR & > 1 MARCIE TAYLOR DB 3724, PG 357 O W ti PB 62, PG 93 O W Lu Q h c a: I a IJ I MATCH LINE — SEE SHEET C-3.' m I �TE MI I RARj INLET y PROTECTION (TYP) 1 _ m J 1 I I t >� f� 1 Q m 1 g: (7 Z o O C GUY WIRE ❑T TELEPHONE PEDESTAL E----�"-, --169'-----�'�--��-------- © CABLE PEDESTAL �' / { ',6a D4 WATER VALVE 1,� rxFIRE HYDRANT[Fr.—] l�JSANITARY SEWER MANHOLE 171a .`171 OINLET PROTECTION 3 - ---, J \ I I 166 CAVINESS LAND I / _ DEVELOPMENT, INC. y DB 9446, PG 307 } -" PR 69. Pr 93 n 1 Q '.1' Y/ �m Y � a Z ' i Of I z 10 W0 m c,+ ♦�--- '-21A ------i��' CI-20A _— a o. O� O� J G �3 A o� o—,... oX ott n N 78.00 LF O 0.71% 18" RCP N voi. 1 77 o w - CI-90.. ....._. _ 170 NARROW PINE COURT~_ 167 — 50' R/W (PUBLIC) �--- 236.51 LF 0 0.55% 15" RCP CI-79 _ --168' ---_-.-------- ( 168 1� 'I 1. -- 1 170TF� � � 1 m, ! i 170.80 1 17 0.45 I O I 73 170 1 TEM 0 AR Y CONSTRUCTION ENTRANCE RIP RAP ENERGY DISSIPATC P I L• 7.5', W: 3.75',7.5', D50: 8" ----THICKNESS: 18" CLASS B STONE — POSSIBLY RELOCATE — ----_ OWER POLE r "- \ BLACK BRIDGE ROAD (SR 1115) 1 1 60' R/W (PUBLIC) J GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HOW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7—DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE (EXCEPT FOR NTH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HOW ZONES) _. —. ....._ ...__ ........ ... .... - _ -�- 7 __ —Ti Approved Stormwater Permit Documents 4 / �F--- _ _ ` ,� '- \ .��� Construction in accordance with these documents is •�, _ ' � A 7, required by the stormwaterrules Permit North Carolina iy USE NAG S75 MATTING _ USE NAG S75 MATTING/ Insperequire during le that the stormwater system designer RELOCATE TELEPHONE �— OR EQUAL. USE STAPLE / —� 1 �.� ,:OR EQUAL. USE STAPLE �—construction;certifyconformi with the r 29 ) co AND CABLE PEDESTAL ( 1 ) PATTERN "D"' I F- r Plans and specs; and certi compliance with the JmJ / 9 ) co � I PATTERN "D" 1 ) stormwater rules. (15A NCAC 2H .1008 (i) ) r 1 Permt# S'/G/¢��dL Date/DAD•/!� 0�3 X w 1 by 2J7� % �� _ -B'wiaier�-er-Weler-@eslily ' 1' I ' C 3/ Sheet # 9l Q Revision Date / c _ 1— W 40 J Chicago Drive - Nike 112 FayeHe+SUe. North Carolina 28306 Phone (910) 426-67/7 Fan (910) 426-5777 License Number. C-2354 .50LUTION,5.INIC �u,GlNccanl4 /� suevtrnls � N3 � rON.SToyciiorl LAraui� REVISIONS PROJECT NAME BLACKBRIDGE VILLAGE SUBDIVISION ZERO LOT LINE DETAILED GRADING AND EROSION CONTROL PLAN CLIENT 639 Executive Place, Suite 400 Fayetteville, North Carolina 28305 Phone: (910) 481-0503 Fax: (910)964-9089 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 843 DRAWING SCALE HORIZONTAL: 1 "=40' DATE RELEASED 160 SEPTEMBER 16, 2014 SHEET NUMBER C-3ol Cr O� OR n, -0 NOMM 1� VICINITY MAP NOT TO SCALE LEGEND: DIP 0 EIP—EXISTING IRON PIPE EPKO EPK—EXISTING PK NAIL ERBO ERB—EXISTING REBAR SRBO SRB—SET REBAR N/F — NOW OR FORMERLY R/W — RIGHT OF WAY RCP — REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE RIGHT—OF—WAY ss SANITARY SEWER LINE so STORM DRAINAGE w WATER LINE cAs UNDERGROUND GAS LINE OVERHEAD UTILITY — PERMANENT EASEMENT X FENCE LINE TREE LINE —toc—Loc—LIMITS OF CONSTRUCTION — si, — sr — SILT FENCE LINE — m — m —JUTE NETTING — o1v — o1v — DIVERSION BERM x 208.47' SPOT ELEVATION BENCHMARK ® SIGN ® BOLLARD ® MAILBOX m TRANSFORMER LIGHT POLE PP UTILITY POLE C GUY WIRE l TELEPHONE PEDESTAL © CABLE PEDESTAL D4 WATER VALVE y�XFIRE HYDRANT , L/ SANITARY SEWER MANHOLE O INLET PROTECTION / / / N: 436,831.320 E: 2,005,126.977 NC GRID NAD 83 (2011) / \ 2" EIP WITH NAIL,, \ \ N/F \ \ / JOHNNIE H. BUNNELLS & WIFE,/ \ ELEANOR YATES BUNNELLS DB 4024, PG 232 \ \ / PB 62, PG 93 \ 5/1 \ ER N/F MARCIE Y. TAYLOR & HUSBAND, DONALD L. TAYLOR DB 3320, PG 260 — PB 72, PG 69 C i 46) \� / I�45) 16� � ERB / 43) 14ERB h / 42 —60, ST \ PR/IMF 1r�.7 j 1/2" ( Q ERB \ / \41) \ _ 16 - 166 1 12- ERB40 / y 65 / \ / � � \ 165 165 / 1�5.25 1/2" / r ERB 1 164 16415 6 9�66 1 B \ \ 11111 \ \ CI 6A -�- 1/2" (DOUBLE) ,�,... /..... i ERB .._ 163 28.00 LF ® ,.V 164 28.00 LF ®! 0.54% 18" RCP '66 5 0.71% 24" RCP //\\\\ERB CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE GROUND STABILIZATION CHART STE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HOW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7—DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) Approved Stormwater Permit Documents Construction in accordance with these documents is required by the stormwater permit. North Carolina rules require that the stormwater system designer Inspect during construction; certify conformity with the plans and specs; and certify compliance with the stormwater rules. (15A NCAC 2H .1008 (j) ) Permit # S/,t/G14,0q j Dale/jO /O - ( by W-QN**wGPAW09)uaft Sheet # G .3. 2- Revision Date'?•46 •/¢ CONSTRUCTION CONFERENCE. , 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORAR' SILT FENCE AND DIVERSION BERMS WHERE SPECIFIED. , 3. CONSTRUCT TEMPORARY SEDIMENT BASIN AS SHOWN. GRUB THE SITE AS NEEDED. SHEET KEY 4. CLEAR AND 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEED NG TO AREAS REMAIN GRASSED. • 6. 7. 8. INSTALL EROSION CONTROL MATTING. INSTALL UTILITIES. INSTALL INLET/OUTLET PROTECTION ON ALL NEW STOPM WATER INLETS/OUTLETS. • 9. 10. PERFORM FINE GRADING. INSTALL AND PREPARE BASE COURSE. ® 11. PAVE ROADWAYS. GRAPHIC SCALE 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. 13. UPON SITE STABILIZATION, SEEK NCDENR APPROVAL TO REMOVE ALL TEMPORARY 40 0 20 40 80 MEASURES. 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE Know what's below. DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDENR EROSION CONTROL MANUAL. Call before you dig. ( IN FEET ) 1 inch = 40 ft. THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 48 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 160 409 Chicago Rive -.Suite 112 Fayetteviite. North Carolina 28306 fax (90),V6-5777 Lirenee Number: C-2554 ,5oLUTIONb, INC ALNpNc 'K A �RVLt Nc A �P3 A 69A�MX7" urourA 0�-lb-/`( REVISIONS PROJECT NAME BLACKBRIDGE VILLAGE SUBDIVISION ZERO LOT LINE DETAILED GRADING AND EROSION CONTROL PLAN CLIENT 639 Executive Place, Suite 400 Fayetteville, North Carolina 28305 Phone: (910) 481-0503 Fax: (910)964-9089 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 843 DRAWING SCALE HORIZONTAL:1 "=40' DATE RELEASED SEPTEMBER 16, 2014 SHEET NUMBER C-302 P NOOA 4* i 38) / . �\ CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE ° P / °° . CONSTRUCTION CONFERENCE. °c P OR �� / / \ • \ ` \ ` 2INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE AN s \C E SjNµE DIVERSION BERMS WHERE SPECIFIED. 1 37) / .`\ ` 3. CONSTRUCT TEMPORARY SEDIMENT BASIN AS SHOWN. 4. CLEAR AND GRUB THE SITE AS NEEDED. 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS I N TG�i o SITE % „ 2 �� I GRASSED. v Om G N \ / / 6. INSTALL EROSION CONTROL MATTING. ya p F� ERB \ / \ / 7. INSTALL UTILITIES. F�^Q F'P _ / 8. INSTALL INLET/OUTLET PROTECTION ON ALL NEW STORM WATER INLETS y V 1, 36) 9. PERFORM FINE GRADING. 2 Qp O'A 10. INSTALL AND PREPARE BASE COURSE. 11. PAVE ROADWAYS. 1/2- 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. O C> 2 ERB - t� �..,s, P 13. UPON SITE STABILIZATION, SEEK NCDENR APPROVAL TO REMOVE ALL 1 MEASURES. 35) v / 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED \ 4- DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDENR EROSION �P ON / s/\ 47 MANUAL. NURITH=Cv 12627.70 (BENT) /2 ERB / OJ ,\ \ �� \ 1 34) ERB e I 0 \ VICINITY MAP �� 23 ' % \ - (BENT) c ! 9 / \3$) \ \ NOT TO SCALE ; 1/2- ERB" / o / LEGEND: se EIP O EIP-EXISTING IRON PIPE K 168.05 EP. ` O 5/8" EPK-EXISTING PK NAIL , + / \ i ERB / ©p / \ ERGO 5/8' ERB-EXISTING REBAR O ERB SIRE-SETSRB-SET REBAR 47 <O \\, , z' N/F - NOW OR FORMERLY RCp SO t'YOq `. , _ 25 SRB / / \ e�z 1 R/W - RIGHT OF WAY .� / C s/= p / -.y < R W O 6> / 1 7. O / sB \ f _ _ ERc / -_n 1\33) \ =a aV RCP -REINFORCED CONCRETE PIPE�- rp� �� PROPERTY LINE •�.. ' �� - /��F - \ J / ADJACENT PROPERTY LINE ----RIGHT-OF-WAY \ 5/8 /ss SANITARY SEWER LINE •CI\ �� rs7 / \ SF ..___ o '�, ERB so STORM DRAINAGE ` w WATER LINE 35.36 LF O r� . TEM.4D NA1L 5 1t ,�1 N 26 43 ces UNDERGROUND GAS LINE 0.42% 42" RCP CI-15A 8 437.8 OVERHEAD UTILITY i 0 <^8/ - ,� Q.� E 2,006,230.86ELEV 164.83 Po NC GRID NAD 8 3D S4 (F S? 3 / - PERMANENT EASEMENT CI-12 X 4a• ® os� o \ Q /' (2011) X FENCE LINE TREE LINE R� 28.00 15 RCP CI-131.0 -toc-Loc- LIMITS OF CONSTRUCTION \ 35.36 LF O / - sv - sv -SILT FENCE LINE - 0.42% 42 RCP - dN - m -JUTE NETTING -orv-olv-DIVERSION BERM p '. ,xyS X 20a47'SPOT ELEVATION / / ` I SRe O BENCHMARK / / TEMPORARY INLET Q \ - ® SIGN ' / PROTECTION (TYP)_J9� N/F 168.2 r2 l r MARCIE YOUNG TAYLOR HEIRS LINE ® BOLLARD NAG 5715 MATTINGALE NTH USING DP8462, PG g83 ® MAILBOX 48 • IF n OR EQUAL USE STAPLE ' mTRANSFORMER 1 1G8.1 t i \ - PATTERN "D' Y,Y LIGHT POLEQ - PP • UTILITY POLE •.... I C GUY WIRE 1 1 29 ❑T TELEPHONE PEDESTAL CI - 16 Tsq KI CABLE PEDESTAL - 1 -- 26 D4 WATER VALVE FIRE HYDRANT 167 ti� SANITARY SEWER MANHOL - U 166.5 OINLET PROTECTION -"'... z� - U� 1 0 Go " I / x . oo yT,. EASEMENT / ' // F 1 W a I . ,c. l �{ i W 3 w 169.10 169.40 I }\ I N 47 I LU 46 Lu I Uw 1'G GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HOW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1. 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HOW ZONES) 3/4" EIP N: 436.831.320 E: 2,005,126.977 NC GRID NAD 83 (2011) 1" EIP w _ Z -„-, -- . ,-, I � I NAG S75 MATTINGTAPL � RIP RAP ENERGY DISSIPATOR � . - J OR EQUAL USES E ♦6°'\- ....- i THICKNW IC1.22 D50.10 5c>a 15q 161 ,r _- - PATTERN D" S _ S 5" e CLASS 1 STONE Q / ` v2 FES 17� GABION BAFFLE cz �: ELEV., 162.00' NARROW PINE COURT,,, .....:..... - .. 50' R/W (PUBLIC) � .,. `-�., 271 55 LF O 3.20% 24 ES-1 RCP •SIDESLOPES OF BASIN ARE 1 30&50 LF O 0.45% 24" RCP �-- - - 3:1 FROM THE TOP OF BASIN l P1 DIV..,- AREnTO HE INVERT BE EED D WITHIN 7 DAYS -. - -. .:.: ....... CI-22 D f DN - I d Stw ter Permit Documents • \ \ ON / N/OF Approve r in accordance with these documents is RIP RAP ENERGY DISSIPATOR ALEJANDR ROSADO Construction j01 PERMANENT INFILTRATION BASIN I required by the stormwater permit North Carolina " _�0-OOl L:12', W: 6',14', D50: 8" ,,HIGH WATER: 158 4 DB 6957, PG 140 rules require that the stormwater system designer O OOl THICKNESS: 18" 2' (10 YR) Inspect during construction: certify conformity with the - CLASS 8 STONE TOP OF BASIN: 162.00' plans and specs, and certify compliance with the tee INVERT OF BASIN: 151.00' I stormwater rules. (15A NCAC 2H .1008 (D) J J ` p 02 INFILTRATION RATE: 1.291N/HR Permit Date 10 b o s I by 7n �,P,P...c..0 639 Executive Place, Suite 400 17 .9 171 1 INFILTRATION BASIN IS TO BE USED AS A 0 LIMITS OF CONSTRUCTION \ ', TEMPORARY SKIMMER SEDIMENT BASIN THROUGH Sheet # A 3.�Revision Dateq.1G •/1f• Fayetteville, North Carolina 28305 50 49 / 21.1 ACRES 00�> CONSTRUCTION THEN CONVERTED TO AN I Phone: (910) 481-0503 / ! INFILTRATION BASIN UPON STABILIZATION \ 'GABIONS SHALL BE STACKED OF THE SITE. Fax: (910) 964-9089 WITH A MINIMUM 3 WIDE BASKETS WITH A7.5'BASE. THEN EVERY 3' ONLY EXCAVATE TO A DEPTH OF 159 OF RISE IN HEIGHT SHALL BE FOR SEDIMENT BASIN, THEN AFTER SITE IS / OFFSET IN 0.75' UP TO 1", STABILIZED CONVERT TO PERMANENT C3.2 INFIL N BASIN Y COMPLETING TION AND iRODD�NG BASING IMPORTED SOD SHALLANOT PROJECT INFORMATION 4o9 Chicago Drive - .Suite 112 Fayette+tUe. North Carolina 28306 Fphon9 910 \\\\ License Number C-2354 bOL_UTIiONb, INC �Ul',1NCL➢JIYi �JI12ViYIlYi T �3 � CON.Ji2LLTW1 LAYOIfr vS-16-/y REVISIONS PROJECT NAME BLACKBRIDGE VILLAGE SUBDIVISION ZERO LOT LINE DETAILED GRADING AND EROSION CONTROL PLAN CLIENT USE NAG S75 MATTING OR EQUAL USE STAPLE, ' I �` ' BE GROWN IN CLAY SOILS. „ PATTERN "C" 0A @ter .., „2" 77 J�' _ EIP �- _ - ---------------------------------------- - -----------�.----- SHEET KEY 7 --- -:::-POSSIBLY RELOCATE- ... ... ............ 1 1/2 EIP ,._ -" I ` ........ (DISTURBED) .......... POWER POLE r001 001 00-1 001 �001 OOl I 0 EPK , O- .. _.�.'fi.JD1_..•"�Ol ..... ...... ..i • - �00?�-""-001 �J' --ie� - -�, _� - --�--- ---- __ .. - �,-a---�=` _....--------------------- GRAPHIC SCALE 1 ,,• 1 Know what's below. 40 D 20 40 80 Call before you dig. IN /F 1 ( IN FEET ) ' CHRIST WORSHIP CENTER CHURCH, INC. 1 inch = 40 ft. I DB 7216, PB 59, PG 512 PG 110 1 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 48 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 160 DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 843 DRAWING SCALE HORIZONTAL: 1 "=40' DATE RELEASED SEPTEMBER 16, 2014 SHEET NUMBER C-33 170 165 160 155 150 INFILTRATION BASIN SANITARY SEWER -0+50 TO 3+00 OF BASIN WIDTH HIGH WATER (1001'R) 160.02' HIGH WATER (10YR) 158.42' HIGH WATER (1YR) 152.38' 170 165 160 155 150 0+00 1 +00 2+00 3+00 Approved Stormweter Permit Documents Construction in accordance with these documents is required by the stormwater permit. North Carolina rules require that the stormwater system designer Inspect during construction; certify conformity with the plans and specs; and certify compliance with the stormwater rules. (15A NCAC 2H .1008 (j) ) Permit # S��i 0 q42-- Date aia- _ by ]2n r. " .. . Sheet # S.5 Revision Date q •!G • fit/' GRAPHIC SCALE 20 0 10 20 40 80 ( IN FEET ) 1 inch = 20 ft. 409 Chicago Pave - Suite 112 FayeRedlle. North Carolina 28306 Phonee(914667 \\�� L� Number. C-2354 6OLiUTION6, INC A,Ltko ce'i� A,wevtn IG A<P� A, COW.Twx-" I Your D2 , �'hGINEOOTT �S-l6-1y REVISIONS PROJECT NAME BLACKBRIDGE VILLAGE SUBDIVISION ZERO LOT LINE INFILTRATION BASIN CLIENT 639 Executive Place, Suite 400 Fayetteville, North Carolina 28305 Phone: (910) 481-0503 Fax: (910)964-9089 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 843 DRAWING SCALE HORIZONTAL: 1"=20' VERTICAL:1"=2' DATE RELEASED SEPTEMBER 16, 2014 SHEET NUMBER C-5z5 CURB AND GUTTER TO BE POURED IN 10' SECTIONS WITH EXPANSION JOINTS EVERY 50' (90' IF MACHINE PLACED) 11 3 B" (END OF CURVE) 2 Q7 ryQ- 3000a PSI QM 7 CONCRETE<. _r n 11 7/8" (LOW POINT IN CURVE) )E 24" 1 24" STANDARD ROLL CURB FLARED DID SECTION DIMENSIONS PPE DA D WALL OD L A B C E i G K J K M 15' 15, 1/4 19 1/2- ]4 3/4- 7'27 1/4- 47 1/2- '47 W- 17 5/8- 18 3/4- TT 16 1/2- 2' 2' 18' 18' 1 23- 74 3/4- 9' 3/4' W*W Ile M 1/4' 19 1 2' 2' 24' 24' 3' 30' 80' 9' 4r' 3T 4' 47 3 Z7 1 • 27 1 e' 25 J 4' 2e Ile 2 13 15 2 3 4' W. 1. 4' 44- 9] 1/2- IS- W- 3] 1/2- 71- 40 7/8' 40- 39 3/4- 39- 3 3/4- 3 3/4- b' 48' 5' ST' 99 1/4- 25 1/2- M 1/4- 29' W 1/2- W 3/4- 52 3/4' W 1/r 51 3/4- 4 1/4- 4 1/4' TOP VIEW NTS NOTES 1. ALL CONCRETE TO BE 4000 PSI. 2. REINFORCEMENT STEEL MEETS ASTM 615 GRADE 60 . 3. ALL EXPOSED EDGES CHAMFERED 3/4' E 4. PIPE TO BE GROUTED INTO FLARED END SECTION JOB SITE BY CONTRACTOR. S. PRECAST FES STRUCTURES SHOULD BE POSITIONED AROUND AN EXISTING PIPE OR PIPE INSERTED INTO FES. FLARED END SECTIONS SHOULD BE PLACED ON A PREPARED FOUNDATION AS SPECIFTED BY THE ENGINEER. - 6. COMPACTION OF BACKFILL MATERIALS SHALL BE AS REQUIRED BY THE ENGINEER. NTS TEMPORARY SEEDINGIMULCHING SPECIFICATIONS (FOR LATE WINTER AND EARLY SPRING SEEDING MIXTURE SPECIES RATE (LBJACRE RYE (GRAIN) 120 ANNUAL KOBE LESPEDEZA 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT EXTEND BEYOND JUNE. SEEDING DATES: JANUARY 1 - MAY 1 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LBJACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR SUMMER) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) GERMAN MILLET 40 A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB./ACRE. SEEDING DATES: MAY 1 -AUGUST 15 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB MORE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR FALLt SEEDING MIXTURE: SPECIES RATE (LBJACRE RYE (GRAIN) 120 SEEDING DATES: AUGUST I5-DECEMBER 30 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LBJACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB./ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE LESPEDEZA IN LATE OR EARLY MARCH. 8 TEMPORARY SEEDING SPECIFICATIONS FINISH GRADE SF9.5A \-COMPACTED SUBGRADE CARRY BASE COURSE 6" BEYOND SURFACE COURSE AT LOCATIONS WITHOUT CURB AND GUTTER 2 PAVEMENT SECTION 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITY ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY. AND ONE WEEK PRIOR TO FINAL INSPECTION. 3. IF POSSIBLE ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE 4, A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF -SITE BORROW OR WASTE AREAS, STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO NCDENR REGIONAL OFFICE FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL_ NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. 6, THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENR OR THE ENGINEER. 6" COMPACTED ABC NTS 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 6. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND STABILIZED. 9. DURING DEWATERING OPERATIONS. WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. 10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF -PRODUCING EVENT ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE ENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED. 12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED AREA. 13- WHEN CROSSING CREEK OR DRAINAGE -WAY, THE CONTRACTOR SHALL RIP -RAP WITH FABRIC DISTURBED BANKS AND CHANNEL AND RESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN 21 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZED IMMEDIATELY. 5 GENERAL EROSION AND SEDIMENT CONTROL NOTES SEEDING SPECIFICATIONS SEEDING MIXTURES SPECIES RATE(LBSJACRE TALL FESCUE SO PENSACOLA BAHIAGRASS 50 SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 SEEDING NOTES: 1. FROM SEPT. 1 TO MAR. 1 USE UNSCARIFIED SERICEA SEED, 2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB /ACRE. 3. WHERE A NEAT APPEARANCE IS DESIRED. OMIT SERICEA AND INCREASE KOBE TO 40 LB /ACRE NURSE PLANTS: BETWEEN APRIL 15 AND AUG. 15, ADD 10 LE./.ACRE OF GERMAN MILLET OR 15 LB /ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 25 LBJACRE RYE (GRAIN). SEEDING DATES: BEST POSSIBLE EARLY SPRING: FEB. 15-MAR. 20 FEB. 15-APR. 30 FALL SEPT, 1-SEPT. 30 SEPT 1-OCT, 31 SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 - 5,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000-BiACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO THE SOIL TESTS OR TOP DRESS WITH 500 LBJACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. SEEDING SPECIFICATIONS SEEDING MIXTURE: SPECIES RATE (LB./ACRE) COMMON BERMUDAGRASS 40-80(1-2 LB/1 000 ET2) SEEDING DATES: COASTAL PLAIN: APR. -JULY SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 500 LB /ACRE 10-10-10 FERTILIZER. MULCH: USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000 LB./ACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE: A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHME14T. INSPECTION AND REPAIR MULCH FREQUENTLY. REFERTILIZE THE FOLLOWING APR. WITH 50 LB/ACRE NITROGEN. 9 PERMANENT SEEDING SPECIFICATIONS GRAVEL ENTRANCE SHALL BE 50 FEET IN LENGTH AND 12 FEET IN WIDTH WITH 2DFOOT RADIUSAT EXISTING G ROADWAY 36 0 MIN 4 0 10'�0' I BL -� FILTER.-2FIC-1 11 WASHED STONE GRAVEL CONSTRUCTION ENTRANCE See Plans, ��°. I_E.�T ! . 2' 6" CABC r w z J 14' 11' 12' NOTES 1. SECTION SHOWN TO DEPICT TYPICAL CUT & FILL CONDITIONS ONLY. GRADING PLAN SHOWS WHETHER SECTION IS IN CUT, FILL OR BOTH 2. A 4' SIDEWALK IS REQUIRED ON SOME STREETS. SEE PLANS FOR LOCATION OF SIDEWALK. 3. WHERE SIDEWALK IS REQUIRED, THERE SHALL BE A 2.5' STRIP BETWEEN BACK OF CURB AND SIDEWALK, SIDEWALK SHALL HAVE A MAXIMUM CROSS -SLOPE OF 2% FROM BACK EDGE OF SIDEWALK TO BACK OF CURB. ROADWAY TYPICAL SECTION DESIGN CRITERIA AGGREGATE SIZE - USE 2-3 INCH WASHED STONE DIMENSION OF GRAVEL PAID THICKNESS -6INCHES MINIMUM WIDTH- 12 FT. MINIMUM. OR FULL WIDTH ATA GE AN POINTS HI THE ERV-HICULARGREATER ENTRANCE AND EXIT CESS ARE.. WHICHEVER IS GREATER LENGTH - W FT. MINIMUM. LOCATION - LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. CONTRACTOR SHALL INSTALLADDITIONAL GRAVEL CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS REOUIRED FOR STAGING ANOgR BORROW AREAS AND MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER. CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL CONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINAL ACCEPTANCE. MAINTENANCE MAINTAIN THE GRAVEL PAD INBA CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY SQ' /7TAD. REQUIRE PERIODIC TOPORESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL 11 OBJECTIONABLE MATERIALS SPILLED. WASHED OR TRACKED ONTO PUBLIC ROADWAYS. AGGREGATE 6" MIN. THICKNESS 2-3" COURSE NTS 6 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PIPE OUTLE WELL-DEFINED PIPE OUTLET TO FIAT AREA - NO WELL-DEDNED CHANNEL A PLAN GRAVEL OR FABRIC SECTION A -A PLAN GRAVEL OR FABRIC NOTES 1. LA IS THE LENGTH OF THE RIPRAP APRON. 2. D - 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6'. 3. IN A WELL-DEFINED CHANNEL DMD THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6' ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER FABRIC OR BLANKET SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. i e { S x y.y r D FILTER DYER GRAVEL OR FABRIC SECTION A -A MAINTENANCE INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT 9 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MACE Ad. NEEDED REPAIRS TO PREVDD FURTHER DAMAGE. 10 TYPICAL RIP RAP APRON NTS NTS NATURAL GROUND MAX. SLOPE (TYP) 1+ I N. 2.5 NATURAL GROUND �1 i 3 / COMPACTED SOIL ��� BE RBNICLL TO 12 INCHES AND THE TOP WIDTH TO 6', OTHER REQUIREMEm SWILL REMAIN THE SHE. TEMPORARY DIVERSION KEY NOTES: 1. CLEAR THE ARE UNDER THE BERM AND STRIP THE ROOTS/OTHER ORGANICS. 2. COMPACT THE SIDE SLOPES, PREFERABLY WITH A TRACKED VEHICLE TO SLOW RUNOFF VELOCITIES. 3. VEGITATE THE RIDGE OF THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS THE BERM WALL REMAIN IN PLACE FOR LESS THAN 30 DAYS. MAINTENANCE: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. 7 TEMPORARY DIVERSION BERM Approved Storrnweter permit Documents Construction in accordance with those documents is required by the stormweter permit. North Caroline rules require that the stormweter system designer Inspect during construction: certify conformity with the plans and specs; and Certity compliance with the stormwater rules. 05A NCAC 2H .1008(j)) PermN # Sul G / 4 0 9 o Z Date /O • !O • /tl by 4. n Sheet #__C_4_&_Revision Date ' !4, NTS 409 Chicago Drive - Suite 112 FayeReAt.le. North CaroUna 28506 Phone (91o) 426-6777 Fax (910) 426-5777 I-icense Number. C-2354 60LUTION'5, INC �cNAlNccmNt SUQVGnN(, AP5 c TPUc"LAyouT REVISIONS PROJECT NAME BLACKBRIDGE VILLAGE SUBDIVISION ZERO LOT LINE DETAILS CLIENT 639 Executive Place, Suite 400 Fayetteville, North Carolina 28305 Phone: (910) 481-0503 Fax: (910)964-9089 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 843 DRAWING SCALE NOT TO SCALE DATE RELEASED SEPTEMBER 16, 2014 SHEET NUMBER C-61.0 DRIVE STEEL POSTS 18' INTO THE GROUND MAXIMUM B' O C. AND EXCAVATE A 4' X B' ATTACH WIRE FENCE TO PASTS AND EXTEND ATTACH WIN OFTHEFENCE POSTSAN THE THE MOTES. TRENCH UPHILL ALONG THE LINE OF PO6T6. EXCAVATED TRENCH AND TURNED OUT 4' IN THE TRENCH. 1. WIRE SHALL BEA MINIMUMOF 32 INCHES IN WIDTH AND STANDARD METAL POSTS 2'-0" IN GROUND TOP B BOTTOM STRAND SHALL HAVE A MINIMUM OF 6 WIRES WITH IT STAY SPACING. NOlE3: MIN. TOGA LIRE 2 FILTER FABRIC SHALL BE A MINIMUM OF 36- IN WIDTH AND 1. GRADE THE BASIN SUCH THAT THE BOTTOM IS LEVEL A 1 TS UIWE IWeWIAE UAIH (� STEEL POSTS STAY WIRES MIN. 12IQ GA SHALL BE FASTENED ADEQUATELY TO THE WRE WITH 0 WIRE STAPLES I-17 LONG. FABRIC THAT DETERIORATES TO SUCH DRIVE POSTS 24-INTO THE GROUND ATTACH VANE FENCE TO POSTS AND EXTEND 2. INSTALL THE BAFFLES AS SHOWN ON THE GRADING PLAN. YFSX GPB♦INGS) LINE HARES EXTENT THAT ITS EFFECTIVENESS IS REDUCED SHALL BE REPLACED BY CONTRACTOR AT CONTMCTCR'S EXPENSE. MAXIMUM 4' 0 C. AND EXCAVATE A 4' X 8- TRENCH UPHILL ALONG THE LINE OF THE BOTTOM OF THE FENCE F INTO THE EXCAVATED TRENCH AND TURNED OUT 4'IN BAFFLES SHALL EXTEND THE FULL MOTH OF THE BASIN. MIN. 12-14 GA. - 3. STEEL POSTS SHALL BE A MIN. OF 5' HEIGHT AND SHALL BE POSTS. THE TRENCH. SUPPORT LIRE OR 3. DO NOT SPLICE THE FABRIC. USE A CONTINUOUS PIECE ACCROSS THE BASIN OR TRAP. .......-.f a `n 4'^ THE SELF FASTENER ANGLE STEEL TYPE. 4. CONTRACTOR SHALL REVIEW SILT FENCE ONCE PER KEEN STEEL PORTS ROPE 4. POSTS FOR THE BAFFLES BAD, BE 4' DID FIiRd BFRN Slm POST ^ Qp LME GRIDS A$IWLON DEPRESSION " ,. " RIND AFTER OCCURRENCE .FEC ANYNECESSARY MAINTENANCE Co IPPRDI(`J•jt THE N[L APPROACHING REPAIRS OR CLEAN-UP TO MAINTAIN THE EFFECTIVENESS OF CLEAN-ACH UP TO q 4 THE DEVICE SHALL DE MADE IMMEDIATELY. 1. INSPECT THE BAFFLES EACH ACTIVE DAY DNSITE IN STEEL ME POSTS PFEETOST NV 11E GROUND -..._.......-�........_ 2 OU OIG THE - vk ...._.._. SINMXINDNG TE MET SPACES Pb515 EVENLY AR0IRD F "{ .r '� .-.a,, ` A, S. REMOVE DEPOSITED SEDIMENT ALONG THE FENCE TO PROVIDE NO CASE IfSS THAN ONCE PER KEEN AND AFTER EACH CH RAINFALL EVENT. MAKE ANY REPAIRS IMMEDIATELY. THE PIER&I OF THE tlKET A MA1BLIIlY OF 4 FEET --'' zrti '�syj?y ADEQUATE STORAGE VOLUME AND TO REDUCE PRESSURE ON THE FENCE BOTTOM ANCHORED WnH SIMPLES APART ._,.,., ,,, * STEP STEP 2 AS NEEDED. 2. REMOVE SEDIMENT DEPOSITS AMEN ME MEASURE REACHES HALF FULL. TAKE CARE TD AVOID DAMAGING THE !'a4Xt_ I fd e ��1A1 3. SURROUND THE POSTS WITH MIE MESH RWOK#M 5. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENR BAFFLES MEN T£ SEDIMENT IS REMOVED. '4 �qy CLOTH. SECURE THE WME MESA TO THE SIEFL POSTS AT ' "`' X h THE TOP, IbD1E ND BOTTOM. PIACMG A 2 fDDT FLAP ATTACH THE FILTER FABRIC TO THE RARE FENCE, EXTEND THE BOTTOM OF ME FABRIC W INTO THE BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF THE SILT REPRESENTATIVE. THE ACTION WILL BE APPROVED MEN THE '' 3. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE S i . 7aY v'X _ ---' a 11E WIRE RESIT UNDER 11E GPANIl FOR ANCHORING `�">�Szv ,y '✓'_'Lisf IX'�vyg��..4%�; 6 RECOMMENDED TRENCH AND TURNED OUT C IN THE TRENCH. FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. CONTRIBUTING DRAINAGE AREA IS STgBIE. _ 2S- �'"+` `:" CONTRACTORREPRESENTATIVE THE AIS CTION M.I. BY AN NCDENR REPRESENTATNE. THE ACTION Wu BE APPROVED MIEN THE CONTRIBUTING DRAINAGE AREA IS 4. PLACE DEAN GRAVEL (ML'Dr (f5 OR 157 STONE) ON STEP 1 STEP 2 STABLE, INLET ZONE ffi Ls SURFACE AEA A 2:1 SLOPE WITH A HBDn OF 18 NC16 AROUND 71E r WiE AND SIIOTHf RI IN EVEN CARATS SLOPE GRAVEL FILTER /5MUM AHED TOAIEIINr OF IS- TOP RACEDOF POSTS MAX 8' 0 C. HARE FENCE HARE' ATTACHED By ITE NETTING ROTTHE FABRIC APPROVED BXTEND OOF STATHE 4. PLACEMENTLEON-3BAFFLES: INLET ZONE 35% OF LENGTH FROM ENTRYPOINT2:1 FIRST INLET FW6 CHAMBER FIRMLYBACKFIL THE TANCHOR THE BOTOMOFTHE SILT SILT FIRMLY TOANCHORFABRIC BOVE YNMN OR%iE TOP CF IK)X 5 DUCE THE CONR✓�DWD ORANGE AREA WS BEEN STAMM REMO'T: A.CAMULATED SEDIMENT AND - wr ,= y A �� - r� "+ m FILTER FABRIC THE BOTTOMFARE AND POSTS EXTEND THE BOTTOM OFT 4' IN TH IC 8- INTO TRENCH FENCE. BURIED FABRICS HALL BE BE VISIBLE HAULNT BE VI THAN OP ME FABRIC SHALL BE B' HIGHER SECOCELLLL-25% OF SECOND CELL -15%OF LENGTH FROM FIRST CELL FIRST CELL OUTLET ZONE-15%CE LENGTH FROM SECOND CELL OF 25x OF SURFACE AREA ESTABLISH FINAL CRIDING ELEVATIONS I,. } ...t 3 t `4EE , ': j,, � �' � '? '. v„ x � � � Q PJ RARE STAPLES t-1/2'LONG BOTTOM OF MBE FENCE N0 2 � TRENCH OR EROSION CONTROL OL MAT ING STAPLE OR USE B'ER031W CWTROL MATTING STAPLES. THE THAN THE KfIR POSTS MA%4'OC. SEfdD dI16FlM .� OF SIIFA. AREA & COMPACT THE AREA PROPERLY AND STABILIZE IT WITH `"' I :. .-t„�" L { I O FILTER FABRIC BURIED B'IN QIIIEr GiATIKDC .+�. �� E%CAVATEO TRENCH &TURNED WT 4' IN THE TRENCH A TOP STAY WRE OR ROPE ZD� 1S OF, SURFACE AREA �yQW % JUTE NETTING OR EWNRENT BOTTOM OF FABRIC BURIED 3' 1 f IN EXCAVATED TRENCH STEEL POST DRIVEN TURNED OUT I IN THE 'x PERSPECTIVE VIEW N' INTO GROUND {9 TRENCH, OR PINNED WTHF q t EROSION CONTROL MATTING STEP 3 MAINTENANCE STEP 4 SECTION A STAPLES. -iLW HMIrBUNCE �P :._.. - I.INSPECTSEDIMENT FENCES AT LEAST ONCE A K£EK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. INSPECT INLETS AT IF.WI WEBILY AND AFTER EACH SIGNIFICANT (IQ INCH WGREATER) RAINFALL EVENT. CLEAR THE MFSH IME OF ANY DEBPoS OR OTHER OBJECTS TO PROVIDE 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. A _ STEEL POST DRIVEN 24' IWO GROUND ADEQUATE R_M FOR SUBREWEM MW, TAE CARE NOT TO DAM(# OR UNDERCUT 3, REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE STEP 3 STEP4 SECTION THE WRE MFSM DJRNG lIF SEOIIEM REMOVA.REPLACE STCK/5 NEEDED. NTS PRESSURE ON THE FENCE. TAKE CARE TOAVOID 4. REMOVE ALL FENCING MATERALSAND UNDERMINING THE FENCE DURING CLEANW T. UNSTABLE SEDIMENT DEPOSITS AND MINGTHE AREA TO GRACE AND STABILIZE AFTER NTS A -A NITS THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED AND NCDENR APPROVES REMOVAL. 1 HARDWARE CLOTH & GRAVEL INLET PROTECTION 2 SILT FENCE 3 POROUS BAFFLES d.w 11.22MI GABION SPECIFICATIONS 4 w It 22MI TRAP INSTALLATION 8W[244MI • �I 2ar CO SIR LI ew'12a M1 i -I 2 w 10 SIR MATERIAL GABIONS SHALL BE MADE OF WELDED STEEL WIRE MESH OF NOMINAL SIZE OF 3' X T THE WELDED STEEL AI RE SHALL BE PVC COATED IN ALL APPLICATIONS PERTAINING TO THE GADION. DIMENSIONS 12" 4w (1 MR 4W TI MR GABIONS SHALL BE BUILT IN VARIOUS LENGTHS AND HEIGHTS. THE • • LENGTH SHALL BE IN MULTIPLES OF THE WIDTH. THE WIDTH SHALL NOT BE LESS THAN 3'. DIMENSIONS 07 STAPLES PER SQ. YO, 0.7 STAPLES PER SO. YD. FOR HEIGHTS, WIDTHS AND LENGTHS ARE SUBJECT THE APPLICATION 6• (08 STAPLES PER SQ. M) IS 0 STAPLES PER $0. M) AND PURPOSE. IF THE LENGTH I$ INCREASED BY A MULTIPLE OF THE \/� (. WIDTH THE BASKET SHALL HAVE A WARE WALL DIAPHRAGM SEAM INTO ITS INTERIOR TO MAINTAIN THE SHAPE OF THE BASKET. eL ti %s• -'\ .... �i a2,$-Y`L„�% 3 ® O 2wI061 MI 3w 1091MI • 1�10�� 200'106IMI 300'10.91MI • • 400, 1w101 FABRICATION GABIONS SHALL BE FABRICATED IN SUCH AWAY THAT THE BASE SIDES, -x� , .:.:- 4w.It�Y1MI • 112� • • LIDS ENDS AND DIAPHRAGMS CAN BE ASSEMBLED AT THE 1_ 2ar(061N • J_ y T 2.w`1061M) CON STRUCTIONSITE INTO A RECTANGULAR UNIT OF THE SPECIFIED " ' "^n 2 w (o 61MI xw' 1061MI • SIZE. THE LID SHALL BE A SEPARATE UNIT OF THE SAME MESH AND • • • • WIRE SPECIFICATIONS AS THE BODY. THE WELD SHEAR STRENGTH " "\ 4w B MR • • • 4.W B MR SHALL COMPLY WITH ASTM A-185-90A. WHERE THE LENGTH OF THE 3B ^ 4w pmm • 4w hz2Ml • GABIONSIION SHALL BE A TONEXCEEDS ^ ^ ^ • • • TO CELLSOF EQUAL NGTH THE WIREDIVIDED MESH SHALL • • • BE MADE OF GALVANIZED STEEL WIRE HAVING A MINIMUM DIAMETER • • OF 3 MM. ALL WARE USED IN THE FABRICATION OF THE GA13ION AND IN ' 1.3 STAPLES PER SQ. YO. - 1.7 STAPLES PER SO. YD, IT 5 STAPLES PER$0. M) (2.0 STAPLES PER SQ. M) 1.3 STAPLES PER SO. YD. 17 STAPLES PER w. YD. 15 STAPLES PER SO M ( 1 (2 0 STAPLES PER SQ. M7 THE WIRING OPERATIONS SHALL CONFORM TO US FEDERAL SPECIFICATION OO-W-46IH AND POSSESS A SOFT TENSILE STRENGTH WITH A CLASS 3 FINISH 5 ZINC COATING IN ACCORDANCE WITH ASTM I 3" Ab41. PREFORMED STEEL WIRE SPIRAL BINDERS WITH A 3' PITCH ARE USED TO ASSEMBLE AND INTERCONNECT EMPTY GABIONS AND SHALL ® ® ® MEET THE SAME SPECIFICATION AS THE WIFE USED IN THE MESH. L L 1mto 46MI I.50'(OI6M1 AFTER ASSEMBLY, THE INDIVIDUAL CARTON UNITS ARE .. 5 O 3w (o at Ml • 3ar 11191 Ml • • 3w fo.9l Ml • • • 1W'Ia46M1 3w 1091M1 • • • • 1W'(O.a6M1 INTERCONNECTED USING THE SAME WIRE AND THE CONNECTION • • 2w[D DM •ti • • • SHOULD BE MADE NO LESS THAN EVERY 6' ALONG THE PERIMETER. vS • • 4.w' T MMI �- w'1061MI THEY SHOULD THEN FILLED WITH CLEAN. HARD STONE FROM 4'-WIN 1 W' III MR • • • • • • • • 4 w' 1122MI 1 W 10 30R DIAMETER. THE LIDS ARE THEN CLOSED AND JOINED TO THE TOP • • • 20D(061M] • • • • • EDGES OF THE INDIVIDUAL GABIONS AND DIAPHRAGMS. THE USE OF 4w.I 22K • • • • • 0 • 2 W ID.SIR EXPEDIENT CLIPS OR HOG RINGS FOR THIS PURPOSE IS NOT • • 1,00(03OAI PERMITTED. • • • • • • • • • • • • • • IF PROPERLY CONSTRUCTED, THE LIDS AND PANELS SHOULD MEET 34 STAPLES PER SQ. YD. 36 STAPLES PER SQ. 1T]. • • • • • • CLOSELY WITHOUT GAPS AND THAT THE TIES PROVIDE A TIGHT JOINT AT ALL PANELS AND DIAPHRAGMS p.t STAPLES PER 50. M) (43 STAPLES PER SO. M) NTS 34 STAPLES PER B0. YD. 36 STAPLES PER SU. YD. (41 STAPLES PER SO. M) (43 STAPLES PER SQ M) NTS NTS 5 STAPLE PATTERN FOR 4' ROLLS 6 STAPLE PATTERN FOR 8' ROLLS 7 GABION BAFFLE INFILTRATION BASIN 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. NOTE: THIS CROSS SECTION IS TO BE USED FOR THE 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH ENTIRE LENGTH OF THE BASIN. WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) SEE PLAN FOR WIDTH PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE EXISTING - AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES GROUND >. k GRASS,., T IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM' STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. ,_ " x, 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING ON BLANKET TYPE. aii SEE PLAN FOR ' 1 L-X DEPTH 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 1 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE 3 BLANKET WIDTH. '• *' 3 NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO I I )':, -: 4" MIN. CLEAN SAND WRAPPED PROPERLY SECURE THE BLANKETS. ,(�ttv IN GEOTEXTILE FILTER FABRICCOMPAC - SEE PLAN CONSTRUCTION SPECIFICATIONS: SUBGRATED SUBGRADE 1. REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA. 2. EXCAVATE THE BASIN AND SHAPE IT TO NEAT LINES AND DIMENSIONS SHOWN ON THE PLANS PLUS 02 FT OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW FOR BULKING DURING SEEDBED PREPARATIONS AND SOD MAINTENANCE: BUILDUP. 3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL 1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. SO THAT SURFACE WATER MAY ENTER THE BASIN FREELY. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. 4. ESTABLISH GRASS IN THE BASIN IMMEDIATELY. 3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE MAINTENANCE & CONSTRUCTION: REINSTALLED. 1. INSPECT THE BASIN FOR EROSION ONCE A WEEK AND AFTER EVERY RAINFALL 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED AREAS. NTS4. 3. MAINTAIN PROPER CROSS SECTION UNTIL THE DITCH IS STABLE. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES NITS V 8 INFILTRATION BASIN CROSS SECTION Approved Stormwater Permit Documents 4 EROSION CONTROL BLANKET INSTALLATION Construction in accordance with these documents is required by the stormwater permit. North Carolina rules require that the stormwater system designer Inspect during Construction; Certify conformity with the plans and specs; and certify Compliance with the stormwater rules.(tSA NCAC 2H . 1008(j)) Permit# 5WGl4 0 0 Date 10- 10' l by ?79ls✓.AU Sheet # (, / Revision Date 9• «• �4 A09 Chicago Drive - 'June 112 FayetteviLle. North Carolina 2,8 , 306 Phone (go) 426-6777 FxR (910) 426-5777 v LJcense Number C-2554 �5oL_UTIONs5 iNc �cHCIMxcTDNc � OIXLVL.YING /IL GT'S � CGIi>TI2IKTMN LAYOUT REVISIONS PROJECT NAME BLACKBRIDGE VILLAGE SUBDIVISION ZERO LOT LINE DETAILS CLIENT 639 Executive Place, Suite 400 Fayetteville, North Carolina 28305 Phone: (910) 481-0503 Fax: (910)964-9089 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 843 DRAWING SCALE NOT TO SCALE DATE RELEASED SEPTEMBER16,2014 SHEET NUMBER C-6ol